00 fittons pq index 09 june 09fittonsc.com/wp-content/uploads/2012/11/company-profile.pdf · al ain...

76
YOUR PARTNER WHO CARES COMPANY PROFILE PO Box 14659, Zayed Bin Sultan Street, Al Ain, U.A.E.., Tel: 03-7640177, Fax 03-7640188

Upload: vandien

Post on 11-Apr-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

YOUR PARTNER WHO CARES

COMPANY PROFILE

PO Box 14659, Zayed Bin Sultan Street, Al Ain, U.A.E.., Tel: 03-7640177, Fax 03-7640188

INDEX

25 July 10 Page 1 of 2

Section Description

1 Introduction

2 Registration Details

3 District Cooling

4 Building Services

5 Solid Waste Handling and Recovery

6 Utility Infrastructure

7 Specialised Engineering

8 Architecture & Structures

9 Quality Assurance & Health and Safety

10 Company Structure

11 Contact Details

12 Summary CV’s of Key Personnel

13 Client’s

14 Projects

15 Detailed CV’s of Key Personnel

INDEX

25 July 10 Page 2 of 2

16 Insurance – Professional Indemnity

17 Insurance – Third Party Liability

Section 1

09 June 09 Page 1 of 1

INTRODUCTION

Fittons Engineering Consultancy LLC is a United Arab Emirates based practice that comes

with a wealth of experience both in the U.A.E. and Europe.

Fittons are committed to providing world class and buildable energy efficient “GREEN”

designs that are suitable for the environment of the Middle East yet retaining the clients high

expectations.

The company is headed by a multi disciplined U.K. Chartered Engineer who has over thirty

years professional experience and holds membership of American and several U.K.

Professional Institutions.

More than twenty three years of this professional experience has been in the United Arab

Emirates as a Consultant in District Cooling, Major Architectural Developments, Building

Services, Utility Infrastructure and Specialised Engineering Projects.

• Fittons provide expertise in the following areas:

• District Cooling

• Building Services

• Utility Infrastructure

• Vertical transportation

• Industrial Architecture

• Project Management

• Solid Waste Handling & Recovery

• Specialised Engineering i.e.

• Water Parks

• Aquariums

• Water Features

• Green Designs

Section 2

Page 1 of 1

Section 3

DISTRICT COOLING

09 June 09 Page 1 of 5

We have staff with up to ten years of

experience in the District Cooling

Industry within the U.A.E. Also Fittons

is currently engaged in Saudi Aramco’s

District Cooling Project in Dhahran as

Technical Advisor. We offer

Consultancy Services from Feasibility

studies through Master Planning and

Concept to Full Designs for Plant

Rooms, ETS’s and Reticulation Pipe

Networks.

The client has the choice to go EPC (Engineer Procure Construct) or PC (Procure Construct).

Section 3

DISTRICT COOLING

09 June 09 Page 2 of 5

With this amount of experience we know the business and our clients benefit.

Collectively our staff have around one

million TR of Design and Construction

Experience in Design District Cooling

industry prior to joining Fittons.

We save clients money by advising on

cooling loads, predicting when orders

should be placed and when

construction and build out needs to

start thus deferring capital expenditure

until necessary.

Fittons Staff have previously worked with

many of the U.A.E. District Cooling

Providers and Contractors and enjoy long

term business relationships through

achieving and delivering the promise.

Section 3

DISTRICT COOLING

09 June 09 Page 3 of 5

Fittons staff, through previous careers, have designed / executed numerous projects over the

years as follows:

Client – Saudi Aramco

1. Dhahran District Cooling Scheme – Technical Advisor 32,000 TR

Client – Tabreed

1. Ajman - DCP 1, Reticulation Network and ETS’s 22,500 TR

2. Ajman - DCP 2, Reticulation Network and ETS’s 30,000 TR

3. Fujairah - DCP, Reticulation Network and ETS’s 9,600 TR

4. Al Ain Central - DCP, Reticulation Network and ETS’s 25,000 TR

5. Al Ain - UAE University DCP, Reticulation Network and ETS’s 20,000 TR

6. Al Ain - Al Jimi DCP, Reticulation Network and ETS’s 5,300 TR

7. Towaisa Military Base – DCP, Reticulation Network and ETS’s 9,600 TR

8. Al Ain – Air College DCP, Reticulation Network and ETS’s 9,600 TR

Client – Emicool

1. Dubai – DIP - DCP 3 35,000 TR

2. Dubai – DIP - Reticulation Network 250,000 TR

Client – Dubai Festival City

1. Dubai - DFC - DCP 1 50,000 TR

2. Dubai - DFC - DCP 2 35,000 TR

3. Dubai – DFC - Reticulation Network and ETS’s 180,000 TR

Section 3

DISTRICT COOLING

09 June 09 Page 4 of 5

Client – Drake and Scull International

1. Dubai – Motor City - DCP 1 40,000 TR

2. Dubai – Motor City – DCP 2 40,000 TR

3. Dubai – Nad Al Sheba - Meydan DCP 50,000 TR

Client – Dubai Municipality

1. Dubai - Zayed University – DCP and Reticulation Network 9,600 TR

Client – Pal Technologies

1. Abu Dhabi - Saraya Development - Reticulation Network 25,000 TR

2. Abu Dhabi - Najmat Phase 1 - Reticulation Network 110,000 TR

3. Abu Dhabi – Najmat Phase 2 - Reticulation Network 60,000 TR

Client – Dhafir Contracting

1. Abu Dhabi - Muroor Street – DCP 35,000 TR

2. Abu Dhabi - Zayed Sporty City – DCP 35,000 TR

Section 3

DISTRICT COOLING

09 June 09 Page 5 of 5

Section 4

BUILDING SERVICES

09 June 09 Page 1 of 3

Over the years staff have designed Building Services for numerous prestige projects within

the U.A.E. ranging from High Tech Telecommunication Buildings through Universities,

Commercial Buildings, Residential Buildings, Retail Developments, Villas, Industrial

Facilities in both high rise and low rise forms.

MECHANICAL SERVICES

ELECTRICAL SERVICES

• HVAC

• Plumbing and Drainage

• Public Health

• Fire Protection

• SCADA Systems

• Sound and Vibration Control

• Heat Recovery Systems

• Solar Energy Systems

• Vertical Transportation

• GAS Systems

• Fire Alarm and Detection Systems

• Fire Strategies

• Building Management Systems

• Closed Circuit Television Systems

• IT and ELV Systems

• Security and Access Control

• Vehicle Management Systems

• MV and LV Systems

• Power and Lighting

Section 4

BUILDING SERVICES

09 June 09 Page 2 of 3

Design Architect - BENOY Image courtesy of BENOY

YAS ISLAND – THE RETAIL - This exotic development is by ALDAR on the Yas Island at

Abu Dhabi. The Retail is the major part of the whole development with a total built up area of

approximately 450,000 m². This mega structure is 320 meters in diameter.

Design Architect - BENOY Image courtesy of BENOY

Section 4

BUILDING SERVICES

09 June 09 Page 3 of 3

Energy efficient designs have been standard for over ten years.

Some of the major projects designed / executed in whole or part by Fittons staff in their

previous careers:

S.NO Project Title Contract

Value AED Client 1 Retail Development at Yas Island 10.0 billion ALDAR

2 Hotel, Office and Residential Development at Marina Abu Dhabi 300 million EIIC

3 Telecommunication Building for Etisalat at Abu Dhabi 180 million Etisalat

4 Transco Head Office Building at Abu Dhabi 80 million Transco

5 Residential Towers at Abu Dhabi 100 million Sheikh Tahnoon al Nahyan

6 ADWEA Control Centre at Abu Dhabi 60 million ADWEA

7 Al Bawadi Mall, Souk, Hotel and Market 600 million Alain Municipality

8 New Vegetable Fish and Meat Market Alain 65 million Alain Municipality

9 Zayed University at Ruwayya, Dubai 450 million Dubai Municipality

10 Telecommunication Building for Etisalat at Dubai 250 million Etisalat

11 Destiny Residential Tower at Dubai 300 million Chapal Group

12 Bridge Residential / Office Tower at Dubai 160 million First Group

13 The Diamond Residential Tower at Dubai 60 million First Group

14 AFTECH Data Centre at Dubai Festival City 40 million Dubai Festival City

15 Water Park in Bahrain 60 million Al Futtaim Majid

16 Nael Shopping Mall, Al Ain 200 million Nael Al Shamsi

Section 5

SOLID WASTE HANDLING & RECOVERY

16 November 2008 Page 1 of 1

In the specialised field of Solid Waste Handling and Recovery, we can offer Fully Designed

Systems and/or the usual Design and Build approach. Earlier in their careers, our engineers

gained extensive experience in designing a “State of the Art” Solid Waste Handling System

within the U.A.E. comprising:

• Dirty MRF (Sorting Station) – with automatic and manual segregation, all linked to

a central computer control system. 1200TPD.

