Page 1: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

www.huawei.com

Huawei Confidential

Security Level: 23/4/18

英文标题 :40-47pt

副标题 :26-30pt

字体颜色 : 反白内部使用字体 :

FrutigerNext LT Medium

外部使用字体 : Arial

中文标题 :35-47pt

字体 : 黑体 副标题 :24-28pt

字体颜色 : 反白字体 : 细黑体

Installing and Commissioning RTN 900

V100R200 Hybrid Microwave

Page 2: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

英文目录标题 :35-40pt

颜色 : R153 G0 B0

内部使用字体 :

FrutigerNext LT Medium

外部使用字体 : Arial

中文目录标题 :35-40pt

颜色 : R153 G0 B0

字体 : 黑体

英文目录正文 :28-30pt

子目录 (2-5 级 ) :20-30pt

颜色 : 黑色内部使用字体 :

FrutigerNext LT Regular

外部使用字体 : Arial

中文目录正文 :28-30pt

子目录 (2-5 级 ):20-30pt

颜色 : 黑色字体 : 细黑体

Contents

• Key Points

• Hardware Installation

• Equipment CommissioningEquipment Commissioning

• DCN CommissioningDCN Commissioning

• AcceptanceAcceptance

• Other SpecificationsOther Specifications

Page 3: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 3Huawei Confidential

Key PointsCaution Cause Requirement

1 Properly handle the IF board

and SCC power switches.

The field personnel do not know how

to operate the power switches. As a

result, a large number of boards on

the existing network are damaged.

This point must be imparted

to every field engineer,

especially the personnel of

the partners.

2 Do not reseat IF cables

when the power is on.

The ODU and IF board are damaged

by the reseating of IF cables when

the power is on.

This point must be imparted

to every field engineer,

especially the personnel of

the partners.

3 Do not tear up the ODU seal

or remove the ODU cover.

If the seal of the ODU is torn up or

the cover of the ODU is removed, the

vendor will refuse to provide warranty

services.

This point must be imparted

to every field engineer,

especially the personnel of

the partners.

4 Do not damage equipment

with improper operations.

If the damage is caused by artificial

factors, the vendor will refuse to

provide warranty services.

This point must be imparted

to every field engineer,

especially the personnel of

the partners.

Page 4: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 4Huawei Confidential

Key Points

Properly handle the IF board and SCC power switches.

These boards are damaged due to improper operations of the personnel. Note: So many boards are found damaged in only one project!

① Train microwave partners for standardized operations according to projects.

② Hand out related training materials to every partner and every engineering team.

③ Provide special trainings for the partners with serious problems.

④ Provide effective trainings to all new partners.

Page 5: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 5Huawei Confidential

Key Points

Do not reseat IF cables when the power is on.

Ensure the power is off before reseating IF cables or IF boards.

Pull IF cables out of the IF board, IF jumper, or ODU or plug into them after the power is off.

IF boards should also be reseated after the power is off.

Be careful in the use of a multimeter for testing the IF output voltage to avoid short circuits.

① Train microwave partners for standardized operations according to projects.

② Hand out related training materials to every partner and every engineering team.

③ Provide special trainings for the partners with serious problems.

④ Provide effective trainings to all new partners.

Page 6: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 6Huawei Confidential

Key Points

Do not reseat IF cables when the power is on.

Power off the IF board before reseating IF cables.

Reseating IF cables when the power is on tends to cause a short circuit between the -48V power supply and the GND, which will blow out the protection tube.

The picture shows the short circuit.

① Train microwave partners for standardized operations according to projects.

② Hand out related training materials to every partner and every engineering team.

③ Provide special trainings for the partners with serious problems.

④ Provide effective trainings to all new partners.

Page 7: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 7Huawei Confidential

Key Points

Do not tear up the ODU seal or remove the ODU cover.

If the seal of the ODU is torn up or the cover of the ODU is removed without permission, the vendor will refuse to provide warranty services.

The seal of the ODU shall not be torn up.

The ODU cover shall not be removed without permission.

① Train microwave partners for standardized operations according to projects.

② Hand out related training materials to every partner and every engineering team.

③ Provide special trainings for the partners with serious problems.

④ Provide effective trainings to all new partners.

Page 8: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 8Huawei Confidential

Key Points

Do not damage equipment with improper operations.

If the damage is caused by artificial factors, the vendor will refuse to provide warranty services.

Handle ODUs with care.

Hoist and install ODUs with caution to avoid collision with the tower.

