A significant example from
a recent Italian newspaper
(3rd February 2010)
Controversy over modern buildings: a recent case
![Page 3: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/3.jpg)
3
The Council building is making us ill !
Deluge of complaints from
employees about the new
headquarters
Some areas are freezing
whereas others are boiling,
encouraging illnesses
The building was designed
as an open space but was
then subdivided
Controversy over modern buildings: a recent case
![Page 4: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/4.jpg)
4
FARAM S.p.A. Headquarters
Project: Renovation and extension works
Location : Parma (Italy)
Architect: Claudio Manni
Total internal area: 1700 m2
•Offices: 850 m2
•Show-room: 350 m2
•Service: 500 m2
![Page 5: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/5.jpg)
5
Existing building
![Page 6: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/6.jpg)
6
Needs, Requirements and Objectives
Corporate image:
implementing innovative and high-
quality solutions
![Page 7: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/7.jpg)
7
Needs, Requirements and Objectives
Employee comfort
•Visual comfort
•Acoustic comfort
•Thermohygrometric comfort
•Air quality
•Ergonomics
•Electromagnetic pollution
![Page 8: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/8.jpg)
8
Strong emotionalwork commitment
Slight emotionalWork commitment
No emotional work commitment
Year 2007
Needs, Requirements and Objectives
18 %
69 %
13 %
0%
20%
40%
60%
80%
100%
Wo
rk d
ed
ica
tion
Staff costs
Building costs
Others
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1
Annual costs for an office building (2008)
Employee comfort
•Company attachment
•Quality of work
•Performance and productivity
![Page 9: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/9.jpg)
9
Employee comfort
•Air quality
•Thermohygrometric conditions
Needs, Requirements and Objectives
% Dissatisfied due to air quality
Pe
rfo
rma
nce
%
Re
lativ
e p
erf
orm
an
ce
Temperature (°C)
![Page 10: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/10.jpg)
10
Needs, Requirements and Objectives
Flexibile solutions
•During design phase
•During installation
![Page 11: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/11.jpg)
11
Adaptabilty
•During the life of the building
Needs, Requirements and Objectives
0%
20%
40%
60%
80%
100%
1960 1980 2005
Off
ice
bu
ildin
g s
pa
ce
Communal areas, meeting rooms…
Closed offices
Open plan offices
Outside
![Page 12: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/12.jpg)
12
The Council building is making us ill !
Deluge of complaints from
employees about the new
headquarters
Some areas are freezing
whereas others are boiling,
encouraging illnesses
The building was designed
as an open space but was
then subdivided
Controversy over modern buildings: a recent case
![Page 13: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/13.jpg)
13
Needs, Requirements and Objectives
Source: F.M.A.
0102030405060708090
0 1 2 3 4 5 6 7 8 9 10
Time [years]A
nnua
l co
st
[M€]
Project cost
Management cost
Total management cost
T.C.O. (Total Cost of Ownership):
assessing the life cycle of a solution
•operating costs (energy, maintenance..)
•“adaption” costs (change in the intended
use of the building, norms, ..)
•downtime costs
![Page 14: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/14.jpg)
14
Needs, Requirements and Objectives
Building Costs [%]
Maintenance costs [%]
External improvements
4 3
Equipment 4 11
Electrical systems 12 13
Fire prevention systems
3 0,25
Air conditioning systems
16 21
Plumbing systems 5 16
Lifts 5 4
Internal finishings 15 19
Roof 1 1,5
External walls 12 10
Structure and foundations
23 1,25
T.C.O. (Total Cost of Ownership):
assessing the life cycle of a solution
•operating costs (energy, maintenance..)
•“adaption” costs (change in the intended
use of the building, norms, ..)
•downtime costs
![Page 15: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/15.jpg)
15
Needs, Requirements and Objectives
Energy efficiency and sustainability
•Lower energy consumption
•Reducing refrigerant
•Low impact on global warming
•Sustainable materials
![Page 16: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/16.jpg)
16
Needs, Requirements and Objectives
Energy efficiency and sustainability
•Lower energy consumption
•Reducing refrigerant
•Low impact on global warming
•Sustainable materials
•2002/91/CE
“Energy performance of buildings” Energy certification label for buildings
![Page 17: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/17.jpg)
17
Proposed Solution
![Page 18: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/18.jpg)
18
Htwh – Heat transfer unit
Modular access floor
INSTALLATION SCHEME Supervisory system
Unitile – Terminal units
ecoflair® - Integrated solution patented by Uniflair
Energy Provider - Multifunctional unit Accv – Air Handling unit
![Page 19: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/19.jpg)
19
14°C35°C
Cold and Hot Loop
• Heating and cooling simultaneously
• Water based (no refrigerant indoors)
• Water Temp. : 14°C cold / 35°C hot
high comfort
energy saving (high C.O.P.)
compatibility with alternative energy
sources (geothermic, solar, ..)
Separation of sensible/latent load
![Page 20: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/20.jpg)
20
• Coil + fan: allows cooling or heating of
the area in which it is installed
• Modular dimensions (600x600 mm): for
integrated installation in a raised floor
• Connected with flexible pipes, these units
can be moved according to layout
changes
Unitile – Terminal unit
230
mm
600
mm
600 mm
![Page 21: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/21.jpg)
21
(*) Designed with the Physics Department, Architecture University of Venice
Directional grille (*)
• The discharge grille directs the air-flow to
follow a “bell” path, creating a sort of
“climatic bubble” between the Unitile and
the suction grille.
• The air-speed is reduced in order to
obtain a high level of comfort for users.
