Water inflow into Icelandic rock mass:- Ólafsfjördur Tunnel
ready
6Héðinsfjarðargöng Project - leakage at the face of Ólafsfjördur Tunnel ready
7
ready
8ready
9ready
10ready
Project description:- The TBM tunnel with HERRENKNECHT Earth Pressure Balance Type TBM (shield 6.120 mm diameter):Total length 3.300m, including ca. 1.500m marine crossing section.
The first tunnel in the world between two continents.
11readyCoast ...... “5’ to 12.00 o’clock” – Jurata (Poland) March 1993Designer and responsible for delivery of gabions
- the first site with gabions based on double twisted mesh (March 1993)First storm – April 1993After completion of works – May 1993July 1996
12Slope collapse 2002
ready
13Different stages of cliff rebuilding ready
14ready
15 15The catastrophal flood – Gdańsk (Poland) 2001
2 m
ready
16 16ready
17ready
18 18
2-3 m/s
ready
19readyConcrete repairs - waterproofing
20 20Royal Castle in Warsaw (Warszawa)
- probably the most sofisticated slope protection, waterproofing systems and drainage in the world (?)
ready
21ready
22ready
Thank You for Your attention!
Ph.D Civ. Eng. Tomasz Najder
Senior Consultant
Movägen 3, 133 36 Saltsjöbaden - Sweden
Tel: 0046 (0)8 717 5714 Fax: 0046 (0)8 717 6042 Mobil: 0046 (0)704 217 012
E-mail: [email protected]
Org. no: 490911 – 2148
ready
23