€¦ · xls file · web view2018-02-09 · 201.010 near the city of santa cruz, from north aptos...

59
Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY R/W Con Vote Vote Date Fund Type PA&ED PS&E R/W Sup Con Sup Total Cap & Sup Perfomance Measure Performance Value 01 Del Norte 101 8.2/8.7 0B090 1072 0100020444 201.113 18-19 $5,589 $ - $ - HBRR-S $2,159 $3,720 $ 373 $ - $ 11,841 2.0 Bridge(s) 01 Del Norte 101 0C590 7011 0113000013 201.015 16-17 $ 145 $ 2,880 $ 2,643 5/17/17 STP $ 504 $ 670 $ 39 $ 295 $ 4,533 213.0 Collision(s) reduced 01 Del Norte 101 25.8/27.3 0C660 1095 0113000023 201.361 18-19 $ 432 $ - $ - NH $ 669 $ 467 ### $ - $ 2,802 87.0 Curb ramp(s) 01 Del Norte 101 0E560 7016 0114000100 201.010 16-17 $ 7 $ 2,900 $ 2,043 8/15/16 STP $ 285 $ 398 $ 4 $ 511 $ 4,105 100.0 Collision(s) reduced 01 Del Norte 101 39.8 0F310 1113 0115000108 201.110 19-20 $ 151 $ 5,852 $ - HBRR-S $1,068 $1,141 $ 154 $1,643 $ 10,009 1.0 Bridge(s) 01 Del Norte 101 21.2 0G210 1122 0116000137 201.131 19-20 $ 18 $10,148 $ - NH $1,488 $2,276 $ 116 $3,974 $ 18,020 1.0 Location(s) 01 Del Norte 101 20.0/R28.0 0H050 1126 0117000089 201.130 16-17 $ 10 $ 600 $ 600 4/6/17 NH $ - $ - $ 10 $ 200 $ 820 2.0 Location(s) 01 Del Norte 101 15.1/15.5 0H690 1128 0118000074 201.130 17-18 $ - $ 9,800 $ 9,800 11/20/17 NH $ - $ - $ - $3,000 $ 12,800 1.0 Location(s) 01 Del Norte 101 14.8/15.1 0H700 1127 0118000075 201.130 17-18 $ 10 $ 7,000 $ 7,000 11/20/17 NH $ - $ - $ 15 $2,200 $ 9,225 1.0 Location(s) 01 Del Norte 101 36.1 43640 0100V 0100000193 201.110 18-19 $3,900 $ - $ - HBRR-S ### $3,700 $ 650 $ - $ 19,192 1.0 Bridge(s) 01 Del Norte 199 33.4 0C470 1094 0112000287 201.235 17-18 $ 7 $ 2,409 $ - NH $ 864 $ 812 $ 9 $ 932 $ 5,033 1.0 Location(s) 01 Del Norte 199 7.5/27.5 0F190 1109 0115000078 201.010 16-17 $ - $ 1,967 $ 2,128 1/24/17 STP $ - $ 459 $ 7 $ 490 $ 2,923 67.0 Collision(s) reduced 01 Del Norte 199 10.2/10.7 0G130 1121 0116000128 201.010 19-20 $ 25 $ 1,570 $ - STP $ 402 $ 507 $ 93 $ 393 $ 2,990 20.0 Collision(s) reduced 01 Del Norte 199 1.1/36.3 48800 1055 0114000074 201.151 19-20 $ 166 $ 4,998 $ - NH $1,100 $1,135 $ 82 $1,221 $ 8,702 18.0 Drainage system(s) 01 Humboldt 36 11.4/34.5 0C500 2363 0112000292 201.112 18-19 $ 502 $ - $ - HBRR-S $2,947 $3,646 $ 268 $ - $ 7,363 905.5 Linear feet 01 Humboldt 36 0.1/1.6 0E010 2379 0113000090 201.015 19-20 $2,727 $ 7,187 $ - STP $ 910 $ 886 $ 592 $ 955 $ 13,257 23.0 Collision(s) reduced 01 Humboldt 36 36.6/39.9 0E930 2409 0115000047 201.010 16-17 $ 231 $ 7,441 $ 7,441 10/19/16 STP $ 90 $ 75 $ 660 $ 40 $ 8,537 54.0 Collision(s) reduced 01 Humboldt 36 10.5/10.8 0F160 2415 0115000076 201.010 19-20 $ 309 $ 2,240 $ - STP $ 910 $ 904 $ 174 $ 537 $ 5,074 20.0 Collision(s) reduced 01 Humboldt 36 29.0/30.0 0G850 2468 0117000067 201.130 16-17 $ 25 $ 900 $ 900 2/6/17 NH $ - $ - $ 15 $ 225 $ 1,165 1.0 Location(s) 01 Humboldt 36 19.0/44.0 0G920 2470 0117000074 201.130 16-17 $ 15 $ 1,500 $ 1,500 2/22/17 NH $ - $ - $ 10 $ 350 $ 1,875 1.0 Location(s) 01 Humboldt 36 36.1/40.5 43730 2272 0112000180 201.310 16-17 $2,550 $ 6,090 $ 6,090 10/19/16 NH $ 200 $ 60 ### $ 52 $ 10,352 3.5 1,000 vehicle hour(s)/yr 01 Humboldt 96 0A120 2302 0113000109 201.113 19-20 $1,089 $ 6,171 $ - HBRR-S $1,419 $1,856 $ 171 $1,948 $ 12,654 3.0 Bridge(s) 01 Humboldt 96 12.3 0E100 2383 0113000124 201.119 16-17 $ 21 $ 1,845 $ 1,486 5/17/17 HBRR-S $ 307 $ 455 $ 87 $ 610 $ 3,325 2.0 Bridge(s) 01 Humboldt 96 0.4 0G710 2462 0117000052 201.999 17-18 $ - $ - $ - ST-CASH $ 267 $ - $ - $ - $ 267 1.0 Location(s) 01 Humboldt 96 7.8/8.0 0G840 2466 0117000066 201.130 16-17 $ 5 $ 500 $ 500 1/24/17 NH $ - $ - $ 5 $ 100 $ 610 1.0 Location(s) 01 Humboldt 96 20.0/24.0 0H030 2478 0117000087 201.130 16-17 $ 25 $ 3,200 $ 3,200 4/6/17 NH $ - $ - $ 25 $ 950 $ 4,200 1.0 Location(s) 2016 SHOPP As of January 2017 Close-Out ($1,000) Near Klamath, at Panther Creek Bridge No. 01-0025 and at Hunter Creek Bridge No. 01-0003. Seismic retrofit. (G13 In Del Norte and Humboldt Counties, on Routes 101, 169, 197 and 199 at various locations. Upgrade metal beam guard rail. In and near Crescent City, from south of Elk Valley Road to north of Wilson Avenue/Burtschell Street. Upgrade ADA facilities and construct traffic calming measures to improve operations and safety for non-motorized users. (G13 Contingency In Del Norte, Humboldt, Lake and Mendocino counties on various routes, at various locations. Install both centerline and edge line rumble strips. Near the Smith River community, at Dominie Creek. Replace box culvert with new bridge and remediate fish passage Near Crescent City, at 0.2 mile north of Cushing Creek Viaduct. Restore roadway to pre-slide condition. In and near Crescent City, from 2.7 miles south of Hamilton Road to 0.1 mile north of Washington Boulevard. Repair sinkhole and repair drainage systems, and restore Near Klamath, from Wilson Creek Road to 1.7 miles north of Rudisill Road. Repair four existing retaining walls, construct new retaining wall, replace culvert and downdrain, and stabilize roadway. Near Crescent City, from 1.0 mile to 1.3 miles north of Rudsill Road. Construct retaining walls, repair culvert and downdrain, and install subsurface Near Crescent City from 0.2 mile north of the Smith River Overflow Bridge. Replace bridge. (G13 Contingency Project) Near Idlewild, south of Collier Tunnel Bridge. Install required public water system in compliance with Federal and State statutes and regulatory Near Gasquet, from 0.4 mile north of South Fork Road to 0.6 mile south of Idlewild Maintenance Station Road at various locations. Install high friction Near Gasquet, from 0.7 to 0.3 mile south of Hardscrabble Creek Bridge. Install high friction surface treatment (HFST), signs, guardrail, and centerline rumble In Del Norte County at various locations from north of Elk Valley Cross Road to south of the Oregon State Line. Culvert rehabilitation and fish passage. Near Bridgeville, at Hely Creek Bridge No. 04-0092, Little Larabee Creek Bridge No. 04-0102 (PM 25.3), and Butte Creek Bridge No. 04-0116. Upgrade bridge rails and widen at three bridges. (G13 Near Fortuna, from Route 101 to River Bar Road. Shoulder widening. Near Dinsmore, from west of Burr Valley Road to west of Buck Mountain Road. (Forest Highway 4). Widen to make lane and shoulder widths standard, realign curves, and improve roadway cross-slope. Near Carlotta, from 0.1 mile east of Riverside Park Road to 0.4 mile east of Riverside Park Road. Curve correction. Near Bridgeville, 1.3 miles west of McClellan Mountain Road to 0.3 mile west of McClellan Mountain Road. Repair slipout, strengthen embankment armament, Near Bridgeville, from 0.3 mile west of Jaymar Lane to 1.7 miles west of Trinity County line. Remove slide debris and hazardous trees, stabilize slope, support geotechnical investigations, and repair Near Dinsmore, from west of Burr Valley Road to Buck Mountain Road (Forest Highway 4). Roadway improvements. In Humboldt County on Routes 96 and 101 at various locations. Seismic retrofit 3 Near Hoopa, on Route 96, at Trinity River Bridge No. 04-0137; also near Arcata, on Route 101, at Arcata Overhead No. 04- 0079R (PM 87.8). Clean, spot blast and Near Willow Creek, at 0.1 mile east of Willow Creek Bridge. Transportation infrastructure improvement for zero- Near Willow Creek, from 0.3 mile west of Tish Tang Campground to Tish Tang Campground. Remove slide debris and Near Weitchpec, from 3.0 miles west of Klamath River to 0.6 mile east of Upper Weitchpec School Road. Repair roadway

