Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
Insured: Comercial building sample 1Property: North Miami Beach
Miami, FL 33162
Estimator: Miami Estimates Business: (844) 205-0870E-mail: [email protected]
Claim Number: - Policy Number: - Type of Loss: Backup of Sewer or Drain
Date of Loss: 4/12/2016 12:00 AM Date Received:Date Inspected: Date Entered: 4/1/2016 12:00 AM
Price List: FLMI8X_MAY16Restoration/Service/Remodel
Estimate: COMMERCIAL_BUILDING1
The following estimate has been prepared based on representations made by the insured. The work outlined in the followingpages will be performed in accordance with all the standards set forth by the South Florida Building Code. Any additional creditsor work required by the client will be processed in the form of a change order.
UNFAIR CLAIM SETTLEMENT PRACTICES: Florida Statute 626.954 (1) "Unfair Insurance Trade Practices Act"Specifically addresses the matter of unfair claim settlement practices 1. Not attempting in good faith to settle claims when, underall the circumstances, it could and should of done so, had it acted fairly and honestly toward its insured and with due regard forher or his interests.
Pursuant to s.817.234, Florida Statues, any person who, with the intent to injure, defraud, or deceive any insurer or insured,prepares, presents, or causes to be presented a proof of loss or estimate of cost or repair of damaged property in support of aclaim under an insurance policy knowing that the proof of loss or estimate of claim or repairs contains any false, incomplete, ormisleading information concerning any fact or thing material the claim commits a felony of the third degree, punishable asprovided in s. 775.082, s.775.803, or s.775.084, Florida Statues.
2
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 2
COMMERCIAL_BUILDING1
12th Floor
12th Floor Corridor
Entry (1) Entry (1)
Women's bathroom (12th)Men's Bathroom (12th)
15' 8
"
7' 10"
8' 6"
15' 4
"
15' 1
0"
2' 4"2' 10"
2' 6" Men's Bathroom (12th) Height: 7' 10"
346.61 SF Walls466.72 SF Walls & Ceiling13.35 SY Flooring46.33 LF Ceil. Perimeter
120.11 SF Ceiling120.11 SF Floor44.00 LF Floor Perimeter
12th Floor Corridor
Entry (1) Entry (1)
Women's bathroom (12th) Men's Bathroom (12th)
2' 4
"
9" 5"5"
5' 8"
5' 2"
3' 1
"
3' 3
"
2' 4" 2"2' 8"
2' 10"
Subroom: Entry (1) Height: 8'
99.33 SF Walls115.26 SF Walls & Ceiling
1.77 SY Flooring16.50 LF Ceil. Perimeter
15.93 SF Ceiling15.93 SF Floor11.83 LF Floor Perimeter
Door 2' 4" X 7' Opens into DEF_12TH_FLO
Door 2' 4" X 7' Opens into MENS_BATHRO
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
1. Heat/AC register - Mechanically 2.00 EA 0.00 14.80 0.00 7.84 37.44attached - Detach & reset
2. Clean ductwork - Interior (PER 2.00 EA 0.00 45.60 0.01 24.17 115.38REGISTER)
AC duct to be cleaned after demolition & construction work is performed
3. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
4. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
5. R&R Suspended ceiling system - 136.04 SF 0.46 4.13 18.19 170.31 812.93High grade - 2' x2'
Suspended system will sustain damages when mitigating wall ceramic tiles
6. Sprinkler head/escutcheon - Detach 2.00 EA 0.00 16.41 0.00 8.70 41.52and reset
7. Mask wall - plastic, paper, tape (per 62.83 LF 0.00 1.20 1.01 20.25 96.66LF)
8. Remove Ceramic/porcelain tile 891.89 SF 2.01 0.00 0.00 475.07 2,267.77
9. Ceramic/porcelain tile 1,025.67 SF 0.00 10.53 305.14 2,942.94 14,048.39
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
3
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 3
CONTINUED - Men's Bathroom (12th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
10. R&R 1/4" Cement board 445.94 SF 0.93 3.31 40.27 511.74 2,442.79
11. R&R Furring strip - 2" x 2" 445.94 SF 0.54 1.19 7.49 206.43 985.40
12. R&R Batt insulation - 6" - R19 - 445.94 SF 0.33 1.18 17.17 182.99 873.53unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
13. R&R Mirror - 1/4" plate glass 23.92 SF 0.33 15.66 13.16 104.85 500.49
14. R&R Countertop - Granite or 13.67 SF 6.03 124.60 66.98 490.96 2,343.65Marble - Commercial grade
15. Add on for undermount sink cutout 3.00 EA 0.00 121.86 0.00 96.88 462.46& polish - single basin
16. Add on Granite or Marble - edge 6.83 LF 0.00 21.33 0.00 38.61 184.29treatment
17. R&R Countertop subdeck - 13.67 SF 0.76 3.21 0.96 14.64 69.87plywood
18. Sink - single - Detach & reset 3.00 EA 0.00 150.61 0.00 119.73 571.56
19. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
20. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
21. R&R Plumbing fixture supply line 6.00 EA 5.59 20.96 2.45 42.87 204.62
22. R&R Handicap grab bar - Stainless 1.00 EA 16.76 70.46 2.31 23.74 113.27steel, 1 1/2" x 24"
23. R&R Handicap grab bar - Stainless 1.00 EA 16.76 87.98 3.29 28.64 136.67steel, 1 1/2" x 36"
24. Toilet - Detach & reset 2.00 EA 0.00 245.55 0.68 130.32 622.10
25. R&R Toilet partition - High grade 2.00 EA 152.98 1,156.91 105.00 722.07 3,446.85(i.e., phenolic, etc.)
26. R&R Urinal partition (plastic 1.00 EA 41.93 239.95 9.80 77.30 368.98laminate or baked enamel steel)
27. R&R Urinal - wall hung 1.00 EA 83.84 792.95 29.06 240.06 1,145.91
28. Apply anti-microbial agent 445.94 SF 0.00 0.34 0.94 40.42 192.98
29. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
30. Paint door slab only - 2 coats (per 2.00 EA 0.00 35.31 0.89 18.95 90.46side)
31. Paint door/window trim & jamb - 2 2.00 EA 0.00 29.43 0.53 15.74 75.13coats (per side)
32. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
33. Paint casing - two coats 34.00 LF 0.00 1.34 0.26 12.15 57.97
34. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
4
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 4
CONTINUED - Men's Bathroom (12th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
35. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
36. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
37. Soap dispenser - Detach & reset 1.00 EA 0.00 17.81 0.00 4.72 22.53
38. Toilet paper dispenser - Detach & 2.00 EA 0.00 37.48 0.00 19.87 94.83reset
39. Floor protection - self-adhesive 136.04 SF 0.55 0.00 1.24 20.15 96.21plastic film
40. Remove Additional labor to 272.08 SF 1.98 0.00 0.00 142.76 681.48remove tile from concrete
41. Remove Tile floor covering - High 272.08 SF 2.79 0.00 0.00 201.16 960.26grade
42. Tile floor covering - High grade 312.89 SF 0.00 10.53 120.90 905.14 4,320.77
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added.
Totals: Men's Bathroom (12th) 790.32 8,560.11 40,862.03
12th Floor Corridor
Entry (1) Entry (1)
Women's bathroom (12th)Men's Bathroom (12th)
15' 1
0"
7' 10"
8' 6"
15' 4
"
15' 8
"
2' 6"
2' 6"
2' 4" Women's bathroom (12th) Height: 7' 10"
346.61 SF Walls466.72 SF Walls & Ceiling13.35 SY Flooring46.33 LF Ceil. Perimeter
120.11 SF Ceiling120.11 SF Floor44.00 LF Floor Perimeter
12th Floor Corridor
Entry (1) Entry (1)
Women's bathroom (12th) Men's Bathroom (12th)
3' 3
"
3' 1
"
5' 8"
5' 2"
2' 4
"5"
9"5"
2' 4" 2' 8"
2' 10"
2"
Subroom: Entry (1) Height: 7' 10"
96.58 SF Walls112.51 SF Walls & Ceiling
1.77 SY Flooring16.50 LF Ceil. Perimeter
15.93 SF Ceiling15.93 SF Floor11.83 LF Floor Perimeter
Door 2' 4" X 7' Opens into DEF_12TH_FLO
Door 2' 4" X 7' Opens into WOMENS_BATH
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
43. Heat/AC register - Mechanically 1.00 EA 0.00 14.80 0.00 3.92 18.72attached - Detach & reset
44. Clean ductwork - Interior (PER 1.00 EA 0.00 45.60 0.00 12.08 57.68REGISTER)
5
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 5
CONTINUED - Women's bathroom (12th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
AC duct to be cleaned after demolition & construction work is performed
45. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
46. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
47. R&R Suspended ceiling system - 136.04 SF 0.46 4.13 18.19 170.31 812.93High grade - 2' x2'
Suspended system will sustain damages when mitigating wall ceramic tiles
48. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
49. Light fixture - Detach & reset 1.00 EA 0.00 48.53 0.00 12.86 61.39
50. Mask wall - plastic, paper, tape 62.83 LF 0.00 1.20 1.01 20.25 96.66(per LF)
51. Remove Ceramic/porcelain tile 886.39 SF 2.01 0.00 0.00 472.13 2,253.77
52. Ceramic/porcelain tile 1,025.67 SF 0.00 10.53 305.14 2,942.94 14,048.39
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
53. R&R Ceramic tile - bullnose 16.00 LF 2.35 6.51 2.76 38.31 182.83
54. R&R 1/4" Cement board 443.19 SF 0.93 3.31 40.02 508.58 2,427.73
55. R&R Furring strip - 2" x 2" 443.19 SF 0.54 1.19 7.45 205.16 979.33
56. R&R Batt insulation - 6" - R19 - 443.19 SF 0.33 1.18 17.06 181.88 868.15unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
57. R&R Mirror - 1/4" plate glass 23.92 SF 0.33 15.66 13.16 104.85 500.49
58. R&R Countertop - Granite or 13.67 SF 6.03 124.60 66.98 490.96 2,343.65Marble - Commercial grade
59. Add on for undermount sink cutout 3.00 EA 0.00 121.86 0.00 96.88 462.46& polish - single basin
60. Add on Granite or Marble - edge 6.83 LF 0.00 21.33 0.00 38.61 184.29treatment
61. R&R Countertop subdeck - 13.67 SF 0.76 3.21 0.96 14.64 69.87plywood
62. Sink - single - Detach & reset 3.00 EA 0.00 150.61 0.00 119.73 571.56
63. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
64. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
65. R&R Plumbing fixture supply line 6.00 EA 5.59 20.96 2.45 42.87 204.62
66. Toilet - Detach & reset 3.00 EA 0.00 245.55 1.01 195.49 933.15
6
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 6
CONTINUED - Women's bathroom (12th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
67. R&R Handicap grab bar - Stainless 1.00 EA 16.76 70.46 2.31 23.74 113.27steel, 1 1/2" x 24"
68. R&R Handicap grab bar - Stainless 1.00 EA 16.76 87.98 3.29 28.64 136.67steel, 1 1/2" x 36"
69. R&R Toilet partition - High grade 3.00 EA 152.98 1,156.91 157.50 1,083.09 5,170.26(i.e., phenolic, etc.)
70. Apply anti-microbial agent 443.19 SF 0.00 0.34 0.93 40.17 191.78
71. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
72. Paint door slab only - 2 coats (per 2.00 EA 0.00 35.31 0.89 18.95 90.46side)
73. Paint door/window trim & jamb - 2 2.00 EA 0.00 29.43 0.53 15.74 75.13coats (per side)
74. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
75. Paint casing - two coats 34.00 LF 0.00 1.34 0.26 12.15 57.97
76. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
77. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
78. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
79. Soap dispenser - Detach & reset 1.00 EA 0.00 17.81 0.00 4.72 22.53
80. Toilet paper dispenser - Detach & 3.00 EA 0.00 37.48 0.00 29.79 142.23reset
81. Floor protection - self-adhesive 136.04 SF 0.55 0.00 1.24 20.15 96.21plastic film
82. Remove Additional labor to 272.08 SF 1.98 0.00 0.00 142.76 681.48remove tile from concrete
83. Remove Tile floor covering - High 272.08 SF 2.79 0.00 0.00 201.16 960.26grade
84. Tile floor covering - High grade 312.89 SF 0.00 10.53 120.90 905.14 4,320.77
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added. Matchingmaterials to men's bathroom.
