Danish Offshore Wind Experience
Anne Højer SimonsenDeputy Director GeneralDanish Energy Agency
Ministry of Climate and Energy
![Page 2: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/2.jpg)
Advantages of Wind Power
• Security of supply• Alleviation of
energy imports
• Environment • climate change
mitigation • conservation of
biodiversity
• Export options• New jobs
![Page 3: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/3.jpg)
16 years of experience offshore
• First Danish offshore wind farm 1991
• Strategic mapping 1995• Capacity now 423 MW.
(3100 MW incl. onshore) • Strategic assessment for
future location of 5200 MW offshore wind power
• 2 x 200 MW being built to go on-line in 2009 and 2011. The projects are on track
• 2011 app. 850 MW offshore
![Page 4: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/4.jpg)
National averageat normal wind conditions 20% of
electricity demand
National average 2006 - 17%
National average January 2007 - 36%
Western Denmark January 2007 - 41%
Wind Power Production
![Page 5: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/5.jpg)
Challenge: To Feed the Grid with Wind Power(Western Denmark as an example)
![Page 6: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/6.jpg)
Key Instruments to promote REHistoric perspective
Public support to research, development and demonstration of RE-technologies
Investment grants for standardized RE-equipment
Favourable prices for electricity fed into the public grid
A suitable legislative and planning framework -supporting the local initiative
Agreements between the Government and the utilities: Wind power programmes and biomass agreement
![Page 7: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/7.jpg)
Large scale integration
• Denmark has very strong interconnectors to neighbouring countries
• Nord Pool is a level playing field• Short gate closure times to allow trades
close to real time• Further integration is possible• Storage and demand side management
could serve as future options• EU: cross border solutions
![Page 8: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/8.jpg)
Decoupling of economic growth and energy consumption
60
80
100
120
140
160
1980 1983 1986 1989 1992 1995 1998 2001 2004
Inde
x
Primary Energy
GDP
Intensity
![Page 9: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/9.jpg)
TenderingAim to bring down financial risk
• Screening for site suitability
• Tender: Fixed price in 10-12 years
• TSO to finance, construct and operate transformer station and sea cable
• TSO obliged to connect wind power and strengthen grid if necessary
• Security that grid connection is available in due time
• Financial compensation if the power produced is curtailed
• One stop shop communication
![Page 10: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/10.jpg)
Support scheme for offshore
• Tender – Cheapest, fastest and most beautiful
• Fixed price in 50.000 full load hours
• = 10-15 years of production
• Low bids:
• Horns Rev 2 = € cent 6,7 per kWh
• Rødsand 2 = € cent 8,3 per kWh
![Page 11: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/11.jpg)
• 26 sites of 200 MW identified
• 5200 MW• Equivalent to 8 % of
total demand or 50% of electricity demand
• Consultation answers is taken into account
• A sensitivity analysis is too be conducted and used in the decision-making process for the actual site selection
Preparing for the future 2025
![Page 12: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/12.jpg)
Conclusions from the Environmentalprogramme
• Public acceptance • Migrating birds avoid
collision• Seals behaviour not
affected• Harbour porpoises
return to the sites• Significant artificial
wreck effect observed
![Page 13: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/13.jpg)
New site: Djursland-Anholt
![Page 14: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/14.jpg)
In conclusion
• Large scale integration possible• A doubling of offshore capacity on track
for 2009-2011• Tender procedure combined with TSO-grid
financing and one stop shop brings down financial risks
• Future locations identified• Environment no problem if sites are
planned properly• One-stop-shop approval procedure
![Page 15: 01 Anne Hojer Simonsen Agencia Danesa De La Energia](https://reader034.vdocuments.mx/reader034/viewer/2022042816/558c55b9d8b42ace428b4700/html5/thumbnails/15.jpg)
Thank you for your attention
Figures and furtherinformation available from www.ens.dk/wind