Upload: dinhnhi

Post on 11-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY R/W Con Vote Vote Date Fund Type PA&ED PS&E R/W Sup Con Sup Total Cap & Sup Perfomance Measure Performance Value01 Del Norte 101 8.2/8.7 0B090 1072 0100020444 201.113 18-19 $ 5,589 $ - $ - HBRR-S $ 2,159 $ 3,720 $ 373 $ - $ 11,841 2.0 Bridge(s)

01 Del Norte 101 0C590 7011 0113000013 201.015 16-17 $ 145 $ 2,880 $ 2,643 5/17/17 STP $ 504 $ 670 $ 39 $ 295 $ 4,533 213.0 Collision(s) reduced

01 Del Norte 101 25.8/27.3 0C660 1095 0113000023 201.361 18-19 $ 432 $ - $ - NH $ 669 $ 467 $1,234 $ - $ 2,802 87.0 Curb ramp(s)

01 Del Norte 101 0E560 7016 0114000100 201.010 16-17 $ 7 $ 2,900 $ 2,043 8/15/16 STP $ 285 $ 398 $ 4 $ 511 $ 4,105 100.0 Collision(s) reduced

01 Del Norte 101 39.8 0F310 1113 0115000108 201.110 19-20 $ 151 $ 5,852 $ - HBRR-S $ 1,068 $ 1,141 $ 154 $ 1,643 $ 10,009 1.0 Bridge(s)

01 Del Norte 101 21.2 0G210 1122 0116000137 201.131 19-20 $ 18 $ 10,148 $ - NH $ 1,488 $ 2,276 $ 116 $ 3,974 $ 18,020 1.0 Location(s)

01 Del Norte 101 20.0/R28.0 0H050 1126 0117000089 201.130 16-17 $ 10 $ 600 $ 600 4/6/17 NH $ - $ - $ 10 $ 200 $ 820 2.0 Location(s)

01 Del Norte 101 15.1/15.5 0H690 1128 0118000074 201.130 17-18 $ - $ 9,800 $ 9,800 11/20/17 NH $ - $ - $ - $ 3,000 $ 12,800 1.0 Location(s)

01 Del Norte 101 14.8/15.1 0H700 1127 0118000075 201.130 17-18 $ 10 $ 7,000 $ 7,000 11/20/17 NH $ - $ - $ 15 $ 2,200 $ 9,225 1.0 Location(s)

01 Del Norte 101 36.1 43640 0100V 0100000193 201.110 18-19 $ 3,900 $ - $ - HBRR-S $10,942 $ 3,700 $ 650 $ - $ 19,192 1.0 Bridge(s)

