FOUNDATIONS

Hydro insulation

Utilities

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 01

DETAIL NAME:

22 mm pipe for electrical

Gypsum board/ MGO board

Floor panel

Tyvek

Anchor bolt

Bottom plate (wooden)

Wall panel

Screw nails according calculationbut no more than 150 mm

End panel connector thk 45 mm

45 x195 mm pressured treated wood

D.P.C. membrane

Green Panel SIP screws

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

D.P.C. membrane

Aerated concrete(acoustic insulation)

Floor support material

20 m

m

MGO board

Screw nails according calculation

Stan

dard

hei

ght o

f 350

mm

Up lift element(tie down element)

SIP WALL/ SIP FLOOR

UP LIFT ELEMENT ONLY ON THE CORNER OF THE BUILDING

Panel thk

Sealant

Construction

FOUNDATIONS

Hydro insulation

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 02

DETAIL NAME:

Construction

FOUNDATIONS

Hydro insulation

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 02

DETAIL NAME:

20 m

m

Gypsum board/ MGO board

Anchor bolt

Bottom plate (wooden)

Wall panel

Screw nails according calculationbut no more than 150 mm

End panel connector thk 45 mm

45 x195 mm pressured treated wood

D.P.C. membrane

Green Panel SIP screws

D.P.C. membrane

Aerated concrete(acoustic insulation)

Floor support material

MGO board

Screw nails according calculation

Panel thk

SIP WALL/ SIP FLOOR

Tyvek

Floor panel

Sealant

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

FOUNDATIONS

Hydro insulation

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 03

DETAIL NAME:

Tyvek

SIP WALL/ SIP FLOOR

Floor joist(perpendicular to wall)

22 mm pipe for electrical

Gypsum board/ MGO board

Anchor bolt

Bottom plate (wooden)

Wall panel

Screw nails according calculationbut no more than 150 mm

Blocking connector thk 45 mm

45 x195 mm pressured treated wood

D.P.C. membrane

D.P.C. membrane

Aerated concrete(acoustic insulation)

Floor support material

20 m

m

MGO board

Screw nails according calculation

Stan

dard

hei

ght o

f 350

mm

Up lift element(tie down element)

Panel thk

Sealant

Thermal insulation

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

FOUNDATIONS

Acoustic

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 04

DETAIL NAME:

Two rows attached or per local code

Min. 5 cm bearing

Green PanelSIP screws

SIP DROOP WALL/ SIP FLOOR

Tyvek

Floor joist

22 mm pipe for electrical

Gypsum board/ MGO board

Anchor bolt

Bottom plate (wooden)

Wall panel

45 x195 mm pressured treated wood

D.P.C. membrane

D.P.C. membrane

Aerated concrete(acoustic insulation)

Floor support material

20 m

m

MGO board

Screw nailsaccording calculation

Stan

dard

hei

ght o

f 350

mm

Sealant

Panel thk

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 5

DETAIL NAME:

SIP WALL/ SIP FLOOR/ STEEL BEAM

Gypsum board/ MGO board

Floor panel

Tyvek

Bottom plate (wooden)

Wall panel

Screw nails according calculationbut no more than150 mm

End panel connector thk 45 mm

45 x 195 mm pressured treated wood

Green Panel S.I.P. screws

D.P.C. membrane

Floor support material

20 m

m

Screw nails according calculation

Aerated concrete(acoustic insulation)

MGO board

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Panel thk

Sealant

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 6

DETAIL NAME:

20 mm pipe for electricalhorizontal chase centered

Gypsum board/ MGO board

Wall panel

Screw nails according calculation

Screws nails according calculation

Bottom plate (wooden)

End panel connector

Header wrap (if required)

Extension top plate (wooden)

Gypsum board/MGO board

Top plate (wooden)

Floor Joist/ Posi-Joist/ I-Joist (perpendicular to wall)

SIP WALL/ FLOOR/ JOIST PARALLEL

Screws nails according calculationbut not less than 50 mm

D.P.C. membrane

Floor support material

20

mm

Aerated concrete(acoustic insulation)

Panel thk

Sealant

Sealant

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Utilities

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 7

DETAIL NAME:

Sta

ndar

d he

ight

of 3

50 m

m

20 mm pipe for electricalhorizontal chase centered

Gypsum board/ MGO board

Wall panel

Screw nails according calculation

Green Panel approved sealant at locations shown

Screws nails according calculation

Bottom plate (wooden)

End panel connector

Header wrap (if required)

Green Panel approved sealant at locations shown

Extension top plate (wooden)

Top plate (wooden)

Floor Joist/ Posi Joist/ I-Joist (perpendicular to wall)

SIP WALL/ FLOOR/ JOIST PARALLEL

Screws nails according calculationbut not less than 50 mm

D.P.C. membrane

Floor support material20 m

m

Aerated concrete(acoustic insulation)

Gypsum board/ MGO board

Panel thk

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 8

DETAIL NAME:

Gypsum board/ MGO board

Green Panel S.I.P. screwaccording calculation

SIP WALL CORNER

End panel connector (wooden)

Green Panel screw nails according calculation

O.S.B. boardAlternative top plate(wooden)

Gypsum board/ MGO board

Panel thk

Green Panel screw nails according calculation

Green Panel S.I.P. screwaccording calculation

Panel t

hk

Bottom plate (wooden)

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 9

DETAIL NAME:

Green Panel S.I.P. systeml

Gypsum board/ MGO board

Structural partition wall

Rockwool insulation

Gypsum board/ MGO board

Green Panel S.I.P. screw

End panel connector O.S.B.

P.I.R. foam

Panel thk

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 10

DETAIL NAME:

Green Panel S.I.P. system

75 m

mP.I.R. foam

Galvanized metal plate75 x 0.4 mm

Galvanized metal angle37.5 x 0.4 mm

Green Panel D.I.P. systemnon structural wall

Gypsum board/ MGO board

Gypsum board/ MGO board 3,6,9 mm

Gypsum board/MGO board

(100

mm

)

Panel thk

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 11

DETAIL NAME:

Gypsum board/ MGO board

Wall panel

Top plate (wooden)

Screw nails accordingcalculations

Green Panel SIP screw

Roof panel

Galvanized metallicangle 37.5 x 0.4 mm

Panel t

hk

O.S.B.

P.I.R. foam

End panelconnector 45 mm

Screw nails accordingcalculations

Panel thk

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 12

DETAIL NAME:

Gypsum board/ MGO board

2 cm

Green Panel approved panel seal tape at roof panels only

Green Panel approved sealant at location shown

Joint wood plate

10-30O

SIP JOINT/ SINGLE LUMBER SPLINE

Screw nails accordingcalculations

Screw nails accordingcalculations

Panel edge sealantat roof panels only

Joint wood plate

Panel t

hk

Panel t

hk

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 13

DETAIL NAME:

Gypsum board/ MGO board Green Panel approved sealant at location shown

Spline attached full round headsmooth shank nails both sides

Panel edge sealant atroof panels only

Green Panel galvanized metallic plate

SIP JOINT/ SPLINE

Screw nails accordingcalculations

Screw nails accordingcalculations

SIP joint element2 cm

Panel t

hk

Panel t

hk

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 14

DETAIL NAME:

Gypsum board/ MGO boardGreen Panel approved

sealant at location shown

Joint wood plate

Panel edge sealant atroof panels only

Green Panel approved panel seal tape at roof panels only

SIP JOINT/ SINGLE 4 X LUMBER SPLINE

Joint wood plate

SIP panel

Screw nails according calculations

Screw nails according calculations

Panel t

hk

Panel t

hk

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 15

DETAIL NAME:

Top plate (wooden)

2 x lintel plate (wooden)

Green Panel screw nailsaccording calculations

2 x blockingA

A

BB

Pa

ne

l th

k

Panel thk

A A

B B

Green Panel approved sealant at location shown

End panel top plate45mm

SMALL OPENING INSIDE PANEL

Green Panel screw nailsaccording calculations

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 16

DETAIL NAME:

ΚΟΡΥΦΗΣ

SIP WALL/ ROOF/ RAKE

Top plate (wooden)

O.S.B. board

P.I.R. foam

Screw nails accordingcalculations

Bottom plate (wooden)

Screw nails accordingcalculations

Panel thk

Bottom plate (wooden)

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 17

DETAIL NAME:

D.P.C. membrane

Floor support material

20 m

m

P.I.R. foam

O.S.B.

