![Page 1: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/1.jpg)
1
EXAMPLE EXAMPLE PROBLEMPROBLEM
378 & 410 GSS378 & 410 GSS
![Page 2: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/2.jpg)
2
TRAINING OBJECTIVESTRAINING OBJECTIVES
• Be able to flood route a 378 pond and design a pond without and with a pipe.
![Page 3: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/3.jpg)
Slide 3
PERM,POOL
TAILWATER ELEV
EXIT CHANNEL
INLET CHANNEL
CREST AUX.. TOP DAM
TAIL-WATER
TOP DAM-FBH +FreeboardCREST AUX.
PERM. POOL
FBH SDH PSH
CONDUIT
CREST PS
DESIGN FLOW (SDH)
TAIL-WATER
AUX. SPLWY.
![Page 4: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/4.jpg)
4
SITES 378 PROBLEM
A. GIVEN:
Drainage Area = 103 acres. Hazard Class = A1 RCN = 72 W/S length = 987’ with a slope of 2% Auxiliary Spillway Crest=Permanent Pool @ Elev. 103.6feet. No principal spillway Valley Floor Elevation - 88 feet
![Page 5: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/5.jpg)
5
Structure Data
Elev. (ft) Surface Area (Ac.)85.5 089.5 0.396.4 1.2100 4.8104.3 10.8106 11.8
107 12.4
![Page 6: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/6.jpg)
6
Rainfall: Design FBH = 8.95”
Rain distribution: Read in a 24-hr duration, rain table
No Principal Spillway Auxiliary Spillway located at 103.6 EL.
![Page 7: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/7.jpg)
7
T = Total Hydraulic Stress – lb/ft2T = Vegetal Stress + Effective Soil StressT = Tve +Te
Auxiliary Spillway has a CL material with PI=15
Allowable effective soil stress=0.05 lb/ft2
![Page 8: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/8.jpg)
8 DAM CENTERLINE Centerline Dam Valley Profile Data:
Station (ft.) /Elev. (ft.)
0/107 26/106 69/104.3
99/103 133/100.8 163/99.6
193/98.4 223/96.9 253/96.4
283/93.6 321/89.5 371/94
401/95.2 421/95.8 451/96.9
491/103.3 521/107
![Page 9: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/9.jpg)
9
Embankment Data:
Top Width = 12’Upstream side slope = 4:1Downstream side slope =
4:1No Wave Berm WidthNo Stability BermsCrown = 0
![Page 10: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/10.jpg)
10Auxiliary Spillway Data: We want to do a Stability & Integrity Analysis of the Spillway. You set the crest at 103.6
Station at DS end of Crest = 620Inlet length of the auxiliary spillway is about 230 ft.Profile or spillway inlet template data
(x,y) (distance, drop): 50’/0’; 280’/3.0’Bottom Width: 30 feetSpillway sideslope = 3:1Spillway slope 3% (constructed exit
channel)
![Page 11: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/11.jpg)
11
50’
280’
3’
Inlet Spillway Template
Z = 3:1
BW = 30’
Tie-in Station 6+20
![Page 12: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/12.jpg)
12
Spillway Geology and Vegetation Spillway Geology and Vegetation Data:Data:
Material in spillway - Clay (CL)PI or (lw) = 18The representative soil particle size D75 = 0.0024 inchesPercent Clay = 28% (in material in spillway)Dry Density of the clay = 92 pcfHeadcut Erodability Index = 0.1Vegetative Retardance Curve Index = 5.6 (Inlet)Vegetative Retardance Curve Index = 5.6 (Outlet)
![Page 13: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/13.jpg)
13Assume 2 foot (2’) of rooting depth in spillwayOne foot (1’) of topsoil will be installed in the constructed channel. CL-PI=15The topsoil D75 is 0.02”.Cover Factor (assume good) bromegrass = 0.7 - 0.8Maintenance Code (assume good in constructed ) = 1Maintenance Code (assume minor irr. in natural ) = 2
![Page 14: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/14.jpg)
14
Coordinates of top of material: Sta. (ft.)/ Elev. (ft.)
100/85; 310/95; 410/106; 500/107; 700/106; 750/100; 930/95; 960/90; 1000/84
![Page 15: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/15.jpg)
15
Erosion resistant soil @ 3% exit slope.Allowable velocity = 7.0 fps.
![Page 16: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/16.jpg)
16
Smooth Bromegrass is a cool-season grass introduced into the United States from Hungary in 1884 -This leafy and sod-forming perennial spreads aggressively through both seeds and rhizomes. It grows 15 to 30 inches high and flowers during late spring and early summer in an open panicle.