Totals: Women's bathroom (12th) 806.63 8,705.29 41,555.09
Total: 12th Floor 1,596.95 17,265.40 82,417.12
11th Floor
7
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 7
Entry (1)
Men's Bathroom (11th)
Entry (1)
Women's bathroom (11th)
11th Floor Corridor
15' 8
"
7' 10"
8' 6"
15' 4
"
15' 1
0"
2' 4"2' 10"
2' 6" Men's Bathroom (11th) Height: 7' 10"
346.61 SF Walls466.72 SF Walls & Ceiling13.35 SY Flooring46.33 LF Ceil. Perimeter
120.11 SF Ceiling120.11 SF Floor44.00 LF Floor Perimeter
Entry (1)
Men's Bathroom (11th)
Entry (1)
Women's bathroom (11th)
11th Floor Corridor
2' 4
"
9" 5"5"
5' 8"
5' 2"
3' 1
"
3' 3
"
2' 4" 2"2' 8"
2' 10"
Subroom: Entry (1) Height: 8'
99.33 SF Walls115.26 SF Walls & Ceiling
1.77 SY Flooring16.50 LF Ceil. Perimeter
15.93 SF Ceiling15.93 SF Floor11.83 LF Floor Perimeter
Door 2' 4" X 7' Opens into DEF_11TH_FLO
Door 2' 4" X 7' Opens into MENS_BATHRO
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
85. Heat/AC register - Mechanically 2.00 EA 0.00 14.80 0.00 7.84 37.44attached - Detach & reset
86. Clean ductwork - Interior (PER 2.00 EA 0.00 45.60 0.01 24.17 115.38REGISTER)
AC duct to be cleaned after demolition & construction work is performed
87. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
88. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
89. R&R Suspended ceiling system - 136.04 SF 0.46 4.13 18.19 170.31 812.93High grade - 2' x2'
Suspended system will sustain damages when mitigating wall ceramic tiles
90. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
91. Mask wall - plastic, paper, tape 62.83 LF 0.00 1.20 1.01 20.25 96.66(per LF)
92. Remove Ceramic/porcelain tile 891.89 SF 2.01 0.00 0.00 475.07 2,267.77
93. Ceramic/porcelain tile 1,025.67 SF 0.00 10.53 305.14 2,942.94 14,048.39
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
94. R&R 1/4" Cement board 445.94 SF 0.93 3.31 40.27 511.74 2,442.79
95. R&R Furring strip - 2" x 2" 445.94 SF 0.54 1.19 7.49 206.43 985.40
8
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 8
CONTINUED - Men's Bathroom (11th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
96. R&R Batt insulation - 6" - R19 - 445.94 SF 0.33 1.18 17.17 182.99 873.53unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
97. R&R Mirror - 1/4" plate glass 23.92 SF 0.33 15.66 13.16 104.85 500.49
98. R&R Countertop - Granite or 13.67 SF 6.03 124.60 66.98 490.96 2,343.65Marble - Commercial grade
99. Add on for undermount sink cutout 3.00 EA 0.00 121.86 0.00 96.88 462.46& polish - single basin
100. Add on Granite or Marble - edge 6.83 LF 0.00 21.33 0.00 38.61 184.29treatment
101. R&R Countertop subdeck - 13.67 SF 0.76 3.21 0.96 14.64 69.87plywood
102. Sink - single - Detach & reset 3.00 EA 0.00 150.61 0.00 119.73 571.56
103. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
104. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
105. R&R Plumbing fixture supply 6.00 EA 5.59 20.96 2.45 42.87 204.62line
106. R&R Handicap grab bar - 1.00 EA 16.76 70.46 2.31 23.74 113.27Stainless steel, 1 1/2" x 24"
107. R&R Handicap grab bar - 1.00 EA 16.76 87.98 3.29 28.64 136.67Stainless steel, 1 1/2" x 36"
108. Toilet - Detach & reset 2.00 EA 0.00 245.55 0.68 130.32 622.10
109. R&R Toilet partition - High grade 2.00 EA 152.98 1,156.91 105.00 722.07 3,446.85(i.e., phenolic, etc.)
110. R&R Urinal partition (plastic 1.00 EA 41.93 239.95 9.80 77.30 368.98laminate or baked enamel steel)
111. R&R Urinal - wall hung 1.00 EA 83.84 792.95 29.06 240.06 1,145.91
112. Apply anti-microbial agent 445.94 SF 0.00 0.34 0.94 40.42 192.98
113. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
114. Paint door slab only - 2 coats (per 2.00 EA 0.00 35.31 0.89 18.95 90.46side)
115. Paint door/window trim & jamb - 2.00 EA 0.00 29.43 0.53 15.74 75.132 coats (per side)
116. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
117. Paint casing - two coats 34.00 LF 0.00 1.34 0.26 12.15 57.97
118. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
119. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
120. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
9
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 9
CONTINUED - Men's Bathroom (11th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
121. Soap dispenser - Detach & reset 1.00 EA 0.00 17.81 0.00 4.72 22.53
122. Toilet paper dispenser - Detach & 2.00 EA 0.00 37.48 0.00 19.87 94.83reset
123. Floor protection - self-adhesive 136.04 SF 0.55 0.00 1.24 20.15 96.21plastic film
124. Remove Additional labor to 272.08 SF 1.98 0.00 0.00 142.76 681.48remove tile from concrete
125. Remove Tile floor covering - 272.08 SF 2.79 0.00 0.00 201.16 960.26High grade
126. Tile floor covering - High grade 312.89 SF 0.00 10.53 120.90 905.14 4,320.77
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added.
Totals: Men's Bathroom (11th) 790.32 8,560.11 40,862.03
Entry (1)
Men's Bathroom (11th)
Entry (1)
Women's bathroom (11th)
11th Floor Corridor
15' 1
0"
7' 10"
8' 6"
15' 4
"
15' 8
"
2' 6"
2' 6"
2' 4" Women's bathroom (11th) Height: 7' 10"
346.61 SF Walls466.72 SF Walls & Ceiling13.35 SY Flooring46.33 LF Ceil. Perimeter
120.11 SF Ceiling120.11 SF Floor44.00 LF Floor Perimeter
Entry (1)
Men's Bathroom (11th)
Entry (1)
Women's bathroom (11th)
11th Floor Corridor
3' 3
"
3' 1
"
5' 8"
5' 2"
2' 4
"5"
9"5"
2' 4" 2' 8"
2' 10"
2"
Subroom: Entry (1) Height: 7' 10"
96.58 SF Walls112.51 SF Walls & Ceiling
1.77 SY Flooring16.50 LF Ceil. Perimeter
15.93 SF Ceiling15.93 SF Floor11.83 LF Floor Perimeter
Door 2' 4" X 7' Opens into DEF_11TH_FLO
Door 2' 4" X 7' Opens into WOMENS_BATH
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
127. Heat/AC register - Mechanically 1.00 EA 0.00 14.80 0.00 3.92 18.72attached - Detach & reset
128. Clean ductwork - Interior (PER 1.00 EA 0.00 45.60 0.00 12.08 57.68REGISTER)
AC duct to be cleaned after demolition & construction work is performed
129. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
10
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 10
CONTINUED - Women's bathroom (11th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
130. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
131. R&R Suspended ceiling system - 136.04 SF 0.46 4.13 18.19 170.31 812.93High grade - 2' x2'
Suspended system will sustain damages when mitigating wall ceramic tiles
132. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
133. Light fixture - Detach & reset 1.00 EA 0.00 48.53 0.00 12.86 61.39
134. Mask wall - plastic, paper, tape 62.83 LF 0.00 1.20 1.01 20.25 96.66(per LF)
135. Remove Ceramic/porcelain tile 886.39 SF 2.01 0.00 0.00 472.13 2,253.77
136. Ceramic/porcelain tile 1,025.67 SF 0.00 10.53 305.14 2,942.94 14,048.39
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
137. R&R Ceramic tile - bullnose 16.00 LF 2.35 6.51 2.76 38.31 182.83
138. R&R 1/4" Cement board 443.19 SF 0.93 3.31 40.02 508.58 2,427.73
139. R&R Furring strip - 2" x 2" 443.19 SF 0.54 1.19 7.45 205.16 979.33
140. R&R Batt insulation - 6" - R19 - 443.19 SF 0.33 1.18 17.06 181.88 868.15unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
141. R&R Mirror - 1/4" plate glass 23.92 SF 0.33 15.66 13.16 104.85 500.49
142. R&R Countertop - Granite or 13.67 SF 6.03 124.60 66.98 490.96 2,343.65Marble - Commercial grade
143. Add on for undermount sink 3.00 EA 0.00 121.86 0.00 96.88 462.46cutout & polish - single basin
144. Add on Granite or Marble - edge 6.83 LF 0.00 21.33 0.00 38.61 184.29treatment
145. R&R Countertop subdeck - 13.67 SF 0.76 3.21 0.96 14.64 69.87plywood
146. Sink - single - Detach & reset 3.00 EA 0.00 150.61 0.00 119.73 571.56
147. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
148. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
149. R&R Plumbing fixture supply 6.00 EA 5.59 20.96 2.45 42.87 204.62line
150. Toilet - Detach & reset 3.00 EA 0.00 245.55 1.01 195.49 933.15
151. R&R Handicap grab bar - 1.00 EA 16.76 70.46 2.31 23.74 113.27Stainless steel, 1 1/2" x 24"
152. R&R Handicap grab bar - 1.00 EA 16.76 87.98 3.29 28.64 136.67Stainless steel, 1 1/2" x 36"
11
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 11
CONTINUED - Women's bathroom (11th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
153. R&R Toilet partition - High grade 3.00 EA 152.98 1,156.91 157.50 1,083.09 5,170.26(i.e., phenolic, etc.)
154. Apply anti-microbial agent 443.19 SF 0.00 0.34 0.93 40.17 191.78
155. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
156. Paint door slab only - 2 coats (per 2.00 EA 0.00 35.31 0.89 18.95 90.46side)
157. Paint door/window trim & jamb - 2.00 EA 0.00 29.43 0.53 15.74 75.132 coats (per side)
158. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
159. Paint casing - two coats 34.00 LF 0.00 1.34 0.26 12.15 57.97
160. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
161. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
162. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
163. Soap dispenser - Detach & reset 1.00 EA 0.00 17.81 0.00 4.72 22.53
164. Toilet paper dispenser - Detach & 3.00 EA 0.00 37.48 0.00 29.79 142.23reset
165. Floor protection - self-adhesive 136.04 SF 0.55 0.00 1.24 20.15 96.21plastic film
166. Remove Additional labor to 272.08 SF 1.98 0.00 0.00 142.76 681.48remove tile from concrete
167. Remove Tile floor covering - 272.08 SF 2.79 0.00 0.00 201.16 960.26High grade
168. Tile floor covering - High grade 312.89 SF 0.00 10.53 120.90 905.14 4,320.77
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added. Matchingmaterials to men's bathroom.
Totals: Women's bathroom (11th) 806.63 8,705.29 41,555.09
Total: 11th Floor 1,596.95 17,265.40 82,417.12
10th Floor
Entry (1)
Men's Bathroom (10th)
Entry (1)
Women's bathroom (10th)
10th Floor Corridor
15' 8
"
7' 10"
8' 6"
15' 4
"
15' 1
0"
2' 4"2' 10"
2' 6" Men's Bathroom (10th) Height: 7' 10"
346.61 SF Walls466.72 SF Walls & Ceiling13.35 SY Flooring46.33 LF Ceil. Perimeter
120.11 SF Ceiling120.11 SF Floor44.00 LF Floor Perimeter
12
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 12
CONTINUED - Men's Bathroom (10th)
Entry (1)
Men's Bathroom (10th)
Entry (1)
Women's bathroom (10th)
10th Floor Corridor
2' 4
"
9" 5"5"
5' 8"
5' 2"
3' 1
"
3' 3
"
2' 4" 2"2' 8"
2' 10"
Subroom: Entry (1) Height: 8'
99.33 SF Walls115.26 SF Walls & Ceiling
1.77 SY Flooring16.50 LF Ceil. Perimeter
15.93 SF Ceiling15.93 SF Floor11.83 LF Floor Perimeter
Door 2' 4" X 7' Opens into DEF_10TH_FLO
Door 2' 4" X 7' Opens into MENS_BATHRO
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
169. Heat/AC register - Mechanically 2.00 EA 0.00 14.80 0.00 7.84 37.44attached - Detach & reset
170. Clean ductwork - Interior (PER 2.00 EA 0.00 45.60 0.01 24.17 115.38REGISTER)
AC duct to be cleaned after demolition & construction work is performed
171. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
172. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
173. R&R Suspended ceiling system - 136.04 SF 0.46 4.13 18.19 170.31 812.93High grade - 2' x2'
Suspended system will sustain damages when mitigating wall ceramic tiles
174. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
175. Mask wall - plastic, paper, tape 62.83 LF 0.00 1.20 1.01 20.25 96.66(per LF)
176. Remove Ceramic/porcelain tile 891.89 SF 2.01 0.00 0.00 475.07 2,267.77
177. Ceramic/porcelain tile 1,025.67 SF 0.00 10.53 305.14 2,942.94 14,048.39
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
178. R&R 1/4" Cement board 445.94 SF 0.93 3.31 40.27 511.74 2,442.79
179. R&R Furring strip - 2" x 2" 445.94 SF 0.54 1.19 7.49 206.43 985.40
180. R&R Batt insulation - 6" - R19 - 445.94 SF 0.33 1.18 17.17 182.99 873.53unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
181. R&R Mirror - 1/4" plate glass 23.92 SF 0.33 15.66 13.16 104.85 500.49
182. R&R Countertop - Granite or 13.67 SF 6.03 124.60 66.98 490.96 2,343.65Marble - Commercial grade
183. Add on for undermount sink 3.00 EA 0.00 121.86 0.00 96.88 462.46cutout & polish - single basin
13
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 13
CONTINUED - Men's Bathroom (10th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
184. Add on Granite or Marble - edge 6.83 LF 0.00 21.33 0.00 38.61 184.29treatment
185. R&R Countertop subdeck - 13.67 SF 0.76 3.21 0.96 14.64 69.87plywood
186. Sink - single - Detach & reset 3.00 EA 0.00 150.61 0.00 119.73 571.56
187. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
188. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
189. R&R Plumbing fixture supply 6.00 EA 5.59 20.96 2.45 42.87 204.62line
190. R&R Handicap grab bar - 1.00 EA 16.76 70.46 2.31 23.74 113.27Stainless steel, 1 1/2" x 24"
191. R&R Handicap grab bar - 1.00 EA 16.76 87.98 3.29 28.64 136.67Stainless steel, 1 1/2" x 36"
192. Toilet - Detach & reset 2.00 EA 0.00 245.55 0.68 130.32 622.10
193. R&R Toilet partition - High grade 2.00 EA 152.98 1,156.91 105.00 722.07 3,446.85(i.e., phenolic, etc.)
194. R&R Urinal partition (plastic 1.00 EA 41.93 239.95 9.80 77.30 368.98laminate or baked enamel steel)
195. R&R Urinal - wall hung 1.00 EA 83.84 792.95 29.06 240.06 1,145.91
196. Apply anti-microbial agent 445.94 SF 0.00 0.34 0.94 40.42 192.98
197. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
198. Paint door slab only - 2 coats (per 2.00 EA 0.00 35.31 0.89 18.95 90.46side)
199. Paint door/window trim & jamb - 2.00 EA 0.00 29.43 0.53 15.74 75.132 coats (per side)
200. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
201. Paint casing - two coats 34.00 LF 0.00 1.34 0.26 12.15 57.97
202. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
203. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
204. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
205. Soap dispenser - Detach & reset 1.00 EA 0.00 17.81 0.00 4.72 22.53
206. Toilet paper dispenser - Detach & 2.00 EA 0.00 37.48 0.00 19.87 94.83reset
207. Floor protection - self-adhesive 136.04 SF 0.55 0.00 1.24 20.15 96.21plastic film
208. Remove Additional labor to 272.08 SF 1.98 0.00 0.00 142.76 681.48remove tile from concrete
209. Remove Tile floor covering - 272.08 SF 2.79 0.00 0.00 201.16 960.26High grade
14
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 14
CONTINUED - Men's Bathroom (10th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
210. Tile floor covering - High grade 312.89 SF 0.00 10.53 120.90 905.14 4,320.77
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added.
