1 BROOKHAVEN SCIENCE ASSOCIATES

NSLS-II Experimental Facilities Overview

Qun ShenDirector, Experimental Facilities Division

NSLS-II Experimental Facilities Advisory Committee Meeting

April 23-24, 2009

Page 2: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

2 BROOKHAVEN SCIENCE ASSOCIATES

Outline

• Updates since May 2008 EFAC Meeting Selection of project beamlines Staffing, organization Revised labor estimates for beamline construction at CD-3

• Activities and progress R&D and infrastructure Beamline design progress BAT Charter Interface management LOB programming

• Issues and outlook • Summary

Page 3: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

3 BROOKHAVEN SCIENCE ASSOCIATES

Project Beamlines: LOI Reviews & Decisions

• Beamline and strategic planning workshops held January-March 2008• Received 11 Letters of Interest (LOIs) from groups wanting to form

Beamline Advisory Teams (BATs) for the project beamlines and subsequent beamlines

• LOIs were reviewed by external reviews and Experimental Facilities Advisory Committee (EFAC). EFAC met May 5-7, 2008 and heard presentations from all 11 LOIs. EFAC report received June 2008.

• NSLS-II carefully evaluated the EFAC rankings and recommendations, and additional information in submitted LOI, external peer reviews, oral presentations and dialog at the EFAC meeting, as well as reviewers’ comments at technical and project reviews, and overall project priorities.

• Final decision on project beamline selection was communicated with DOE program office and announced at end of August 2008.

Page 4: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

4 BROOKHAVEN SCIENCE ASSOCIATES

Six Project Beamlines at NSLS-II

1 meV

0.1 meV

Inelastic x-ray scattering

Hard x-ray nanoprobe

100m long

High-energy powder diffraction

Sub-m reso. x-ray spectroscopy

30m long hutch

Coherent hard x-ray scattering

Coherent soft x-ray scattering/polarization

Page 5: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

5 BROOKHAVEN SCIENCE ASSOCIATES

Staff Hiring

• Recruitment of high-quality staff is a major, high-priority activity of XFD during the past year

• Since last EFAC meeting in May 2008, 18 staff have joined XFD:Five group leaders for project

beamlines; Final agreement for one remaining position expected soon;

Ten staff for experimental R&D and photon source development;

Two mechanical engineers for beamline designs.

Expe

rimen

tal F

acili

ties

FTE

• Searches on-going for several key areas:• Nanopositioning engineer / scientist;• Mirror metrology expert;• Beamline scientists.

Page 6: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

6 BROOKHAVEN SCIENCE ASSOCIATES

Experimental Facilities Organization

Beamline Advisory

Teams (BATs)

Page 7: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

7 BROOKHAVEN SCIENCE ASSOCIATES

Design and Construction Labor Profile

• As part of CD-3 preparations, beamline labor requirement was refined:

• Total effort per BL during project is ~ 28.5 FTE-years (was ~ 23.1 FTE-yrs per BL in original baseline estimate)

Page 8: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

8 BROOKHAVEN SCIENCE ASSOCIATES

Revised Non-R&D FTE & Funding Profiles

• Added engineer and tech support during installation and testing

• Revised estimate for Nanoprobe satellite bldg. and beam-transport tunnel

• Adjustments have been made in initial beamline endstation instrumentation to offset increased cost due to added labor

• The initial scope of all beamlines can be met within baseline XFD non-R&D budget of $76.3M

• PCR-08-034 approved & implemented.

Total FTE-yrs = 188.6 (baseline = 155.1)

Page 9: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

9 BROOKHAVEN SCIENCE ASSOCIATES

Revised Funding Profile in R&D

• Consolidated MLL and Kinoform into single 1nm R&D• Added R&D beamline at NSLS for optics testing• Redirected thermal modeling engineering effort to optical figure control for

<0.1urad optics

Total budget in R&D is within baseline $19M; Total FTE = 65.6 (baseline = 75.5)

PCR-08-034

Page 10: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

10 BROOKHAVEN SCIENCE ASSOCIATES

Experimental Facilities R&D Program

• 1 nm focusing optics and nanopositioning• 0.1 meV high-resolution optics • X-ray beam position monitors• Optical figure control (heat load, metrology)

Yan, Conley, Lima, Chu (NSLS-II); Maser, Macrander, Rose, Stephenson, et al. (ANL)

Deposition Lab

Optical Metrology

Lab

Optical Assembly

Lab

Mechanical &

Electrical Tech Area

Etching and Fine Polishing

Lab

General Purpose

Lab

Nano-positioning

Lab

General Purpose

Lab

Lapping and

Cutting Lab

The east wing of Bldg.703 has been renovatedSeven labs are ISO 7 (Class 10000) clean rooms (4,200 ft2) to accommodate XFD R&D activities

Cai, Huang, Honnicke, Keister, Coburn, Struble (NSLS-II); Shvyd’ko (APS)

Page 11: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

11 BROOKHAVEN SCIENCE ASSOCIATES

Moving into R&D Labs and Offices in B703Apr.21, 2009

Jan.2, 2009

Page 12: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

12 BROOKHAVEN SCIENCE ASSOCIATES

Multilayer Laue Lens (MLL) for 1 nm Optics

H. Yan, PRB 79, 1 (2009).

t

• wMLL Deposition System (R. Conley):• Contract awarded to CVD; delivery Jul’09; • Grow 1st MLL by Sep’09.