![Page 17: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/17.jpg)
17
T = Total Hydraulic Stress – lb/ft2T = Vegetal Stress + Effective Soil StressT = Tve +Te
Allowable Vegetal Stress=Tva = 0.75 CiCi = Retardance Index@ Ci = 5.6Tva = 4.2 lbs/ft2 - Allowable vegetal stressTa= Allowable Total Hydraulic Stress=4.2 + .05= 4.25
lb/ft2
![Page 18: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/18.jpg)
18PART A
FIND: Save Separate Files
1. Is this an acceptable pond design without a pipe? Y / N
A. Top of Dam= _________ EL.B. Settled Volume= ____________ CY
2. Remove all vegetation. (HINT-n=.0156. For fine-grained, cohesive soils, the value of n is taken as 0.0156) Is this an acceptable pond design without a pipe? Y / N
![Page 19: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/19.jpg)
19
PART B: Use PART A input as a start.
This pond has gullies in the upstream area of the pool. Need to design a GSS for this site. Permanent Pool @ Elev. 100.0 ft. This will cover headcuts with 2.0 ft. of water. Crest of principal spillway = 100.0 ft EL. Volume of sediment between principal and aux spw = 0.0 AF. Rainfall: PSH=1 day = 7.5”Principal Spillway Data: (Single Stage Circular Conduit)
Number of Conduits = 1Length of Conduit = 114 feetDiameter of Conduit = 12”Conduit “n” = 0.013Ke = 1.0HGL at outlet of conduit = 89.5 feet.Riser weir length = 6.28 feet. (24 inch dia.)
![Page 20: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/20.jpg)
20
![Page 21: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/21.jpg)
21
No Wave Berm WidthNo stability BermsCrown = 1.0’
Auxiliary Spillway Data: We want to do a Stability & Integrity Analysis of the
Spillway. Let the program set the crest of the auxiliary spillway.
1. What is the Auxiliary Spillway Crest (ASC) _________EL.2. What is the Top of Dam (TOD) ____________EL.3. What is estimated construction volume ________CY.4. What is effective soil stress_____________lb/ft2. 5. What is the integrity distance for the spillway
analyzed.
![Page 22: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/22.jpg)
22
Part C Use Part B file as a start
Rainfall: PSH=1 day = 7.5”Use a Hood Inlet with same diameter and pipe length as
the pipe drop.Distance to bend 100’ and bend to outlet 14’.The elevation of the bend is 90 and the outlet is 89.Say the Mannings “n” = 0.013Circular weir coeff. -- 0.6Entrance coeff. -- 1.0
1. What is the Auxiliary Spillway Crest (ASC) _________EL.2. What is the Top of Dam (TOD) ____________EL.3. What is estimated construction volume ________CY.
![Page 23: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/23.jpg)
23
![Page 24: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/24.jpg)
24
Part D Use Part B input file as a start
Add stability berm on the down stream side at 5’ with 25’ top width. Add a wave berm width =20’ on the front slope.
1. What is estimated construction CY?.
![Page 25: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/25.jpg)
25
Right Click on the Start button, and Select Explore.
Management of files
FOLLOW ALONG
![Page 26: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/26.jpg)
26
Highlight Local Drive (C:)
![Page 27: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/27.jpg)
27
Click - File/New/Folder
![Page 28: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/28.jpg)
28
2. Exit Explore
1. Type “SITESWorkshop” and enter
![Page 29: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/29.jpg)
29
1. Left Click the Start button/All Programs/Engineering
Applications/SITES/SITES 2005
![Page 30: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/30.jpg)
30
![Page 31: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/31.jpg)
31
![Page 32: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/32.jpg)
32
![Page 33: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/33.jpg)
33
File / New File / New ProjectProject
Locate SITESWorkshop
and Double Click
![Page 34: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/34.jpg)
34
File / New File / New ProjectProject
Click OKTYPE EX1
![Page 35: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/35.jpg)
35
File / New FileFile / New File
File/New File
![Page 36: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/36.jpg)
36
File / Save AsFile / Save As
File/Save As
Click Save
![Page 37: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/37.jpg)
37
HOME SCREEN
![Page 38: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/38.jpg)
38
Navigating in SITES
• Home Screen
• Schematic
• Input Screens
![Page 39: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/39.jpg)
39
Schematic
• Editing File
• Dbl-click element to edit
![Page 40: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/40.jpg)
40
Input Screen -Typical• Editing data
element on schematic
![Page 41: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/41.jpg)
41
File / ContinueFile / Continue
File/Continue
![Page 42: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/42.jpg)
42
Enter Data /Next Screen
4. Class (a) dams that have a product of storage times the effective height of the dam of 3,000 or more, those more than 35 ft in effective height, and all class (b) and class (c) dams shall meet or exceed the requirements specified in Technical Release No. 60 (TR-60).
![Page 43: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/43.jpg)
43
Watershed SchematicWatershed Schematic
Click to Add Structure
![Page 44: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/44.jpg)
44
Watershed SchematicWatershed Schematic
Double Click to Add Data
For This Structure
![Page 45: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/45.jpg)
45
Watershed InformationWatershed Information
Input Data and Click
![Page 46: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/46.jpg)
46
Structure Data TableStructure Data Table
InPut Data and Click
![Page 47: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/47.jpg)
47
Watershed DataWatershed Data
Input Data and Click
NRCS Curve Number Method
![Page 48: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/48.jpg)
48
Rainfall DataRainfall Data
Input Data and Click
![Page 49: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/49.jpg)
49
Rainfall Distribution Rainfall Distribution TableTable
Click Open
![Page 50: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/50.jpg)
50
Rainfall Distribution Rainfall Distribution TableTable
Input Data and Click
![Page 51: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/51.jpg)
51
Pool DataPool Data
Include planned aerated sediment, for life of structure. (optional)
Include planned submerged sediment, for life of structure.