Totals: Men's Bathroom (10th) 790.32 8,560.11 40,862.03
Entry (1)
Men's Bathroom (10th)
Entry (1)
Women's bathroom (10th)
10th Floor Corridor
15' 1
0"
7' 10"
8' 6"
15' 4
"
15' 8
"
2' 6"
2' 6"
2' 4" Women's bathroom (10th) Height: 7' 10"
346.61 SF Walls466.72 SF Walls & Ceiling13.35 SY Flooring46.33 LF Ceil. Perimeter
120.11 SF Ceiling120.11 SF Floor44.00 LF Floor Perimeter
Entry (1)
Men's Bathroom (10th)
Entry (1)
Women's bathroom (10th)
10th Floor Corridor
3' 3
"
3' 1
"
5' 8"
5' 2"
2' 4
"5"
8"5"
2' 4" 2' 8"
2' 10"
2"
Subroom: Entry (1) Height: 7' 10"
96.58 SF Walls112.51 SF Walls & Ceiling
1.77 SY Flooring16.50 LF Ceil. Perimeter
15.93 SF Ceiling15.93 SF Floor11.83 LF Floor Perimeter
Door 2' 4" X 7' Opens into DEF_10TH_FLO
Door 2' 4" X 7' Opens into WOMENS_BATH
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
211. Heat/AC register - Mechanically 1.00 EA 0.00 14.80 0.00 3.92 18.72attached - Detach & reset
212. Clean ductwork - Interior (PER 1.00 EA 0.00 45.60 0.00 12.08 57.68REGISTER)
AC duct to be cleaned after demolition & construction work is performed
213. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
214. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
215. R&R Suspended ceiling system - 136.04 SF 0.46 4.13 18.19 170.31 812.93High grade - 2' x2'
Suspended system will sustain damages when mitigating wall ceramic tiles
216. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
217. Light fixture - Detach & reset 1.00 EA 0.00 48.53 0.00 12.86 61.39
15
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 15
CONTINUED - Women's bathroom (10th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
218. Mask wall - plastic, paper, tape 62.83 LF 0.00 1.20 1.01 20.25 96.66(per LF)
219. Remove Ceramic/porcelain tile 886.39 SF 2.01 0.00 0.00 472.13 2,253.77
220. Ceramic/porcelain tile 1,025.67 SF 0.00 10.53 305.14 2,942.94 14,048.39
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
221. R&R Ceramic tile - bullnose 16.00 LF 2.35 6.51 2.76 38.31 182.83
222. R&R 1/4" Cement board 443.19 SF 0.93 3.31 40.02 508.58 2,427.73
223. R&R Furring strip - 2" x 2" 443.19 SF 0.54 1.19 7.45 205.16 979.33
224. R&R Batt insulation - 6" - R19 - 443.19 SF 0.33 1.18 17.06 181.88 868.15unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
225. R&R Mirror - 1/4" plate glass 23.92 SF 0.33 15.66 13.16 104.85 500.49
226. R&R Countertop - Granite or 13.67 SF 6.03 124.60 66.98 490.96 2,343.65Marble - Commercial grade
227. Add on for undermount sink 3.00 EA 0.00 121.86 0.00 96.88 462.46cutout & polish - single basin
228. Add on Granite or Marble - edge 6.83 LF 0.00 21.33 0.00 38.61 184.29treatment
229. R&R Countertop subdeck - 13.67 SF 0.76 3.21 0.96 14.64 69.87plywood
230. Sink - single - Detach & reset 3.00 EA 0.00 150.61 0.00 119.73 571.56
231. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
232. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
233. R&R Plumbing fixture supply 6.00 EA 5.59 20.96 2.45 42.87 204.62line
234. Toilet - Detach & reset 3.00 EA 0.00 245.55 1.01 195.49 933.15
235. R&R Handicap grab bar - 1.00 EA 16.76 70.46 2.31 23.74 113.27Stainless steel, 1 1/2" x 24"
236. R&R Handicap grab bar - 1.00 EA 16.76 87.98 3.29 28.64 136.67Stainless steel, 1 1/2" x 36"
237. R&R Toilet partition - High grade 3.00 EA 152.98 1,156.91 157.50 1,083.09 5,170.26(i.e., phenolic, etc.)
238. Apply anti-microbial agent 443.19 SF 0.00 0.34 0.93 40.17 191.78
239. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
240. Paint door slab only - 2 coats (per 2.00 EA 0.00 35.31 0.89 18.95 90.46side)
16
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 16
CONTINUED - Women's bathroom (10th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
241. Paint door/window trim & jamb - 2.00 EA 0.00 29.43 0.53 15.74 75.132 coats (per side)
242. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
243. Paint casing - two coats 34.00 LF 0.00 1.34 0.26 12.15 57.97
244. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
245. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
246. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
247. Soap dispenser - Detach & reset 1.00 EA 0.00 17.81 0.00 4.72 22.53
248. Toilet paper dispenser - Detach & 3.00 EA 0.00 37.48 0.00 29.79 142.23reset
249. Floor protection - self-adhesive 136.04 SF 0.55 0.00 1.24 20.15 96.21plastic film
250. Remove Additional labor to 272.08 SF 1.98 0.00 0.00 142.76 681.48remove tile from concrete
251. Remove Tile floor covering - 272.08 SF 2.79 0.00 0.00 201.16 960.26High grade
252. Tile floor covering - High grade 312.89 SF 0.00 10.53 120.90 905.14 4,320.77
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added. Matchingmaterials to men's bathroom.
Totals: Women's bathroom (10th) 806.63 8,705.29 41,555.09
Total: 10th Floor 1,596.95 17,265.40 82,417.12
9th Floor
17
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 17
Men's bathroom (9th)
9th Floor Corridor
Women's bathroom (9th)
Elevator Offset (9th) (1)1' 3
"1'
3"
5' 9"5' 9"3' 2"3"7"2"6"5' 1"4' 5"3' 2"2"6"2"6"
10"
10"
3' 18' 8"18' 4"6' 4"6' 3'1' 4"1'23' 8"23' 4"5' 11"2"6"10"1' 2" 27' 8"27' 5' 11"6"10"6"10"
3' 3' 3'2' 6"2' 4"22' 1"21' 9"3'2' 6"2' 2"4"2"2' 7"1' 8"6' 10"2' 7"
3' 5
"3'
5"
3'2"2' 6"2' 2"
3' 4
"11
"11
"
20' 4"20' 2"
3' 3'5' 11"4"8"8"1'33' 2"32' 6"5' 11"6"10"6"10"2' 6"2"6" 63' 4"63'3'18' 9"19' 1" 44' 3"43' 11"
9th Floor Corridor Height: 7' 8"
1,997.78 SF Walls2,796.66 SF Walls & Ceiling
88.76 SY Flooring311.07 LF Ceil. Perimeter
798.88 SF Ceiling798.88 SF Floor253.91 LF Floor Perimeter
Door 3' 4" X 6' 8" Opens into Exterior
Door 3' 2" X 6' 8" Opens into Exterior
Door 3' 2" X 6' 8" Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 5' 11" X 6' 8" Opens into Exterior
Door 5' 11" X 6' 8" Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into WOMENS_BATH
Door 3' X 7' Opens into MENS_BATHRO
Door 5' 11" X 6' 8" Opens into Exterior
Door 5' 11" X 6' 8" Opens into Exterior
Door 2' 6" X 6' 8" Opens into Exterior
Door 3' X 7' Opens into Exterior
Men's bathroom (9th)
9th Floor Corridor
Women's bathroom (9th)
Elevator Offset (9th) (1)
3' 4
"11
"1'
5"
3' 5"
3' 5"3' 11"
2' 10"
3' 2" 6"
1' 1'2'
10"
1' 1
0"
2' 2
"
1' 1
1"
2' 3
"
3' 4" 8' 5"
8' 9"
Subroom: Elevator Offset (9th) (1) Height: 8'
230.74 SF Walls315.47 SF Walls & Ceiling
9.41 SY Flooring39.17 LF Ceil. Perimeter
84.73 SF Ceiling84.73 SF Floor28.58 LF Floor Perimeter
Door 3' 4" X 6' 8" Opens into DEF_9TH_FLOO
Door 3' 11" X 6' 8" Opens into Exterior
Window 2' 10" X 4' 3" Opens into Exterior
Door 3' 4" X 6' 8" Opens into Exterior
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
253. Heat/AC register - Mechanically 8.00 EA 0.00 14.80 0.00 31.38 149.78attached - Detach & reset
254. Clean ductwork - Interior (PER 8.00 EA 0.00 45.60 0.04 96.68 461.52REGISTER)
AC duct to be cleaned after demolition & construction work is performed
18
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 18
CONTINUED - 9th Floor Corridor
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
255. R&R Suspended ceiling system - 883.61 SF 0.44 4.59 145.97 1,216.50 5,807.03Commercial grade - 2' x 4'
Suspended ceiling system sustained category three water intrusion from above damaged drain lines
256. Remove Surveillance camera - 2.00 EA 55.89 0.00 0.00 29.62 141.40color
257. Install Surveillance camera - 2.00 EA 0.00 174.89 0.00 92.69 442.47color
258. Commercial smoke detector - 1.00 EA 0.00 45.59 0.00 12.08 57.67Detach & reset
259. Sprinkler head/escutcheon - 7.00 EA 0.00 16.41 0.00 30.44 145.31Detach and reset
260. Fluorescent light fixture - 2' & 4' - 12.00 EA 0.00 70.95 0.00 225.62 1,077.02Detach & reset
261. Mask or cover per square foot 2,228.52 SF 0.46 0.00 9.36 274.14 1,308.62
262. Two coat plaster over 1/2" 1,129.96 SF 0.00 8.74 118.65 2,648.56 12,643.06gypsum
263. R&R Batt insulation - 6" - R19 - 1,129.96 SF 0.33 1.18 43.50 463.69 2,213.43unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability and drywall paper to pucker & ripple. Water restorationcompany performed cut outs and removed part of walls to complete dry out process. Replacing 4' of wall section damaged and contaminated bycategory 3 water for a complete mitigation of damages.
264. Thin coat plaster (no lath) 2,228.52 SF 0.00 4.50 62.40 2,674.05 12,764.79
Walls need to be re-finished due to damages caused when replacing part of walls, flooring & base cove
265. Scrape the walls & prep for paint 2,228.52 SF 0.00 0.60 1.56 354.75 1,693.42
266. Seal the walls w/anti-microbial 2,228.52 SF 0.00 1.40 109.20 855.72 4,084.85coating - one coat
267. Paint the walls - two coats 2,228.52 SF 0.00 0.91 29.64 545.26 2,602.85
268. Remove Fire alarm - Remote 4.00 EA 20.96 0.00 0.00 22.21 106.05LED indicator
269. Install Fire alarm - Remote LED 4.00 EA 0.00 122.41 0.00 129.75 619.39indicator
270. Remove 10 lb. ABC fire 1.00 EA 3.74 0.00 0.00 0.99 4.73extinguisher
271. Install 10 lb. ABC fire 1.00 EA 0.00 7.80 0.00 2.07 9.87extinguisher
272. Remove Fire alarm - Manual pull 2.00 EA 20.96 0.00 0.00 11.11 53.03station
273. Install Fire alarm - Manual pull 2.00 EA 0.00 81.61 0.00 43.25 206.47station
274. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
275. Interior door - Detach & reset 8.00 EA 0.00 83.74 0.45 177.66 848.03
19
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 19
CONTINUED - 9th Floor Corridor
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
276. Interior double door - Detach & 4.00 EA 0.00 121.70 0.25 129.07 616.12reset
277. Paint door slab only - 2 coats (per 17.00 EA 0.00 35.31 7.54 161.07 768.88side)
278. Paint door/window trim & jamb - 17.00 EA 0.00 29.43 4.53 133.78 638.622 coats (per side)
279. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
280. Paint casing - two coats 250.00 LF 0.00 1.34 1.93 89.29 426.22
281. Remove Door signs 17.00 EA 4.19 0.00 0.00 18.87 90.10
282. Install Door signs 17.00 EA 0.00 9.35 0.00 42.13 201.08
283. Remove Drinking fountain with 1.00 EA 90.63 0.00 0.00 24.01 114.64cooler
284. Install Drinking fountain with 1.00 EA 0.00 364.83 0.00 96.68 461.51cooler
285. Water extraction - Cat 3 water - 883.61 SF 0.00 1.76 0.00 412.12 1,967.27Heavy
286. Floor protection - cloth - skid 883.61 SF 1.21 0.00 32.16 291.86 1,393.19resistant, breathable
287. Remove Tear out vinyl & 883.61 SF 1.55 0.00 0.00 362.94 1,732.54underlayment
288. Floor preparation for resilient 883.61 SF 0.00 0.80 11.75 190.45 909.09flooring - Heavy
289. Embossing leveler for vinyl 883.61 SF 0.00 1.00 20.41 239.57 1,143.59flooring
290. Remove Vinyl floor covering 883.61 SF 1.03 0.00 0.00 241.18 1,151.30(sheet goods) - Commercial grade
291. Vinyl floor covering (sheet goods) 1,016.15 SF 0.00 5.93 273.14 1,669.21 7,968.12- Commercial grade
15 % waste added for Vinyl floor covering (sheet goods) - Commercial grade.