01 Del Norte 199 33.4 0C470 1094 0112000287 201.235 17-18 $ 7 $ 2,409 $ - NH $ 864 $ 812 $ 9 $ 932 $ 5,033 1.0 Location(s)

01 Del Norte 199 7.5/27.5 0F190 1109 0115000078 201.010 16-17 $ - $ 1,967 $ 2,128 1/24/17 STP $ - $ 459 $ 7 $ 490 $ 2,923 67.0 Collision(s) reduced

01 Del Norte 199 10.2/10.7 0G130 1121 0116000128 201.010 19-20 $ 25 $ 1,570 $ - STP $ 402 $ 507 $ 93 $ 393 $ 2,990 20.0 Collision(s) reduced

01 Del Norte 199 1.1/36.3 48800 1055 0114000074 201.151 19-20 $ 166 $ 4,998 $ - NH $ 1,100 $ 1,135 $ 82 $ 1,221 $ 8,702 18.0 Drainage system(s)

01 Humboldt 36 11.4/34.5 0C500 2363 0112000292 201.112 18-19 $ 502 $ - $ - HBRR-S $ 2,947 $ 3,646 $ 268 $ - $ 7,363 905.5 Linear feet

01 Humboldt 36 0.1/1.6 0E010 2379 0113000090 201.015 19-20 $ 2,727 $ 7,187 $ - STP $ 910 $ 886 $ 592 $ 955 $ 13,257 23.0 Collision(s) reduced

01 Humboldt 36 36.6/39.9 0E930 2409 0115000047 201.010 16-17 $ 231 $ 7,441 $ 7,441 10/19/16 STP $ 90 $ 75 $ 660 $ 40 $ 8,537 54.0 Collision(s) reduced

01 Humboldt 36 10.5/10.8 0F160 2415 0115000076 201.010 19-20 $ 309 $ 2,240 $ - STP $ 910 $ 904 $ 174 $ 537 $ 5,074 20.0 Collision(s) reduced

01 Humboldt 36 29.0/30.0 0G850 2468 0117000067 201.130 16-17 $ 25 $ 900 $ 900 2/6/17 NH $ - $ - $ 15 $ 225 $ 1,165 1.0 Location(s)

01 Humboldt 36 19.0/44.0 0G920 2470 0117000074 201.130 16-17 $ 15 $ 1,500 $ 1,500 2/22/17 NH $ - $ - $ 10 $ 350 $ 1,875 1.0 Location(s)

01 Humboldt 36 36.1/40.5 43730 2272 0112000180 201.310 16-17 $ 2,550 $ 6,090 $ 6,090 10/19/16 NH $ 200 $ 60 $1,400 $ 52 $ 10,352 3.5 1,000 vehicle hour(s)/yr

2016 SHOPP As of January 2017 Close-Out($1,000)

Near Klamath, at Panther Creek Bridge No. 01-0025 and at Hunter Creek Bridge No. 01-0003. Seismic retrofit. (G13 Contingency Project)In Del Norte and Humboldt Counties, on Routes 101, 169, 197 and 199 at various locations. Upgrade metal beam guard rail.In and near Crescent City, from south of Elk Valley Road to north of Wilson Avenue/Burtschell Street. Upgrade ADA facilities and construct traffic calming measures to improve operations and safety for non-motorized users. (G13 Contingency Project)

In Del Norte, Humboldt, Lake and Mendocino counties on various routes, at various locations. Install both centerline and edge line rumble strips.

Near the Smith River community, at Dominie Creek. Replace box culvert with new bridge and remediate fish passage barrier.Near Crescent City, at 0.2 mile north of Cushing Creek Viaduct. Restore roadway to pre-slide condition.In and near Crescent City, from 2.7 miles south of Hamilton Road to 0.1 mile north of Washington Boulevard. Repair sinkhole and repair drainage systems, and restore roadway.

Near Klamath, from Wilson Creek Road to 1.7 miles north of Rudisill Road. Repair four existing retaining walls, construct new retaining wall, replace culvert and downdrain, and stabilize roadway.

Near Crescent City, from 1.0 mile to 1.3 miles north of Rudsill Road. Construct retaining walls, repair culvert and downdrain, and install subsurface dewatering system.

Near Crescent City from 0.2 mile north of the Smith River Overflow Bridge. Replace bridge. (G13 Contingency Project)Near Idlewild, south of Collier Tunnel Bridge. Install required public water system in compliance with Federal and State statutes and regulatory requirements.

Near Gasquet, from 0.4 mile north of South Fork Road to 0.6 mile south of Idlewild Maintenance Station Road at various locations. Install high friction surface treatment.

Near Gasquet, from 0.7 to 0.3 mile south of Hardscrabble Creek Bridge. Install high friction surface treatment (HFST), signs, guardrail, and centerline rumble strip.

In Del Norte County at various locations from north of Elk Valley Cross Road to south of the Oregon State Line. Culvert rehabilitation and fish passage.

Near Bridgeville, at Hely Creek Bridge No. 04-0092, Little Larabee Creek Bridge No. 04-0102 (PM 25.3), and Butte Creek Bridge No. 04-0116. Upgrade bridge rails and widen at three bridges. (G13 Contingency Project)

Near Fortuna, from Route 101 to River Bar Road. Shoulder widening.Near Dinsmore, from west of Burr Valley Road to west of Buck Mountain Road. (Forest Highway 4). Widen to make lane and shoulder widths standard, realign curves, and improve roadway cross-slope.

Near Carlotta, from 0.1 mile east of Riverside Park Road to 0.4 mile east of Riverside Park Road. Curve correction.Near Bridgeville, 1.3 miles west of McClellan Mountain Road to 0.3 mile west of McClellan Mountain Road. Repair slipout, strengthen embankment armament, and repair roadway.

Near Bridgeville, from 0.3 mile west of Jaymar Lane to 1.7 miles west of Trinity County line. Remove slide debris and hazardous trees, stabilize slope, support geotechnical investigations, and repair roadway.

Near Dinsmore, from west of Burr Valley Road to Buck Mountain Road (Forest Highway 4). Roadway improvements.

