049 communication, constructability and high productivity
TRANSCRIPT
![Page 2: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/2.jpg)
![Page 3: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/3.jpg)
![Page 4: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/4.jpg)
There are different communication instruments, such
as: e-mail document telephone meeting contracts specifications reports manuals schedules calculations
![Page 5: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/5.jpg)
drawings computer files Disks print-outs photographs agenda’s and minutes of meetings The management of documentation and
communication used in a project is used by a number of subcontractors, the storage and retrieval thereof for further use.
![Page 6: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/6.jpg)
STANDARDISATION OF COMMUNICATION The main purpose of standardisation is to
develop a specific level of conformity. This process of standardisation has certain
advantages for the management of a project, such as:
Less different documents. Revised drawings overtake the other
drawings. Records are easy to handle.
![Page 7: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/7.jpg)
Standardisation contributes to increased productivity.
The documents and communication from one project to the next are the same or similar.
Therefore less confusion is created.
![Page 8: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/8.jpg)
Constructability is the integration of construction expertise into all phases of the project.
For Improving factors such as: cost schedule quality and overall project objectives.
![Page 9: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/9.jpg)
The proper use of the knowledge gained by participants such as:
managers designers site workers other contributors Learning from their past experience
increases the level of productivity/project success.
![Page 10: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/10.jpg)
Constructability must be used at key points in the project life cycle. This includes:
in the planning phase; early in the design phase; prior to the procurement phase; prior to the mobilization phase for construction.
![Page 11: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/11.jpg)
Constructability is defined as-the use of construction knowledge and experience in areas such as:
Planning; Design; Procurement; and site operations.
To achieve overall project objectives.
![Page 12: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/12.jpg)
![Page 13: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/13.jpg)
![Page 14: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/14.jpg)
HighProductivity
![Page 15: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/15.jpg)
SinglePoint
ofcontactDrawings
![Page 16: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/16.jpg)
![Page 17: 049 Communication, Constructability and high productivity](https://reader033.vdocuments.mx/reader033/viewer/2022042618/5889b44f1a28aba54d8b5d43/html5/thumbnails/17.jpg)
Constructability
Remove
Riskcontrol Conflict
Longdurationsactivities
DisruptionsDelays
Finderrors
etc.
Strategy
Schedulelogic
Mistakes inconstruction
sequence
Projectcomplexity
Projectfutures
Dimensions
Marital
Standardize
Activitieshard
tocontrol
Information(MIS )
Communication at all levels
Strategy
Schedulelogic
PlanningDesign-prefabrication
procurementSite operation