1 integration mgmt / initiating process group 4.1 develop ... · 4.1 develop project charter . 2...

48
1 26/02/2013 18:23:36 1 Input: Project statement of work Business case Agreements Enterprise environmental factors Organizational process assets Tools & Techniques Expert judgement Facilitation techniques Output: Project charter Integration Scope Time Cost Quality Human Resources Communications Risk Procurement Stakeholders Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Upload: others

Post on 19-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

1

26/02/2013 18:23:36 1

Input:

Project statement of work

Business case

Agreements

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Expert judgement

Facilitation techniques

Output:

Project charter

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Page 2: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

2

26/02/2013 18:23:37 2

Input:

Project Charter

Outputs from other processes

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Expert judgement

Facilitation Techniques

Output:

Project management plan

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Integration Mgmt / Planning Process Group 4.2 Develop Project Management Plan

Page 3: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

3

26/02/2013 18:23:37 3

Input:

Project management plan

Approved change requests

Enterprise environmental factors

Organizational process assets

Output:

Deliverables

Work performance information

Change requests

Project management plan updates

Project document updates

Tools & Techniques

Expert judgement

Project management information system

Meetings

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Integration Mgmt / Executing Process Group 4.3 Direct and Manage Project Work

Page 4: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

4

26/02/2013 18:23:37 4

Input:

Project management plan

Schedule forecasts

Cost forecasts

Validated changes

Work performance information

Enterprise environmental factors

Organizational process assets

Output:

Change requests

Work performance reports

Project management plan updates

Project documents updates

Tools & Techniques

Expert judgement

Analytical Techniques

Project Management Information System

Meetings

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Integration Mgmt / Monitoring & Controlling 4.4 Monitor and Control Project Work

Page 5: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

5

26/02/2013 18:23:37 The 44 PMBOK(R) processes 5

Input:

Project management plan

Work performance reports

Change requests

Enterprise environmental factors

Organizational process assets

Output:

Approved change requests

Change log

Project management plan updates

Project documents updates

Tools & Techniques

Expert judgement

Meetings

Change control tools

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Integration Mgmt / Monitoring & Controlling 4.5 Perform Integrated Change Control

Page 6: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

6

26/02/2013 18:23:37 6

Input:

Project management plan

Accepted deliverables

Organizational process assets

Tools & Techniques

Expert judgement

Analytical techniques

Meetings

Output:

Final product, service or result transition

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Integration Mgmt / Closing Process Group 4.6 Close Project or Phase

Page 7: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

7

26/02/2013 18:23:37 7

Input:

Project management plan

Project Charter

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Expert judgement

Meetings

Output: Scope Management Plan

Requirements Management Plan

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Scope Mgmt / Planning Process Group 5.1 Plan Scope Management

Page 8: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

8

26/02/2013 18:23:37 8

Input:

Scope management plan

Requirements management plan

Stakeholder management plan

Project charter

Stakeholder register

Output:

Requirements documentation

Requirements traceability matrix

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Scope Mgmt / Planning Process Group 5.2 Collect Requirements

Tools & Techniques

Interviews

Focus groups

Facilitated workshops

Group creativity techniques

Group decision-making techniques

Questionnaires and surveys

Observations

Prototypes

Benchmarking

Context Diagrams

Document Analysis

Page 9: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

9

26/02/2013 18:23:37 9

Input: Scope management plan

Project charter

Requirements documentation

Organizational process assets

Tools & Techniques Expert judgement

Product analysis

Alternatives generation

Facilitated workshops

Output: Project scope statement

Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Scope Mgmt / Planning Process Group 5.3 Define Scope

Page 10: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

10

26/02/2013 18:23:38 10

Input: Scope management plan

Project scope statement

Requirements documentation

Enterprise environmental factors

Organizational process assets

Tools & Techniques Decomposition

Expert judgement

Output: Scope baseline

Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Scope Mgmt / Planning Process Group 5.4 Create Work Breakdown Structure

Page 11: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

11

26/02/2013 18:23:38 11

Input:

Project management plan

Requirements documentation

Requirements traceability matrix

Verified deliverables

Work performance data

Tools & Techniques

Inspection

Group decision-making techniques

Output:

Accepted deliverables

Change requests

Work performance information

Project document updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Scope Mgmt / Monitoring and Controlling 5.5 Validate Scope

Page 12: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

12

26/02/2013 18:23:38

12

Input:

Project management plan

Requirements documentation

Requirements traceability matrix

Work performance data

Organisation process assets

Tools & Techniques

Variance analysis

Output:

Work performance information

Change requests

Project management plan updates

Project document updates

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Scope Mgmt / Monitoring and Controlling 5.6 Control Scope

Page 13: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

13

26/02/2013 18:23:38 13

Input:

Project management plan

Project charter

Enterprise environmental factors

Organization process assets

Tools & Techniques

Expert judgement

Analytical techniques

Meetings

Output:

Schedule management plan

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Time Mgmt / Planning Process Group 6.1 Plan Schedule Management

Page 14: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

14

26/02/2013 18:23:38 14

Input:

Schedule management plan

Scope baseline

Enterprise environmental factors

Organization process assets

Tools & Techniques

Decomposition

Rolling wave planning

Expert judgement

Output:

Activity list

Activity attributes

Milestone list

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Time Mgmt / Planning Process Group 6.2 Define Activities

Page 15: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

15

26/02/2013 18:23:38 15

Input: Schedule management plan

Activity list

Activity attributes

Milestone list

Project scope statement

Enterprise environmental factors

Organizational process assets

Tools & Techniques Precedence Diagramming Method (PDM)

Dependency determination

Leads and lags

Output: Project schedule network diagrams

Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Time Mgmt / Planning Process Group 6.3 Sequence Activities

Page 16: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

16

26/02/2013 18:23:38 16

Input: Schedule management plan

Activity list

Activity attributes

Resource calendars

Risk register

Activity cost estimates

Enterprise environmental factors

Organizational process assets

Tools & Techniques Expert judgement

Alternative analysis

Published estimating data

Bottom-up estimating

Project management software

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Time Mgmt / Planning Process Group 6.4 Estimate Activity Resources

Output: Activity resource requirements

Resource breakdown structure

Project documents updates

Page 17: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

17

26/02/2013 18:23:38 17

Input:

Schedule management plan

Activity list

Activity attributes

Activity resource requirements

Resource calendars

Project scope statement

Risk register

Resource breakdown structure

Enterprise environmental factors

Organizational process assets

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Time Mgmt / Planning Process Group 6.5 Estimate Activity Durations

Tools & Techniques

Expert judgement

Analogous estimating

Parametric estimating

Three-point estimating

Group decision-making techniques

Reserve analysis

Output:

Activity duration estimates

Project document updates

Page 18: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

18

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

26/02/2013 18:23:38 18

Input: Schedule management plan

Activity list

Activity attributes

Project schedule network diagrams

Activity resource requirements

Resource calendars

Activity duration estimates

Project scope statement

Risk register

Project staff assignments

Resource breakdown structure

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Schedule network analysis

Critical path method

Critical chain method

Resource optimization techniques

Modelling techniques

Leads and lags

Schedule compression

Scheduling tool

Output: Schedule baseline

Project schedule

Schedule data

Project calendars

Project management plan updates

Project documents updates

Time Mgmt / Planning Process Group 6.6 Develop Schedule

Page 19: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

19

26/02/2013 18:23:38 19

Input: Project management plan

Project schedule

Work performance data

Project calendars

Schedule data

Organizational process assets

Tools & Techniques

Performance reviews

Project management software

Resource optimization techniques

Modeling techniques

Leads and lags

Schedule compression

Scheduling tool

Output: Work performance information

Schedule forecasts

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Time Mgmt / Monitoring and Controlling 6.7 Control Schedule

Page 20: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

20

26/02/2013 18:23:38 20

Input:

Project management plan

Project charter

Enterprise environmental factors

Organizational process assets

Tools & Techniques Expert judgement

Analytical techniques

Meetings

Output:

Cost management plan

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Cost Mgmt / Planning Process Group 7.1 Plan Cost Management

Page 21: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

21

26/02/2013 18:23:38 21

Input:

Cost management plan

Human resource management plan

Scope baseline

Project schedule

Risk register

Enterprise environmental factors

Organizational process assets

Output:

Activity cost estimates

Basis of estimates

Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Cost Mgmt / Planning Process Group 7.2 Estimate Costs

Tools & Techniques Expert judgement

Analogous estimating

Parametric estimating

Bottom-up estimating

Three-point estimating

Reserve analysis

Cost of quality (COQ)

Project management software

Vendor bid analysis

Group decision-making techniques

Page 22: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

22

26/02/2013 18:23:38 22

Input:

Cost management plan

Scope baseline

Activity cost estimates

Basis of estimates

Project schedule

Resource calendars

Risk register

Agreements

Organization process assets

Output:

Cost baseline

Project funding requirements

Project documents updates

Tools & Techniques

Cost aggregation

Reserve analysis

Expert judgement

Historical relationships

Funding limit reconciliation

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Cost Mgmt / Planning Process Group 7.3 Determine Budget

Page 23: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

23

26/02/2013 18:23:38 23

Input:

Project management plan

Project funding requirements

Work performance data

Organizational process assets

Tools & Techniques

Earned value management

Forecasting

To-complete performance index (TCPI)

Performance reviews

Project management software

Reserve analysis

Output:

Work performance information

Cost forecasts

Change requests

Project management plan updates

Project documents updates

Organization process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Cost Mgmt / Monitoring and Controlling 7.4 Control Costs

Page 24: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

24

26/02/2013 18:23:38 24

Input:

Project management plan

Stakeholder register

Risk register

Requirements documentation

Enterprise environmental factors

Organizational process assets

Output:

Quality management plan

Process improvement plan

Quality metrics

Quality checklists

Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Quality Mgmt / Planning Process Group 8.1 Plan Quality Management

Tools & Techniques

Cost-benefit analysis

Cost of quality

Seven basic quality tools

Benchmarking

Design of experiments

Statistical sampling

Additional quality planning tools

Meetings

Page 25: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

25

26/02/2013 18:23:38 25

Input:

Quality management plan

Process Improvement Plan

Quality metrics

Quality control measurements

Project documents

Output:

Change requests

Project management plan updates

Project documents updates

Organisational process assets updates

Tools & Techniques

Quality management and control tools

Quality audits

Process analysis

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Quality Mgmt / Executing Process Group 8.2 Perform Quality Assurance

Page 26: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

26

26/02/2013 18:23:38 The 44 PMBOK(R) processes 26

Input: Project management plan

Quality metrics

Quality checklists

Work performance data

Approved change requests

Deliverables

Project documents

Organizational process assets

Tools & Techniques Seven basic quality tools

Statistical sampling

Inspection

Approved change requests review

Output: Quality control measurements

Validated changes

Verified deliverables

Work performance information

Change requests

Project management plan updates

Project document updates

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Quality Mgmt / Monitoring & Controlling 8.3 Control Quality

Page 27: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

27

26/02/2013 18:23:38 27

Input:

Project Management Plan

Activity resource requirements

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Organisational charts and position descriptions

Networking

Organizational theory

Expert judgement

Meetings

Output:

Human resource management plan

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Human Resources Mgmt / Planning 9.1 Plan Human Resource Management

Page 28: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

28

26/02/2013 18:23:38 28

Input:

Human resources management plan

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Pre-assignment

Negotiation

Acquisition

Virtual Teams

Multi-criteria decision analysis

Output:

Project staff assignments

Resource calendars

Project management plan updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Human Resources Mgmt / Executing 9.2 Acquire Project Team