292. R&R Vinyl cove - 4" wrap 282.49 LF 2.19 7.74 32.83 752.07 3,590.02
Totals: 9th Floor Corridor 946.63 15,074.48 71,959.00
20
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 20
Men's bathroom (9th)
9th Floor Corridor
Women's bathroom (9th)
Elevator Offset (9th) (1)
19'
18' 8
"
8' 7"7' 11"
15' 7
"
15' 3
"
2' 7"
3' 5
"
3' 5
"
3' 2"2' 6" Men's bathroom (9th) Height: 7' 10"
395.47 SF Walls534.42 SF Walls & Ceiling15.44 SY Flooring53.17 LF Ceil. Perimeter
138.95 SF Ceiling138.95 SF Floor50.17 LF Floor Perimeter
Door 3' X 7' Opens into DEF_9TH_FLOO
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
293. Heat/AC register - Mechanically 2.00 EA 0.00 14.80 0.00 7.84 37.44attached - Detach & reset
294. Clean ductwork - Interior (PER 2.00 EA 0.00 45.60 0.01 24.17 115.38REGISTER)
AC duct to be cleaned after demolition & construction work is performed
295. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
296. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
297. R&R Suspended ceiling system - 138.95 SF 0.46 4.13 18.58 173.95 830.31High grade - 2' x2'
Suspended ceiling system sustained category three water intrusion from above damaged drain lines
298. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
299. Mask wall - plastic, paper, tape 53.17 LF 0.00 1.20 0.86 17.14 81.80(per LF)
300. Remove Ceramic/porcelain tile 790.94 SF 2.01 0.00 0.00 421.30 2,011.09
301. Ceramic/porcelain tile 909.58 SF 0.00 10.53 270.60 2,609.85 12,458.33
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
302. R&R 1/4" Cement board 395.47 SF 0.93 3.31 35.71 453.82 2,166.33
303. R&R Furring strip - 2" x 2" 395.47 SF 0.54 1.19 6.64 183.07 873.87
304. R&R Batt insulation - 6" - R19 - 395.47 SF 0.33 1.18 15.23 162.28 774.67unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
305. R&R Mirror - 1/4" plate glass 11.25 SF 0.33 15.66 6.19 49.31 235.39
306. R&R Sink - wall mounted - High 3.00 EA 41.93 501.05 46.13 443.90 2,118.97grade
307. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
308. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
21
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 21
CONTINUED - Men's bathroom (9th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
309. R&R Plumbing fixture supply 6.00 EA 5.59 20.96 2.45 42.87 204.62line
310. Toilet - Detach & reset 1.00 EA 0.00 245.55 0.34 65.17 311.06
311. R&R Urinal - wall hung 1.00 EA 83.84 792.95 29.06 240.06 1,145.91
312. R&R Toilet partition - High grade 2.00 EA 152.98 1,156.91 105.00 722.07 3,446.85(i.e., phenolic, etc.)
313. R&R Handicap grab bar - 1.00 EA 16.76 70.46 2.31 23.74 113.27Stainless steel, 1 1/2" x 24"
314. R&R Handicap grab bar - 1.00 EA 16.76 87.98 3.29 28.64 136.67Stainless steel, 1 1/2" x 36"
315. Apply anti-microbial agent 395.47 SF 0.00 0.34 0.83 35.86 171.15
316. Paint door slab only - 2 coats (per 1.00 EA 0.00 35.31 0.44 9.47 45.22side)
317. Paint door/window trim & jamb - 1.00 EA 0.00 29.43 0.27 7.88 37.582 coats (per side)
318. Paint casing - two coats 17.00 LF 0.00 1.34 0.13 6.07 28.98
319. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
320. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
321. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
322. Soap dispenser - Detach & reset 3.00 EA 0.00 17.81 0.00 14.16 67.59
323. Toilet paper dispenser - Detach & 1.00 EA 0.00 37.48 0.00 9.93 47.41reset
324. Floor protection - self-adhesive 138.95 SF 0.55 0.00 1.26 20.59 98.27plastic film
325. Remove Additional labor to 277.90 SF 1.98 0.00 0.00 145.81 696.05remove tile from concrete
326. Remove Tile floor covering - 277.90 SF 2.79 0.00 0.00 205.46 980.80High grade
327. Tile floor covering - High grade 319.59 SF 0.00 10.53 123.49 924.53 4,413.30
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added. Matchingmaterials to men's bathroom.
Totals: Men's bathroom (9th) 670.09 7,273.62 34,720.79
22
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 22
Men's bathroom (9th)
9th Floor Corridor
Women's bathroom (9th)
Elevator Offset (9th) (1)
18' 8
"
19'
7' 11"8' 7"
15' 3
"
15' 7
"
2' 7"
3' 5
"
3' 5
"
3' 2' 6"4"2"
Women's bathroom (9th) Height: 7' 10"
395.47 SF Walls534.42 SF Walls & Ceiling15.44 SY Flooring53.17 LF Ceil. Perimeter
138.95 SF Ceiling138.95 SF Floor50.17 LF Floor Perimeter
Door 3' X 7' Opens into DEF_9TH_FLOO
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
328. Heat/AC register - Mechanically 2.00 EA 0.00 14.80 0.00 7.84 37.44attached - Detach & reset
329. Clean ductwork - Interior (PER 2.00 EA 0.00 45.60 0.01 24.17 115.38REGISTER)
AC duct to be cleaned after demolition & construction work is performed
330. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
331. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
332. R&R Suspended ceiling system - 138.95 SF 0.46 4.13 18.58 173.95 830.31High grade - 2' x2'
Suspended ceiling system sustained category three water intrusion from above damaged drain lines
333. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
334. Mask wall - plastic, paper, tape 53.17 LF 0.00 1.20 0.86 17.14 81.80(per LF)
335. Remove Ceramic/porcelain tile 790.94 SF 2.01 0.00 0.00 421.30 2,011.09
336. Ceramic/porcelain tile 909.58 SF 0.00 10.53 270.60 2,609.85 12,458.33
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
337. R&R 1/4" Cement board 395.47 SF 0.93 3.31 35.71 453.82 2,166.33
338. R&R Furring strip - 2" x 2" 395.47 SF 0.54 1.19 6.64 183.07 873.87
339. R&R Batt insulation - 6" - R19 - 395.47 SF 0.33 1.18 15.23 162.28 774.67unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
340. R&R Mirror - 1/4" plate glass 11.25 SF 0.33 15.66 6.19 49.31 235.39
341. R&R Sink - wall mounted - High 3.00 EA 41.93 501.05 46.13 443.90 2,118.97grade
342. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
343. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
23
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 23
CONTINUED - Women's bathroom (9th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
344. R&R Plumbing fixture supply 6.00 EA 5.59 20.96 2.45 42.87 204.62line
345. Toilet - Detach & reset 2.00 EA 0.00 245.55 0.68 130.32 622.10
346. R&R Toilet partition - High grade 3.00 EA 152.98 1,156.91 157.50 1,083.09 5,170.26(i.e., phenolic, etc.)
347. R&R Handicap grab bar - 1.00 EA 16.76 70.46 2.31 23.74 113.27Stainless steel, 1 1/2" x 24"
348. R&R Handicap grab bar - 1.00 EA 16.76 87.98 3.29 28.64 136.67Stainless steel, 1 1/2" x 36"
349. Apply anti-microbial agent 395.47 SF 0.00 0.34 0.83 35.86 171.15
350. Paint door slab only - 2 coats (per 1.00 EA 0.00 35.31 0.44 9.47 45.22side)
351. Paint door/window trim & jamb - 1.00 EA 0.00 29.43 0.27 7.88 37.582 coats (per side)
352. Paint casing - two coats 17.00 LF 0.00 1.34 0.13 6.07 28.98
353. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
354. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
355. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
356. Soap dispenser - Detach & reset 3.00 EA 0.00 17.81 0.00 14.16 67.59
357. Toilet paper dispenser - Detach & 2.00 EA 0.00 37.48 0.00 19.87 94.83reset
358. Floor protection - self-adhesive 138.95 SF 0.55 0.00 1.26 20.59 98.27plastic film
359. Remove Additional labor to 277.90 SF 1.98 0.00 0.00 145.81 696.05remove tile from concrete
360. Remove Tile floor covering - 277.90 SF 2.79 0.00 0.00 205.46 980.80High grade
361. Tile floor covering - High grade 318.65 SF 0.00 10.53 123.13 921.81 4,400.32
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added. Matchingmaterials to men's bathroom.
Totals: Women's bathroom (9th) 693.51 7,466.95 35,643.77
Total: 9th Floor 2,310.23 29,815.05 142,323.56
8th Floor
24
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 24
Men's bathroom (8th)Women's bathroom (8th)
8th Floor Corridor
Elevator Offset (8th) (1)3' 4
"11
"11
"
31' 8"31' 6"
9' 1
0"9'
2"
3'5' 4"5' 2"11' 8"11' 4"3' 9' 1"
8' 11"7' 11"7' 7" 2'2' 2"
3'2"6"1' 9"
2' 1"3'1' 6"
1' 10"5"10"2'2'
2"3'80' 2"
80' 6" 7' 4"7' 2"3'76' 7"76' 11"
10' 10"10' 9"3'
61' 6"61' 10"
26'25' 10"3'
57' 11"58' 3"
29' 6"
29' 5"3'39' 11"40' 3"
47' 6"
47' 5"3'
36' 4"36' 8"
51' 2"
51'3'
20' 10"
21' 2"
66' 7"
66' 6"3'
16' 11"
17' 3"
70' 6"
70' 5"3'3' 2"3' 6"
84' 3"
84' 2"
3' 4
"4"8"
4"8"
3' 11' 7"11' 3"51' 8"52'3' 57' 8"
57' 4"5' 7"5' 11" 3' 21' 7"
21' 3"41' 8"42'
3' 25' 2"24' 10"
38' 1"
38' 5"3'
41' 9"
41' 5"
21' 6"
21' 10"3'
45' 9"
45' 5"
17' 6"17' 10"
25' 5
"24
' 9"
3'16' 7"16' 11" 21' 5"21' 1"3'20' 3"
20' 7" 17' 9"17' 5"3'5"9"7"11
"
3' 41' 4"41' 8"8"1' 3' 15' 5"15' 9"
26' 7"26' 11"
25' 7"25' 11"
16' 5"16' 9"
3' 29' 4"29' 8"
12' 8"13'
14' 5
"14
' 5"
3'6"4"10' 5"10' 1"3'5' 5"
5' 3"5' 7"5' 3"3' 10' 5"
10' 3"6"2" 3'2' 6"2' 2"4"2"
2' 7"1' 2"6' 4"2' 7"
3' 5
"3'
5"
3'4"2' 3"1' 11"
8th Floor Corridor Height: 7' 8"
2,444.77 SF Walls3,289.03 SF Walls & Ceiling
93.81 SY Flooring409.46 LF Ceil. Perimeter
844.26 SF Ceiling844.26 SF Floor309.80 LF Floor Perimeter
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' 4" X 6' 8" Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into WOMENS_BATH
Door 3' X 6' 8" Opens into MENS_BATHRO
25
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 25
CONTINUED - 8th Floor Corridor
Men's bathroom (8th)Women's bathroom (8th)
8th Floor Corridor
Elevator Offset (8th) (1)
3' 4
"11
"1'
5"
3' 5"
3' 5"3' 11"
2' 10"
3' 2" 6"
1' 1'2'
10"
1' 1
0"
2' 2
"
1' 1
1"
2' 3
"
3' 4"
1' 9"
7' 3"
Subroom: Elevator Offset (8th) (1) Height: 8'
230.74 SF Walls315.47 SF Walls & Ceiling
9.41 SY Flooring39.17 LF Ceil. Perimeter
84.73 SF Ceiling84.73 SF Floor28.58 LF Floor Perimeter
Door 3' 4" X 6' 8" Opens into DEF_8TH_FLOO
Door 3' 11" X 6' 8" Opens into Exterior
Window 2' 10" X 4' 3" Opens into Exterior
Door 3' 4" X 6' 8" Opens into Exterior
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
362. Heat/AC register - Mechanically 9.00 EA 0.00 18.50 0.00 44.12 210.62attached - Detach & reset
363. Clean ductwork - Interior (PER 9.00 EA 0.00 57.00 0.04 135.96 649.00REGISTER)
AC duct to be cleaned after demolition & construction work is performed
364. R&R Suspended ceiling system - 928.99 SF 0.55 5.74 153.47 1,589.15 7,585.96Commercial grade - 2' x 4'
Suspended ceiling system sustained category three water intrusion from above damaged drain lines
365. Fluorescent light fixture - 2' & 4' - 15.00 EA 0.00 88.69 0.00 352.55 1,682.90Detach & reset
366. Sprinkler head/escutcheon - 1.00 EA 0.00 20.51 0.00 5.43 25.94Detach and reset
367. Mask or cover per square foot 2,675.51 SF 0.58 0.00 11.24 414.20 1,977.24
368. Two coat plaster over 1/2" 1,353.52 SF 0.00 10.93 142.12 3,958.07 18,894.16gypsum
369. R&R Batt insulation - 6" - R19 - 1,353.52 SF 0.41 1.48 52.11 691.71 3,301.97unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability and drywall paper to pucker & ripple. Water restorationcompany performed cut outs and removed part of walls to complete dry out process. Replacing 4' of wall section damaged and contaminated bycategory 3 water for a complete mitigation of damages.
