04/10/2007 M. Dracos 1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

Upload: milo-lloyd

Post on 05-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 1

EUROThe European Design Study for a high intensity neutrino oscillation

facility (Rob Edgecock, Mats Lindroos, Marcos

Dracos)

Page 2: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 2

What is an EU Design Study?

• The 27 European Union member states is in the process of creating a common Research Area with common Research Infrastructure

• The EU funding for research is organized as Frame Work programmers with different components– The FP contributes with 5% to the total national research funding in

Europe– We are presently working within the 6th FP– The Design Studies is one component in the FP and has as objective to

provide first designs for possible common research infrastructure

• The ESFRI (European Strategy Forum on Research Infrastructures, European roadmap for research infrastructures) committee establishes a priority list for new common infrastructure to which the EU is willing to contribute– The Design Studies is the first step in the process to qualify for

financing from the EU for the infrastructure– For the infrastructure to be constructed a member state(s) or an

intergovernmental organization must bid for it and offer an important part of the funding

• International participation is strongly encouraged

Page 3: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 3

Work Program: Work Program: CapacitiesCapacities

EU call

Page 4: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 4

Design Studies budgetDesign Studies budget

Page 5: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 5

Objectives of EURONU DS

• The recent discovery that the neutrino changes type (or flavour) as it travels through space, a phenomenon referred to as neutrino oscillations…

• The implications are far reaching…

• Knowledge of the contribution of neutrinos in these areas needs precise measurements of the parameters governing neutrino oscillations.

• This will require a new high intensity beam-based neutrino oscillation facility in which neutrino beams are generated using new and highly challenging concepts.

• This Design Study will review all three currently accepted methods of realizing this facility (the so-called neutrino Super-Beams, Beta Beams and Neutrino Factories).

• It includes a detailed study of the key technical challenges of the accelerator facilities, of the detector options necessary to measure the neutrino oscillation parameters and a comparison of the physics reach of these facilities.

• The design study will also perform a cost assessment that, coupled with the physics performance, will permit the European research authorities to make a timely decision on the lay-out and construction of the future European neutrino oscillation facility.

Page 6: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 6

Neutrino FacilitiesNeutrino Facilities

pH- linac 2.2 (3.5) GeV, 4 MW

Target

~300 MeV beam to far detector

decay tunnel

Accumulatorring + bunchcompressor

Magnetichorn capture(collector)

proton driver

hadrons

p

Protondriver

Isol target& ion source

DECAYRING

B = 5TL=6880 m

PSB

EURISOLExisting at CERN

New RFQ

SPS

PS Linac

H- linac 2.2 GeV, 4 MW

Target

Linac 2 GeV

RecirculatingLinacs 2 50 GeV

Decay ring – 50 GeV2000 m circumference

Ionizationcooling

Phase rotation

beam to far detector

Drift

Accumulatorring + bunchcompressor

Magneticcapture

beam to near detector

SPL Super-Beam

Neutrino Factory

Beta-Beam

Page 7: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 7

Participants

Page 8: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 8

p-driver

target

collector

front-end

accel.

stor. ring

technologies

beam

Overview

SB BB NF

13 CPV MSW…

(non-acc. ?)

LAr

Cerenkov

Emulsions

magnetized

physics

detectors

facilities

Page 9: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 9

p-driver

target

collector

front-end

accel.

stor. ring

technologies

beam

Work Packages and Deliverables

Super-BeamSuper-Beam

Neutrino FactoryNeutrino Factory

Beta-BeamBeta-Beam

in order to underline synergies…

Near det.

Beam instr.

Far det.

Perform.

Comparison

DetectorsDetectors

PhysicsPhysics

Page 10: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 10

Objectives of the tasks

• Management:– Lead and coordinate the DS– Comparison of the three facilities

• Super beam:– Design of target and collector– Beam characteristics for the SPL superbeam– Specifications for the proton driver

• Neutrino factory– Design of muon front end– Design of an acceleration scenario– Develop a conceptual design for proton beam

handling after the primary production target (proton beam dump)

– End-to-end simulation of the neutrino factory complex

Page 11: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 11

Objectives of the tasks

• Beta-beam– Review acceleration scenario for high-Q value

isotopes– Production of beta-beam isotopes with the production

ring concept– Review decay ring design for high-Q value isotopes– Continue R&D on bunching

• Detector task– Study a Magnetized Iron Neutrino Detector– Study a Cerenkov detector – Study a near detector

• Physics task– Study physics performance– Make optimization of the different possible scenarios– Make a comparison

Page 12: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 12

Effort in people (120 person years)

Page 13: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 13

Organization

Page 14: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 14

Organization

GOVERNING BOARDGOVERNING BOARD

1 representative of each Participant

+ Management Board, ECFA respresentative and representatives of other neutrino

activities (all ex -of f icio)1 meeting/ year

MANAGEMENT BOARDMANAGEMENT BOARD(Executive committee of Coordination Board)(Executive committee of Coordination Board)

Project Leader + 3 Members

COORDINATION BOARDCOORDINATION BOARD

Management Board+ Task Leaders

+ Coordinators of related EU activities(ex -of f icio)

2-3 Meetings / year

INTERNATIONAL ADVISORY INTERNATIONAL ADVISORY PANELPANEL

3 Members – 1 Meeting/ year

ANNUAL PARTICIPANT ANNUAL PARTICIPANT MEETINGMEETING

1 Meeting/ year

WP Nufact

WP BetaB

WP MGT WP Detec

WP PhysWP SuperB

DI SSEMI NATI ON BOARDDI SSEMI NATI ON BOARD

3 Member s – Meet ings as r equir ed

Page 15: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 15

Money

• Total cost: 14.45M€• EC request: 4.8M€• Ratio: 33%

WP (total €)

0%

5%

10%

15%

Year 1 Year 2 Year 3 Year 4

WP1

WP2

WP3

WP4

WP5

WP6

Page 16: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 16

Time scale

• In short:– We will work for 4

years– We hope to start

beginning 2008– We will use the

last year for the comparison task

Page 17: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 17

EU decision

• The proposal got a top ranking in the evaluation of the proposals

• We have been invited to negotiate for a maximum 4 MEuro EU financing

Page 18: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 18

Annual meeting

•Annual meeting to gather the Neutrino physics community and report on the progress of the study

•The meeting will be combined with task meeting, management meetings and reviews

–November 2008: CERN

–November 2009: USA

–November 2010: RAL (Project review)

–November 2011: Paris

•Your are invited to participate!

Page 19: 04/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

04/10/2007 M. Dracos 19

EndEnd