08/05/2010 © ngs 2006 title 1 mmc modernmmc modern...

56
www.greenspec .co.uk 08/05/2010 © NGS 2006 Title 1 1 www.capem.eu MMC Modern MMC Modern M th d f Methods of Construction

Upload: dothuan

Post on 06-Apr-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.eu

MMC ModernMMC Modern M th d fMethods of

Construction

Page 2: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euDefinition

• ‘a broad range of processes that aim to d b tt lit h iproduce more, better quality homes in

less time.

• The definition is categorised in terms of products:products:

• Panellised, volumetric, hybrid and other th dmethods,

• and may involve off site manufacturing.’2

and may involve off site manufacturing.

• NAO (National Audit Office)

Page 3: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Offsite Configurations:

• Volumetric, – Modular

• Domestic: parts of flats or housesM t l B d b th id b th b d• Motels: Bedroom bath corridor bath bedroom

– Podular• Bathorooms• Bathorooms• Kitchens• Plant roomsPlant rooms

• Panellised: Walls, floors, roofs,• Turn key solutions• Turn key solutions

– Fast food chains: Complete fit out at factory 3

Page 4: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euOpportunities:

• Off-site factory production

• On-site in factory conditions

• Waste minimisation in factory, no site waste

• No surpluses delivered to site, used in f tfactory

• Packaging minimisationPackaging minimisation

• Efficient site work09/05/2010 © NGS 2007-2010 MMC 4

Page 5: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Lean Construction

• Aim to minimise waste in all its forms– Management time

Labour time– Labour time

• Factory production can exploit this wellFactory production can exploit this well

09/05/2010 5© NGS 2007-2010 MMC

Page 6: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euLean Gone Wrong

• But lean is being misinterpreted and going wrong, seriously wrong– MasonryMasonry

– Wiring

09/05/2010 © NGS 2007-2010 MMC 6

Page 7: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.ukDesign Issues:08/05/2010 © NGS 2006 Title 1

1www.capem.eu

Design Issues: Factory ProductionFactory Production

• Created to standard/design sizes– Ignore site reality

– Base inaccurate setting out?Base inaccurate setting out?

• Site/Factory tolerances– sometimes things go wrong

• Site operative idea of tolerances don’t• Site operative idea of tolerances don t match factory

• Wasted on site if wrong size09/05/2010 © NGS 2007-2010 MMC 7

Page 8: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.ukDesign Issues:08/05/2010 © NGS 2006 Title 1

1www.capem.eu

Design Issues:Site productionSite production

• Create site factory under canvas

• When offered up, if wrong size, rework and reinstalland reinstall

• Potentially less wastey

09/05/2010 © NGS 2007-2010 MMC 8

Page 9: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euDesign Issues: Insulation

• Rarely have any thermal mass or d t d ldecrement delay

• Use thin high embodied carbon andUse thin high embodied carbon and embodied energy insulating materials

G b t it ? H t l• Gaps between units? Heat loss

09/05/2010 © NGS 2007-2010 MMC 9

Page 10: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euDesign Issues: Installation

• Big strong operatives may damage f il tfragile parts

• Site operative idea of tolerances don’tSite operative idea of tolerances don t match factory

W t d it if i• Wasted on site if wrong size

• ‘Helping hand’ supports permitHelping hand supports permit adjustment– Potentially one man operation– Potentially one man operation

09/05/2010 © NGS 2007-2010 MMC 10

Page 11: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euProcurement:

• High % of Costs: are in the Modules

• Low % of Costs: Site works

Profits for attendance and preliminaries• Profits for attendance and preliminaries by Main Contractor if % become large

• Site Works Contractor/Operatives may become a subcontractor of the Modularbecome a subcontractor of the Modularmanufacturer– More control over site setting out and– More control over site setting out and

tolerances09/05/2010 11

Page 12: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euSite Preparation:

• Similar to Normal sites

• All services in and wastes out

• Landscape: Hard, soft and wet

• May include reclaim and reuse of water• May include reclaim and reuse of water

• May include permeable pavementMay include permeable pavement

• Bases for MMC need to be accurate

09/05/2010 © NGS 2007-2010 MMC 12

Page 13: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euLogistics Issues

• Volumetric: – Transporting lots of fresh air

Avoided by panellised– Avoided by panellised

• Just in time deliveryJust in time delivery– Needs buffer park-up place near site

• Road closuresExpensive crane hire– Expensive crane hire

09/05/2010 © NGS 2007-2010 MMC 13

Page 14: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Issues

14

Page 15: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

GMV Greenwich Millennium Village Phase 2b4 storey concrete framed and metal framed panel infill © NGS