Gypsum board

Screw nails according calculations

S.I.P. system

Aerated concrete(acoustic insulation)

Panel thk

Solid Beam (for support andconnections seeDetail no. 48 - Floors chapter)

Screw nails according calculations

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 18

DETAIL NAME:

Max. 2800

Panel joint wood plate45 x 90 mm

Bottom plate45 x 90 mm

Green Panel S.I.P. system

Screw nails according calculations

O.S.B.

P.I.R. foam

1250

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 19

DETAIL NAME:

Screw nails according calculations

Bottom plate45 x 90 mm

Panel joint wood plate90 x 90 mm

Max. 3500

200

1250

Green Panel S.I.P. system

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 20

DETAIL NAME:

Hangers

Hangers 600 mm

Screw nails according calculations

Green Panel S.I.P. system

4 x 7.5/ 200

DETAIL ABottom plate

45 x 90 mm

Panel joint wood plate

For more th

an 4 m

DETAIL A

2001250

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 21

DETAIL NAME:

45x90

Bottom plate45x90mm

Lintel wood plate2 pieces of 45 x 90 mm

Green Panel S.I.P. system

window oppening

Lintel structure for openings more than 2.80maccording engineering calculations

Green Panel S.I.Psystem

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 22

DETAIL NAME:

Continue lintel wood plate 2 pieces of 38 x 89 mm

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 23

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Fire

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 24

DETAIL NAME:

GROUND FLOOR, ap. 1 GROUND FLOOR, ap. 2

FIRST FLOOR, ap. 1 FIRST FLOOR, ap. 2

LAST FLOOR, ap. 1 LAST FLOOR, ap. 2

D.P.C. membrane

Floor support material

20 m

m

D.P.C. membrane

Floor support material

20m

m

D.P.C. membrane

Floor support material

20 m

m

D.P.C. membrane

Floor support material

20 m

m

D.P.C. membrane

Floor support material

20m

m

D.P.C. membrane

Floor support material

20 m

m

O.S.B

S.I.P. system, roof panel

S.I.P. system, wall panel

S.I.P. system, wall panel

Fire protection Gyproc 50 mm

Fire protection Gyproc 50 mm

Fire protection Gyproc 50 mm

O.S.B

O.S.B

ROCKWOOL

Wood beamRockwool

RockwoolRockwool

S.I.P. system, roof panel

Gypsum board/MGO board

Gypsum board/MGO board

Gypsum board/MGO board

Wood beam

I beam wood + O.S.B.

I beam wood+O.S.B.

S.I.P. system, wall panel

S.I.P. system, wall panel

S.I.P. system, wall panel

Aerated concrete(acoustic insulation)

Aerated concrete(acoustic insulation)

Aerated concrete(acoustic insulation)

Aerated concrete(acoustic insulation)

Aerated concrete(acoustic insulation)

Aerated concrete(acoustic insulation)

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Fire

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 25

DETAIL NAME:

D.P.C. membrane

Floor support material

20 m

m

Aerated concrete(acoustic insulation)

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Fire

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 26

DETAIL NAME:

S.I.P. panel

Beam

Rockwool 30 mm

Rockwool 30 mm

GAP, 12 mm

Beam

O.S.B. 12 mm for insulation support

Sound absorption tape

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 27

DETAIL NAME:

screw nail typesGreen Panel

SCREW NAIL TYPESGREEN PANEL

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 28

DETAIL NAME:

CUTTING LIST

1.4

00.8

0

2.8

0 B1

B2

B3

B4

0.6

01.6

00.6

0

0.6

02.2

0

0.35

0.70 0.80 0.55 0.60 1.25

0.30

1.25 0.80 1.25 1.05 1.25

B5

B6

B7

B8 B9 B10

B11

B12 B13 B14

CUTTING LIST

2.8

0

0.6

0

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 29

DETAIL NAME:

Lintel plate45 x 90 mm

Base plate45 x 90 mm

Lateral plate45x90mm

Lateral plate45 x 90 mm

125 cm

NOTE! If the window opening more then 60 x 60 cm, structural frame is needed.NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 30

DETAIL NAME:

NOTE! If the window opening position has in top of the panel less then 60cm, it needs engineering calculations; for more than 60x60cm, it needs structural frame

Less

than 6

0 c

m

125 cm

Lintel plate45 x 90 mm

Base plate45 x 90 mm

Lateral plate45x90mm

Lateral plate45 x 90 mm

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 31

DETAIL NAME:

125 cm Top plate45 x 90 mm

Bottom plate45 x 90 mm

280 c

m

End panel plate45 x 90 x 2665 VIEW

PLAN

End panel plate45 x 90 x 2665

Joint panel plate90 x 90 x 2665

Joint panel plate90 x 90 x 2665

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Acoustic

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 32

DETAIL NAME:

Extension plateTop plate

Brick

Brick

Rendering

Wood eave board

Fascia board

Roof tileRockwool

Wood slate

TyvekRafter

Purlin

S.I.P. system

Gypsum board/MGO board

Window

LintelTop plate

Lintel

300

22

5200

13 112 50 100 20

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Acoustic

Fire

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 33

DETAIL NAME:

Brick/ concrete

S.I.P. panel

O.S.B.Rockwool

Acoustic slide concrete

TOP VIEW

O.S.B.

Gypsum board/ MGO board

Rockwool

Steam barrier

Plastic profile

S.I.P. system

O.S.B.

O.S.B.

P.I.R. foam

Fire protection,Gyproc 50 mm

Brick/ concrete

Gypsum board/MGO board

O.S.B.

Screw nails accordingcalculations

End panel plate (wooden)

End panel plate (wooden)

Fire protection,Gyproc 50 mm

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Thermal insulation

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 34

DETAIL NAME:

S.I.P. system

O.S.B.

Bottom plate (wooden)

Pressured treated wood

Slide concrete

Anchor bold

P.I.R. foam

O.S.B.

Slide concrete

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Thermal insulation

Fire

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 35

DETAIL NAME:

Gypsum board/MGO board

O.S.B.

P.I.R. foam

Double gypsum board/ MGO board

Tyvek

S.I.P. systemScrew nails accordingcalculations

Fire protection,Gyproc 50 mm

Fire protection,Gyproc 50 mm

Brick/ concrete

Gypsum board/ MGO board

APARTMENT 1

APARTMENT 2

O.S.B.

Tyvek

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Thermal insulation

Fire

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 36

DETAIL NAME:

Fire protection,Gyproc 50 mm

Brick fixing system

Tyvek

Up lift element (wooden)

O.S.B.

Screw nails accordingcalculation

Rockwool

Wood beam

Gypsum board/ MGO board

O.S.B.

Extension plate (wooden)

Top plate (wooden)

P.I.R. foam O.S.B.

Finished brick

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Screw nails accordingcalculation

Construction

Fire

Hydro insulation

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 37

DETAIL NAME:

Gypsum board/ MGO board

Gypsum board/MGO board

Chimney

Hydroinsulation

Fire protection

Roof S.I.P. panel

O.S.B.

P.I.R. foam

O.S.B.

5 cm

5 cm

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Hydro insulation

Fire

Construction

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 38

DETAIL NAME:

S.I.P. system

Fire protection

Fire place concrete structure

Gypsum board/MGO board

S.I.P. system

Chimney

Fire protection

Fire place concrete structure

Fire place concrete structure

Concrete base

SECTION

TOP VIEW Stone mask

End panel connector(wooden)

S.I.P. system, wall panel

Concrete box

Fire protection

FIRE PLACE

Fire place - structure

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

Utilities

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 39

DETAIL NAME:

Utilities pipes

O.S.B.

Wood slate

End panel connector

Screw nails accordingcalculations

End panel connector

O.S.B.

P.I.R. foam

S.I.P. system

S.I.P. system

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

Utilities

Acoustic

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 40

DETAIL NAME:

Concrete slab

Base concrete

Tyvek

Floor tiles

Plinth

O.S.B.

