002 my cv in english (briefing updated 03.04.2016-all)

39
1 | Page Curriculum Vitae 1. General Information : Name : Dr. Eng. (Architect): AHMED MOH. HOSSAM ELDIN ABDEEN MOH. BAKEER. Address : 6 Al Sir St, OLAYA Road Cross with Khurais Road – RIYADH. K. S. A. 93 Abd EL Aziz Fahmi St, Saint Fatima Sq., Nozha, Heliopolis, Cairo - P. Code # 11361. EGYPT Cell Phone : +966 56 245 8621 +20 100 128 0127 Date of Birth : February 5, 1960. Place of Birth : Cairo, Egypt. Nationality : Egyptian. Registration : Registered Architectural Engineer Member of SAUDI COUNCIL OF ENGINEERS (Arch. Dept.) No; 113739 - Dated by: 16/01/2012. Registered Consultant Engineer (Execution Supervision) Member of The Syndicate of Engineers (Architectural Dept.). No; 2882 /2 - Dated by: 11/12/2012. Registered Architect. Member of The Syndicate of Engineers (Architectural Dept.). No; 4480 /6 - Dated by: 5/9/1982.

Upload: ahmed-abdeen

Post on 20-Feb-2017

774 views

Category:

Documents


5 download

TRANSCRIPT

1 | P a g e

Curriculum Vitae

1 . G e n e r a l I n f o r m a t i o n :

Name : Dr. Eng. (Architect): AHMED MOH. HOSSAM ELDIN ABDEEN MOH. BAKEER.

Address : 6 Al Sir St, OLAYA Road Cross with Khurais Road – RIYADH.

K. S. A. 93 Abd EL Aziz Fahmi St, Saint Fatima Sq., Nozha, Heliopolis,

Cairo - P. Code # 11361.

EGYPT

Cell Phone : +966 56 245 8621

+20 100 128 0127

Date of Birth : February 5, 1960.

Place of Birth : Cairo, Egypt.

Nationality : Egyptian.

Registration : Registered Architectural Engineer

Member of SAUDI COUNCIL OF ENGINEERS (Arch. Dept.)

No; 113739 - Dated by: 16/01/2012.

Registered Consultant Engineer (Execution Supervision)

Member of The Syndicate of Engineers (Architectural Dept.).

No; 2882 /2 - Dated by: 11/12/2012.

Registered Architect.

Member of The Syndicate of Engineers (Architectural Dept.).

No; 4480 /6 - Dated by: 5/9/1982.

2 | P a g e

2 . E d u c a t i o n : Sep., 2005 : PH.D. Architectural Eng.

Faculty Of Engineering - Ain Shams University.

Thesis: “ Urban Development and Revitalization Of Prince

Shaikhoun Historic Group At Khalifa District in Cairo ”

Oct., 1995 : M. Sc. Architectural Eng. ( Urban Design - Town Planning )

Faculty Of Engineering - Ain Shams University.

Thesis: “ The Influence Of Environmental Factors On Urban Design

at Salah El Din’s Citadel District “

(Analytical Documentary Study For El AZAB Area.)

Jun., 1982 : Bachelor of Architectural Eng.,

Faculty Of Engineering - Ain Shams University.

Project of Graduation:

A Complex for Development of The Islamic Arts & Civilizations at Salah El Din’ Citadel District.

3 | P a g e

3 . T r a i n i n g C o u r s e s & S e m i n a r s : 2011: Symposium on: The future of urbanization in Egypt during the social

justice - Amar Ya Misr group, under the auspices of the Supreme Council for

Culture / Egyptian Opera House - 11/5/2011.

2010: Methods of Evaluating students (Workshop) _ Prof. Dr. / Ibrahim Zuheiry

(Thebes Higher Institute for Computer and Administrative Sciences / unit quality

assurance).

That in the period from 18/12 to 19/12/2010.

May, 1983: A Training Course No; (36) for Training The New Engineers & Raising

The Administrative Capability - (General Administration of Training,

Planning & Development - Pyramids Training Institute, Arab Contractors.)

That in the period from 7/5/1983 to 28/5/1983.

Overall Assessment: excellence.

4 . P r a c t i c a l S k i l l s : Administration & supervising of the large great scale construction Mega projects &

sites.

Coordination bet. All special trades, Work Shop Drawings, Cost Value & Document

Controlling Review.

Design of Architectural, Decorative working details and the Executive Details.

(Work shop Drawings).