If the damage is caused by artificial factors, the vendor will refuse to provide warranty services.

The ODUs damaged during engineering operations must be returned as soon as possible. The vendor shall not provide warranty services after the warranty expires.

① Train microwave partners for standardized operations according to projects.

② Hand out related training materials to every partner and every engineering team.

③ Provide special trainings for the partners with serious problems.

④ Provide effective trainings to all new partners.

Page 9: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

英文目录标题 :35-40pt

颜色 : R153 G0 B0

内部使用字体 :

FrutigerNext LT Medium

外部使用字体 : Arial

中文目录标题 :35-40pt

颜色 : R153 G0 B0

字体 : 黑体

英文目录正文 :28-30pt

子目录 (2-5 级 ) :20-30pt

颜色 : 黑色内部使用字体 :

FrutigerNext LT Regular

外部使用字体 : Arial

中文目录正文 :28-30pt

子目录 (2-5 级 ):20-30pt

颜色 : 黑色字体 : 细黑体

Contents

• Key Points

• Hardware Installation

• Equipment CommissioningEquipment Commissioning

• DCN CommissioningDCN Commissioning

• AcceptanceAcceptance

• Other SpecificationsOther Specifications

Page 10: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 10Huawei Confidential

Installation of RTN 900 V1R2 Hybrid Microwave Hardware

Scenario Note Key Points

1 Installation of

ODUs

The operation is the same as that of the traditional microwave.

The Standardized Operating Process (SOP) is implemented based on the existing process. Courseware for partners .3D animation.

2 Installation of

IDUs

The operation is the same as that of the RTN 900 V1R1.

Page 11: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 11Huawei Confidential

Installation of IDUs

Requirements for the input power of the IDU

RTN 910 RTN 950

Rated Voltage –48V/–60V –48V/–60V

Voltage Range –38.4V ~– 72V –38.4V ~– 72V

Number of Input Power Supplies

2 2

Recommended Fuse Capacity

10A 20A

Page 12: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

英文目录标题 :35-40pt

颜色 : R153 G0 B0

内部使用字体 :

FrutigerNext LT Medium

外部使用字体 : Arial

中文目录标题 :35-40pt

颜色 : R153 G0 B0

字体 : 黑体

英文目录正文 :28-30pt

子目录 (2-5 级 ) :20-30pt

颜色 : 黑色内部使用字体 :

FrutigerNext LT Regular

外部使用字体 : Arial

中文目录正文 :28-30pt

子目录 (2-5 级 ):20-30pt

颜色 : 黑色字体 : 细黑体

Contents

• Key Points

• Hardware Installation

• Equipment Commissioning

• DCN CommissioningDCN Commissioning

• AcceptanceAcceptance

• Other SpecificationsOther Specifications

Page 13: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 13Huawei Confidential

Commissioning – Strategies

BTS

IDU IDU

Third-party service channel or direct connection

B A

BSCMSC

Microwave NMS

Means for supporting the partner to complete the construction of BTSs independently: •WEBLCT•Handheld terminal•Remote access in wireless mode•SOP

Means for remote access: • Downloading the script files for remote

access in wireless mode• Centralized NMS (including 2M and

shared 2M)

Service configuration tools•U2000•U2000 LCT

Remote commissioning is recommended.

Page 14: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 14Huawei Confidential

Equipment Commissioning – Strategies

RTN 900

Service configuration

System commissioning

Hardware installation

Antenna alignment

Hardware installation

Equipment power-on

RF configuration

Antenna alignment

Complete the

station work

Hardware personnel

Software commissioning engineers

Central Telecommunications Room

Station work

Equipment commissioning

It is recommended that the partners complete the station work independently.

Page 15: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 15Huawei Confidential

Equipment Commissioning – Key Points Methods for commissioning the hybrid microwave are described as

follows:

The AM function of the hybrid microwave should be disabled before the

antennas are aligned.

The antennas should be aligned in low modulation mode provided by

network planning.

The received signal level (RSL) value must be within the scope as

required. The AM function of the hybrid microwave must be enabled after

the antennas are aligned.

Note: During equipment commissioning, perform operations as required. Otherwise, the boards may be damaged and you have to enter the station to replace the damaged boards!

Page 16: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 16Huawei Confidential

Equipment Commissioning• Power On

There is no power switch on the RTN 900 IDU cabinet, so that, it is

important to test the input voltage value.

