00 fittons pq index 09 june 09fittonsc.com/wp-content/uploads/2012/11/company-profile.pdf · al ain...
TRANSCRIPT
YOUR PARTNER WHO CARES
COMPANY PROFILE
PO Box 14659, Zayed Bin Sultan Street, Al Ain, U.A.E.., Tel: 03-7640177, Fax 03-7640188
INDEX
25 July 10 Page 1 of 2
Section Description
1 Introduction
2 Registration Details
3 District Cooling
4 Building Services
5 Solid Waste Handling and Recovery
6 Utility Infrastructure
7 Specialised Engineering
8 Architecture & Structures
9 Quality Assurance & Health and Safety
10 Company Structure
11 Contact Details
12 Summary CV’s of Key Personnel
13 Client’s
14 Projects
15 Detailed CV’s of Key Personnel
INDEX
25 July 10 Page 2 of 2
16 Insurance – Professional Indemnity
17 Insurance – Third Party Liability
Section 1
09 June 09 Page 1 of 1
INTRODUCTION
Fittons Engineering Consultancy LLC is a United Arab Emirates based practice that comes
with a wealth of experience both in the U.A.E. and Europe.
Fittons are committed to providing world class and buildable energy efficient “GREEN”
designs that are suitable for the environment of the Middle East yet retaining the clients high
expectations.
The company is headed by a multi disciplined U.K. Chartered Engineer who has over thirty
years professional experience and holds membership of American and several U.K.
Professional Institutions.
More than twenty three years of this professional experience has been in the United Arab
Emirates as a Consultant in District Cooling, Major Architectural Developments, Building
Services, Utility Infrastructure and Specialised Engineering Projects.
• Fittons provide expertise in the following areas:
• District Cooling
• Building Services
• Utility Infrastructure
• Vertical transportation
• Industrial Architecture
• Project Management
• Solid Waste Handling & Recovery
• Specialised Engineering i.e.
• Water Parks
• Aquariums
• Water Features
• Green Designs
Section 3
DISTRICT COOLING
09 June 09 Page 1 of 5
We have staff with up to ten years of
experience in the District Cooling
Industry within the U.A.E. Also Fittons
is currently engaged in Saudi Aramco’s
District Cooling Project in Dhahran as
Technical Advisor. We offer
Consultancy Services from Feasibility
studies through Master Planning and
Concept to Full Designs for Plant
Rooms, ETS’s and Reticulation Pipe
Networks.
The client has the choice to go EPC (Engineer Procure Construct) or PC (Procure Construct).
Section 3
DISTRICT COOLING
09 June 09 Page 2 of 5
With this amount of experience we know the business and our clients benefit.
Collectively our staff have around one
million TR of Design and Construction
Experience in Design District Cooling
industry prior to joining Fittons.
We save clients money by advising on
cooling loads, predicting when orders
should be placed and when
construction and build out needs to
start thus deferring capital expenditure
until necessary.
Fittons Staff have previously worked with
many of the U.A.E. District Cooling
Providers and Contractors and enjoy long
term business relationships through
achieving and delivering the promise.
Section 3
DISTRICT COOLING
09 June 09 Page 3 of 5
Fittons staff, through previous careers, have designed / executed numerous projects over the
years as follows:
Client – Saudi Aramco
1. Dhahran District Cooling Scheme – Technical Advisor 32,000 TR
Client – Tabreed
1. Ajman - DCP 1, Reticulation Network and ETS’s 22,500 TR
2. Ajman - DCP 2, Reticulation Network and ETS’s 30,000 TR
3. Fujairah - DCP, Reticulation Network and ETS’s 9,600 TR
4. Al Ain Central - DCP, Reticulation Network and ETS’s 25,000 TR
5. Al Ain - UAE University DCP, Reticulation Network and ETS’s 20,000 TR
6. Al Ain - Al Jimi DCP, Reticulation Network and ETS’s 5,300 TR
7. Towaisa Military Base – DCP, Reticulation Network and ETS’s 9,600 TR
8. Al Ain – Air College DCP, Reticulation Network and ETS’s 9,600 TR
Client – Emicool
1. Dubai – DIP - DCP 3 35,000 TR
2. Dubai – DIP - Reticulation Network 250,000 TR
Client – Dubai Festival City
1. Dubai - DFC - DCP 1 50,000 TR
2. Dubai - DFC - DCP 2 35,000 TR
3. Dubai – DFC - Reticulation Network and ETS’s 180,000 TR
Section 3
DISTRICT COOLING
09 June 09 Page 4 of 5
Client – Drake and Scull International
1. Dubai – Motor City - DCP 1 40,000 TR
2. Dubai – Motor City – DCP 2 40,000 TR
3. Dubai – Nad Al Sheba - Meydan DCP 50,000 TR
Client – Dubai Municipality
1. Dubai - Zayed University – DCP and Reticulation Network 9,600 TR
Client – Pal Technologies
1. Abu Dhabi - Saraya Development - Reticulation Network 25,000 TR
2. Abu Dhabi - Najmat Phase 1 - Reticulation Network 110,000 TR
3. Abu Dhabi – Najmat Phase 2 - Reticulation Network 60,000 TR
Client – Dhafir Contracting
1. Abu Dhabi - Muroor Street – DCP 35,000 TR
2. Abu Dhabi - Zayed Sporty City – DCP 35,000 TR
Section 4
BUILDING SERVICES
09 June 09 Page 1 of 3
Over the years staff have designed Building Services for numerous prestige projects within
the U.A.E. ranging from High Tech Telecommunication Buildings through Universities,
Commercial Buildings, Residential Buildings, Retail Developments, Villas, Industrial
Facilities in both high rise and low rise forms.
MECHANICAL SERVICES
ELECTRICAL SERVICES
• HVAC
• Plumbing and Drainage
• Public Health
• Fire Protection
• SCADA Systems
• Sound and Vibration Control
• Heat Recovery Systems
• Solar Energy Systems
• Vertical Transportation
• GAS Systems
• Fire Alarm and Detection Systems
• Fire Strategies
• Building Management Systems
• Closed Circuit Television Systems
• IT and ELV Systems
• Security and Access Control
• Vehicle Management Systems
• MV and LV Systems
• Power and Lighting
Section 4
BUILDING SERVICES
09 June 09 Page 2 of 3
Design Architect - BENOY Image courtesy of BENOY
YAS ISLAND – THE RETAIL - This exotic development is by ALDAR on the Yas Island at
Abu Dhabi. The Retail is the major part of the whole development with a total built up area of
approximately 450,000 m². This mega structure is 320 meters in diameter.
Design Architect - BENOY Image courtesy of BENOY
Section 4
BUILDING SERVICES
09 June 09 Page 3 of 3
Energy efficient designs have been standard for over ten years.
Some of the major projects designed / executed in whole or part by Fittons staff in their
previous careers:
S.NO Project Title Contract
Value AED Client 1 Retail Development at Yas Island 10.0 billion ALDAR
2 Hotel, Office and Residential Development at Marina Abu Dhabi 300 million EIIC
3 Telecommunication Building for Etisalat at Abu Dhabi 180 million Etisalat
4 Transco Head Office Building at Abu Dhabi 80 million Transco
5 Residential Towers at Abu Dhabi 100 million Sheikh Tahnoon al Nahyan
6 ADWEA Control Centre at Abu Dhabi 60 million ADWEA
7 Al Bawadi Mall, Souk, Hotel and Market 600 million Alain Municipality
8 New Vegetable Fish and Meat Market Alain 65 million Alain Municipality
9 Zayed University at Ruwayya, Dubai 450 million Dubai Municipality
10 Telecommunication Building for Etisalat at Dubai 250 million Etisalat
11 Destiny Residential Tower at Dubai 300 million Chapal Group
12 Bridge Residential / Office Tower at Dubai 160 million First Group
13 The Diamond Residential Tower at Dubai 60 million First Group
14 AFTECH Data Centre at Dubai Festival City 40 million Dubai Festival City
15 Water Park in Bahrain 60 million Al Futtaim Majid
16 Nael Shopping Mall, Al Ain 200 million Nael Al Shamsi
Section 5
SOLID WASTE HANDLING & RECOVERY
16 November 2008 Page 1 of 1
In the specialised field of Solid Waste Handling and Recovery, we can offer Fully Designed
Systems and/or the usual Design and Build approach. Earlier in their careers, our engineers
gained extensive experience in designing a “State of the Art” Solid Waste Handling System
within the U.A.E. comprising:
• Dirty MRF (Sorting Station) – with automatic and manual segregation, all linked to
a central computer control system. 1200TPD.