Gypsum board/MGO board

Utilities pipe

P.I.R. foam O.S.B.

Anchor bold

Screw nails accordingcalculations

Finishing material

Base concrete

Top plate (wooden)

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

Utilities

WALLS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 41

DETAIL NAME:

Concrete slab

Base concrete

Tyvek

Floor tiles

Plinth

O.S.B.

Gypsum board/MGO board

Utilities pipe

P.I.R. foam

O.S.B.

Anchor bold

Screw nails accordingcalculations

M.G.O. board

Top plate (wooden)

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Construction

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 41

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

SIP WALL/ SIP FLOOR/ STEEL BEAM

Gypsum board/ MGO board

Floor panel

Tyvek

Bottom plate (wooden)

Wall panel

Screw nails according calculationbut no more than 150 mm

End panel connector thk 45 mm

45 x 195 mm pressured treated wood

Green Panel S.I.P. screws

D.P.C. membrane

Floor support material

20

mm

Screw nails according calculation

Aerated concrete(acoustic insulation)

MGO board

Panel thk

Acoustic

Construction

Hydro insulation

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 42

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

20 mm pipe for electricalhorizontal chase centered

Gypsum board/ MGO board

Wall panel

Screw nails according calculation

Green Panel approved sealant at locations shown

Screws nails according calculation

Bottom plate (wooden)

End panel connector

Header wrap (if required)

Green Panel approved sealant at locations shown

Extension top plate (wooden)

Gypsum board/MGO board

Top plate (wooden)

Floor Joist/ Posi-Joist/ I-joist (perpendicular to wall)

SIP WALL/ FLOOR/ JOIST PARALLEL

Screws nails according calculationbut not less than 50 mm

D.P.C. membrane

Floor support material2

0 m

m

Aerated concrete(acoustic insulation)

Panel thk

Hydro insulation

Construction

Utilities

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 43

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Wall panel

Screw nails according calculation

Green Panel approved sealant at locations shown

Height extension top plate

End panel connector 45 mm

D.P.C. membrane

Green Panel approved sealant at locations shown

Screw nails according calculation

Top plate (wooden)

Gypsum board/ MGO board

Gypsum board/ MGO board

20 mm pipe for electricalhorizontal chase centered

SIP WALL/FLOOR/ JOIST PARALLEL

Bottom plate (wooden)

Wood andO.S.B. joist

D.P.C. membrane

Floor support material

Aerated concrete(acoustic insulation)

Panel thk

20

mm

Construction

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 44

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

D.P.C. membrane

Floor support material

Galvanized metal angle 37.5 x 0.4 mm

100 mm

P.I.R. foam

Gypsum board/MGO board 3,6,9 mm

Floor panel

Tyvek

D.P.C. membrane

Anchor bolt

D.I.P. systemnonstructural wall

S.I.P. wall

45 x 195 mm pressured treated wood

Aerated concrete(acoustic insulation)

S.I.P. wall

Acoustic

Construction

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 45

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Acoustic absorption tape

O.S.B. floor support

S.I.P. systemGreen Panel

Top plate2 plies x 45mm x 90 mm

Screw nailsaccording calculations

“I” type beamGreen Panel

Hanger as per calculation

Acoustic

Construction

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 46

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Beam

Acoustic absorption tape

O.S.B. floor support

S.I.P. systemGreen Panel

Top plate2 plies x 45mm x 90 mm

Screw nailsaccording calculations

Screw nailsaccording calculations

Construction

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 47

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Wood beam Top plate45 x 90 mm

O.S.B.

S.I.P. panel

P.I.R. foam

O.S.B.

Hanger as per calculation

Acoustic

Fire

Construction

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 48

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Fire protectionGyproc 50 mm

Concrete

Rockwool 50 mm

O.S.B. 18 mm

S.I.P. systemBeam

Double gypsum board/MGO board

Gypsum board/MGO board

End panel connector

Screw nails accordingcalculations

Gyproc 50 mm

Bottom plate (wooden)

Gypsum board/MGO board

O.S.B.

O.S.B.

Tyvek

P.I.R foam

Plastic profile

Aerated concrete(acoustic insulation)

Acoustic

Construction

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 49

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Gypsum board/MGO board

P.I.R. foam

O.S.B.

