1. Wagon Tipplers with Side Arm Chargers- 4 sets2. Apron Feeders- 4 sets3. Reversible Stacker cum Reclaimer- 2 nos4. Crushers- 4 nos5. Screens- 4 nos6. Motorized Traveling Trippers- 6 nos7. Automatic Sampling system- 2 sets8. Passenger cum Goods elevators- 2 sets9. Utilities such as dust extraction, dust suppression and ventilation.
3
4
Work Status-• The highest building of CHP TP-5 has been completed in 58.0 mtr and Crusher
House 37.0 mtr is 40 % completed approxly
• TRF is working on this project site 24X7.
• One 200 MT crane, one 100 MT crane, one 75 MT crane and Two 18 MT cranes have already been mobilized at the site, apart from seven 12 MT capacity hydra cranes.
• Mechanical work of Crusher House is also in progress
• Civil work of project is approxly near end.s
• The approximate manpower engaged at the site is 750 per day
• Mechanical erection of two wagon tippler is as under-
• Endring, Side Beam, Side Beam assembly, Cradle Assembly, Static Beweighbridge, Line shaft Assembly, Clamp, arm-4 nos., Hydraulic power pack, oil cooler pack is also erected till now.
5
Date:10.1.10
Stacker Reclaimer-1
TP-21
Unit # 1500 MW
Unit # 2500 MW
Unit # 3500 MW
TP-1
TP-3 TP-4
TP-7TP-6 TP-8 TP-9 TP-10TP-5
TP-14
TP-13
TP-18
TP-12
TP-19
TP-20
TP-17
CrusherHouse
Stacker Reclaimer-2
C-1A/B (283)
C-15A/B (103)
C-16A/B (157)
C-14A/B (157)
C-2A/B (415)
C-13A/B (203)C-3A/B (203)
C-4A/B (87)
C-5A/B (520)
C-6A/B (144) C-7A/B (107) C-8A/B (118)
C-10AC-9B C-11AC-10B
C-9A
Wagon Tippler 3 & 4
Wagon Tippler 1 & 2
Pent House
Pent House
Pump House- B
Pump House- A
Pump House- C
Main Ctrl RoomHT Sw itch GearMCC-1B
WTMCC-1A
Legends
For Reference
.
Str Erection in Progress
TP-2
Mechanical Erection in Progress
Civil /Building/Floors in Progress
CHP LAYOUT
6
Structural erection- 31/1Slab-2 mtr-20/11 15/2Slab-10 mtr-01/12 20/2
Tp-1 Slab-17 mtr-15/12 28/2Foundation- 10/2 Structure upto 60 mtr- 25/1 Con-2a/b drive unit mtr-15/0120/3Roof slab- 25/2 Structure upto 68 mtr- 10/2Found. for pump/ motor-10/3 Structure upto 75 mtr- 20/2Rele. for Pump/motor erect-25/3 Slab 52 mtr- 25/1 Fixed tippler erection-15/3 Structural erection 15/2Pump/motor/piping for CWS-10/4 Slab 66 mtr- 20/2 9 A tail pully erection-1/3 Slab-2 mtr- 20/2
Roof slab- 31/3 Chutes-15/3 tp-6 Tp-2 Slab-11 mtr- 05/3Con-5a/b drive 66 mtr- 15/3 Slab-17 mtr- 10/3Chutes- 31/3 Con-6ab drive unit-15/4 Chutes- 15/3
Structural Erection- 25/1 9 B tail pully erection-15/03Slab 2.8 mtr 25/1 Chutes-31/03 tp-7 Structural erection 25/1Slab 9 mtr- 10/2 Slab-8 mtr- 15/2Slab 12.75 mtr- 20/2 Tripper erection-31/3 Tp-3 Slab-14 mtr 25/1Slab 20 mtr- 28/2 Con-9A shortpost stringer-15/3 chutes- 28/2Con-4a/b drive unit 12.75 mtr-15/3 Idler & belting-10/4 Bunker C-13B drive unit- 15/3Chutes- 28/3 9 a drive unit-15/4
slab 6 mtr roof 30/1Drive unit C-12A- 15/3
Rail GROUTING-100 mtr-15/1Flooring 100 mt-20/1 Conveyor Details:-
Second slab/ roof--31/1 Machine erection-15/4 Conveyor S.p.Stringer Idlers/Pully Belting C.Wt.Windows/door and release for MCC erection-15/2 Con-14A/b 15/1 20/2 15/3 20/3MCC pannel installation-31/3 Con-15A/B 25/1 31/1 5/3 25/3Charging of MCC-10/4 Found. For pump/ motor-20/1 Con-1A/B 15/2 28/2 15/3 25/3
Release for pump/motor erec-25/1 Con-2A/B 28/2 15/2 5/3 20/3Pump/motor/piping for CWS- Con-3A/B 28/2 25/2 10/3 20/3
Con-4A/B 31/1 20/2 15/3 20/3 Con-5A/B 28/2 31/3 05/4 10/4
Con-6A/B 15/3 31/3 05/4 10/4C15 drive mech. Erection-15/2 Con-9A/B 15/3 31/3 05/4 10/4Chute- 15/3 Con-12A 15/3
Moving head-31/3 Con-13A/B 15/3 31/3 10/4 15/4
