PRAY FIRST BEFORE YOU START YOUR LEARNING PROCESSFOR EVERYONE: ALWAYS BELIEVE YOU CAN DO, DON’T U EVER GIVE UP
GOOD MORNING & GOOD DAY
![Page 2: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/2.jpg)
INTRODUCTION TO INTRODUCTION TO CONSTRUCTION INDUSTRYCONSTRUCTION INDUSTRY
![Page 3: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/3.jpg)
MANAGEMENT
PROJECT MANAGEMENT
CONSTRUCTIONPROJECT MANAGEMENT
![Page 4: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/4.jpg)
THE SCENARIO OF CONSTRUCTION INDUSTRY
a) Every project has their own uniqueness
b) Influenced by weather condition
c) Involving the usage of varieties of energy
d) Involvement of many parties
e) A complex system
![Page 5: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/5.jpg)
WHAT IS PROJECT?
A SERIES OF ACTIVITIES & TASKS THAT:
a) Have specific objective to be completed within certain specification
b) Have defined start and end dates
c) Have funding limits
d) Consume resources
![Page 6: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/6.jpg)
3 BASIC CHARACTERISTIC OF CONSTRUCTION PROJECT
TIMECOST
QUALITY
![Page 7: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/7.jpg)
GOAL & OBJECTIVE
1) Cost Project completed according to the
financial budget given2) Time
Project completed within the time given3) Quality
Project completed according to the specification and quality which has been set
![Page 8: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/8.jpg)
TYPES OF CONSTRUCTION PROJECT
1. Residential Construction
- low cost houses, single family house,
high rise apartment, condominium
2. Building Construction
- small retail stores, shopping complex
school, university, hospital, warehouse
![Page 9: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/9.jpg)
3. Heavy Engineering Construction
- dams, bridges, highway, ports, harbour
4. Industrial Construction
- petroleum refineries, steel mills,
petrochemical plant
![Page 10: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/10.jpg)
IMPORTANT ELEMENTS IN CONSTRUCTION
PROJECT ARE AS FOLLOWS:
a) Manpower Resourcesb) Material Resourcesc) Logistic/Machineriesd) Financial /moneye) Knowledge on technology & managementf) Past experienceg) Professionalism
![Page 11: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/11.jpg)
h) Continuing Professional Development
i) Research & Development
j) Consultancy
k) Fast track/Design Build/Package-deal
l) Capacity Of Financing The Project
m) Capacity To Design The Project
n) Joint-Ventures
![Page 12: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/12.jpg)
Manpower Resources
Technical LevelManagement LevelSupport System LevelWorkers
- skilled
- unskilled
![Page 13: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/13.jpg)
Material Resources
construction material – cement, bricks components - pre-fabricated material
2 Parties involved in obtaining these resources that is
supplier manufacturer
![Page 14: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/14.jpg)
LOGISTIC
Machineries such as tipper truck, backhoe, bulldozer, crane etc
Tools such as hammer, saw, shovel, bar bender etc
![Page 15: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/15.jpg)
Financial
capital, equity, profit credits from the supplier, manufacturer loan from bank, finance
- short term loan
- long term loan
![Page 16: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/16.jpg)
Knowledge On Technology & Management
The capability & capacity of construction company depends on i) understanding of business activity
ii) how to handle/method of business
iii) Problem solving
iv) How to increase efficiency & productivity
![Page 17: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/17.jpg)
Past Experience
Building service Civil worksOthers specialization
ProfessionalismProfessionalism
Excellent recordExcellent record Compliance with contract Compliance with contract
requirementrequirement Improvement in quality of workImprovement in quality of work
![Page 18: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/18.jpg)
Continuing Professional Development
Most important factor in improving capability to higher level and standard
Research & DevelopmentResearch & Development
Related to current technology, Related to current technology, principal & management practiceprincipal & management practice
Improve efficiency in construction & Improve efficiency in construction & solving problem faced by the solving problem faced by the industryindustry
![Page 19: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/19.jpg)
ConsultancyFacilitate construction company to improve
knowledgeGiving second & independent opinion to
the professional & internal specialist
Fast Track/Design-build/Package-Fast Track/Design-build/Package-Deal Deal
In Mega Project due to the factor of In Mega Project due to the factor of time, financial, complex designtime, financial, complex design
![Page 20: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/20.jpg)
Project Financing Capacity
The capability to acquire financing facility for certain period for big project
Project Designing CapacityProject Designing Capacity The capability to modify/provide The capability to modify/provide
facility and design service yg facility and design service yg sempurnasempurna
Joint-VenturesJoint-Ventures Especially at international levelEspecially at international level
![Page 21: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/21.jpg)
LIFE CYCLE OF A CONS. PROJECT
1) Concept & feasibility studies
2) Engineering & design
3) Procurement
4) Construction
5) Start up Implementation
6) Operation / Utilization
![Page 22: 1 1 Introduction Construction Industry](https://reader035.vdocuments.mx/reader035/viewer/2022062513/55787c91d8b42a14628b5327/html5/thumbnails/22.jpg)
SMILE MAKES YOU LOVELIER LIKE THESE FLOWERS. DON’T YOU AGREE?
SO FAR, OK? ANY PROBLEM, PLEASE INFORM ME.