Page 29: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

29

26/02/2013 18:23:38 29

Input: Human resource management plan

Project staff assignments

Resource calendars

Tools & Techniques Interpersonal skills

Training

Team-building activities

Ground rules

Co-location

Recognition and rewards

Personal assessment tools

Output: Team performance assessments

Enterprise environmental factors updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Human Resources Mgmt / Executing 9.3 Develop Project Team

Page 30: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

30

26/02/2013 18:23:38 30

Input:

Human resource management plan

Project staff assignments

Team performance assessments

Issue log

Work performance reports

Organizational process assets

Output:

Change requests

Project management plan updates

Project documents updates

Enterprise environmental factors updates

Organizational process assets updates

Tools & Techniques Observation and conversation

Project performance appraisals

Conflict management

Interpersonal skills

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Human Resources Mgmt / Executing 9.4 Manage Project Team

Page 31: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

31

26/02/2013 18:23:38 31

Input: Project management plan

Stakeholder register

Enterprise environmental factors

Organizational process assets

Tools & Techniques Communications requirement analysis

Communications technology

Communication models

Communication methods

Meetings

Output: Communications management plan

Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Communication Mgmt / Planning Process Group 10.1 Plan Communications Management

Page 32: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

32

26/02/2013 18:23:38 32

Input:

Communication management plan

Work performance reports

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Communication technology

Communication models

Communication methods

Information management systems

Performance reporting

Output:

Project communications

Project management plan updates

Project documents updates

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Communications Mgmt / Executing 10.2 Manage Communications

Page 33: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

33

26/02/2013 18:23:38 33

Input: Project management plan

Project communications

Issue log

Work performance data

Organizational process assets

Tools & Techniques Information management systems

Expert judgement

Meetings

Output: Work performance information

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Communications Mgmt / Monitoring & Controlling 10.3 Control Communications

Page 34: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

34

26/02/2013 18:23:38 34

Input:

Project management plan

Project charter

Stakeholder register

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Analytical techniques

Expert judgement

Meetings

Output:

Risk management plan

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Risk Mgmt / Planning Process Group 11.1 Plan Risk Management

Page 35: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

35

26/02/2013 18:23:38 35

Input: Risk management plan

Cost management plan

Schedule management plan

Quality management plan

Human Resource management plan

Scope baseline

Activity cost estimates

Activity duration estimates

Stakeholder register

Project documents

Procurement documents

Enterprise environmental factors

Organizational process assets

Output: Risk register

Tools & Techniques

Documentation reviews

Information gathering techniques

Checklist analysis

Assumptions analysis

Diagramming techniques

SWOT analysis

Expert judgement

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Risk Mgmt / Planning Process Group 11.2 Identify Risks

Page 36: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

36

26/02/2013 18:23:38 36

Input: Risk management plan

Scope baseline

Risk register

Enterprise environmental factors

Organizational process assets

Tools & Techniques Risk probability and impact assessment

Probability and impact matrix

Risk data quality assessment

Risk categorization

Risk urgency assessment

Expert judgement

Output: Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Risk Mgmt / Planning Process Group 11.3 Perform Qualitative Risk Analysis

Page 37: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

37

26/02/2013 18:23:38 37

Input: Risk management plan

Cost management plan

Schedule management plan

Risk register

Enterprise environmental factors

Organizational process assets

Tools & Techniques Data gathering and representation techniques

Quantitative risk analysis and modeling techniques

Expert judgement

Output: Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Risk Mgmt / Planning Process Group 11.4 Perform Quantitative Risk Analysis

Page 38: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

38

26/02/2013 18:23:38 38

Input: Risk management plan

Risk register

Tools & Techniques Strategies for negative risks or threats

Strategies for positive risks or opportunities

Contingent response strategies

Expert judgement

Output: Project management plan updates

Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Risk Mgmt / Planning Process Group 11.5 Plan Risk Responses