15

Page 16: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

PrefabricatedPrefabricated lpanel

constructionconstruction

Page 17: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Metal Stud External Walls

Metal C Studs, Thermal Insulation, Breather Membrane, inner lining, Vapour Barrier, outer lining

Thermal bridging with metal studs is significant17

Page 18: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Greenwich Millennium VillageGreenwich Millennium Village Phase 2a

• Egan initiative implemented:

Phase 2a

prefabrication off-site, simple assembly on site,y ,reduction of site wasteof site waste

• later on-sitefactory-production

18

Page 19: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Metal frame walls

• Balloon frame Platform Frame

19

Page 20: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Restraint

Concrete Frame RestraintRestraint

Infill panels

Curtain wallSupport

RestraintRestraint

SupportSupport 20

Page 21: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Factory Prefabrication:

• Conditions ensure no deterioration

• No mud or cement splashes

• No rain to spoil

• Use of all the materials supplied• Use of all the materials supplied

• Reusing until all is goneReusing until all is gone

• Virtually no waste

09/05/2010 21© NGS 2007-2010 MMC

Page 22: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Strength v U Value in external wall

Avoid over design of structure around openingsg p gAvoid lack of design: adding additional studs for luckAvoid creating wide cold bridges through insulation

A id W t h i th l i l ti llAvoid Waste: chopping thermal insulation rolls09/05/2010 22© NGS 2007-2010 MMC

Page 23: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Compound Studs ‘I Studs’ to accommodate more thermal insulationaccommodate more thermal insulation

Compound section reduces amount of materials used weight cold bridgingmaterials used, weight, cold-bridging

09/05/2010 23© NGS 2007-2010 MMC

Page 24: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

MMC ModernMMC Modern M th d fMethods of

ConstructionOpaque Timber WallsTimber Constructions

Page 25: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Compound Studs ‘I Studs’, inner and outer boards and thermal insulationouter boards and thermal insulation

Prefabricated external wall panelPrefabricated external wall panel25

Page 26: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Compound studs ‘I studs’, inner and outer boards and thermal insulationouter boards and thermal insulation

Prefabricated external wall panelsPrefabricated external wall panels26

Page 27: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Insulated structural Panels

Roof panels create

Habitable Roof Space

Platform FramePlatform Frame

27

Page 28: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Ladders: See L30/110A, L30/112C, L30/113D, L30/114E, L30/115F.

1

www.greenspec.co.uk

www.capem.eu15/04/2010 © NGS 2006 Title 1

Airtightness &Airtightness & Building ElementsBuilding Elements

12 of 25 Air Movement in Buildings

Another GreenSpec CPD to download soon 28

Page 29: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

SIP Structural Insulated Panel

Prefabricated external wall panelPrefabricated external wall panel29

Page 30: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

SIP Structural Insulated Panel

Prefabricated external wall panelPrefabricated external wall panel30

Page 31: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Structural Insulated Panels

Roof panels create

Habitable Roof Space

Platform FramePlatform Frame

31

Page 32: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Load bearing CrossLoad-bearing Cross L i t d Ti bLaminated Timber Panel walls (CLTP)( )

Opaque Timber WallsTimber Constructions

Page 33: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Load-bearing Structural Cross Laminated Timber PanelLaminated Timber Panel

Prefabricated external wall panelpsoftwood lamina or plywood core option33

Page 34: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Cross Laminated Timber Panelsshear walls floors and roofs

34

Page 35: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Cross Laminated Timber Panelsshear walls floors and roofs

35

Page 36: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Cross Laminated Timber PanelCross Laminated Timber Panelshear walls floors and roofs

36

Page 37: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Cross Laminated timber Panels

Roof panels create

Habitable Roof Space

Platform FramePlatform Frame

37

Page 38: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Load-bearing oad bearingTimber blockworkTimber blockwork

Opaque Timber WallsTimber Constructions

Page 39: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

STEKOLoad bearing timber blockworkLoad-bearing timber blockworkConstruction Resources Showrooms Southwark London

39

Page 40: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

STEKOSTEKO

Load-bearing timber blockwork40

Page 41: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.eu

Off SitOff-Site

Page 42: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Mtech Group

• Showcasing:– componentscomponents

– assemblies

– framing systems

– volumetric modular units

• round-up of latest technologiesp g

• setting a radical vision for the way offsite construction might be delivered in the next few years.