• Transfer Stations – for remote locations to enable bulking and compacting of the

waste prior to transporting to the MRF – this saves operational costs and minimises

the number vehicles needed to transport the waste.

• Clinical Waste Incinerators – To deal with the hazardous waste generated by

hospital and clinics such as radioactive isotopes, needles, body parts etc prior to

encapsulation.

• Fallen Stock Incinerators – To deal with dead stock from farms and road accidents

etc.

• Crushing Plant – To enable re-use of Construction and Demolition Waste as road

sub-bases etc.

• Landfill Site – with properly coordinated, lined and monitored cells to ensure our

environment is not further polluted.

A COMPLETE SOLUTION for MUNICIPAL WASTE

Section 6

UTILITY INFRASTRUCTURE

16 November 2008 Page 1 of 1

Experience in utility infrastructure dates back to 1985 and covers all aspects.

• Sub Stations

• MV and LV Systems

• Functional Lighting

• Amenity Lighting

• Communications

• Road Lighting

• District Cooling Mains

• Gravity Mains

• Pressure Systems

• Pumping Stations

• Potable Water

• Irrigation

Section 7

SPECIALISED ENGINEERING

09 June 09 Page 1 of 1

We are one of few who offer experience in the engineering design and execution of:

• Swimming Pools and Spa’s

Indoor and Outdoor

Fresh Water or Salt Water

• Solid Waste Handling

Material Recovery Facility (Sorting Station)

Transfer Stations

Clinical Waste Incinerators

Fallen Stock Incinerators

Crushing Plants

Hazardous Waste

Landfills

• Industrial Facilities

• Aquariums

• Water Parks

• Water Features

Section 8

ARCHITECTURE and STRUCTURES

09 June 09 Page 1 of 1

Fittons Engineering Consultancy LLC has a license within the Emirate of Abu Dhabi for

“Engineering Consultancy for the General Building” and is at present processing a license for

Dubai.

Within Abu Dhabi, this permits us to execute any form of building architecture, structure and

associated services; we anticipate the Dubai License will be restricted to G+4 initially.

Whilst Architectural and Structural designs are available we normally limit these disciplines

to support our core Engineering Business.

Should a client wish more from Architecture, Structures or Master Planning, then Fittons

Engineering Consultancy LLC would partner with suitable local and international companies

as necessary to meet the client’s requirements.

Fittons would be the Architect of Record (AOR) and we would naturally process NOC’s and

Building Permits.

Section 9

QUALITY ASSURANCE and HEALTH & SAFETY

09 June 09 Page 1 of 1

Although not ISO 9000 certified, Fittons Engineering Consultancy LLC operates a Quality

Assurance programme in line with the requirements of ISO 9000 and a have a full Health and

Safety Policy.

A copy of our Quality Manual and the Health and Safety Policy can be provided upon request.

Section 10

COMPANY STRUCTURE

16 November 2008 Page 1 of 2

Please see the Following Document

Section 10a

COMPANY   STRUCTURE                                                                                                      09 June 09                      (Intended)  

 

Administration 

Managing Director 

PM’s and RE’s 

Contracts  QA, QC, HSE 

Finance 

Manager Mechanical 

DESIGN  CONTRACT ADMINISTRATION 

Administration Senior Engineers 

Senior QS Architect Manager Electrical 

Projects Manager

Inspectors Engineers 

Sen. Mech. Eng’s.  QS Civil / Struct. Eng. Sen. Elec. Eng’s. 

Mech. Eng’s.  Materials Eng. Arch. Technician Elec. Eng’s. 

CAD CAD 

Section 11

09 June 09 Page 1 of 1

CONTACT DETAILS

Fittons Engineering Consultancy LLC, Zayed Bin Sultan Street, PO Box 14659, Al Ain, Abu Dhabi, United Arab Emirates. Tel.: +971 (03) 7640177 Fax.: +971 (03) 7640188 Email: [email protected] or Gerry McGuire – CEO Mob: +971 (050) 6183102 Email: [email protected] or Mohammed Tauqir – Projects Manager Mob: +971 (050) 4710461 Email: [email protected] or Jamal Saifudeen – Design Manager - Electrical Mob: +971 (050) 7931457 Email: [email protected] or Ibrahim Sheriff – Design Manager - Mechanical Mob: +971 (050) 3794890 Email: [email protected]

Section 12

SUMMARY CV’S of KEY PERSONNEL

09 June 09 Page 1 of 1

Gerry McGuire CEO Qualification CEI Part2 (BSc.) - UK

Experience 33 years – of which 23 years in U.A.E.

Professional Affiliations Chartered Engineer - UK

Chartered Environmentalist – UK

MIMechE – UK

MIET – UK (formerly MIEE - UK)

MASHRAE - USA

Member of Society Engineers – U.A.E.

Former Founder Board Member of Emirates Green Building Council (EGBC)

Mohammed Tauqir Projects Manager Qualification B.Eng. - India

Experience 13 years

Professional Affiliations Member of Society Engineers – U.A.E.

Jamal Saifudeen Design Manager - Electrical Qualification B.Eng. - India

Experience 21 years

Professional Affiliations Member of Society Engineers – U.A.E.

Ibrahim Sheriff Design Manager - Mechanical Qualification B.Eng. - India

Experience 12 years

Professional Affiliations Member of Society Engineers – U.A.E.

Graham Richards Project Development Manager Qualification HNC – Mechanical Engineering – UK

HNC – Aeronautical - UK

Experience 33 years

Detailed CV’s form a separate document and can be provided upon request.

Section 13

CLIENT’S and CLIENTS who PRE-QUALIFIED us

30 Nov 09 Page 1 of 1

GES

KEO

Benoy

Merass

ALDAR

Emicool

Coolrich

Bin Darwish

Tabreed UAE

PAL Technology

Hyder Consulting

Dubai Festival City

Al MAL Investments

Banque Saudi Fransi

Tabreed Saudi Arabia

Drake & Scull International

Section 14

PROJECTS

18 July 10 Page 1 of 1

Project Size Value Location

Dhahran District Cooling Scheme 32,000 TR SAR 408 Million Dhahran - KSA

Canvas Hotel 200 Bedroom AED 60 Million Al Ain - UAE

Mohammed Bin Zayed – District Cooling Scheme

122,000 TR AED 1000 Million Abu Dhabi - UAE

Meydan District Cooling Plant 20,000 TR AED 150 Million Dubai - UAE

Economic City – District Cooling Scheme 50,000 TR SAR 400 Million KSA

Maliha District Cooling Scheme 12,500 TR AED 93 Million Sharjah - UAE

Sheikha Salama Mosque 600 TR AED 25 Million Al Ain - UAE

UAE University – District Cooling Scheme 22,500 TR AED 170 Million Al Ain - UAE

Dubai Investment Park – District Cooling Scheme

265,000 TR CONFIDENTIAL Dubai - UAE

Al Ain Wild Life & Resort 30,000 TR AED 225 Million Al Ain - UAE

Al Bedah Forest Ranger Station Building SPECIAL ECO BUILDING

CONFIDENTIAL Abu Dhabi - UAE

Al Watani Housing – District Cooling Scheme

3,400 TR CONFIDENTIAL Abu Dhabi - UAE

Section 15

DETAILED CVS OF

KEY PERSONNEL

18 July 2010 Page 1 of 2

Please see the Following Document

Contents

• Gerry Arthur McGuire - CEO • Muhammed Tauqir - Project Manager • Ibrahim Sheriff - Design Manager (Mech) • Jamal Saifudeen - Design Manager (Elec) • Mujahid Adam - Architect

CURRICULUM VITAE

Name: Gerald Arthur McGuire

Born 20th November 1951

Professional Experience 34 years (24 years in the U.A.E.)