Teaching The Architectural Design and Working Drawings at the Institutes and the

engineering faculties.

Urban & Architectural Design Works especially in the field of Rehabilitation &

Co-ordination of the Urban & Historic Centers.

Historic engineering Analysis for historic sites.

MS office software and Microsoft project Software.

Computer Aided Design (Auto CAD) for Shop drawings & Relevant

Details Following NCS (National Cad Standards)

Presentation, Perspectives & Architectural Models.

Fluent oral and written English, Arabic Languages, and Some little understood

French

4 | P a g e

5 . W o r k & C a r e e r H i s t o r y R e c o r d : Aug., 2014

till Now

- Technical Manager South Border Infra Structure Project Since July, 2014. Saudi

Bin Ladin Group / Riyadh Technical Office.

2012/Aug.,

2014:

- Deputy Technical Director & Head of Architecture and Coordination Depts. Saudi

Bin Ladin Group / Riyadh Technical Office.

King Abdullah Integrated project for developing the security Location of

Ministry of interior 3rd

Stage all over the Kingdom- KAP 03

South Border Infra Structure

(Kingdom of Saudi Arabia).

2009/2012: - Teaching Staff- Higher Institute of Engineering

– Shorouk Academy.

Teacher from: (31/ 01/2012) till (05/05/2012)

- Teaching Staff- Higher Institute of Engineering

– Thebes Academy.

Teacher from: (24/ 10/2007) till (05/03/2012)

- Teaching Staff- Higher Institute of Engineering and Technology - Kaluoyia.

(Lecturer 16/02/2009 to 15/03/2010).

- Architectural Design Eng., - (freelance).

Development of Luxor Cornish & Shop Drawings

Fustat Park – Old Cairo

Slamtex Weaver Factory

(A. R. E.)

1989/2009: - Architectural Design & Supervision Eng., - Senior engineer through office of Prof.

Dr. /FARUOK ELGOUHARY.

- Architectural Design Eng., - (freelance.).

- Teaching Staff- Higher Institute of Engineering – Thebes Academy.(Teacher from:

24/ 10/2007)

- Teaching Staff- Higher Institute of Engineering and Technology - Kaluoyia.

(Lecturer 16/02/2009 to 15/03/2010).

(A. R. E.)

5 | P a g e

1985/1989: - Architectural Design & Supervision Eng., - through Sagr Consulting Engineers

(Eng., / Abdul Rahman Sagr Al Ereify).

(Kingdom of Saudi Arabia).

1983/1985: - Architectural Design & Construction Eng., - through AGILCO Co. for the

international construction (Arabia Germania Invest. co.).

- Architectural Design Eng.,- through The Engineering Studies office (E.S.O.) -

(Prof. Dr./ Ismail Amer ; Prof. Dr./ Ahmed Fouad Aid ) .

- Architectural Design Eng., - (freelance.).

(A. R. E.)

1983: - Construction Eng., through Arab Contractors co.

(Osman Ahmed Osman & partners.).

(A. R. E.)

1982: - Architectural Design & Supervision Eng., - through ElSAMAN for architecture,

planning & decorations office (Eng., Mahmoud Abd ELAziz ElSAMAN).

(A. R. E.)

6 | P a g e

6 . w o r k s R e l a t e d E x p e r i e n c e :

With more over than 33 years’ experience in the engineering field through design, construction,

construction supervision and project management for many types of projects [Public buildings

(Ministries, Faculties & Educational buildings & Military Projects), residential projects, hospitals,

towers and factories. Hereunder the summary of resume contains my qualifications and skills hoping

it will explain my merit to join your esteemed firm and work through the curriculum and the policy in

order to provide my professional services to the clients and ensure the implementation of the firm

goals. With the extensive experience in dealing with professional and sub-professional crews, clients,

consultants and contractors.

Sept.,/2014

Till Now:

- Technical Manager (SBI) South Border Infra Structure Project: Assigned since

July, 2014 (Registered Aug. 2014) Saudi Bin Ladin Group / Riyadh Technical Office.

Owner: MOI [ Ministry of Interior - K S A ]

Lump Sum Cost (Design & Built):

11, 500,000,000 milliard SAR - Approx.: 3,066,666,667.00 $ (price Jan.2016)

Duration: 36 Months As from Date of receipt the location

Responsibilities:-

Operation, design, engineering, project evaluation and technical office management.

Review & Coordination bet. All special trades, Work Shop Drawings, Cost Value & Document

Controlling Review.