![Page 22: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/22.jpg)
22
• To connect Unitiles to the main pipes
• Increasing flexibility: with a local pump and
“plug and play” connections, it allows to
move and to add Unitile units, increasing the
cooling capacity.
• Simplicity and speed of installation
Hydraulic Kit
![Page 23: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/23.jpg)
23
CoolingHeating
Hydraulic Kit
![Page 24: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/24.jpg)
24
• User setting for temperature and air-
speed (1,2,3, auto)
• Stand-alone operation
• Integrated ambient temperature sensor
• Easy connection in TLan with Utat units
Wall installation
Table support installationTLan
Local User Terminal
![Page 25: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/25.jpg)
25
Wireless control
• Advanced technology
• Simplicity and speed of installation
• Reduced cost of installation
• Increasing flexibility in moving Unitiles
• Captivating design
• No visible wires on desks
![Page 26: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/26.jpg)
27
• Commercial buildings often require
heating and cooling simultaneously
during the year
• Transferring energy is much better
rather than creating it: this is the
basic idea of the ecoflair® system
• The Heat Transfer Unit (HTWH)
balances the simultaneous opposite
thermal loads within the building
Energy efficiency
![Page 27: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/27.jpg)
28
• Commercial buildings often require
heating and cooling simultaneously
during the year
• Transferring energy is much better
rather than creating it: this is the
basic idea of the ecoflair® system
• The Heat Transfer Unit (HTWH)
balances the simultaneous opposite
thermal loads within the building
Energy efficiency
![Page 28: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/28.jpg)
29
Cooling: some heat is
“removed” from the air, and
it is transferred to the cold
loop (water T. increases)
Cooling: some heat is
“removed” from the air, and
it is transferred to the cold
loop (water T. increases) In the HTWH this q.ty of
heat is “moved” from the
cold to the hot water
In the HTWH this q.ty of
heat is “moved” from the
cold to the hot water
Heating: the heat which
has been cumulated in the
hot loop (water) is given
back to the air in another
building area
Heating: the heat which
has been cumulated in the
hot loop (water) is given
back to the air in another
building area
Heat Transfer Unit - HTWH
• Restores the water set-point temperature in the 2 loops, transferring excess
energy from the cold to the hot loop
![Page 29: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/29.jpg)
30
HEATING LOAD (kW)
COOLING LOAD(kW)
TRANSFERRED BY THE HTWHTRANSFERRED BY THE HTWH
PROVIDED BY THE E.P.
PROVIDED BY THE E.P.
Energy Provider - external multifunctional unit
• Integrates the unbalanced thermal energy
• Production of hot and cold water
independently or simultaneously
• Independent cold/hot water circuits (no
cycle inversion)
• Reduced footprint (1 unit only)
• Free-cooling operation available
• High energy efficiency (recovering heat)
• Outdoor and easy installation
![Page 30: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/30.jpg)
31
• Managing the quality of internal air:
Humidity
(humidification/dehumidification)
Adequate air exchange
Air filtration
Monitoring of the CO2 and VOC levels
• Cross flow heat exchanger to exchange
heat between exhausted discharged air and
incoming fresh air.
ACCV – Air handling unit
![Page 31: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/31.jpg)
32
Ground Floor
Ground Floor1st Floor
FARAM Headquarters – Project description
ecoflair® system
Fan coil / underfloor system
Integration with a boiler available in
production
Supervisory System
![Page 32: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/32.jpg)
33
Building work on site
![Page 33: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/33.jpg)
34
Building work on site
![Page 34: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/34.jpg)
35
Finished project
![Page 35: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/35.jpg)
36
Finished project
![Page 36: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/36.jpg)
37
Finished project: 2nd step
![Page 37: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/37.jpg)
38
Finished project: external
![Page 38: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/38.jpg)
39
Comfort
Flexibility
Cost
€
Benefits obtained
• Representative headquarters
• Integration of systems in the modular
access floor
• High comfort conditions (individual
control, air quality, low noise)
• Spatial flexibility and modularity
• Energy saving
• Reduction in operating costs
![Page 39: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/39.jpg)
40
ecoflair® - some references
![Page 40: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/40.jpg)
41
Padova University Refectory
Area: 350 m2
Typology: 2 pipe-system (external heat-pump)
![Page 41: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/41.jpg)
42
Restaurant in Catanzaro
Area: 250 m2
Typology: 2 pipe-system (external heat-pump)
![Page 42: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/42.jpg)
43
Extension works “Traspolare S.p.A.” Headquarters
Area: 700 m2
Typology: different water based systems
• Ground floor: hydronic cassette
• First floor: ecoflair UTAT units in a 4-pipe system
• Loft floor: cold beams
• Bathrooms: ceiling radiant installation
![Page 43: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/43.jpg)
44
FIRST FLOOR OFFICES
DETAIL
FIRST FLOOR:
ecoflair UTAT units
in a 4-pipe system
Extension works “Traspolare S.p.A.” Headquarters
![Page 44: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/44.jpg)
45
Extension works “Traspolare S.p.A.” Headquarters
![Page 45: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/45.jpg)
46
Restoration of the Church of San Francesco in Naples
Typology: 2 pipe-system in a traditional floor
![Page 46: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/46.jpg)
47
Restoration of an office building in Bologna
Area: 1000 m2
Typology: ecoflair® system in office area
Traditional fan-coils in refectory area
3-way co-generation plant
![Page 47: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/47.jpg)
48
Restoration of an office building in Bologna
![Page 48: 1 ecoflair ® A Case History: FARAM S.P.A. (PARMA, ITALY)](https://reader035.vdocuments.mx/reader035/viewer/2022062217/56649de55503460f94adcd58/html5/thumbnails/48.jpg)
49
ecoflair ®