• MLL testing (H. Yan, E. Lima):• Collaboration with CNM/APS; • 1st far-field image of 2D

focusing by MLL

• MLL theory (H. Yan):• Effect of interfacial

roughness

Page 13: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

13 BROOKHAVEN SCIENCE ASSOCIATES

0.1 meV Optics & R&D Beamline at NSLS

NSLS X16a beamline SourceMirrorMono

• Crystal fabrication facility in Bldg.703 • R&D beamline X16A at NSLS developed

and started operations April 2009 • End-station test instrument designed and assembled

with temperature control ovens for dispersion crystals

Tilting (rad)

Cai, Huang, Honnicke, Keister, Coburn, Struble (NSLS-II)Shvyd’ko (APS)

Page 14: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

14 BROOKHAVEN SCIENCE ASSOCIATES

Optical Metrology Laboratory

ALS: flat mirror (InSync) measurements

NSLS-II Optical Metrology Lab plans to house/develop cutting-edge metrology tools for advanced optics development:

• Fizeau interferometer• Long Trace Profiler (LTP)• Phase shifting micro-interferometer• Atomic Force Microscope (AFM)• At wavelength metrology

Page 15: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

15 BROOKHAVEN SCIENCE ASSOCIATES

XPD BAT, November 24, 2008

BAT Meetings

SRX BAT, October 30, 2008

CHX BAT, December 9, 2008

IXS BAT, December 5, 2008

CSX BAT, January 8, 2009 HXN BAT, January 26, 2009

• All Beamline Advisory Teams (BATs) have completed first official meetings:• Good progress made on scientific and technical scopes• All BAT reports have been received• Beamline conceptual designs in progress

Page 16: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

16 BROOKHAVEN SCIENCE ASSOCIATES

MOU and BAT Charter

Page 17: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

17 BROOKHAVEN SCIENCE ASSOCIATES

Main Elements of BAT Charter

• Beamline Advisory Team (BAT) is a small group of scientists who submit a Letter of Interest (LOI) to NSLS-II, representing a particular community, to propose a specific beamline based on a specific set of experimental techniques to carry out a particular scientific mission.

• Submitted LOIs are reviewed by external reviewers and by the NSLS-II Experimental Facilities Advisory Committee (EFAC), and approved by the NSLS-II.

• Primary role of BAT is to advise the NSLS-II Experimental Facilities Division Director on the scientific mission and the technical requirements for the beamline and to work closely with the beamline scientists during design, construction, and commissioning of the beamline.

• NSLS-II has the overall responsibility for the design and construction of the beamline, including hiring of staff. Major beamline revisions are to be made in consultation with the associated BAT and the community at large. Final decisions on any issues in the design and construction of a beamline reside with the NSLS-II.

Page 18: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

18 BROOKHAVEN SCIENCE ASSOCIATES

Need EFAC Advice on the Following …

• Does the BAT Charter adequately describe roles and responsibilities of the BAT?

• Does individual BAT membership adequately represent the particular user community for the beamline?

• To ensure high quality interactions between BAT and NSLS-II, we believe there is a need for formal communication channels between EFAC and the BATs:• to periodically review how BAT is doing by EFAC, e.g. every 1-2 years;• to allow BAT to register concerns and complaints about certain NSLS-II actions.

• Should NSLS-II have a BAT Council, consisting of representatives from all BATs?

Page 19: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

19 BROOKHAVEN SCIENCE ASSOCIATES

Beamline Construction Schedule Baseline

CD-3 Review

Procurement start

EF beneficial occupancy

Conceptual Design

Preliminary Design

Final Design

Long lead time procurement

InstallationTesting

Construction start Ready for Beam

Page 20: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

20 BROOKHAVEN SCIENCE ASSOCIATES

Project Beamline Conceptual Designs

• Finalizing X-ray optics and beamline layout;• Optimizing insertion device specifications; • Heat load analysis on x-ray mirrors and

monochromators; • Concept of end-station instrument;• Iterating with BAT;• Cost and schedule update

Page 21: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

21 BROOKHAVEN SCIENCE ASSOCIATES

Project Beamline Insertion Device Optimizations

• Studies on insertion device options: Oleg Chubar (XFD/ASD) Toshi Tanabe (ASD)

• New XFD/ASD joint working group on IDs: members include XFD, ASD, and NSLS staff; meets weekly to discuss ID options and specifications; current focus is on high-beta long straights.