• Transfer Stations – for remote locations to enable bulking and compacting of the
waste prior to transporting to the MRF – this saves operational costs and minimises
the number vehicles needed to transport the waste.
• Clinical Waste Incinerators – To deal with the hazardous waste generated by
hospital and clinics such as radioactive isotopes, needles, body parts etc prior to
encapsulation.
• Fallen Stock Incinerators – To deal with dead stock from farms and road accidents
etc.
• Crushing Plant – To enable re-use of Construction and Demolition Waste as road
sub-bases etc.
• Landfill Site – with properly coordinated, lined and monitored cells to ensure our
environment is not further polluted.
A COMPLETE SOLUTION for MUNICIPAL WASTE
Section 6
UTILITY INFRASTRUCTURE
16 November 2008 Page 1 of 1
Experience in utility infrastructure dates back to 1985 and covers all aspects.
• Sub Stations
• MV and LV Systems
• Functional Lighting
• Amenity Lighting
• Communications
• Road Lighting
• District Cooling Mains
• Gravity Mains
• Pressure Systems
• Pumping Stations
• Potable Water
• Irrigation
Section 7
SPECIALISED ENGINEERING
09 June 09 Page 1 of 1
We are one of few who offer experience in the engineering design and execution of:
• Swimming Pools and Spa’s
Indoor and Outdoor
Fresh Water or Salt Water
• Solid Waste Handling
Material Recovery Facility (Sorting Station)
Transfer Stations
Clinical Waste Incinerators
Fallen Stock Incinerators
Crushing Plants
Hazardous Waste
Landfills
• Industrial Facilities
• Aquariums
• Water Parks
• Water Features
Section 8
ARCHITECTURE and STRUCTURES
09 June 09 Page 1 of 1
Fittons Engineering Consultancy LLC has a license within the Emirate of Abu Dhabi for
“Engineering Consultancy for the General Building” and is at present processing a license for
Dubai.
Within Abu Dhabi, this permits us to execute any form of building architecture, structure and
associated services; we anticipate the Dubai License will be restricted to G+4 initially.
Whilst Architectural and Structural designs are available we normally limit these disciplines
to support our core Engineering Business.
Should a client wish more from Architecture, Structures or Master Planning, then Fittons
Engineering Consultancy LLC would partner with suitable local and international companies
as necessary to meet the client’s requirements.
Fittons would be the Architect of Record (AOR) and we would naturally process NOC’s and
Building Permits.
Section 9
QUALITY ASSURANCE and HEALTH & SAFETY
09 June 09 Page 1 of 1
Although not ISO 9000 certified, Fittons Engineering Consultancy LLC operates a Quality
Assurance programme in line with the requirements of ISO 9000 and a have a full Health and
Safety Policy.
A copy of our Quality Manual and the Health and Safety Policy can be provided upon request.
Section 10a
COMPANY STRUCTURE 09 June 09 (Intended)
Administration
Managing Director
PM’s and RE’s
Contracts QA, QC, HSE
Finance
Manager Mechanical
DESIGN CONTRACT ADMINISTRATION
Administration Senior Engineers
Senior QS Architect Manager Electrical
Projects Manager
Inspectors Engineers
Sen. Mech. Eng’s. QS Civil / Struct. Eng. Sen. Elec. Eng’s.
Mech. Eng’s. Materials Eng. Arch. Technician Elec. Eng’s.
CAD CAD
Section 11
09 June 09 Page 1 of 1
CONTACT DETAILS
Fittons Engineering Consultancy LLC, Zayed Bin Sultan Street, PO Box 14659, Al Ain, Abu Dhabi, United Arab Emirates. Tel.: +971 (03) 7640177 Fax.: +971 (03) 7640188 Email: [email protected] or Gerry McGuire – CEO Mob: +971 (050) 6183102 Email: [email protected] or Mohammed Tauqir – Projects Manager Mob: +971 (050) 4710461 Email: [email protected] or Jamal Saifudeen – Design Manager - Electrical Mob: +971 (050) 7931457 Email: [email protected] or Ibrahim Sheriff – Design Manager - Mechanical Mob: +971 (050) 3794890 Email: [email protected]
Section 12
SUMMARY CV’S of KEY PERSONNEL
09 June 09 Page 1 of 1
Gerry McGuire CEO Qualification CEI Part2 (BSc.) - UK
Experience 33 years – of which 23 years in U.A.E.
Professional Affiliations Chartered Engineer - UK
Chartered Environmentalist – UK
MIMechE – UK
MIET – UK (formerly MIEE - UK)
MASHRAE - USA
Member of Society Engineers – U.A.E.
Former Founder Board Member of Emirates Green Building Council (EGBC)
Mohammed Tauqir Projects Manager Qualification B.Eng. - India
Experience 13 years
Professional Affiliations Member of Society Engineers – U.A.E.
Jamal Saifudeen Design Manager - Electrical Qualification B.Eng. - India
Experience 21 years
Professional Affiliations Member of Society Engineers – U.A.E.
Ibrahim Sheriff Design Manager - Mechanical Qualification B.Eng. - India
Experience 12 years
Professional Affiliations Member of Society Engineers – U.A.E.
Graham Richards Project Development Manager Qualification HNC – Mechanical Engineering – UK
HNC – Aeronautical - UK
Experience 33 years
Detailed CV’s form a separate document and can be provided upon request.
Section 13
CLIENT’S and CLIENTS who PRE-QUALIFIED us
30 Nov 09 Page 1 of 1
GES
KEO
Benoy
Merass
ALDAR
Emicool
Coolrich
Bin Darwish
Tabreed UAE
PAL Technology
Hyder Consulting
Dubai Festival City
Al MAL Investments
Banque Saudi Fransi
Tabreed Saudi Arabia
Drake & Scull International
Section 14
PROJECTS
18 July 10 Page 1 of 1
Project Size Value Location
Dhahran District Cooling Scheme 32,000 TR SAR 408 Million Dhahran - KSA
Canvas Hotel 200 Bedroom AED 60 Million Al Ain - UAE
Mohammed Bin Zayed – District Cooling Scheme
122,000 TR AED 1000 Million Abu Dhabi - UAE
Meydan District Cooling Plant 20,000 TR AED 150 Million Dubai - UAE
Economic City – District Cooling Scheme 50,000 TR SAR 400 Million KSA
Maliha District Cooling Scheme 12,500 TR AED 93 Million Sharjah - UAE
Sheikha Salama Mosque 600 TR AED 25 Million Al Ain - UAE
UAE University – District Cooling Scheme 22,500 TR AED 170 Million Al Ain - UAE
Dubai Investment Park – District Cooling Scheme
265,000 TR CONFIDENTIAL Dubai - UAE
Al Ain Wild Life & Resort 30,000 TR AED 225 Million Al Ain - UAE
Al Bedah Forest Ranger Station Building SPECIAL ECO BUILDING
CONFIDENTIAL Abu Dhabi - UAE
Al Watani Housing – District Cooling Scheme
3,400 TR CONFIDENTIAL Abu Dhabi - UAE
Contents
• Gerry Arthur McGuire - CEO • Muhammed Tauqir - Project Manager • Ibrahim Sheriff - Design Manager (Mech) • Jamal Saifudeen - Design Manager (Elec) • Mujahid Adam - Architect
CURRICULUM VITAE
Name: Gerald Arthur McGuire
Born 20th November 1951
Professional Experience 34 years (24 years in the U.A.E.)
Nationality: British
Present Position CEO of Fittons Engineering Consultancy LLC – UAE Responsible for Business Development, P&L, Complete Operations, Designs and Contract Administration for District Cooling Schemes, Building Services, Utility Infrastructure and Specialised Engineering Projects.