Nationality: British

Present Position CEO of Fittons Engineering Consultancy LLC – UAE Responsible for Business Development, P&L, Complete Operations, Designs and Contract Administration for District Cooling Schemes, Building Services, Utility Infrastructure and Specialised Engineering Projects.

Qualifications: * CEI Part II (BSc. Hons.) in Mechanical & Production Engineering (four year full time course)

* Chartered Engineer, UK * Chartered Environmental Engineer, UK * MIMechE – UK * MIET – UK * MASHRAE * Member of Society of Engineers – U.A.E. * Formerly Founder Board Member of Emirates Green Building Council - EGBC

Summary of Experience

2004 – to Sept. 08 Managing Director of Entec Europe Ltd - UAE Responsible for Design, Operations, P&L for the Solid Waste Management System of Al Ain.

2004 – to Sept 08 Executive Director of Entec Shankland Cox (JV) - UAE

Full responsibility for all Designs, Operations, Business Development, P&L etc. for projects ranging from Township Master Plans, Individual Buildings and Waste recovery Systems to large District Cooling Schemes.

Page 2 of 6 Gerald McGuire

Nov. 97 to 2004

Director of Engineering - Shankland Cox Ltd. - UAE Responsible for all aspects of Engineering Designs, Fee Proposals, Feasibility Studies, Contract Administration for District Cooling Schemes, Utility Infrastructures, Irrigation Schemes, Building Services and Waste Recovery Systems.

Oct. 85 to Nov 97 Head of Mechanical and Electrical Engineering for Maunsells Consultancy Services Ltd – UAE Responsible for all aspects of mechanical and electrical works, i.e. fee proposals, feasibility studies, design and supervision for infrastructures, irrigation schemes, building services, sewage & water pumping stations, waste water treatment plants, harbours etc.

Aug. 84 to Oct.85 Engineering and Works Manager for Metito Arabia Industries - Saudi Arabia Responsible for the construction, equipping, staffing, and operations of a plant to manufacture water and sewage related products, i.e. filtration systems, reverse osmosis systems, package sewage treatment plant, pressure vessels, booster pumpsets and chemical dosing systems. I also produced the Quality Control and Assurance Procedures in accordance with BS 5750.

Jun. 83 to Aug.84 Director - F. Bamford Engineering Ltd. - UK

Responsible for start-up of a new business to produce security products i.e. development of business plan, obtaining funding, design of products, works engineering, marketing, sales and profitability.

Aug. 81 to Jun. 83 Engineering and General Manager for Brimbridge Ltd, & Strand Tool Ltd. - UK

Responsible for all aspects of a works producing security products, pumps, pressure vessels, general fabrications and machined products, i.e. design, manufacturing, marketing, sales and profitability.

Page 3 of 6 Gerald McGuire

Mar. 79 to Nov. 81

Production Manager for S.E.I. Ltd. - UK

Responsible for a MOD 0521 (BS 5750) manufacturing unit producing quartz crystal oscillators i.e. equipment design, Q.C. / Q.A., staffing and union negotiations.

May 76 to Mar. 79 Senior Quality Engineer - Ferranti Computer Systems Ltd. -UK

Responsible for all aspects of quality control and quality assurance to MOD 0521 associated with a main frame computer manufacturing company, including customer demonstrations / testing / liaisons.

1972 to 1976 Engineer – Ferranti (Transformers) Ltd. - UK

I held various positions within the large main grid transformer industry (400KV), i.e. design engineer, production engineer, research & development engineer, draughtsman, testing engineer etc., all as part of my training to become a professional engineer. I was part of the design team which developed the worlds first thyrister controlled switch gear.

1968 to 1972 Technician Apprentice - Ferranti (Transformers) Ltd. - UK

General engineering training within the large main grid 400KV transformer & switchgear industry.

Name: Gerald Arthur McGuire Address: PO Box 14659, Al Ain, Abu Dhabi, United Arab Emirates Tel: +971(03)7678230 (H) Fax: +971(03)7678240 (H) Mob: +971(050)6183102 (M) Email: [email protected] (H) [email protected] (O)

Page 4 of 6 Gerald McGuire

Projects Executed by Gerald McGuire – Nov 1985 To Date Architectural Projects

CLIENT DESCRIPTION STATUS LOCATION Value

Royal Group 200 Bed Hotel targeting Estidama 3 Pearl Ongoing Al Ain 70m

BD/ALDAR HVAC – Sheikha Salama Mosque Ongoing Al Ain ?

AAM / Nael Al Shamsi Retail Mall, Hotel and Market Completed Al Ain 500m

Abu Dhabi Nat. Hotels Hilton Hotel - Cabanas to Completed Abu Dhabi ?

Abu Dhabi Nat. Hotels Meridian Hotel – Turkish Hamam Style Spa Completed Abu Dhabi ?

Abu Dhabi Nat. Hotels Hilton Hotel – Health Club Completed Al Ain 15m

Abu Dhabi Nat. Hotels Intercontinental Hotel - Resort Style Extension Completed Al Ain 15m

Al Ain Municipality New Vegetable, Fish and Meat Market Completed Al Ain 150m

Al Ain Municipality Zoo Extension Completed Al Ain 50m

Al Ain Municipality Three Indoor Municipal Swimming Pools Completed Al Ain 65m

Al Ain Municipality Canning Factory, Freezer and Cold Stores Completed Al Ain 15m

ALDAR Retail and Hotels – YAS ISLAND Completed Abu Dhabi 5,000m?

Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m

Chapal Destiny Residential Tower Completed Dubai 65m

Dhabi Group Le Royal Meridian Hotel - Extension Completed Abu Dhabi 45m

Dubai Municipality Wharf & Fuelling Facility for 300 Dhows Completed Dubai 350m

Dubai Municipality Banyas Road System Completed Dubai 300m

Dubai Municipality Zayed University Completed Dubai 700m

Dubai Municipality Customs Bonded Warehouses Completed Dubai 35m

EIIC Marina Hotel and Residential Apartments Completed Abu Dhabi 750m

EIIC Mixed Use Development Completed Al Ain 1,200m

Etisalat Telecommunication & Admin. Tower Building Completed Abu Dhabi 225m

Etisalat Telecommunication Building Completed Abu Dhabi 75m

Etisalat Telecommunications Call Centre Completed Ajman 55m

Etisalat Telecommunication & Admin. Tower Building Completed Dubai 275m

First Homes The Bridge Residential / Office Tower Completed Dubai 55m

JAFZA Freezer and Cold Stores Completed Dubai 10m

NCTH Head Quarters Tower Building Completed Abu Dhabi 75m

Transco Head Office Building Completed Abu Dhabi 45m

Page 5 of 6 Gerald McGuire

District Cooling Projects

CLIENT DESCRIPTION STATUS LOCATION RT

GES DCP and Network Ongoing Sharjah 12,000

Banque Saudi Fransi Technical Advisor for DCP and Network Ongoing Saudi Arabia 32,000

ADM / KEO Technical Advisor for DCP’s & Networks Ongoing Abu Dhabi 122,000

KEO Specialist sub-consultant Ongoing Kuwait/SA 50,000

Hyder / AWPR Feasibility study Completed Al Ain 14,000

Tafseer DCP & Network Ongoing Abu Dhabi 5,000

Emicool Network partial re-design Completed Dubai 265,000

Bin Darwish U.A.E. University Network partial re-design Completed Al Ain 20,000

DSI DCP - Meydan Ongoing Dubai 40,000

Coolrich Network Stress Analysis Completed Confidential 10,000

PAL / Bin Darwish Reem Phase 2 Network Completed Abu Dhabi 60,000

Dhafir DCP - Muroor Completed Abu Dhabi 35,000

Dhafir DCP – Zayed Sport City Completed Abu Dhabi 35,000

Drake & Scull DCP – Meydan Completed Dubai 50,000

Drake & Scull DCP 1 – Motor City Completed Dubai 40,000

Drake & Scull DCP 2 – Motor City Completed Dubai 40,000

Dubai Festival City DCP 1 Completed Dubai 50,000

Dubai Festival City DCP 2 Completed Dubai 35,000

Dubai Festival City Network Completed Dubai 180,000

Dubai Municipality DCP – Zayed University Completed Dubai 9,600

Emicool DCP - DIP Completed Dubai 35,000

Emicool Network - DIP Completed Dubai 250,000

PAL Technologies Network – Saraya Completed Abu Dhabi 25,000

PAL Technologies Network – Najmat Completed Abu Dhabi 110,000

PAL Technologies Network – Najmat Phase 2 Completed Abu Dhabi 60,000

Tabreed DCP 1 & Network Completed Ajman 22,500

Tabreed DCP 2 & Network Completed Ajman 30,000

Tabreed DCP & Network – Al Jimi Completed Al Ain 5,300

Tabreed DCP & Network - Central Completed Al Ain 25,000

Tabreed DCP & Network – U.A.E. University Completed Al Ain 20,000

Tabreed DCP & Network Completed Fujairah 9,600

Tabreed DCP & Network Completed Towaisa 9,600

Page 6 of 6 Gerald McGuire

Infrastructure Projects

CLIENT DESCRIPTION LOCATION

Al Ain Municipality M14 – 3 No Sewage Pumping Station, Press. and Gravity Mains Al Ain