370. Thin coat plaster (no lath) 2,675.51 SF 0.00 5.63 74.91 4,011.57 19,149.60
Walls need to be re-finished due to damages caused when replacing part of walls, flooring & base cove
371. Scrape the walls & prep for paint 2,675.51 SF 0.00 0.75 1.87 532.25 2,540.75
372. Seal the walls w/anti-microbial 2,675.51 SF 0.00 1.75 131.10 1,275.50 6,088.74coating - one coat
373. Paint the walls - two coats 2,675.51 SF 0.00 1.14 35.58 817.70 3,903.36
374. Remove Fire alarm - Remote 5.00 EA 26.20 0.00 0.00 34.72 165.72LED indicator
26
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 26
CONTINUED - 8th Floor Corridor
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
375. Install Fire alarm - Remote LED 5.00 EA 0.00 153.01 0.00 202.74 967.79indicator
376. Remove 10 lb. ABC fire 2.00 EA 4.68 0.00 0.00 2.49 11.85extinguisher
377. Install 10 lb. ABC fire 2.00 EA 0.00 9.75 0.00 5.17 24.67extinguisher
378. Remove Fire alarm - Manual pull 2.00 EA 26.20 0.00 0.00 13.89 66.29station
379. Install Fire alarm - Manual pull 2.00 EA 0.00 102.01 0.00 54.06 258.08station
380. Interior door unit - Commercial 2.00 EA 0.00 478.55 33.62 262.54 1,253.26grade
381. Interior door - Detach & reset 28.00 EA 0.00 104.68 1.59 777.14 3,709.77
382. Paint door slab only - 2 coats (per 30.00 EA 0.00 44.14 13.31 354.44 1,691.95side)
383. Paint door/window trim & jamb - 30.00 EA 0.00 36.79 8.00 294.60 1,406.302 coats (per side)
384. R&R Door opening (jamb & 2.00 EA 8.79 151.81 7.70 87.16 416.06casing) - 32"to36"wide - paint grade
385. Paint casing - two coats 510.00 LF 0.00 1.68 3.93 228.09 1,088.82
386. Exit sign - Detach & reset 5.00 EA 0.00 76.51 0.00 101.38 483.93
387. Remove Door signs 31.00 EA 5.24 0.00 0.00 43.04 205.48
388. Install Door signs 31.00 EA 0.00 11.69 0.00 96.03 458.42
389. Remove Drinking fountain with 1.00 EA 113.29 0.00 0.00 30.02 143.31cooler
390. Install Drinking fountain with 1.00 EA 0.00 456.04 0.00 120.85 576.89cooler
391. Water extraction - Cat 3 water - 928.99 SF 0.00 2.20 0.00 541.60 2,585.38Heavy
392. Floor protection - cloth - skid 928.99 SF 1.51 0.00 33.81 380.70 1,817.28resistant, breathable
393. Remove Tear out vinyl & 928.99 SF 1.94 0.00 0.00 477.59 2,279.83underlayment
394. Floor preparation for resilient 928.99 SF 0.00 1.00 12.36 249.46 1,190.81flooring - Heavy
395. Embossing leveler for vinyl 928.99 SF 0.00 1.25 21.46 313.41 1,496.11flooring
396. Remove Vinyl floor covering 928.99 SF 1.29 0.00 0.00 317.58 1,515.98(sheet goods) - Commercial grade
397. Vinyl floor covering (sheet goods) 1,068.34 SF 0.00 7.41 287.17 2,173.95 10,377.52- Commercial grade
15 % waste added for Vinyl floor covering (sheet goods) - Commercial grade.
398. R&R Vinyl cove - 4" wrap 338.38 LF 2.74 9.68 39.32 1,124.13 5,366.13
27
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 27
CONTINUED - 8th Floor Corridor
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
Totals: 8th Floor Corridor 1,064.71 22,114.99 105,567.87
Men's bathroom (8th)Women's bathroom (8th)
8th Floor Corridor
Elevator Offset (8th) (1)
19'
18' 8
"
8' 7"7' 11"
15' 7
"
15' 3
"
2' 7"
3' 5
"
3' 5
"
3' 4"2' 3" Men's bathroom (8th) Height: 7' 10"
395.73 SF Walls533.97 SF Walls & Ceiling15.36 SY Flooring53.07 LF Ceil. Perimeter
138.24 SF Ceiling138.24 SF Floor50.07 LF Floor Perimeter
Door 3' X 6' 8" Opens into DEF_8TH_FLOO
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
399. Heat/AC register - Mechanically 2.00 EA 0.00 18.50 0.00 9.81 46.81attached - Detach & reset
400. Clean ductwork - Interior (PER 2.00 EA 0.00 57.00 0.01 30.21 144.22REGISTER)
AC duct to be cleaned after demolition & construction work is performed
401. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 88.69 0.00 47.01 224.39Detach & reset
402. Cold air return cover - Detach & 1.00 EA 0.00 25.26 0.00 6.70 31.96reset
403. R&R Suspended ceiling system - 138.24 SF 0.58 5.16 18.48 215.18 1,027.16High grade - 2' x2'
Suspended ceiling system sustained category three water intrusion from above damaged drain lines
404. Sprinkler head/escutcheon - 2.00 EA 0.00 20.51 0.00 10.87 51.89Detach and reset
405. Mask wall - plastic, paper, tape 53.07 LF 0.00 1.50 0.85 21.33 101.79(per LF)
406. Remove Ceramic/porcelain tile 791.46 SF 2.51 0.00 0.00 526.44 2,513.00
407. Ceramic/porcelain tile 909.58 SF 0.00 13.16 270.60 3,243.78 15,484.45
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
408. R&R 1/4" Cement board 395.73 SF 1.16 4.14 35.73 565.27 2,698.37
409. R&R Furring strip - 2" x 2" 395.73 SF 0.68 1.49 6.65 229.33 1,094.72
410. R&R Batt insulation - 6" - R19 - 395.73 SF 0.41 1.48 15.24 202.24 965.41unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
411. R&R Mirror - 1/4" plate glass 11.25 SF 0.41 19.58 6.19 61.24 292.32
28
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 28
CONTINUED - Men's bathroom (8th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
412. R&R Sink - wall mounted - High 3.00 EA 52.41 626.31 46.13 551.79 2,634.08grade
413. R&R P-trap assembly - ABS 3.00 EA 10.49 77.83 1.27 70.56 336.79(plastic)
414. Sink faucet - Detach & reset 3.00 EA 0.00 151.55 0.00 120.49 575.14
415. R&R Plumbing fixture supply 6.00 EA 6.99 26.20 2.45 53.43 255.02line
416. Toilet - Detach & reset 1.00 EA 0.00 306.94 0.34 81.42 388.70
417. R&R Urinal - wall hung 1.00 EA 104.80 991.19 29.06 298.15 1,423.20
418. R&R Toilet partition - High grade 2.00 EA 191.23 1,446.14 105.00 895.65 4,275.39(i.e., phenolic, etc.)
419. R&R Handicap grab bar - 1.00 EA 20.95 88.08 2.31 29.51 140.85Stainless steel, 1 1/2" x 24"
420. R&R Handicap grab bar - 1.00 EA 20.95 109.98 3.29 35.58 169.80Stainless steel, 1 1/2" x 36"
421. Apply anti-microbial agent 395.73 SF 0.00 0.43 0.83 45.32 216.31
422. Paint door slab only - 2 coats (per 1.00 EA 0.00 44.14 0.44 11.80 56.38side)
423. Paint door/window trim & jamb - 1.00 EA 0.00 36.79 0.27 9.83 46.892 coats (per side)
424. Paint casing - two coats 17.00 LF 0.00 1.68 0.13 7.60 36.29
425. Outlet or switch - Detach & reset 2.00 EA 0.00 21.76 0.00 11.53 55.05
426. Remove Paper towel dispenser 1.00 EA 20.95 0.00 0.00 5.56 26.51
427. Install Paper towel dispenser 1.00 EA 0.00 30.44 0.00 8.06 38.50
428. Soap dispenser - Detach & reset 3.00 EA 0.00 22.26 0.00 17.70 84.48
429. Toilet paper dispenser - Detach & 1.00 EA 0.00 46.85 0.00 12.42 59.27reset
430. Floor protection - self-adhesive 138.24 SF 0.69 0.00 1.26 25.62 122.27plastic film
431. Remove Additional labor to 276.48 SF 2.48 0.00 0.00 181.71 867.38remove tile from concrete
432. Remove Tile floor covering - 276.48 SF 3.49 0.00 0.00 255.70 1,220.62High grade
433. Tile floor covering - High grade 319.59 SF 0.00 13.16 123.49 1,147.27 5,476.56
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added. Matchingmaterials to men's bathroom.
Totals: Men's bathroom (8th) 670.02 9,046.11 43,181.97
29
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 29
Men's bathroom (8th)Women's bathroom (8th)
8th Floor Corridor
Elevator Offset (8th) (1)
18' 8
"
19'
7' 11"8' 7"
15' 3
"
15' 7
"
2' 7"
3' 5
"
3' 5
"
3' 2' 6"4"2"
Women's bathroom (8th) Height: 7' 10"
395.47 SF Walls534.42 SF Walls & Ceiling15.44 SY Flooring53.17 LF Ceil. Perimeter
138.95 SF Ceiling138.95 SF Floor50.17 LF Floor Perimeter
Door 3' X 7' Opens into DEF_8TH_FLOO
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
434. Heat/AC register - Mechanically 2.00 EA 0.00 18.50 0.00 9.81 46.81attached - Detach & reset
435. Clean ductwork - Interior (PER 2.00 EA 0.00 57.00 0.01 30.21 144.22REGISTER)
AC duct to be cleaned after demolition & construction work is performed
436. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 88.69 0.00 47.01 224.39Detach & reset
437. Cold air return cover - Detach & 1.00 EA 0.00 25.26 0.00 6.70 31.96reset
438. R&R Suspended ceiling system - 138.95 SF 0.58 5.16 18.58 216.29 1,032.44High grade - 2' x2'
Suspended ceiling system sustained category three water intrusion from above damaged drain lines
439. Sprinkler head/escutcheon - 2.00 EA 0.00 20.51 0.00 10.87 51.89Detach and reset
440. Mask wall - plastic, paper, tape 53.17 LF 0.00 1.50 0.86 21.37 101.99(per LF)
441. Remove Ceramic/porcelain tile 790.94 SF 2.51 0.00 0.00 526.10 2,511.36
442. Ceramic/porcelain tile 909.58 SF 0.00 13.16 270.60 3,243.78 15,484.45
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
443. R&R 1/4" Cement board 395.47 SF 1.16 4.14 35.71 564.91 2,696.62
444. R&R Furring strip - 2" x 2" 395.47 SF 0.68 1.49 6.64 229.18 1,093.99
445. R&R Batt insulation - 6" - R19 - 395.47 SF 0.41 1.48 15.23 202.09 964.76unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
446. R&R Mirror - 1/4" plate glass 11.25 SF 0.41 19.58 6.19 61.24 292.32
447. R&R Sink - wall mounted - High 3.00 EA 52.41 626.31 46.13 551.79 2,634.08grade
448. R&R P-trap assembly - ABS 3.00 EA 10.49 77.83 1.27 70.56 336.79(plastic)
449. Sink faucet - Detach & reset 3.00 EA 0.00 151.55 0.00 120.49 575.14
30
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 30
CONTINUED - Women's bathroom (8th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
450. R&R Plumbing fixture supply 6.00 EA 6.99 26.20 2.45 53.43 255.02line
451. Toilet - Detach & reset 2.00 EA 0.00 306.94 0.68 162.86 777.42
452. R&R Toilet partition - High grade 3.00 EA 191.23 1,446.14 157.50 1,343.45 6,413.06(i.e., phenolic, etc.)
453. R&R Handicap grab bar - 1.00 EA 20.95 88.08 2.31 29.51 140.85Stainless steel, 1 1/2" x 24"
454. R&R Handicap grab bar - 1.00 EA 20.95 109.98 3.29 35.58 169.80Stainless steel, 1 1/2" x 36"
455. Apply anti-microbial agent 395.47 SF 0.00 0.43 0.83 45.29 216.17
456. Paint door slab only - 2 coats (per 1.00 EA 0.00 44.14 0.44 11.80 56.38side)
457. Paint door/window trim & jamb - 1.00 EA 0.00 36.79 0.27 9.83 46.892 coats (per side)
458. Paint casing - two coats 17.00 LF 0.00 1.68 0.13 7.60 36.29
459. Outlet or switch - Detach & reset 2.00 EA 0.00 21.76 0.00 11.53 55.05
460. Remove Paper towel dispenser 1.00 EA 20.95 0.00 0.00 5.56 26.51
461. Install Paper towel dispenser 1.00 EA 0.00 30.44 0.00 8.06 38.50
462. Soap dispenser - Detach & reset 3.00 EA 0.00 22.26 0.00 17.70 84.48
463. Toilet paper dispenser - Detach & 2.00 EA 0.00 46.85 0.00 24.83 118.53reset
464. Floor protection - self-adhesive 138.95 SF 0.69 0.00 1.26 25.75 122.89plastic film
465. Remove Additional labor to 277.90 SF 2.48 0.00 0.00 182.64 871.83remove tile from concrete
466. Remove Tile floor covering - 277.90 SF 3.49 0.00 0.00 257.02 1,226.89High grade
467. Tile floor covering - High grade 318.65 SF 0.00 13.16 123.13 1,143.89 5,460.45
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added. Matchingmaterials to men's bathroom.
Totals: Women's bathroom (8th) 693.51 9,288.73 44,340.22
Total: 8th Floor 2,428.24 40,449.83 193,090.06
7th Floor
31
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 31
7th Floor Corridor
Entry (1)
Women's bathroom (7th)
Entry1 (1)
Men's Bathroom (7th)
15' 8
"
7' 10"
8' 6"
15' 4
"
15' 1
0"
2' 4"2' 10"
2' 6" Men's Bathroom (7th) Height: 7' 10"
346.61 SF Walls466.72 SF Walls & Ceiling13.35 SY Flooring46.33 LF Ceil. Perimeter
120.11 SF Ceiling120.11 SF Floor44.00 LF Floor Perimeter
7th Floor Corridor
Entry (1)
Women's bathroom (7th)
Entry1 (1)
Men's Bathroom (7th)
2' 4
"
9" 5"5"
5' 8"
5' 2"
3' 1
"
3' 3
"
2' 4" 2"2' 8"
2' 10"
Subroom: Entry1 (1) Height: 8'
99.33 SF Walls115.26 SF Walls & Ceiling
1.77 SY Flooring16.50 LF Ceil. Perimeter
15.93 SF Ceiling15.93 SF Floor11.83 LF Floor Perimeter
Door 2' 4" X 7' Opens into DEF_7TH_FLOO
Door 2' 4" X 7' Opens into MENS_BATHRO
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
468. Heat/AC register - Mechanically 2.00 EA 0.00 14.80 0.00 7.84 37.44attached - Detach & reset
469. Clean ductwork - Interior (PER 2.00 EA 0.00 45.60 0.01 24.17 115.38REGISTER)
AC duct to be cleaned after demolition & construction work is performed
470. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
471. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
472. R&R Suspended ceiling system - 136.04 SF 0.46 4.13 18.19 170.31 812.93High grade - 2' x2'
Suspended system will sustain damages when mitigating wall ceramic tiles
473. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
474. Mask wall - plastic, paper, tape 62.83 LF 0.00 1.20 1.01 20.25 96.66(per LF)
475. Remove Ceramic/porcelain tile 891.89 SF 2.01 0.00 0.00 475.07 2,267.77
476. Ceramic/porcelain tile 1,025.67 SF 0.00 10.53 305.14 2,942.94 14,048.39
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
477. R&R 1/4" Cement board 445.94 SF 0.93 3.31 40.27 511.74 2,442.79
478. R&R Furring strip - 2" x 2" 445.94 SF 0.54 1.19 7.49 206.43 985.40
32
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 32
CONTINUED - Men's Bathroom (7th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
479. R&R Batt insulation - 6" - R19 - 445.94 SF 0.33 1.18 17.17 182.99 873.53unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