Qualifications: * CEI Part II (BSc. Hons.) in Mechanical & Production Engineering (four year full time course)
* Chartered Engineer, UK * Chartered Environmental Engineer, UK * MIMechE – UK * MIET – UK * MASHRAE * Member of Society of Engineers – U.A.E. * Formerly Founder Board Member of Emirates Green Building Council - EGBC
Summary of Experience
2004 – to Sept. 08 Managing Director of Entec Europe Ltd - UAE Responsible for Design, Operations, P&L for the Solid Waste Management System of Al Ain.
2004 – to Sept 08 Executive Director of Entec Shankland Cox (JV) - UAE
Full responsibility for all Designs, Operations, Business Development, P&L etc. for projects ranging from Township Master Plans, Individual Buildings and Waste recovery Systems to large District Cooling Schemes.
Page 2 of 6 Gerald McGuire
Nov. 97 to 2004
Director of Engineering - Shankland Cox Ltd. - UAE Responsible for all aspects of Engineering Designs, Fee Proposals, Feasibility Studies, Contract Administration for District Cooling Schemes, Utility Infrastructures, Irrigation Schemes, Building Services and Waste Recovery Systems.
Oct. 85 to Nov 97 Head of Mechanical and Electrical Engineering for Maunsells Consultancy Services Ltd – UAE Responsible for all aspects of mechanical and electrical works, i.e. fee proposals, feasibility studies, design and supervision for infrastructures, irrigation schemes, building services, sewage & water pumping stations, waste water treatment plants, harbours etc.
Aug. 84 to Oct.85 Engineering and Works Manager for Metito Arabia Industries - Saudi Arabia Responsible for the construction, equipping, staffing, and operations of a plant to manufacture water and sewage related products, i.e. filtration systems, reverse osmosis systems, package sewage treatment plant, pressure vessels, booster pumpsets and chemical dosing systems. I also produced the Quality Control and Assurance Procedures in accordance with BS 5750.
Jun. 83 to Aug.84 Director - F. Bamford Engineering Ltd. - UK
Responsible for start-up of a new business to produce security products i.e. development of business plan, obtaining funding, design of products, works engineering, marketing, sales and profitability.
Aug. 81 to Jun. 83 Engineering and General Manager for Brimbridge Ltd, & Strand Tool Ltd. - UK
Responsible for all aspects of a works producing security products, pumps, pressure vessels, general fabrications and machined products, i.e. design, manufacturing, marketing, sales and profitability.
Page 3 of 6 Gerald McGuire
Mar. 79 to Nov. 81
Production Manager for S.E.I. Ltd. - UK
Responsible for a MOD 0521 (BS 5750) manufacturing unit producing quartz crystal oscillators i.e. equipment design, Q.C. / Q.A., staffing and union negotiations.
May 76 to Mar. 79 Senior Quality Engineer - Ferranti Computer Systems Ltd. -UK
Responsible for all aspects of quality control and quality assurance to MOD 0521 associated with a main frame computer manufacturing company, including customer demonstrations / testing / liaisons.
1972 to 1976 Engineer – Ferranti (Transformers) Ltd. - UK
I held various positions within the large main grid transformer industry (400KV), i.e. design engineer, production engineer, research & development engineer, draughtsman, testing engineer etc., all as part of my training to become a professional engineer. I was part of the design team which developed the worlds first thyrister controlled switch gear.
1968 to 1972 Technician Apprentice - Ferranti (Transformers) Ltd. - UK
General engineering training within the large main grid 400KV transformer & switchgear industry.
Name: Gerald Arthur McGuire Address: PO Box 14659, Al Ain, Abu Dhabi, United Arab Emirates Tel: +971(03)7678230 (H) Fax: +971(03)7678240 (H) Mob: +971(050)6183102 (M) Email: [email protected] (H) [email protected] (O)
Page 4 of 6 Gerald McGuire
Projects Executed by Gerald McGuire – Nov 1985 To Date Architectural Projects
CLIENT DESCRIPTION STATUS LOCATION Value
Royal Group 200 Bed Hotel targeting Estidama 3 Pearl Ongoing Al Ain 70m
BD/ALDAR HVAC – Sheikha Salama Mosque Ongoing Al Ain ?
AAM / Nael Al Shamsi Retail Mall, Hotel and Market Completed Al Ain 500m
Abu Dhabi Nat. Hotels Hilton Hotel - Cabanas to Completed Abu Dhabi ?
Abu Dhabi Nat. Hotels Meridian Hotel – Turkish Hamam Style Spa Completed Abu Dhabi ?
Abu Dhabi Nat. Hotels Hilton Hotel – Health Club Completed Al Ain 15m
Abu Dhabi Nat. Hotels Intercontinental Hotel - Resort Style Extension Completed Al Ain 15m
Al Ain Municipality New Vegetable, Fish and Meat Market Completed Al Ain 150m
Al Ain Municipality Zoo Extension Completed Al Ain 50m
Al Ain Municipality Three Indoor Municipal Swimming Pools Completed Al Ain 65m
Al Ain Municipality Canning Factory, Freezer and Cold Stores Completed Al Ain 15m
ALDAR Retail and Hotels – YAS ISLAND Completed Abu Dhabi 5,000m?
Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m
Chapal Destiny Residential Tower Completed Dubai 65m
Dhabi Group Le Royal Meridian Hotel - Extension Completed Abu Dhabi 45m
Dubai Municipality Wharf & Fuelling Facility for 300 Dhows Completed Dubai 350m
Dubai Municipality Banyas Road System Completed Dubai 300m
Dubai Municipality Zayed University Completed Dubai 700m
Dubai Municipality Customs Bonded Warehouses Completed Dubai 35m
EIIC Marina Hotel and Residential Apartments Completed Abu Dhabi 750m
EIIC Mixed Use Development Completed Al Ain 1,200m
Etisalat Telecommunication & Admin. Tower Building Completed Abu Dhabi 225m
Etisalat Telecommunication Building Completed Abu Dhabi 75m
Etisalat Telecommunications Call Centre Completed Ajman 55m
Etisalat Telecommunication & Admin. Tower Building Completed Dubai 275m
First Homes The Bridge Residential / Office Tower Completed Dubai 55m
JAFZA Freezer and Cold Stores Completed Dubai 10m
NCTH Head Quarters Tower Building Completed Abu Dhabi 75m
Transco Head Office Building Completed Abu Dhabi 45m
Page 5 of 6 Gerald McGuire
District Cooling Projects
CLIENT DESCRIPTION STATUS LOCATION RT
GES DCP and Network Ongoing Sharjah 12,000
Banque Saudi Fransi Technical Advisor for DCP and Network Ongoing Saudi Arabia 32,000
ADM / KEO Technical Advisor for DCP’s & Networks Ongoing Abu Dhabi 122,000
KEO Specialist sub-consultant Ongoing Kuwait/SA 50,000
Hyder / AWPR Feasibility study Completed Al Ain 14,000
Tafseer DCP & Network Ongoing Abu Dhabi 5,000
Emicool Network partial re-design Completed Dubai 265,000
Bin Darwish U.A.E. University Network partial re-design Completed Al Ain 20,000
DSI DCP - Meydan Ongoing Dubai 40,000
Coolrich Network Stress Analysis Completed Confidential 10,000
PAL / Bin Darwish Reem Phase 2 Network Completed Abu Dhabi 60,000
Dhafir DCP - Muroor Completed Abu Dhabi 35,000
Dhafir DCP – Zayed Sport City Completed Abu Dhabi 35,000
Drake & Scull DCP – Meydan Completed Dubai 50,000
Drake & Scull DCP 1 – Motor City Completed Dubai 40,000
Drake & Scull DCP 2 – Motor City Completed Dubai 40,000
Dubai Festival City DCP 1 Completed Dubai 50,000
Dubai Festival City DCP 2 Completed Dubai 35,000
Dubai Festival City Network Completed Dubai 180,000
Dubai Municipality DCP – Zayed University Completed Dubai 9,600
Emicool DCP - DIP Completed Dubai 35,000
Emicool Network - DIP Completed Dubai 250,000
PAL Technologies Network – Saraya Completed Abu Dhabi 25,000
PAL Technologies Network – Najmat Completed Abu Dhabi 110,000
PAL Technologies Network – Najmat Phase 2 Completed Abu Dhabi 60,000
Tabreed DCP 1 & Network Completed Ajman 22,500
Tabreed DCP 2 & Network Completed Ajman 30,000
Tabreed DCP & Network – Al Jimi Completed Al Ain 5,300
Tabreed DCP & Network - Central Completed Al Ain 25,000
Tabreed DCP & Network – U.A.E. University Completed Al Ain 20,000
Tabreed DCP & Network Completed Fujairah 9,600
Tabreed DCP & Network Completed Towaisa 9,600
Page 6 of 6 Gerald McGuire
Infrastructure Projects
CLIENT DESCRIPTION LOCATION
Al Ain Municipality M14 – 3 No Sewage Pumping Station, Press. and Gravity Mains Al Ain
Al Ain Municipality M16 – 2 No Sewage Pumping Station, Press. and Gravity Mains Al Ain
Al Ain Municipality M17 – 2 No Sewage Pumping Station, Press. and Gravity Mains Al Ain
Al Ain Municipality M20 – 1 No Sewage Pumping Station, Press. and Gravity Mains Al Ain
Al Ain Municipality M21 – 1 No Sewage Pumping Station, Press. and Gravity Mains Al Ain
Al Ain Municipality N1 – 4 No Sewage Pumping Station, Press. and Gravity Mains Al Ain
Al Ain Municipality M4 – STP Extension Al Ain
Misc. Water Related Projects
CLIENT DESCRIPTION LOCATION (AED)
Abu Dhabi Municipality Sea Water Aquarium – Khalifa Park Abu Dhabi 20m
Al Ain Municipality Four Indoor Large Spa / Swimming Pools Al Ain 35m
Al Ain Municipality Private Spa / Pool for H.H. Shk. Zayed Al Nahyan Al Ain 15m
Al Ain Municipality Dancing / Musical Fountain Al Ain 12m
Al Ain Municipality Sea Water Aquarium – Ayn Al Faydah (design only) Al Ain 35m
Al Ain Municipality Various Water Features to Several Parks Al Ain varies
MAF Water Park on Roof of Bahrain City Centre Bahrain 130m
Meraas Water features to Burj Lake Hotel Dubai varies
Solid Waste Management Systems
CLIENT DESCRIPTION LOCATION (AED)
Al Ain Municipality Design of complete solid waste management system for Al Ain and its Surrounding Regions comprising 1200TPD Sorting Station (Dirty MRF), Transfer Stations, Clinical Waste Incinerator and Landfill followed by Outsoucing Operations to private contractors.
