    Damage of Highway Bridges Due to The 2011off the Pacific Coast of Tohoku Earthquake

    National Institute for Land and Infrastructure ManagementRoad Department,

    Bridge and Structures Division

    Research Center for Disaster Risk Management,

    Earthquake Disaster Prevention Division

    Public Works Research InstituteCenter for Advanced Engineering Structural Assessment and Research

    CAESAR

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    2/26

    Missions of NILIM/PWRI Bridge Reconnaissance Team

    Mission 1: Technical Supports for Highway AdministratorsTohoku Regional Development Bureau,

    Local Governments (Iwate Pref., Ibaraki Pref., Chiba City, Kitakami City, etc.)

    Mission 2: Damage Evaluation and Verification of Design Code

    Emergency Inspection Follow-up Inspection

    Inspec-

    tion

    Temporary

    Repairs

    Perm

    a

    nen

    t

    Repair

    s

    Planning of

    Temporary Repairs

    Temporary

    Repairs

    Philosophy of

    Permanent RepairsPerma-

    nent

    Repairs

    NILIM / PWRI, CAESAR

    Reconn

    ais

    sa

    nce

    (TE

    C-F

    OR

    CE

    )

    Technic

    al

    Supports

    Technical

    Supports

    Reconn

    aiss

    an

    ce

    (DamageMechanism)

    STEP. 1

    STEP. 2 STEP. 3

    STEP. 4 STEP. 5

    Technical

    Supports

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    3/26

    Reconnaissance Activity for Highway Bridges

    Targets (148 Bridges, as of Apr. 25, 2011)

    Damage Due to Ground Motion Effect

    Damage Due to Tsunami EffectDamage Due to Soil Liquefaction Effect

    Reconnaissance Teams

    NILIM Total of 34 PersonDay

    CAESAR Total of 79 PersonDay

    Reconnaissance

    Area Map

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    4/26

    Categorization of Damage to Highway Bridges

    1. Effect of Ground Motion

    2. Effect of Tsunami

    3. Effect of Soil Liquefaction

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    5/26

    Damage to RC Columns at Section of Cut-off of Longitudinal Rebars

    Damage Due to Effect of Ground MotionBridges Designed Based on Pre-1980 Specifications

    Shear cracks following flexural failure at section of cut-off of longitudinal rebars

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    6/26

    Damage to RC Pier Wall with Small Amount of Reinforcement

    Damage Due to Effect of Ground MotionBridges Designed Based on Pre-1980 Specifications

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    7/26

    Subsidence of Deck End

    Resulting from Broken

    Movable Bearing

    Damage of Fix Bearing

    Damage to Steel Bearings

    Damage Due to Effect of Ground MotionBridges Designed Based on Pre-1980 Specifications

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    8/26

    Damage ofSuperstructure-side

    Attachment

    Damage toAttachment of

    Bearings

    Damage to Pier Top

    Damage Due to Effect of Ground MotionBridges Designed Based on Pre-1980 Specifications

    Damage to Pier Top

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    9/26

    Collapse of Bridge withPile-bent Columns

    Damage Due to Effect of Ground MotionBridges Designed Based on Pre-1980 Specifications

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    10/26

    Slight Buckling and

    Crack Observed in

    Lower Chord

    Member

    Damage to Upper Lateral

    Bracing in Langer Bridge

    Damage of Steel Bridge

    Damage Due to Effect of Ground MotionBridges Designed Based on Pre-1980 Specifications

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    11/26

    Retrofitted/Unretrofitted Bridge Piers Located Close

    Failure of MovableSteel Bearing

    about

    400m

    Retrofitted

    (3-span cont. + 4-span cont.

    Damage to Cut-offSection of Long. Rebars

    Shear Crack

    Unretrofitted

    (3-span cont. + 3-span cont.