480. R&R Mirror - 1/4" plate glass 23.92 SF 0.33 15.66 13.16 104.85 500.49
481. R&R Countertop - Granite or 13.67 SF 6.03 124.60 66.98 490.96 2,343.65Marble - Commercial grade
482. Add on for undermount sink 3.00 EA 0.00 121.86 0.00 96.88 462.46cutout & polish - single basin
483. Add on Granite or Marble - edge 6.83 LF 0.00 21.33 0.00 38.61 184.29treatment
484. R&R Countertop subdeck - 13.67 SF 0.76 3.21 0.96 14.64 69.87plywood
485. Sink - single - Detach & reset 3.00 EA 0.00 150.61 0.00 119.73 571.56
486. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
487. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
488. R&R Plumbing fixture supply 6.00 EA 5.59 20.96 2.45 42.87 204.62line
489. R&R Handicap grab bar - 1.00 EA 16.76 70.46 2.31 23.74 113.27Stainless steel, 1 1/2" x 24"
490. R&R Handicap grab bar - 1.00 EA 16.76 87.98 3.29 28.64 136.67Stainless steel, 1 1/2" x 36"
491. Toilet - Detach & reset 2.00 EA 0.00 245.55 0.68 130.32 622.10
492. R&R Toilet partition - High grade 2.00 EA 152.98 1,156.91 105.00 722.07 3,446.85(i.e., phenolic, etc.)
493. R&R Urinal partition (plastic 1.00 EA 41.93 239.95 9.80 77.30 368.98laminate or baked enamel steel)
494. R&R Urinal - wall hung 1.00 EA 83.84 792.95 29.06 240.06 1,145.91
495. Apply anti-microbial agent 445.94 SF 0.00 0.34 0.94 40.42 192.98
496. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
497. Paint door slab only - 2 coats (per 2.00 EA 0.00 35.31 0.89 18.95 90.46side)
498. Paint door/window trim & jamb - 2.00 EA 0.00 29.43 0.53 15.74 75.132 coats (per side)
499. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
500. Paint casing - two coats 34.00 LF 0.00 1.34 0.26 12.15 57.97
501. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
502. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
503. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
33
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 33
CONTINUED - Men's Bathroom (7th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
504. Soap dispenser - Detach & reset 1.00 EA 0.00 17.81 0.00 4.72 22.53
505. Toilet paper dispenser - Detach & 2.00 EA 0.00 37.48 0.00 19.87 94.83reset
506. Floor protection - self-adhesive 136.04 SF 0.55 0.00 1.24 20.15 96.21plastic film
507. Remove Additional labor to 272.08 SF 1.98 0.00 0.00 142.76 681.48remove tile from concrete
508. Remove Tile floor covering - 272.08 SF 2.79 0.00 0.00 201.16 960.26High grade
509. Tile floor covering - High grade 312.89 SF 0.00 10.53 120.90 905.14 4,320.77
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added.
Totals: Men's Bathroom (7th) 790.32 8,560.11 40,862.03
7th Floor Corridor
Entry (1)
Women's bathroom (7th)
Entry1 (1)
Men's Bathroom (7th)
15' 1
0"
7' 10"
8' 6"
15' 4
"
15' 8
"
2' 6"
2' 6"
2' 4" Women's bathroom (7th) Height: 7' 10"
346.61 SF Walls466.72 SF Walls & Ceiling13.35 SY Flooring46.33 LF Ceil. Perimeter
120.11 SF Ceiling120.11 SF Floor44.00 LF Floor Perimeter
7th Floor Corridor
Entry (1)
Women's bathroom (7th)
Entry1 (1)
Men's Bathroom (7th)
3' 3
"
3' 1
"
5' 8"
5' 2"
2' 4
"4"
9"5"
2' 4" 2' 8"
2' 10"
2"
Subroom: Entry (1) Height: 7' 10"
96.58 SF Walls112.51 SF Walls & Ceiling
1.77 SY Flooring16.50 LF Ceil. Perimeter
15.93 SF Ceiling15.93 SF Floor11.83 LF Floor Perimeter
Door 2' 4" X 7' Opens into DEF_7TH_FLOO
Door 2' 4" X 7' Opens into WOMENS_BATH
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
510. Heat/AC register - Mechanically 1.00 EA 0.00 14.80 0.00 3.92 18.72attached - Detach & reset
511. Clean ductwork - Interior (PER 1.00 EA 0.00 45.60 0.00 12.08 57.68REGISTER)
AC duct to be cleaned after demolition & construction work is performed
512. Fluorescent light fixture - 2' & 4' - 2.00 EA 0.00 70.95 0.00 37.60 179.50Detach & reset
34
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 34
CONTINUED - Women's bathroom (7th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
513. Cold air return cover - Detach & 1.00 EA 0.00 20.21 0.00 5.35 25.56reset
514. R&R Suspended ceiling system - 136.04 SF 0.46 4.13 18.19 170.31 812.93High grade - 2' x2'
Suspended system will sustain damages when mitigating wall ceramic tiles
515. Sprinkler head/escutcheon - 2.00 EA 0.00 16.41 0.00 8.70 41.52Detach and reset
516. Light fixture - Detach & reset 1.00 EA 0.00 48.53 0.00 12.86 61.39
517. Mask wall - plastic, paper, tape 62.83 LF 0.00 1.20 1.01 20.25 96.66(per LF)
518. Remove Ceramic/porcelain tile 886.38 SF 2.01 0.00 0.00 472.13 2,253.75
519. Ceramic/porcelain tile 1,025.67 SF 0.00 10.53 305.14 2,942.94 14,048.39
Category 3 water seeped into walls through grout. Walls have matching tiles to floor being removed and replaced. Restoration company removedpart of wall tile peirmeter to complete dry out process. Wall has two layers of ceramic tiles. Both layers to be replaced as per policy "replacementcost" clause.
520. R&R Ceramic tile - bullnose 16.00 LF 2.35 6.51 2.76 38.31 182.83
521. R&R 1/4" Cement board 443.19 SF 0.93 3.31 40.02 508.58 2,427.73
522. R&R Furring strip - 2" x 2" 443.19 SF 0.54 1.19 7.45 205.16 979.33
523. R&R Batt insulation - 6" - R19 - 443.19 SF 0.33 1.18 17.06 181.88 868.15unfaced batt
Water leak intruded into walls resulting in core to soften and lose structural stability. Replacing 4' of room perimeter & cement board supportingwall tiles for a complete mitigation of damages.
524. R&R Mirror - 1/4" plate glass 23.92 SF 0.33 15.66 13.16 104.85 500.49
525. R&R Countertop - Granite or 13.67 SF 6.03 124.60 66.98 490.96 2,343.65Marble - Commercial grade
526. Add on for undermount sink 3.00 EA 0.00 121.86 0.00 96.88 462.46cutout & polish - single basin
527. Add on Granite or Marble - edge 6.83 LF 0.00 21.33 0.00 38.61 184.29treatment
528. R&R Countertop subdeck - 13.67 SF 0.76 3.21 0.96 14.64 69.87plywood
529. Sink - single - Detach & reset 3.00 EA 0.00 150.61 0.00 119.73 571.56
530. R&R P-trap assembly - ABS 3.00 EA 8.39 62.26 1.27 56.51 269.73(plastic)
531. Sink faucet - Detach & reset 3.00 EA 0.00 121.24 0.00 96.38 460.10
532. R&R Plumbing fixture supply 6.00 EA 5.59 20.96 2.45 42.87 204.62line
533. Toilet - Detach & reset 3.00 EA 0.00 245.55 1.01 195.49 933.15
534. R&R Handicap grab bar - 1.00 EA 16.76 70.46 2.31 23.74 113.27Stainless steel, 1 1/2" x 24"
535. R&R Handicap grab bar - 1.00 EA 16.76 87.98 3.29 28.64 136.67Stainless steel, 1 1/2" x 36"
35
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 35
CONTINUED - Women's bathroom (7th)
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
536. R&R Toilet partition - High grade 3.00 EA 152.98 1,156.91 157.50 1,083.09 5,170.26(i.e., phenolic, etc.)
537. Apply anti-microbial agent 443.19 SF 0.00 0.34 0.93 40.17 191.78
538. Interior door unit - Commercial 2.00 EA 0.00 382.84 33.62 211.82 1,011.12grade
539. Paint door slab only - 2 coats (per 2.00 EA 0.00 35.31 0.89 18.95 90.46side)
540. Paint door/window trim & jamb - 2.00 EA 0.00 29.43 0.53 15.74 75.132 coats (per side)
541. R&R Door opening (jamb & 2.00 EA 7.03 121.45 7.70 70.14 334.80casing) - 32"to36"wide - paint grade
542. Paint casing - two coats 34.00 LF 0.00 1.34 0.26 12.15 57.97
543. Outlet or switch - Detach & reset 2.00 EA 0.00 17.41 0.00 9.23 44.05
544. Remove Paper towel dispenser 1.00 EA 16.76 0.00 0.00 4.45 21.21
545. Install Paper towel dispenser 1.00 EA 0.00 24.35 0.00 6.46 30.81
546. Soap dispenser - Detach & reset 1.00 EA 0.00 17.81 0.00 4.72 22.53
547. Toilet paper dispenser - Detach & 3.00 EA 0.00 37.48 0.00 29.79 142.23reset
548. Floor protection - self-adhesive 136.04 SF 0.55 0.00 1.24 20.15 96.21plastic film
549. Remove Additional labor to 272.08 SF 1.98 0.00 0.00 142.76 681.48remove tile from concrete
550. Remove Tile floor covering - 272.08 SF 2.79 0.00 0.00 201.16 960.26High grade
551. Tile floor covering - High grade 312.89 SF 0.00 10.53 120.90 905.14 4,320.77
Floor tiles tested positive for hollowness indicating category 3 water intrusion compromised adhesive that binds tiles to concrete substrate. Ceramictile flooring has an additional layer underneath. They need to be replaced as per "Replacement Cost" policy clause. 15 % waste added. Matchingmaterials to men's bathroom.
Totals: Women's bathroom (7th) 806.63 8,705.29 41,555.07
Total: 7th Floor 1,596.95 17,265.40 82,417.10
2nd Floor
36
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 36
2nd Floor Corridor
Mechanical Room
3' 4
"1'
7"
11"
3' 4"3' 5"
3' 9"
14' 4"
14' 2"
3'
9' 5"
9' 9"8' 6"
3'
17' 3"
17' 7"
8"
3' 2
"
2' 11"2'3'
7' 9"
8' 1"7' 1"3'2' 9"
12' 5"
2nd Floor Corridor Height: 10' 11"
523.38 SF Walls669.44 SF Walls & Ceiling16.23 SY Flooring64.39 LF Ceil. Perimeter
146.06 SF Ceiling146.06 SF Floor36.64 LF Floor Perimeter
Door 3' 4" X 7' Opens into Exterior
Door 3' X 7' Opens into MECHANICAL_R
Door 3' 4" X 6' 8" Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Window - Goes to Floor 3' 2" X 3' Opens into Exterior
Door 2' 11" X 6' 8" Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
552. R&R Insulated duct - 30" 36.50 LF 1.26 43.86 21.69 442.18 2,110.75diameter, 22 gauge
All ceiling items damaged by category 3 water flood from above level
553. Heat/AC register - Mechanically 1.00 EA 0.00 14.80 0.00 3.92 18.72attached - Detach & reset
14 doors damaged by category 3 water
554. Clean ductwork - Interior (PER 1.00 EA 0.00 45.60 0.00 12.08 57.68REGISTER)
AC duct to be cleaned after demolition & construction work is performed
555. R&R Recessed light fixture 4.00 EA 12.46 124.35 9.95 147.65 704.84
556. Smoke detector - Detach & reset 1.00 EA 0.00 46.99 0.00 12.45 59.44
557. Fluorescent light fixture - 2' & 4' - 4.00 EA 0.00 70.95 0.00 75.21 359.01Detach & reset
558. R&R Suspended ceiling system - 146.06 SF 0.46 4.13 19.53 182.83 872.78High grade - 2' x2'
559. Mask wall - plastic, paper, tape 64.39 LF 0.00 1.20 1.04 20.75 99.06(per LF)
560. Two coat plaster over 1/2" 523.38 SF 0.00 8.74 54.95 1,226.77 5,856.06gypsum
Water leak intruded into walls resulting in core to soften and lose structural stability and drywall paper to pucker & ripple. Water restorationcompany removed base cove to complete dry out process. Replacing all walls damaged and contaminated by category 3 water for a completemitigation of damages.
561. R&R Furring strip - 2" x 2" 523.38 SF 0.54 1.19 8.79 242.27 1,156.51
562. R&R Batt insulation - 6" - R19 - 523.38 SF 0.33 1.18 20.15 214.78 1,025.24unfaced batt
37
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 37
CONTINUED - 2nd Floor Corridor
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
Category 3 water intruded into walls resulting in core to soften and lose structural stability and drywall paper to pucker & ripple. Water restorationcompany removed base cove to complete dry out process. Replacing all walls damaged and contaminated by category 3 water for a completemitigation of damages.
563. Scaffold - per section (per day) 65.00 DA 0.00 20.25 0.00 348.81 1,665.06
564. Labor to set up and take down 13.00 EA 0.00 28.66 0.00 98.74 471.32scaffold - per section
565. Additional cost for high wall or 523.38 SF 0.00 0.43 0.00 59.64 284.69ceiling - 11' to 14' high
Scaffolding based upon 13 sections to cover perimeter & 2 sections stacked up to cover high ceiling for 5 days.
566. Texture drywall - smooth / skim 523.38 SF 0.00 1.18 3.30 164.53 785.42coat
Walls need to be re-finished due to damages caused when replacing walls, vinyl flooring & cove.
