09.12.2014. turin. altec. exomars progress report exomars science working team 09-12-2014
TRANSCRIPT
09.12.2014. Turin. ALTEC.
ExoMars Progress Report
ExoMars Science Working Team
09-12-2014
ExoMars Progress Report
ExoMars Science Working Team
09-12-2014
09.12.2014. Turin. ALTEC.
ESA ESTRACK
2016 Mission
Carrier Module (CM)
Surface Platform
NASA DSN
Rover
Descent Module (DM)
2
SchiaparelliEDL Demonstrator Module (EDM)
MOCC @ ESOC Spacecraft Operations
Science Operations Centre ESAC
ROS Antennas
ROCC
Science Archive Back-up Centre IKI
LPOCC
Programme OverviewTwo missions launched in 2016 and 2018 The 2016 mission consists of a Trace Gas Orbiter (TGO) and an EDL Demonstrator Module (EDM)
The 2018 mission consists of a Carrier Module (CM) and a Descent Module (DM) with a Rover and a stationary Landing Platform
Trace Gas Orbiter (TGO)
Proton M
2018 Mission.
Proton M
09.12.2014. Turin. ALTEC. 3
Main Organisation Documents & ActivityDocument & activity Status
Cooperation Agreement Signed
Joint Management Plan Signed
2018 mission Responsibility Matrix Signed in 2013 and 2014 (update)
2016 mission Responsibility Matrix Signed in 2014
Planning Agreement Signed in 2013 and 2014
(update)
2016 and 2018 missions Master Schedules Under revision
Joint Configuration Control Management Document Signed
ExoMars Joint Programme Objectives Document Signed
Joint ExoMars Steering Board Formed
Chief Designers‘ Board Formed
Standards Review Working Group Formed and operational
Landing Site Selection Working Group Formed and operational
09.12.2014. Turin. ALTEC. 4
TGO Science Instruments.
ACS – Atmospheric Chemistry Suite. The three spectrometers cover respectively the bands 0.7–1.7 µm, 2.3–4.6 µm., and 1.7–17.0 µm. ACS will study trace gases, profile isotope ratios, and contribute to atmospheric escape studies.
Status: ACS-STM delivered to TAS-F. Flight hardware is scheduled for delivery at the end of March 2015.
FREND - Fine Resolution Epithermal Neutron DetectorNeutron detector with a collimation module to significantly narrow the instrument’s field of view, thus allowing the creation of higher resolution maps of hydrogen distribution.
Status: FREND-QM delivered to TAS-F. Flight hardware is scheduled for delivery at the end of February 2015.
09.12.2014. Turin. ALTEC. 5
Progress on the 2018 Mission
MISSION & SYSTEM Joint DM Design Review
2018 DM DR Board Close-out took place on 13 October 2014
Several issues remained open however it was agreed to forward the open RIDs and issues to the S-PDR panels for disposition
System PDR S-PDR Board session was held on November 6, 2014, with equal co-chairing of the
European and the Russian participants
After the session the conclusion was made that S-PDR objectives has not been fully achieved
Final session of S-PDR Board is planned on May 5, 2015.
March 2015March 2015 May 2015May 2015April 2015April 2015February 2015February 2015December 2014December 2014 January 2014January 2014
Actions ClosureActions Closure Actions
Acceptance #1Actions
Acceptance #1
ActionsAcceptance #2
2
ActionsAcceptance #2
2
ResponsibilityMatrix Draft
ResponsibilityMatrix Draft
Close-Out Package Delivery
Close-Out Package Delivery Co-locationCo-location
Panel Endorsement
Panel Endorsement S-PDR CO BoardS-PDR CO Board
09.12.2014. Turin. ALTEC. 6
Progress on the 2018 Mission
DESCENT MODULE The DM baseline configuration is updated based on the DM DR outcome
DM de-scoping re-distribution of functions of the Russian OBC-2 between the other Russian Units and
European OBC-1
decrease of mass of the European RM decrease of mass of the Russian scientific equipment on Landing Platform
Increase of clearance of landing platform Optimization of power supply/ power consumption system
It is necessary to finalize PAS baseline configuration (number of stages, number of fixation points, loads at deployment etc.)
CARRIER MODULE A Carrier Module Design Review (Industry Level Review) completed
It is necessary to solve the issues on Power Supply System, thruster impact on DM, avoidance of collision with DM after separation
09.12.2014. Turin. ALTEC.
Descent Module (DM)
2018 SCC Overview – Cruise Configuration
Adapter with separation system
Carrier Module (CM)
09.12.2014. Turin. ALTEC. 8
Parachute system
Back Shield
Rover
2018 DM Configuration
Lander
Front Shield
09.12.2014. Turin. ALTEC. 9
Rover
Landed Platform with Rover – latest configuration
Lander
09.12.2014. Turin. ALTEC. 10
Milestone Date
ESA Council at Min. Level 2 December 2014.
2016 FM FREND and ACS deliveries to ESA February – March 2015
2018 Mission CD/E1 Rider 2 signature 1 April 2015
2018 Mission C/D Kick-Off TBD
2018 Mission S-PDR CO Board 4 May 2015
2016 Mission SCC Adaptor and Separation Mechanism Test
June 2015
2016 Mission EDM/TGO Mating for SCC Test 11 June 2015
2016 Mission FAR September 2015 (TBC)
2016 Missions start Launch Campaign in Baikonur 26 October 2015
Major Short TermMilestones