DIABLODe-rotated Imager of the Aurora Borealis in Low-Earth Orbit
Interim Review 1
DIABLODe-rotated Imager of the Aurora Borealis in Low-Earth Orbit
Interim Review 1Nicole Demandante
Laura FisherJason Gabbert
Lisa HewittLang KenneyNick Pulaski
Matt SandovalTim Sullivan
Advisors:Alex HoehnJoe Footdale
Nicole DemandanteLaura Fisher
Jason GabbertLisa Hewitt
Lang KenneyNick Pulaski
Matt SandovalTim Sullivan
Advisors:Alex HoehnJoe Footdale
2
AgendaAgenda
Resolution of IssuesDesign UpdateTest PlanScheduleBudgetCurrent StatusCurrent Issues to be Resolved
Resolution of IssuesDesign UpdateTest PlanScheduleBudgetCurrent StatusCurrent Issues to be Resolved
3
Request for ActionRequest for Action
“Re-evaluate the 'tombstone' to 'bearing ring' design features including the worm and gear”
Nutation simulation test has been redesigned
Bearing structure has been redesigned
“Re-evaluate the 'tombstone' to 'bearing ring' design features including the worm and gear”
Nutation simulation test has been redesigned
Bearing structure has been redesigned
4
Design UpdateDesign Update
Mass: 42.0 kg Mass: 27.8 kg
96cm98cm
5
Design UpdateDesign Update
New bearings – Kaydon “Reali-Slim”2 Angular Contact
4.25" ID x 4.75" OD0.25" Wide 0.09kg each
1 X-Type (4 point contact)7.5” ID x 8” OD0.15kg
New bearings – Kaydon “Reali-Slim”2 Angular Contact
4.25" ID x 4.75" OD0.25" Wide 0.09kg each
1 X-Type (4 point contact)7.5” ID x 8” OD0.15kg
6
Design UpdateDesign Update
New preload designNew preload design
7
Design UpdateDesign Update
Bearing structure1° Offset Test
Bearing structure1° Offset Test
8
TestingTesting Component Tests
Camera Slip Ring Encoder Accelerometer Motor
Subsystem Tests Structural Motor with accelerometers, encoders Slip rings with encoders, camera, motor signal Signal conditioning
System Tests Measure accelerometer data Take pictures Use laser pointer 1º offset tilt
Software Tests Data collection: encoders and accelerometers Counter and index pulse reset Control loop with motors/encoders Calibration with full system
Component Tests Camera Slip Ring Encoder Accelerometer Motor
Subsystem Tests Structural Motor with accelerometers, encoders Slip rings with encoders, camera, motor signal Signal conditioning
System Tests Measure accelerometer data Take pictures Use laser pointer 1º offset tilt
Software Tests Data collection: encoders and accelerometers Counter and index pulse reset Control loop with motors/encoders Calibration with full system
9
TestingTestingPointing within 3º
Component Test – EncoderMeasure noise on oscilloscopeTest signal conditioning
Software TestsQuantify frequency of dropped/added pulsesVerify that index pulse resets counterTest control loop with motors and encoders
System TestVerify pointing accuracy with laser pointer
Field of view minimum of 12ºComponent Test – Camera
Determine zoom needed for 12º FOVSubsystem Test – Structures
Take pictures through optics tube
Pointing within 3ºComponent Test – Encoder
Measure noise on oscilloscopeTest signal conditioning
Software TestsQuantify frequency of dropped/added pulsesVerify that index pulse resets counterTest control loop with motors and encoders
System TestVerify pointing accuracy with laser pointer
Field of view minimum of 12ºComponent Test – Camera
Determine zoom needed for 12º FOVSubsystem Test – Structures
Take pictures through optics tube
10
TestingTestingTake pictures at 90º
Subsystem Test – StructuresMeasure pointing with laser pointerVerify mirror mounting accuracy
Image ClarityComponent Test – Slip Ring
Measure noise with LabVIEW and OscilloscopeQuantify amplitude and frequency of noiseExamine effects on USB transfer, motor control signal,
encoder signalSystem Tests
Record data with LabVIEWMeasure amplitude and frequency of vibrations with
accelerometersAnalyze encoder data to determine magnitude of motor
fluctuationsAnalyze pictures to quantify pixel smear
Take pictures at 90ºSubsystem Test – Structures
Measure pointing with laser pointerVerify mirror mounting accuracy
Image ClarityComponent Test – Slip Ring
Measure noise with LabVIEW and OscilloscopeQuantify amplitude and frequency of noiseExamine effects on USB transfer, motor control signal,
encoder signalSystem Tests