20 mtr slab- 15/128 mtr slab- 10/2Roof 38 mtr-1 28/2 Cable Gallery-shuttle conveyor erection-(31/1) Foundation Trestle Fab. Gallery Fab. T. Ere. G.Ere.crusher erection- 25/1 92 90 90 90 90screen erection- 25/2 W.T to C.H (3) 28/2 05/2 15/2 02/3 15/3Con-1a/b drive unit-15/3 C.H to MC-1B (2) 25/1 28/1 12/2 10/2 17/2Chutes- 31/3 M.C-B to tp4-1 30/1 31/1 10/2 10/2 15/2Lighting- 31/3 Appron feeder erection- 31/1 Finalcable tray/ Cabling- 28/2 Belt feeder (5/6)erection- 28/2Trial of crusher- 31/3 Control room release1st floor- 28/2Cooling water- 25/3 Hopper gunniting- 20/1
ConveyorApporach Road
The Programme is subjected to timely release of Payments/Fronts/Drawings
Roof slab-31/1Found. For pump/motor-28/2Release for pump/motor erect-15/3
Drive unit-C13-31/3Moving Head-25/3
Chutes-31/3
MCC charging-31/03
Slab 2 mtr-15/2
Pump/motor/piping for CWS-15/4
Roof slab-31/1Release for mech-20/2Conv. Tech-10/4
MCC pannel Equipment-15/3Charging of pannel-31/3
Door/window/railing-15/2
OVERALL CHP PROGRAMME AREAWISE/ ACTIVITYWISE FOR UNIT#1 (BALANCE WORK)
Release for mech-15/3Conveyor Tech-31/3Chute- 31/3
Date:10.1.10
Cable Trench-25/1Brick work/ door & window-15/02Release for MCC erection-30/01
Lighting-31/3
Slab 9 mtr-20/2Chutes-15/3
Full C. room/2nd release 2st floor- 31/3 Cable Gallery
TotalChute- 15/2Drive unit of C-14- 31/1
15/4
MCC- C in side TP-5
TP-3TP-14
TP-13
TP-1TP-12 Stacker Reclaimer-1
TP-21
TP-18
Unit # 1500 MW
Unit # 2500 MW
Unit # 3500 MW
TP-4
TP-7TP-6 TP-8 TP-9 TP-10 TP-11
TP-15
TP-16
TP-19
TP-20
TP-17
CrusherHouse
Stacker Reclaimer-2
C-1A/B
C-15A/B (103)C-16A/B (157)
C-14A/B (157)
C-2A/B (415)
C-12A (720)
C-13A/B (203)C-12B (720)C-3A/B (203)
C-4A/B (87)
C-5A/B (520)
C-6A/B (144) C-7A/B (107) C-8A/B (118)
C-10AC-9B C-11A C-11BC-10B
C-9A
Wagon Tippler 3 & 4
Wagon Tippler 1 & 2
Pent House
Pent House
Pump House- B
Pump House- A
Pump House- C
Main Ctrl RoomHT Switch GearMCC-1B
WTMCC-1A
N
.
TP-2
TP-5
LEGENDS
TRF Office
OVERALL PLANNING AREAWISE/ ACTIVITYWISE FOR BALANCE WORK
7
Date-10.01.10
A
175 mtr 100 mtr415 mtr A
103 Mtr 90 Mtr 520 Mtr 130 mtr
Summary of Gallery Erection Erected
Planned in Jan
1 7 4 32 18 12 63 8 3 54 3 35 22 17 56 3 0 3
Total 61 39 22
GALLERY/TRESTLE ERECTION STATUS-CHP JHAJJAR
ConvTotal. Scope Erected
Bal planned in Jan
10 mtr
Pent house Crusher House
TP-1 TP-2
(+) 28.156 M
40 M
(+) 14. M
18 M
(+) 10.7 M
17 M
(+) 10.7 M
17 M
TP-2 TP-3 TP-4
(+) 66.2 M
(+) 67.3 M
TP-5 TP-6
76 M 76 M
14 M
17 M
(+) 7.8 M
C-5ab
C-4abC-3ab
C-3abC-2ab
C-1ab
A
A
(+) 3.8 M
(+) 20.8 M
(+) 14 M
1a 1b 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
5.8 M
9.8 M
55 M
15/01/10 (75/75)
20/01/10 (100/75)
17/01/10(75 T)
19/01/10 (75 T)
21/1/10 21/1/10
15/1/10 (75/ 75)
25/01/10
10/1/10 (200 T) 25/01
20/01/10 (75/ 75)
27/01
31/01 20/01 29/0130/01
OVERALL GALLERY AND TERSTLE PROGRAMME FOR
CHP
8
9
Erection in Progress in Con-5A/B on March’09
10
11
CON-5A/B ERECTION
12
Up Next is ………
13
TP-5 ERECTION
ON MARCH’09
14
15
TP-5 ERECTION
ON APRIL’09
16
17
ON JANUARY’10 TP-5 ERECTION
18
Crusher House ERECTION
19
Safety Tips:- Safety Tips:-
1. 100% Safety comply at our Civil Agency 1. 100% Safety comply at our Civil Agency
2. 98% Safety comply at our Structural Agency 2. 98% Safety comply at our Structural Agency
3. Safety Training held at site3. Safety Training held at site
4. Celebrated 4th March as Safety Day4. Celebrated 4th March as Safety Day
9. Safety Banners and Safety Board distributed at site
9. Safety Banners and Safety Board distributed at site
20