1 2 3 setup strongback bulkheads and tmp. frames in place ......then build cabin-top on mould (using...
TRANSCRIPT
-
LAST MODIFIED:13-07-2011
Troublemaker 9500 BUILD SEQUENCEDRAWING No.Schionning Designs Michael
Van Schalkwyk www.schionningdesigns.com.au
BOAT:DRAWN BY: TITLE:PTY. LTD. ALL DIMENSIONSIN MILLIMETRES These plans are for the construction of a single vessel; not to be reproduced or communicated without
our written agreement. 01
1 2 3
4
7
5 6
98Add side decks, aft decks, fwd deck and cockpit.
Setup Strongback Bulkheads and tmp. Frames in Place Bottom Strip Planking in Place
Add cabin sides Then build cabin-top on mould (Using plots).Fit and glue cabin top.
Now all the detail:Cut hatches and ports, doors and windows.Fit all deck hardware and core holes.Fair, bog and high build then paint.Next make masts and booms
Add underfloor webs and keel case,then add cabin sole (floor).Add mast tubes.Now build furniture from bottom to top and rememberwater tanks under bunk must be resin sealed well.
Make two cradles to suit at bulkhead positions.Turn hull over.Tape all inside joins.
Side panels in place. When look OK glue to bulkheads.Add plastic tape to panel edges and bulkheads, stripplank the mid sections, clean up and fill holes and gapsthen glass the outside of strip planking.Remove the strip sections clean up and glass theinside then glue back into position.