Review & Coordination bet. All special trades of Work Shop Drawings for Helipads,

Review and approve technical and material submittals.

Support to maintaining project budget and schedule planning.

Attending progress meeting, discussing and suggesting technical proposals.

Taking part in the project management review and risk management review.

Coordinating between the construction and engineering teams ensuring that the construction

requirements are conveyed to the engineering teams and that the engineering deliverables satisfy

the construction requirements

Managing the cost analysis of site activities in the coordination with cost control

Coordination with quantity Surveyors or payment appreciations and change orders

Taking part in selection process of subcontractors and suppliers for project, reviewing sub

contactors’ invoices.

Taking part in the contractual aspect of projects, Documenting project issues/conditions.

2012/2014: - Deputy Technical Director & Head of Architecture and Coordination Depts.

Saudi Bin Ladin Group / Riyadh Technical Office.

King Abdullah Integrated project for developing the security Location of Ministry

of interior 3rd

Stage all over the Kingdom - KAP 03

Description: Construction of (610) locations with total area of (1,843,805 m2) for:-

General security Authority (321) locations

Civil Defence Authority (35) Locations

Investigation Authority (89) Locations.

Customs Authority (41) Locations.

Strategic Buildings Security Authority (12) Locations.

Drugs Enforcement Authority (33) Locations.

Civil Affair Authority (57) Locations.

Owner : MOI [ Ministry of Interior - K S A ]

7 | P a g e

Lump Sum Cost :

11,912,743,963.20 milliard SAR-Approx.: 3,176,604,896.68 $ (price Jan.2016)

Duration: 1080 days As of Date of receipt the location

Responsibilities:-

Technical Managing operator, Design Review, Coordination bet. All trades, Work Shop Drawings

Review, and Cost Value & Document Controlling

Review the tender documents (Design drawings, Bills of Quantities and the specifications) prior

to be submitted to the project consultant.

Review Concept design, design development and the final design layouts prior to Submitting to

the project consultant.

Coordinate with other trades specially the MEP about HVAC system requirements such as

Chillers, Pumps, Plate heat exchangers, Filters, Fans, AHUs, Fan coil units and VAVs. & the

firefighting system requirements such as pumps, dampers, switches and valves.

Review the material submittals prior to be submitted to the project consultant.

Review the installation method statements prior to be submitted to the project Consultant.

Review the shop drawing layouts prior to be submitted to the project consultant.

Monitor project quality performance and take appropriate corrective action and to report

infringement, problems and any unusual observations to immediate.

Review As-built drawings and operation and maintenance manuals prior to be submitted to the

project consultant.

Review variation orders and proposals prior to be submitted to the project consultant.

Attending the progress and coordination meetings.

Sign off on the completed works with completed documentation.

(Kingdom of Saudi Arabia).

07/2012: - Assigned Member of Teaching Staff, Department of Architecture / Higher Institute of

Engineering and Technology – Shorouk Academy from: (31/01/2012).

- Member of teaching staff, Department of Architecture (teacher) / Higher Institute of

Engineering - Thebes Academy, since :( 24/10/2007). until (05/03/2012) And to teach

the following courses:

Architectural design (1, 3.5, 6) / Design principles and Architectural

Drawing, Working Drawings (1.2, 3) in / Building Construction (1.2) and

Graduation Projects.

- Assigned Member of Teaching Staff, Department of Architecture / Higher Institute of

Engineering and Technology – at Qlliobiaya from: (16/02/2009) until :(03/15/2010).

And to teach the following courses:

Architectural Design (1 / A, 1 / b), Architectural Design (2 / a).

(A. R. E.)

07/2011: ** As attribution by the Owner :

- Design and preparation of drawings of the villa housing, Owner Eng. / Hani Al-

Badawi - Block No. (4), Block 16028, District V (local -3) Obour City - a total area

(572.63 m 2) - and area of building construction = 194.30 m 2 (by 34%.)

- Design and working drawings to the village of Belladonna (Group villas, the 13

villas, a shopping mall), the king of Eng. / Hazem Hassan and Co. (Company Spring),

bee-90 - by North Coast on a total area of 4900 m 2 and the proportion of building

construction (37%).

8 | P a g e

- Design and preparation of drawings and supervision of the executional work of the

villa housing, Owner Eng. / Abdullah, Najib El Salam, Mr. / Hani Abdullah El Salam -

Plot No. [(1), (2), (21)] Block 16030, District V (local - 3) Obour City - a total area

(2237.75 m 2) - and the building construction area = 385.91 m 2 (18%).

