3 Open Issues Technical Technical None at this time None at this time Schedule Schedule Time to install PEPSI power, low priority Time to install PEPSI power, low priority Financial Financial Will have to purchase cable and connectors Will have to purchase cable and connectors Resource Resource None None

TRANSCRIPT

Page 1: 1 LBT Q2 2008 Eng/SW Review PWR: Site electrical power

11

LBT Q2 2008 Eng/SW LBT Q2 2008 Eng/SW ReviewReview

PWR: Site electrical powerPWR: Site electrical power

Page 2: 1 LBT Q2 2008 Eng/SW Review PWR: Site electrical power

22

Highlights (Q2/2008)Highlights (Q2/2008) Install power for PEPSI container on 3L, inprocessInstall power for PEPSI container on 3L, inprocess Power monitoring indicated that we have no major problemsPower monitoring indicated that we have no major problems The PF is about 0.83 inductive, MGIO has a capacitive load and The PF is about 0.83 inductive, MGIO has a capacitive load and

would like us to not compensate our loadwould like us to not compensate our load Continue monitoring power qualityContinue monitoring power quality

Page 3: 1 LBT Q2 2008 Eng/SW Review PWR: Site electrical power

33

Open IssuesOpen Issues TechnicalTechnical

None at this timeNone at this time ScheduleSchedule

Time to install PEPSI power, low priorityTime to install PEPSI power, low priority FinancialFinancial

Will have to purchase cable and connectorsWill have to purchase cable and connectors ResourceResource

None None

Page 4: 1 LBT Q2 2008 Eng/SW Review PWR: Site electrical power

44

Planning (Q3/2008)Planning (Q3/2008) Install connection point power for PEPSI at bridge locationInstall connection point power for PEPSI at bridge location Continue monitoring power qualityContinue monitoring power quality Continue to install power for PEPSI container on 3LContinue to install power for PEPSI container on 3L

Page 5: 1 LBT Q2 2008 Eng/SW Review PWR: Site electrical power

55

Mountain Work ProcedureMountain Work Procedure Use Issue Trak to submit work request, using this article in the Knowledge BaseUse Issue Trak to submit work request, using this article in the Knowledge Base Article Nbr:  10  Title:  Mountain Work Request Form  Organization:  Large Binocular Telescope Article Nbr:  10  Title:  Mountain Work Request Form  Organization:  Large Binocular Telescope

 Category:  Work Request Form     Keywords:  Mountain Work Request Form      Article:  If you  Category:  Work Request Form     Keywords:  Mountain Work Request Form      Article:  If you need to coordinate work on the telescope you must fill out and submit a Mountain Work need to coordinate work on the telescope you must fill out and submit a Mountain Work Request Form. Request Form. Here is what you do.Here is what you do.1) Submit an IssueTrak issue with the IssueType of "Mountain Work Request"1) Submit an IssueTrak issue with the IssueType of "Mountain Work Request"2) Remember the issue #.2) Remember the issue #.3) Fill out the form that is an attachment to this article.3) Fill out the form that is an attachment to this article.Instructions on how to fill out the mountain work request form can be found at the end of the Instructions on how to fill out the mountain work request form can be found at the end of the form.form.3.a) Open the attachment (the form) and fill it out.3.a) Open the attachment (the form) and fill it out.3.b) Save the form to your disk with the name of the IssueTrak issue # for the work request you 3.b) Save the form to your disk with the name of the IssueTrak issue # for the work request you submitted (the number mentioned in step 2, see above). submitted (the number mentioned in step 2, see above). Example, if the work request was submitted as issue # 857, name the mountain work request Example, if the work request was submitted as issue # 857, name the mountain work request form as, 857a.doc, when you save it.form as, 857a.doc, when you save it.4) Attach the filled out request form to the IssueTrak issue.4) Attach the filled out request form to the IssueTrak issue.     Entered By:  Cushing, Norm on 30-Oct-2007 3:56PM  Modified By:  Admin, Software on 31-     Entered By:  Cushing, Norm on 30-Oct-2007 3:56PM  Modified By:  Admin, Software on 31-Oct-2007 11:55PM          Oct-2007 11:55PM          Attachments:Attachments:    Mountain_Work_Request_Form-1.docMountain_Work_Request_Form-1.doc   31-Oct-2007 9:17AM   31-Oct-2007 9:17AM