Record data with LabVIEWMeasure amplitude and frequency of vibrations with
accelerometersAnalyze encoder data to determine magnitude of motor
fluctuationsAnalyze pictures to quantify pixel smear
11
TestingTesting Test bed range: 2 – 20 rpm
Component Test – MotorMeasure built-in speed output with oscilloscopeVerify voltage/speed curve
Subsystem Test – MotorMeasure encoder signal in LabVIEWUse encoders to verify voltage/speed after gearing
Nutation Simulation Subsystem Test – Structures
Measure pointing with laser pointerVerify 1º tilt
System TestRun full system tests with 1º tilt Analyze pixel smear, observe pointing error
Test Camera similar to flight Camera Component Test – Camera
Set shutter speed to 100ms
Test bed range: 2 – 20 rpm Component Test – Motor
Measure built-in speed output with oscilloscopeVerify voltage/speed curve
Subsystem Test – MotorMeasure encoder signal in LabVIEWUse encoders to verify voltage/speed after gearing
Nutation Simulation Subsystem Test – Structures
Measure pointing with laser pointerVerify 1º tilt
System TestRun full system tests with 1º tilt Analyze pixel smear, observe pointing error
Test Camera similar to flight Camera Component Test – Camera
Set shutter speed to 100ms
12
ScheduleSchedule Ordering Parts Electronics Fabrication Component, Subsystem Testing
Ordering Parts Electronics Fabrication Component, Subsystem Testing
13
ScheduleSchedule
Manufacturing & IntegrationManufacturing & Integration
14
ScheduleScheduleSoftware, System TestingSoftware, System Testing
15
BudgetBudget
Total Spent:$4349.56
(as of 2/3)
Expect to Spend:$699.45
(not including margin)
Total Budget:$5802.30
(including 15% margin)
Team Component DistributorPart Number
Unit Cost Quantity
Total Cost Purchased
Camera Camera Circuit City OLM SP510UZ $299.99 1 $299.99 YesMemory Card Circuit City OLM 1GBHXD $45.99 1 $45.99 YesProtection Plan Circuit City CSP CCA $79.99 1 $79.99 YesMirror $100.00 1 $100.00 No
Electronics Encoders Anderson Controls HS20-1024-71206 $305.00 2 $610.00 YesAccelerometers Analog Devices ADXL203 $12.00 4 $48.00 NoBuffer Circuit Linear Systems LS7184 $3.25 4 $13.00 NoOp Amps $1.00 6 $6.00 NoDual Op Amps Digi-Key LM1458NFS-ND $0.45 6 $2.70 No
Motors Motors Oriental Motors AXH015K-100 $324.00 2 $648.00 YesAngular Contact Bearings Kaydon KA042AR0 $390.00 2 $780.00 Yes4pt Contact Bearing Kaydon KA075XPo $433.00 1 $433.00 Yes
Power 6 channel slip rings MOOG Components $313.00 1 $313.00 Yes12 channel slip rings MOOG Components $493.00 1 $493.00 YesMiscellaneous $10.00 1 $10.00 NoExtra Camera Batteries $10.00 1 $10.00 No
Structures Shaft Couplers McMaster-Carr 3084K31 $23.38 2 $46.76 YesFlexible Shaft Coupling McMaster-Carr 9861T819 $24.48 1 $24.48 YesFlanges McMaster-Carr 44705K228 $10.76 2 $21.52 YesDowel Pins McMaster-Carr 98381A537 $12.06 1 $12.06 Yes5" OD, 4" ID, 1' Tube McMaster-Carr 9056K571 $70.83 1 $70.83 Yes0.25" Thick, 12"x2" Al McMaster-Carr 9246K13 $21.91 2 $43.82 Yes0.25" Thick, 18"x18" Al McMaster-Carr 89155K27 $78.19 2 $156.38 Yes1' Al Rectangular Tube metalsdepot.com T36414 $61.44 1 $61.44 No0.5" Tubing McMaster-Carr 8978K625 $16.00 1 $16.00 No**0.125" sheet $65.00 1 $65.00 No**1/16" sheets $60.00 1 $60.00 NoLbrackets McGuckins $10.00 1 $10.00 YesC-clamps McGuckins $2.50 4 $10.00 YesScrews/nuts McGuckins $15.00 1 $15.00 Yes
Other Fall Report Printing $215.99 1 $215.99 YesSpring Report Printing $300.00 1 $300.00 NoShipping for McMaster-Carr #1 $19.75 1 $19.75 YesShipping for metalsdepot.com $7.31 1 $7.31 No
Margin (15%) $753.29
$5,802.30
$4,000.00
$2,000.00
$197.70Remaining Funds
Total Expenses
FundsAerospace DepartmentEngineering Excellence Fund
16
Current StatusCurrent Status
Parts ReceivedEncodersSlip RingsMotorsCameraSome aluminum
Parts OrderedBearings
Manufactured itemsBottom box structureTop plateMirror mount
Parts ReceivedEncodersSlip RingsMotorsCameraSome aluminum
Parts OrderedBearings
Manufactured itemsBottom box structureTop plateMirror mount
17
Current Issues to be ResolvedCurrent Issues to be Resolved
Flange – shaft to plate connection
Part received is incorrect sizeHave found usable part from
McMaster-Carr
Flange – shaft to plate connection
Part received is incorrect sizeHave found usable part from
McMaster-Carr
18
Questions?Questions?