Brick/ concrete

Bottom plate (wooden)

Screw nails accordingcalculations

Up lift element

Extension plate(wooden)

Top plate (wooden)

O.S.B.

Screw nails accordingcalculations

Rockwool

Wood beam

O.S.B.

Gypsum board/MGO board

Screw nails accordingcalculations

S.I.P. system

Construction

FLOORS

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 50

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Wood beam

Double gypsum board or otherapproved thermal barrier

O.S.B.

P.I.R. foam

Gypsum board/ MGO board

O.S.B.

O.S.B.

Metallic profile

P.I.R. foam

Bottom plate (wooden)

Utilities pipe

End beam connector(wooden)

Screw nails accordingcalculations

Aerated concrete(acoustic insulation)

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 51

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

O.S.B. panelGypsum board/ MGO board

Green Panel screw nailsaccording calculation

Beveled lumber attached, full round head smooth shank nails both sides

10d nails two rows staggered or per local code

SIP WALL ANGLED CORNER

O.S.B. panel

P.I.R. foamS.I.P. roof panel

Green Panel approved sealant at locations shown

Pan

el th

k

Panel thk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 52

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Green Panel approved sealant at locations shown

Beveled lumber attached, fullround head smooth shank

nails both sides

Green Panel S.I.P. screw

SIP WALL ANGLED CORNER/ OVERLAY

Green Panel screw nailaccording calculation

Gypsum board/ MGO board

O.S.B. panel

P.I.R. foam

Pan

el th

k

Panel thk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 53

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Gypsum board/ MGO board

Roof panel S.I.P. system

Wall panel S.I.P. system

Top plate 45 mm

Green Panel approved galvanized metal angle

Green Panel S.I.P. screw

Green Panel approvedsealant at locations shown

End panel plate

SIP WALL/ ROOF/ SQUARECUT EAVE

Screw nails according tocalculations

P.I.R. foam

O.S.B. panel

Panel thk

Pan

el th

k

Gypsum board/ MGO board

Green Panel screw nailsaccording calculation

P.I.R. foam

O.S.B. panel

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 54

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Gypsum board or otherapproved thermal barrier

Roof panel S.I.P. system

Wall panel S.I.P. system

Screw nail accordingcalculations

SILI top plate

Green Panel screw

Green Panel approvedgalvanized metal angle

Panel thk

SIP WALL/ ROOF/ BLOCKING/ SQUARE CUT EAVE

Gypsum board/MGO board

P.I.R. foam

Screw nails accordingcalculations

End panel plate

Pan

el th

k

P.I.R. foam

O.S.B. panel

O.S.B. panel

Green Panel approvedsealant at locations shown

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 55

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

SIP WALL/ ROOF/ PLUMB CUT EAVE

Gypsum board or otherapproved thermal barrier

Roof panel S.I.P. system

Wall panel S.I.P. system

Screw nail accordingcalculations

SILI top plate

Green Panel screw

Green Panel approvedgalvanized metal angle

Gypsum board/MGO board

P.I.R. foam

Screw nails accordingcalculations

End panel plate

Pan

el th

k

P.I.R. foam

O.S.B. panel

O.S.B. panel Green Panel approvedsealant at locations shown

Panel thk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 56

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

SIP WALL/ ROOF/ BLOCKING/ PLUMB CUT EAVE

Panel thk

Gypsum board or otherapproved thermal barrier

Wall panel S.I.P. system

Screw nail accordingcalculations

SILI top plate

Green Panel approvedgalvanized metal angle

Gypsum board/MGO board

P.I.R. foam

Pan

el th

k

O.S.B. panel

Roof panel S.I.P. system

Green Panel screw

Screw nails accordingcalculations

End panel plate

P.I.R. foam

O.S.B. panel

Green Panel approvedsealant at locations shown

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 57

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Height extension top plate (wooden)

Pre-engineered wood trusses

Screw nails according calculations

Top plate (wooden) 45 mm

Green Panel screw nails according calculations

SIP WALL/ PRE-ENGINEERED WOOD TRUSSES

Galvanized metallic platefor joint pieces with nails

Galvanized metallic platefor joint pieces with nails

Gypsum board /MGO board

Wall panel S.I.P. system

Wood beam/ joist

Pan

el th

k

Panel thk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 58

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Ridge beam

Gypsum board or otherapproved thermal barrier

Galvanized metallic profile

O.S.B.

