1 capri prague meeting capri-dynaspat, 11./12. april 2005 capri-dynaspat project second project...
TRANSCRIPT
1
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
CAPRI-Dynaspat Project
Second Project Workshop
Prague, 11. and 12.April 2004
2
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Introduction
• Thanks to the Prague team for hosting us• A busy year for CAPRI: negotiations and start
of SEAMLESS, unforeseen IPTS project, demand from the commission …
• … and a quite successful start for our project:– East expansion much further then expected
(model runs on preliminary data for EU27 ..)Excellent co-operation on GIS-link between JRC and Bonn
– Regular optimistic signals on energy and labor
… but still a lot to do and discuss …
3
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Current project with CAPRI
• 3 “Specific Targeted Research Projects”:– CAPRI-Dynaspat– Eu-Med-Agpol trade liberalization with
Mediterrean countries (3/2004-3/2007)– MercoPol trade liberalization with South
American countries (4/2005-4/2008)
• 2 “Integrated projects”– Seamless (Bonn, LEI, IAMM)– Sensor (LEI, The Hague)
• Project for IPTS Sevilla (Bonn, FAL)
4
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Developments
CAPRIModeling System
FarmTypes
Seamless/IPTS
ImprovedMarket Model
Eu-MedAgpol/MercoPol/Seamless
GIS-Link
Labor
Energy
Dynaspat
RecursiveDynamic
Dynaspat
DNDCLandscape
HydrologicalModels
?
AlternativeLand uses
Sensor
EastExpansion
Dynaspat
5
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Developments cntd.
• CAPRI is since October 2004 installedin DG-AGRI
• First results presented, with in some cases surprisingly good results
• Decision to use CAPRI for baseline publication in early summer
6
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Organisation CAPRI-Dynaspat
Bonn: Co-ordination & Training of partners,
Overall model design, Recursive-Dynamic
version, scenario analysis
Prague: East expansion of CAPRI
Ispra: GIS link, bio-phyiscal model for Green House
Gas Emissions, Landscape indicator
Galway: Labour projections and labour demand
Tänikon: Energy use indicator
7
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Overview on tasks
• Regular updates, reference run, scenario writing and impact analysis– Regular updates of the data base (WP1)– Reference runs (WP2)– Yearly scenario analysis (WP 3)
• Methodological Improvements of the existing modelling system– Dynamic version of supply module (WP 4)– Dynamic version of market module module (WP 5)– Employment module (WP 7)
• Improved environmental indicators and
link to a Geographical Information system for landscape assessment– Energy use indicator (WP 6)– CAPRI GIS Link (WP 8)– Landscape indicator (WP 9)– Greenhouse gas process model link (WP 10)
• Preparation for East Expansion– CAPRI east expansion pilot study (WP 11)– CAPRI east epxansion network (WP 12)
8
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
CAPRI-Dynaspat: WPs
EconomicCore Model
Data BaseUpdates (WP1)
Coco Data Base(consistent & complete
time seriesat MS level)
CAPRI Data Base(consistent & complete
base year data set for farm types at NUTS)
ReferenceRuns (WP2)
ScenarioAnalysis (WP3)
DynamicSupply (WP4)
DynamicMarket (WP5)
Environmental& EconomicIndicators
EnergyUse (WP6)
Employment(WP7)
GIS
CAPRI- GIS(WP8)
ProcessModel
ExpansionEast (WP11)
CAPRI-Soil(WP10)
Landscape(WP9)
D24 D26 D23
D19D21 D15 D17D11 D13
D18D20 D14 D16D10 D12
D4-6D22 D7-9D25/27
D1/2/3
9
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Regular updates, reference run, scenarios
• Download latest available datafrom EuroStat, DG-AGRI, FAO
• Reconcile data base:– fill gaps– remove inconsistencies– re-estimate input allocation
• Check for new projections(FAPRI/DG-AGRI/FAO)
and revise reference run• Contact DG-AGRI, define scenarios, run
model and perform impact analysis
10
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Methodological improvements
• Switch from comparative static(= long run equilibrium)
to recursive-dynamic version(=show adjustment path)
• Re-estimate non-linear cost functions with adjustment costs, embed annual herd size for cattle
• Introduce partial adjustment model in the market model
• Employment module (projection + link to activities)
11
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Environmental indicators
• Introduce „engineering factors“ for energy use in agricultural activities => energy indicator
• GIS link develop distribution algorithm from NUTS II results to grid(econometrics, data on climate, soil, elevation etc. necessary at NUTS II/grid level)
• Bio-Phyiscal process model for GHG requires GIS link
• Landscape indicators
12
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
East expansion
• „Pilot study“:full regionalization of CZ, PL and HU
• Document proceeding to ensure that process can be repeated (in an improved manner) in the remaining MS
• Build up a network of suitable contacts in the new MS to apply and maintain CAPRI
13
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
Agenda for the meeting
• Monday: Status and outlook WP1-3 6-10:– Results achieved– Discussion and decisions on next steps
• Tuesday morning: Hotspot on East expansion– Short overview on WP4+5 (recursive dynamic version)– Where do we stand– Next steps– What avenues for the different WPs regarding EU-10?
• Tuesday afternoon: Project management– Reporting– Deliverables– Web-page– Further co-operation, visits ..
14
CAPRICAPRI
Prague Meeting CAPRI-Dynaspat, 11./12. April 2005
END