    23.09.2010MAN Diesel & Turbo < 1 >

    Nature of the maritime maintenance problem,

    seen from an engine manufactures point of view.

    Michael Petersen

    Senior Manager

    Engine Management / PrimeServ

  • 7/29/2019 02 - Michael Petersen

    2/35

    23.09.2010MAN Diesel & Turbo

    Agenda

    2

  • 7/29/2019 02 - Michael Petersen

    3/35

    23.09.2010MAN Diesel & Turbo

    Life cycle cost is the total costfrom design to disposal, theobjective of LCC is to choose themost cost effective approach, sothat the lowest long term cost ofownership is achieved!

    Maintenance seen as a life cycle cost.

    3

  • 7/29/2019 02 - Michael Petersen

    4/35

    23.09.2010MAN Diesel & Turbo

    Maintenance seen as a life cycle cost.

    Procurement cost

    4

    Procurement cost is widely usedas the primary (and sometimesonly) criterion for equipment,

    spare parts or system selection(i.e. the cheaper the better).

    However, the major costs lie inthe care and operation of

    equipment during its life.

  • 7/29/2019 02 - Michael Petersen

    5/3523.09.2010MAN Diesel & Turbo

    CBOCondition Based Overhaul Strategy,

    Largely extended Overhaul intervals.

    Never touch a well running unit

    Condition Based Overhaul (CBO)

    5

  • 7/29/2019 02 - Michael Petersen

    6/3523.09.2010MAN Diesel & Turbo

    Condition Based Overhaul (CBO)

    6

  • 7/29/2019 02 - Michael Petersen

    7/3523.09.2010MAN Diesel & Turbo

    Condition Based Overhaul (CBO)

    7

  • 7/29/2019 02 - Michael Petersen

    8/3523.09.2010MAN Diesel & Turbo

    Condition Based Overhaul (CBO)

    8

  • 7/29/2019 02 - Michael Petersen

    9/3523.09.2010MAN Diesel & Turbo

    The Objective is:

    Tankers and similar vessels

    3 - 5 years operation without immobilisation, equal to

    18 / 32,000 hours between major overhauls (dock todock)

    Container, bulkers and similar vessels

    Up to 5 years between major overhauls of bearings,turbochargers, pistons, cylinders and piston rings.

    Condition Based Overhaul (CBO)

    9

  • 7/29/2019 02 - Michael Petersen

    10/3523.09.2010MAN Diesel & Turbo

    Status

    Major Overhauls / Inspections,which require immobilisation:

    Bearings

    Turbochargers

    Cylinder units

    Fuel pumps

    Exhaust valves

    Condition Based Overhaul (CBO)

    10

  • 7/29/2019 02 - Michael Petersen

    11/3523.09.2010MAN Diesel & Turbo

    Condition Based Overhaul (CBO)

    How to judge when overhaul is necessary?

    2-stroke engine's can be inspected by open-up

    the doors, go in, see, check and record.

    In addition Bearing Wear Monitoring (BWM),

    Main Bearing Temp. Monitoring (MBTM),Water in Oil Monitoring (WIOM) and

    Liner Wall Temperature (LWT) systems are

    essential tools

    11

  • 7/29/2019 02 - Michael Petersen

    12/3523.09.2010MAN Diesel & Turbo

    Bearings, CBO overhaul / open-up criteria:

    Main bearings should only be opened in case of alarm.

    Check every 3 month:

    Clearance and deflexion readings.

    Bearing edges to be checked by wire-feeler formissing- or squeezed-out metal

    All parts of the crank case to be checked for loose metal.

    Con. rod- and x-head bearings:

    Random open up inspection at the 5 year's docking,

    and in case of external indications

    Condition Based Overhaul (CBO)

    12

  • 7/29/2019 02 - Michael Petersen

    13/3523.09.2010MAN Diesel & Turbo

    Condition Based Overhaul (CBO)

    13

  • 7/29/2019 02 - Michael Petersen

    14/3523.09.2010MAN Diesel & Turbo

    Condition Based Overhaul (CBO)

    14

  • 7/29/2019 02 - Michael Petersen

    15/35

    23.09.2010MAN Diesel & Turbo

    Modern MAN BW 2-stroke

    engines are designed to

    extended TBO by means of:

    Slide fuel valves

    Nimonic- or Dura spindles

    W-seat

    Oros combustion Chamber,

    formed entirely in steel as a

    result of

    low positioned matingsurface

    Low positioned ring packages

    Heavy dutyring packages

    Optimised liner temperature

    Condition Based Overhaul (CBO)

    15

  • 7/29/2019 02 - Michael Petersen

    16/35

    23.09.2010MAN Diesel & Turbo

    Nimonic spindle & W-seat,

    S60MC, 25.500 service hrs

    Dura Spindle & W-seat,

    S60MC, 40.042 service hrs

    (DuraSpindle seat welded on Nimonic spindle)

    Condition Based Overhaul (CBO)

  • 7/29/2019 02 - Michael Petersen

    17/35

    23.09.2010MAN Diesel & Turbo

    Modern MAN BW 2-stroke

    engines are designed to

    extended TBO by means of:

    Slide fuel valves

    Nimonic- or Dura spindles

    W-seat

    Oros combustion Chamber,

    formed entirely in steel as a

    result of

    low positioned matingsurface

    Low positioned ring packages

    Heavy dutyring packages

    Optimised liner temperature

    Condition Based Overhaul (CBO)

    17

  • 7/29/2019 02 - Michael Petersen

    18/35

    23.09.2010MAN Diesel & Turbo

    When is piston overhaul needed?

    Before piston burning reach 15

    mm

    Condition based piston overhaul

  • 7/29/2019 02 - Michael Petersen

    19/35

    23.09.2010MAN Diesel & Turbo

    Condition Based Overhaul (CBO)

    Still rounding

    Still rounding

    Still rounding

    Still roundingCBO example:

    10K98MC-C, unit 7, 23,597 hours

    without overhaul.

    Note, visual good condition,

    without being perfect.

    Is it due for overhaul?

    19

  • 7/29/2019 02 - Michael Petersen

    20/35

    23.09.2010MAN Diesel & Turbo

    Status

    Fig. 3. Totally scuffed unit. Lubrication should beincreased to maximum until overhaul is convenientwith regard to the schedule of the ship. Due to thefriction heat developed, the piston rings get hardened,and the wear rate of the liner increases significantly.However, the hardening protects the rings, which iswhy the operation may be continued safely until nextconvenient port stay.

    Fig. 4. Unit with micro-seizures on the top ring as aresult of metal-to-metal contact. Should be counter-acted by temporarily increased lubrication. It isimportant to lower the lubrication to normal as soonas the active mz-attack is stopped. Note that old, notactive, mz-marks remain visible long after the attackhas stopped and do not call for increased lubrication.

    Fig. 5. Unit with 23,500 hours without piston overhaul.Note that most of the rounding is still intact, indicatingthat only of the wear potential is used. Further, themeasurements above from the same unit shows thatonly of the ring groove wear potential is used, andthe rate of burnings on the piston top is insignificant.Consequently, overhaul of that unit is not needed atthis stage.

    Visual inspection of piston rings (cermet-alu coated top ring)

    Condition Based Overhaul (CBO)

  • 7/29/2019 02 - Michael Petersen

    21/35

    23.09.2010MAN Diesel & Turbo

    Status

    Fig. 6. Totally scuffed unit. Lubrication should beincreased to maximum until overhaul is convenientwith regard to the schedule of the ship. Due to thefriction heat developed, the piston rings get hardened,and the wear rate of the liner increases significantly.However, the hardening protects the rings, which is

    why operation may be continued safely until nextconvenient port stay.

    Fig. 7. Unit with micro-seizures on the top and bottomrings as a result of metal-to-metal contact. Should becounteracted by temporarily increased lubrication. Itis important to lower the lubrication to normal as soonas the active mz-atack is stopped. Note that old, notactive, mz-marks remain visible a long time and do

    not call for increased lubrication.

    Fig. 8. Unit running very well after 20,021 runninghours. Note that the last remains of the alu-coat arestill visible on the lower edge, indicating remainingrounding left. This means that the ring wear is lessthan 2 mm out of possible 3 mm. Consequently,many more hours are left from the point of view of

    wear.

    Visual inspection of piston r ings (all alu-coated)

    Condition Based Overhaul (CBO)

  • 7/29/2019 02 - Michael Petersen

    22/35

    23.09.2010MAN Diesel & Turbo 22

    Condition Based Overhaul (CBO)

    Scuffingw

    ear

    Polishedw

    ear

    Adhesive

    wear

    Normalcorrosive

  • 7/29/2019 02 - Michael Petersen

    23/35

    23.09.2010MAN Diesel & Turbo

    Condition Based Overhaul (CBO)

    23

    Cylinder ConditionReport - la...

