(1-7r7 wohr/government of india - department of …dae.nic.in/writereaddata/7cps20032017.pdf(1-7r7...

4
( 1-7R7 wohR/Government of India 1:RTPI 61`rli 141-TT/Department of Atomic Energy 4 -cicimq L-i4-1.-ciq aTTTITT/Secretariat Coordination Section 3-117f1T 1 T791Anushakti Bhavan, WITIFff f -rdTA- 4-iwi A 174/C.S.M Marg, Tr4/Mumbai - 400 001. (1T022- 22862661) e-mail: sectcorddae.gov.in No. 21/5/2016-SCS/3931. March 0 , 2017 OFFICE MEMORANDUM Subject : Grant of PRIS (0), (G) and (I) — Regarding. The undersigned is directed to refer to this Department's O.M. No.1/1(5)/2008-SCS/284 dated 05.05.2009, as amended / revised from time to time, on the captioned subject. 2. As per the extant orders on the subject, the PRIS(0) and (G) are granted on basic pay (i.e. pay in the pay band plus grade pay as per 6 th CPC) and PRISM is granted in the form of Variable increments to S&T personnel as indicated in the Appendix to TC&TSC, BARC Note No.TC/1631/2009/40618 dated 05.05.2009, endorsed vide DAE Note No.1/1(5)/2008-SCS/309 dated 12.05.2009 . 3. Consequent on acceptance of 7 th CPC recommendations by M/o Finance, the Department vide OM No.8/4/2016-9894 dated 29.07.2016 has adopted the Revised Pay Structure(Pay Matrix) w.e.f. 01.01.2016. 4. Accordingly, it has been decided in the Department to adopt new Revised Pay Structure (Pay Matrix) of 7 th Central Pay Commission (CPC) for payment of PRIS(0) & (G) w.e.f. 01.01.2016. As regards, PRISM to S&T personnel, the value of one increment for drawal of PRISM will be as per the table indicated in Annexure-1 as recommended by Trombay Council in its 2006 th Meeting held on 07.03.2017, w.e.f. 01.01.2016, subject to maximum ceiling of Rs.25,700 per month to an employee. 1

Upload: letuyen

Post on 05-May-2018

252 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: (1-7R7 wohR/Government of India - Department of …dae.nic.in/writereaddata/7cps20032017.pdf(1-7R7 wohR/Government of India 1:RTPI 61`rli 141-TT/Department of Atomic Energy 4-cicimq

(1-7R7 wohR/Government of India

1:RTPI 61`rli 141-TT/Department of Atomic Energy

4-cicimq L-i4-1.-ciq aTTTITT/Secretariat Coordination Section

3-117f1T 1T791Anushakti Bhavan,

WITIFff f -rdTA- 4-iwi A 174/C.S.M Marg,

Tr4/Mumbai - 400 001.

(1T022- 22862661) e-mail: sectcorddae.gov.in

No. 21/5/2016-SCS/3931. March 0 , 2017

OFFICE MEMORANDUM

Subject : Grant of PRIS (0), (G) and (I) — Regarding.

The undersigned is directed to refer to this Department's O.M.

No.1/1(5)/2008-SCS/284 dated 05.05.2009, as amended / revised from time to time,

on the captioned subject.

2. As per the extant orders on the subject, the PRIS(0) and (G) are granted on

basic pay (i.e. pay in the pay band plus grade pay as per 6 th CPC) and PRISM is

granted in the form of Variable increments to S&T personnel as indicated in the

Appendix to TC&TSC, BARC Note No.TC/1631/2009/40618 dated 05.05.2009,

endorsed vide DAE Note No.1/1(5)/2008-SCS/309 dated 12.05.2009 .

3. Consequent on acceptance of 7 th CPC recommendations by M/o Finance, the

Department vide OM No.8/4/2016-9894 dated 29.07.2016 has adopted the Revised

Pay Structure(Pay Matrix) w.e.f. 01.01.2016.