01 Humboldt 96 0A120 2302 0113000109 201.113 19-20 $ 1,089 $ 6,171 $ - HBRR-S $ 1,419 $ 1,856 $ 171 $ 1,948 $ 12,654 3.0 Bridge(s)

01 Humboldt 96 12.3 0E100 2383 0113000124 201.119 16-17 $ 21 $ 1,845 $ 1,486 5/17/17 HBRR-S $ 307 $ 455 $ 87 $ 610 $ 3,325 2.0 Bridge(s)

01 Humboldt 96 0.4 0G710 2462 0117000052 201.999 17-18 $ - $ - $ - ST-CASH $ 267 $ - $ - $ - $ 267 1.0 Location(s)

01 Humboldt 96 7.8/8.0 0G840 2466 0117000066 201.130 16-17 $ 5 $ 500 $ 500 1/24/17 NH $ - $ - $ 5 $ 100 $ 610 1.0 Location(s)

01 Humboldt 96 20.0/24.0 0H030 2478 0117000087 201.130 16-17 $ 25 $ 3,200 $ 3,200 4/6/17 NH $ - $ - $ 25 $ 950 $ 4,200 1.0 Location(s)

01 Humboldt 96 24.2/R44.2 0H190 2482 0117000127 201.130 16-17 $ 25 $ 2,000 $ 2,000 4/17/17 NH $ - $ - $ 25 $ 600 $ 2,650 1.0 Location(s)

01 Humboldt 101 27.7 0A110 2301 0112000211 201.113 19-20 $ 44 $ 6,078 $ - HBRR-S $ 4,641 $ 2,072 $ 215 $ 1,855 $ 14,905 1.0 Bridge(s)

01 Humboldt 101 110.6 0B420 2340 0112000126 201.131 16-17 $ 760 $ 4,500 $ 1,301 5/17/17 NH $ 270 $ 1,500 $ 90 $ 706 $ 7,826 2.0 Location(s)

01 Humboldt 101 110.6 0B421 2472 0117000078 201.131 17-18 $ - $ 500 $ 500 10/18/17 NH $ - $ - $ - $ 300 $ 800 0.0 Location(s)

01 Humboldt 101 75.3/77.6 0B620 2346 0112000156 201.378 19-20 $ 695 $ 5,589 $ - NH $ 462 $ 921 $ 644 $ 660 $ 8,971 50.0 Curb ramp(s)

01 Humboldt 101 0B820 7009 0112000189 201.015 16-17 $ 71 $ 3,500 $ 2,287 3/15/17 STP $ 173 $ 345 $ 104 $ 529 $ 4,722 6.0 Collision(s) reduced

01 Humboldt 101 102.9/105.2 0C440 2365 0112000284 201.235 17-18 $ 20 $ 4,544 $ - NH $ 412 $ 1,817 $ 15 $ 1,035 $ 7,843 2.0 Location(s)

01 Humboldt 101 69.9/75.2 0C570 2382 0113000009 201.122 19-20 $ 366 $ 31,243 $ - NH $ 646 $ 1,258 $ 52 $ 6,696 $ 40,261 21.1 Lane mile(s)

01 Humboldt 101 77.0/77.5 0C710 2368 0113000031 201.010 17-18 $ 278 $ 2,607 $ - STP $ 395 $ 1,029 $ 348 $ 725 $ 5,382 72.0 Collision(s) reduced

01 Humboldt 101 0C840 7012 0113000066 201.015 16-17 $ 11 $ 2,054 $ 2,228 10/19/16 STP $ 144 $ 268 $ 62 $ 420 $ 2,959 111.0 Collision(s) reduced

01 Humboldt 101 80.8/87.8 0C970 2375 0113000094 201.015 18-19 $ 118 $ 1,763 $ - STP $ 510 $ 300 $ 48 $ 267 $ 3,006 39.0 Collision(s) reduced

01 Humboldt 101 79.8/84.7 0E000 2376 0113000091 201.112 18-19 $ 196 $ 4,249 $ - HBRR-S $ 1,480 $ 1,514 $ 63 $ 892 $ 8,394 300.0 Linear feet

01 Humboldt 101 78.0/79.8 0E040 2380 0113000100 201.121 18-19 $ 21 $ 3,135 $ - NH $ 107 $ 167 $ 104 $ 725 $ 4,259 7.0 Lane mile(s)

01 Humboldt 101 88.2/88.3 In Arcata, at Route 299. Realign ramp curve. 0E650 2397 0114000117 201.015 19-20 $ 600 $ 3,220 $ - STP $ 901 $ 662 $ 164 $ 613 $ 6,160 24.0 Collision(s) reduced01 Humboldt 101 78.1/79.6 0E680 2393 0114000123 201.010 18-19 $ 360 $ 6,254 $ - STP $ 1,114 $ 690 $ 362 $ 1,236 $ 10,016 503.0 Collision(s) reduced

01 Humboldt 101 R17.9/87.8 0E770 2400 0115000009 201.322 18-19 $ 1,359 $ - $ - NH $ 1,010 $ 1,355 $ 65 $ - $ 3,789 3.0 Bridge(s)

01 Humboldt 101 79.5/80.2 0F200 2417 0115000088 201.113 19-20 $ 3,837 $ 3,695 $ - HBRR-S $ 709 $ 1,574 $ 75 $ 1,206 $ 11,096 1.0 Bridge(s)

01 Humboldt 101 79.9/86.1 0F220 2418 0115000092 201.310 18-19 $ 240 $ 6,807 $ - NH $ 414 $ 667 $ 114 $ 830 $ 9,072 23.0 1,000 vehicle hour(s)/yr

01 Humboldt 101 R39.2/R48.3 0F360 2422 0115000115 201.121 18-19 $ 6 $ 14,515 $ - NH $ 579 $ 680 $ 85 $ 1,518 $ 17,383 36.8 Lane mile(s)

01 Humboldt 101 R90.1/109.6 0F820 2439 0116000067 201.121 20-21 $ - $ - $ - NH $ 332 $ - $ - $ - $ 332 77.7 Lane mile(s)

01 Humboldt 101 124.5 0F960 2447 0116000109 201.110 18-19 $ 1,523 $ - $ - HBRR-S $ 966 $ 644 $ 193 $ - $ 3,326 1.0 Bridge(s)

In Humboldt County on Routes 96 and 101 at various locations. Seismic retrofit 3 bridges.Near Hoopa, on Route 96, at Trinity River Bridge No. 04-0137; also near Arcata, on Route 101, at Arcata Overhead No. 04-0079R (PM 87.8). Clean, spot blast and repaint bridges.

