00 time sheets - mar2013-oct2014.xlsx

50
Month: Februarie / February Contract Number: Year: 2013 Name of Company: S.C. INTEGRAL DESIGN Employee's Name: Cârlig Constantin - Title: QUANTITY SURVEYO MONTHLY TIME SHEET Day Date Hour Work Description Arr Dep Break Cumul Fr 1 Sa 2 Su 3 Mo 4 1 Tu 5 1 9.00 18.30 8.00 Acknowledge the Contract 5R2 We 6 1 9.00 18.30 8.00 Th 7 1 9.00 18.30 8.00 Fr 8 1 9.00 18.30 8.00 Acknowlegde the Technical Design Sa 9 Su 10 Mo 11 1 9.00 18.30 8.00 Tu 12 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) We 13 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) Th 14 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) Fr 15 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) Sa 16 Su 17 Mo 18 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) Tu 19 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) We 20 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) Th 21 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) Fr 22 1 9.00 18.30 8.00 LOT 6 - centralizare articole (oscar) Sa 23 Su 24 Mo 25 1 9.00 18.30 8.00 Tu 26 1 9.00 18.30 8.00 IPS 03 - Pregatire foi evidenta Bill 3 We 27 1 9.00 18.30 8.00 Th 28 1 9.00 18.30 8.00 TOTAL 18 144.00 Summary of Days Worked To Date This Month Cumulated 0 18 18 Employee's Signature Project Manager Cârlig C-tin Antonio Jose Seve Martin Date: Date: Date: 2/28/2012 2/28/2012 2/28/2012 Days Worked 15,30- 17,00 15,30- 17,00 Acknowledge the Contract, BoQ, Price description 15,30- 17,00 Analisis of the first 15teen most important items 15,30- 17,00 15,30- 17,00 GI - Overview, LOT 6 - centralizare articole (oscar) 15,30- 17,00 15,30- 17,00 15,30- 17,00 15,30- 17,00 15,30- 17,00 15,30- 17,00 15,30- 17,00 15,30- 17,00 15,30- 17,00 15,30- 17,00 5R3 - pregatire IPS 03 / PV predare echipamente IT / Pregatire foi evidentă GI/ Pregatire foi evidenta Bill 2 15,30- 17,00 15,30- 17,00 IPS 03 - Pregatire foi evidenta Bill 4, IPS 03, 15,30- 17,00 IPS 03, LOT 6 - Documente Suport VO- uri (oscar) Contract TOTAL Previous Month

Upload: constantin-florin

Post on 17-Nov-2015

237 views

Category:

Documents


4 download

TRANSCRIPT

February 2013Month:Februarie / FebruaryContract Number: Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulFr1Sa2Su3Mo41Tu519.0018.3015,30-17,008.00Acknowledge the Contract 5R2We619.0018.3015,30-17,008.00Acknowledge the Contract, BoQ, Price descriptionTh719.0018.3015,30-17,008.00Analisis of the first 15teen most important itemsFr819.0018.3015,30-17,008.00Acknowlegde the Technical DesignSa9Su10Mo1119.0018.3015,30-17,008.00GI - Overview, LOT 6 - centralizare articole (oscar)Tu1219.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)We1319.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)Th1419.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)Fr1519.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)Sa16Su17Mo1819.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)Tu1919.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)We2019.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)Th2119.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)Fr2219.0018.3015,30-17,008.00LOT 6 - centralizare articole (oscar)Sa23Su24Mo2519.0018.3015,30-17,008.005R3 - pregatire IPS 03 / PV predare echipamente IT / Pregatire foi evident GI/ Pregatire foi evidenta Bill 2Tu2619.0018.3015,30-17,008.00IPS 03 - Pregatire foi evidenta Bill 3We2719.0018.3015,30-17,008.00IPS 03 - Pregatire foi evidenta Bill 4, IPS 03, Th2819.0018.3015,30-17,008.00IPS 03, LOT 6 - Documente Suport VO-uri (oscar)TOTAL18144.00Summary of Days Worked To DateContractTOTALPreviousMonthThis MonthCumulated01818

Employee's SignatureProject ManagerCrlig C-tinAntonio Jose Seve Martin

Date:Date:Date:2/28/122/28/122/28/12

March 2013Month:Martie / MarchContract Number: Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulFr119.0018.3015,30-17,008.00Planning future activities / Cost analisys - Retaing Walls, Slope Reinforcements / LOT 6 - additions on claim items (OSCAR)Sa2Su3Mo419.0018.3015,30-17,008.00Start Working On Breakdowns - Planning / LOT 6 - additions on claim items (OSCAR)Tu519.0018.3015,30-17,008.00Working On Breakdowns - Planning (Microsoft Project) / Building the format for breakdowns / Internal Weekly Meeting / Building the pursuance sheets for 5R3 itemsWe619.0018.3015,30-17,008.00Breakdowns CO 01f (Retaing wall) - base for discution / Breakdown Concrete - discution Base / Building the pursuance sheets for 5R3 items / LOT 6 - additions on claim items (OSCAR)Th719.0018.3015,30-17,008.00IPS 03Fr819.0018.3014,00-15,008.00IPS 03 / Letter to Engineer (IPS 02)Sa9Su10Mo1119.0018.3014,00-15,008.00Breakdowns CO 04 - case studyTu1219.0018.3014,00-15,008.00Breakdowns CO 04We1319.0018.3014,00-15,008.00IPS 03Th1419.0018.3014,00-15,008.00IPS 03 / Preparing List of Reports that was to be performed by the Contractor for 5R3 (along with ms. Guran)Fr1519.0018.3014,00-15,008.00IPS 03 /Sa16Su17Mo1819.0018.3014,00-15,008.00IPS 03Tu1919.0018.3014,00-15,008.00IPS 03We2019.0018.3014,00-15,008.00IPS 03 - sent to engineerTh2119.0018.3014,00-15,008.00ITEM LIST PREPARATION - bridgesFr2219.0018.3014,00-15,008.00ITEM LIST PREPARATION - bridgesSa23Su24Mo2519.0018.3014,00-15,008.00ITEM LIST PREPARATION - bridgesTu2619.0018.3014,00-15,008.00ITEM LIST PREPARATION - bridgesWe2719.0018.3014,00-15,008.00MONTHLY MEETING / ITEM LIST PREPARATION - bridgesTh2819.0018.3014,00-15,008.00DAILY JOURNAL / MONTHLY REPORT OF PERSONEL AND MACHINES Fr2919.0018.3014,00-15,008.00IPS 04 - UPDATE GI / UPDATE LIST OF CORESPONDENCE OF CLAIMS / IPS 04Sa30Su31TOTAL21168.00Summary of Days Worked To DateContractTOTALPreviousMonthThis MonthCumul182139Employee's SignatureProject ManagerCrlig C-tinAntonio Jose Seve Martin

Date:3/29/13ore lucrate168Verificare 00.00zero e bineRata / or10Curs 28 feb4.4032Val (Lei)7,397.38

April 2013Month:Aprilie / AprilContract Number: Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulSaSuMo119.0018.3015,30-17,008.00IPS 04 - UPDATE LIST OF CORESPONDENCETu219.0018.3015,30-17,008.00Checking daily journal / MeetingWe319.0018.3015,30-17,008.00View over technical Drawings /Th419.0018.3015,30-17,008.00View over technical Drawings /Fr519.0018.3014,00-15,008.00Monthly Report - Sa6Su7Mo819.0018.3014,00-15,008.00IPS 04Tu919.0018.3014,00-15,008.00IPS 04We1019.0018.3014,00-15,008.00IPS 04Th1119.0018.3014,00-15,008.00IPS 04 / FOTO REPORT 1 - APRIL / Identification of existing BillboardsFr1219.0018.3014,00-15,008.00IPS 04 - IPS 03 JoitSa13Su14Mo1519.0018.3014,00-15,008.00IPS 04 / UPDATE LIST OF CORESPONDENCETu1619.0018.3014,00-15,008.00IPS 04 / ELECTRICAL RELOCATION CEZ ANALYSISWe1719.0018.3014,00-15,008.00PRINT, LETTER, BOUND - IPS 04, BREAKDOWN CO 04,Th1819.0018.3014,00-15,008.00 BREAKDOWN CO 04, CO 13aFr1919.0018.3014,00-15,008.00 BREAKDOWN CO 13aSa20Su21Mo2219.0018.3014,00-15,008.00 BREAKDOWN CO 13a, Culvert 94+698Tu2319.0018.3014,00-15,008.00 BREAKDOWN CO 04, CO 13a, CO 13b, IPC 18 - Caransebe BypassWe2419.0018.3014,00-15,008.00IPC 18 - Caransebe BypassTh2519.0018.3014,00-15,008.00TIMIOARA - DRDP IPC 18 for ApprovalFr2619.0018.3014,00-15,008.00VO 11 - LOT 6 Caransebe Bypass - List of Overpass Quantites / Starting to gather supporting documentsSa27Su28Mo2919.0018.3014,00-15,008.00VO 11 - LOT 6 Caransebe Bypass - Supporting documentsTu3019.0018.3014,00-15,008.00VO 11 - LOT 6 Caransebe Bypass - Supporting documentsTOTAL22176.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul392261Employee's SignatureProject ManagerCrlig C-tinAntonio Jose Seve Martin

Date:5/2/13ore lucrate176Verificare 00.00zero e bineRata / or10Curs 30 apr4.3237Val (Lei)7,609.71

