1 National Railway System Project Status 08/07/08 Prepared by Raisa Spector Presented by TBD Project team #3: Roberto Masciovecchio Raisa Spector Suzanne Smith Omar Mahmoud Mark Sanbower David Saavedra

Upload: georgiana-glenn

Post on 17-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 National Railway System Project Status 08/07/08 Prepared by Raisa Spector Presented by TBD Project team #3: Roberto Masciovecchio Raisa Spector Suzanne

1

National Railway System Project Status 08/07/08

Prepared by Raisa SpectorPresented by TBD

Project team #3:Roberto MasciovecchioRaisa SpectorSuzanne SmithOmar MahmoudMark SanbowerDavid Saavedra

Page 2: 1 National Railway System Project Status 08/07/08 Prepared by Raisa Spector Presented by TBD Project team #3: Roberto Masciovecchio Raisa Spector Suzanne

2

National Railway System Project Status

• Accomplishment:– Revisited Scope Statement and Work Breakdown Sturcture– Finished WBS Dictionary

• Planned Activities:– Risk Register – Prioritized list of quantified risks – Activity List and Cost Estimate & Cost– Budgeting

Page 3: 1 National Railway System Project Status 08/07/08 Prepared by Raisa Spector Presented by TBD Project team #3: Roberto Masciovecchio Raisa Spector Suzanne

3

National Railway System Project Status

No Descriptions Due Date Assigned1 Team members are not familiar with the

railroad bed (embracement) construction engineering, specification, and terminology needed for creating

WBS, WBS dictionary.

08/07/2008 Roberto – as having access to Venezuela site.

Suzanne – as a Technical Writer

2 Same difficulties with reaching

Venezuela contracting company

telephone and Internet

connections in Venezuela do

not provide desirable 24 hours

service.

During whole project Roberto

Issues:

Page 4: 1 National Railway System Project Status 08/07/08 Prepared by Raisa Spector Presented by TBD Project team #3: Roberto Masciovecchio Raisa Spector Suzanne

4

National Railway System Project Status

• RiskNo Description Due Date. Assigned1 Difficulties with gathering

information may complicate project development.

Team

• Constraints:No Description Due Date Assigned1

2

3

Team members are available only part time – everyone has full time job.

Project has to be completed and posted on the Web Site by 8/29/08

Not every member of the team has MS Project and MS PowerPoint. Work should be distributed in a logical way to those who have the software and those who don't. This will enable everyone to contribute in an equal and meaningful way

Team

Team

Raisa Spector (PM)