Near Willow Creek, at 0.1 mile east of Willow Creek Bridge. Transportation infrastructure improvement for zero-emission vehicle charging.Near Willow Creek, from 0.3 mile west of Tish Tang Campground to Tish Tang Campground. Remove slide debris and stabilize slope.Near Weitchpec, from 3.0 miles west of Klamath River to 0.6 mile east of Upper Weitchpec School Road. Repair roadway slipout.Near Orleans, from 0.9 mile east of Upper Weitchpec Road to 0.8 mile west of Siskiyou County line. Remove slide debris, reconstruct embankment slipouts, and repair drainage systems.

Near Myers Flat, at South Fork Eel River Bridge No. 04-0123. Seismic retrofit.Near Trinidad at 1.9 miles south of Kane Road; also at 1.3 miles north of Kane Road (PM T113.8). Reconstruct roadway and de-water.Near Trinidad at 1.9 miles south of Kane Road; also at 1.3 miles north of Kane Road (PM T113.8). Environmental mitigation for EA 0B420.In Eureka, from north of Herrick Avenue Overcrossing to south of the Eureka Slough Bridge. Upgrade curb ramps, sidewalks, and signal push-buttons to ADA standards.

In Humboldt and Mendocino counties, on Routes 20 and 101 at various locations. Upgrade metal beam guard rail.Near Trinidad, between PMs 102.9 and 105.2. Install public water system in compliance with Federal and State statutes and regulatory requirements.

In and near Eureka, from south of Fields Landing Overhead to north of Herrick Avenue Overcrossing. Roadway rehabilitation.In Eureka, 0.3 mile south to 0.2 mile north of Wabash Avenue. Improve intersections.In Lake, Mendocino, Humboldt and Del Norte Counties, on Routes 20,36, 101, 175 and 299 at various locations. Upgrade crash cushions.Near Eureka, from PMs 80.0 to 87.8. Upgrade metal beam guardrail.Near Eureka, at various locations from 0.2 miles south of Eureka Slough Bridge to 0.2 miles north of Gannon Slough Bridge. Upgrade bridge rails and replace bridge.

In Eureka on 4th Street from Broadway to Eureka Slough Bridge; also on 5th street from O Street to Eureka Slough Bridge. Pavement rehabilitation.

In Eureka, on 4th Street from Broadway to Y Street. Restripe to add traffic and bicycle lanes, construct pedestrian bulb-outs and ADA ramps, and install or modify signals.

In Humboldt County, at South Fork Eel River Bridge and Separation No. 04-0065, South Fork Eel River Bridge No. 04-0076 (PM 35.5), and Arcata Overhead No. 04-0079R. Strengthen three bridge structures. (G13 Contingency Project)

In Eureka at the Eureka Slough Bridge No. 04-0022L. Seismic retrofit.In and near Eureka and Arcata, from south of Cole Avenue to north of Route 255. Operational improvements.Near Redcrest, from Englewood Park Undercrossing to Eel River Bridge and Overhead. Pavement rehabilitation.Near Trinidad, from 1.3 miles south of School Road to 0.4 mile north of Big Lagoon Bridge. Pavement rehabilitation.Near Orick, at 0.2 mile south of Lost Man Creek Bridge. Remove fish passage barrier. (G13 Contingency Project)

01 Humboldt 101 87.8/R91.5 0G510 7024 0117000013 201.010 19-20 $ - $ 1,301 $ - STP $ 394 $ 582 $ 90 $ 616 $ 2,983 30.0 Collision(s) reduced

01 Humboldt 101 24.0/26.5 0G810 2465 0117000063 201.130 16-17 $ 75 $ 4,000 $ 4,000 2/16/17 NH $ - $ - $ 25 $ 700 $ 4,800 3.0 Location(s)

01 Humboldt 101 28.4/32.0 0G820 2464 0117000064 201.130 16-17 $ 35 $ 3,500 $ 3,500 2/16/17 NH $ - $ - $ 30 $ 700 $ 4,265 3.0 Location(s)

01 Humboldt 101 R40.5/R42.0 0G830 2463 0117000065 201.130 16-17 $ 35 $ 5,000 $ 5,000 2/16/17 NH $ - $ - $ 20 $ 750 $ 5,805 1.0 Location(s)

01 Humboldt 101 R6.0 0G860 2467 0117000068 201.130 16-17 $ 10 $ 750 $ 750 2/6/17 NH $ - $ - $ 10 $ 200 $ 970 1.0 Location(s)

01 Humboldt 101 R50.5 0G960 2474 0111700080 201.130 16-17 $ 10 $ 600 $ 600 3/6/17 NH $ - $ - $ 10 $ 150 $ 770 1.0 Location(s)

01 Humboldt 101 T0.0/R13.0 0H100 2480 0117000103 201.130 16-17 $ 15 $ 3,400 $ 3,400 4/6/17 NH $ - $ - $ 25 $ 700 $ 4,140 1.0 Location(s)

01 Humboldt 101 29.4 0H490 2496 0117000229 201.130 16-17 $ 70 $ 10,500 $ 10,500 6/20/17 NH $ - $ - $ 30 $ 2,500 $ 13,100 1.0 Location(s)

01 Humboldt 101 R11.8/26.7 48770 7002 0114000071 201.151 20-21 $ - $ - $ - NH $ 878 $ - $ - $ - $ 878 19.0 Drainage system(s)

01 Humboldt 169 28.0/32.0 0G930 2471 0117000076 201.130 16-17 $ 10 $ 950 $ 950 3/6/17 NH $ - $ - $ 10 $ 320 $ 1,290 1.0 Location(s)

01 Humboldt 169 15.0/30.0 0H020 2477 0117000086 201.130 16-17 $ 5 $ 700 $ 700 3/16/17 NH $ - $ - $ 10 $ 175 $ 890 1.0 Location(s)

01 Humboldt 211 R77.2/78.6 0H070 2479 0117000096 201.130 16-17 $ 30 $ 3,000 $ 3,000 4/6/17 NH $ - $ - $ 20 $ 600 $ 3,650 1.0 Location(s)

01 Humboldt 254 42.4 0G980 2475 0117000082 201.130 16-17 $ 10 $ 500 $ 500 3/6/17 NH $ - $ - $ 10 $ 175 $ 695 1.0 Location(s)

01 Humboldt 254 4.0/6.0 0H010 2476 0117000085 201.130 16-17 $ 25 $ 3,000 $ 3,000 4/6/17 NH $ - $ - $ 25 $ 900 $ 3,950 2.0 Location(s)

01 Humboldt 254 6.8/42.1 40950 2270 0100000158 201.151 18-19 $ 305 $ 1,453 $ - NH $ 513 $ 838 $ 151 $ 403 $ 3,663 7.0 Drainage system(s)