May 2013Month:Mai / MayContract Number: Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulWe118.0017.3014,00-15,004.00VO 11 - LOT 6 Caransebe Bypass - Supporting documentsTh219.0018.3015,30-17,008.00VO 11 - LOT 6 Caransebe Bypass - Supporting documentsFr319.0018.3014,00-15,008.00VO 12 - LOT 6 Caransebe Bypass - Supporting documentsSa4Su5Mo6EASTERTu719.0018.3014,00-15,008.00VO 12, VO 13 - LOT 6 Caransebe Bypass - Summary TextWe819.0018.3014,00-15,008.00Find, read, study OG 43/1997, HG 84/02.02.2011 - on Caransebe Bypass - Issue Th919.0018.3014,00-15,008.00Meeting at UM 01440 - Caransebes, LOT6Fr1019.0018.3014,00-15,008.00VO 12, VO 13 - LOT 6 Caransebe Bypass - Summary TextSa11Su12Mo1319.0018.3014,00-15,008.00VO 12, VO 13 - LOT 6 Caransebe Bypass - Final checkings, Scan, Print, Bound, Copy, Letters / IPC 19 - LOT 6Tu1419.0018.3014,00-15,008.00VO 10 - preparation, sent to G. Rice / IPC 18 - preparation an electronical copy for Mr. Borlovan, sent / IPC 19 - LOT 6We1519.0018.3014,00-15,008.00Preparing IPC 19 - LOT 6Th1619.0018.3014,00-15,008.00Preparing IPC 19 - LOT 6Fr1719.0018.3014,00-15,008.00Preparing IPC 19 - LOT 6Sa18Su19Mo2019.0018.3014,00-15,008.00Preparing IPS 05 - 5R3Tu2119.0018.3014,00-15,008.00Preparing IPS 05 - 5R3We2219.0018.3014,00-15,008.00Preparing to send IPS 05 - 5R3/ Breakdown GI 01 - 5R3 / LOT 6 - IPC 19 - EscalationTh2319.0018.3014,00-15,008.00Caransebes - Meeting LOT 6Fr2419.0018.3014,00-15,008.00Draft letter VO10 (for David Saiz) / Scanat VO11 - documente justificative / Telefon DRDP Timisoare GI11 si GI12 / Recomandation Letter COPISA CONSTRUCTII SA - Draft / Scrisoare - Neconformitati LOT 6 - BorlovanSa25Su26Mo2719.0018.3014,00-15,008.00Recomandation Letter Copisa Constructii / Draft Letter to DRDP Timisoara - Maintenance 5r3 / IPS 06 - 5r3 Tu2819.0018.3014,00-15,008.00IPC 02 - 5r3We2919.0018.3014,00-15,008.00IPC 02 - 5r3 - finalised to be sendTh3019.0018.3014,00-15,008.00IPS 06 - 5r3 - prepared and ready to sendFr3119.0018.3014,00-15,008.00IPC 02 - version 2 - preparation and ready to send.TOTAL22172.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul612283Employee's SignatureProject ManagerCrlig C-tinAntonio Jose Seve Martin

Date:5/31/13ore lucrate172Verificare 00.00zero e bineRata / or10Curs 30 mai4.3320Val (Lei)7,451.04

Iunie 2013Month:Iunie / JuneContract Number: Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)MONTHLY TIME SHEETDayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulMo319.0018.3014,00-15,008.00MEETING 5R3 in TG JIU/ IPC 19 - LOT 6 with DRDR TimisoaraTu419.0018.3014,00-15,008.00IPC 19 - LOT 6 with DRDR TimisoaraWe519.0018.3014,00-15,008.00IPC 19 - LOT 6 with DRDR TimisoaraTh619.0018.3014,00-15,008.00Summary LOT 6 - issues to be clariffied / Send recomandation to G. Rice / Send Vo 12 and Vo 13 to G. Rice / Resend IPC 2 - 5r3 to Hugh MM, Hyder's RE and QS / Papers for bridges payed on LOT 6 (expasion joints)Fr719.0018.3014,00-15,008.00VO 11 - clarificationsSa8Su9Mo1019.0018.3014,00-15,008.00Make a copy of IPS 19 - LOT 6 for CNADNR.Tu1119.0018.3014,00-15,008.00Site visit with Owner of the Electrical Cables for identificationWe1219.0018.3014,00-15,008.00Craiova - for IPC 02Th1319.0018.3014,00-15,008.00IPS 06 - supplementary docs , revision according with the yesterday meeting, also IPC 02 - 5r3 ,Fr1419.0018.3014,00-15,008.00VO 12 AND VO 13, BREAKDOWNSSa15Su16Mo1719.0018.3014,00-15,008.00Went to Caransebes, meeting with mr Orbulesc to prepare the tomorrow meetingTu1819.0018.3014,00-15,008.00Went to Caransebes, meeting with mr Borlovan, clariffing parapets, carriage gutter, cleaning river bed, coating slopes on water course regularizationWe1919.0018.3014,00-15,008.00Monthly meeting - TG Jiu, meeting with Hyder's QSTh2019.0018.3014,00-15,008.00Processing data from Monday and Thusday - caransebesFr2119.0018.3014,00-15,008.00Breakdowns - culvertsSa22Su23Mo2419.0018.3014,00-15,008.00Finalised VO 12 - support papers, copies, calculation roundabouts lightiningTu2519.0018.3014,00-15,008.00VO 12 - left from yesterdayWe2619.0018.3014,00-15,008.00Breakdowns / Meeting with Mr. Diaconu at LainiciTh2719.0018.3014,00-15,008.00Tg Jiu - Finalising IPC 02 with QS Hyder and RE Hyder Fr2819.0018.3014,00-15,008.00Preparing IPC 02 to be sent (scanner, copies, packaging) / Start to print support documents for VO 11 - copy 2 and copy 3 Sa29Su30TOTAL20160.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul8320103Employee's SignatureProject ManagerCrlig C-tinAntonio Jose Seve Martin

Date:7/2/13ore lucrate160Verificare 00.00zero e bineRata / or10Curs 01 iulie4.4501Val (Lei)7,120.167120.1683

Iulie 2013Month:Iulie / JulyContract Number: Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)

MONTHLY TIME SHEETIulie / Julio / July 2013

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulMo119.0018.3014,00-15,008.00Preparing IPC 02 to be sent (scanner, copies, packaging) / Start to print support documents for VO 11 - copy 2 and copy 3 Tu219.0018.3014,00-15,008.00VO 12 AND 13 - PREPARATION TO BE SENT ON COPISA's office Bucharest / Prepare cover sheet for VO 11 items /We319.0018.3014,00-15,008.00IPS 07 / VO 12 and VO 13 - talk with G .Rice / VO 11 - cover sheets for VO 11Th419.0018.3014,00-15,008.00Writing VO 11 / daily mesurements for 5R3 - culverts / removal existing pavement / demolition of existing concrete guard rails / demolition of existing retainig wall Fr519.0018.3014,00-15,008.00VO 11 / 5R3 - daily mesurementsSa6Su7Mo819.0020.3014,00-15,008.00IPC 18 / IPC 19 CLARIFICATIONS FOR MARIUS PIRNUTA / SEND IPC 02 - 5R3 at CNADNRTu919.0018.3014,00-15,008.00VO 12 AND 13 - clarification woth Marius Pirnuta / 5r3 - daily mesurementsWe1019.0018.3014,00-15,008.00Send VO 11 cover sheets at DRDP Timisoara for Signature and Revision (if the case)Th1119.0020.3014,00-15,008.00Bound VO 11, copies, prepare to be send on Bucharest / Daily mesurements for 5r3Fr1219.0018.3014,00-15,008.00VO 11 sent on Bucharest / Clarification on VO 11, 12 and 13 with Mirela Tanase / Covering letters for VO 11, 12 and 13Sa1310.3015.305Daily Mesurements 5r3Su14Mo1519.0020.3014,00-15,008.00Follow the Vo 11, 12 and 13 - talk with Marius Pirnuta, Mirela Tanase, Dragos Enasescu, mr. Borlovan / Daily Mesurements for 5r3Tu1619.0020.3014,00-15,008.00Follow the Vo 11, 12 and 13 - talk with Marius Pirnuta and Mirela Tanase / Daily mesurements on 5r3 / Prepare supporting documents for GI 01 / Breakdown GI 01We1719.0019.3014,00-15,008.00Went to sign PV for GI 11 june 2013 Livezeni and Meri Districts / Daily evidence af works 5R3 - Culverts / Forwarding letters GI 11 and GI 01 / Start working on VO 14 - Royalty Mining - priority Zero.Th1819.0018.3014,00-15,008.00Finalising BD for GI 01 / Working on VO 14 - Royalty Mining - written sectionFr1919.0018.3014,00-15,008.00Working on VO 14 - Royalty Mining - tables finishedSa2010.0014.004Daily Mesurements 5r3Su21Mo2219.0018.3014,00-15,008.00Working on VO 14 - Find supporting documents, put them togethr, copy, forder them - prepare to be sent to COPISA Bucharest / Daily mesurements on Culverts 5R3Tu2319.0018.3014,00-15,008.00VO 14 - copy, forder them - prepare to be sent to COPISA Bucharest / Daily mesurements on Culverts 5R3We2419.0018.3014,00-15,008.00Went to Bucharest with IPC 01 - 5R3 / Change table for VO14Th2519.0018.3014,00-15,008.00IPC 19 - add VO14 and finalising guard railsFr2619.0018.3014,00-15,008.005R3 - DAILY MESUREMENTSSa27Su28Mo2919.0018.3014,00-15,008.005R3 - DAILY MESUREMENTSTu3019.0018.3014,00-15,008.005R3 - DAILY MESUREMENTSWe3119.0018.3014,00-15,008.005R3 - DAILY MESUREMENTSTOTAL23193.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul10323126Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve Martin

Date:7/25/13ore lucrate193
MyPc: MyPc:am pus 5 ore in plus / 50 euro pentur orele de romana ale lui Antonio Rondasi inca 4 ore/40 euro pentru Antonio SeveVerificare 00.00zero e bineRata / or10Curs 30 apr4.4040Val (Lei)8,499.72

August 2013Month:August / August 2013Contract Number: Year:2013Name of Company:S.C. INTEGRAL DESIGN S.R.L.Employee's Name:Crlig Constantin - FlorinTitle:QUANTITY SURVEYOR (5R3)