Al Ain Municipality M16 – 2 No Sewage Pumping Station, Press. and Gravity Mains Al Ain

Al Ain Municipality M17 – 2 No Sewage Pumping Station, Press. and Gravity Mains Al Ain

Al Ain Municipality M20 – 1 No Sewage Pumping Station, Press. and Gravity Mains Al Ain

Al Ain Municipality M21 – 1 No Sewage Pumping Station, Press. and Gravity Mains Al Ain

Al Ain Municipality N1 – 4 No Sewage Pumping Station, Press. and Gravity Mains Al Ain

Al Ain Municipality M4 – STP Extension Al Ain

Misc. Water Related Projects

CLIENT DESCRIPTION LOCATION (AED)

Abu Dhabi Municipality Sea Water Aquarium – Khalifa Park Abu Dhabi 20m

Al Ain Municipality Four Indoor Large Spa / Swimming Pools Al Ain 35m

Al Ain Municipality Private Spa / Pool for H.H. Shk. Zayed Al Nahyan Al Ain 15m

Al Ain Municipality Dancing / Musical Fountain Al Ain 12m

Al Ain Municipality Sea Water Aquarium – Ayn Al Faydah (design only) Al Ain 35m

Al Ain Municipality Various Water Features to Several Parks Al Ain varies

MAF Water Park on Roof of Bahrain City Centre Bahrain 130m

Meraas Water features to Burj Lake Hotel Dubai varies

Solid Waste Management Systems

CLIENT DESCRIPTION LOCATION (AED)

Al Ain Municipality Design of complete solid waste management system for Al Ain and its Surrounding Regions comprising 1200TPD Sorting Station (Dirty MRF), Transfer Stations, Clinical Waste Incinerator and Landfill followed by Outsoucing Operations to private contractors.

Al Ain 120m

CURRICULUM VITAE

Name Muhammed Tauqir

Year of birth 16th April 1974

Profession Mechanical Engineer

Nationality Indian

Languages English, Hindi

Qualifications Bachelor of Engineering – Mechanical Engineering

Karnatak University – 1996

Present Position Senior Mechanical Design Engineer Designs and Contract Administration for District Cooling Schemes, Building Services, Utility Infrastructure and Specialized Engineering Projects.

Area of Experience

1. Design of Commercial & Residential Buildings, Leisure development which includes Zoo, Water Parks, Recreational facilities, District Cooling Plant rooms and Reticulation piping.

2. Well versed with local authority regulations.

3. Well versed with various design software’s such as HEVACOMP, Carried HAP4.2, Pipenet, etc.

4. Design reticulation piping and establish the distribution head for the secondary chilled water pumps.

5. Design of ETS rooms, zone valve pits and co-ordinate with infrastructure contractors regarding right of the way for the chilled water services.

6. Conduct feasibility study and value engineering exercise for implementing the type of AC System selection like distributed / central systems including the use of options of chillers like absorption chillers, gas driven chillers, electrical chillers (air / water cooled type) taking into consideration the present challenges of refrigerant use like issues of ozone depletion and global warming potential.

7. Carry out chiller capacity selections, cooling tower selections, pump selection, Thermal Storage tank capacity calculations, Reticulation piping scheme concept and design, design of Mechanical services the plant room, etc.

8. Design check & logic requirements of complete Building Management System & Automatic Controls (BMS).

Muhammed Tauqir Page 2 of 8

9. Study various Energy conservation measures in line with LEED and Green building council regulations.

10. Carry out Heat load calculations for the buildings, design public health systems based on CIBSE, select Grilles and diffusers, ducts, etc.

11. Generate Layout drawings for all the Mechanical services such as Air conditioning, Public health, Fire Fighting, Reticulation piping, etc.

Administrative Works

1. Preparing tender documents and specification of Mechanical installation with keen observation and quality assurance.

2. Estimation and finalization of Mechanical installation for the cost study of the project prior to tender.

3. Preparation of Mechanical drawings to the satisfaction and approval of client/concerned authorities.

4. Preparation of cost comparison chart of tenderers

Summary of Experience - Total experience 12 years

1) 2009 Onwards - Fittons Engineering Consultancy LLC

2) 2003 – 2009 M/s Shankland Cox, Al Ain

Major projects are follows

Project: Al Ain Zoo Phase 1 & Miscellaneous Package

Client – Al Ain Municipality

S.No Description AED (Millions)

1. Mechanical design included different types of animal houses to be maintained at different comfort conditions as per the geological origin of the animals. Miscellaneous package included Cat House, Main Entrance, Reptile House, Boundary Wall, and Fencing.

85

Muhammed Tauqir Page 3 of 8

Project: Al Ain Zoo Phase 2

Client – Al Ain Municipality

S.No Description AED (Millions)

1. This was an extension to Phase 1 and Miscellaneous Works. Mechanical design included different types of animal houses to be maintained at different comfort conditions as per the geological origin of the animals. Each building was separate with DX units.

120

Project: Bahrain Water Park

Client – Majid Al Futtaim

S.No Description AED (Millions)

1. Leisure building which includes water parks. Challenging HVAC design due to huge water bodies.

128

Project: Yas Island – The Retail

Client – M/s ALDAR

S.No Description AED (Millions)

1. This exotic development is by ALDAR on the Yas Island at Abu Dhabi. The Retail is the major part of the whole development with a total built up area of approx. 450,000 sq.m. This mega structure is 320 meters in diameter. The building is a challenge for MEP designer since inside is exposed with 2500 sqm of water bodies.

3,500

Project: Yas Island – East West Hotel (Movenpick)

Client – M/s ALDAR

S.No Description AED (Millions)

1. The hotel is a part of Aldar’s Yas Island development in Abu Dhabi. It is a 575 bedroom four star hotel operated by Movenpick.

500

Muhammed Tauqir Page 4 of 8

Project : Zayed University – Dubai

Client – Dubai Municipality

S.No Description AED (Millions)

1. The University with a capacity of total of 7000 students is one of the best designed educational facilities in the U.A.E. Participated as Senior Design Engineer for complete MEP design from concept to detail design stage. The MEP team also won award of appreciation from the Ministry of Education for their impressive performance.

450

Project : Bawadi Mall – Al Ain

Client – Nael Al Shamsi

S.No Description AED (Millions)

1. The mall is a unique shopping experience in Al Ain with a total of 100,000 sq.m of built up area. The cooling load is catered by a site wide district cooling plant.