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 17: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 17Huawei Confidential

Equipment Commissioning Power on equipment and IF

boards• RTN 950

• RTN 910

1 2 3

The switches must be pulled out first and then turned to the right. Forcible pulling is prohibited!

Power on the corresponding power distribution box first. Power on the ODUs on the IF board (including active and standby ODUs). Note: The switches must be first pulled out and then turned.

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 18: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 18Huawei Confidential

Equipment Commissioning• Connect Laptop with RTN 900

ETH-OAM

WEBLCT

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 19: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 19Huawei Confidential

Equipment Commissioning Login U2000 Web

LCT

password : T2000

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 20: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 20Huawei Confidential

Equipment Commissioning Creat NE

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 21: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 21Huawei Confidential

Equipment Commissioning Configure NE ID/ NE Name

Configure NE names.

Change NE IDs. The IDs in one network must be unique.

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 22: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 22Huawei Confidential

Equipment Commissioning Add boards.

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 23: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 23Huawei Confidential

Equipment Commissioning Create the IF 1+1 protection group (this step can be omitted for the 1+0 mode).

Slot 1 and Slot 2 constitute a protection group with Slot 1 as the recommended working slot.

Slot 3 and Slot 5 constitute a protection group with Slot 3 as the recommended working slot.

Slot 4 and Slot 6 constitute a protection group with Slot 4 as the recommended working slot.

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 24: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 24Huawei Confidential

Equipment Commissioning Configure Link

① ③

⑤⑥

⑦See Next Page

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 25: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 25Huawei Confidential

Equipment Commissioning

Confirm that the AM function is disable .the default value is disable.

Configure Hybrid/AM——set IF channel band and confirm that the AM function is disabled.

Set the channel space and modulation

accroding to the design document.

Input the E1 number of the Hybrid

microwave frame. The E1 number should

be the same as the design document. The number of E1 should be the same in

one hop.

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 26: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 26Huawei Confidential

Equipment Commissioning Align the antennas – query the receive power.

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 27: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 27Huawei Confidential

Equipment Commissioning Enable the AM function.

After the AM function is enabled, set IF Channel Band, Modulation Mode of the Assured AM Capacity, and Modulation Mode of the Full AM Capacity according to networking planning.

It is zero when E1 does not exist.

⑥④ ⑤ ⑦

Power on equipment

Basic configuration

Confirm that the AM function is disabled

Align antennas

Enable the AM function

Page 28: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

英文目录标题 :35-40pt

颜色 : R153 G0 B0

内部使用字体 :

FrutigerNext LT Medium

外部使用字体 : Arial

中文目录标题 :35-40pt

颜色 : R153 G0 B0

字体 : 黑体

英文目录正文 :28-30pt

子目录 (2-5 级 ) :20-30pt

颜色 : 黑色内部使用字体 :

FrutigerNext LT Regular

外部使用字体 : Arial

中文目录正文 :28-30pt

子目录 (2-5 级 ):20-30pt

颜色 : 黑色字体 : 细黑体

Contents

• Key Points

• Hardware Installation

• Equipment Commissioning

• DCN CommissioningDCN Commissioning

• Acceptance

• Other Specifications

Page 29: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 29Huawei Confidential

DCN Commissioning – Extended ECC Communicate NMS information through the extended

ECC.For one telecom room, multiple RTN600s can interwork through the extended ECC. This work must be made clear to partners in advance.

NMS

Page 30: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 30Huawei Confidential

DCN Commissioning – Solution Introduction Through third-party networks

Solution Description Advantage Disadvantage Priority

Through service

channels provided

by the customer

The customer provides the Ethernet or E1 (or N x 64 K)

channels, and NMS information of Huawei is directly

connected to the third-party Ethernet port as common

services or connected to E1 channels through the protocol

converter/clock port.

The interface of Huawei is

simple, involving no

cooperation with third-party

equipment.

The service channels of the

customer are occupied.

1

Transparent

transmission

through

synchronous

ports or

asynchronous

ports

The third-party equipment is required to provide the

synchronous or asynchronous data ports. Then, information

is transmitted transparently through the third-party

microwave equipment. Finally, information is converted back

to Ethernet NMS information through the protocol converter.

The NMS can also be connected to the third-party

equipment directly.

Service channels are not

occupied.

1. Special connectors need

to be prepared. 2. The

cooperation of the third party

is required, which is very

risky.

2

Through the IP

over DCC

protocol

The NEs of the third-party equipment are required to support

IP and NMS ports. NMS information is transmitted in IP

sharing mode.