MONTHLY TIME SHEETAugust / Agosto / August 2013

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulTh119.0018.3014,00-15,008.00Daily measurement 5r3 / Materials on siteFr219.0018.3014,00-15,008.00Construction book - LOT 6 / IPS 07 - EstimationSa3Su4Mo519.0020.3014,00-15,008.00Construction book - LOT 6 / IPS 07 - Daily measurements - culvertsTu619.0018.3014,00-15,008.00Construction book - LOT 6 / IPS 07 - Daily measurements - demolition of existing retaing walls and existing guard-railsWe719.0018.3014,00-15,008.00Construction book - LOT 6 / IPS 07 - Daily measurements - removal of the existing pavementTh819.0020.3014,00-15,008.00Construction book - LOT 6 / IPS 07 - Daily measurements - explozionFr919.0018.3014,00-15,008.00Deva - With Juan Obradors / IPS 07 - Advance Payment - First Instalment - the above IPS 07 will become IPS 08Sa10Su11Mo1219.0020.3014,00-15,008.00IPS 07 - Advance Payment - 1st instalment - arrangement to be sent / Gault Rice returnal to Romania - arange for VO 14 to be signed / IPS 08 - daily mesurementsTu1319.0020.3014,00-15,008.00IPS 08 - daily measurements E08-1/E08-3 - Prepare draft letters for ... Asking payment for IPC 01We1419.0019.3014,00-15,008.00VO 11 - sent editable format to M. Pirnuta / Site visitTh1519.0018.3014,00-15,008.00Daily measurement 5r3 / Materials on site / Culverts / Reading claim letters from Clive HorridgeFr1619.0018.3014,00-15,008.00Report to David - IPC 19, VO11, VO12, VO13, VO14 / Daily measurements - preparing table for works on 5R3Sa17Su18Mo1919.0018.3014,00-15,008.00G. Rice - VO14 - Telephone/Push for VO14 (until the end of the week will have an answer) / Ask M. Pirnuta about - VO11, VO12, VO13Tu2019.0018.3014,00-15,008.00Answer M- Pirnuta's e-mail with clarifications regardind VO11We2119.0018.3014,00-15,008.00Draft letter - IPC 19 COPISA - CNADNR and DRDP Timisoara29-Jul28Th2219.0018.3014,00-15,008.00IPs 0826-AugFr2319.0018.3014,00-15,008.00BD GI 01 - Arsin / Culverts table evidence of Justification and Comparation with Fisical Status / Ips 08 / VO 11 - H018 - clarifications for CNADNRSa24Su25Mo2619.0018.3014,00-15,008.00IPS 08 - daily measurements - culverts / Materials on siteTu2719.0018.3014,00-15,008.00IPS 08 - daily measurements - culverts / Materials on site / Cutting trees / LOT 6 - VO 12 / VO 13We2817.3011.304.00IPC 08 - daily measurement - culverts / MaterialsTh29115.3019.304.00IPC 08 - daily measurement - culverts / MaterialsFr3019.0018.3014,00-15,008.00VO 12 - VO 13 - VO 14 - clarificationsTOTAL22168.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul12622148Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve Martin

Date:8/29/13ore lucrate168Verificare 00.00zero e bineRata / or10Curs 29 aug4.4466Val (Lei)7,470.29

Septembrie 2013Month/Mes:September / Septiembre / SeptembrieName of Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2013Employee's Name: Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract Number: 3080-003/13-din 05.02.2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALSeptember / Septiembre / Septembrie

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulMo219.0018.3014,00-15,008.00IPS 08 - Daily Program - Monthly ReportTu319.0018.3014,00-15,008.00IPS 08 - Materials on site - Daily Program - Monthly Report - Explosion 110+930 - Answer to G. Rice regarding VO14We419.0018.3014,00-15,008.00Daily measurements - curverts - Clarifications VO14 - Daily Program - Monthly ReportTh519.0018.3014,00-15,008.00IPS 08 - Daily measurements - materials - Clarifications VO14 - Daily Program - Monthly ReportFr619.0018.3014,00-15,008.00IPS 08 - Daily measurements - Clarifications VO14 - Daily Program - Sent - Monthly Report - august 2013 - Sent IPS 08Sa7Su8Mo919.0018.3014,00-15,008.00LOT 6 - Earth Filling - Materials Tests - Daily Activity Program - Daily JournalTu1019.0018.3014,00-15,008.00VO 14 - clarifications / IPS 08 - more attachments - Daily Activity ProgramWe1119.0018.3014,00-15,008.00Targu Jiu - IPS 08 - Daily Activity ProgramTh1219.0018.3014,00-15,008.00Update Culverts - Prepare IPS 09 - Advance Payment - Daily Activity ProgramFr1319.0018.3014,00-15,008.00VO 14 - draft letter from G. Rice - Analisys / IPS 08 - more attachments / Daily Activity Program / Daily JournalSa1419.0018.3014.00-15.008.00VO 14 - preparing clarifications for VO 14 - tables of excavations / summary of bad quality of earth excavated on LOT 6Su15Mo1619.0018.3014,00-15,008.00IPS 08 - clarificari / Daily Activity ProgramTu1719.0018.3014,00-15,008.00VO 12 - clarifications / Update Culverts / Daily Activity Program / Daily JournalWe1819.0018.3014,00-15,008.00VO 12 and VO 13 clarifications / Update Culverts / Daily Activity Program / Daily Journal / IPS 08 - print support documents culvertsTh1919.0018.3014,00-15,008.00VO 12 and VO 13 clarifications - counting verical signals and clarifying horisontal marking an Marius Pirnuta comments / Update Culverts / Daily Activity Program / Daily Journal Fr2019.0018.3014,00-15,008.00At Trgu Jiu at Engineer's QS for IPS 08Sa2119.0018.3014.00 - 15.008.00Final clarifications and preparations for Monday IPC 19 - LOT 6Su22Mo2319.0018.3014,00-15,008.00At Timisoara with IPC 19 - Daily Activity ProgramTu2419.0018.3014,00-15,008.00LOT 6 - IPC 19 updating final clarifications from yesterday / DN 66 - Daily Activity ProgramWe2519.0018.3014,00-15,008.00Breakdown C02-2 / C02-2' / Demolition / Excavation / Formworks / Concrete C8/10, C12/15 / Placing Precasted tipe P2 / Mortar M100 / Waterproof - Orisontal and Vertical / Drain / - Daily Activity Program / Daily Site Journal / Support Documents Culverts IPS 08Th2619.0018.3014,00-15,008.00Clarification for IPS 08 - DN 66 / Minutes of GI - DN 66 - for the following IPS / Input new dates received from DRDP Timisoara - LOT 6 IPC 19 - Riverbed cleaning / Site daily journal / Daily Activity Program / Select pictures from site - Ernest-Dorian-Bob / Fr2719.0018.3014,00-15,008.00DN 66 - BD culverts / Photo monthly Report - started / Daily Activity ProgramSa28Su29Mo3019.0018.3014,00-15,008.00At Tg Jiu - DN 66 - IPS 08 issuesTOTAL23184.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul14823171Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve Martin

Date:10/1/13

ore lucrate1841.82Verificare 00.00Rata /or10Curs 30 sep4.4560Val (Lei)8,199.04Data ncepere contract:5-Feb-13Data finalizare contract:1-Aug-15Azi suntem n data de:30-Sep-13Total zile de contract:907Total zile scurse:237Total zile rmase:670184

Octombrie 2013Month/Mes:Octombrie / Octubre / OctoberName of Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2013Employee's Name: Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract Number: 3080-003/13-din 05.02.2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALOctombrie / Octubre / October

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulTu119.0018.3014,00-15,008.00Preparation Breakdown CULVERTS V2 / Culvers daily update / Daily site journal / Daily activity programWe219.0018.3014,00-15,008.00Preparation Breakdown CULVERTS V3 / At Tg Jiu with IPS 08Th319.0018.3014,00-15,008.00At Tg Jiu with IPS 08 / Daily site journal / Daily activity programFr419.0018.3014,00-15,008.00Update culverts summary / Photographic report / Daily site journal / Daily activity programSa5Su6Mo719.0018.3014,00-15,008.00Monthly Report / Culvers / IPS 10 / Daily site journal / Daily Activity ProgramTu819.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site Journal / Daily Activity JournalWe919.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site Journal / Daily Activity JournalTh1019.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site Journal / Daily Activity JournalFr110.59.0013.004.00 IPS 08 / Daily site Journal / Daily Activity JournalSa12Su13Mo1419.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site Journal / Daily Activity JournalTu1519.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site Journal / Daily Activity JournalWe1619.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site Journal / Daily Activity JournalTh1719.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site Journal / Daily Activity JournalFr1819.0018.3014,00-15,008.00Tg Jiu - IPS 08 / Daily site Journal / Daily Activity JournalSa190.511.0018.3014.00-15.004.00IPC - IPS 08 - Update culverts summary / Photo monthly reportSu20Mo2119.0018.3014,00-15,008.00IPC - IPS 08 - Update culverts summaryTu2219.0018.3014,00-15,008.00Tg Jiu - IPC 03 / Summary list for mr. Chesnoiu /Daily site Journal / Daily Activity JournalWe2319.0018.3014,00-15,008.00Preparation IPS 10 - september / Daily site journal / Daily Activity JournalTh2419.0018.3014,00-15,008.00LOT 6 - dragos enasescu visit - VO11-VO12-VO09(Valea Mica) / Daily site Journal / Daily activity Program / Daily measurements culverts / Fr2519.0018.3014,00-15,008.00Ips 10 - Gi / Daily site Journal / Daily activity Program / Daily measurements culverts / Sa26Su27Mo2819.0018.3014,00-15,008.00Meeting Tg Jiu 5r3 - IPS nr.08 - respond to the queries on rejection letter of IPS 08 / / Daily site Journal / Daily activity Program /Tu2919.0018.3014,00-15,008.00Build IPS 10 - culverts - situation of Missing Supporting Documents / / Daily site Journal / Daily activity Program / We3019.0018.3014,00-15,008.00Ips 10 - culverts / LOT 6 - Marius Pirnuta queries on LOT 6 VO 12 AND VO13 / Daily site Journal / Daily activity Program / Daily measurements culverts / Th3119.0018.3014,00-15,008.00Ips 10 - print / Answer to querries regarding Materials on site IPS 08 5r3 / Daily site Journal / Daily activity Program / Daily measurements culverts / TOTAL23184.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul17123194Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve Martin

Date:10/31/13

ore lucrate184Verificare 00.00Rata /or10Curs 30 sep4.4304Val (Lei)8,151.94Data ncepere contract:5-Feb-13Data finalizare contract:1-Aug-15Azi suntem n data de:2-Oct-13Total zile de contract:907Total zile scurse:239Total zile rmase:668

Noiembrie 2013Month/Mes:Noiembrie / Noviembre / NovemberName of Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2013Employee's Name: Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract Number: 3080-003/13-din 05.02.2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALNoiembrie / Noviembre / November

