Managing Strategic Lead Times
Compiled by Rulzion Rattray
![Page 2: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/2.jpg)
2
Time Based Competition
• Price and quality important, but increasingly cost of time is crucial element in choice:– Shortening life cycles– Customers drive for reduced inventory– Volatile markets making reliance on forecasts
dangerous
![Page 3: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/3.jpg)
3
Life Cycle and Lead Time
Time
Sales
Late Entrant
ObsolescentStock
Market
![Page 4: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/4.jpg)
4
Drive to Reduced Inventories
• The drive towards Just in time delivery has had a major impact .– Responsiveness can only be achieved through
time compression in supply chain.
• Volatile Markets & Forecasts:– History tell; us that no matter how sophisticated
the forecasting technique it will be wrong
![Page 5: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/5.jpg)
5
The Concept of Lead Time
• The time it takes for customers to receive their purchases.
• The order to delivery cycle
• Customers are increasingly sensitive to time.
• Shortening delivery time a major potential source of competitive advantage
![Page 6: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/6.jpg)
6
The order to delivery cycle
• Order Cycle Time:– Time taken from order to delivery Short lead
time major source of competitive advantage.Customer places order
Order entry Orderprocessing
Order Assembly
Orderreceived
Transport
• Each step consumes time– If order not met from stock but manufactured
lead times will be extended.
![Page 7: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/7.jpg)
7
Cash to Cash Cycle
• Time taken to convert order in to cash.• The longer the pipeline form the source of
materials to the final user the less responsive to changes in demand the system will be.
• Ensuring timely response to volatile demand will require a fundamentally new approach.
![Page 8: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/8.jpg)
8
Logistics Pipeline Management
• The process whereby manufacturing and procurement lead time are linked to the market.
• Key managing the supply Chain as a single entity.
• Common fallacy long lead times give security. The opposite is true!
![Page 9: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/9.jpg)
9
Lead Time Gap• Problem of most organisations is time taken
to procure, make and deliver is longer than the customer will wait.
Procurement Manufacturing Delivery
Logistics lead time
Customer order cycle
Order fulfilmentLead TimeGap
• If logistics lead time = customers required order cycle. Forecast & inventory not required!
![Page 10: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/10.jpg)
10
Reducing Logistics Lead Time• The visibility of the logistics process must be
increased.• Fundamental questioning of why we do things the
way we do. • Optimising Production Technology (OPT1):
– All activities can be categorised as bottleneck (slowest activity in the chain)or non bottle necks.
– Throughput of whole system is determined by bottlenecks.
– Bottlenecks often associated with information flow
![Page 11: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/11.jpg)
11
Improving Visibility of Demand• Key requirement of getting earlier warning
about customer’s requirements.
• Real demand may happen a lot earlier than demand penetrating the system.
• How:– Improving information flow so manufacturing gets
to hear about changes in the market earlier.– Postponement of commitment of product to its final
form– Earlier notification of customer intentions get
customers to order more frequently
![Page 12: 1 Managing Strategic Lead Times Compiled by Rulzion Rattray](https://reader035.vdocuments.mx/reader035/viewer/2022072006/56649d005503460f949d3123/html5/thumbnails/12.jpg)
12
References• 1Goldratt, E.M., (1990), “Theory of Constraints”, North River
Press.
• Christopher, M. & Braithwaite, A., (1989), “Managing Strategic Lead Times”, Logistics Information Management, December.
• T V Ramaswamy, “Lead time-centred materials management” http://www.industrialproductsfind.com/content/archive/General/Logistics/lg150120026.jsp, accessed 19-02-2002.