Al Ain 120m
CURRICULUM VITAE
Name Muhammed Tauqir
Year of birth 16th April 1974
Profession Mechanical Engineer
Nationality Indian
Languages English, Hindi
Qualifications Bachelor of Engineering – Mechanical Engineering
Karnatak University – 1996
Present Position Senior Mechanical Design Engineer Designs and Contract Administration for District Cooling Schemes, Building Services, Utility Infrastructure and Specialized Engineering Projects.
Area of Experience
1. Design of Commercial & Residential Buildings, Leisure development which includes Zoo, Water Parks, Recreational facilities, District Cooling Plant rooms and Reticulation piping.
2. Well versed with local authority regulations.
3. Well versed with various design software’s such as HEVACOMP, Carried HAP4.2, Pipenet, etc.
4. Design reticulation piping and establish the distribution head for the secondary chilled water pumps.
5. Design of ETS rooms, zone valve pits and co-ordinate with infrastructure contractors regarding right of the way for the chilled water services.
6. Conduct feasibility study and value engineering exercise for implementing the type of AC System selection like distributed / central systems including the use of options of chillers like absorption chillers, gas driven chillers, electrical chillers (air / water cooled type) taking into consideration the present challenges of refrigerant use like issues of ozone depletion and global warming potential.
7. Carry out chiller capacity selections, cooling tower selections, pump selection, Thermal Storage tank capacity calculations, Reticulation piping scheme concept and design, design of Mechanical services the plant room, etc.
8. Design check & logic requirements of complete Building Management System & Automatic Controls (BMS).
Muhammed Tauqir Page 2 of 8
9. Study various Energy conservation measures in line with LEED and Green building council regulations.
10. Carry out Heat load calculations for the buildings, design public health systems based on CIBSE, select Grilles and diffusers, ducts, etc.
11. Generate Layout drawings for all the Mechanical services such as Air conditioning, Public health, Fire Fighting, Reticulation piping, etc.
Administrative Works
1. Preparing tender documents and specification of Mechanical installation with keen observation and quality assurance.
2. Estimation and finalization of Mechanical installation for the cost study of the project prior to tender.
3. Preparation of Mechanical drawings to the satisfaction and approval of client/concerned authorities.
4. Preparation of cost comparison chart of tenderers
Summary of Experience - Total experience 12 years
1) 2009 Onwards - Fittons Engineering Consultancy LLC
2) 2003 – 2009 M/s Shankland Cox, Al Ain
Major projects are follows
Project: Al Ain Zoo Phase 1 & Miscellaneous Package
Client – Al Ain Municipality
S.No Description AED (Millions)
1. Mechanical design included different types of animal houses to be maintained at different comfort conditions as per the geological origin of the animals. Miscellaneous package included Cat House, Main Entrance, Reptile House, Boundary Wall, and Fencing.
85
Muhammed Tauqir Page 3 of 8
Project: Al Ain Zoo Phase 2
Client – Al Ain Municipality
S.No Description AED (Millions)
1. This was an extension to Phase 1 and Miscellaneous Works. Mechanical design included different types of animal houses to be maintained at different comfort conditions as per the geological origin of the animals. Each building was separate with DX units.
120
Project: Bahrain Water Park
Client – Majid Al Futtaim
S.No Description AED (Millions)
1. Leisure building which includes water parks. Challenging HVAC design due to huge water bodies.
128
Project: Yas Island – The Retail
Client – M/s ALDAR
S.No Description AED (Millions)
1. This exotic development is by ALDAR on the Yas Island at Abu Dhabi. The Retail is the major part of the whole development with a total built up area of approx. 450,000 sq.m. This mega structure is 320 meters in diameter. The building is a challenge for MEP designer since inside is exposed with 2500 sqm of water bodies.
3,500
Project: Yas Island – East West Hotel (Movenpick)
Client – M/s ALDAR
S.No Description AED (Millions)
1. The hotel is a part of Aldar’s Yas Island development in Abu Dhabi. It is a 575 bedroom four star hotel operated by Movenpick.
500
Muhammed Tauqir Page 4 of 8
Project : Zayed University – Dubai
Client – Dubai Municipality
S.No Description AED (Millions)
1. The University with a capacity of total of 7000 students is one of the best designed educational facilities in the U.A.E. Participated as Senior Design Engineer for complete MEP design from concept to detail design stage. The MEP team also won award of appreciation from the Ministry of Education for their impressive performance.
450
Project : Bawadi Mall – Al Ain
Client – Nael Al Shamsi
S.No Description AED (Millions)
1. The mall is a unique shopping experience in Al Ain with a total of 100,000 sq.m of built up area. The cooling load is catered by a site wide district cooling plant.