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulFr119.0018.3014,00-15,008.00Ips 10 - print / Finish, sent to Engineer/ Daily site Journal / Daily activity Program / Daily measurements - Excavations / Sa2Su3Mo419.0018.3014,00-15,008.00Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity Program / Daily measurements - Excavations, Culverts / Tu519.0018.3014,00-15,008.00IPS 11 - GI / Breakdown for Slope Mesh / Daily site Journal / Daily Activity Journal / Monthly Report - Photo ReportWe619.0018.3014,00-15,008.00Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity Program / Daily measurements - Excavations, Culverts Monthly Report - Copies and ScanTh719.0018.3014,00-15,008.00Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity Program / Daily measurements - Excavations, Culverts / Monthly Report - Sent to EngineerFr819.0018.3014,00-15,008.00Targu Jiu - at Engineer Office - final preparations for IPC 02 / Daily activity Program / Daily measurements - Excavations, Culverts Sa919.0018.3014.00-15.008.00IPS 11 - GI / Daily Measurements - CulvetsSu10Mo1119.0018.3014,00-15,008.00IPS 11 - GI / Daily Measurements - Culverts / Daily site Journal / Daily Activity JournalTu1219.0018.3014,00-15,008.00IPS 11 / Daily Measurements - Excavations / Daily site Journal / Daily Activity JournalWe1319.0018.3014,00-15,008.00IPS 11 / Daily Measurements - Asphalt / Daily site Journal / Daily Activity JournalTh1419.0018.3014,00-15,008.00IPS 11 / Daily Measurements - Conterlevels / Daily site Journal / Daily Activity JournalFr1519.0018.3014,00-15,008.00IPS 11 - Daily Measurements - Material - Final preparation - Sent at Targu Jiu for handover and explanations / Daily site Journal / Daily Activity JournalSa1619.0018.3014.00-15.008.00IPS - Updating Materials List for Precast Elements / Sand / Balast / Cement / IPS - Update of Status of Culverts on Site - Justified and BuiltSu17Mo1819.0018.3014,00-15,008.00IPS 12 - GI's / Daily Measurements - Culverts / Daily site Journal / Daily Activity JournalTu1919.0018.3014,00-15,008.00IPS 12 - Daily Measurements - Slope Mesh / Preparing Breakdown for Slope Protection - Mesh / Daily site Journal / Daily Activity JournalWe2019.0018.3014,00-15,008.00IPS 12 - Daily Measurements - Slope Mesh, Asphalt and Excavations / Preparing Breakdown for Slope Protection - Mesh / Daily site Journal / Daily Activity JournalTh2119.0018.3014,00-15,008.00IPS 12 - Daily Measurements - Culverts / Final - Breakdown for Slope Protection - Mesh / Daily site Journal / Daily Activity JournalFr2219.0018.3014,00-15,008.00IPS 12 - Daily Measurement - Materials - Print to be sent to Engineer - Way to Tg Jiu to handover IPS 12 and explanations / Daily site Journal / Daily Activity JournalSa2319.0018.3014.00-15.008.00IPC 03 - Preparation along with Engineer QS, answering the queries / Preparing Copies Ready for CNADNR approval - Deadline Monday 25th nov.Su2419.0018.3014.00-15.008.00Way to Craiova - IPC 03 - Obtaing signatures needed from Resident Engineer and from Project Manager - Deadline Monday 25th nov.Mo2519.0018.3014,00-15,008.00IPS 11, 12, IPC 03 - Way to Bucharest at CNADNR to handover the IPC 03 / Daily site Journal / Daily Activity JournalTu2619.0018.3014,00-15,008.00LOT 6 - Caransebes Bypass / DRDP Timisoara clarifications for Valea Mica, planning VO 11, 12 and 13 / Daily site Journal / Daily Activity JournalWe2719.0018.3014,00-15,008.00Planning IPS 13 / Measurents Valea Mica, ballast and extraexcavations / Daily Site Journal / Daily Activity ProgramTh2819.0018.3014,00-15,008.00Review of IPC 2 and 3 to detarmine difference in payments regarding on planning IPS 13 / Measurents Valea Mica, ballast and extraexcavations / Daily Site Journal / Daily Activity ProgramFr2919.0018.3014,00-15,008.00IPS 13 - GI / Daily Site Journal / Daily Activity ProgramTOTAL25200.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul19425219Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve Martin

Date:11/29/13

ore lucrate200Verificare 00.00Rata /or10Curs 29 nov4.4412Val (Lei)8,882.40Data ncepere contract:5-Feb-13Data finalizare contract:1-Aug-15Azi suntem n data de:30-Nov-13Total zile de contract:907Total zile scurse:298Total zile rmase:609

Decembrie 2013Month/Mes:Decembrie / Diciembre / DecemberName of Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2013Employee's Name: Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract Number: 3080-003/13-din 05.02.2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALDecembrie / Diciembre / December

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulMo219.0018.3014,00-15,008.00IPS 13 - GI / Daily Site Journal / Daily Activity ProgramTu319.0018.3014,00-15,008.00Monthly Report - November 2013 / Daily Site Journal / Daily Activity ProgramWe419.0018.3014,00-15,008.00Monthly Report - Photographic Report - November 2013 / Daily Site Journal / Daily Activity ProgramTh519.0018.3014,00-15,008.00At Caransebes at the Military Unit - Meeting for Reception with Anedan and Military Unit Representative Fr619.0018.3014,00-15,008.00Monthly Progress Report - Anexe / Daily site Journal (signed by Resident Engineer) - Prepare copies / Scan original / Sent / Daily Site Journal / Daily Activity ProgramSa7Su8Mo919.0018.3014,00-15,008.00Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by the Consultant of Ministry of Transport / Daily Site Journal / Daily Activity ProgramTu1019.0018.3014,00-15,008.00Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by the Consultant of Ministry of Transport. / Daily Site Journal / Daily Activity ProgramWe1119.0018.3014,00-15,008.00Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by the Consultant of Ministry of Transport. / Daily Site Journal / Daily Activity ProgramTh1219.0018.3014,00-15,008.00IPS 13 - GI - Clearing Utilities Documents / Daily Site Journal / Daily Activity ProgramFr1319.0018.3014,00-15,008.00IPS 13 - Daily Measurements - Various Tables - Mainly Culverts / Daily Site Journal / Daily Activity ProgramSa14Su15Mo1619.0018.3014,00-15,008.00Table of IPC'es details for LOT 6 - asked by DRDP Timisoara - New Engineer Team Office/ Daily Site Journal / Daily Activity ProgramTu1719.0018.3014,00-15,008.00Table of VO's details for LOT 6 - asked by DRDP Timisoara - New Engineer Team Office/ Daily Site Journal / Daily Activity ProgramWe1819.0018.3014,00-15,008.00IPS 13 - Ballace of culverts between requests and payed / Clarification of Remaining Supportig Documents / Daily Site Journal / Daily Activity ProgramTh1919.0018.3014,00-15,008.00IPS 13 - Final checking / Daily Site Journal / Daily Activity ProgramFr2018.3017.3014,00-15,008.00Ballace of culverts between requests and payed / Clarification of Remaining Supportig Documents / Daily Site Journal / Daily Activity ProgramSa21Su22Mo2318.3017.3014,00-15,008.00Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site JournalTu2418.3017.3014,00-15,008.00Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site JournalWe25FELIZ NAVIDAD !Th26Fr2718.3017.3014,00-15,008.00Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site JournalSa28Su29Mo3018.3017.3014,00-15,008.00Monthly Report - December 2013 / Daily Site Journal / Daily Activity ProgramTu3118.3017.3014,00-15,008.00Monthly Report - Photographic Report - December 2013 / Daily Site Journal / Daily Activity ProgramTOTAL20160.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul21920239Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinAntoni Ronda i RodriguezAntonio Jose Seve Martin

Date:12/18/13

ore lucrate160Verificare 00.00Rata /or10Curs 18 dec4.4749Val (Lei)7,159.84Data ncepere contract:5-Feb-13Data finalizare contract:1-Aug-15Azi suntem n data de:31-Dec-13Total zile de contract:907Total zile scurse:329Total zile rmase:578

Ianuarie 2014Month/Mes:Ianuarie / Enero / JanuaryName of Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2014Employee's Name: Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract Number: 3080-003/13-din 05.02.2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALIanuarie / Enero / January

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulFr319.0018.3014,00-15,008.00Monthly Report - December 2013 - Written section / Daily Site Journal to be singned by Engineer , Print, Scan, Copy, Tide it, Prepare the Letter / Daily Site Journal / Daily Activity ProgramSa4Su5Mo619.0018.3014,00-15,008.00Sent Monthy Report December 2013 at Engineer / Daily Site Journal / Daily Activity ProgramTu719.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/ We819.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/ Th919.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/ Fr1019.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/ Sa11Su12Mo1319.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/ Tu1419.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/ We1519.0018.3014,00-15,008.00IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/ Th1619.0018.3014,00-15,008.00LOT 6 - Overview Unapproved Variation Orders / Daily Site Journal / Daily Activity Program/ Fr1719.0018.3014,00-15,008.00LOT 6 - Overview Unapproved Variation Orders - Contact Diana Pogaci and/or Marius Pirnuta / Daily Site Journal / Daily Activity Program/ Sa18Su19Mo2019.0018.3014,00-15,008.00LOT 6 - Overview Unapproved Variation Orders / Daily Site Journal / Daily Activity Program/ Tu2119.0018.3014,00-15,008.00Way to Caransebes and then to Timisoare to search for IPC 17 - LOT 6 Caransebes Bypass / Daily Activity Program / Daily site JournalWe2219.0018.3014,00-15,008.00Contact Diana Pogaci (CNADNR - LOT 6 QS - replaces Marius Pirnuta) for VO11, VO12 and VO13 / Contact Liliana Toma - Ramboll and Marius Pirnuta - ask for IPC17 Lot 6 / Prepare Front Tables for VO11-Vertical Signals in accordance with Diana's Request / Daily Activity Program / Daily Site JournalTh2319.0018.3014,00-15,008.00Prepare IPS 17 Lot 6 on M. Pirnuta format / Daily Activity Program / Daily Site JournalFr2419.0018.3014,00-15,008.00Various Checks on Quantities 5R3 / Preparing Tables / Overview Supporting Documents / Daily Activity Program / Daily Site Journal Sa25Su26Mo2719.0018.3014,00-15,008.00Various Checks on Quantities 5R3 / VO 11 - Vertical Signal - Supporting Document, Quantities DDE/ Daily Activity Program / Daily Site Journal Tu2819.0018.3014,00-15,008.00VO 11 - Vertical Signal - Supporting Document, Quantities DDE/ Letter LOT6 - IPC17-Retention Money / Daily Activity Program / Daily Site Journal We2919.0018.3014,00-15,008.00IPS 13 - January 2014 / Work Procedure for IPS'es / Daily Activity Program / Site JournalTh3019.0018.3014,00-15,008.00IPS 13 - January 2014 / Daily Activity Program / Site JournalFr3119.0018.3014,00-15,008.00IPS 13 - January 2014 / Daily Activity Program / Site JournalTOTAL21168.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul23921260Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:1/31/14

ore lucrate168Verificare 00.00Rata /or10Curs 18 dec4.4978Val (Lei)7,556.30Data ncepere contract:5-Feb-13Data finalizare contract:1-Aug-15Azi suntem n data de:31-Jan-14Total zile de contract:907Total zile scurse:360Total zile rmase:547