200

Project : Telecommunication & Admin Building – Dubai

Client – Etisalat

S.No Description AED (Millions)

1. This iconic structure standing tall in front of World Trade Centre, Dubai is Etisalat’s Telecommunication & Administration building. Fittons team had to deal with air conditioning of complex data centers which need high level of air conditioning precision and reliability

275

Projects : District Cooling Plant rooms and Reticulation piping

Client – M/s Tabreed

S.No Description Tonnage

1. Ajman District cooling Plantroom – 01and associated reticulation piping

22,500

2. Ajman District cooling Plantroom – 02 and associated 30,000

Muhammed Tauqir Page 5 of 8

reticulation piping

3. Al Ain Central Plantroom and associated reticulation piping 25,000

4. UAE University District cooling Plantroom at Al Ain and associated reticulation piping

20,000

5. Al Jimi District cooling Plantroom at Al Ain and associated reticulation piping

5,300

6. Al Air college reticulation piping & building conversion design 7.600

Client – M/s Emicool

S.No Description Tonnage

1. District cooling Plantroom – 03 at Dubai Investment Park 35,000

2. Reticulation pipework for Dubai investment park 250,000

Client – M/s Dubai Festival City

S.No Description Tonnage

1. District cooling Plantroom – 01 at Dubai Festival City 50,000

2. District cooling Plantroom – 02 at Dubai Festival City 35,000

3. Reticulation pipework for Dubai Festival City including future plantrooms

180,000

Client – M/s Drake and Scull International

S.No Description Tonnage

1. Dubai Motorcity District cooling Plantroom – 01 40,000

2. Dubai Motorcity District cooling Plantroom - 02 40,000

3. Meydan District cooling Plantroom at Nad al Sheba 50,000

Client – M/s Pal Technologies

S.No Description Tonnage

1. Reticulation piping for Saraya Development in Abu Dhabi 25,000

2. Reticulation piping for Najmat Abudhabi phase - I 110,000

3. Reticulation piping for Najmat Abudhabi phase - II 60,000

Muhammed Tauqir Page 6 of 8

3) 1996 – 2003 Emirates Trading Agency

Responsible for all mechanical design works in wide range of projects. Some of the major projects while working for ETA are:

• Emirates Palace Hotel, Abu Dhabi • Emirates Towers, Dubai • Convention Centre, Dubai. • Delhi Metro, Delhi (India)

I hereby confirm that the information furnished above is true to the best of my knowledge.

Muhammed Tauqir.

Muhammed Tauqir Page 7 of 8

Projects Executed by Muhammed Tauqir – Nov 1996 to Date

Mixed Use Projects CLIENT DESCRIPTION STATUS LOCATION Value

Royal Group Haya Hotel at Jebel Hafeet, Al Ain Ongoing Al Ain 70m

BD/ALDAR HVAC – Sheikha Salama Mosque Ongoing Al Ain 80m

AAM / Nael Al Shamsi Retail Mall, Hotel and Market Completed Al Ain 500m

Abu Dhabi Nat. Hotels

Hilton Hotel – Health Club Completed Al Ain 15m

Abu Dhabi Nat. Hotels

Intercontinental Hotel - Resort Style Extension

Completed Al Ain 15m

Al Ain Municipality New Vegetable, Fish and Meat Market Completed Al Ain 150m

Al Ain Municipality Zoo Extension Completed Al Ain 50m

Al Ain Municipality Three Indoor Municipal Swimming Pools Completed Al Ain 65m

ALDAR Retail and Hotels – YAS ISLAND Completed Abu Dhabi 5,000m

Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m

Chapal Destiny Residential Tower Completed Dubai 65m

Dhabi Group Le Royal Meridian Hotel - Extension Completed Abu Dhabi 45m

Dubai Municipality Wharf & Fuelling Facility for 300 Dhows Completed Dubai 350m

Dubai Municipality Zayed University Completed Dubai 700m

EIIC Marina Hotel and Residential Apartments Completed Abu Dhabi 750m

EIIC Mixed Use Development Completed Al Ain 1,200m

Etisalat Telecommunication & Admin. Tower Building

Completed Abu Dhabi 225m

Etisalat Telecommunication Building Completed Abu Dhabi 75m

Etisalat Telecommunications Call Centre Completed Ajman 55m

Etisalat Telecommunication & Admin. Tower Building

Completed Dubai 275m

First Homes The Bridge Residential / Office Tower Completed Dubai 55m

JAFZA Freezer and Cold Stores Completed Dubai 10m

Transco Head Office Building Completed Abu Dhabi 45m

Muhammed Tauqir Page 8 of 8

Projects Executed by Muhammed Tauqir – Nov 1996 to Date

District Cooling Projects CLIENT DESCRIPTION STATUS LOCATION RT

GES DCP and Network Ongoing Sharjah 12,000

Banque Saudi Fransi

Technical Advisor for DCP and Network Ongoing Saudi Arabia 32,000

ADM / KEO Technical Advisor for DCP’s & Networks Ongoing Abu Dhabi 122,000

KEO Specialist sub-consultant Ongoing Kuwait/SA 50,000

Hyder / AWPR Feasibility study Completed Al Ain 14,000

Tafseer DCP & Network Ongoing Abu Dhabi 5,000

Emicool Network partial re-design Completed Dubai 265,000

Bin Darwish U.A.E. University Network partial re-design

Completed Al Ain 20,000

DSI DCP - Meydan Ongoing Dubai 40,000

PAL / Bin Darwish Reem Phase 2 Network Completed Abu Dhabi 60,000

Dhafir DCP – Zayed Sport City Completed Abu Dhabi 35,000

Drake & Scull DCP – Meydan Completed Dubai 50,000

Drake & Scull DCP 1 – Motor City Completed Dubai 40,000

Drake & Scull DCP 2 – Motor City Completed Dubai 40,000

Dubai Festival City DCP 1 Completed Dubai 50,000

Dubai Festival City DCP 2 Completed Dubai 35,000

Dubai Festival City Network Completed Dubai 180,000

Dubai Municipality DCP – Zayed University Completed Dubai 9,600

Emicool Network - DIP Completed Dubai 250,000

PAL Technologies Network – Saraya Completed Abu Dhabi 25,000

PAL Technologies Network – Najmat Completed Abu Dhabi 110,000

PAL Technologies Network – Najmat Phase 2 Completed Abu Dhabi 60,000

Tabreed DCP 1 & Network Completed Ajman 22,500

Tabreed DCP 2 & Network Completed Ajman 30,000

Tabreed DCP & Network – Al Jimi Completed Al Ain 5,300

Tabreed DCP & Network – U.A.E. University Completed Al Ain 20,000

Tabreed DCP & Network Completed Towaisa 9,600

CURRICULUM VITAE

Name Ibrahim Sheriff

Year of birth 04th December 1976

Profession Mechanical Engineer

Nationality Indian

Languages English, Hindi, Tamil

Qualifications Bachelor of Engineering – Mechanical Engineering

Madras University – 1997

Present Position Mechanical Design Manager Designs and Contract Administration for District Cooling Schemes, Building Services, Utility Infrastructure and Specialised Engineering Projects.

Area of Experience

1. Design of District Cooling Plantrooms, Reticulation piping and HVAC Systems for Airports, Shopping Malls, Universities, Hotels, High rise Buildings, etc

2. Well versed with various design software’s such as HEVACOMP, Carried HAP4.2,

Pipenet, etc.

3. Design reticulation piping and establish the distribution head for the secondary chilled water pumps.

4. Design of ETS rooms, zone valve pits and co-ordinate with infrastructure contractors regarding right of the way for the chilled water services.

5. Conduct feasibility study and value engineering exercise for implementing the type of AC System selection like distributed / central systems including the use of options of chillers like absorption chillers, gas driven chillers, electrical chillers (air / water cooled type) taking into consideration the present challenges of refrigerant use like issues of ozone depletion and global warming potential.

6. Carry out chiller capacity selections, cooling tower selections, pump selection, Thermal Storage tank capacity calculations, Reticulation piping scheme concept and design, design of Mechanical services the plant room, etc.

7. Design check & logic requirements of complete Building Management System & Automatic Controls (BMS).

8. Study various Energy conservation measures in line with LEED and Green building

council regulations.

Ibrahim Sheriff Page 2 of 7

9. Carry out Heat load calculations for the buildings, design public health systems based on CIBSE, select Grilles and diffusers, ducts, etc.

10. Generate Layout drawings for all the Mechanical services such as Air conditioning, Public health, Fire Fighting, Reticulation piping, etc.

Administrative Works

1. Preparing tender documents and specification of Mechanical installation with keen observation and quality assurance.

2. Estimation and finalization of Mechanical installation for the cost study of the project prior to tender.

3. Preparation of Mechanical drawings to the satisfaction and approval of client/concerned authorities.

4. Preparation of cost comparison chart of tenderers

Summary of Experience - Total experience 11 years

1) 2009 Onwards - Fittons Engineering Consultancy LLC

2) 2006 – 2009 M/s Shankland Cox, Al Ain

Major projects are follows

Project : Yas Island – The Retail

Client – M/s ALDAR

S.No Description AED (Millions)

1. This exotic development is by ALDAR on the Yas Island at Abu Dhabi. The Retail is the major part of the whole development with a total built up area of approx. 450,000 sq.m. This mega structure is 320 meters in diameter. The building is a challenge for MEP designer since inside is exposed with 2500 sqm of water bodies.

