WARM MIX ASPHALT WARM MIX ASPHALT A Contractors Experience A Contractors Experience
CalAPA Spring ConferenceApril 25, 2013
Ontario, CA
Tony LimasGranite Construction Company
2
Today's Discussion
WMA Experience - By the Numbers
Granite WMA Projects
Challenges
WMA Optimization
Takeaways
CalAPA 2013
3
By the Numbers Over 60 HMA plants capable of producing
WMA Approximately 30 asphalt plants retrofitted
with WMA mechanical foaming units • Astec Double Barrel Green• Gencor Green Machine Ultrafoam GX• Maxam AQUA Black• Stansteel Eco-Blend
Some plants using other WMA technologies
CalAPA 2013
4
Accumulative WMA Tonnage to Date
CalAPA 2013
5
WMA Technologies Experience
WMA Technologies Used to Date:
Gencor Ultrafoam (Water Injection Foam) Astec Double Barrel Green (Water Injection Foam) Evotherm ET/DAT/M1 (Chemical) Maxam (Water Injection Foam) RediSet WMX (Chemical) Sasobit (Wax) Advera (TR Foam) Stansteel (Water Injection Foam) Cecabase RT (Chemical)
CalAPA 2013
6
Typical Granite WMA Projects
CalAPA 2013
State/Local/Private Caltrans- I-5 Northern CA (+400,000 tons) 15% RAP WSDOT- SR-12 Add Lanes (80,000 tons) 20% RAP WSDOT – SR 410 Emergency Repair (13,000 tons) 20% RAP WSDOT - US 12 FT. to Walla Walla (81,034 tons) 18% RAP Alaska - Anchorage International Airport (6,500 tons) Alaska - City of Anchorage (1,200 tons) Washington - City of Ocean City (40,000 tons) 30% RAP Pacific Gas & Electric (200 tons) 15% RAP Conoco Philips – Kuparak AK (46,000 tons) Cameron Airpark – Cameron Park, CA (9,200 tons) 20% RAP Geyser Industries, Geyserville, CA (3,000 tons) 15% RAP Granite Construction, Tucson AZ (225 tons) 15% RAP Granite Construction, Salt Lake City, UT (200 tons) 40% RAP
CalAPA 2013
8
Granite’s 1st WMA Test SectionPlant Access Road – Indio, CA (2008)
Astec Double Barrel Green ½” Dense WMA/15% RAP
CalAPA 2013
9
Rubberized Crack Filler
No Crack Sealant Swelling
CalAPA 2013
10
August 2010 (2 year review)
Inbound WMA Outbound WMA
No Rutting
CalAPA 2013
11
August 2010 (2 year review)
Typical Surface Texture Typical Reflective Cracking
HMA
WMA
HMA WMA
CalAPA 2013
Reflective Crack
12
City of Indio, CA
½ Dense GradedPlant Prod Temp: 270 F. (Astec Double Barrel)Job Mix Temp/Breakdown Rolling: 230 F.Intermediate Rolling 175 F.Final Rolling: 160 F.Average Density: 93% RICE
CalAPA 2013
13
City of Indio, CA
CalAPA 2013
14
Warm Mix Hot Mix
City of Indio, CA
CalAPA 2013
15
City of Indio Test Sections
Warm Mix
92.9% RICE
Hot Mix
92.6% RICE
CalAPA 2013
16
WSDOT SR-3
½” Dense Graded PG 64-22 Plant Prod Temp: 330 F
(Gencor Ultrafoam) Job Mix Temp: 300 F Job Ambient Temp: 60 F Density: 92 - 95% RICE
CalAPA 2013
17
Conoco Philips Airfield
CalAPA 2013
18
Kuparak, Alaska¾” Dense Graded Mix
– Northern-most runway in USA
CalAPA 2013
19
Kuparak, Alaska WMA/Anti-Strip Additive: Evotherm M-1 3G (0.50% BTW of binder) Lift thickness: Three 2” lifts in structural section
CalAPA 2013
20
Kuparak, Alaska
Tender mix – 93.5% LTMD compaction for first 5,000 TN Reduced compaction temperature - slowed production Reduced WMA dosage to 0.30 - Tenderness eliminated – Production
increased 95.5% LTMD compaction for last 41,000 TN Compaction achieved at 180 - 190˚ F Pay Factor: 1.044 over 46,000 TN
CalAPA 2013
21
WMA Dosage (Kuparak, AK)%
R
AP
.1 .2 .3 .4 .5% Evotherm M1 G3*
Co
vera
ge