Page 39: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

39

26/02/2013 18:23:38 39

Input: Project management plan

Risk register

Work performance data

Work performance reports

Output: Work performance information

Change requests

Project Management Plan updates

Project documents updates

Organizational process assets updates

Tools & Techniques

Risk reassessment

Risk audits

Variance and trend analysis

Technical performance measurement

Reserve analysis

Meetings

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Risk Mgmt / Monitoring and Controlling 11.6 Control Risks

Page 40: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

40

26/02/2013 18:23:38 40

Input: Project management plan Requirement documentation Risk register Activity resource requirements Project schedule Activity cost estimates Stakeholder register Enterprise environmental factors Organizational process assets

Output: Procurement management plan Procurement statement of work Procurement documents Source selection criteria Make-or-buy decisions Change requests Project documents updates

Tools & Techniques

Make-or-buy analysis

Expert judgement

Market research

Meetings

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Procurement Mgmt / Planning Process Group 12.1 Plan Procurement Management

Page 41: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

41

26/02/2013 18:23:38 41

Input: Project management plan

Procurement documents

Source selection criteria

Seller proposals

Project documents

Make-or-buy decisions

Procurement statement of work

Organizational process assets

Output: Selected sellers

Agreements

Resource calendars

Change requests

Project management plan updates

Project documents updates

Tools & Techniques Bidder conference

Proposal evaluation techniques

Independent estimates

Expert judgement

Advertising

Analytical techniques

Procurement negotiations

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Procurement Mgmt / Executing Process Group 12.2 Conduct Procurements

Page 42: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

42

26/02/2013 18:23:38 42

Input:

Project management plan

Procurement documents

Agreements

Approved change requests

Work performance reports

Work performance data

Output:

Work performance information

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates

Tools & Techniques

Contract change control system

Procurement performance reviews

Inspections and audits

Performance reporting

Payment systems

Claims administration

Records management system

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Procurement Mgmt / Monitoring & Controlling 12.3 Control Procurements

Page 43: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

43

26/02/2013 18:23:38 43

Input: Project management plan

Procurement documents

Tools & Techniques Procurement audits

Procurement negotiations

Records management system

Output: Closed procurements

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Procurement Mgmt / Closing Process Group 12.4 Close Procurements

Page 44: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

44

26/02/2013 18:23:38 44

Input:

Project charter

Procurement documents

Enterprise environmental factors

Organizational process assets

Tools & Techniques

Stakeholder analysis

Expert judgement

Meetings

Output:

Stakeholder register

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Communication Mgmt / Initiating Process Group 13.1 Identify Stakeholders

Page 45: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

45

26/02/2013 18:23:38 45

Input: Project management plan Stakeholder register Enterprise environmental factors Organization process assets

Tools & Techniques

Expert judgement

Meetings

Analytical techniques

Output: Stakeholder management plan Project documents updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Stakeholder Mgmt / Planning Process Group 13.2 Plan Stakeholder Management

Page 46: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

46

26/02/2013 18:23:38 46

Input: Stakeholder management plan

Communications management plan

Change log

Organizational process assets

Tools & Techniques Communication methods

Interpersonal skills

Management skills

Output: Issue log

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Stakeholder Mgmt / Executing Process Group 13.3 Manage Stakeholder Engagement

Page 47: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

47

26/02/2013 18:23:38 47

Input:

Project management plan

Issue log

Work performance data

Project documents

Tools & Techniques

Information management systems

Expert judgement

Meetings

Output:

Work performance information

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates

Integration Scope Time Cost

Quality Human Resources

Communications Risk

Procurement Stakeholders

Stakeholder Mgmt / Monitoring & Controlling 13.4 Control Stakeholder Engagement

Page 48: 1 Integration Mgmt / Initiating Process Group 4.1 Develop ... · 4.1 Develop Project Charter . 2 26/02/2013 18:23:37 2 ... Project documents updates Time Mgmt / Planning Process Group

48

2/26/2013 48

How to read the slides

Knowledge Area Process Group

Process Name

The Inputs are often Outputs of other processes.

Section of PMBOK®

These are the Tools and Techniques that are to be used to generate Outputs from Inputs.

Context