3,500

Project : Yas Island – East West Hotel (Movenpick)

Client – M/s ALDAR

S.No Description AED (Millions)

1. The hotel is a part of Aldar’s Yas Island development in Abu Dhabi. It is a 575 bedroom four star hotel operated by Movenpick.

500

Ibrahim Sheriff Page 3 of 7

Project : Zayed University – Dubai

Client – Dubai Muncipality

S.No Description AED (Millions)

1. The University with a capacity of total of 7000 students is one of the best designed educational facility in the U.A.E. Participated as Senior Design Engineer for complete MEP design from concept to detail design stage. The MEP team also won award of appreciation from the Ministry of Education for their impressive performance.

700

Project : Bawadi Mall – Al Ain

Client – Nael Al Shamsi

S.No Description AED (Millions)

1. The mall is a unique shopping experience in Al Ain with a total of 100,000 sq.m of built up area. The cooling load is catered by a site wide district cooling plant.

200

Project : Telecommunication & Admin Building – Dubai

Client – Etisalat

S.No Description AED (Millions)

1. This iconic structure standing tall in front of World Trade Centre, Dubai is Etisalat’s Telecommunication & Administration building. Fittons team had to deal with air conditioning of complex data centers which need high level of air conditioning precision and reliability

275

Projects : District Cooling Plant rooms and Reticulation piping

Client – M/s Tabreed

S.No Description Tonnage

1. Ajman District cooling Plantroom – 01and associated reticulation piping

22,500

2. Ajman District cooling Plantroom – 02 and associated reticulation piping

30,000

Ibrahim Sheriff Page 4 of 7

3. Al Ain Central Plantroom and associated reticulation piping 25,000

4. UAE University District cooling Plantroom at Al Ain and associated reticulation piping

20,000

5. Al Jimi District cooling Plantroom at Al Ain and associated reticulation piping

5,300

6. Al Air college reticulation piping & building conversion design 7.600

Client – M/s Emicool

S.No Description Tonnage

1. District cooling Plantroom – 03 at Dubai Investment Park 35,000

2. Reticulation pipework for Dubai investment park 250,000

Client – M/s Dubai Festival City

S.No Description Tonnage

1. District cooling Plantroom – 01 at Dubai Festival City 50,000

2. District cooling Plantroom – 02 at Dubai Festival City 35,000

3. Reticulation pipework for Dubai Festival City including future plantrooms

180,000

Client – M/s Drake and Scull International

S.No Description Tonnage

1. Dubai Motorcity District cooling Plantroom – 01 40,000

2. Dubai Motorcity District cooling Plantroom - 02 40,000

3. Meydan District cooling Plantroom at Nad al Sheba 50,000

Client – M/s Pal Technologies

S.No Description Tonnage

1. Reticulation piping for Saraya Development in Abu Dhabi 25,000

2. Reticulation piping for Najmat Abudhabi phase - I 110,000

3. Reticulation piping for Najmat Abudhabi phase - II 60,000

Ibrahim Sheriff Page 5 of 7

3) 2004 – 2006 National Kharafi, Kuwait

Responsible for all mechanical design works in wide range of projects. Some of the major projects while working for Kharafi are:

• U.S Army Camp, Kuwait • PAAET, Kuwait

4) 1998 – 2004 Emirates Trading Agency

Responsible for all mechanical design works in wide range of projects. Some of the major projects while working for ETA are:

• Emirates Palace Hotel, Abu Dhabi • Emirates Towers, Dubai • Convention Centre, Dubai. • Delhi Metro, Delhi (India)

I hereby confirm that the information furnished above is true to the best of my knowledge.

Ibrahim Sheriff.

Ibrahim Sheriff Page 6 of 7

Projects Executed by Ibrahim Sheriff – Nov 1997 to Date

Mixed Use Projects CLIENT DESCRIPTION STATUS LOCATION Value

Royal Group Haya Hotel at Jebel Hafeet, Al Ain Ongoing Al Ain 70m

BD/ALDAR HVAC – Sheikha Salama Mosque Ongoing Al Ain 80m

AAM / Nael Al Shamsi Retail Mall, Hotel and Market Completed Al Ain 500m

Abu Dhabi Nat. Hotels

Hilton Hotel – Health Club Completed Al Ain 15m

Abu Dhabi Nat. Hotels

Intercontinental Hotel - Resort Style Extension

Completed Al Ain 15m

Al Ain Municipality New Vegetable, Fish and Meat Market Completed Al Ain 150m

Al Ain Municipality Zoo Extension Completed Al Ain 50m

Al Ain Municipality Three Indoor Municipal Swimming Pools Completed Al Ain 65m

ALDAR Retail and Hotels – YAS ISLAND Completed Abu Dhabi 5,000m

Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m

Chapal Destiny Residential Tower Completed Dubai 65m

Dhabi Group Le Royal Meridian Hotel - Extension Completed Abu Dhabi 45m

Dubai Municipality Wharf & Fuelling Facility for 300 Dhows Completed Dubai 350m

Dubai Municipality Zayed University Completed Dubai 700m

EIIC Marina Hotel and Residential Apartments Completed Abu Dhabi 750m

EIIC Mixed Use Development Completed Al Ain 1,200m

Etisalat Telecommunication & Admin. Tower Building

Completed Abu Dhabi 225m

Etisalat Telecommunication Building Completed Abu Dhabi 75m

Etisalat Telecommunications Call Centre Completed Ajman 55m

Etisalat Telecommunication & Admin. Tower Building

Completed Dubai 275m

First Homes The Bridge Residential / Office Tower Completed Dubai 55m

Transco Head Office Building Completed Abu Dhabi 45m

Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m

Ibrahim Sheriff Page 7 of 7

Projects Executed by Ibrahim Sheriff – Nov 1997 To Date

District Cooling Projects CLIENT DESCRIPTION STATUS LOCATION RT

GES DCP and Network Ongoing Sharjah 12,000

Banque Saudi Fransi

Technical Advisor for DCP and Network Ongoing Saudi Arabia 32,000

ADM / KEO Technical Advisor for DCP’s & Networks Ongoing Abu Dhabi 122,000

KEO Specialist sub-consultant Ongoing Kuwait/SA 50,000

Hyder / AWPR Feasibility study Completed Al Ain 14,000

Tafseer DCP & Network Ongoing Abu Dhabi 5,000

Emicool Network partial re-design Completed Dubai 265,000

Bin Darwish U.A.E. University Network partial re-design

Completed Al Ain 20,000

DSI DCP - Meydan Ongoing Dubai 40,000

PAL / Bin Darwish Reem Phase 2 Network Completed Abu Dhabi 60,000

Dhafir DCP – Zayed Sport City Completed Abu Dhabi 35,000

Drake & Scull DCP – Meydan Completed Dubai 50,000

Drake & Scull DCP 1 – Motor City Completed Dubai 40,000

Drake & Scull DCP 2 – Motor City Completed Dubai 40,000

Dubai Festival City DCP 1 Completed Dubai 50,000

Dubai Festival City DCP 2 Completed Dubai 35,000

Dubai Festival City Network Completed Dubai 180,000

Dubai Municipality DCP – Zayed University Completed Dubai 9,600

Emicool Network - DIP Completed Dubai 250,000

PAL Technologies Network – Saraya Completed Abu Dhabi 25,000

PAL Technologies Network – Najmat Completed Abu Dhabi 110,000

PAL Technologies Network – Najmat Phase 2 Completed Abu Dhabi 60,000

Tabreed DCP 1 & Network Completed Ajman 22,500

Tabreed DCP 2 & Network Completed Ajman 30,000

Tabreed DCP & Network – Al Jimi Completed Al Ain 5,300

Tabreed DCP & Network – U.A.E. University Completed Al Ain 20,000

Tabreed DCP & Network Completed Towaisa 9,600

CURRICULUM VITAE

Name Jamal Saifudeen

Year of birth 6th July 1967

Profession Electrical Engineer

Nationality Indian

Languages English, Tamil

Qualifications Bachelor of Engineering – Electrical Engineering

Madurai Kamaraj University – 1988

Present Position Electrical Design Manager Designs of Electrical & Low Current Systems for Building Services & District Cooling Projects.