(A. R. E.)

98/2009: - Design, Working drawings, Specifications & Supervision on The Construction Works

for The Faculties of Pharmacy, Dentistry & Computer and information project, Owner: Ain Shams Univ.- Area 25300 m

2 – Built area: 13265m

2 (52.43%),

Abbassya – AlWehda AlAfricia st., (Still Under Construction).

Time of Construction: (192) months.

Estimated Cost: 210, 000,000 million L.E - Approx.: 55,763,440.89 $ (price

jan.2002)

- Some Residential Building & Villas.

** As attribution by the Owner :

- Design & Working drawings of Some Residential Building & Villas.

- Construction works of “Ouché Patisserie”, Owner / Hassan Mohamed Ahmed, at

ElShams Sporting Club - Steel Construction System, At Commercial Zone.

Time of Construction: (2) months. Cost: 40,000 thousand L .E.

- Construction works of “Gift House Shop”, Owner / Mustafa Sieff., at ElShams

Sporting Club, Gate No.; (1) Zone.

Time of Construction: (2) months. Cost: 25,000 thousand L .E.

** Through office of Prof. Dr./ FARUOK ELGOUHARY:

- Design, Working drawings, Preparing of Specifications & Supervision on The

Construction Works for The Faculty of Computers & Information project, Owner: Ain

Shams Univ.- Abbassya - AlWehda AlAfricia St., - Area: 10335.88m2 – Built area:

4183.71 m2 (40.48%).

●● Estimated Cost : 32, 407,240 million L.E

(A. R. E.)

89/2002: ** Through office of Prof. Dr./ FARUOK ELGOUHARY:

Position Held

Senior Design Architect

Site Supervision.

Construction Management.

- Coordination of Site Plan for Zone of Gate No; 2, Administration Bldg. & Mosque at

Sham Sporting Club.

- Supervision on the Construction works for THE ORIENTAL WEAVERS’ Factory &

Administration Building Zone (B1) Industrial, 10th of Ramadan City.

Time of Construction: (24) months. Cost : 5, 346,000 million L.E.

- Design, Working drawings, Specifications & Supervision on The Construction Works

for The Ministry of Finance & Customs Department Towers, Area 21500m2

– Built area: 8000m2 (37%), Ramses St.; extension -Nasr City.

Time of Construction: (144) months.

Cost: 190, 000,000 million L.E. – Approx.: 41,645,161.29 $ (price jan.2002)

9 | P a g e

- Some Residential Buildings & Villas

- Construction works of Ì Ouché Patisserie, Owner / Hassan Mohamed Ahmed, at El

Shams Sporting Club with steel construction System at Commercial Zone.

Time of Construction: (2) months.

Cost: 40, 000 Thousand L.E.

- Construction work of Gift House Shop, Owner / Moustafa Seiff, at El Shams Sporting

Club, Gate No. 01 Zone.

Time of Construction: (2) months.

Cost: 25, 000 Thousand L.E.

85/1989: ⃰⃰⃰⃰ ⃰ Sagr Consultant Engineers - ( Eng. / Abdul Rahman Sagr Al Areify [Certificate of

experience is enclosed]):

Position Held

Architectural Design Engineer.

Site Supervision.

- Designing & Preparing the working drawings of Mr. /Abd Allah ElSafy’s Hotel in

Belgorashy.

- Designing & Preparing the working drawings of H.H. Prince’s / Abd El Rahman Bin

Saad Al-Saud mother’s rest House in Taif.

- Designing & Preparing the working drawings of specialized hospital for parturition

and larynx disease - of Al-Shaby’s WAQF IN Taif – Area 1370.00 m2.

- Supervision the construction works of As-Salam commercial and residential center –

Owner Sheikh / Yakzan Bin Saleh El Gabrey – Area 2500.00 m2 in Taif, Constructing

time : 30 months – Estimated cost: 15.00 million SR.

- Supervising and following up the project of the Formed General of the First Legion for

the National Guard in the western area in Taif, Construction time: 24 months – Total

cost: 13.876 million SR.

- Designing and following up the preparation of working drawings for a number of fuel,

car services and car wash stations in Taif.

- Designing and preparing the working drawings for the mosque of Al-Waqfs and

Mosques’ Management at Missan Bel- Harith in Taif – Area 900.00 m2.

- Studying and designing the residence of the Holy Qur’an Memorization Group in Taif

– Area 2000.00 m2 – Estimated cost: 12.00 million SR.