42

Page 43: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Mtech’s MD Darren Richards

• "In the same way that the industrial revolution provided new and vastly improved materials notably:provided new and vastly improved materials, notably:

• steel, glass and concrete

• the current digital revolution is offering new methods of design and construction within offsite technology,“

• "Emerging processes utilising CAD, CAM and even on-line designs could set a new precedent for the construction industryconstruction industry

• with the potential for the end-user to have much greater input into the final designs.“

09/05/2010 © NGS 2007-2010 MMC 43

greater input into the final designs.

Page 44: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Offsite Prefabrication

• new design processes, innovations in:– Foundations

– Basement

– timber frame

t t h l– concrete technology;

– Structural Insulated Panel Systems (SIPs)

– light steel framinglight steel framing

– fast-track cladding

– panelised roofing systems

• Bathroom and kitchen pod technology will also continue to have a strong presence

with the emphasis on new applications and hybrid solutions• with the emphasis on new applications and hybrid solutions44

Page 45: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

'Spotlight on Offsite'

• Mtech's Technical Guided Tours,

• Meet the Client sessions

Offsite Masterclass seminars• Offsite Masterclass seminars

• Contact Loretta Sales

• Tel: 020 8870 8794

• Email: [email protected]

• www interbuild com45

• www.interbuild.com

Page 46: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

Offsite Construction AwardsOffsite Construction Awards (OSC)(OSC)

• call for entries

• www.oscmagazine.com

09/05/2010 © NGS 2007-2010 MMC 46

Page 47: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euAdvisory

• Mtech Group Limited, Maple House, The Professional Quarter, Shrewsbury Business Park, Shrewsbury, SY2 6LG, y,

• Tel 01743 282280

• Fax 01743 357367

h• www.mtech-group.com

09/05/2010 © NGS 2007-2010 MMC 47

Page 48: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euTechnical talks

• Mtech group next offsite event

• www.technicaltalk.co.uk

09/05/2010 © NGS 2007-2010 MMC 48

Page 49: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euOffsite Directory

• The 2008/9 Offsite Directory

• Mtech Consult and Building magazine• Mtech Consult and Building magazine

• the most comprehensive reference listing of offsite manufacturers available in the UK.

• over 650 offsite manufacturing, service and consultancy companies

• Categorized by area of expertise

• industry reports and editorial insights

• expert opinion on key issues affecting the off-site sector

• sustainability and regulatory compliance Since 2004y g y p

09/05/2010 © NGS 2007-2010 MMC 49

Page 50: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euOffsite Directory

• acknowledged as the essential independent reference guide for offsite construction

• Offsite Directory for FREE

• Post & Packaging £5

09/05/2010 © NGS 2007-2010 MMC 50

Page 51: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euContact

• Rhonda Farr

[email protected]

• 01743 357377

• Mtech Consult• Mtech Consult

09/05/2010 © NGS 2007-2010 MMC 51

Page 52: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.offsiteonline.co.uk 2010

• 1st anniversary of going live,

• an outstanding success

• brought awareness of the diverse gcompanies who can supply the offsite sector,

• others may be interested in adding their company to the directory as a potential p y y psupplier and be noticed by decision makers,

• visit the website at to check your suitability.

09/05/2010 52

Page 53: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.eu

• Offsiteonline was developed as a result of:

• Pressure by specifiers and contractors• Pressure by specifiers and contractors

• to deliver information on the capabilities pof manufacturers and suppliers to the offsite industryoffsite industry,

• so the more information provided the pgreater opportunity to be found by companies that need product.

09/05/2010 © NGS 2007-2010 MMC 53

Page 54: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euBuilding Magazine

• planned major advertising campaign– June and July 2010

li di t ill f t B ildi• online directory will feature on Building Magazines website

• >1 million hits/month

• targeting specifiers, major contractors, architects and procurement managersarchitects and procurement managers

• media advertising, e-mail shots and 09/05/2010 © NGS 2007-2010 MMC 54

Page 55: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euYour opportunity

• add your company before this campaign begins– go to the register your company link on thego to the register your company link on the

Offsiteonline home page or call

• upgrade entry – Full and Enhanced entries availableFull and Enhanced entries available

– book your upgrade early.

09/05/2010 © NGS 2007-2010 MMC 55

Page 56: 08/05/2010 © NGS 2006 Title 1 MMC ModernMMC Modern …greenbuildingencyclopaedia.uk/wp-content/uploads/201… ·  · 2015-11-2108/05/2010 © NGS 2006 Title 1 1 MMC ModernMMC Modern

www.greenspec.co.uk

08/05/2010 © NGS 2006 Title 1

1www.capem.euContact

• Susie Bell

• Sales and Marketing

• DDI: 01743 276041

09/05/2010 © NGS 2007-2010 MMC 56