Area of Experience

1. Design and selection of lighting fixture based on CIBSE Code Recommendation using computerised calculation including photometric curves and Sioux diagrams for each luminaries.

2. Design and selection of emergency luminaries as per the local civil defense requirements DIN/VDE; BS Standards.

3. Designing of low voltage programmable lighting control system including selection of network control units; lighting relay control unit; relays and intelligent switches.

4. Design and selection of single; multiword insulated cables as per the ADDC & DEWA requirements IEE regulation including voltage drop circulation with ambient temperature of the cables.

5. Design and selection of feeder and plug in bus ways as per the requirement of the building.

6. Design of electrical load calculation including selection of outgoing ways; breakers; Elk’s, etc.

7. Design and selection of panel boards including bus bars; air circuit breakers; molded case circuit breakers; miniature circuit breakers’ residual current devices, etc.

8. Designing of automatic power factor equipment including HRC fuses; current limiting reactors; discharge resistors and capacitor elements.

9. Design and selection of automatic fire alarm system bused on local civil defense regulation; UL listed and NFPA standard including intelligent detectors; monitor module, alarm indicating devices; magnetic door holder with cable distribution and arrangement.

10. Design and selection of CCTV system including selection of camera; lens, monitors, multiplexer/digital recorder.

Jamal Saifudeen Page 2 of 7

11. Design and monitoring door access control systems including card reading sensors; multiple switch monitor, cards, door contact; keypad coding unit.

12. Design and selection of satellite receiving decoding and broadcasting system including dual feed horn; amplifier; converter, inverter, etc.

13. Designing of lighting protection system as per the local code and the BS including selection of air terminals; down conductors; electrodes, etc.

14. Designing of earthling system as per the BS standards and local regulations.

Administrative Works

1. Preparing tender documents and specification of electrical installation with keen observation and quality assurance.

2. Estimation and finalization of electrical installation for the cost study of the project prior to tender.

3. Preparation of electrical drawings to the satisfaction and approval of client/concerned authorities.

4. Preparation of cost comparison chart of tenderness

Summary of Experience - Total experience 17 years

1) 2009 Onwards - Fittons Engineering Consultancy LLC

2) 1997 – 2009 M/s Shankland Cox, Al Ain

Major projects are follows

Project : Al Ain Zoo Phase 1 & Miscellaneous Package

Client – Al Ain Municipality

S.No Description AED (Millions)

1. Electrical design (Lighting, Power, Special Lighting for Reptile, PA System) is done as per the geological origin of the animals. Miscellaneous package including Cat House, Reptile House, Incubation Centre & Bird House.

85

Project : Al Ain Zoo Phase 2

Client – Al Ain Municipality

S.No Description AED (Millions)

1. This was an extension to Phase 1 and Miscellaneous Works. Electrical design (Lighting, Power, PA System), included different types of animal houses to be maintained at different comfort conditions as per the geological origin of the animals.

120

Jamal Saifudeen Page 3 of 7

Project : Telecommunication & Admin Building – Abu Dhabi

Client – Etisalat

S.No Description AED (Millions)

1. The Glass structure Telecommunication & Admin Building Located at Airport Road in Abu Dhabi. Fittons team had done detail Lighting, power, Low current system design (cctv, Access control, Telephone, PA, Fire alarm with voice evacuation, Queuing system etc).

300

Project : Telecommunication & Admin Building – Abu Dhabi

Client – Etisalat

S.No Description AED (Millions)

1. This iconic structure Building located in front of Dubai world trade centre. Fittons team had done detail lighting, power, low current system design (cctv, Access control, Telephone, PA, Fire alarm with Voice evacuation, Queing system etc).

300

Project : Yas island – The Retail

Client – ALDAR

S.No Description AED (Millions)

1. This development is by ALDAR on the Yas island Abu Dhabi. This whole development with total Built-up area approx. 450,000 sq.m.

Fittons team had done detail lighting, power, Low current system design (cctv, Access control, Telephone, Data, PA, Fire alarm with Voice evacuation, Car park management system) and Lift traffic analysis.

3500

Project : Yas island – East West Hotel (Moven’pick)

Client – ALDAR

S.No Description AED (Millions)

1. The Hotel is a part of Aldar’s Yas island development in Abu Dhabi. It is a 575 bedroom four star hotel operated by Moven’pick. Fitton team had done Electrical, Low current design and Lift traffic analysis.

60

Jamal Saifudeen Page 4 of 7

Zayed University - Dubai

Client – Dubai Municipality

S.No Description AED (Millions)

1. The University with the capacity of total of 7000 students is one of the best educational facilities in UAE. Fittons team had done Electrical, Lighting, Power, Low current system from concept stage to detail design stage. The MEP team also won award of appreciation from the ministry of education for their impressive performance.

700

Bawadi Mall – Al Ain

Client – Nael Al Shamsi

S.No Description AED (Millions)

1. The shopping mall located in Meyzad – Al Ain with total built-up area of 100,000 sq.m. Fittons team had done Lighting, Power and Low current system.

200

Projects : District Cooling Plant rooms and Reticulation piping

Client – M/s Tabreed

S.No Description Tonnage

1. Ajman District cooling Plantroom – 01and associated reticulation piping

22,500

2. Ajman District cooling Plantroom – 02 and associated reticulation piping

30,000

3. Al Ain Central Plantroom and associated reticulation piping 25,000

4. UAE University District cooling Plantroom at Al Ain and associated reticulation piping

20,000

5. Al Jimi District cooling Plantroom at Al Ain and associated reticulation piping

5,300

6. Al Air college reticulation piping & building conversion design 7.600

Client – M/s Emicool

S.No Description Tonnage

1. District cooling Plantroom – 03 at Dubai Investment Park 35,000

2. Reticulation pipework for Dubai investment park 250,000

Jamal Saifudeen Page 5 of 7

Client – M/s Dubai Festival City

S.No Description Tonnage

1. District cooling Plantroom – 01 at Dubai Festival City 50,000

2. District cooling Plantroom – 02 at Dubai Festival City 35,000

3. Reticulation pipework for Dubai Festival City including future plantrooms

180,000

Client – M/s Drake and Scull International

S.No Description Tonnage

1. Dubai Motorcity District cooling Plantroom – 01 40,000

2. Dubai Motorcity District cooling Plantroom - 02 40,000

3. Meydan District cooling Plantroom at Nad al Sheba 50,000

Client – M/s Pal Technologies

S.No Description Tonnage

1. Reticulation piping for Saraya Development in Abu Dhabi 25,000

2. Reticulation piping for Najmat Abudhabi phase - I 110,000

3. Reticulation piping for Najmat Abudhabi phase - II 60,000

3) 1995 – 1997 Perfection Consultants Worked as Senior Electromechanical Engineer.

4) 1989 – 1995 Global Contracting Company Worked as Electrical Site Engineer.

I hereby confirm that the information furnished above is true to the best of my knowledge.

Jamal Saifudeen.

