Dennis L. Edwards Dennis L. Edwards TunnelTunnel
Constructability ReviewFebruary 5, 2010
East Portal looking west circa 1940
East Portal looking west circa 2001
Nathan K. Potter, PEProject Manager
Oregon Department of Transportation
Randy G. Hinderer, PESenior Project Manager
LOCHNER
![Page 2: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/2.jpg)
2
AgendaAgenda
• Introduction • Project Overview • Constructability Review Agenda
![Page 3: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/3.jpg)
3
Dennis L. Edwards TunnelDennis L. Edwards Tunnel
Originally called the Sunset Tunnel, construction was completed by the Works Progress Administration (WPA) in 1940.
The tunnel was renamed after Dennis Edwards, a member of the District 2A staff who was killed during inspection activities in January 1999 when part of the tunnel collapsed. Closure and detour duration was approximately 5 weeks.
Technical DataUS26 (Sunset) (Highway No. 047)Mile point: 40.9Bridge No. 02552Posted Speed: 55 MPHAverage Daily Traffic (ADT): 6,700Average Daily Truck Traffic (ADTT): 12% (804)
![Page 4: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/4.jpg)
4
Dennis Edwards Tunnel(MP 40.90)
![Page 5: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/5.jpg)
5
Project ObjectivesProject Objectives
• Reline the tunnel• Lighting Improvements• Drainage Improvements• Freight industry has asked to ODOT
to consider vertical improvements• Bicycle/Pedestrian Improvements
![Page 6: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/6.jpg)
6
Historic ConsiderationsHistoric ConsiderationsModel of the West Portal
The builders
East Portal looking west
The completed masonry portal
![Page 7: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/7.jpg)
7
1
2
Tillamook Railroad Over Crossing (MP 42.50)
Dennis EdwardsTunnel(MP 40.90)
Tim
ber
Ro
ad10
mile
s
11 Miles
OR
47
16 Miles
Timber RoadColumbia CountyWashington County
Oregon 47Length Restricted65’ Truck-tractor and Semi-trailer
Total Detour Route = 26 MilesDistance on US 26 = 11 Miles
Additional Distance = 15 Miles
Local Tunnel DetourLocal Tunnel Detour
1
2
![Page 8: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/8.jpg)
8
Regional DetoursRegional Detours (Seaside to I-405)(Seaside to I-405)
US 26 = 79 MilesUS 30 = 115
Miles
Difference 36 Miles
![Page 9: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/9.jpg)
9
Tunnel ProfileTunnel Profile
![Page 10: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/10.jpg)
10Edwards Tunnel, West Portal, March 2000
![Page 11: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/11.jpg)
11Edwards Tunnel, STA 0+00 Looking East, March 2000
![Page 12: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/12.jpg)
12Edwards Tunnel, STA 0+50 Looking East, March 2000
![Page 13: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/13.jpg)
13Edwards Tunnel, STA 1+00 Looking East, March 2000
![Page 14: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/14.jpg)
14Edwards Tunnel, STA 1+50 Looking East, March 2000
![Page 15: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/15.jpg)
15Edwards Tunnel, STA 2+00 Looking East, March 2000
![Page 16: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/16.jpg)
16Edwards Tunnel, STA 2+50 Looking East, March 2000
![Page 17: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/17.jpg)
17Edwards Tunnel, STA 3+00 Looking East, March 2000
![Page 18: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/18.jpg)
18Edwards Tunnel, STA 3+50 Looking East, March 2000
![Page 19: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/19.jpg)
19Edwards Tunnel, STA 4+00 Looking East, March 2000
![Page 20: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/20.jpg)
20Edwards Tunnel, STA 4+50 Looking East, March 2000
![Page 21: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/21.jpg)
21Edwards Tunnel, STA 5+00 Looking East, March 2000
![Page 22: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/22.jpg)
22Edwards Tunnel, STA 5+50 Looking East, March 2000
![Page 23: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/23.jpg)
23Edwards Tunnel, STA 6+00 Looking East, March 2000
![Page 24: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/24.jpg)
24Edwards Tunnel, STA 6+50 Looking East, March 2000
![Page 25: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/25.jpg)
25Edwards Tunnel, STA 7+00 Looking East, March 2000
![Page 26: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/26.jpg)
26Edwards Tunnel, STA 7+71.5 North Side, March 2000
![Page 27: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/27.jpg)
27Edwards Tunnel, East Portal, March 2000
![Page 28: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/28.jpg)
28Edwards Tunnel, Looking East from East Portal, March 2000
![Page 29: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/29.jpg)
29Edwards Tunnel, North Side of East Portal, March 2000
![Page 30: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/30.jpg)
30
System DrainageSystem Drainage
![Page 31: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/31.jpg)
31
Alternative 1: Lining OnlyAlternative 1: Lining Only
• Replaces the tunnel lining• Replaces / rehabilitates the tunnel PCC floor
and drainage system• Installs new lighting system • Existing portals and stone masonry will remain
untouched.
![Page 32: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/32.jpg)
32
Alternative 2: Floor LoweringAlternative 2: Floor Lowering
• Clearance achieved by removing the existing lining consisting of steel and timber sets, removing the rubble and gravel behind the existing liner, and replacing the liner with rock bolted shotcrete directly to the exposed siltstone bedrock.
• Roadway elevation will be lowered throughout the tunnel approximately 2.5 feet to achieve vertical clearance, transitioning back to existing grade approximately 700 feet on both tunnel approach sections.
• Existing portals and stone masonry will remain intact, however underpinning the portal masonry and associated concrete wall structure with new footings will be necessary.
![Page 33: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/33.jpg)
33
Alternative 3: Portal RaisingAlternative 3: Portal Raising
• Clearance achieved by removing the existing lining consisting of steel and timber sets, removing the rubble and gravel behind the existing liner, and replacing the liner with rock bolted shotcrete directly to the exposed siltstone bedrock.
• Existing portals will be raised approximately 2.5 feet to achieve vertical clearance.
• RequireS specialized work for the historic portal stone masonry, which will be removed and replaced on a new portal wall structure at a higher elevation.
![Page 34: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/34.jpg)
34
Constructability Review AgendaConstructability Review AgendaGOAL: What is the highway closure duration?
• Equipment– Dimensions– Location– What equipment will be
required to raise the portals, excavate, etc., will it fit in the tunnel
• Methods – Contingency plans for
unknowns – Roadway undercutting– What protection / shoring
methods will be required for the portals?
– Lowering the tunnel floor and roadway:
– Historic Stone Portal Removal and Reconstruction
– Specialty work required to maintain material integrity during removal and reconstruction
– Timber Lining Demolition– Shotcrete Lining Demolition
• Materials– Concrete– Masonry materials – Historic Stone Portal
Underpinning• Staging
– Raising Portals– Re-Lining – Is it feasible to lower the
tunnel floor, construct temporary ties into existing roadway, and stage approach roadway construction with single lane closures?
– Is there any methodology to keep the highway partially open?
• Durations– Existing lining removal– Roadway lowering– Rising portals: reconstruction
verses lifting– Full closure versus partials
![Page 35: 1 Dennis L. Edwards Tunnel Constructability Review February 5, 2010 East Portal looking west circa 1940 East Portal looking west circa 2001 Nathan K. Potter,](https://reader035.vdocuments.mx/reader035/viewer/2022062312/55158f84550346486b8b5836/html5/thumbnails/35.jpg)
35
Tunnel ProfileTunnel Profile