IXS beamline

Page 22: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

22 BROOKHAVEN SCIENCE ASSOCIATES

Project Beamline Heat Load Analysis

• Thermal analysis on x-ray monochromators

Water-cooled Si mono.Max. slope error ~ 20 rad

LN2-cooled Si mono.Max. slope error ~ 0.2 rad

Vishy Ravindranath, Sushil Sharma (ASD) Lonny Berman (NSLS)

• Heat load analysis on x-ray optics are on-going for six beamlines• Primary conclusion is that LN2-cooled Si mono is needed for hard

x-ray undulator beamlines; Systematic study is underway.

Page 23: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

23 BROOKHAVEN SCIENCE ASSOCIATES

Hard X-ray Nanoprobe in Satellite Building

• Vibration isolation from main building• 100 m long larger working distance• Concrete expt. hutch w/ acoustic damping• Consideration of vibration isolation

similar to EM, from ground up • Air-lock entry and

temperature stability

• ……

N. Simos (CFD)

vibration sources

Page 24: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

24 BROOKHAVEN SCIENCE ASSOCIATES

Laboratory Office Building (LOB)

• XFD effort on LOB programming requirements:• Held several expanded staff meetings to

discuss LOB space requirements• Did detailed estimates on staffing levels and

expected number of users, & their office needs• Did detailed analysis on basic equipment needs

that are required by most user groups in support of their experiments at beamlines• Worked with professional lab planners from HDR on realistic laboratory layouts• Held a town-hall meeting with broader community to discuss with the community

about our current plan and invite feedback

• LOB design at CD-2 was baselined under certain financial constraints, and needs to be reevaluated.

• Expanded LOB design has been given the green light by DOE to proceed.

Page 25: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

25 BROOKHAVEN SCIENCE ASSOCIATES

Outreach to Community

• Six beamline advisory teams, with combined membership of >50 scientists representing a diverse user community, have been the main focus of community interactions during the past year.

• NSLS-II XFD participations in several community organized workshops and meetings, including:

• BER/NIH workshop on life science at NSLS-II, Sep.11-12, 2008• High pressure research workshop, Oct. 6, 2008• XAS community workshop, Mar. 6, 2009• Workshop on SR applications in microelectronics, Mar. 20, 2009• Workshop on SR applications in glass research, Apr. 6, 2009• Weekly beamline transition workgroup meetings

• Focused efforts in XFD on defining BATs, recruitment, R&D infrastructure, and beamline conceptual designs have made it difficult to be more engaged with the community during the past year.

• With more staff scientists on board, we fully expect that community outreach will regain momentum in the coming year.

Page 26: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

26 BROOKHAVEN SCIENCE ASSOCIATES

Responses to May 2008 EFAC Recommendations

Page 27: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

27 BROOKHAVEN SCIENCE ASSOCIATES

Responses to Previous EFAC Recommendations

Page 28: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

28 BROOKHAVEN SCIENCE ASSOCIATES

Issues and Outlook

• High resolution R&D programs, 1 nm and 0.1 meV, are very challenging; Outcomes may have impact on beamline designs

Need to design beamlines with built-in flexibility to accommodate R&D outcomes

• Interface activities with ASD especially in the area of insertion device optimization and front-end designs; may impact beamline schedule

Need proactive interface management and considerable interactions at several levels

• Recruiting and retaining best staff in XFD Hiring of in the coming months will focus on nanopositioning eng., optical metrology

expert, and beamline scientists. Efforts to create and maintain a nurturing research environment in XFD and

encourage discussions on science, R&D, and career developments.

• Managing priorities and interacting with BATs Need open and transparent discussions with BAT so difficult decisions can be made

with BAT inputs; EFAC input and advisory are welcome.

Page 29: 1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities

29 BROOKHAVEN SCIENCE ASSOCIATES

Summary

• NSLS-II Experimental Facilities Division is making good progress in staff recruitment, infrastructure building, x-ray optics R&D, and beamline conceptual designs.

• Beamline Advisory Team selection process for project beamlines completed by CD-3. Beamline advisory team charter developed.

• Beamline conceptual designs, with full engagement of BATs, are well underway and on schedule.

• Considerable interactions with community and NSLS are on going, particularly in LOB programming and workshop participations. An increasing level of NSLS-II outreach activities are anticipated for the coming year, given much higher level of staffing in XFD.

• We appreciate EFAC input and advice on many topics discussed or to be discussed at today’s meeting