200
Project : Telecommunication & Admin Building – Dubai
Client – Etisalat
S.No Description AED (Millions)
1. This iconic structure standing tall in front of World Trade Centre, Dubai is Etisalat’s Telecommunication & Administration building. Fittons team had to deal with air conditioning of complex data centers which need high level of air conditioning precision and reliability
275
Projects : District Cooling Plant rooms and Reticulation piping
Client – M/s Tabreed
S.No Description Tonnage
1. Ajman District cooling Plantroom – 01and associated reticulation piping
22,500
2. Ajman District cooling Plantroom – 02 and associated 30,000
Muhammed Tauqir Page 5 of 8
reticulation piping
3. Al Ain Central Plantroom and associated reticulation piping 25,000
4. UAE University District cooling Plantroom at Al Ain and associated reticulation piping
20,000
5. Al Jimi District cooling Plantroom at Al Ain and associated reticulation piping
5,300
6. Al Air college reticulation piping & building conversion design 7.600
Client – M/s Emicool
S.No Description Tonnage
1. District cooling Plantroom – 03 at Dubai Investment Park 35,000
2. Reticulation pipework for Dubai investment park 250,000
Client – M/s Dubai Festival City
S.No Description Tonnage
1. District cooling Plantroom – 01 at Dubai Festival City 50,000
2. District cooling Plantroom – 02 at Dubai Festival City 35,000
3. Reticulation pipework for Dubai Festival City including future plantrooms
180,000
Client – M/s Drake and Scull International
S.No Description Tonnage
1. Dubai Motorcity District cooling Plantroom – 01 40,000
2. Dubai Motorcity District cooling Plantroom - 02 40,000
3. Meydan District cooling Plantroom at Nad al Sheba 50,000
Client – M/s Pal Technologies
S.No Description Tonnage
1. Reticulation piping for Saraya Development in Abu Dhabi 25,000
2. Reticulation piping for Najmat Abudhabi phase - I 110,000
3. Reticulation piping for Najmat Abudhabi phase - II 60,000
Muhammed Tauqir Page 6 of 8
3) 1996 – 2003 Emirates Trading Agency
Responsible for all mechanical design works in wide range of projects. Some of the major projects while working for ETA are:
• Emirates Palace Hotel, Abu Dhabi • Emirates Towers, Dubai • Convention Centre, Dubai. • Delhi Metro, Delhi (India)
I hereby confirm that the information furnished above is true to the best of my knowledge.
Muhammed Tauqir.
Muhammed Tauqir Page 7 of 8
Projects Executed by Muhammed Tauqir – Nov 1996 to Date
Mixed Use Projects CLIENT DESCRIPTION STATUS LOCATION Value
Royal Group Haya Hotel at Jebel Hafeet, Al Ain Ongoing Al Ain 70m
BD/ALDAR HVAC – Sheikha Salama Mosque Ongoing Al Ain 80m
AAM / Nael Al Shamsi Retail Mall, Hotel and Market Completed Al Ain 500m
Abu Dhabi Nat. Hotels
Hilton Hotel – Health Club Completed Al Ain 15m
Abu Dhabi Nat. Hotels
Intercontinental Hotel - Resort Style Extension
Completed Al Ain 15m
Al Ain Municipality New Vegetable, Fish and Meat Market Completed Al Ain 150m
Al Ain Municipality Zoo Extension Completed Al Ain 50m
Al Ain Municipality Three Indoor Municipal Swimming Pools Completed Al Ain 65m
ALDAR Retail and Hotels – YAS ISLAND Completed Abu Dhabi 5,000m
Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m
Chapal Destiny Residential Tower Completed Dubai 65m
Dhabi Group Le Royal Meridian Hotel - Extension Completed Abu Dhabi 45m
Dubai Municipality Wharf & Fuelling Facility for 300 Dhows Completed Dubai 350m
Dubai Municipality Zayed University Completed Dubai 700m
EIIC Marina Hotel and Residential Apartments Completed Abu Dhabi 750m
EIIC Mixed Use Development Completed Al Ain 1,200m
Etisalat Telecommunication & Admin. Tower Building
Completed Abu Dhabi 225m
Etisalat Telecommunication Building Completed Abu Dhabi 75m
Etisalat Telecommunications Call Centre Completed Ajman 55m
Etisalat Telecommunication & Admin. Tower Building
Completed Dubai 275m
First Homes The Bridge Residential / Office Tower Completed Dubai 55m
JAFZA Freezer and Cold Stores Completed Dubai 10m
Transco Head Office Building Completed Abu Dhabi 45m
Muhammed Tauqir Page 8 of 8
Projects Executed by Muhammed Tauqir – Nov 1996 to Date
District Cooling Projects CLIENT DESCRIPTION STATUS LOCATION RT
GES DCP and Network Ongoing Sharjah 12,000
Banque Saudi Fransi
Technical Advisor for DCP and Network Ongoing Saudi Arabia 32,000
ADM / KEO Technical Advisor for DCP’s & Networks Ongoing Abu Dhabi 122,000
KEO Specialist sub-consultant Ongoing Kuwait/SA 50,000
Hyder / AWPR Feasibility study Completed Al Ain 14,000
Tafseer DCP & Network Ongoing Abu Dhabi 5,000
Emicool Network partial re-design Completed Dubai 265,000
Bin Darwish U.A.E. University Network partial re-design
Completed Al Ain 20,000
DSI DCP - Meydan Ongoing Dubai 40,000
PAL / Bin Darwish Reem Phase 2 Network Completed Abu Dhabi 60,000
Dhafir DCP – Zayed Sport City Completed Abu Dhabi 35,000
Drake & Scull DCP – Meydan Completed Dubai 50,000
Drake & Scull DCP 1 – Motor City Completed Dubai 40,000
Drake & Scull DCP 2 – Motor City Completed Dubai 40,000
Dubai Festival City DCP 1 Completed Dubai 50,000
Dubai Festival City DCP 2 Completed Dubai 35,000
Dubai Festival City Network Completed Dubai 180,000
Dubai Municipality DCP – Zayed University Completed Dubai 9,600
Emicool Network - DIP Completed Dubai 250,000
PAL Technologies Network – Saraya Completed Abu Dhabi 25,000
PAL Technologies Network – Najmat Completed Abu Dhabi 110,000
PAL Technologies Network – Najmat Phase 2 Completed Abu Dhabi 60,000
Tabreed DCP 1 & Network Completed Ajman 22,500
Tabreed DCP 2 & Network Completed Ajman 30,000
Tabreed DCP & Network – Al Jimi Completed Al Ain 5,300
Tabreed DCP & Network – U.A.E. University Completed Al Ain 20,000
Tabreed DCP & Network Completed Towaisa 9,600
CURRICULUM VITAE
Name Ibrahim Sheriff
Year of birth 04th December 1976
Profession Mechanical Engineer
Nationality Indian
Languages English, Hindi, Tamil
Qualifications Bachelor of Engineering – Mechanical Engineering
Madras University – 1997
Present Position Mechanical Design Manager Designs and Contract Administration for District Cooling Schemes, Building Services, Utility Infrastructure and Specialised Engineering Projects.
Area of Experience
1. Design of District Cooling Plantrooms, Reticulation piping and HVAC Systems for Airports, Shopping Malls, Universities, Hotels, High rise Buildings, etc
2. Well versed with various design software’s such as HEVACOMP, Carried HAP4.2,
Pipenet, etc.
3. Design reticulation piping and establish the distribution head for the secondary chilled water pumps.
4. Design of ETS rooms, zone valve pits and co-ordinate with infrastructure contractors regarding right of the way for the chilled water services.
5. Conduct feasibility study and value engineering exercise for implementing the type of AC System selection like distributed / central systems including the use of options of chillers like absorption chillers, gas driven chillers, electrical chillers (air / water cooled type) taking into consideration the present challenges of refrigerant use like issues of ozone depletion and global warming potential.
6. Carry out chiller capacity selections, cooling tower selections, pump selection, Thermal Storage tank capacity calculations, Reticulation piping scheme concept and design, design of Mechanical services the plant room, etc.
7. Design check & logic requirements of complete Building Management System & Automatic Controls (BMS).
8. Study various Energy conservation measures in line with LEED and Green building
council regulations.
Ibrahim Sheriff Page 2 of 7
9. Carry out Heat load calculations for the buildings, design public health systems based on CIBSE, select Grilles and diffusers, ducts, etc.
10. Generate Layout drawings for all the Mechanical services such as Air conditioning, Public health, Fire Fighting, Reticulation piping, etc.
Administrative Works
1. Preparing tender documents and specification of Mechanical installation with keen observation and quality assurance.
2. Estimation and finalization of Mechanical installation for the cost study of the project prior to tender.
3. Preparation of Mechanical drawings to the satisfaction and approval of client/concerned authorities.
4. Preparation of cost comparison chart of tenderers
Summary of Experience - Total experience 11 years
1) 2009 Onwards - Fittons Engineering Consultancy LLC
2) 2006 – 2009 M/s Shankland Cox, Al Ain
Major projects are follows
Project : Yas Island – The Retail
Client – M/s ALDAR
S.No Description AED (Millions)
1. This exotic development is by ALDAR on the Yas Island at Abu Dhabi. The Retail is the major part of the whole development with a total built up area of approx. 450,000 sq.m. This mega structure is 320 meters in diameter. The building is a challenge for MEP designer since inside is exposed with 2500 sqm of water bodies.