01 Humboldt 254 11.1/11.2 47531 2381 0113000112 201.131 16-17 $ 50 $ 873 $ 737 6/28/17 NH $ 208 $ 337 $ 89 $ 256 $ 1,813 2.0 Location(s)

01 Humboldt 283 0.1 0E840 2407 0115000036 201.119 16-17 $ 11 $ 4,162 $ 4,481 6/28/17 HBRR-S $ 296 $ 679 $ 14 $ 973 $ 6,135 1.0 Bridge(s)

01 Humboldt 299 R16.1/R16.4 0E030 2378 0113000099 201.335 19-20 $ 19 $ 3,008 $ - NH $ 425 $ 880 $ 89 $ 648 $ 5,069 14.3 Acre(s) treated/pollutant

01 Humboldt 299 20.5/30.2 0F460 2427 0116000010 201.010 19-20 $ 127 $ 6,886 $ - STP $ 986 $ 864 $ 21 $ 921 $ 9,805 40.0 Collision(s) reduced

In and near Arcata, between West End Road and School Road at four locations. Construct shoulder rumble strip, upgrade guardrail, construct guardrail slope retaining wall, and place High Friction Surface Treatment (HFST).

Near Miranda, from 1.0 mile south of Salmon Creek Road to 1.5 miles north of Salmon Creek Road. Remove slide debris, repair slipout, strengthen embankment armament, and repair sinkhole in roadway.

Near Weott, from 0.5 mile north of Route 254 to 0.4 mile north of Pesula Road. Remove slide debris, repair sinkhole and cracking in asphalt roadway, construct soldier pile retaining wall, and construct debris barrier catchment.

Near Redcrest, from 0.8 mile north of Sorenson Road to 2.3 miles north of Sorenson Road. Remove slide debris and hazardous trees, stabilize slope, construct soldier pile retaining walls, repair failed culverts, and support Geotechnical investigations (drilling).

Near Benbow, at 0.1 mile north of South Fork Eel River Bridge. Replace failed culvert and repair sinkhole in roadway.Near Scotia, at 0.1 mile south of South Scotia Road. Stabilize failed slope, repair sinkhole adjacent to shoulder, repair roadway crossing culvert, improve drainage system, and repair roadway.

Near Garberville, from Mendocino County line to 0.3 mile north of Skyway Road. Repair and replace culverts, repair sinkholes, and restore roadway.

Near Weott, at 1.1 miles south of Willford Road. Construct soldier pile retaining walls, repair drainage systems, and reconstruct roadway.Near Garberville, from north of Redwood Drive to 1.3 miles south of Myers Flat; also, in Mendocino County on Route 271 near Piercy, from 0.5 mile north of Confusion Hill to 0.5 mile north of Route 101 Separation (PM 16.1 to 20.0). Rehabilitate or replace drainage Near Martins Ferry, from 1.7 miles north of Mitchell Road to 1.4 miles north of Weitchpec School Road. Remove slide debris, repair slipout, strengthen embankment armament, repair drainage system, and repair roadway.

Near Pecwan, from 0.5 mile south of Pecwan Creek Bridge to Martins Ferry School Creek Bridge. Repair embankment slipout, install slope drainage, replace damaged culverts, support geotechnical investigations, and repair roadway.

Near Ferndale, at Eel River (Fernbridge) Bridge No. 04-0134. Repair bridge scour.Near Holmes, at 1.3 miles north of Holmes Flat Road. Remove slide debris and hazardous trees, stabilize slope, repair drainage, and repair roadway.

Near Miranda, from 0.1 mile south of Fish Creek Road to Madrona Road. Reconstruct embankment slipout, repair sinkhole, and restore roadway.

Near Miranda, from 2.3 miles south of Miranda Post Office to 0.9 mile south of Bear Creek Bridge. Upgrade drainage systems.Near Myers Flat, at 0.3 mile north and at 0.4 mile north of Bridge Creek Road. Required mitigation for EA 01-47502 to reconstruct and restore culverts.

In and near Scotia and Rio Dell, at Eel River Overhead No. 04-0015. Clean, spot-blast and paint steel bridge members.Near Blue Lake, from north of Simpson Road to north of Chezem Road at various locations. Install erosion control Storm Water Mitigation measures at 3 locations.

Near Willow Creek, from 1.5 mile east of East Bair Road to 0.4 mile west of Cedar Creek Road, at various locations. Widen shoulders.

01 Humboldt 299 30.7/37.7 0F470 2426 0116000011 201.010 19-20 $ 19 $ 11,388 $ - STP $ 1,640 $ 1,668 $ 45 $ 2,518 $ 17,278 118.0 Collision(s) reduced

01 Humboldt 299 R1.9/37.8 0F620 2433 0116000035 201.151 21-22 $ - $ - $ - NH $ 904 $ - $ - $ - $ 904 24.0 Drainage system(s)

01 Humboldt 299 38.9/39.5 0F680 2434 0116000044 201.010 19-20 $ 211 $ 2,594 $ - STP $ 1,108 $ 1,306 $ 238 $ 1,103 $ 6,560 18.0 Collision(s) reduced

01 Humboldt 299 R14.7/R15.7 0F690 2435 0116000045 201.010 19-20 $ - $ 1,386 $ - STP $ 498 $ 697 $ 9 $ 642 $ 3,232 13.0 Collision(s) reduced

01 Humboldt 299 19.2/19.4 0G910 2469 0117000073 201.130 16-17 $ 10 $ 650 $ 650 2/6/17 NH $ - $ - $ 10 $ 180 $ 850 1.0 Location(s)

01 Humboldt 299 30.6 0G950 2473 0117000079 201.130 16-17 $ 10 $ 1,750 $ 1,750 3/16/17 NH $ - $ - $ 10 $ 350 $ 2,120 1.0 Location(s)

01 Lake 1 0E850 7018 0115000037 201.015 18-19 $ 12 $ 3,800 $ - STP $ 742 $ 812 $ 81 $ 1,266 $ 6,713 246.0 Collision(s) reduced

01 Lake 20 0C810 3096 0113000060 201.010 17-18 $ 167 $ 6,860 $ - STP $ 706 $ 859 $ 217 $ 1,381 $ 10,190 40.0 Collision(s) reduced

01 Lake 20 0E080 3098 0113000122 201.112 19-20 $ 263 $ 5,621 $ - HBRR-S $ 943 $ 1,136 $ 324 $ 1,601 $ 9,888 853.0 Linear feet