Start Routing is required.
Input Data and Click
![Page 52: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/52.jpg)
52
Principal Spillway TypePrincipal Spillway Type
Input Data and Click
![Page 53: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/53.jpg)
53
Valley ElevationsValley Elevations
Input Data and Click
![Page 54: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/54.jpg)
54
Valley ElevationsValley Elevations
Input Data and Click
Enter
![Page 55: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/55.jpg)
55
Valley ElevationsValley Elevations
Input Data and Click
Enter
![Page 56: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/56.jpg)
56
Valley ElevationsValley Elevations
Input Data and Click
Enter
![Page 57: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/57.jpg)
57
Valley ElevationsValley Elevations
Input Data and Click
Enter
Click Next Screen
![Page 58: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/58.jpg)
58
Embankment TemplateEmbankment Template
Input Data and Click
![Page 59: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/59.jpg)
59
Auxiliary Spillway (AS) CrestAuxiliary Spillway (AS) Crest
Click
Click
![Page 60: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/60.jpg)
60
Auxiliary Spillway (AS) Auxiliary Spillway (AS) CrestCrest
Input Data and Click
![Page 61: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/61.jpg)
61
Tie Station Definition
• Downstream end of the level crest section of auxiliary spillway
• Ties station together for:– Auxiliary spillway inlet template – Geologic materials in auxiliary spillway exit
channel
![Page 62: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/62.jpg)
62
50’
280’
3’
Inlet Spillway Template
Z = 3:1
BW = 30’
Tie-in Station 6+20
![Page 63: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/63.jpg)
63Auxiliary Spillway Inlet Auxiliary Spillway Inlet TemplateTemplate
Click
Tie-in Station 6+20
![Page 64: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/64.jpg)
64Auxiliary Spillway Exit Auxiliary Spillway Exit TemplateTemplate
Input Data and Click
![Page 65: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/65.jpg)
65Auxiliary Spillway Exit Auxiliary Spillway Exit TemplateTemplate
![Page 66: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/66.jpg)
66Auxiliary Spillway Exit Auxiliary Spillway Exit TemplateTemplate
![Page 67: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/67.jpg)
67Auxiliary Spillway Cross Auxiliary Spillway Cross SectionSection
Input Data and Click
![Page 68: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/68.jpg)
68
Auxiliary Spillway Auxiliary Spillway MaterialMaterial
Input Data
![Page 69: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/69.jpg)
69
Auxiliary Spillway Auxiliary Spillway MaterialMaterial
Input Data and Click
Next Screen
![Page 70: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/70.jpg)
70
Topsoil Fill And General Topsoil Fill And General FillFill
Input Data
Click
![Page 71: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/71.jpg)
71
Topsoil Fill And General Topsoil Fill And General FillFill
Input Data and Click
Next Screen
![Page 72: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/72.jpg)
72
Output OptionsOutput Options
Input Data and Click
Next Screen
![Page 73: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/73.jpg)
73
Watershed SchematicWatershed Schematic
File / Home Screen
![Page 74: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/74.jpg)
74
Home ScreenHome Screen
File / Save As Save
Yes
![Page 75: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/75.jpg)
75
Home ScreenHome Screen
Build / Check FIle
Click
Build / Build File
![Page 76: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/76.jpg)
76
Home ScreenHome Screen
View / Summary Table
Click to Highlight
View Text
![Page 77: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/77.jpg)
77
Output TextOutput Text
Edit/Find
Click
Click
Adjust Side Bar
![Page 78: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/78.jpg)
78
Output TextOutput TextMaximize
Ta=.05 lb/ft2.OK
Velocity < Va=7.0 fps.OK
Tve=T-Te=1.66 lb/ft2.Less than allowable of 4.2 lb/ft2
OK
![Page 79: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/79.jpg)
79
Output TextOutput TextFile/Exit
ASC=103.6 El.TOD=106.4 El.
Volume=8435 CY
![Page 80: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/80.jpg)
80
Output TextOutput Text
File/Exit
![Page 81: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/81.jpg)
81
Home ScreenHome Screen
File/Save AsA2EX1nopipe.d2c
Finish EX1
![Page 82: 1 EXAMPLE PROBLEM 378 & 410 GSS. 2 TRAINING OBJECTIVES Be able to flood route a 378 pond and design a pond without and with a pipe](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56649e795503460f94b78f09/html5/thumbnails/82.jpg)
82
The End
• “The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable sex, marital status, family status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual’s income is derived from public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at 202-720-2600 (voice and TDD).
• “To file a complaint of discrimination write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) 202-720-6382 (TDD). USDA is an equal opportunity provider and employer.”