Panel edge sealant End panel connector 45 mm

Green Panel S.I.P. screw

Min. 5 cm bearing

SIP ROOF/ RIDGE BEAM/ RIDGE PLATES

Green Panel approvedsealant at locations shown

Panel thk

Pan

el th

k

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 59

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Ridge beam

Gypsum board/MGO board

Panel edge sealantGreen Panel SIP screw

End panel connector

Rafter

SIP ROOF/ RAFTER/ RIDGE PLATES

Galvanizedmetallic profile

Screw nails according calculations

Green Panel approvedsealant at locations shown

Panel thk P

anel

thk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 60

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Green Panel screw

Panel edge sealant

Two part polyurethanefoam sealant

Ridge beam

Gypsum board/ MGO board

1 cm min.

O.S.B.

Min. 5 cm bearing

SIP ROOF/ RIDGE BEAM/ TWO PART FOAM

Panel thk

Pan

el th

k

Galvanizedmetallic profile

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 61

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Galvanizedmetallic profile

O.S.B.

Min. 5 cm bearing

Ridge beam

Gypsum board/ MGO board

Panel edge sealantGreen Panel approved sealant

at locations shown

End panel connector45mm

Green Panel S.I.P. screw

SIP ROOF/ RIDGE BEAM/ OVERLAY

Screw nails according calculation

Panel th

kPanel thk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 62

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Panel edge sealant

Gypsum board /MGO board

O.S.B.

Green Panel galvanized metallic angle

Valley beam (min. 5c m bearing each panel)

Engineered lumber valley plates attachedfull round head smooth shank nails top side

SIP ROOF/ VALLEY BEAM PLATES

Screw nails according calculations

Green Panel S.I.P. screw

Green Panel approvedsealant at locations shown

Panel thkP

anel

thk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 63

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Gypsum Board/ MGO board

O.S.B.

Green Panel galvanized metallic angle

Valley beam (min. 5 cm bearing each panel)

Green Panel S.I.P. screw

Panel edge sealant

Green Panel approved two part polyurethane foam sealant

SIP ROOF/ VALLEY BEAM/ TWO PART FOAM

Pan

el th

kP

anel thk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 64

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Green Panel S.I.P. screws

Panel edge sealant

O.S.B. surface spline attachedfull round head smooth shank nails top side

Green Panel approved two part polyurethane foam sealant

Gypsum board/ MGO board

Beam

O.S.B.Green Panel approved panel seal tape at roof panels only

SIP JOINT/ BEAM/ OSB SURFACE SPLINE

Screw nails according calculation

Panel t

hk

Panel t

hk

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 65

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Panel edge sealantat roof panels only

Spline attached full round head smoothshank nails top side

SIP JOINT/ BEAM/ INSULSPLINE

Panel t

hk

Panel t

hk

Green Panel approved two part polyurethane foam sealant

Gypsum board/ MGO board

BeamO.S.B.

Screw nails according calculation

Green Panel S.I.P. screws

ROOF

Construction

INTEGRATED CONSTRUCTION SYSTEM

SCALE:

LAST UPDATE: DETAIL 66

DETAIL NAME:

NOTES:

1. The detail is to be used with Green Panel construction drawings and installation guide. Refer to Green Panel construction drawings for final nail and screw schedules.2. All building components used in construction with this detail shall be in compliance with local code requirement.

Green Panel S.I.P. screws

Gypsum board/MGO boardBeam

O.S.B.

SIP PANEL/ INTERMEDIATE BEAM

Panel t

hk

Panel t

hk

INTEGRATED CONSTRUCTION SYSTEM

The Grand Complex, 7th Floor Office 7.1490 Calea 13 Septembrie 5th district

Bucharest, Romania, 050726Tel.: +40 (21) 311.24.78 Fax: +40 (21) 311.24.82

[email protected] www.green-panel.eu