A record that shows an item’s lot-size policy, lead time and various time- phased data Lot size = 230 unit Lead time = 2 wks Inventory Record Week No. 1 2 3 4 5 6 7 8 Gross requirements 150 0 0 120 0 150 120 0 Scheduled receipt Projected on- hand inventory (37) Planned receipt Planned order release Material Requirement Planning (MRP) 230

Upload: shilpi-islam

Post on 12-Jan-2016

212 views

Category:

Documents


0 download

DESCRIPTION

Mgt

TRANSCRIPT

Page 1: 08. MRP - Copy

A record that shows an item’s lot-size policy, lead time and various time-phased data Lot size = 230 unit

Lead time = 2 wks

Inventory Record

Week No. 1 2 3 4 5 6 7 8

Gross requirements 150 0 0 120 0 150 120 0

Scheduled receipt

Projected on-hand inventory (37)

Planned receipt

Planned order release

Material Requirement Planning (MRP)

230

Page 2: 08. MRP - Copy

Lot size = 230 unitLead time = 2 wks

Safety stock = 80 unit

Inventory Record

Week No. 1 2 3 4 5 6 7 8

Gross requirements 150 0 0 120 0 150 120 0

Scheduled receipt 230

Projected on-hand inventory (37)

Planned receipt

Planned order release

Material Requirement Planning (MRP)

Page 3: 08. MRP - Copy

Lot for LotLead time = 2 wks

Inventory Record

Week No. 1 2 3 4 5 6 7 8

Gross requirements 150 0 0 120 0 150 120 0

Scheduled receipt 230

Projected on-hand inventory (37)

Planned receipt

Planned order release

Material Requirement Planning (MRP)

Page 4: 08. MRP - Copy

Material Requirement Planning (MRP)Example

A

DB

C

FD

Week No. 1 2 3 4 5 6

Gross requirements of A 80

Gross requirements of C 50

2

Page 5: 08. MRP - Copy

Material Requirement Planning (MRP)For A (LT = 1 wk; lot for lot)

Week No. 1 2 3 4 5 6

Gross requirements

Scheduled receipt

Projected on-hand inventory

Planned receipt

Planned order release

For C (LT = 1 wk; lot for lot)

Week No. 1 2 3 4 5 6

Gross requirements

Scheduled receipt

Projected on-hand inventory

Planned receipt

Planned order release

Page 6: 08. MRP - Copy

Material Requirement Planning (MRP)For D (LT = 2 wks; lot size = 100)

Week No. 1 2 3 4 5 6

Gross requirements

Scheduled receipt

Projected on-hand inventory (15)

Planned receipt

Planned order release