Februarie 2014Month/Mes:Februarie / Fevrero / FebruaryName of Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2014Employee's Name: Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract Number: 3080-003/13-din 05.02.2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALFebruarie / Fevrero / February

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulMo319.0018.3014,00-15,008.00In Tg Jiu at Engineer Office / Photographic Report - January 2014 / Daily Site Journal / Daily Activity ProgramTu419.0018.3014,00-15,008.00Monthly Report - January 2014 - Print, Scan / Daily Site Journal / Daily Activity ProgramWe519.0018.3014,00-15,008.00IPS 13 - November, December, January - Summary Review _ Materials on Site / Daily Site Journal / Daily Activity JournalTh619.0018.3014,00-15,008.00LOT 6 - Caransebes Bypass - VO's Summary Sheet / 5R3 - IPS 13 / IPC Payment Details / Daily Activity Program / Daily Site JournalFr719.0018.3014,00-15,008.00IPS 13 - November, December, January - Summary Review _ Materials on Site / Daily Site Journal / Daily Activity JournalSa8Su9Mo1019.0018.3014,00-15,008.00LOT6 - Caransebes Bypass - Prepare and sent e-mail explanations regarding IPC 17 to DRDP Timisoara / 5r3 - Mining Royalty Fee_Financial Implications_Changes in Law / Daily Site Journal / Daily Activity ProgramTu1119.0018.3014,00-15,008.00DRDP Timisoara - LOT 6 - clarifications IPC 17 and VO's / Daily Site Journal / Daily Activity ProgramWe1219.0018.3014,00-15,008.00DRDP Timisoara - LOT 6 - clarifications IPC 17, survey Valea Mic, quantities Valea Mic, Editing Minute of Appendix of 20th dec 2013, Taking - Over Minute, Variation Orders / Daily Site Journal / Daily Activity ProgramTh1319.0018.3014,00-15,008.00DRDP Timisoara - LOT 6 - clarifications IPC 17, survey Valea Mic, quantities Valea Mic, Editing Minute of Appendix of 20th dec 2013, Taking - Over Minute, Variation Orders / Daily Site Journal / Daily Activity ProgramFr1419.0018.3014,00-15,008.00Preaparing Breakdown GI 06 / Daily Activity Program / Daily site JournalSa1519.0018.3014,00-15,008.00Preaparing IPC 13 - Supporting DocumentsSu16Mo1719.0018.3014,00-15,008.00IPS 13 - Supporting Document / Daily Measurements - CUlverts / Daily Activity Program / Daily site JournalTu1819.0018.3014,00-15,008.00IPS 13 - Supporting Document / Daily Measurements - Cantilevers / Daily Activity Program / Daily site JournalWe1919.0018.3014,00-15,008.00IPS 13 - Supporting Document / General Items_Print_Scan / Daily Activity Program / Daily site JournalTh2019.0018.3014,00-15,008.00Handing over the IPS 13 at Targu Jiu_Engineer Office / Daily Activity Program / Daily Site JournalFr2119.0018.3014,00-15,008.00Daily Measurements - Bridges / Daily Activity Program / Daily site JournalSa22Su23Mo2419.0018.3014,00-15,008.00Preparing Breakdowns_ E14 - Umplutura cu Material Drenant / Preparing Breakdowns _ MS5 - Parapet New Jersey pe zid de sprijin / Daily Activity Program / Daily Site JournalTu2519.0018.3014,00-15,008.00Study for preparation of Breakdowns_ B38 - Injectare fisuri cu rasini epoxidice, E13 - 4 _ Excavarea in roci stancoase cu exploziv , B72 - Derocare stanca - fara explozibil / CO 07 - Console din beton armat / Daily Activity Program / Daily Site JournalWe2619.0018.3014,00-15,008.00Preparing Breakdowns_ E13 - 4 _ Excavarea in roci stancoase cu exploziv , B72 - Derocare stanca - fara explozibil / Daily Activity Program / Daily Site JournalTh2719.0018.3014,00-15,008.00Preparing Breakdowns CO 07 - Console din beton armat / Daily Activity Program / Daily Site JournalFr2819.0018.3014,00-15,008.00Preparing Photographic Report _ february 2014TOTAL21168.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul26021281Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:2/28/14

ore lucrate168Verificare 00.00Rata /or10Curs 18 dec4.4978Val (Lei)7,556.30Data ncepere contract:5-Feb-13Data finalizare contract:1-Aug-15Azi suntem n data de:31-Jan-14Total zile de contract:907Total zile scurse:360Total zile rmase:547

Martie 2014Month/Mes:Martie / Marzo / MarchName of Company: S.C. INTEGRAL DESIGN S.R.L.Year/Ao:2014Employee's Name: Crlig Constantin - FlorinTitle: QUANTITY SURVEYOR (5R3)Contract Number: 3080-003/13-din 05.02.2013

MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALMartie / Marzo / March

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulMo319.0018.3014,00-15,008.00In Tg Jiu at Engineer Office for IPC 05 - 5r3 / Taking Pictures for Photographic Report - February 2014 / Daily Site Journal / Daily Activity ProgramTu419.0018.3014,00-15,008.00Preparing Photo Report / Monthly Report - under construction / Daily Site Journal / Daily Activity ProgramWe519.0018.3014,00-15,008.00Mesurement of real DDE quantities vertical signal on LOT 6 - Caransebes Bypass / Monthly Report - under construction / Daily Site Journal / Daily Activity ProgramTh619.0018.3014,00-15,008.00Mesurement of real DDE quantities vertical signal on LOT 6 - Caransebes Bypass / Monthly Report - under construction / Daily Site Journal / Daily Activity ProgramFr719.0018.3014,00-15,008.00Measurement LOT 6 - Vertical Signal DDE, for VO signals and markings / Daily Site Journal / Daily Activity ProgramSa8Su9Mo1019.0018.3014,00-15,008.00In Tg Jiu at Engineer Office for IPC 05 - 5r3 / Taking Pictures for Photographic Report - March 2014 / Daily Site Journal / Daily Activity ProgramTu1119.0018.3014,00-15,008.00Breakdows 5r3 / Clarifications Liliana Toma, LOT6 - IPC 17 - Return of Retention Money / Daily Site Journal / Daily Activity ProgramWe1219.0018.3014,00-15,008.00Breakdows 5r3 / Clarifications Liliana Toma, LOT6 - IPC 17 - Return of Retention Money / Daily Site Journal / Daily Activity ProgramTh1319.0018.3014,00-15,008.00Breakdows 5r3 / Daily Site Journal / Daily Activity ProgramFr1419.0018.3014,00-15,008.00Breakdows 5r3 / Daily Site Journal / Daily Activity ProgramSa15Su16Mo1719.0018.3014,00-15,008.005R3 - IPS14 / Daily Site Journal / Daily Activity ProgramTu1819.0018.3014,00-15,008.005R3 - IPS14 / LOT 6 - Prepare Electronic Statement at Completion for Liliana Toma and Doru Borlovan / Daily Site Journal / Daily Activity ProgramWe1919.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Culverts / 5r3 - Daily Site Journal / 5r3 - Daily Activity ProgramTh2019.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Materials / LOT 6 - Arrangements with Liliana Toma regarding IPC17 for Andrew Inmann arrival on 25th March / 5r3 Daily Site Journal / 5r3 Daily Activity Program / 5r3 - Taking pictures for Monthly Report - March / Taking contact with Subcontractor's staff for Daily Activity SheetsFr2119.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity ProgramSa22Su23Mo2419.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity Program / LOT 6 - Get knowledge about SAT in preparation for Tomorrow meeting with DRDP Timisoara Engineer RepresentativesTu2519.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity Program / LOT 6 - Meeting with DRDP Timisoara Engineer Representatives - presenting the SAT for LOT 6 and planning a schedule of workWe2619.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity Program / LOT 6 - Overview IPS 19 in relation with SAC (for DRDP Timisoara)Th2719.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Went to site for pictures in preparation of Photo Report - March 2014Fr2819.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Preparating of Photo Report - March 2014. Went on site with technical office to analize consola in specific areas.Sa2919.0018.3014,00-15,008.005R3 - Daily Site Journal / 5r3 Daily Activity Program / LOT 6 - Overview IPS 19 in relation with SAC (for DRDP Timisoara) , VO 11 and VO 12 Vertical Signal and Horizontal MarkingsSu30Mo3119.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Preparating of Photo Report - March 2014.Preparing the Monthly Report _ March 2014TOTAL22176.00Summary of Days Worked To Date20-Feb-14ContractTOTALPreviousThis MonthCumul28122303Employee's SignatureGeneral ManagerProject Manager2856Crlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin20-Mar-1417-Apr-14Date:3/31/14

ore lucrate176Verificare 00.00Rata /or10Curs 18 dec4.4553Val (Lei)7,841.33Data ncepere contract:5-Feb-13Data finalizare contract:1-Aug-15Azi suntem n data de:1-Apr-14Total zile de contract:907Total zile scurse:420Total zile rmase:487

