PROJECT OUTLINE

1. Introduction 2. Site location, analysis and orientation 3. Site restrictions and design challenges 4. Schematics, design development, planning 5. Structural design analysis 6. Interior & exterior communication paths 7. Exterior façade (glazing/cladding) 8. Interior finishes 9. Construction methods and assemblies

SITE LOCATION, SEISMIC ANALYSIS

04/14/23 2

Location of the project: San Francisco, CA

Seismic Analysis: Zone 4

– TWISTING TOWER

SITE RESTRICTION AND DESIGN CHALLENGES GENERAL INFORMATIONGEOTECHNICAL

Soil Type Sd (Soft soil profile)

Bearing Capacity 3500psi

Liquefaction Yes, data obtained at USGS

Piles have to be used

04/14/23 3 – TWISTING TOWER

Site Location

04/14/23 4

SITE RESTRICTION AND DESIGN CHALLENGESGENERAL INFORMATIONSEISMIC ZONE MAP

– TWISTING TOWER

04/14/23 5

SITE RESTRICTION AND DESIGN CHALLENGESGENERAL INFORMATIONSEISMIC ZONE

Seismic zone : 4Occupancy category : Mix used (B, R, )Occupancy type : IA

– TWISTING TOWER

SITE RESTRICTION AND DESIGN CHALLENGESDEEP FOUNDATION

04/14/23 6

N

Prestressed Concrete Piles

Piles Driving Equipments

• Large load and great height structure requires deep foundation• Steel Reinforced Concrete piles• 6 feet concrete mat caps and secure the piles in place.

– TWISTING TOWER

SITE RESTRICTION AND DESIGN CHALLENGESTHREE STORY UNDERGROUND PARKING

04/14/23 7

Area: 177’ x 83’Total Area: 45000 sfParking Spaces: 222

– TWISTING TOWER

SITE RESTRICTION AND DESIGN CHALLENGESGENERAL INFORMATIONWIND LOAD

Site(California Building Code CBC 2009)

Wind speed = 80mph

04/14/23 8 – TWISTING TOWER

It is a cold place in general, the building needs to worry about HEATING for most of the year. COOLING is NOT a major concern.

SITE RESTRICTION AND DESIGN CHALLENGESGENERAL INFORMATIONSAN FRANCISCO'S CLIMATE

04/14/23 9 – TWISTING TOWER

SITE RESTRICTION AND DESIGN CHALLENGESGENERAL INFORMATION AVERAGE SOLAR RADIATION

24o

72o

Jun 21th

Dec 21th

Solar Altitude

An asset, the building should collect as much as solar energy for HEATING.

04/14/23 10 – TWISTING TOWER

SCHEMATICS DESIGN, DEVELOPMENT & PLANNING

04/14/23 11

Torso Building

– TWISTING TOWER

SCHEMATICS DESIGN, DEVELOPMENT & PLANNING

04/14/23 12

Rectangular & Oval Shape Buildings

– TWISTING TOWER

SCHEMATICS DESIGN, DEVELOPMENT & PLANNING

04/14/23 13

LOCATION: SAN FRANCISCO, CA

CLIENT: XYZ

TYPE: SUPER TALL, MIX USED, RETAIL, CORPORATE OFFICE, RESIDENTIAL

BUILDING SIZE: 1,800,000 SF

HEIGHT: 720 FT (60 FLOORS) WITH A 50 FT ANTENNA

OPTION 1

OPTION 3

OPTION 2

FINAL DESIGN

– TWISTING TOWER

SCHEMATICS DESIGN, DEVELOPMENT & PLANNING

04/14/23 14 – TWISTING TOWER

CORE FLOOR PLAN LAYOUT (TYP)

04/14/23 16

CORE WALL 7,400 SF

ELEVATORS

STAIRWAYS

STORAGE AREA

RESTROOMS

INTERIOR COMMUNICATION PATHS

– TWISTING TOWER

CORPORATE OFFICE FLOOR PLAN3TH – 30TH FLOOR

04/14/23 24

TOTAL FOOTAGE – 30,000 SF – TWISTING TOWER

04/14/23 17

RESIDENTIAL FLOOR PLANS 31ST – 59TH FLOORS

(4) 1 bedroom units - 1000 sf

(2) 2 bedrooms units - 2000 sf

(2) 2 bedrooms units - 2500 sf

(2) 3 bedrooms units - 2800 sf

(2) 3 bedrooms units - 3000 sf

– TWISTING TOWER

04/14/23 18

EXTERIOR FAÇADE GLAZING & CLADDING (GFRC PANELS)

– TWISTING TOWER

04/14/23 19

INTERIOR FINISHES

INTERIOR DECORATION AT THE FOYER

LOWER STORE - WAYS FULLY GLAZED

– TWISTING TOWER

04/14/23 20

INTERIOR FINISHES

VIEW OF THE CORE BRACING VIEW OF THE HALLWAY

– TWISTING TOWER

04/14/23 21

INTERIOR FINISHES

ROOF TOP VIEW OF BLDG

– TWISTING TOWER

04/14/23 22

CONSTRUCTION METHODS AND ASSEMBLIES

IN PERFORMANCE CORE, REBAR IS THICKER AT THE BASE, WHERE IT DOES

THE MOST WORK

EXTERIOR GLAZING

STEEL BRACING

– TWISTING TOWER

04/14/23 23

RENDERINGS

– TWISTING TOWER

04/14/23 24

REFERENCES :

1. Skyscrapers Structure and Design By Mathew Wells Projects: The High Cliff - HONG KONG Deutsche Post – GERMANY2. Arup San Francisco Unbonded Brace Eric Ko, Caroline Field From research to Practice – A value story

www.arup.com/_assets/_download/download172.pdf3. Geotechnical Engineering Handbook By Robert W. Day4. Building Code Illustrated A Guide to Understanding the 2009 IBC5. Turning Torso Case Study By Mojgan Aghamir6. Torre Mayor Case Study By José Luigi Torricos

– TWISTING TOWER