567. Scrape the walls & prep for paint 523.38 SF 0.00 0.60 0.37 83.31 397.71
568. Seal the walls w/anti-microbial 523.38 SF 0.00 1.40 25.65 200.97 959.35coating - one coat
569. Paint the walls - two coats 523.38 SF 0.00 0.91 6.96 128.07 611.31
570. Paint door slab only - 2 coats (per 7.00 EA 0.00 35.31 3.11 66.32 316.60side)
571. Paint door/window trim & jamb - 7.00 EA 0.00 29.43 1.87 55.09 262.972 coats (per side)
572. Paint casing - two coats 119.00 LF 0.00 1.34 0.92 42.50 202.88
573. Water extraction from hard 146.06 SF 0.00 0.94 0.00 36.38 173.68surface floor - Cat 3 water
574. Floor protection - self-adhesive 146.06 SF 0.55 0.00 1.33 21.63 103.29plastic film
Totals: 2nd Floor Corridor 179.61 3,886.88 18,554.37
2nd Floor Corridor
Mechanical Room
6' 3
"
36' 1
"
36' 3
"
4'7'
3" 9' 7"
7' 7
"
9' 8"
9' 8"
21'
3'7" Mechanical Room Height: 13' 4"
1,476.70 SF Walls1,729.13 SF Walls & Ceiling
28.05 SY Flooring117.58 LF Ceil. Perimeter
252.43 SF Ceiling252.43 SF Floor104.58 LF Floor Perimeter
Door 3' X 7' Opens into Exterior
Door 4' X 7' Opens into Exterior
Door 3' X 7' Opens into Exterior
Door 3' X 7' Opens into CORRIDOR
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
38
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 38
CONTINUED - Mechanical Room
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
575. Content Manipulation charge - 4.00 HR 0.00 48.04 0.00 50.93 243.09per hour
576. Mask wall - plastic, paper, tape 117.58 LF 0.00 1.50 1.89 47.24 225.50(per LF)
577. R&R Ductwork - Mechanical 1.00 EA 41.93 985.18 10.79 275.05 1,312.95room - Plenum & Return air
578. R&R Ductwork system - hot or 1.00 EA 620.98 6,541.75 160.38 1,940.63 9,263.74cold air
From 12th floor bathrooms to 7th floor bathrooms
579. R&R Coil - 5 ton - cased 1.00 EA 63.51 998.19 42.84 292.70 1,397.24
580. R&R Furnace - floor - up to 1.00 EA 70.34 2,096.05 95.61 599.44 2,861.4465,000 BTU
581. Interior door unit - Commercial 3.00 EA 0.00 382.84 50.43 317.72 1,516.67grade
582. R&R Interior double door - 1.00 EA 28.34 677.08 32.31 195.50 933.23Commercial grade
583. Paint door slab only - 2 coats (per 5.00 EA 0.00 44.23 2.24 59.20 282.59side)
584. Paint door/window trim & jamb - 5.00 EA 0.00 36.81 1.34 49.13 234.522 coats (per side)
585. Paint casing - two coats 35.00 LF 0.00 1.68 0.27 15.66 74.73
586. Water extraction from hard 252.43 SF 0.00 1.18 0.00 78.94 376.81surface floor - Cat 3 water
587. Masonry acid wash 1,729.13 SF 0.00 0.56 2.42 257.24 1,227.97
Acid washing 4' of wall perimeter and floor to eliminate category 3 water contaminants.Plumbing mitigation performed through this room.
588. Electrical (Bid Item) 1.00 EA 0.00 6,250.00 0.00 1,656.25 7,906.25
Charge applies to detachment and resetting of all electrical components in mechanical room
589. Floor protection - self-adhesive 252.43 SF 0.70 0.00 2.30 47.44 226.44plastic film
Totals: Mechanical Room 402.82 5,883.07 28,083.17
Total: 2nd Floor 582.43 9,769.95 46,637.54
Generals
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
590. Content Manipulation charge - 80.00 HR 0.00 30.74 0.00 651.69 3,110.89per hour
This charged is used to move contents out of the way of the repairs and set them back to their location. This is not a pack-out charge. Based upon 1foreman and 3 workers. If a pack-out is necessary it will be charged separately.
39
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 39
CONTINUED - Generals
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
591. Dumpster load - Approx. 40 10.00 EA 748.79 0.00 0.00 1,984.29 9,472.19yards, 7-8 tons of debris
592. Single axle dump truck - per load - 10.00 EA 247.55 0.00 0.00 656.01 3,131.51including dump fees
593. Commercial Supervision / Project 90.00 HR 0.00 58.00 0.00 1,383.30 6,603.30Management - per hour
594. Negative air fan/Air scrubber (24 30.00 DA 0.00 70.00 0.00 556.50 2,656.50hr period) - No monit.
595. Neg. air fan/Air scrub.-XLrg (per 30.00 DA 0.00 140.00 0.00 1,113.00 5,313.0024 hr period)-No monit.
596. Caution tape 2,000.00 LF 0.00 0.08 2.80 43.14 205.94
597. Job-site cargo/storage container - 3.00 MO 0.00 115.84 0.00 92.09 439.6140' long - per month
598. Temporary construction office - 3.00 MO 0.00 279.08 0.00 221.86 1,059.10portable (trailer)
1 offices for 3 months
599. Temporary toilet (per month) 6.00 MO 0.00 119.02 0.00 189.24 903.36
2 temporary toilets for men and 2 for women for 3 months
600. Temporary power usage (per 3.00 MO 0.00 284.99 59.85 242.44 1,157.26month) - Commercial
3 months of electrical usage
601. Temporary water - hookup fee - 3.00 EA 0.00 500.00 0.00 397.50 1,897.50Commercial
3 months of water usage
602. Architectural/Drafting fees (Bid 25,820. EA 0.00 1.50 0.00 10,263.45 48,993.45item) 00
Drafting fees are based upon the standard fee of $1.50/sq. ft. of construction.The square footage of this structure (25,820.10 sq ft) are detailed in page # 50 (interior walls, ceiling & floor).
603. On-Site Inventory, Packing, 64.00 HR 0.00 23.36 0.00 396.18 1,891.22Boxing, Moving chrg - per hour
Packout includes: packing, wrapping of furniture, art & crafts, wardrobe boxes, etc. Disassemble electronics. Delivery to storage. Also includesprotection for lamps, mirrors & pictures. Foreman supervision is also included. NOTE: Charges based upon two full-time labor days (round trip)for 4 movers (including foreman).
604. Debris chute - per week - 30" x 4' 36.00 WK 15.60 0.00 0.00 148.82 710.42section
605. Debris chute hopper - per week - 432.00 WK 28.80 0.00 0.00 3,297.02 15,738.6230" x 4' section
606. Debris chute mounting hardware - 432.00 WK 25.00 0.00 0.00 2,862.00 13,662.00per week
Chute waste system is based upon the usage of a section every 4’ (1 hopper per chute line and mounting hardware). In this property it takes 36chutes to cover the 12 floors. Construction is estimated to be completed within 3 months.
607. Final cleaning - construction - 19,973. SF 0.00 0.19 0.00 1,005.65 4,800.58Residential 29
40
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 40
CONTINUED - Generals
DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P
608. General clean - up 90.00 HR 0.00 23.37 0.06 557.39 2,660.75
Air purifiers to comply with OSHA 1926.55 (a & b) to avoid inhalation, ingestion, skin absorption, or contact with any material or anycontaminants at construction site. In this case 6 units and 6 large units for 5 days. Also a daily construction site cleaning is required for safety &health concerns, site cleaning based upon a 1 hour daily clean up for duration of 90 days. Also a construction supervisor is required to coordinateworkers & sub-contractors and to make sure construction site complies with OSHA health & safety standards 29 CFR 1926.20(b) requiring that allconstruction employers have an accident prevention program that provides for frequent and regular inspections of job sites, materials, andequipment by competent persons designated by the employer, based upon 1 hour daily for the duration of 90 days.
Totals: Generals 62.71 26,061.57 124,407.20
Labor Minimums Applied
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
609. Temporary repair services labor 1.00 EA 0.00 25.08 0.00 6.65 31.73minimum
Totals: Labor Minimums Applied 0.00 6.65 31.73
Line Item Totals: COMMERCIAL_BUILDING1 11,771.41 175,164.65 836,158.55
Additional Charges Charge
Permit 750.00
Additional Charges Total $750.00
Grand Total Areas:18,961.85 SF Walls 6,857.42 SF Ceiling SF Walls and Ceiling25,819.286,857.42 SF Floor 761.94 SY Flooring 2,304.27 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 2,896.85 LF Ceil. Perimeter
6,857.42 Floor Area 7,256.24 Total Area 18,961.85 Interior Wall Area19,596.91 Exterior Wall Area 2,548.93 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length0.00 Total Ridge Length 0.00 Total Hip Length
41
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 41
Summary for DwellingLine Item Total 649,222.49
Permit 750.00Material Sales Tax 11,771.41
Subtotal 661,743.90Overhead 66,175.13Profit 109,188.27
Replacement Cost Value $837,107.30Net Claim $837,107.30
Miami Estimates
42
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 42
Recap by Room
Estimate: COMMERCIAL_BUILDING1
Area: 12th FloorMen's Bathroom (12th) 31,511.60 4.85%Women's bathroom (12th) 32,043.17 4.94%
Area Subtotal: 12th Floor 9.79%63,554.77
Area: 11th FloorMen's Bathroom (11th) 31,511.60 4.85%Women's bathroom (11th) 32,043.17 4.94%
Area Subtotal: 11th Floor 9.79%63,554.77
Area: 10th FloorMen's Bathroom (10th) 31,511.60 4.85%Women's bathroom (10th) 32,043.17 4.94%
Area Subtotal: 10th Floor 9.79%63,554.77
Area: 9th Floor9th Floor Corridor 55,937.89 8.62%Men's bathroom (9th) 26,777.08 4.12%Women's bathroom (9th) 27,483.31 4.23%
Area Subtotal: 9th Floor 16.97%110,198.28
Area: 8th Floor8th Floor Corridor 82,388.17 12.69%Men's bathroom (8th) 33,465.84 5.15%Women's bathroom (8th) 34,357.98 5.29%
Area Subtotal: 8th Floor 23.14%150,211.99
Area: 7th FloorMen's Bathroom (7th) 31,511.60 4.85%Women's bathroom (7th) 32,043.15 4.94%
Area Subtotal: 7th Floor 9.79%63,554.75
Area: 2nd Floor2nd Floor Corridor 14,487.88 2.23%
43
Miami Estimates
1101 NE 4 SreetHallandale Beach, Fl 33009Ph: (844) 205-0870Email: [email protected]
COMMERCIAL_BUILDING1 2/21/2018 Page: 43
Mechanical Room 21,797.28 3.36%
Area Subtotal: 2nd Floor 5.59%36,285.16Generals 98,282.92 15.14%Labor Minimums Applied 25.08
Subtotal of Areas 100.00%649,222.49
Total 649,222.49 100.00%
High-rise buildings have lower productivity than regular structures. It involves staff of different skill levels. Thesynchronization that entails the consultancies, coordination of contractors etc. increases as well. Specific workprocedures are set or elaborated such as work authorizations, inspections etc. High-rise structures also incur overtime.The delivery of materials and disposing of waste is much more time consuming. These factors result in the increase of 25% of material and labor cost which have been added to this estimate.
This insured has two claims in this dwelling. If some damages overlaps it’s because of the scope of work that is requiredto completely mitigate the damages and not because it is our intention to duplicate damages.
