01.07.2004 collimator revue a. bertarelli - s. calatroni - m. mayer - r. perret ts/mme 1 outline of...
TRANSCRIPT
01.07.2004 Collimator rev01.07.2004 Collimator revueue
A. Bertarelli - S. Calatroni - M. Mayer - R. PA. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MMEerret TS/MME
11
OUTLINE of the presentation OUTLINE of the presentation Technical Support Technical Support
DepartmentDepartment Collimator Work-package from AB to TS Collimator Work-package from AB to TS
departmentdepartment
Design strategyDesign strategy Technical designTechnical design Thermal and Mechanical CalculationsThermal and Mechanical Calculations
Experimental validation of thermal Experimental validation of thermal calculationscalculations
PlanningPlanning Quality control - ManufacturingQuality control - Manufacturing ConclusionsConclusions
01.07.2004 Collimator rev01.07.2004 Collimator revueue
A. Bertarelli - S. Calatroni - M. Mayer - R. PA. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MMEerret TS/MME
22
Logistics– Engineering– Logistics– Engineering– Design ManufacturingDesign Manufacturing
COLLIMATOR PROJECT RESOURCE PLANNING
Project Leader: Ralph Assmann Ralph AssmannProject engineer: Oliver Aberle Enrico Chiaveri
Manfred Mayer
Beam aspects, Mechanical engineering work package, Radiation issues, Cooling, Vacuum, Energy deposition, Machine protection, Beam instrumentation, Operation……
Coordination, mechanical engineering: Manfred MayerThermal and Mechanical CalculationsThermal and Mechanical Calculations: Alessandro BertarelliDesign strategy Technical design:Design strategy Technical design: Roger Perret Roger PerretExperimental validation:Experimental validation: Sergio Calatroni Sergio Calatroni
01.07.2004 Collimator rev01.07.2004 Collimator revueue
A. Bertarelli - S. Calatroni - M. Mayer - R. PA. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MMEerret TS/MME
33
Work-Package entrusted to our Work-Package entrusted to our department:department:
– Mechanical engineering and analysis and design Mechanical engineering and analysis and design of six types of different collimatorsof six types of different collimators
– Prototype design follow-up and production for Prototype design follow-up and production for SPS installation in August 2004, SPS installation in August 2004, started in September ’03
– SPSSPS life test and robustness life test and robustness test - first prioritytest - first priority– Drawings for series production end of August Drawings for series production end of August
Prototype manufacturing: well advanced Involved specialties:
– Design office, ANSIS thermo-mechanical simulations
– Workshop, Brazing, Surface Coatings, Metrology – Water cooling, installation, remote handling
LHC COLLIMATORS LHC COLLIMATORS