Service channels are not

occupied.

1. It is hard to configure. 2.

The cooperation of the third

party is required, which is

very risky.

3

Through the OSI

protocol

The NEs of the third-party equipment are required to support

OSI (TP4) and NMS network ports. NMS information is

transmitted in OSI sharing mode.

Service channels are not

occupied.

1. It is harder to configure

this solution than the IP

solution. 2. The cooperation

of the third party is required,

which is very risky.

4

Page 31: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

英文目录标题 :35-40pt

颜色 : R153 G0 B0

内部使用字体 :

FrutigerNext LT Medium

外部使用字体 : Arial

中文目录标题 :35-40pt

颜色 : R153 G0 B0

字体 : 黑体

英文目录正文 :28-30pt

子目录 (2-5 级 ) :20-30pt

颜色 : 黑色内部使用字体 :

FrutigerNext LT Regular

外部使用字体 : Arial

中文目录正文 :28-30pt

子目录 (2-5 级 ):20-30pt

颜色 : 黑色字体 : 细黑体

Contents

• Key Points

• Hardware Installation

• Equipment Commissioning

• DCN Commissioning

• AcceptanceAcceptance

• Other SpecificationsOther Specifications

Page 32: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 32Huawei Confidential

Acceptance – Strategies1. The operations must be strictly compliant with the Acceptance Guide.

2. The acceptance consists of two parts, namely, Acceptance Items and Form

(Recommended) and Acceptance Items and Form (Optional).

3. It is recommended that the items to be tested should be selected only from the

Acceptance Items and Form (Recommended) and the items should be as few as

possible. If the customer has special requirements, a few items that can be tested

can be selected from the Acceptance Items and Form (Optional).

4. Before the acceptance, acceptance items and operation instructions that

correspond to these items should be printed based on the selected items,

combined into a manual, and submitted to the customer. The manual submitted to

the customer cannot consist of items not to be tested and corresponding test

instructions. It is prohibited to submit the unedited Acceptance Guide to users.

5. The items selected from the Acceptance Items and Form (Optional) need to be

quoted and charged separately.

6. Recommend remote acceptance to customers. It is recommended that the

percentage of items subject to on-site acceptance be 5% - 10%.

Page 33: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 33Huawei Confidential

Acceptance – Online Test Methods of Ethernet Services Online test methods of Ethernet services: The ETH-OAM function is used for testing Ethernet services.

Prerequisite: Antenna alignment is completed. The RTN605 V100R300 or RTN620 V100R300 is configured with the EMS6.

1. Select the NE from the Object Tree in the NE Explorer of the NE1, and then choose Configuration > Ethernet OAM Management > Ethernet Service OAM Management

2. Select the MD, MA, and MEP that correspond to Port 1, click OAM. 3. Select Start LB.

The LB Test window is displayed. . 4. Select MP ID, and set the parameters in Test Node. 5. Click Start Test. 6. Check Detection Result. The LossRate in the Detection Result should be 0.

Procedure:

Page 34: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 34Huawei Confidential

Acceptance – AM Test Method of testing the AM handover function: If the hybrid microwave is used for transmission, whether the

handover function is normal can be verified by testing the AM handover function.

Prerequisite: The antennas are aligned. The HYBRID/AM mode is configured.

① Disable the AM function.

② Enable 15-minute performance monitoring.

③ Query the performance: No FEC-BER-COR-ER, and only the low modulation mode is available.

④ Enable the AM function.

⑤ Query the performance: No FEC-BER-COR-ER exists. It can be found that the modulation modes is adjusted from low to high.

Procedure:

Notes: 1. The two ends of the link must be configured synchronously. 2. This method is not the same as the method of decreasing the optical power described in the Commissioning Guide. This is better. The Commissioning Guide will be modified later.

1 、

3 、

5 、

Page 35: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

英文目录标题 :35-40pt

颜色 : R153 G0 B0

内部使用字体 :

FrutigerNext LT Medium

外部使用字体 : Arial

中文目录标题 :35-40pt

颜色 : R153 G0 B0

字体 : 黑体

英文目录正文 :28-30pt

子目录 (2-5 级 ) :20-30pt

颜色 : 黑色内部使用字体 :

FrutigerNext LT Regular

外部使用字体 : Arial

中文目录正文 :28-30pt

子目录 (2-5 级 ):20-30pt

颜色 : 黑色字体 : 细黑体

Contents

• Key Points

• Hardware Installation

• Equipment Commissioning

• DCN Commissioning

• Acceptance

• Other SpecificationsOther Specifications

Page 36: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 36Huawei Confidential

Reclaiming Licenses Strategies and requirements for microwave licenses

Due to the uncertainty of microwave network planning, delivery based on

BTSs is impossible. Therefore, under the microwave strategy, the Supply Chain

delivers the maximum number of licenses. The GTS is in charge of reclaiming

the frontline licenses. For projects delivered by customers, customer support

engineers should mark them clearly and the Supply Chain delivers the licenses

as planned.

