01 - gug 2012 - chairman introduction

Upload: rahul-anand

Post on 03-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    1/17

    2012 GAS-INSULATED SUBSTATIONS USERS GROUP26 - 28 November 2012

    Dubai, United Arab Emirates

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    2/17

    WHAT IS IT?

    The ALTOM GRID GIS Users Group is aworldwide community of technical specialists

    focused on GIS developments in terms ofproduct, systems and services

    With participation of :

    PRODUCTS

    SOLUTIONS

    SERVICES

    USERS

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    3/17

    NOT A COMMERCIAL EVENTBUT A COMMUNITY

    With a Chairman, a Board, a Host

    NOT TO SELL EXISTING PRODUCTS

    BUT TO HEAR THE VOICE OF THE USERSTo develop the right range for tomorrow

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    4/17

    Monday, November 26

    His Excellency Mr. Saeed Mohammed Al Tayer MD & CEO of DEWA

    DEWA critical role in the Emirate of Dubai Electricity supply : over 600,000 customers

    Water supply: over 500,000 customers

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    5/17

    Monday, November 26

    DEWA contribution to development of Dubaiimportant factor in the rapid rise of the Emirates

    globally in business and industry

    DEWA response to growing demand in energy by advanced planning

    by preparing the necessary groundwork by executing its projects at the highest quality,

    safety and environmental standards.

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    6/17

    Monday, November 26

    DEWA workforce 8,900 people

    Dedicated to quantity and quality of services

    Highest standards in consistency and reliability.

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    7/17

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    8/17

    Board role for 3 years:

    propose topics, select topics for theyear,

    follow up of topics/questions from

    one year to the next, select "contributors" for the topics

    among users and one Alstom Gridspecialists,

    prepare and validate the report ofUsers Group sessions

    The Board consists of

    50% Usersand50 % Alstom

    Board Members

    Anne-Isabelle FEIGE

    Akstom Grid, GIS PL Communication ManagerFrance

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    9/17

    Concrete achievements :- Guides and publications :

    - Urban/underground S/S- MRE- Outdoor GIS- SF6 Management and best practises- GIL : env. Impact analysis- GIL : installed base

    - Software & tools :- MRE simulator- Life Cycle Cost Calculation (AL3C)

    - Real Product demos :

    - HV apparatus

    - Monitoring and control solutions

    - Workshops on best practises

    Substations visits

    Achievements

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    10/17

    2008 in Barcelona :

    Host : Endesa

    2009 in UK Host : National grid

    2010 In Lucerne, Switzerland

    Host : Axpo

    2011 In Cannes, France

    Host : RTE, France

    Former sessions

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    11/17

    Numerous Benefits

    Visit substations

    Be updated on latest technologies and be trained

    See real product demos

    Get useful tools (guides, software, publications)

    Influence R&D developments / Interact with AlstomExperts

    Network with like-minded peers

    Voice their wishes for next UG sessions

    Benefits for the Users

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    12/17

    Numerous Benefits

    Both ways communication with Users

    Learn from the users

    Transfer our manufacturers viewDrive our developments

    Test / validate technical solutions/ innovations

    Be a valued partner

    Trust and strengthened relationships

    Benefits for ALSTOM GRID

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    13/17

    2012 Format of the event

    Dubai, November 26-28 2012 :

    2 Days

    From Monday to Wednesday afternoon Conferences

    Workshops Real product demos / demo area

    Substation visit : Dewa 400/132 kV substation

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    14/17

    2012 conference topics

    Future networks developments and characteristics Investigate background of requirements for higher

    values.

    On line partial discharge monitoring

    Propose a tutorial on the different techniques for PDM

    Highlight the critical aspects of signal interpretation

    Show a return on experience from live substationsequipped with online PDM

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    15/17

    2012 conference topics

    Enhanced availability during Maintenance, Repair,Extension (MRE) nice-to-have or really needed?

    Present Survey results

    Users testimonials

    Debate about expectations for future generations of GIS

    Asset management challenges and strategies

    How do the new generations of GIS contribute to theenhancement of the Total Cost of Ownership ?

    Invite users to tell their expectations (regarding theabove)

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    16/17

    Demo area

    PRODUCTS

    F35 145kV bay, with all digital solutions 420 kV circuit-breaker Disconnector ME-4 earthing switch and disconnector drive

    MONITORING AND CONTROL

    Digital chain for Digital Instrument transformers SF6 monitoring BWatch3

    Partial discharge monitoring PDWatch Point-on-wave switching RPH3

    AVAILABILITY

    Maintenance Isolating Device MRE safety rule

  • 7/29/2019 01 - GUG 2012 - Chairman Introduction

    17/17

    Substation visit

    Barsha 400-132 kV substation

    on to the questions of the participants.

    Technical visit with several

    poles addressing the main

    features of this important

    electrical node in this region.