3,500
Project : Yas Island – East West Hotel (Movenpick)
Client – M/s ALDAR
S.No Description AED (Millions)
1. The hotel is a part of Aldar’s Yas Island development in Abu Dhabi. It is a 575 bedroom four star hotel operated by Movenpick.
500
Ibrahim Sheriff Page 3 of 7
Project : Zayed University – Dubai
Client – Dubai Muncipality
S.No Description AED (Millions)
1. The University with a capacity of total of 7000 students is one of the best designed educational facility in the U.A.E. Participated as Senior Design Engineer for complete MEP design from concept to detail design stage. The MEP team also won award of appreciation from the Ministry of Education for their impressive performance.
700
Project : Bawadi Mall – Al Ain
Client – Nael Al Shamsi
S.No Description AED (Millions)
1. The mall is a unique shopping experience in Al Ain with a total of 100,000 sq.m of built up area. The cooling load is catered by a site wide district cooling plant.
200
Project : Telecommunication & Admin Building – Dubai
Client – Etisalat
S.No Description AED (Millions)
1. This iconic structure standing tall in front of World Trade Centre, Dubai is Etisalat’s Telecommunication & Administration building. Fittons team had to deal with air conditioning of complex data centers which need high level of air conditioning precision and reliability
275
Projects : District Cooling Plant rooms and Reticulation piping
Client – M/s Tabreed
S.No Description Tonnage
1. Ajman District cooling Plantroom – 01and associated reticulation piping
22,500
2. Ajman District cooling Plantroom – 02 and associated reticulation piping
30,000
Ibrahim Sheriff Page 4 of 7
3. Al Ain Central Plantroom and associated reticulation piping 25,000
4. UAE University District cooling Plantroom at Al Ain and associated reticulation piping
20,000
5. Al Jimi District cooling Plantroom at Al Ain and associated reticulation piping
5,300
6. Al Air college reticulation piping & building conversion design 7.600
Client – M/s Emicool
S.No Description Tonnage
1. District cooling Plantroom – 03 at Dubai Investment Park 35,000
2. Reticulation pipework for Dubai investment park 250,000
Client – M/s Dubai Festival City
S.No Description Tonnage
1. District cooling Plantroom – 01 at Dubai Festival City 50,000
2. District cooling Plantroom – 02 at Dubai Festival City 35,000
3. Reticulation pipework for Dubai Festival City including future plantrooms
180,000
Client – M/s Drake and Scull International
S.No Description Tonnage
1. Dubai Motorcity District cooling Plantroom – 01 40,000
2. Dubai Motorcity District cooling Plantroom - 02 40,000
3. Meydan District cooling Plantroom at Nad al Sheba 50,000
Client – M/s Pal Technologies
S.No Description Tonnage
1. Reticulation piping for Saraya Development in Abu Dhabi 25,000
2. Reticulation piping for Najmat Abudhabi phase - I 110,000
3. Reticulation piping for Najmat Abudhabi phase - II 60,000
Ibrahim Sheriff Page 5 of 7
3) 2004 – 2006 National Kharafi, Kuwait
Responsible for all mechanical design works in wide range of projects. Some of the major projects while working for Kharafi are:
• U.S Army Camp, Kuwait • PAAET, Kuwait
4) 1998 – 2004 Emirates Trading Agency
Responsible for all mechanical design works in wide range of projects. Some of the major projects while working for ETA are:
• Emirates Palace Hotel, Abu Dhabi • Emirates Towers, Dubai • Convention Centre, Dubai. • Delhi Metro, Delhi (India)
I hereby confirm that the information furnished above is true to the best of my knowledge.
Ibrahim Sheriff.
Ibrahim Sheriff Page 6 of 7
Projects Executed by Ibrahim Sheriff – Nov 1997 to Date
Mixed Use Projects CLIENT DESCRIPTION STATUS LOCATION Value
Royal Group Haya Hotel at Jebel Hafeet, Al Ain Ongoing Al Ain 70m
BD/ALDAR HVAC – Sheikha Salama Mosque Ongoing Al Ain 80m
AAM / Nael Al Shamsi Retail Mall, Hotel and Market Completed Al Ain 500m
Abu Dhabi Nat. Hotels
Hilton Hotel – Health Club Completed Al Ain 15m
Abu Dhabi Nat. Hotels
Intercontinental Hotel - Resort Style Extension
Completed Al Ain 15m
Al Ain Municipality New Vegetable, Fish and Meat Market Completed Al Ain 150m
Al Ain Municipality Zoo Extension Completed Al Ain 50m
Al Ain Municipality Three Indoor Municipal Swimming Pools Completed Al Ain 65m
ALDAR Retail and Hotels – YAS ISLAND Completed Abu Dhabi 5,000m
Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m
Chapal Destiny Residential Tower Completed Dubai 65m
Dhabi Group Le Royal Meridian Hotel - Extension Completed Abu Dhabi 45m
Dubai Municipality Wharf & Fuelling Facility for 300 Dhows Completed Dubai 350m
Dubai Municipality Zayed University Completed Dubai 700m
EIIC Marina Hotel and Residential Apartments Completed Abu Dhabi 750m
EIIC Mixed Use Development Completed Al Ain 1,200m
Etisalat Telecommunication & Admin. Tower Building
Completed Abu Dhabi 225m
Etisalat Telecommunication Building Completed Abu Dhabi 75m
Etisalat Telecommunications Call Centre Completed Ajman 55m
Etisalat Telecommunication & Admin. Tower Building
Completed Dubai 275m
First Homes The Bridge Residential / Office Tower Completed Dubai 55m
Transco Head Office Building Completed Abu Dhabi 45m
Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m
Ibrahim Sheriff Page 7 of 7
Projects Executed by Ibrahim Sheriff – Nov 1997 To Date
District Cooling Projects CLIENT DESCRIPTION STATUS LOCATION RT
GES DCP and Network Ongoing Sharjah 12,000
Banque Saudi Fransi
Technical Advisor for DCP and Network Ongoing Saudi Arabia 32,000
ADM / KEO Technical Advisor for DCP’s & Networks Ongoing Abu Dhabi 122,000
KEO Specialist sub-consultant Ongoing Kuwait/SA 50,000
Hyder / AWPR Feasibility study Completed Al Ain 14,000
Tafseer DCP & Network Ongoing Abu Dhabi 5,000
Emicool Network partial re-design Completed Dubai 265,000
Bin Darwish U.A.E. University Network partial re-design
Completed Al Ain 20,000
DSI DCP - Meydan Ongoing Dubai 40,000
PAL / Bin Darwish Reem Phase 2 Network Completed Abu Dhabi 60,000
Dhafir DCP – Zayed Sport City Completed Abu Dhabi 35,000
Drake & Scull DCP – Meydan Completed Dubai 50,000
Drake & Scull DCP 1 – Motor City Completed Dubai 40,000
Drake & Scull DCP 2 – Motor City Completed Dubai 40,000
Dubai Festival City DCP 1 Completed Dubai 50,000
Dubai Festival City DCP 2 Completed Dubai 35,000
Dubai Festival City Network Completed Dubai 180,000
Dubai Municipality DCP – Zayed University Completed Dubai 9,600
Emicool Network - DIP Completed Dubai 250,000
PAL Technologies Network – Saraya Completed Abu Dhabi 25,000
PAL Technologies Network – Najmat Completed Abu Dhabi 110,000
PAL Technologies Network – Najmat Phase 2 Completed Abu Dhabi 60,000
Tabreed DCP 1 & Network Completed Ajman 22,500
Tabreed DCP 2 & Network Completed Ajman 30,000
Tabreed DCP & Network – Al Jimi Completed Al Ain 5,300
Tabreed DCP & Network – U.A.E. University Completed Al Ain 20,000
Tabreed DCP & Network Completed Towaisa 9,600
CURRICULUM VITAE
Name Jamal Saifudeen
Year of birth 6th July 1967
Profession Electrical Engineer
Nationality Indian
Languages English, Tamil
Qualifications Bachelor of Engineering – Electrical Engineering
Madurai Kamaraj University – 1988
Present Position Electrical Design Manager Designs of Electrical & Low Current Systems for Building Services & District Cooling Projects.