4. Accordingly, it has been decided in the Department to adopt new Revised Pay

Structure (Pay Matrix) of 7 th Central Pay Commission (CPC) for payment of PRIS(0)

& (G) w.e.f. 01.01.2016. As regards, PRISM to S&T personnel, the value of one

increment for drawal of PRISM will be as per the table indicated in Annexure-1 as

recommended by Trombay Council in its 2006 th Meeting held on 07.03.2017, w.e.f.

01.01.2016, subject to maximum ceiling of Rs.25,700 per month to an employee.

1

Page 2: (1-7R7 wohR/Government of India - Department of …dae.nic.in/writereaddata/7cps20032017.pdf(1-7R7 wohR/Government of India 1:RTPI 61`rli 141-TT/Department of Atomic Energy 4-cicimq

5. All other terms, conditions and clarifications already issued by the Department

from time to time on the subject shall remain unaltered.

6. Before disbursing the arrears towards PRIS(0), (G) and (I) w.e.f 01.01.2016,

the Drawing & Disbursing Officers shall take an undertaking from an employee as

per the Annexure-2 enclosed herewith.

7. The expenditure involved in making payment as per New Pay Matrix of 7 th

CPC shall be met from within the budget of the respective Units and debited to the

respective "salary head". Before making the payment, the Units should ensure that

the budget provision exists.

8. Separate orders will be issued in respect of the Public Sector Undertakings

and Aided Institutions under the Department.

9. This issues with the approval of Secretary, DAE.

10. Hindi version follows.

Encl : As above.

re(S. Merv . lexa er) Joint Secretary to the Government of India

All Heads of Constituent Units of DAE

Copy forwarded to : - 1. Principal Director of Audit, Scientific Department, Department of Atomic

Energy, Anushakti Bhavan, C.S.M. Marg, Mumbai — 400 001. 2. Chief Controller of Accounts, DAE

Copy for information and necessary action to :-

1. Under Secretary (Power), DAE } with regard to Paragraph 8 herein

2. Under Secretary(R&D-II), DAE above

Copy for information to :-

1. All Officers and Sections in DAE 2. Secretary, Staff Side, Atomic Energy Workers & Staff Union; BARC, Trombay,

Mumbai - 400 085.

2

Page 3: (1-7R7 wohR/Government of India - Department of …dae.nic.in/writereaddata/7cps20032017.pdf(1-7R7 wohR/Government of India 1:RTPI 61`rli 141-TT/Department of Atomic Energy 4-cicimq

Annexure 1

to DAE 0.M.No.21/5/2016-SCS/313) dated 2.0 ' 0 3" 21014.v

Revised value of one increment for drawl of PRIS — Individual Incentive to S&T Personnel as follows:

Sr. No.

Level in the Pay Matrix Revised Value of one increment

Earlier Increment Value

1. Level — 16 6200 2270

2. Level — 15 5500 1920

3. Level — 14 4300 1650

4. Level — 13A 3900 1460

5. Level — 13 3600 1390

6. Level — 12 2400 900

7. Level — 11 2000 760

8. Level — 10 1700 630

9. Level — 9 1600 630

10. Level — 8 1400 570

11. Level — 7 1300 560

12. Level — 6 1100 490

13. Level — 5 900 340

14. Level — 4 800 300

15. Level — 3 700 250

16. Level — 2 600 240

Page 4: (1-7R7 wohR/Government of India - Department of …dae.nic.in/writereaddata/7cps20032017.pdf(1-7R7 wohR/Government of India 1:RTPI 61`rli 141-TT/Department of Atomic Energy 4-cicimq

Annexure 2

to DAE 0.M.No.21/5/2016-SCS/3931 dated 20.03.2017

Government of India Department of Atomic Energy

(Name of Unit )

UNDERTAKING

I hereby undertake that in the event of any orders issued by Government of

India contrary to the decision conveyed vide DAE OM No.21/5/2016-SCS/ 3931

dated 20.03.2017 regarding payment of PRIS(0), (G) and (I) as per the Revised Pay

Structure (Pay Matrix) of 7 th Central Pay Commission (CPC), any payment so made

shall be refunded by me to the Department.

Signature

Name

Designation

Employee No.

Date:

Unit