  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    1/57

    Microwave Equipment Hardware

    Installation Guide

    Microwave Product Customer Service Dept.2009-1

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    2/57

    Content

    Installation Flow

    Installation Preparative

    Installation Steps

    Hardware Installation Check

    Commissioning Test

    Appendix

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    3/57

    Installation Flow Sort and count goods

    Check if com pleted? supply again goods

    Check if the installing

    conditions is ok?

    Install indoor part

    Yes

    Yes

    Feedback

    responsibility party

    N o

    N o

    Install outdoor part

    Check installation

    Check if the installing

    result is ok?

    Clean the work local

    End

    Correct

    Yes

    No

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    4/57

    Content

    Installation Flow

    Installation Preparative

    Installation Steps

    Hardware Installation Check

    Commissioning Test

    Appendix

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    5/57

    Installation Preparative

    1. Sort and count goods

    1. Record delivery table information for each site.

    2. Record information of counting and inspecting goods.

    3. If the goods information does not comply with the site

    information, ask for supplement.

    2. Preparations

    Documents

    Tools

    Manpower

    Check installation conditions

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    6/57

    Documents

    Microwave implementation

    data table

    Microwave link to olo

    Site implementation plan view

    design drawing

    Link performance table

    Link sectional drawing

    E1 distribution table

    Documents Preparation beforeImplementation

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    7/57

    Tools

    SN Name QuantityMain

    parameter

    Remark

    1 Multimeter 1 With buzzer

    2 Compass 2

    Tools and instruments and

    operation safety requirements

    4 Pull RopeDecided by

    antenna height

    5 Assembledtools

    2

    Caution

    Follow the implementation regulation strictly during installation.

    All installation stuff must wear safety helmet and safety belt.

    All tools for electrical installation and operation must have insulation treatment.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    8/57

    Manpower

    Antenna caliber: 0.3m/0.6m/1.2m

    Decide manpower mainly according to antenna caliber. Recommendation as

    follows:

    5 People

    Antenna caliber: 1.8m/2m

    Antenna caliber: 2.4m/3.2m

    8 People

    10 People

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    9/57

    Check Installation Conditions

    Check indoor installation conditions

    Check outdoor installation conditions

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    10/57

    Check Indoor Installation Conditions

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    11/57

    Check Installation Condition

    Check indoor installation condition

    Check outdoor installation condition

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    12/57

    Check Outdoor Installation Condition

    Tower Pole Outdoor cable rack

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    13/57

    Content

    Installation Flow

    Installation Preparative

    Installation Steps

    Hardware Installation Check

    Commissioning Test

    Appendix

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    14/57

    Installation Steps

    1 Indoor Installation

    2 Outdoor Installation

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    15/57

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    16/57

    Indoor Installation

    Fixing Rack

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    17/57

    Indoor Installation

    The adjacent racks should

    be pressed compact, without

    any spacing over 3mm.

    Fixing Rack

    The adjacent racks of the

    same type should be uniform

    In height, with a deviation

    not more than 2mm.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    18/57

    Indoor Installation

    The rack (cable distribution frame,

    or power cabinet) should not have

    a vertical error exceedin 1 of its

    height.

    Fixing Rack

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    19/57

    Indoor Installation

    Fixing IDU

    Caution:

    IDU must be fixed firmly on the stably installed rack.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    20/57

    Indoor Installation

    IDU Installation Points

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    21/57

    Indoor Installation

    Connect IDU I/O Board (75)

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    22/57

    Indoor Installation

    IDU Power

    connector plugs

    Caution:

    Do not mistake the power supply polarity. It may cause IDU damage.

    ZTE IDU Power

    connector jack

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    23/57

    Indoor Installation

    IDU Grounding

    IDU grounding point

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    24/57

    Indoor Installation

    Make IF cable head

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    25/57

    Indoor Installation

    Make IF cable head

    IF cable connecter shall be fixed with the cable tightly and has good electrical contact.Wrap the connecter end and the cable with insulation tape for about 3cm. Wrap evenly and tightly.

    Check IF cable short with multimeter.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    26/57

    Line-up E1 cable

    Indoor Installation

    Specification and routing of E1 signal cable shall comply with design requirements.

    Cut E1 cables according to the design before wiring, and make clear marks at both ends.

    Weld properly on correct position. The welding part shall be smooth and even with no point.

    Line-up the cables orderly and neatly.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    27/57

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    28/57

    Indoor Installation

    Power supply

    terminals busbar

    Caution:

    The power supply terminal busbar shall be installed upper right. Power cables shall be

    lined orderly. Connect the cables strictly following the regulation. Avoid short.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    29/57

    Indoor Installation

    The power cable and ground cable

    terminals should be crimped firmly,and the spring washers should be

    pressed flat when crimping a bolt.

    Use copper lugs according to the

    core diameters and bolt diameters.