- Studying and designing of H.H. Prince / Bander bin Abdul Aziz Al-Saud’s residential

and commercial complex in Makkah – Area 3670.00 sq. m.

- Architectural study for designing the commercial, Administration and Residential

complex of H.H.PRINCE’S / Badr Bin Abdul Aziz Al-Saud Mother in Makkah – Area

6765.00 sq. m.

(Kingdom of Saudi Arabia).

84/1985: **Through AGILCO Co. (Arabia Germania Invest. co.) for the international

construction:

- Construction works of the mosque & Islamic Services owner Mrs. / Zahia M. Awad,

Elnozha Elgadida - Heliopolis.

Time of Construction: (9) months. Cost: 432,000 thousand L .E.

10 | P a g e

- Construction works of El Sindbad Fun-Fair at Heliopolis (Nozha).

Time of Construction: (7) months. Cost: 1,073,000 million L .E.

** As attribution by the Owner :

- Design & working drawings of ElHelal Commercial Residential Tower owner /

ElHelal Co. Groups -district No; 7, area No; 1 Alwehda Alarabia St.; from geser al

Suez, ain Shames. (Area 1005 M2 ).

- Design & working drawings of Residential building - owner Mrs. / AMAL ISSA

ALSAID AHMED. Groups -district No; 11, area No; 196- 10th of Ramadan.

(A. R. E.)

** Through The Engineering Studies office (E.S.O.) - ( Prof. Dr./ Ismail Amer ; Prof.

Dr./ Ahmed Fuoad Aid ):

- Contribute to The Design of Residential Commercial Complex at Rowy.

- Contribute to The Design of A Court Yard at Rowy.

(Sultanate Oman.)

1983: ** Through ARAB CONTRACTORS Co.(Osman Ahmed Osman & Par.) :

- Construction the works of Residential Buildings at Heliopolis Housing projects

(7200 Apt. units ) by the structural Systems mentioned below :-

1- Lift Slab System.

2- Flat Slab System.

** Through The Engineering Studies office (E.S.O.) - ( Prof. Dr./ Ismaiel Amer ; Prof.

Dr./ Ahmed Fuo’ad Aid ):

- Design Suggestion & budget of ALAHRAM NEWSPAPER Building expansion.

- Design a Residential, Commercial & administrative tower (Maadi.).

- Design a Residential building (Ismailia city).

- Design a Residential, Commercial & Administrative building (Area = 2036 M²)

Owner:/ Raas Alhekma cooperative residence society - (Roushdy- Alex.).

- Design the Decorations of the entrance for MARRYLAND Residential tower Owner: /

Raas Alhekma cooperative residence society.

** Through AGILCO Co. for the international construction (Arabia Germania Invest.

co.):

- Construction works of Dr. / MAHER FAHMY ’S Villa - (Nasr City).

- Construction the complementary works of the Industrial Complex owner / E.Y.

industrial Co.

- Tender Study of the Cairo International airport worker’s residence project.

- Tender Study of four residential buildings project at 7 th district at Maadi.

- Design & Working drawing of the mosque & Islamic Services owner Mrs. / ZAHIA

MOHAMED AWD , Elnozha Elgadida - Heliopolis .

- Design of Residential building - owner Mrs. / FATTMA ALY KHAMISS, Cairo,

Ismailia desert Road.

(A. R. E.)

11 | P a g e

1982: ** Through El SAMAN office for Architecture , planning & Decorations (Eng.,/

Mahmoud Abdel Aziz ElSAMAN) :

- Design & Working drawings for Raising & Upgrading of Abdu Basha mosque &

Clinics.

- Design, Working drawings & supervision on the construction works of Residential

building - owner: / Refaat Ahmed Ayob, 22 Ahmed Shafik st.;-hada’ak Alkobba.

- Supervision on Construction works of bonbon Sima factory’s expansion.

** Through Alumiva for contracting Co. as attribution :

- Construction the complementary works for El Bostan Fuel Station (Tahrir sq,).

(A. R. E.)

80/1981: - Contribute to supervision on the construction works of CAIRO MARROITT OMAR

EL KHAYAM hotel through HARTELA CONSTRUCTION LTD. Co. (Finland); then

through UNITED CONTRACTORS Co. for constructing the outer metal fences.

(A. R. E.)

Thus in addition to presentation for some projects of Residential Commercial buildings, Villas,

Resorts & Hotels and some Models at SAUDI ARABIA & EGYPT. & Also Thus in addition to some historical projects & studies experience.