01 Lake 20 5.8 0F490 3107 0116000013 201.110 20-21 $ - $ - $ - HBRR-S $ 577 $ - $ - $ - $ 577 1.0 Bridge(s)

01 Lake 20 5.1/5.7 0G330 4647 0116000170 201.010 19-20 $ 234 $ 7,441 $ - STP $ 1,463 $ 1,877 $ 144 $ 1,870 $ 13,029 14.0 Collision(s) reduced

01 Lake 20 28.4 0G700 3112 0117000051 201.999 18-19 $ - $ - $ - ST-CASH $ 230 $ - $ - $ - $ 230 1.0 Location(s)

01 Lake 20 5.0/21.0 0H040 3115 0117000088 201.130 16-17 $ 5 $ 500 $ 500 3/16/17 NH $ - $ - $ 5 $ 150 $ 660 1.0 Location(s)

01 Lake 29 R41.4 0B690 3097 0112000184 201.378 16-17 $ 7 $ 645 $ 763 5/17/17 NH $ 160 $ 350 $ 16 $ 265 $ 1,443 10.0 Curb ramp(s)

01 Lake 29 9.6/10.3 0C750 3095 0113000046 201.010 17-18 $ 695 $ 5,200 $ 5,420 12/14/17 STP $ 954 $ 1,185 $ 201 $ 1,322 $ 9,557 26.0 Collision(s) reduced

01 Lake 29 34.1/R34.5 0E640 3101 0114000116 201.010 17-18 $ 7 $ 1,050 $ 1,014 5/17/17 STP $ 410 $ 375 $ 30 $ 390 $ 2,262 7.0 Collision(s) reduced

01 Lake 29 12.8/14.4 0E720 3102 0115000003 201.010 19-20 $ 502 $ 8,813 $ - STP $ 1,280 $ 1,119 $ 88 $ 2,464 $ 14,266 18.0 Collision(s) reduced

01 Lake 29 0E730 3203 0115000004 201.010 19-20 $ 459 $ 5,646 $ - STP $ 1,355 $ 1,216 $ 62 $ 2,039 $ 10,777 45.0 Collision(s) reduced

01 Lake 29 0E830 7017 0115000034 201.315 20-21 $ - $ - $ - NH $ 587 $ - $ - $ - $ 587 21.0 Field element(s)

01 Lake 29 12.0/15.0 0H060 3114 0117000090 201.130 16-17 $ 10 $ 2,700 $ 2,700 4/6/17 NH $ - $ - $ 10 $ 550 $ 3,270 1.0 Location(s)

01 Lake 29 28.5/31.6 29811 3099 0114000043 201.010 18-19 $ 9,777 $ 38,578 $ - STP $ 4,000 $ 4,638 $1,920 $ 7,137 $ 66,050 83.0 Collision(s) reduced

01 Lake 53 0E820 3104 0115000033 201.315 20-21 $ - $ - $ - NH $ 618 $ - $ - $ - $ 618 30.0 Field element(s)

01 Lake 175 R25.0/27.5 0A040 3080 0100020013 201.010 17-18 $ 2,756 $ 10,221 $ - STP $ 2,214 $ 2,161 $ 964 $ 2,784 $ 21,100 22.0 Collision(s) reduced

Near Willow Creek, from 0.1 mile east of Cedar Creek Road to 1.1 miles west of Route 96. Widen shoulders, place high-friction surface treatment (HFST), install rumble strips, guardrail, and cable net drapery.

Near Blue Lake and Willow Creek, from 0.1 mile east of Route 200 to 0.5 mile east of Boise Creek Campground. Rehabilitate drainage culverts.Near Willow Creek, from 0.1 mile west of Willow Way to Panther Road. Widen shoulders, upgrade ADA curb ramps, and install a bus turn-out.

Near Blue Lake, from 2.2 miles east of Simpson Road to 3.2 miles east of Simpson Road. Widen shoulders, and install rumble strips and guardrailing.

Near Blue Lake, from 0.1 mile to 0.3 mile east of Bair Road. Remove slide debris, stabilize saturated slope and repair distressed roadway.Near Willow Creek, at 0.1 mile north of Cedar Creek Road. Remove slide debris, stabilize slope, install rock slope protection (RSP), and repair roadway.

In Lake and Mendocino Counties on various routes at various locations. Upgrade guardrail, end treatments, and transition railings to current standards and install vegetation control measures.

Near Clear Lake Oaks, on Route 20, from 0.4 mile west to 0.4 mile east of Route 53; also on Route 53, from 0.3 mile south of Route 20 to Route 20. Install traffic signal or a roundabout.

In Lake County on Routes 20, 29 and 175 at various locations. Replace and upgrade bridge rails on 5 bridges.Near Upper Lake at Bachelor Creek Bridge No. 14-0001. Replace multi-plate steel culvert bridge with precast concrete box culverts and wingwalls.

Near Upper Lake, from 0.4 mile west to 0.2 mile east of Witter Springs Road. Curve improvement, shoulder widening, and add left-turn pocket and rumble strips.

Near Clearlake Oaks, at the Clearlake Oaks Maintenance Station. Transportation infrastructure improvement for zero-emission vehicle charging.

Near Upper Lake, from 0.2 mile east of Saratoga Springs Road to Bruner Drive. Remove slide debris, reconstruct embankment slipout, repair drainage, and repair roadway.

Near Lakeport, at Lakeport Overcrossing. Upgrade pedestrian facilities.Near Middletown, from Putah Lane to 0.3 mile north of Spruce Road. Install traffic signal or a roundabout.Near Kelseyville, from 0.2 mile south to 0.2 mile north of Cruickshank Road. Widen for left- turn channelization safety improvementsNear Lower Lake, from north of Spruce Grove Road to south of Hofacker Lane. Widen shoulders.

Near Lower Lake, at various locations. Widen for truck climbing lanes and shoulders.In Lake and Mendocino Counties, on Routes 20, 29, 101, 175, and 281 at various locations. Upgrade the existing Transportation Management System (TMS) elements toNear Lakeport, from 0.1 mile north of Spruce Grove Road to 0.1 mile north of Hofacker Lane. Repair sinkhole, replace culvert, and restore roadway.

Near Kelseyville, from north of Route 29/281 Junction to north of Route 29/175 Junction. Improve road condition.In Lake County, on Routes 20, 29, 53, and 175 at various locations. Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring and data transmission.

Near Middletown, from east of Putah Creek Bridge to Dry Creek Bridge. Widen shoulders.