    It is not allowed to cut off partial

    core to suit a small copper lug or cut

    open a copper lug to suit a large bolt.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    30/57

    Indoor Installation

    The copper lugs and the bare part of

    connected wire should be wrapped

    tightly with insulating tape or shrinkable

    tubes. When insulating tape is applied,

    its color should conform to the color

    label requirements.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    31/57

    Indoor Installation

    Labels shall have

    the same direction

    Its not allowed!

    a es no n or er

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    32/57

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    33/57

    Indoor Installation

    In the case of upward cabling, the

    cables should be mounted directly

    along the cabling rack, and should

    Wiring Requirements

    not e a t g t y aga nst t e eat-s n

    panel on the top of the cabinet.When cabling along the upper part

    of the cabinet is necessary, the cables

    should be spaced 10cm away from

    the heat-sink panel on the top of the

    cabinet.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    34/57

    Indoor Installation

    The downward cables, when piled

    up on the floor, cannot exceed

    of the floor height, or ventilation

    Wiring Requirements

    .

    For the cables outside a cabinet, the

    part over one meter away from thecabinet is not allowed to intercross.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    35/57

    Indoor Installation

    The power cable, signal cable, and tail

    fiber should be bundled and wired

    separately .The power cable and signal

    cable outside a cabinet should be

    s aced over 5cm a art without

    overlapping and mixture.

    The insulating jacket of a cable is in

    good condition, without core exposed.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    36/57

    Indoor Installation

    Cables Line-up

    No cross. Fix with ties or feeder clip every 1m~1.5m.

    Cables shall be tied and lined orderly and neatly.IF cables shall not cross on the cable rack. Do not tie IF cable together with

    grounding cable and power cable.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    37/57

    Outdoor Installation

    Install Antenna Pole

    0.3m/0.6m 1.2m

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    38/57

    Outdoor Installation

    ODU 1+0 Integrated Installation

    Caution:

    Mount ODU to the antenna and connect the wave guide connecters of the antenna and

    ODU. Make sure the waterproof gasket is complete and in good condition. Fasten 4 buckles.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    39/57

    Outdoor Installation

    ODU 1+1 Integrated Installation

    Caution:

    Mount 2 ODU onto a hybrid and connect the hybrid to the antenna. Make sure the

    waterproof gasket is complete and in good condition. Fasten 4 bolts.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    40/57

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    41/57

    Outdoor Installation

    ODU 1+1 Separated Installation

    Caution:

    Mount 2 ODU to a hybrid and install the hybrid to a bracket. Fix the bracket to the pole

    with a U bolt. Connect antenna and the bracket with a flexible wave guide.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    42/57

    Outdoor Installation

    1 2

    Mounting Antenna

    34

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    43/57

    Outdoor Installation

    ODU IF cable connecter

    Caution:

    Wrap the connecter with tape and fix with ties tightly.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    44/57

    Outdoor Installation

    ODU Grounding

    Caution:

    Grounding cable shall be connect to the nearest grounding point. Cables can not be

    winded together.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    45/57

    Outdoor Installation

    IF cable grounding

    Caution:

    Wrap the connecting part with waterproof mud and tape.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    46/57

    Outdoor Installation

    Outdoor IF cable line up and fix

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    47/57

    Outdoor Installation

    The feeder must have a waterproof

    arch before entering an equipment

    room.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    48/57

    Content

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    49/57

    Content

    Installation Flow

    Installation Preparative

    Installation Steps

    Hardware Installation Check

    Commissioning Test

    Appendix

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    50/57

    Hardware Installation Check

    IDU and ODU have proper grounding.

    Check input power voltage and polarity.

    IF cable connect ODU and IDU properly.

    IF cable and signal cable shall be lined tidily and orderly.

    Waterproof treatment of IF cable connecters.

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    51/57

    Hardware Installation Check

    Check the power polarity and cable radius.Power supply check

    IF cable check Check the IF cable connecter, if there is short orbad contact.

    Rack fix checkCheck if the rack is fixed tightly.

    E1 cable checkCheck if the E1 cable and connecter are weldedTightly, and E1 cables connect right.

    IF cable connecter

    waterproof check Check if the waterproof is properly done.

    Antenna check Check if the antenna is fixed tightly.

    Content

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    52/57

    Content

    Installation Flow

    Installation Preparative

    Installation Steps

    Hardware Installation Check

    Commissioning Test

    Appendix

    Commissioning Test

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    53/57

    Commissioning Test

    Tributary 1 outTributary 2 in

    Tributary 2 out

    Tributary 3 in

    Tributary 1 in

    MicroStar

    radio

    MicroStar

    radio

    Bit error testTest method:

    Remote endLocal end

    Bit Error

    Analyzer

    Tributaryn out

    Tributaryn in

    Tributaryn out

    After microwave link is setup, check E1 bit error with bit error analyzer.

    Confirm if E1 channel runs normally.

    Use management software of the equipment to operate bit error test.

    Remote end self loop

    Content

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    54/57

    Content

    Installation Flow

    Installation Preparative

    Installation Steps

    Hardware Installation Check

    Commissioning Test

    Appendix

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    55/57

    Appendix

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    56/57

    Appendix

    Bit error analyzer operation introduction

    Inward Loop back test

    E1 interface circuit E1 interface circuit

    Bit error

    analyzer

  • 8/13/2019 09 Microwave Equipment Hardware Installation Guide [Compatibility Mode]

    57/57