Area of Experience
1. Design and selection of lighting fixture based on CIBSE Code Recommendation using computerised calculation including photometric curves and Sioux diagrams for each luminaries.
2. Design and selection of emergency luminaries as per the local civil defense requirements DIN/VDE; BS Standards.
3. Designing of low voltage programmable lighting control system including selection of network control units; lighting relay control unit; relays and intelligent switches.
4. Design and selection of single; multiword insulated cables as per the ADDC & DEWA requirements IEE regulation including voltage drop circulation with ambient temperature of the cables.
5. Design and selection of feeder and plug in bus ways as per the requirement of the building.
6. Design of electrical load calculation including selection of outgoing ways; breakers; Elk’s, etc.
7. Design and selection of panel boards including bus bars; air circuit breakers; molded case circuit breakers; miniature circuit breakers’ residual current devices, etc.
8. Designing of automatic power factor equipment including HRC fuses; current limiting reactors; discharge resistors and capacitor elements.
9. Design and selection of automatic fire alarm system bused on local civil defense regulation; UL listed and NFPA standard including intelligent detectors; monitor module, alarm indicating devices; magnetic door holder with cable distribution and arrangement.
10. Design and selection of CCTV system including selection of camera; lens, monitors, multiplexer/digital recorder.
Jamal Saifudeen Page 2 of 7
11. Design and monitoring door access control systems including card reading sensors; multiple switch monitor, cards, door contact; keypad coding unit.
12. Design and selection of satellite receiving decoding and broadcasting system including dual feed horn; amplifier; converter, inverter, etc.
13. Designing of lighting protection system as per the local code and the BS including selection of air terminals; down conductors; electrodes, etc.
14. Designing of earthling system as per the BS standards and local regulations.
Administrative Works
1. Preparing tender documents and specification of electrical installation with keen observation and quality assurance.
2. Estimation and finalization of electrical installation for the cost study of the project prior to tender.
3. Preparation of electrical drawings to the satisfaction and approval of client/concerned authorities.
4. Preparation of cost comparison chart of tenderness
Summary of Experience - Total experience 17 years
1) 2009 Onwards - Fittons Engineering Consultancy LLC
2) 1997 – 2009 M/s Shankland Cox, Al Ain
Major projects are follows
Project : Al Ain Zoo Phase 1 & Miscellaneous Package
Client – Al Ain Municipality
S.No Description AED (Millions)
1. Electrical design (Lighting, Power, Special Lighting for Reptile, PA System) is done as per the geological origin of the animals. Miscellaneous package including Cat House, Reptile House, Incubation Centre & Bird House.
85
Project : Al Ain Zoo Phase 2
Client – Al Ain Municipality
S.No Description AED (Millions)
1. This was an extension to Phase 1 and Miscellaneous Works. Electrical design (Lighting, Power, PA System), included different types of animal houses to be maintained at different comfort conditions as per the geological origin of the animals.
120
Jamal Saifudeen Page 3 of 7
Project : Telecommunication & Admin Building – Abu Dhabi
Client – Etisalat
S.No Description AED (Millions)
1. The Glass structure Telecommunication & Admin Building Located at Airport Road in Abu Dhabi. Fittons team had done detail Lighting, power, Low current system design (cctv, Access control, Telephone, PA, Fire alarm with voice evacuation, Queuing system etc).
300
Project : Telecommunication & Admin Building – Abu Dhabi
Client – Etisalat
S.No Description AED (Millions)
1. This iconic structure Building located in front of Dubai world trade centre. Fittons team had done detail lighting, power, low current system design (cctv, Access control, Telephone, PA, Fire alarm with Voice evacuation, Queing system etc).
300
Project : Yas island – The Retail
Client – ALDAR
S.No Description AED (Millions)
1. This development is by ALDAR on the Yas island Abu Dhabi. This whole development with total Built-up area approx. 450,000 sq.m.
Fittons team had done detail lighting, power, Low current system design (cctv, Access control, Telephone, Data, PA, Fire alarm with Voice evacuation, Car park management system) and Lift traffic analysis.
3500
Project : Yas island – East West Hotel (Moven’pick)
Client – ALDAR
S.No Description AED (Millions)
1. The Hotel is a part of Aldar’s Yas island development in Abu Dhabi. It is a 575 bedroom four star hotel operated by Moven’pick. Fitton team had done Electrical, Low current design and Lift traffic analysis.
60
Jamal Saifudeen Page 4 of 7
Zayed University - Dubai
Client – Dubai Municipality
S.No Description AED (Millions)
1. The University with the capacity of total of 7000 students is one of the best educational facilities in UAE. Fittons team had done Electrical, Lighting, Power, Low current system from concept stage to detail design stage. The MEP team also won award of appreciation from the ministry of education for their impressive performance.
700
Bawadi Mall – Al Ain
Client – Nael Al Shamsi
S.No Description AED (Millions)
1. The shopping mall located in Meyzad – Al Ain with total built-up area of 100,000 sq.m. Fittons team had done Lighting, Power and Low current system.
200
Projects : District Cooling Plant rooms and Reticulation piping
Client – M/s Tabreed
S.No Description Tonnage
1. Ajman District cooling Plantroom – 01and associated reticulation piping
22,500
2. Ajman District cooling Plantroom – 02 and associated reticulation piping
30,000
3. Al Ain Central Plantroom and associated reticulation piping 25,000
4. UAE University District cooling Plantroom at Al Ain and associated reticulation piping
20,000
5. Al Jimi District cooling Plantroom at Al Ain and associated reticulation piping
5,300
6. Al Air college reticulation piping & building conversion design 7.600
Client – M/s Emicool
S.No Description Tonnage
1. District cooling Plantroom – 03 at Dubai Investment Park 35,000
2. Reticulation pipework for Dubai investment park 250,000
Jamal Saifudeen Page 5 of 7
Client – M/s Dubai Festival City
S.No Description Tonnage
1. District cooling Plantroom – 01 at Dubai Festival City 50,000
2. District cooling Plantroom – 02 at Dubai Festival City 35,000
3. Reticulation pipework for Dubai Festival City including future plantrooms
180,000
Client – M/s Drake and Scull International
S.No Description Tonnage
1. Dubai Motorcity District cooling Plantroom – 01 40,000
2. Dubai Motorcity District cooling Plantroom - 02 40,000
3. Meydan District cooling Plantroom at Nad al Sheba 50,000
Client – M/s Pal Technologies
S.No Description Tonnage
1. Reticulation piping for Saraya Development in Abu Dhabi 25,000
2. Reticulation piping for Najmat Abudhabi phase - I 110,000
3. Reticulation piping for Najmat Abudhabi phase - II 60,000
3) 1995 – 1997 Perfection Consultants Worked as Senior Electromechanical Engineer.
4) 1989 – 1995 Global Contracting Company Worked as Electrical Site Engineer.
I hereby confirm that the information furnished above is true to the best of my knowledge.
Jamal Saifudeen.