    No Damage to Piersand Bearings

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    12/26

    Damage of Lateral Displacement Stopper

    (Expansion Joint Protector)

    Subsidence of Backfill soil for Abutment

    Damage Due to Effect of Ground MotionBridges Designed Based on Post-Kobe EQ Specifications

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    13/26

    Rupture of Elastomeric Rubber Bearings

    Damage Due to Effect of Ground MotionBridges Designed Based on Post-Kobe EQ Specifications

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    14/26

    Cross-railway Bridge

    Cross-river Bridge

    Subsidence of Embankment for Approaching to Bridge

    Damage Due to Effect of Ground Motion

    Subsidence of

    20 cm

    Subsidence of

    40 cm

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    15/26

    Damage Due to Effect of Tsunami

    Wash Away of All Spans of Girders and Backfill soil of Abutments

    Rupture ofElastomericBearings

    DampersInstalled forSeismicRetrofit

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    16/26

    Backfill soil ofabutment wascompletely

    washed away.

    Displacement Stoppers and Anchor Bars

    without Damage

    Damage Due to Effect of Tsunami

    Wash Away of All Spans of Girders and Backfill soil of Abutments

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    17/26

    Wash Away

    of Backfill soilfor AbutmentWash Away of SteelGirder Upstream

    Wash Away of

    Substructure Scour ofFoundation

    Damage Due to Effect of Tsunami

    Wash Away of All Spans of Girders, one substructure and Backfill soil of Abutments

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    18/26

    Wash Away of Backfill soil

    Damage Due to Effect of Tsunami

    Wash Away of Some Spans of Girders and Backfill soil of Abutments

    Deformation of Side

    Block of Steel Bearing

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    19/26

    (Photo Provided from Tohoku Regional Development Bureau, MLIT)

    Damage Due to Effect of Tsunami

    Wash Away of Some Spans of Girders

    Upside-downConcrete Girder

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    20/26

    Damage Due to Effect of Tsunami

    Backfill soil of abutments was

    washed away due to tsunami

    attack but bridge structure wasnot washed away.

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    21/26

    Temporary Repairby Barry Bridge

    Before Earthquake

    Scour of PileFoundation

    Damage Due to Effect of Tsunami

    Backfill soil of abutments was

    washed away due to tsunami

    attack but bridge structure wasnot washed away.

    (Photo Provided from Tohoku

    Regional Development Bureau, MLIT)

    (Photo Provided from TohokuRegional Development Bureau, MLIT)

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    22/26

    Damage Due to Effect of Tsunami

    Bridge girders were affected by

    tsunami attack but bridge

    structure was not washed away.

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    23/26

    Damage Due to Effect of Soil Liquefaction

    Subsidence of Soil

    NarrowingDeck-end Gap

    Resulting fromMovement of

    Abutment

    Subsidence of Soil

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    24/26

    Failure of Embankment

    near Bridge

    Subsidence of Backfill soil

    of Abutment (50-80cm)

    Crack at Seat

    on Abutment

    Damage Due to Effect of Soil Liquefaction

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    25/26

    Preliminary Summary of Damage to Highway Bridges

    1. Damage Due to Effect of Ground Motion

    Unretrofitted Bridges Designed Based on Pre-1980 Specifications

    Damage to RC Columns at Section of Cut-off of Longitudinal Rebars

    Damage to RC Pier Wall with Small Amount of Reinforcement

    Damage to Steel Bearings

    Damage to Attachment of Bearings

    Collapse of Pile-bent Column

    Bridges Designed Based on Post-Kobe Earthquake SpecificationsAlmost No Damage except an Example of Rupture of Elastomeric Bearings

    Embankment for Approaching to Bridge

    Subsidence of Backfill soil of Abutment

    2. Damage Due to Effect of Tsunami

    Wash Away of SuperstructuresWash Away of Backfill soil of Abutment

    Scour of Foundation

    3. Damage Due to Effect of Soil Liquefaction

    Damage to Steel Bearings and Crack to Parapet Wall

    Narrowing Deck-end Gap Resulting from Movement of AbutmentSubsidence of Backfill soil for Abutment

  • 7/27/2019 07Damage of Highway Bridges Due to the 2011 Off the Pacific Coast of Tohoku Earthquake

    26/26

    Acknowledgment

    Damage investigation was supported by a number oforganizations. Special appreciation is extended to Iwate Pref.,