0 .1 .2 .3 .4 .5% Evotherm M1
70 % Min
*Mathy Construction
Alaska TM T-414
CalAPA 2013
22
Cameron Airpark, Cameron Park , CA
½” Dense GradedPlant Prod Temp: 270 F. (Gencor Ultrafoam) Job Mix Temp: 245 F.Completed Compaction 160 F.92-96% RICE
CalAPA 2013
23
Cameron Airpark, Cameron Park, CA
Typical WMA Over Fabric
CalAPA 2013
24
Warm Mix over Fabric
Cameron Airpark
CalAPA 2013
Good Bond
25
Caltrans SR-101 Scotia, CA¾” RWMA Type GWMA: 5.0% Evotherm DAT Plant Prod Temp: 250 F. Job Mix Temp: 230 F.Ambient Temp: 55 F.Density: 92-94 RICE
Notched Wedge Joint
CalAPA 2013
26
Caltrans SR-101 Scotia, CA
Material Transfer Device (MTD)
CalAPA 2013
27
WSDOT – Nile Road Project 1/2” Dense Graded PG 64-28 PM WMA Technology: (Gencor Ultrafoam) Plant Prod Temp: 270 – 275 Haul: 60 min, (tarps/insulated beds) Project Mix Temp: 260 – 270 Job Ambient Temp: Brisk? Density: 92-93% RICE
CalAPA 2013
28
WSDOT - Nile Road Project
Checking Mat Temp
CalAPA 2013
29
WSDOT - Nile Road Project
CalAPA 2013
30
WSDOT Nile Road Project
“ We had to work at getting everything started in the cold weather. There were very few problems, but it was a challenge to get things de-iced and going in the morning”
“ We were very successful using warm mix. The long hauls and the cooling
mix would have caused a problem with HMA. By using the warm mix we were able to learn a lot about how well the mix compacts at lower temperatures.
“The job was able to pull the 3rd roller.”
“From this experience we are more confident about long hauls, and cool weather paving when using WMA”
CalAPA 2013
31
Caltrans SR-70 Oroville, CA
3 Month Detour on SR 703 Month Detour on SR 70AADT 18,500, Trucks 15% on 5% GradeAADT 18,500, Trucks 15% on 5% Grade
CalAPA 2013
32
Caltrans SR-70 Oroville, CA ½” DGAC w/ PG 64 -16 Plant Prod Temp: 240 F. Haul Time: 10 minutes Job Mix Temp: 230 F. (Evotherm DAT) Density: 92-94% RICE
Breakdown Roller Temp 183 – 225 F.92% RICE achieved at 160 F.
CalAPA 2013
33
Caltrans SR-70 Oroville, CA
Wheel PathWheel Path
No Rutting
CalAPA 2013
34
Chism St.Taylor St.
McCarran Blvd.
Bravo Ave.Lo
cal W
MA
Reco
nstr
uctio
n Pr
ojec
tsLo
cal W
MA
Reco
nstr
uctio
n Pr
ojec
ts
CalAPA 2013
35
Bravo Ave. Reconstruction 2010
CalAPA 2013
36
Reno - Taylor St Reconstruction In-Place Recycle Existing HMA + Base (partial depth
HMA cold milling first)
Gencor UltraFoam WMA w/ 15% RAP Surface Course
CalAPA 2013
WMA
37
Anchorage International
¾” Dense Graded PG 64-34WMA: Evotherm DAT Plant Prod Temp: 235 F. Job Mix Temp: 230 F.Avg. Density: 95% RICE
Echelon Paving
CalAPA 2013
38
Anchorage International
¾” Dense Graded PG 64-34 PMWMA: Evotherm DAT Plant Prod Temp: 285 F. Job Temp: 260 F.Avg. Density: 95% RICE
CalAPA 2013
Anchorage International
Pulling Field Samples
CalAPA 2013
40
Anchorage International
Wearing Course ¾” Dense Graded PG 64-34 PM
CalAPA 2013
41
Interstate 5 (CA)Total Tons WMA >450,000
Mainline Overlay .10' - 1/2" RHMA -Type O WMA.12' - 3/4" RHMA Type G WMA.13' - 3/4" RHMA Type G WMA.20' - 3/4" dense graded WMAGeosynthetic Pavement Interlayer (GPI) .20' - 3/4" dense graded WMA
CalAPA 2013
Median Widening .25' - 3/4" RHMA Type G WMA.25' - 3/4" dense graded WMA.25' - 3/4" dense graded WMA
42
Interstate 5 (CA)¾” Dense Graded PG 64-105.0% Evotherm DAT 2GPlant Prod Temp: 310 F. Job Mix Temp: 300 F.93 – 94% RICE at 150 -170 F.
