0. part 00 ee, extreme engineering. 2010.02.15 - part 2 slide show

23
Extreme engineering part 2 IX-2009 (Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited.

Upload: tomasz-najder

Post on 11-Feb-2017

22 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

Extreme engineering – part 2IX-2009

(Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready

1

Copyright noticeUnauthorised copying of this

presentation as whole or in parts in any form or by any means, electronic,

photocopying, recording or otherwise, without prior written

permision is prohibited.

Page 2: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

2

ready

Page 3: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

3

ready

Page 4: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

4

ready

Page 5: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

Water inflow into Icelandic rock mass:- Ólafsfjördur Tunnel

ready

Page 6: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

6Héðinsfjarðargöng Project - leakage at the face of Ólafsfjördur Tunnel   ready

Page 7: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

7

ready

Page 8: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

8ready

Page 9: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

9ready

Page 10: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

10ready

Project description:- The TBM tunnel with HERRENKNECHT Earth Pressure Balance Type TBM (shield 6.120 mm diameter):Total length 3.300m, including ca. 1.500m marine crossing section.

The first tunnel in the world between two continents.

Page 11: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

11readyCoast ...... “5’ to 12.00 o’clock” – Jurata (Poland) March 1993Designer and responsible for delivery of gabions

- the first site with gabions based on double twisted mesh (March 1993)First storm – April 1993After completion of works – May 1993July 1996

Page 12: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

12Slope collapse 2002

ready

Page 13: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

13Different stages of cliff rebuilding ready

Page 14: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

14ready

Page 15: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

15 15The catastrophal flood – Gdańsk (Poland) 2001

2 m

ready

Page 16: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

16 16ready

Page 17: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

17ready

Page 18: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

18 18

2-3 m/s

ready

Page 19: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

19readyConcrete repairs - waterproofing

Page 20: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

20 20Royal Castle in Warsaw (Warszawa)

- probably the most sofisticated slope protection, waterproofing systems and drainage in the world (?)

ready

Page 21: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

21ready

Page 22: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

22ready

Page 23: 0. Part 00 EE, Extreme engineering. 2010.02.15 - part 2 slide show

Thank You for Your attention!

Ph.D Civ. Eng. Tomasz Najder

Senior Consultant

Movägen 3, 133 36 Saltsjöbaden - Sweden

Tel: 0046 (0)8 717 5714 Fax: 0046 (0)8 717 6042 Mobil: 0046 (0)704 217 012

E-mail: [email protected]

Org. no: 490911 – 2148

ready

23