  • 7/29/2019 02 - Michael Petersen

    24/35

    23.09.2010MAN Diesel & Turbo

    4.8 mm

    When is piston overhaul needed?

    3 mm

    Condition Based Overhaul (CBO)

    24

  • 7/29/2019 02 - Michael Petersen

    25/35

    23.09.2010MAN Diesel & Turbo

    Cylinder Lubrication, latest experience

  • 7/29/2019 02 - Michael Petersen

    26/35

    23.09.2010MAN Diesel & Turbo

    Testing flat rate at 0.50 g/kWh abs.

    8S60MC Car-carrierHigh topland pistonAlu-coated CPR piston ringsSlide fuel valve

    Low cyl. oil dosages 0.50 g/kWh the last6,805h on 4 cylinders

    Piston (number 1) never pulled (picture takenat 42,773 ring hours after running 0.55 g/kWh!)Piston number 1 has now just passed 50,000hours without overhaul.

    Cylinder Lubrication, latest experience

  • 7/29/2019 02 - Michael Petersen

    27/35

    23.09.2010MAN Diesel & Turbo

    Overhaul Strategy on MAN B&W 2Stroke Engines :

    Tankers:

    9To limi t overhauls and inspections by means of extended engine monitoring

    93 / 5 year overhaul intervals, to coincide with Class-Dockings, are presently possible

    on engines with the newest design.

    Container and Bulk Carriers:

    9To limit overhauls / inspections by means of Condition Based Overhaul (CBO),

    whereby the average TBO of the main components can be increased

    up to 5 years.

    Condition Based Overhaul (CBO)

    27

  • 7/29/2019 02 - Michael Petersen

    28/35

    23.09.2010MAN Diesel & Turbo

    Overhaul Strategy on MAN B&W 2Stroke engines

    9Expect all pistons to be fully reconditioned

    by re-welding and re-chroming9 Heavy duty Piston Ring Packages

    9Extended engine monitoring

    9Intensified engine survey

    (scavenge port inspections)

    Condition Based Overhaul (CBO)

    28

  • 7/29/2019 02 - Michael Petersen

    29/35

    23.09.2010MAN Diesel & Turbo

    Overhaul Strategy on MAN B&W 2Stroke engines

    Quality requirements for significantly Extended TBO of the Cylinder Units:

    9Sophisticated Piston Ring Packages require high manufacturing quality

    9Recondit ioning of piston crowns requires high quality from an authorised work

    shop

    9The piston overhaul jobs require high quality, also regarding the reporting

    9Intermediate inspections require qualified engineers and reporting

    Condition Based Overhaul (CBO)

    29

    Service Versus

    Advantage of Maintenance contracts

  • 7/29/2019 02 - Michael Petersen

    30/35

    23.09.2010MAN Diesel & Turbo 30

    MAN Diesel

    PrimeServ

    Copenhagen

    Spare

    Parts

    Upgrades

    Special

    Projects

    Technical

    Service

    Diesel

    Academy

    Service Versus

    Engine Management Concept

    Advantage of Maintenance contracts.Engine Management Concept

    Advantage of Maintenance contracts

  • 7/29/2019 02 - Michael Petersen

    31/35

    23.09.2010MAN Diesel & Turbo

    Advantage of Maintenance contracts.EMC overview

    (1) MAN Diesel conducts the complete logistic works

    Advantage of Maintenance contracts.

  • 7/29/2019 02 - Michael Petersen

    32/35

    23.09.2010MAN Diesel & Turbo

    Advantage of Maintenance contracts.Maintenance Schedule

    Advantage of Maintenance contracts.

  • 7/29/2019 02 - Michael Petersen

    33/35

    23.09.2010MAN Diesel & Turbo

    gMachinery Otimisation

    Advantage of Maintenance contracts.

  • 7/29/2019 02 - Michael Petersen

    34/35

    23.09.2010MAN Diesel & Turbo

    gEngine Performance

    Action:

    Observe any abnormality by daily checks of engine parameters.

    Maintain full engine performance report twice every month

    Evaluate all obtained engine data carefully and compare with earlier data / shop

    test / sea trial data.

    Benefits:

    Safe and Reliable Engine.

    Low Maintenances Cost.

    Optimum Plant Economy