Aprilie 2014Month/Mes:Aprilie / Abril / AprilName of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin - FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din 05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481Aprilie / Abril / AprilPn la main:20-Jun-14DayDateDays WorkedHourWork DescriptionOBS.Azi suntem n data de:30-Apr-14ArrDepBreakCumulTu119.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Preparating of Photo Report - March 2014.Preparing the Monthly Report _ March 2014Total zile rmase:51We219.0018.3014,00-15,008.00Went ot Tg Jiu at Hyder, engineer office to close the Daily Site Journal for March 2014 / 5r3 Daily Activity Program / Taking Pictures for Photo Report - April 2014. / Preparing the Monthly Report _ March 2014Th319.0018.3014,00-15,008.005R3 - IPS14 / Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Preparing the Monthly Report _ March 2014Fr419.0018.3014,00-15,008.00LOT 6 - Discutions on IPC at Completion / 5R3 - IPS14 / Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Preparing the Monthly Report _ March 2014 - scan, copies, bounding - ready to be sent to Engineer up to 7th of March according with the contract.Sa5Su6Mo719.0018.3014,00-15,008.00LOT 6 - Ask clarifications about the time of completing a determination / LOT 6 - Answer to Dragos Enasescu's e-mail regarding A027B justifications / 5R3 - Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Send Monthly Report _ March 2014. Tu819.0018.3014,00-15,008.00LOT 6 - Finalyse and send explanations for A027b/ 5R3 - Preparing daily site journal - blank, for subcontractors / Daily measurements - Slope protection / Daily measurements - culverts / Daily Activity Program / Daily Site Journal We919.0018.3014,00-15,008.00LOT 6 - Finalyse and send explanations for A027b/ 5R3 - Preparing daily site journal - blank, for subcontractors / Daily measurements - Slope protection / Translating Index for Informe tecnico/ Daily measurements - culverts / Daily Activity Program / Daily Site Journal Th1019.0018.3014,00-15,008.005R3 - Daily measurements - Bridge 125+320 / Daily measurement - Culverts / Translating Informe tecnico/ Daily Activity Program / Daily Site Journal Fr1119.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating Informe tecnico/ Daily Activity Program / Daily Site Journal Sa1219.0013.004.005R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating Informe tecnico/ Daily Activity Program / Daily Site Journal Su13Mo1419.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating Informe tecnico/ Daily Activity Program / Daily Site Journal Tu1519.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating Informe tecnico/ Daily Activity Program / Daily Site Journal We1619.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Daily Activity Program / Daily Site Journal / Working on Photo Report for April 2014Th1719.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Daily Activity Program / Daily Site Journal / Working on Photo Report for April 2014Fr1819.0018.3014,00-15,008.005R3 - Daily measurements - Update IPS 14 - under construction / Daily Activity Program / Daily Site Journal / Working on Photo Report for April 2014Sa19Su20EASTERMo21Second Day of EASTERTu2219.0018.3014,00-15,008.005R3 - Daily measurements - Update IPS 14 - under construction / Daily Activity Program / Daily Site Journal / Working on Photo Report for April 2014We2319.0018.3014,00-15,008.00Targu Jiu at Engineer office to sign the Daily Site Journal / LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site JournalTh2419.0018.3014,00-15,008.00LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site JournalFr2519.0018.3014,00-15,008.00LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since the FEDR Dep in Transport Ministry is looking to cut them / 5R3 - Daily Activity Program / Daily site JournalSa2619.0018.3014,00-15,008.00LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site JournalSu27Mo2819.0018.3014,00-15,008.005R3 - Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since the FEDR Dep in Transport Ministry is looking to cut them / LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site JournalTu2919.0018.3014,00-15,008.005R3 - Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since the FEDR Dep in Transport Ministry is looking to cut them / LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site JournalWe3019.0018.3014,00-15,008.00LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since the FEDR Dep in Transport Ministry is looking to cut them / 5R3 - Daily Activity Program / Daily site JournalTOTAL23180.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul30323326Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:4/30/14

ore lucrate184Verificare 0-4.00Rata /or10Curs 18 dec4.4600Val (Lei)8,206.40

Mai 2014Month/Mes:Mai / May / MaioName of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin - FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din 05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481Mai / May / Maio

DayDateDays WorkedHourWork DescriptionOBS.Pn la main:20-Jun-14ArrDepBreakCumulAzi suntem n data de:30-May-14Th119.0018.3014,00-15,008.005R3 - Preparing photograph for Photo Monthly Report - April 2014 / Preparing Monthly Report - April 2014 / 5R3 - Daily Site Journal / Daily Activity ProgramFr219.0018.3014,00-15,008.005R3 - Preparing Monthly Report - April 2014 - Scan / 2 Copies / Bounding - as final preparation to be ready for sent / LOT 6 - Review answer prepared by TEA for DRDP Timisoara and prepare papers to be sent to DRDP accordingly. / 5R3 - Daily Site Journal / Daily Activity ProgramTotal zile rmase:21Sa3Su4Mo519.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / Working on Photo Report for April 2014 / 5R3 - Daily Site Journal / Daily Activity ProgramTu619.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / Daily Activity Program / Daily Site Journal / Working on Photo Report for April 2014 / LOT 6 - speak with Marius Pirnuta about VO11/12/13 - sent by e-mail previously named document for review in preparation for the next week meeting / 5R3 - Daily Site Journal / Daily Activity ProgramWe719.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily Activity Program / Prepare answer for AM POSTTh819.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily Activity Program / LOT 6 - Final preparation support documents for TEA in order to send an answer to DRDP TIMISOARA - BoQFr919.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily Activity Program / LOT 6 - Final preparation support documents for TEA in order to send an answer to DRDP TIMISOARA - Variation OrdersSa10111.0016.005.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily Activity Program Su11Mo1219.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily Activity Program / LOT 6 - Final preparation support documents for TEA, PM-s in order to send an answer to DRDP TIMISOARA - Variation Orders / Preparations for tomorrow meeting with DRDP Timisoara and with CNADNRTu1319.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR representative Marius Pirnuta / / 5r3 - Daily Site Journal / Daily Activity ProgramWe1419.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR representative Marius Pirnuta . Also at the meeting attended David Saiz, Marian Copilu and Liliana Dimitriu / / 5r3 - Daily Site Journal / Daily Activity ProgramTh1519.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR representative Marius Pirnuta . Also at the meeting attended Liliana Dimitriu / / 5r3 - Daily Site Journal / Daily Activity ProgramFr1619.0018.3014,00-15,008.00LOT 6 - Preparation of Minute of the discutions held durring the week / Ask lette VO9 to Liliana Toma / Send the Minute to all participants at the meeting / Make a plan of solving the issues on SaC and PM along with Oscar / / 5R3 - Update the quantities - collect the datas from production department / Daily Site Journal / Daily Activity ProgramSa17112.0016.004.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily Activity Program Su18Mo1919.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily Activity Program / LOT 6 - Final preparation support documents for TEA, PM-s in order to send an answer to DRDP TIMISOARA - Variation Orders / Preparations for tomorrow meeting with DRDP Timisoara and with CNADNRTu2019.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal / Daily Activity ProgramWe2119.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal / Daily Activity ProgramTh2219.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal / Daily Activity ProgramFr2319.0018.3014,00-15,008.00LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal / Daily Activity ProgramSa2419.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / Preparing the IPS no. 14 / 5r3 - Daily Site Journal / Daily Activity Program Su25Mo2619.0018.3014,00-15,008.005R3 - Daily measurements - Escalation, Materials / Preparing the IPS no. 14 / 5r3 - Daily Site Journal / Daily Activity Program Tu2719.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramWe2819.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramTh2919.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC also way to Casansebes, in the firs part of the day - to check on site the step dichs, the ditches and the quantities on roundabouts / 5r3 - Daily Site Journal / Daily Activity ProgramFr3019.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramSa31TOTAL25193.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul32625351Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:5/30/14

ore lucrate193.Verificare 00.00Rata /or10Curs4.3963Val (Lei)8,484.86

Iunie 2014Month/Mes:Iunie / June / JunioName of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin - FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din 05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481Iunie / June / Junio

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulMo219.0018.3014,00-15,008.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity ProgramPn la main:26-Jun-14Tu319.0018.3014,00-15,008.005R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity ProgramAzi suntem n data de:1-Jul-14We419.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramTotal zile rmase:-5Th519.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramFr619.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramSa7Su8Mo919.0018.3014,00-15,008.005R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity ProgramTu1019.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramWe1119.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramTh1219.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramFr1319.0018.3014,00-15,008.005R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity ProgramSa14111.0016.005.005R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily Activity Program carlosSu15Mo1619.0018.3014,00-15,008.005R3 - Daily measurements - Escalation, Materials / Preparing the IPS no. 14 / 5r3 - Daily Site Journal / Daily Activity Program Tu1719.0018.3014,00-15,008.005R3 - Daily measurements, Receiving Minutes from Quality Department (Proces verbal - Podete / Console) and keeping accounts of the work in relation with production to build the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity ProgramWe1819.0018.3014,00-15,008.005R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS 14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity ProgramTh1919.0018.3014,00-15,008.00LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios regarding SaC / 5r3 - Daily Site Journal / Daily Activity ProgramFr2019.0018.3014,00-15,008.00LOT 6 - VO 14 - PM 10 / 5r3 - Daily Site Journal / Daily Activity ProgramSa21Su22Mo2319.0018.3014,00-15,008.00LOT 6 - VO 14 - PM 10 / 5r3 - Daily Site Journal / Daily Activity ProgramTu2419.0018.3014,00-15,008.00LOT 6 - VO 14 - PM 09 and Overpassed quantities summary sheets / 5r3 - Daily Site Journal / Daily Activity ProgramWe2519.0018.3014,00-15,008.00LOT 6 - went to Caransebes for signature on Variation Orders VO13 meeting DRDP representatives, Dragos Enasescu and Doru borlovan / 5r3 - Daily Site Journal / Daily Activity ProgramTh2619.0018.3014,00-15,008.00LOT 6 - preparation of summary for VO13 / 5r3 - Daily Site Journal / Daily Activity ProgramFr2719.0018.3014,00-15,008.00LOT 6 - preparation of summary for VO13 / 5r3 - Daily Site Journal / Daily Activity ProgramSa28Su29Mo3019.0018.3014,00-15,008.00LOT 6 - preparation of summary for VO13 / 5r3 - Daily Site Journal / Daily Activity ProgramTOTAL22173.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul35122373Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:6/30/14

ore lucrate173Verificare 00.00Rata /or10Curs4.3963Val (Lei)7,605.60

Iulie 2014Month/Mes:Iulie / July / JulioName of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin - FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din 05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481Iulie / July / Julio

