    A hands-on, dynamic, result-oriented Superintendent with over 35 years of significant achievement inmanaging piping projects across a wide range of industries and technical levels. Having worked withmany top companies in international shipping and construction industries, onshore and offshore, I havebecome highly competent in a variety of fields. I trust my experience will back this statement up andlook forward to my next challenge. Some of my core competencies include:

    Health, Safety & Environment

    Pre-Fabrication & Erection

    Manpower & Man-Hours PlanningDaily Reports

    Quality Control

    Drawings Execution

    Budget Planning & ManagementPunch List and Tests

    Pre-Commissioning

    Material Planning

    Work History

    Field Engineer THYSSENKRUPP Companhia SiderrgicaDo Atlntico - Brasil

    05.2008 12.2011

    Responsible on the different areas for the construction proposals analysis and on the Construction side, for thecoordination of contractor companies, evaluating their progress daily to ensure that the project specifications andagreed schedule are followed accordingly. Ensure that the Construction Plan is followed correctly, by identifyingand resolving any project deviations, therefore maintaining the stipulated project schedule, quality, safety &environmental measures at all times. Coordination of test packs and punch lists. Part of a pre-commissioningteam.

    Piping Designer GroupLeader

    TECHNIP ITALY - CanadaClient: Canadian Natural Resources

    10.2007 04.2008

    Project: Horizont Primary Upgrade. Monitoring and assisting in the implementation of project quality and safety &environment. Liaising with clients, engineers and consultants. Co-ordinating and reviewing of drawings submissions,specifications, changes and document control. Assisting with the preparation and maintenance of the project schedule. Co-ordinating inspection duties and assisting in construction design, including preparation of layout and lift drawings. Co-ordinating field details, site inspections and liaising with subcontractors. Identified and resolving field technical issues.

    Site Superintendent CCIC (Consolidated ContractorsInternational Company) - Qatar

    11.2006 - 09.2007

    Gas Expansion Project - Ras Laffan. Responsible for the mechanical and piping erection of the Sulphur Storage andRefrigerant Area including all Tie-ins preparation, fabrication and installation.

    Piping Surveyor Technical Department of Ponticelli Offshore -Angola

    03.2006 - 10.2006

    TOTAL Rosa project on Board of FPSO Girassol, Luanda, Angola. Surveyed all new line routes before pre-fabrication.Elaborated reports, when necessary, to justify modifications and propose new routes for approval.

  • 7/31/2019 1 - CV - Joaquim Monte

    2/3

    2 | P a g e

    Technical OfficeEngineer

    IREM, S.P.A. Gasoil Project, SCANRAFF -Lysekil, Sweden

    03.2005 - 11.2005

    Responsible for the elaboration and coordination of all test packs for all piping systems on the new project. Surveyed qualitycontrol and documentation for take-over.

    Mechanical and PipeSupervisor

    TECHNIP DE PORTUGAL, Sines Refinary(GALP) - Portugal

    05.2004 02.2005

    Worked as Supervisor in the new project of LPG BOTTLE FILLING PLANT. Followed up daily progress and coordinated allinstallation machineries and piping erection. Surveyed quality control and documentation for take-over. Advisor andcoordinator during the pre-commissioning, commissioning and start-up.

    Mechanical and PipeSupervisor

    TECHNIP DE PORTUGAL, Sines Refinary GALP -Portugal

    02.2004 04.2004

    Worked as Supervisor on the shut-down and was responsible for the Reactor, Regenerator and 3rd Stage Separator repairs,on the Catalic Fluid Cracking Unit. Coordinated and followed up the daily progress.

    Supervisor SIEMENS - KOCH DE PORTUGAL,Termoelctrica do Rebate - Carregado

    09.2003 01.2004

    Responsible for fabrication and installation of piping for Main Condenser, Boiler and Gas Turbine.

    Shift Supervisor ABB CMM, Soporcel (Paper Factory) 06.2003 08.2003

    Responsible for the repairs and conversion of the auxiliary boiler.

    Field Engineer ABB LUMMUS GLOBAL B.V., on P.O. 11 -Lyondell Project in Holland

    10.2002 05.2003

    Was part of the team responsible for final inspections (Test Packs, Punch Lists, Hydro-Tests and As Built drawings).Followed up pre-commissioning.

    Senior Supervisor andPreparation HeadOfficer

    DUBAI DRYDOCKS - Dubai, U.A.E. 01.1986 09.2002

    Worked as a Senior Supervisor of the Pipe Department overseeing a total of 375 employees. Responsible for thecoordination of Work Preparation, Manpower and Man-hours Planning. Prepared studies and analysis of work specificationspresented by the owners for the piping job of different vessels like VLCC Tankers, LPG and LNG Gas Carriers, Rigs,Platforms, Navy Vessels, FPSOs, etc.

    Senior Draftsman SETENAVE SHIPYARD - Setubal, Portugal 1979-1986

    Worked as a Senior Draftsman in the Mechanical Drafts Office for machinery & piping of new vessel projects (VLCCTankers, Bulk Carriers, etc.). Executed different type of drawings including Isometrics, General Arrang., P&ID, etc.

    Senior Work Preparator SETENAVE SHIPYARD - Setubal, Portugal 1975-1979

    Worked as a Senior Work Preparator in the New Projects Central Office. Coordinated and controlled the distribution of alljobs related equipment, structures, piping, etc., for fabrication and installation within the different departments.

  • 7/31/2019 1 - CV - Joaquim Monte

    3/3

    3 | P a g e

    Shop Work Preparator SETENAVE SHIPYARD - Setubal, Portugal 1974-1975

    Worked as Shop Work Preparator, preparing all job phases for fabrication, including bending and cutting machines.

    Pipe Work Preparator LISNAVE SHIPYARD - Lisbon, Portugal 1971-1974

    Worked as a Pipe Work Preparator on board of different vessels coordinating all jobs between on board and workshop.

    Pipe Fitter LISNAVE SHIPYARD - Lisbon, Portugal 1968-1971

    Education & Certification

    High School DiplomaTechnical Diploma(Engineering Subjects)

    Liceu National de Almada, PortugalEscola Industrial e Comercial de Beja, Portugal

    19681983

    Computer Proficiencies

    Microsoft Office (Excel, Word, PowerPoint, Outlook, Project)

    Hobbies

    Tennis, Running, and Reading

    Personal Details

    Nationality:

    Marital Status:

    Portuguese

    Married