1 anatomy of a successful lng project gastech 2008 original conceptual photo of eg lng train 1
TRANSCRIPT
1
Anatomy of a Successful LNG ProjectGastech 2008
Anatomy of a Successful LNG ProjectGastech 2008
Original Conceptual Photo of EG LNG Train 1Original Conceptual Photo of EG LNG Train 1
2
- Henry AldorfRegional Vice-President Business Development
- Bonifacio MonsuyDeputy Managing Director EG LNG
- Al PaceProject Director
- Henry AldorfRegional Vice-President Business Development
- Bonifacio MonsuyDeputy Managing Director EG LNG
- Al PaceProject Director
Anatomy of a Successful LNG ProjectGasTech 2008
Anatomy of a Successful LNG ProjectGasTech 2008
3
- Project Development
- Entrepreneurial Company
- Health, Environmental, Safety, Security
- Cost
- Quality – Conformance to Requirements
- Schedule
- National Content
- Project Development
- Entrepreneurial Company
- Health, Environmental, Safety, Security
- Cost
- Quality – Conformance to Requirements
- Schedule
- National Content
What Makes a Successful Project? What Makes a Successful Project?
4
- Project Developed in Record Time:August 2002 Recommend LNG PlantJune 2004 EPC Contract Notice to Proceed
- EG LNG: Formed Ahead of Schedule
- Safety OSHA Recordable Rate 0.67 8.7 Million Hours without Lost Time Incident
- Project Developed in Record Time:August 2002 Recommend LNG PlantJune 2004 EPC Contract Notice to Proceed
- EG LNG: Formed Ahead of Schedule
- Safety OSHA Recordable Rate 0.67 8.7 Million Hours without Lost Time Incident
EG LNG Train 1 SuccessesEG LNG Train 1 Successes
5
EG LNG Train 1 SuccessesEG LNG Train 1 Successes
- Cost: Within Budget
- Quality: Exceeded Nameplate Capacity in Plant Performance Test
- Schedule: First LNG Shipment 5 Months Ahead
- National Content: Exceeded Goals
- Cost: Within Budget
- Quality: Exceeded Nameplate Capacity in Plant Performance Test
- Schedule: First LNG Shipment 5 Months Ahead
- National Content: Exceeded Goals
6
- Highly Experienced Team
- E.G. Government Placed Priority on Project
- Shareholders Aligned
- Synergy Between Gas Supplier & Train 1
- Self Financed
- Lessons Learned From Ongoing Operations
- All Offtake to One Entity
- Highly Experienced Team
- E.G. Government Placed Priority on Project
- Shareholders Aligned
- Synergy Between Gas Supplier & Train 1
- Self Financed
- Lessons Learned From Ongoing Operations
- All Offtake to One Entity
Project Development - How We Did it Project Development - How We Did it
7
- Staffed with Senior People
- Managed Against a Business Plan
- Excellent E.G. Government Cooperation
- Local Business Entities Assistance
- Immediate Start with National Staffing
- Cost Control Like a Project
- Managed to a Schedule
- Staffed with Senior People
- Managed Against a Business Plan
- Excellent E.G. Government Cooperation
- Local Business Entities Assistance
- Immediate Start with National Staffing
- Cost Control Like a Project
- Managed to a Schedule
Entrepreneurial Company Building Why It Was Successful
Entrepreneurial Company Building Why It Was Successful
8
- Proven General Contractor
- Proven Technology
- Proven Vendors and Subcontractors
- Serial No. 8
- Lump Sum Turn Key
- Incentives for: Safety, Schedule, National
Content, Plant Production
- Proven General Contractor
- Proven Technology
- Proven Vendors and Subcontractors
- Serial No. 8
- Lump Sum Turn Key
- Incentives for: Safety, Schedule, National
Content, Plant Production
Project Execution ModelSetting Up For Success
Project Execution ModelSetting Up For Success
9
- Management Commitment and Strong Participation
- Created Culture of Safety First
- Agreed Safety Procedures Before Mobilization
- More “Boots on the Ground”
- Safety Incentives
- All Incidents Reported & Investigated, Even Property Damage
- Management Commitment and Strong Participation
- Created Culture of Safety First
- Agreed Safety Procedures Before Mobilization
- More “Boots on the Ground”
- Safety Incentives
- All Incidents Reported & Investigated, Even Property Damage
Project Execution Model Health Environmental Safety (HES)
Project Execution Model Health Environmental Safety (HES)
10
- Highly Experienced TeamBoth Owner & Contractor Experience
- Owner’s PMT Resided with ContractorCenter of Gravity Shift
- Created a One Team Environment
- Highly Experienced TeamBoth Owner & Contractor Experience
- Owner’s PMT Resided with ContractorCenter of Gravity Shift
- Created a One Team Environment
Project Execution ModelProject Management Fundamentals
Project Execution ModelProject Management Fundamentals
11
- Minimized Change from the FEED (AFE) Basis
- Owner’s PMT did not Question the Need for a Quick Response
- Owner Used a Variety of Subject Matter Experts
- Minimized Change from the FEED (AFE) Basis
- Owner’s PMT did not Question the Need for a Quick Response
- Owner Used a Variety of Subject Matter Experts
Project Execution Model Engineering
Project Execution Model Engineering
12
- Long Lead Orders Before Financial Investment Decision
- International Procurement
- Project Specific Construction Jetty
- Considerable Owner Inspection (In Addition to Contractor’s Inspection)
- Long Lead Orders Before Financial Investment Decision
- International Procurement
- Project Specific Construction Jetty
- Considerable Owner Inspection (In Addition to Contractor’s Inspection)
Project Execution ModelProcurement
Project Execution ModelProcurement
13
- Built Dedicated Facilities
- Brought in Professional Instructors (Spanish Speaking)
- Dove-Tailed Training Schedule with Construction Staffing Plan
- Built Dedicated Facilities
- Brought in Professional Instructors (Spanish Speaking)
- Dove-Tailed Training Schedule with Construction Staffing Plan
Project Execution Model Craft Training
Project Execution Model Craft Training
14
Project Execution Model Craft Training
Project Execution Model Craft Training
15
- Construction Participation in Design for Constructability
- Very Effective Early Works Program at Site
- Strong Early Focus on Engineering & Procurement Schedules Ensured Materials & Equipment On Site When Needed
- Construction Participation in Design for Constructability
- Very Effective Early Works Program at Site
- Strong Early Focus on Engineering & Procurement Schedules Ensured Materials & Equipment On Site When Needed
Project Execution ModelConstruction
Project Execution ModelConstruction
16
- Assumed from Day 1 that Money Would be Tight
- Very Strong Emphasis on Owner’s Cost Forecasting - Schedule – Sense of Urgency from Day 1 + Incentives
- Assumed from Day 1 that Money Would be Tight
- Very Strong Emphasis on Owner’s Cost Forecasting - Schedule – Sense of Urgency from Day 1 + Incentives
Project Execution ModelProject Controls
Project Execution ModelProject Controls
17
- A Great Team Effort
- Highly Motivated, Creative, Experienced Personnel
- Fundamentals Still Apply
- A Great Team Effort
- Highly Motivated, Creative, Experienced Personnel
- Fundamentals Still Apply
Closing Comments Closing Comments
18
Aerial Photo of EG LNG Train 1 Aerial Photo of EG LNG Train 1