Jamal Saifudeen Page 6 of 7

Projects Executed by Jamal Saifudeen – Nov 1989 to Date

Mixed Use Projects CLIENT DESCRIPTION STATUS LOCATION Value

Royal Group Haya Hotel at Jebel Hafeet, Al Ain Ongoing Al Ain 70m

BD/ALDAR HVAC – Sheikha Salama Mosque Ongoing Al Ain 80m

AAM / Nael Al Shamsi Retail Mall, Hotel and Market Completed Al Ain 500m

Abu Dhabi Nat. Hotels

Hilton Hotel – Health Club Completed Al Ain 15m

Abu Dhabi Nat. Hotels

Intercontinental Hotel - Resort Style Extension

Completed Al Ain 15m

Al Ain Municipality New Vegetable, Fish and Meat Market Completed Al Ain 150m

Al Ain Municipality Zoo Extension Completed Al Ain 50m

Al Ain Municipality Three Indoor Municipal Swimming Pools Completed Al Ain 65m

ALDAR Retail and Hotels – YAS ISLAND Completed Abu Dhabi 5,000m

Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m

Chapal Destiny Residential Tower Completed Dubai 65m

Dhabi Group Le Royal Meridian Hotel - Extension Completed Abu Dhabi 45m

Dubai Municipality Wharf & Fuelling Facility for 300 Dhows Completed Dubai 350m

Dubai Municipality Zayed University Completed Dubai 700m

EIIC Marina Hotel and Residential Apartments Completed Abu Dhabi 750m

EIIC Mixed Use Development Completed Al Ain 1,200m

Etisalat Telecommunication & Admin. Tower Building

Completed Abu Dhabi 225m

Etisalat Telecommunication Building Completed Abu Dhabi 75m

Etisalat Telecommunications Call Centre Completed Ajman 55m

Etisalat Telecommunication & Admin. Tower Building

Completed Dubai 275m

First Homes The Bridge Residential / Office Tower Completed Dubai 55m

Transco Head Office Building Completed Abu Dhabi 45m

Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m

Jamal Saifudeen Page 7 of 7

Projects Executed by Jamal Saifudeen – Nov 1989 To Date

District Cooling Projects CLIENT DESCRIPTION STATUS LOCATION RT

GES DCP and Network Ongoing Sharjah 12,000

Banque Saudi Fransi

Technical Advisor for DCP and Network Ongoing Saudi Arabia 32,000

ADM / KEO Technical Advisor for DCP’s & Networks Ongoing Abu Dhabi 122,000

KEO Specialist sub-consultant Ongoing Kuwait/SA 50,000

Hyder / AWPR Feasibility study Completed Al Ain 14,000

Tafseer DCP & Network Ongoing Abu Dhabi 5,000

Emicool Network partial re-design Completed Dubai 265,000

Bin Darwish U.A.E. University Network partial re-design

Completed Al Ain 20,000

DSI DCP - Meydan Ongoing Dubai 40,000

PAL / Bin Darwish Reem Phase 2 Network Completed Abu Dhabi 60,000

Dhafir DCP – Zayed Sport City Completed Abu Dhabi 35,000

Drake & Scull DCP – Meydan Completed Dubai 50,000

Drake & Scull DCP 1 – Motor City Completed Dubai 40,000

Drake & Scull DCP 2 – Motor City Completed Dubai 40,000

Dubai Festival City DCP 1 Completed Dubai 50,000

Dubai Festival City DCP 2 Completed Dubai 35,000

Dubai Festival City Network Completed Dubai 180,000

Dubai Municipality DCP – Zayed University Completed Dubai 9,600

Emicool Network - DIP Completed Dubai 250,000

PAL Technologies Network – Saraya Completed Abu Dhabi 25,000

PAL Technologies Network – Najmat Completed Abu Dhabi 110,000

PAL Technologies Network – Najmat Phase 2 Completed Abu Dhabi 60,000

Tabreed DCP 1 & Network Completed Ajman 22,500

Tabreed DCP 2 & Network Completed Ajman 30,000

Tabreed DCP & Network – Al Jimi Completed Al Ain 5,300

Tabreed DCP & Network – U.A.E. University Completed Al Ain 20,000

Tabreed DCP & Network Completed Towaisa 9,600

CURRICULUM VITAE

Name Mugahid Adam Badry

Year of birth 18th Aug 1971

Profession Architect

Nationality Sudanese

Languages English, Arabic

Qualifications BSc. (Honours) in Architecture Engineering & Environmental Planning from Sharq Al Neil University, Sudan.

Present Position Senior Architect Designs and Contract Administration, Liaison with Authorities for Building Services, Utility Infrastructure, District Cooling Schemes, and Specialized Engineering Projects.

EXPERIENCE & PROJECTS: UAE (1998 – 2009)

March 2009 to Date FITTONS Engineering Consultancy (Al-Ain) Working as Architect, Process Coordinator for NOCs, Building Permits etc.

2007- Feb .2009 Entec (Al-Ain) UAE UNIVERSITY CAMPUS DEVELOPMENT DISTICT COOLING PLANT Work as PROJECT MANAGER.

• Site management. • Approval for material and Quality Control. • Meetings and joint side works with clients or sub contractors. • Execution progress and work evaluation. • Tests and approval of materials and all projects needs. • Handling the documents and paper work. • Provide continuous and rigorous daily inspection. • Participate in the review and approval of all shop drawings, brochures and samples. • Ensure all materials delivered on site are inspected.

2006-2007 CPD Middle East LLC (DUBI) DUBI MALL – Package DS-O2A Work as QA/QC.

• Following Shop drawings & sample's approval from the consultant. • Control Quality of Dry wall partitions & space frame cladding & finishing materials, work

on GRG & GRC Columns. • Provide continuous and rigorous daily inspection. • Ensure QA/QC reports as and when required in the contract. • Participate in the review and approval of all shop drawings, brochures and samples.

Ensure all materials delivered on site inspected.

Mujahid Adam Page 2 of 3

2004 – 2006 JUMIRA INT'L CONSLTANTS – (Al-Ain)

Work as Technical Manager.

• Design for a different types of Commercial buildings and Luxury villas in Alain. • Preparing Building Specifications with Owners. • Following drawings & sample's approval from Town Planning & Municipality & Drainage

depart & 1st Gulf Bank. • Make Quantities for tenders and quotations. • Site supervision and Management.

2002 – 2004 3D CLASSIC CONSULTANTS – (Al-Ain)

Architects & Engineers

Work as a Designer and exudation Engineer

• Assist the manager for design of different types of Commercial buildings and Luxury villas as, well as follow – up approval from different departs in Alain & Abu Dhabi.

• Supervision of H.H Sheikh Sultan Bin Tahnoon A-Nahyan Palace at sila'a. • Execution and site supervision.

2001 – 2002 AL HADARA General Constructions – (Abu-Dhabi)

Work as Site Engineer

For AL-SLAMAT KINDERGARDEN (P.W.D)

• Follow – up PWD Al Ain,(company Representation) • Following drawings & sample approval from PWD & Municipality & Drainage

depart- Al Ain. • Following the payments from PWD and doing sub-contractors payments • Time Schedules and sub-contractors performance.

1999 – 2001 Al AHGAF General Constructions Ltd. – (Abu-Dhabi)

Work as Site Engineer

• Construction of H.H Sheikh Hamad Bin Hamdan Al-Nahyan Palace. • Management of labour and sites works execution. • Materials supply, Local material preparation and quality control assistant

1998 – 1999 KHALEFA AIM General Constructions (Al-Ain) Work as Site Engineer

• Construction of Some Local Villa and Mosque's. • Co-operate with consultant to solve many problems accorded while execution. • Site supervision and Management.

1996 – 1998 TASSMEEM ENG. CO.LTD – SUDAN

Low cost Houses and Educational Buildings

Work as Architect & Site Construction

• Supervision of site and maintenance work. • Management of labour and site work. • Materials supply, Local material preparation and quality control assistant.

Mujahid Adam Page 3 of 3

COMPUTER SKILLS:

PCs running Microsoft Windows, MS-DOS, WordPerfect, Word for Windows, Excel, AutoCAD R14, 2000, 2006,2009

Internet

TECHNICAL EXPERIENCE & DUTIES:

1. Planning and Execution Project analysis and dividing to production stages Short daily and weekly reports/Instruction to contractors and manpower Meetings and joint side works with clients or sub contractors Report and note down the progress parallel with breakdown schedule and

progress percentage preparation 2. Coordination

Obtain of approvals, No objection, clearance and projects permit Arrangement of subcontractors and prices estimation Facilitate the missions and time squeeze

3. Supervisory Performance of all the workers, contractors and subcontractors Execution progress and work evaluation

4. Management Handling the documents and paper work Estimation of job size and the required staff Manpower control, machinery, vehicles and offices

5. Construction A good experience in constructing a different types of buildings Related services execution(AC/Electrical works/Drainage /plumping

fire alarms/fire fighting/control panels/generator & fuel/Landscape) Tests and approval of materials and all projects needs

Section 16

INSURANCE

PROFESSIONAL INDEMNITY

18 July 2010 Page 1 of 2

Please see the Following Document

Section 17

INSURANCE

THIRD PARTY LIABILITY

18 July 2010 Page 1 of 2

Please see the Following Document