44
COMMERCIAL_BUILDING1 2/21/2018 Page: 44
12th Floor
12th Floor Corridor
Entry (1)
Elevators
Entry (1)
Women's bathroom (12th)Men's Bathroom (12th)
Elevator
Stairs
12th Floor
5' 2
"
5' 1
0"
5' 2"
6' 7
"
7' 3
"
15' 8
"
1' 5
"
1' 5
"
3' 5
"
13' 8"8' 2"
3' 1
"
7' 10"
5' 2"
117' 4"111' 10"
8' 6"
15' 4
"
19' 1
"
8' 6"
11"
6' 3"
7' 10"
130' 4"130' 4" 6' 11"
7' 7"
45
COMMERCIAL_BUILDING1 2/21/2018 Page: 45
11th Floor
Entry (1)
Men's Bathroom (11th)
Entry (1)
Women's bathroom (11th)
11th Floor Corridor
Elevators
Elevator
11th Floor
5' 2"
15' 8
"
8' 6"
15' 4
"
7' 10"
3' 5
" 5' 2"
3' 1
"
19' 1
"
8' 6"
7' 10"
5' 2
"
5' 1
0"
117' 4"111' 10"
6' 3"
11"
13' 8"8' 2"
6' 7
"
7' 3
"
6' 11"
7' 7"
1' 5
"
1' 5
"
130' 4"130' 4"
46
COMMERCIAL_BUILDING1 2/21/2018 Page: 46
10th Floor
Entry (1)
Men's Bathroom (10th)
Entry (1)
Women's bathroom (10th)
10th Floor Corridor
Elevators
Elevator
10th Floor
5' 2"
15' 8
"
8' 6"
15' 4
"
7' 10"
3' 5
" 5' 2"
3' 1
"
19' 1
"
8' 6"
7' 10"
5' 2
"
5' 1
0"
117' 4"111' 10"
6' 3"
11"
13' 8"8' 2"
6' 7
"
7' 3
"
6' 11"
7' 7"
1' 5
"
1' 5
"
130' 4"130' 4"
47
COMMERCIAL_BUILDING1 2/21/2018 Page: 47
9th Floor
Men's bathroom (9th)
9th Floor Corridor
Women's bathroom (9th)
Elevators
Elevator
Elevator Offset (9th) (1)
9th Floor
3' 7"4' 3"
12'12' 4"
6' 11"
7' 7"
27' 1"
3' 3'
6' 11"
7' 7"
20' 4"
1' 8"
15' 7
"
15' 3
"
6' 7
"
7' 3
"
27' 8"27'
19'
18' 8
"
8' 7"7' 11"
10"
2' 7"
6' 10"
2' 7"
1' 1'
10"6' 11"
7' 7"
1' 5
"
3' 5"
3' 5"
5' 2
"
10"20' 10"
33' 5"
5' 4"
28'27' 4"
5' 8"
5' 4"6' 11"
7' 7"
3' 3'
7' 11"8' 7"
3' 6"
4' 2" 3' 5
"
3' 5
"
5' 9"
5' 9"
5' 1
0"
5' 1"
4' 5"
33' 2"
32' 6"
66'
66'6' 11"
7' 7"
48
COMMERCIAL_BUILDING1 2/21/2018 Page: 48
8th Floor
Elevator
Men's bathroom (8th)Women's bathroom (8th)
8th Floor Corridor
Elevator Offset (8th) (1)
8th Floor
2'
2' 2"
2'2' 2"
20'
19' 6"
9' 1
0"
9' 2
"
4' 11"5' 7"
31' 8"
66' 3"
66' 3"
3' 5
"
3' 5
"
45'
45' 8"
4'
4' 8
"
4'
4' 8
"
2' 7"
41'
41'
3' 5"
3' 5"
4' 11
"
5' 7"
1' 1'6' 11"
7' 7"
1' 5
"
10"
32' 2"
5' 2
"
90' 6"
90' 8"
2' 7"
10"
6' 7
"
7' 3
"
6' 4"
1' 2"
25' 5
"
24' 9
"
19'
18' 8
"
8' 7"
7' 11"
14' 5
"
14' 5
"
13' 5"
7' 11"
8' 7"
19' 9"
5' 4"
15' 7
"
15' 3
"
12'
12' 3"
5' 7"
5' 4"
49
COMMERCIAL_BUILDING1 2/21/2018 Page: 49
7th Floor
7th Floor Corridor
Entry (1)
Women's bathroom (7th)
Entry1 (1)
Men's Bathroom (7th)
Elevators
Elevators
7th Floor
4' 1"
3' 5"
6' 8"
6'
3' 5
"
5' 9"
5' 9"
7' 1
1"7'
11"
1' 6
"
1' 6
"
7'7' 8"
5' 2
"
5' 1
0"
8' 2"
121' 7"121' 7"
6' 8
"
7' 4
"
3' 4"4'
13' 8"
5' 2"5' 2"
7' 10"5' 4"
15' 1
0"
7' 10"
8' 6"
1'
6' 4"
2' 6"
3' 6"
4' 2"
101' 11"
95' 9"3' 6"
4' 2"
1'
3' 3
"
3' 1
"15
' 4"
19' 1
"
8' 6"
15' 8
"
50
COMMERCIAL_BUILDING1 2/21/2018 Page: 50
2nd Floor
2nd Floor Corridor
Mechanical Room
2nd Floor
7' 7
"
6' 1
1"
9' 8"
9' 8"
25'
25' 4
"
18' 2"
18' 2"
1' 6
"
1' 6
"
7' 2"
7' 10"
5' 4
"
4' 1"
25' 4"
21' 3"
12' 9
"
12' 9
"
4' 2"
4' 10"
45'
51' 4
"
6' 1
0"
7' 6
"
9' 7"
9' 7"
Miami Estimates 1101 NE 4th Street, Hallandale Beach FL 33009
Ph: 844-205-0870 Email: [email protected]
www.MiamiEstimates.com
Picture File
Insured:
Address:
Date of loss:
Type:
Policy no:
Claim no:
Commercial building sample 1
North Miami Beach FL 33162
4/12/2016
Drain backup
______________
______________
View of property 12th floor corridor
12th floor men’s bathroom where damages started
Water remediation company removed part of 12th
floor men’s bathroom walls and wall tiles to complete
dry out process
Bathrooms
Water remediation company removed part of 12th
floor men’s bathroom walls and wall tiles to complete
dry out process
Matching 12th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
Matching 12th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
Bathrooms in this property have another layer of wall
tiles underneath visible tiles. They need to be replaced
as per "Replacement Cost" policy clause.
Last layer of discontinued tiles
Older layer of tiles
Adjacent 12th floor women’s bathroom also sustained
damages. It’s composed of same discontinued
materials.
11th floor corridor
11th floor women’s bathroom sustained damages
Water remediation company removed part of 11th floor
women’s bathroom walls and wall tiles to complete
dry out process
Bathrooms
Water remediation company removed part of 11th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 11th floor
women’s bathroom walls and wall tiles to complete
dry out process
Part of 11th floor women’s bathroom suspended
ceiling system removed due to category three water
intrusion from damaged drain lines
Part of 11th floor women’s bathroom suspended
ceiling system removed due to category three water
intrusion from damaged drain lines
11th floor men’s bathroom sustained damages
Water remediation company removed part of 11th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 11th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 11th floor
men’s bathroom walls and wall tiles to complete dry
out process
Last layer of discontinued tiles
Older layer of tiles
Part of 11th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
Part of 11th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
Matching 11th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
10th floor corridor
Bathrooms
10th floor women’s bathroom sustained damages
Water remediation company removed part of 10th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 10th
floor women’s bathroom walls and wall tiles to
complete dry out process
Part of 10th floor women’s bathroom suspended
ceiling system removed due to category three water
intrusion from damaged drain lines
Part of 10th floor women’s bathroom suspended
ceiling system removed due to category three water
intrusion from damaged drain lines
Matching 10th floor women’s bathroom floor tiles
tested positive for hollowness indicating category 3
water intrusion compromised adhesive that binds tiles
to concrete substrate.
10th floor men’s bathroom sustained damages
Water remediation company removed part of 10th
floor men’s bathroom entry walls to complete dry out
process
Damages to 10th floor men’s bathroom entry door
opening from above damaged drain line
Water remediation company removed part of 10th
floor men’s bathroom entry baseboards due to category
3 water intrusion
Water remediation company removed part of 10th
floor men’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 10th
floor men’s bathroom walls and wall tiles to complete
dry out process
Matching 10th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
9th floor corridor sustained damages.
Water remediation company removed part of 9th floor
corridor walls and base cove to complete dry out
process
Water remediation company removed part of 9th floor
corridor walls and base cove to complete dry out
process
Water remediation company removed part of 9th floor
corridor walls and base cove to complete dry out
process
Water remediation company removed part of 9th floor
corridor walls and base cove to complete dry out
process
9th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
9th floor women’s bathroom sustained damages
Water remediation company removed part of 9th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 9th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 9th floor
women’s bathroom walls and wall tiles to complete
dry out process
Part of 9th floor women’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
Part of 9th floor women’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
9th floor men’s bathroom sustained damages
Water remediation company removed part of 9th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 9th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 9th floor
men’s bathroom walls and wall tiles to complete dry
out process
8th floor corridor sustained damages
Water remediation company removed part of 8th floor
base cove to complete dry out process
Water remediation company removed part of 8th floor
base cove to complete dry out process
Bathroom
Bathroom
Water remediation company removed part of 8th floor
base cove to complete dry out process
Water remediation company removed part of 8th floor
base cove to complete dry out process
8th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
8th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
8th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
8th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
8th floor women’s bathroom sustained damages
Water remediation company removed part of 8th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 8th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 8th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 8th floor
women’s bathroom walls and wall tiles to complete
dry out process
Category three water intrusion to 8th floor women’s
bathroom suspended ceiling
Part of 8th floor women’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
8th floor men’s bathroom sustained damages
Water remediation company removed part of 8th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 8th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 8th floor
men’s bathroom walls and wall tiles to complete dry
out process
Part of 8th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
Part of 8th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
7th floor corridor
Bathrooms
7th floor men’s bathroom sustained damages
Water remediation company removed part of 7th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 7th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 7th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 7th floor
men’s bathroom walls and wall tiles to complete dry
out process
Matching 7th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
Part of 7th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
7th floor women’s bathroom sustained damages
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Matching 7th floor women’s bathroom floor tiles
tested positive for hollowness indicating category 3
water intrusion compromised adhesive that binds tiles
to concrete substrate.
Part of 7th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
2nd floor east corridor sustained damages
Part of 2nd floor east corridor’s suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
2nd floor east corridor’s mechanical room sustained
damages
2nd floor east corridor’s mechanical room sustained
damages Category three water damages to mechanical room
Mechanical room
Category three water damages to mechanical room Category three water damages to mechanical room
Category three water damages to mechanical room AC duct system punctured to release category 3 water
AC duct system punctured to release category 3 water AC duct system punctured to release category 3 water
Mechanical industrial equipment and machinery to be
detached & reset in order to mitigate category three
water damages
Mechanical industrial equipment and machinery to be
detached & reset in order to mitigate category three
water damages
Mechanical industrial equipment and machinery to be
detached & reset in order to mitigate category three
water damages
Mechanical industrial equipment and machinery to be
detached & reset in order to mitigate category three
water damages
Miami Estimates 1101 NE 4th Street, Hallandale Beach FL 33009
Ph: 844-205-0870 Email: [email protected]
www.MiamiEstimates.com
Picture File
Insured:
Address:
Date of loss:
Type:
Policy no:
Claim no:
Commercial building sample 1
North Miami Beach FL 33162
4/12/2016
Drain backup
______________
______________
View of property 12th floor corridor
12th floor men’s bathroom where damages started
Water remediation company removed part of 12th
floor men’s bathroom walls and wall tiles to complete
dry out process
Bathrooms
Water remediation company removed part of 12th
floor men’s bathroom walls and wall tiles to complete
dry out process
Matching 12th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
Matching 12th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
Bathrooms in this property have another layer of wall
tiles underneath visible tiles. They need to be replaced
as per "Replacement Cost" policy clause.
Last layer of discontinued tiles
Older layer of tiles
Adjacent 12th floor women’s bathroom also sustained
damages. It’s composed of same discontinued
materials.
11th floor corridor
11th floor women’s bathroom sustained damages
Water remediation company removed part of 11th floor
women’s bathroom walls and wall tiles to complete
dry out process
Bathrooms
Water remediation company removed part of 11th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 11th floor
women’s bathroom walls and wall tiles to complete
dry out process
Part of 11th floor women’s bathroom suspended
ceiling system removed due to category three water
intrusion from damaged drain lines
Part of 11th floor women’s bathroom suspended
ceiling system removed due to category three water
intrusion from damaged drain lines
11th floor men’s bathroom sustained damages
Water remediation company removed part of 11th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 11th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 11th floor
men’s bathroom walls and wall tiles to complete dry
out process
Last layer of discontinued tiles
Older layer of tiles
Part of 11th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
Part of 11th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
Matching 11th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
10th floor corridor
Bathrooms
10th floor women’s bathroom sustained damages
Water remediation company removed part of 10th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 10th
floor women’s bathroom walls and wall tiles to
complete dry out process
Part of 10th floor women’s bathroom suspended
ceiling system removed due to category three water
intrusion from damaged drain lines
Part of 10th floor women’s bathroom suspended
ceiling system removed due to category three water
intrusion from damaged drain lines
Matching 10th floor women’s bathroom floor tiles
tested positive for hollowness indicating category 3
water intrusion compromised adhesive that binds tiles
to concrete substrate.
10th floor men’s bathroom sustained damages
Water remediation company removed part of 10th
floor men’s bathroom entry walls to complete dry out
process
Damages to 10th floor men’s bathroom entry door
opening from above damaged drain line
Water remediation company removed part of 10th
floor men’s bathroom entry baseboards due to category
3 water intrusion
Water remediation company removed part of 10th
floor men’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 10th
floor men’s bathroom walls and wall tiles to complete
dry out process
Matching 10th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
9th floor corridor sustained damages.
Water remediation company removed part of 9th floor
corridor walls and base cove to complete dry out
process
Water remediation company removed part of 9th floor
corridor walls and base cove to complete dry out
process
Water remediation company removed part of 9th floor
corridor walls and base cove to complete dry out
process
Water remediation company removed part of 9th floor
corridor walls and base cove to complete dry out
process
9th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
9th floor women’s bathroom sustained damages
Water remediation company removed part of 9th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 9th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 9th floor
women’s bathroom walls and wall tiles to complete
dry out process
Part of 9th floor women’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
Part of 9th floor women’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
9th floor men’s bathroom sustained damages
Water remediation company removed part of 9th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 9th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 9th floor
men’s bathroom walls and wall tiles to complete dry
out process
8th floor corridor sustained damages
Water remediation company removed part of 8th floor
base cove to complete dry out process
Water remediation company removed part of 8th floor
base cove to complete dry out process
Bathroom
Bathroom
Water remediation company removed part of 8th floor
base cove to complete dry out process
Water remediation company removed part of 8th floor
base cove to complete dry out process
8th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
8th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
8th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
8th floor corridor suspended ceiling system sustained
category three water intrusion from above damaged
drain lines
8th floor women’s bathroom sustained damages
Water remediation company removed part of 8th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 8th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 8th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 8th floor
women’s bathroom walls and wall tiles to complete
dry out process
Category three water intrusion to 8th floor women’s
bathroom suspended ceiling
Part of 8th floor women’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
8th floor men’s bathroom sustained damages
Water remediation company removed part of 8th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 8th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 8th floor
men’s bathroom walls and wall tiles to complete dry
out process
Part of 8th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
Part of 8th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
7th floor corridor
Bathrooms
7th floor men’s bathroom sustained damages
Water remediation company removed part of 7th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 7th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 7th floor
men’s bathroom walls and wall tiles to complete dry
out process
Water remediation company removed part of 7th floor
men’s bathroom walls and wall tiles to complete dry
out process
Matching 7th floor men’s bathroom floor tiles tested
positive for hollowness indicating category 3 water
intrusion compromised adhesive that binds tiles to
concrete substrate.
Part of 7th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
7th floor women’s bathroom sustained damages
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Water remediation company removed part of 7th floor
women’s bathroom walls and wall tiles to complete
dry out process
Matching 7th floor women’s bathroom floor tiles
tested positive for hollowness indicating category 3
water intrusion compromised adhesive that binds tiles
to concrete substrate.
Part of 7th floor men’s bathroom suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
2nd floor east corridor sustained damages
Part of 2nd floor east corridor’s suspended ceiling
system removed due to category three water intrusion
from damaged drain lines
2nd floor east corridor’s mechanical room sustained
damages
2nd floor east corridor’s mechanical room sustained
damages Category three water damages to mechanical room
Mechanical room
Category three water damages to mechanical room Category three water damages to mechanical room
Category three water damages to mechanical room AC duct system punctured to release category 3 water
AC duct system punctured to release category 3 water AC duct system punctured to release category 3 water
Mechanical industrial equipment and machinery to be
detached & reset in order to mitigate category three
water damages
Mechanical industrial equipment and machinery to be
detached & reset in order to mitigate category three
water damages
Mechanical industrial equipment and machinery to be
detached & reset in order to mitigate category three
water damages
Mechanical industrial equipment and machinery to be
detached & reset in order to mitigate category three
water damages