The Challenge
• Buildings consume about 40% of the total energy requirements in Europe.
• On average, the existing housing stock in Europe will be standing for the next 75 years.
• The current renovation rate of the building stock is only 1% per year.
• There is a need for more energy efficient and deeper renovations.
![Page 3: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/3.jpg)
3
“SURE! – Nordic Built for
Sustainable Retrofitting”
is a Nordic project focused
on renovating the existing
housing stock by optimising
the energy consumption in
an efficient and inexpensive
way.
The Project
![Page 4: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/4.jpg)
4
Parallel to the installation of heat optimising technologies,
residents are supported in achieving a more sustainable
energy behaviour, so the daily use contributes to
lowering the building’s total heat consumption.
The Project
![Page 5: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/5.jpg)
5
The goal of the project is to:
• Reduce the energy consumption for heating with
up to 15% before an energy renovation
• Integrate an ICT platform for registration and
assessment of the indoor climate
• Develop an interactive visualisation platform to
achieve energy savings of 15-20%
• Establish an open ICT infrastructure supporting a
higher degree of information sharing
The Project
![Page 6: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/6.jpg)
6
Who Are We
The SURE! Project consists of companies, technical
institutes and knowledge institutions from Finland,
Sweden and Denmark.
The three participating companies are:
• Ecofective
• BaseN
• IC-Meter
![Page 7: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/7.jpg)
7
Who Are We
The participating technical institutes from Sweden –
Swedish ICT – are:
• Interactive Institute
• Acreo
The participating knowledge institutions
from Denmark are:
• VIA University College
• Insero Energy
• Insero Business Services
![Page 8: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/8.jpg)
8
The SURE Solution
The project combines three systems in one solution:
• A diagnostics and optimisation system to map the energy consumption
• An interactive visualisationsystem
• An open ICT infrastructure
![Page 9: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/9.jpg)
9
The SURE Solution
👤
Optimisation
Visualisation
Open ICT infrastructure
![Page 10: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/10.jpg)
10
The project features a number of pilot
buildings in Denmark and Sweden.
The end goal is a total of 50 demonstration
buildings in the Nordic countries.
The timeframe for pilot and demonstration is
from 2014 to mid 2016.
Demonstration
![Page 11: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/11.jpg)
11
Social housing as demonstration
• will be part of a development project
• has a separate heat supply
• has a majority of tenants that
wish to be involved actively as
informants through user-driven
innovation
• has buildings from before 1970 in
Horsens, Copenhagen, Malmö,
Stockholm and Helsinki
Demonstration
![Page 12: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/12.jpg)
12
Previous experiments carried out at the Frauenhofer
Institute in Germany with two identical buildings.
Energy savings (accumulated):
Test results
![Page 13: 01. sure presentation for nordic built kickoff final](https://reader033.vdocuments.mx/reader033/viewer/2022060121/55949f691a28ab1e398b4583/html5/thumbnails/13.jpg)
13
The behaviour
In addition to the technical optimisation, the project will involve the tenants and support them in a more energy efficient use of their home.
The project expects to promote sustainable behavioural patterns among the residents, e.g. by preventing the so-called ‘rebound’ effect, where the consumption rises following an energy renovation.