Jamal Saifudeen Page 6 of 7
Projects Executed by Jamal Saifudeen – Nov 1989 to Date
Mixed Use Projects CLIENT DESCRIPTION STATUS LOCATION Value
Royal Group Haya Hotel at Jebel Hafeet, Al Ain Ongoing Al Ain 70m
BD/ALDAR HVAC – Sheikha Salama Mosque Ongoing Al Ain 80m
AAM / Nael Al Shamsi Retail Mall, Hotel and Market Completed Al Ain 500m
Abu Dhabi Nat. Hotels
Hilton Hotel – Health Club Completed Al Ain 15m
Abu Dhabi Nat. Hotels
Intercontinental Hotel - Resort Style Extension
Completed Al Ain 15m
Al Ain Municipality New Vegetable, Fish and Meat Market Completed Al Ain 150m
Al Ain Municipality Zoo Extension Completed Al Ain 50m
Al Ain Municipality Three Indoor Municipal Swimming Pools Completed Al Ain 65m
ALDAR Retail and Hotels – YAS ISLAND Completed Abu Dhabi 5,000m
Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m
Chapal Destiny Residential Tower Completed Dubai 65m
Dhabi Group Le Royal Meridian Hotel - Extension Completed Abu Dhabi 45m
Dubai Municipality Wharf & Fuelling Facility for 300 Dhows Completed Dubai 350m
Dubai Municipality Zayed University Completed Dubai 700m
EIIC Marina Hotel and Residential Apartments Completed Abu Dhabi 750m
EIIC Mixed Use Development Completed Al Ain 1,200m
Etisalat Telecommunication & Admin. Tower Building
Completed Abu Dhabi 225m
Etisalat Telecommunication Building Completed Abu Dhabi 75m
Etisalat Telecommunications Call Centre Completed Ajman 55m
Etisalat Telecommunication & Admin. Tower Building
Completed Dubai 275m
First Homes The Bridge Residential / Office Tower Completed Dubai 55m
Transco Head Office Building Completed Abu Dhabi 45m
Badri & Bensouda Shangri-La Hotel – 254 bedrooms Completed Dubai 150m
Jamal Saifudeen Page 7 of 7
Projects Executed by Jamal Saifudeen – Nov 1989 To Date
District Cooling Projects CLIENT DESCRIPTION STATUS LOCATION RT
GES DCP and Network Ongoing Sharjah 12,000
Banque Saudi Fransi
Technical Advisor for DCP and Network Ongoing Saudi Arabia 32,000
ADM / KEO Technical Advisor for DCP’s & Networks Ongoing Abu Dhabi 122,000
KEO Specialist sub-consultant Ongoing Kuwait/SA 50,000
Hyder / AWPR Feasibility study Completed Al Ain 14,000
Tafseer DCP & Network Ongoing Abu Dhabi 5,000
Emicool Network partial re-design Completed Dubai 265,000
Bin Darwish U.A.E. University Network partial re-design
Completed Al Ain 20,000
DSI DCP - Meydan Ongoing Dubai 40,000
PAL / Bin Darwish Reem Phase 2 Network Completed Abu Dhabi 60,000
Dhafir DCP – Zayed Sport City Completed Abu Dhabi 35,000
Drake & Scull DCP – Meydan Completed Dubai 50,000
Drake & Scull DCP 1 – Motor City Completed Dubai 40,000
Drake & Scull DCP 2 – Motor City Completed Dubai 40,000
Dubai Festival City DCP 1 Completed Dubai 50,000
Dubai Festival City DCP 2 Completed Dubai 35,000
Dubai Festival City Network Completed Dubai 180,000
Dubai Municipality DCP – Zayed University Completed Dubai 9,600
Emicool Network - DIP Completed Dubai 250,000
PAL Technologies Network – Saraya Completed Abu Dhabi 25,000
PAL Technologies Network – Najmat Completed Abu Dhabi 110,000
PAL Technologies Network – Najmat Phase 2 Completed Abu Dhabi 60,000
Tabreed DCP 1 & Network Completed Ajman 22,500
Tabreed DCP 2 & Network Completed Ajman 30,000
Tabreed DCP & Network – Al Jimi Completed Al Ain 5,300
Tabreed DCP & Network – U.A.E. University Completed Al Ain 20,000
Tabreed DCP & Network Completed Towaisa 9,600
CURRICULUM VITAE
Name Mugahid Adam Badry
Year of birth 18th Aug 1971
Profession Architect
Nationality Sudanese
Languages English, Arabic
Qualifications BSc. (Honours) in Architecture Engineering & Environmental Planning from Sharq Al Neil University, Sudan.
Present Position Senior Architect Designs and Contract Administration, Liaison with Authorities for Building Services, Utility Infrastructure, District Cooling Schemes, and Specialized Engineering Projects.
EXPERIENCE & PROJECTS: UAE (1998 – 2009)
March 2009 to Date FITTONS Engineering Consultancy (Al-Ain) Working as Architect, Process Coordinator for NOCs, Building Permits etc.
2007- Feb .2009 Entec (Al-Ain) UAE UNIVERSITY CAMPUS DEVELOPMENT DISTICT COOLING PLANT Work as PROJECT MANAGER.
• Site management. • Approval for material and Quality Control. • Meetings and joint side works with clients or sub contractors. • Execution progress and work evaluation. • Tests and approval of materials and all projects needs. • Handling the documents and paper work. • Provide continuous and rigorous daily inspection. • Participate in the review and approval of all shop drawings, brochures and samples. • Ensure all materials delivered on site are inspected.
2006-2007 CPD Middle East LLC (DUBI) DUBI MALL – Package DS-O2A Work as QA/QC.
• Following Shop drawings & sample's approval from the consultant. • Control Quality of Dry wall partitions & space frame cladding & finishing materials, work
on GRG & GRC Columns. • Provide continuous and rigorous daily inspection. • Ensure QA/QC reports as and when required in the contract. • Participate in the review and approval of all shop drawings, brochures and samples.
Ensure all materials delivered on site inspected.
Mujahid Adam Page 2 of 3
2004 – 2006 JUMIRA INT'L CONSLTANTS – (Al-Ain)
Work as Technical Manager.
• Design for a different types of Commercial buildings and Luxury villas in Alain. • Preparing Building Specifications with Owners. • Following drawings & sample's approval from Town Planning & Municipality & Drainage
depart & 1st Gulf Bank. • Make Quantities for tenders and quotations. • Site supervision and Management.
2002 – 2004 3D CLASSIC CONSULTANTS – (Al-Ain)
Architects & Engineers
Work as a Designer and exudation Engineer
• Assist the manager for design of different types of Commercial buildings and Luxury villas as, well as follow – up approval from different departs in Alain & Abu Dhabi.
• Supervision of H.H Sheikh Sultan Bin Tahnoon A-Nahyan Palace at sila'a. • Execution and site supervision.
2001 – 2002 AL HADARA General Constructions – (Abu-Dhabi)
Work as Site Engineer
For AL-SLAMAT KINDERGARDEN (P.W.D)
• Follow – up PWD Al Ain,(company Representation) • Following drawings & sample approval from PWD & Municipality & Drainage
depart- Al Ain. • Following the payments from PWD and doing sub-contractors payments • Time Schedules and sub-contractors performance.
1999 – 2001 Al AHGAF General Constructions Ltd. – (Abu-Dhabi)
Work as Site Engineer
• Construction of H.H Sheikh Hamad Bin Hamdan Al-Nahyan Palace. • Management of labour and sites works execution. • Materials supply, Local material preparation and quality control assistant
1998 – 1999 KHALEFA AIM General Constructions (Al-Ain) Work as Site Engineer
• Construction of Some Local Villa and Mosque's. • Co-operate with consultant to solve many problems accorded while execution. • Site supervision and Management.
1996 – 1998 TASSMEEM ENG. CO.LTD – SUDAN
Low cost Houses and Educational Buildings
Work as Architect & Site Construction
• Supervision of site and maintenance work. • Management of labour and site work. • Materials supply, Local material preparation and quality control assistant.
Mujahid Adam Page 3 of 3
COMPUTER SKILLS:
PCs running Microsoft Windows, MS-DOS, WordPerfect, Word for Windows, Excel, AutoCAD R14, 2000, 2006,2009
Internet
TECHNICAL EXPERIENCE & DUTIES:
1. Planning and Execution Project analysis and dividing to production stages Short daily and weekly reports/Instruction to contractors and manpower Meetings and joint side works with clients or sub contractors Report and note down the progress parallel with breakdown schedule and
progress percentage preparation 2. Coordination
Obtain of approvals, No objection, clearance and projects permit Arrangement of subcontractors and prices estimation Facilitate the missions and time squeeze
3. Supervisory Performance of all the workers, contractors and subcontractors Execution progress and work evaluation
4. Management Handling the documents and paper work Estimation of job size and the required staff Manpower control, machinery, vehicles and offices
5. Construction A good experience in constructing a different types of buildings Related services execution(AC/Electrical works/Drainage /plumping
fire alarms/fire fighting/control panels/generator & fuel/Landscape) Tests and approval of materials and all projects needs
Section 16
INSURANCE
PROFESSIONAL INDEMNITY
18 July 2010 Page 1 of 2
Please see the Following Document
Section 17
INSURANCE
THIRD PARTY LIABILITY
18 July 2010 Page 1 of 2
Please see the Following Document