CalAPA 2013
43
Interstate 5 (CA)
1/2” RWMA-G5.0% Evotherm DAT 2GSpec Plant Prod Temp: 285 minPlant Temp: 310 F. (Evotherm DAT)Job Temp: 300 F.93 - 94% RICE at 130 - 150 F.
CalAPA 2013
44
Interstate 5 (CA)
½” RHMA-O5.0% Evotherm DAT 2GPlant Temp: 310 F. (cold/wind nights) Job Mix Temp: 300 F.
CalAPA 2013
45
Challenges
½” Dense Graded Mix/20% RAP (Washington) (Washington) WMA Additive: Gencor Ultrafoam WMA Dosage: 2.0% by weight of binder Anti Strip: Evotherm M1 3G (added at refinery) Anti Strip Dosage 0.5% by weight of binder (WSDOT) Lift thickness: 0.15’Production temperature: 265 – 285 F. 4 rollers on pavement (3 steel 1 rubber tire) Finish rolling: 120 -130 F. Struggled to achieve consistent compaction entire project Pay Factor: 0.90 (3 Lots)Takeaway: Overdose of WMA technology/Additive
CalAPA 2013
46
Challenges WMA Pilot Project (District 11) ¾” RHMA-G
Advera PQ Corporation 0.25% by wt. of RWMA
Rediset Aksonobel 0.75% by wt. of binder Sasobit Sasol Wax 1.5% by wt. of binder Evotherm MeadWestvaco (DAT) 5.0% by wt. of binder
0.20 foot lift on cold planed surfaceElevated paving temperatures (day paving)
Ambient: 101 F. ± Substrate surface: 142 F. ±
Struggled to meet compaction
CalAPA 2013
47
Challenges
I-8 WMA Pilot Project (con’t)
RWMA produced in desert temperatures at elevated WMA production temperatures (275 F min)
Mix temperatures did not drop fast enough to get below the “tender zone” during daytime paving operations?
Takeaway: - No value added using WMA additives
CalAPA 2013
48
WMA Optimization
What is WMA Optimization?
“The efficient and sustainable use of a WMA technology resulting in the least cost”
CalAPA 2013
49
WMA Optimization
Managing the Mix Cessation Temperature (2 edge sword)
Factors to consider
Environmental/Project Conditions Choice of WMA Technology WMA Additive Dosage Plant Production Temp (minimize – maximize)
CalAPA 2013
2
2.5
3
3.5
4
4.5
Mix
Stif
fnes
s
Mix Stiffness vs. Temperature - Optimization Good
WMA
Breakdown
Tender Zone
Intermediat/Finish
Water Injection Foam (Cameron Airpark) Prduction Temp: 270 F.
CalAPA 2013
2
2.5
3
3.5
4
4.5
Mix
Sti
ffn
es
s
Mix Stiffness vs. Temperature - Optimization Poor
WMA
Breakdown
TenderZone
Intermediate/Finish
Chemical 5%Prod Temp 270 F.
CalAPA 2013
2
2.5
3
3.5
4
4.5
Mix
Sti
ffn
es
sMix Stiffness vs. Temperature - Optimization Good
WMA
Breakdown
TenderZoneIntermediate/Finish
Chemical 3%Prod Temp 270 F.
CalAPA 2013
2
2.5
3
3.5
4
4.5
Mix
Stif
fnes
s
Mix Stiffness vs. Temperature - Optimization Good
WMA
Breakdown
Tender Zone
Intermediate/Finish
Chemical 3%Prod Temp 240 F.
CalAPA 2013
54
Todays Takeaways Warm Mix Asphalt:
Can reduce plant energy consumption at the plant
Allows for longer hauls
Extends mix life in cooler temperatures
Extends mix life in thinner lifts
May reduce the equipment needs (roller)
• WMA allows for paving in cooler temperatures
CalAPA 2013
55
Todays Takeaways
Warm Mix Asphalt Dosage can influence:
The intensity and duration of the tender zone
The final compaction temperature (two-edge sword)
CalAPA 2013
Thank You
Questions?
CalAPA 2013