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulTu119.0018.3014,00-15,008.00LOT 6 - preparation of 2 copies for VO13 - overpass quantities / 5r3 - Daily Site Journal / Daily Activity ProgramPn la main:20-Jun-14We219.0018.3014,00-15,008.00LOT 6 - preparation of 2 copies for VO13 - PM's / 5r3 - Daily Site Journal / Daily Activity ProgramAzi suntem n data de:30-Jun-14Th319.0018.3014,00-15,008.00LOT 6 - VO 13 - scanning and packaging to be sent to Buchares / 5r3 - Daily Site Journal / Daily Activity ProgramTotal zile rmase:-10Fr419.0018.3014,00-15,008.005r3 - Preparing Monthly Report - June 2014 / 5r3 - Daily Site Journal / Daily Activity Programa venit pe 26 iunie 2014Sa5Su6Mo719.0018.3014,00-15,008.005r3 - Materials on Site / Daily Measurements - slope protection / 5r3 - Daily Site Journal / Daily Activity ProgramTu819.0018.3014,00-15,008.005r3 - Materials on Site / Daily Measurements - culverts / 5r3 - Daily Site Journal / Daily Activity ProgramWe919.0018.3014,00-15,008.005r3 - Materials on Site / Daily Measurements - culverts, earthworks / 5r3 - Daily Site Journal / Daily Activity ProgramTh1019.0018.3014,00-15,008.005r3 - Went on Tg Jiu at Engineer Office with Antonio - disscution over IPS / Daily Site Journal / Daily Activity Program Fr1119.0018.3014,00-15,008.005r3 - Materials on Site / Daily Measurements - general items / 5r3 - Daily Site Journal / Daily Activity ProgramSa12Su13Mo1419.0018.3014,00-15,008.00Preparing summary tabels for IPS 14 in order to send the IPS to Engineer / 5r3 - Daily Site Journal / Daily Activity ProgramTu1519.0018.3014,00-15,008.00Preparing summary tabels for IPS 14 in order to send the IPS to Engineer / Sent the IPS to Engineer - the letter and a summary / 5r3 - Daily Site Journal / Daily Activity ProgramWe1619.0018.3014,00-15,008.00Receiving documents from the Quality Department (culverts) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity ProgramTh1719.0018.3014,00-15,008.00Receiving documents from the Quality Department (culverts, contilevels, slope protection) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity ProgramFr1819.0018.3014,00-15,008.00Receiving documents from the Quality Department (culverts, contilevels, slope protection, earthworks ) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity ProgramSa1919.0018.3014,00-15,008.00Receiving documents from the Quality Department (culverts, contilevels, slope protection, earthworks ) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity ProgramSu20Mo2119.0018.3014,00-15,008.00Went to Tg Jiu with supporting documents for IPS 14 - Receiving documents from the Quality Department (culverts, contilevels, slope protection, earthworks ) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity ProgramTu2219.0018.3014,00-15,008.005r3 - Materials on Site - Summary for IPS 14 - see the last attachents for the months of May, June ,July 2014 / 5r3 - Daily Site Journal / Daily Activity ProgramWe2319.0018.3014,00-15,008.005r3 - Materials on Site - Summary for IPS 14 - see the last attachents for the months of May, June ,July 2014 / 5r3 - Daily Site Journal / Daily Activity ProgramTh2419.0018.3014,00-15,008.00At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity ProgramFr2519.0018.3014,00-15,008.00At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity ProgramSa26Su27Mo2819.0018.3014,00-15,008.00LOT 6 - Clarifing tabels for Liliana Toma in order to close the VO13 / 5R3 - Summary of Materials on Site - Preparing the final attachments for IPS 14 / 5r3 - Daily Site Journal / Daily Activity ProgramTu2919.0018.3014,00-15,008.00At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity ProgramWe3019.0018.3014,00-15,008.00At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity ProgramTh3119.0018.3014,00-15,008.00At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity ProgramTOTAL24192.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul37324397Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:7/29/14

ore lucrate192Verificare 00.00Rata /or10Curs4.3873Val (Lei)8,423.62

August 2014Month/Mes:August / August / AgostoName of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin - FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data de:7-Apr-14Contract Number: 3080-003/13-din 05.02.2013 Total zile de contract:907Total zile scurse:426MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:481August / August / Agosto

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulFr119.0018.3014,00-15,008.005r3 - Daily Measurements / Daily Site Journal / Daily Activity ProgramAm primit masina pe:26-Jun-14Sa2115.0017.004.005r3 - Preparing the Monthly Report - July 2014Azi suntem n data de:6-Aug-14Su3Total zile de cand am masina:41Mo419.0018.3014,00-15,008.005r3 - At Engineer Office in Tg Jiu for IPS 14 / Preparing the Monthly Report - July 2014 / Daily Site Journal / Daily Activity ProgramTu519.0018.3014,00-15,008.00LOT 5 - summary table for VO13 asked by Liliana Toma / Preparing the Monthly Report for July 2014 / 5r3 - Daily Site Journal / Daily Activity ProgramWe619.0018.3014,00-15,008.005r3 - Preparing the Photo Report for July 2014 to be sent / 5r3 - Daily Site Journal / Daily Activity ProgramTh719.0018.3014,00-15,008.00IPS 14 - daily measurements, Receiving documents from the Quality Department - calculations, processing in order to be sent and attached to IPC 06 - Daily Site Journal - Daily Activity ProgramFr819.0018.3014,00-15,008.00IPS 14 - Went to Tg Jiu at engineer office to hand over the documents - calculations in order to be sent and attached to IPC 06 - Daily Site Journal - Daily Activity ProgramSa9Su10Mo1119.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site Journal - Daily Activity ProgramTu1219.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Receiving documents from the Quality Department - calculations, processing in order to be sent and attached to IPC 06 - Daily Site Journal - Daily Activity ProgramWe1319.0018.3014,00-15,008.00Went to Tg Jiu with supporting documents for IPS 14 - Receiving documents from the Quality Department (culverts, contilevels, slope protection, earthworks ) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity ProgramTh1419.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site Journal - Daily Activity ProgramFr1519.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site Journal - Daily Activity ProgramSa16Su17Mo1819.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site Journal - Daily Activity ProgramTu1919.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site Journal - Daily Activity ProgramWe2019.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site Journal - Daily Activity ProgramTh2119.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site Journal - Daily Activity Program Fr2219.0018.3014,00-15,008.00IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Scanning - Copies for CNADNR final preparation before sending - Daily Site Journal - Daily Activity Program Sa23Su24Mo2519.0018.3014,00-15,008.00IPS 15 - Under Construction - Summaries of Unpaied items - planning works for the ongoing IPS - Daily Site Journal - Daily Activity Program Tu2619.0018.3014,00-15,008.00IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program We2719.0018.3014,00-15,008.00IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program Th2819.0018.3014,00-15,008.00IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program Fr2919.0018.3014,00-15,008.00IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program Sa30111.0019.008.005r3 - Stating Prepartion of the Monthly Report - August 2014 / IPS 15 - Under Construction - Summary Sheet for IPS 15 items - General Items - Daily Site Journal - Daily Activiy ProgramSu31TOTAL23180.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul39723420Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:8/29/14

ore lucrate184Verificare 0-4.00Rata /or10Curs4.4008Val (Lei)8,097.47

Septembrie 2014Month/Mes:Septembrie / September / SeptiembreName of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin - FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data de:30-Sep-14Contract Number: 3080-003/13-din 05.02.2013 Total zile de contract:907Total zile scurse:602MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:305Septembrie / September / Septiembre

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulMo119.0018.3014,00-15,008.005r3 - Preparing IPS 15 / Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity ProgramA venit masina pe:26-Jun-14Tu219.0018.3014,00-15,008.005r3 - Preparing IPS 15 - at Tg Jiu meeting with road engineer to clarify the supporting documents/ Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity ProgramAzi suntem n data de:27-Sep-14We319.0018.3014,00-15,008.005r3 - Preparing IPS 15 - at Tg Jiu meeting with road engineer to clarify the supporting documents/ Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity ProgramTotal zile de cand am masina:93Th419.0018.3014,00-15,008.005r3 - Preparing IPS 15 / Preparing the Monthly Report - August 2014, scan, copies, forwarding letter / Daily Site Journal / Daily Activity ProgramFr519.0018.3014,00-15,008.005r3 - Preparing IPS 15 - at Tg Jiu meeting with QS in order to hand over and to present the content of IPS / Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity ProgramSa619.0018.3014,00-15,008.00Daily Measurents - Cantilevels, Culverts, Earthworks / Daily Site Journal / Daily Activity ProgramSu7Mo8Tu9We10VACANTATh11Fr12Sa13Su14Mo1519.0018.3014,00-15,008.005r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in order to Support building of the IPC / Daily Site Journal / Daily Activity ProgramTu1619.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily Site Journal - Daily Activity ProgramWe1719.0018.3014,00-15,008.00IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily Site Journal - Daily Activity ProgramTh1819.0018.3014,00-15,008.00IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily Site Journal - Daily Activity ProgramFr1919.0018.3014,00-15,008.00IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily Site Journal - Daily Activity ProgramSa2019.0018.3014,00-15,008.00IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily Site Journal - Daily Activity ProgramSu21Mo2219.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at engineer office for final preparations, scan, copies of the IPC in order to e sent to Employer / Daily Site Journal - Daily Activity ProgramTu2319.0018.3014,00-15,008.00IPS 16 - Starting prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks and culverts / Daily Site Journal - Daily Activity ProgramWe2419.0018.3014,00-15,008.00IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks and culverts / Daily Site Journal - Daily Activity ProgramTh2519.0018.3014,00-15,008.00IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks and culverts / Daily Site Journal - Daily Activity ProgramFr2619.0018.3014,00-15,008.00IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks and culverts / Daily Site Journal - Daily Activity ProgramSa27111.0019.0014,00-15,008.00IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks and culverts / Daily Site Journal - Daily Activity ProgramSu28Mo2919.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at engineer office for final preparations, scan, copies of the IPC in order to e sent to Employer / Daily Site Journal - Daily Activity ProgramTu3019.0018.3014,00-15,008.00IPS 16 - Starting prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks and culverts / Daily Site Journal - Daily Activity ProgramTOTAL20160.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul42020440Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:9/29/14

ore lucrate160Verificare 00.00Rata /or10Curs4.4152Val (Lei)7,064.32

Octombrie 2014Month/Mes:Octombrie / October / OctubreName of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin - FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data de:30-Sep-14Contract Number: 3080-003/13-din 05.02.2013 Total zile de contract:907Total zile scurse:602MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:305Octombrie / October / Octubre