During the engineering implementation or before preliminary acceptance,

GTS engineers reclaim licenses according to the actual license capacity in the

orders. GTS engineers download license files of the corresponding capacity

from the support website of Huawei, load them on the site or remotely through

the DC software, and then click the files to activate them.

Page 37: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 37Huawei Confidential

Reclaiming Licenses Hybrid microwave license solution

This will be added in TR6!

Page 38: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 38Huawei Confidential

Entry to CEAS In 2008, the Network Product Technical Service Dept issued the

Notice on Requirements for Entry of Information About RTN Microwave Customer Equipment to CEAS, clearly requiring that engineering information about RTN microwave should be entered to CEAS in a timely manner.

① The requirements and mode of entering homegrown products to CEAS should be the same

as those of other products. After a project is completed, related data needs to be entered in

CEAS. For entry criteria and operation methods, see the appendix to the Notice.

② For RTN microwave engineering projects completed in 2008 or earlier, all missing data

should be entered in CEAS in Q1 of 2009.

③ The network product manager of the technical service department at each representative

office is the first owner for entering and supplementing data about homegrown microwave

in CEAS. The product manager designates microwave engineers to complete the entry.

Currently, CEAS features low entry rate, low accuracy, and poor availability, which

seriously affects the follow-up implementation of services. To improve the data entry rate

of CEAS and enhance the timeliness and accuracy of CEAS data entry, the Network

Product Technical Service Dept reiterates that:

Page 39: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 39Huawei Confidential

Entry to CEAS

Guide to entry of data about RTN900 V1000R200 in CEAS:

④ ⑤

Page 40: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 40Huawei Confidential

Repair and Return of Damaged Boards Currently, there is a large number of OEM parts, especially ODUs, are not returned. This situation

seriously affects the analysis of fault causes and improvement of product quality of Huawei. If the damaged boards (especially ODUs) are not returned in a timely manner, the vendor may delay

the replenishment. The purchased microwave or ODU damaged within the warranty, especially at the engineering stage,

should be timely returned to vendors for repair, thus avoiding expensive maintenance costs caused by the repairs and returns beyond the warranty period.

Guide to Repair and Return of Overseas Purchased Microwave Parts (V1.0)

Guide to the Process of Handling the Faulty Purchased ODU (Applicable to the Countries Outside China)(V1.0)

Guide to the Process of Handling the Faulty Purchased ODU (Applicable to China)(V1.0) Criteria for Determining Whether an ODU Fault Is Caused by a Quality Defect of the ODUChecklist for the Description of the Faulty ODU.xls

Overseas Return and Repair Process for Spare Parts of Purchased ODUs Used in Self-Made Microwave Equipment

In March 2009, the process for handling damaged microwave ODUs was issued to the frontline for trial use. Representative offices and project teams need to return damaged parts and purchased parts as required.

Page 41: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

HUAWEI TECHNOLOGIES CO., LTD. Page 41Huawei Confidential

Strategies for Spare Parts Key strategic points of homegrown microwave spare parts:

The number of microwave spare parts to be sold is 3% - 5% of that of microwave spare

parts to be installed. GTS engineers should control the sales of microwave spare parts

to customers effectively.

The HQ does not store spare parts for OEM microwave or purchased equipment such

as ODUs and antennas.

In principle, representative offices are not allowed to store microwave spare parts,

especially OEM equipment such as ODUs.

For managed services and replacement of spare parts, representative offices can store

a certain number of IDU and ODU spare parts according to the lowest requirement.

The HQ should review and approve the applications of representative offices for spare

parts in strict compliance with related service contracts and service SLAs.

The OEM microwave and OEM spare parts applied for by representative offices shall, in

principle, not be returned to the HQ (the method of handling the returned equipment or

spare parts is unavailable).

Page 42: 01-Installation and Commissioning the RTN 900 V1R2 Hybrid Microwave-20091220-A

Thank youwww.huawei.com