Managing Strategic Lead Times

Compiled by Rulzion Rattray

Page 2: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

2

Time Based Competition

• Price and quality important, but increasingly cost of time is crucial element in choice:– Shortening life cycles– Customers drive for reduced inventory– Volatile markets making reliance on forecasts

dangerous

Page 3: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

3

Life Cycle and Lead Time

Time

Sales

Late Entrant

ObsolescentStock

Market

Page 4: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

4

Drive to Reduced Inventories

• The drive towards Just in time delivery has had a major impact .– Responsiveness can only be achieved through

time compression in supply chain.

• Volatile Markets & Forecasts:– History tell; us that no matter how sophisticated

the forecasting technique it will be wrong

Page 5: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

5

The Concept of Lead Time

• The time it takes for customers to receive their purchases.

• The order to delivery cycle

• Customers are increasingly sensitive to time.

• Shortening delivery time a major potential source of competitive advantage

Page 6: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

6

The order to delivery cycle

• Order Cycle Time:– Time taken from order to delivery Short lead

time major source of competitive advantage.Customer places order

Order entry Orderprocessing

Order Assembly

Orderreceived

Transport

• Each step consumes time– If order not met from stock but manufactured

lead times will be extended.

Page 7: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

7

Cash to Cash Cycle

• Time taken to convert order in to cash.• The longer the pipeline form the source of

materials to the final user the less responsive to changes in demand the system will be.

• Ensuring timely response to volatile demand will require a fundamentally new approach.

Page 8: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

8

Logistics Pipeline Management

• The process whereby manufacturing and procurement lead time are linked to the market.

• Key managing the supply Chain as a single entity.

• Common fallacy long lead times give security. The opposite is true!

Page 9: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

9

Lead Time Gap• Problem of most organisations is time taken

to procure, make and deliver is longer than the customer will wait.

Procurement Manufacturing Delivery

Logistics lead time

Customer order cycle

Order fulfilmentLead TimeGap

• If logistics lead time = customers required order cycle. Forecast & inventory not required!

Page 10: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

10

Reducing Logistics Lead Time• The visibility of the logistics process must be

increased.• Fundamental questioning of why we do things the

way we do. • Optimising Production Technology (OPT1):

– All activities can be categorised as bottleneck (slowest activity in the chain)or non bottle necks.

– Throughput of whole system is determined by bottlenecks.

– Bottlenecks often associated with information flow

Page 11: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

11

Improving Visibility of Demand• Key requirement of getting earlier warning

about customer’s requirements.

• Real demand may happen a lot earlier than demand penetrating the system.

• How:– Improving information flow so manufacturing gets

to hear about changes in the market earlier.– Postponement of commitment of product to its final

form– Earlier notification of customer intentions get

customers to order more frequently

Page 12: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray

12

References• 1Goldratt, E.M., (1990), “Theory of Constraints”, North River

Press.

• Christopher, M. & Braithwaite, A., (1989), “Managing Strategic Lead Times”, Logistics Information Management, December.

• T V Ramaswamy, “Lead time-centred materials management” http://www.industrialproductsfind.com/content/archive/General/Logistics/lg150120026.jsp, accessed 19-02-2002.