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulWe119.0018.3014,00-15,008.005r3 - Preparing IPS 16 - at Tg Jiu meeting with road engineer to clarify the supporting documents/ Preparing the Monthly Report - September 2014 / Daily Site Journal / Daily Activity ProgramA venit masina pe:26-Jun-14Th219.0018.3014,00-15,008.005r3 - Preparing IPS 16 / Preparing the Monthly Report - September 2014, scan, copies, forwarding letter / Daily Site Journal / Daily Activity ProgramAzi suntem n data de:29-Oct-14Fr319.0018.3014,00-15,008.005r3 - Preparing IPS 16 / Preparing the Monthly Report - September 2014, scan, copies, forwarding letter / Daily Site Journal / Daily Activity ProgramTotal zile de cand am masina:125Sa4Su5Mo619.0018.3014,00-15,008.005r3 - Preparing IPS 16 - Daily Measurements - culvers / Daily Site Journal / Daily Activity ProgramTu719.0018.3014,00-15,008.005r3 - Preparing IPS 16 - Daily Measurements - contilevels / Daily Site Journal / Daily Activity ProgramWe819.0018.3014,00-15,008.005r3 - Preparing IPS 16 - Daily Measurements - earthworks / Daily Site Journal / Daily Activity ProgramTh919.0018.3014,00-15,008.005r3 - Preparing IPS 16 - Daily Measurements - slope protection / Daily Site Journal / Daily Activity ProgramFr1019.0018.3014,00-15,008.005r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in order to Support building of the IPC / Daily Site Journal / Daily Activity ProgramSa1119.0018.3014,00-15,008.005r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in order to Support building of the IPC / Daily Site Journal / Daily Activity ProgramSu12Mo1319.0018.3014,00-15,008.005r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in order to Support building of the IPC / Daily Site Journal / Daily Activity ProgramTu1419.0018.3014,00-15,008.00Preparing Table - cost for General Items - Variation Order 01.v1 / Daily Site Journal - Daily Activity ProgramWe1519.0018.3014,00-15,008.00Preparing Table - cost for General Items - Variation Order 01.v2 / Daily Site Journal - Daily Activity ProgramTh1619.0018.3014,00-15,008.00IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity ProgramFr1719.0018.3014,00-15,008.00IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity ProgramSa18Su19Mo2019.0018.3014,00-15,008.00IPS 16 - Daily Measurements/ Preparing Table - quantitier for H4B - Variation Order 02.v1 / Daily Site Journal - Daily Activity ProgramTu2119.0018.3014,00-15,008.00IPS 16 - Daily Measurements/ Preparing Table - quantitier for H4B - Variation Order 02.v2 / Daily Site Journal - Daily Activity ProgramWe2219.0018.3014,00-15,008.00IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity ProgramTh2319.0018.3014,00-15,008.00IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity ProgramFr2419.0018.3014,00-15,008.00IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks and culverts / Daily Site Journal - Daily Activity ProgramSa25Su26Mo2719.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS office to talk about the status of and to clarify issues, if any / Daily Site Journal - Daily Activity ProgramTu2819.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily Activity ProgramWe2919.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily Activity ProgramTh3019.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily Activity ProgramFr3119.0018.3014,00-15,008.00IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily Activity ProgramTOTAL24192.00Summary of Days Worked To DateContractTOTALPreviousThis MonthCumul44024464Employee's SignatureGeneral ManagerProject ManagerCrlig Constantin-FlorinCarlos GalidoAntonio Jose Seve Martin

Date:10/29/14

ore lucrate192Verificare 00.00Rata /or10Curs4.4152Val (Lei)8,477.18

Noiembrie 2014Month/Mes:Noiembrie / November / NoviembreName of Company: S.C. INTEGRAL DESIGN S.R.L.Data ncepere contract:5-Feb-13Year/Ao:2014Employee's Name: Crlig Constantin - FlorinData finalizare contract:1-Aug-15Title: QUANTITY SURVEYOR (5R3)Azi suntem n data de:30-Sep-14Contract Number: 3080-003/13-din 05.02.2013 Total zile de contract:907Total zile scurse:602MONTHLY TIME SHEET / HOJA DE ASISTENCIA MENSUALTotal zile rmase:305Noiembrie / November / Noviembre

DayDateDays WorkedHourWork DescriptionOBS.ArrDepBreakCumulSa119.0018.3014,00-15,008.005r3 - Preparing IPC 08 at Petrosani with Hyder's QS Su2Mo319.0018.3014,00-15,008.005r3 - IPC 08 - At Tg Jiu - final preparations for sending the IPC to Employer / Daily site Jurnal / Daily Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - in preparation for IPS 17A venit masina pe:26-Jun-14Tu419.0018.3014,00-15,008.005r3 - Went on Site - Meeting with mr. Chesnoiu posponed for tomorrow / Daily site Jurnal / Daily Activity Program / Summary of payments - PAVEMENT-BALLAST-CRUSHED STONE-AB2-MILLING- in preparation for IPS 17Azi suntem n data de:7-Nov-14We519.0018.3014,00-15,008.005r3 - Went on Site - Meeting with mr. Chesnoiu posponed for tomorrow / Daily site Jurnal / Daily Activity Program / Summary of payments - CONSOLIDATIONS-SLOPE PROTECTION - BARRIERS - TORRENT BARRIER start CANTILEVERS - in preparation for IPS 17Total zile de cand am masina:134Th619.0018.3014,00-15,008.005r3 - Went on Site - Meeting with mr. Chesnoiu - talking problems regarding cantilevel papers / Bringing Papers / VO-3 preparation of quantities tables / Daily site Jurnal / Daily Activity Program / Fr719.0018.3014,00-15,008.005r3 - Went on Site - Measuring concrete guard rails demolition and retaing wall demolitions on culverts / Final review and preparation of the VO3 quantities table - Slope Protection / Record papers of cantilevels / Daily site Jurnal / Daily Activity Program / Sa819.0018.3014,00-15,008.005r3 - Office paper work - Records of Cantilevers / Daily site Jurnal / Daily Activity Program / Su95r3 - Photo Monthly Report / Daily site Jurnal / Daily Activity Program / Mo1019.0018.3014,00-15,008.005r3 - Went on Site - Measuring concrete guard rails demolition and retaing wall demolitions on culverts / Record of prepared papers for cantilevels / Daily site Jurnal / Daily Activity Program / Tu1119.0018.3014,00-15,008.005r3 - Went of Site to Arrange a Meeting Between Topo Dep and Mr. Chesnoiu to clarify the issue of milling for certification / Discutition over the Barriers for Torrents in order to clarify the papers for payment (it results that the papers are not clear for this type of works ) / also discutions to clarify RNC 38 and 32 - discutions are on deadlock, since the solution for RNC 32 is a new solution and it has no approval, no notification prepared by Contractor => dificulty in chargeing/cobrar the works / Record papers of cantilevels / Daily site Jurnal / Daily Activity Program / We1219.0018.3014,00-15,008.005r3 - Went on Tg. Jiu at Engineer Office to meet mr. Chesnoiu to clarrify the problems with the Cantilevers / Picking up papers for Certification / Record papers of cantilevels / Daily site Jurnal / Daily Activity Program / Th1319.0018.3014,00-15,008.00Went on site to measure the Cantilevers 118+376 and 118+485 for clarifications regarding the IPS / Record of demolition of concrete guard rails and existing retaining walls on Culverts / Daily Site Journal / Daily Activity Program.Fr1419.0018.3014,00-15,008.00Record of Milling / Reevaluatioan of total quantities on slope protection an preparation of the financial impact on this issue / Daily Site Journal / Daily Activity Program / Sa1519.0018.3014,00-15,008.00Montly Report - oct 2014 Su16Mo1719.0018.3014,00-15,008.005r3 - Monthly Report - oct 2014 / Record of received papers / Preparing summary on New Jersey (as material on site) issue / Preparing an Economical Impact Table with Issues On IPC 09 / Daily site Jurnal / Daily Activity Program / Tu1819.0018.3014,00-15,008.005r3 - Record of received papers - printing and went on Tg Jiu tu Engineer Office to present them and register them / Tracking the way papers are prepared for the Certification / Daily Site Journal / Daily Activity Program / We1919.0018.3014,00-15,008.005r3 - Record of received papers - printing / Tracking the way papers are prepared for the Certification / Daily Site Journal / Daily Activity Program / Th2019.0018.3014,00-15,008.005r3 - Record of received papers - printing and went on Tg Jiu tu Engineer Office to present them and register them / Tracking the way papers are prepared for the Certification / Daily Site Journal / Daily Activity Program / Fr2119.0018.3014,00-15,008.005r3 - Record of received papers - printing and went on Tg Jiu tu Engineer's QS Office to present them and register them / Went on Road Engineer office to receive supporting documents and also to clarify the issue with the tables for the variations on milling and on AB2 that is going to replace the BAD / Tracking the way papers are prepared for the Certification / Daily Site Journal / Daily Activity Program / Sa2219.0018.3014,00-15,008.005r3 - Record of supporting documents in order to be prepared whan the quality documents are about to have the final signatures / Also - record of cantilevels for comparation beetwen the figures from production and the certified figures / Daily Site Journal / Daily Activity Program / Su23Mo2419.0018.3014,00-15,008.005r3 - Record of supporting documents in order to be prepared whan the quality documents are about to have the final signatures / Also - record of cantilevels for comparation beetwen the figures from production and the certified figures / Daily Site Journal / Daily Activity Program / Tu2519.0018.3014,00-15,008.00IPC 09 - preparation on Tg Jiu (last day / postoned for tommorow) We2619.0018.3014,00-15,008.00Final preparations on supporting documents along with Quality Department and Topo department / IPC 09