01 Lake 175 17.4/23.6 0G750 3113 0117000056 201.130 16-17 $ 25 $ 2,000 $ 2,000 1/24/17 NH $ - $ - $ 25 $ 400 $ 2,450 4.0 Location(s)

01 Lake VAR 42780 3047B 0100000180 201.151 17-18 $ 438 $ 3,773 $ - NH $ 880 $ 1,346 $ 746 $ 1,135 $ 8,318 26.0 Drainage system(s)

01 Mendocino 1 41.8/42.3 0C550 4578 0112000300 201.010 19-20 $ 462 $ 1,702 $ - STP $ 622 $ 326 $ 223 $ 608 $ 3,943 16.0 Collision(s) reduced

01 Mendocino 1 31.4 0E110 4588 0113000125 201.112 19-20 $ 333 $ 7,325 $ - HBRR-S $ 1,363 $ 1,445 $ 191 $ 1,759 $ 12,416 321.5 Linear feet

01 Mendocino 1 42.3/42.5 0E940 4616 0115000048 201.150 19-20 $ 168 $ 1,102 $ - NH $ 415 $ 405 $ 67 $ 370 $ 2,527 1.0 Location(s)

01 Mendocino 1 0.0/15.0 0F440 4626 0116000008 201.121 19-20 $ 15 $ 12,585 $ - NH $ 623 $ 704 $ 85 $ 2,590 $ 16,602 31.4 Lane mile(s)

01 Mendocino 1 6.5/9.5 0F710 4630 0116000047 201.010 19-20 $ 433 $ 519 $ - STP $ 940 $ 978 $ 472 $ 728 $ 4,070 6.0 Collision(s) reduced

01 Mendocino 1 71.2/71.4 0G060 4639 0116000120 201.010 19-20 $ 263 $ 1,991 $ - STP $ 874 $ 1,094 $ 190 $ 783 $ 5,195 16.0 Collision(s) reduced

01 Mendocino 1 75.5/76.5 0G450 4651 0116000189 201.130 16-17 $ 25 $ 4,250 $ 4,250 7/25/16 NH $ - $ - $ 25 $ 1,250 $ 5,550 1.0 Location(s)

01 Mendocino 1 104.4 0G730 4658 0117000054 201.130 16-17 $ 50 $ 2,500 $ 2,500 1/24/17 NH $ - $ - $ 30 $ 500 $ 3,080 1.0 Location(s)

01 Mendocino 1 78.0/83.5 0G800 4661 0117000061 201.130 16-17 $ 30 $ 3,000 $ 3,000 1/24/17 NH $ - $ - $ 20 $ 500 $ 3,550 5.0 Location(s)

01 Mendocino 1 38.5/40.5 0G890 4664 0117000071 201.130 16-17 $ 5 $ 400 $ 400 2/22/17 NH $ - $ - $ 5 $ 125 $ 535 3.0 Location(s)

01 Mendocino 1 34.4/38.4 0H000 4669 0117000084 201.130 16-17 $ 15 $ 1,250 $ 1,250 4/6/17 NH $ - $ - $ 15 $ 350 $ 1,630 2.0 Location(s)

01 Mendocino 1 6.8/87.9 0H440 4693 0117000222 201.240 18-19 $ 8,820 $ - $ - NH $ 57 $ 1,700 $ 7 $ - $ 10,584 7.0 Location(s)

01 Mendocino 1 18.5/71.4 0H441 4699 0118000077 201.240 19-20 $ 4,410 $ - $ - NH $ 29 $ 850 $ 3 $ - $ 5,292 4.0 Location(s)

01 Mendocino 1 62.1/78.9 36270 0154T 0116000031 201.121 18-19 $ 1 $ 13,582 $ - NH $ 336 $ 501 $ 36 $ 657 $ 15,113 32.9 Lane mile(s)

01 Mendocino 1 43.3/44.2 40110 4490 0100000154 201.110 19-20 $ 7,748 $ - $ - HBRR-S $ 5,500 $ 5,220 $ 828 $ - $ 19,296 1.0 Bridge(s)

01 Mendocino 1 42.4/43.3 40140 4491 0100000155 201.110 19-20 $ 6,324 $ - $ - HBRR-S $ 5,800 $ 5,593 $ 810 $ - $ 18,527 1.0 Bridge(s)

01 Mendocino 1 43480 4507 0100000672 201.112 19-20 $ 1,099 $ 15,650 $ - HBRR-S $ 3,806 $ 2,825 $ 341 $ 3,650 $ 27,371 1,463.0 Linear feet

01 Mendocino 20 33.3/34.4 0E090 4587 0113000123 201.110 19-20 $ 250 $ - $ - HBRR-S $ 2,087 $ 3,129 $ 260 $ - $ 5,726 2.0 Bridge(s)

01 Mendocino 20 R37.8/R38.4 0E470 4596 0114000072 201.010 17-18 $ 20 $ 2,460 $ 2,595 1/23/18 STP $ 645 $ 474 $ 43 $ 433 $ 4,075 20.0 Collision(s) reduced

Near Middletown, from 0.2 mile east of Grouse Springs Road to 0.1 mile east of Socrates Mine Road. Remove slide debris, repair drainage systems, reconstruct roadway, and conduct further geotechnical investigations of slope and roadway settlement.

In Lake County, on Routes 20. 29 and 53 at various locations. Upgrade drainage systems.Near Albion, from 1.5 miles north of Route 128 to 0.1 mile south of Navarro Ridge Road. Widen for standard shoulders, and install rumble strips and guardrail.

Near Fort Bragg at Elk Creek Bridge No. 10-0120. Replace and upgrade bridge rails.Near Albion, at Navarro Ridge Road. Improve drainage, repair erosion, widen shoulders, and repair roadway.In and near Point Arena, from Sonoma County Line to 0.1 mile south of Mill Street. Pavement rehabilitation.Near Gualala, from 0.4 mile north of Havens Neck Drive to 0.5 mile south of Iverson Road. Widen shoulders and install edge-line rumble strips and guardrail.

Near Fort Bragg, from 0.03 mile south to 0.07 mile north of Abalobadiah Creek. Curve improvement and shoulder widening.Near Westport, from 0.6 mile to 1.4 miles north of Blue Slide Gulch. Repair slide damage and settlement of roadway.Near Leggett, at 1.2 miles south of Route 101. Remove slide debris, stabilize slope, and conduct further geotechnical investigations to develop final scope of repairs.

Near Westport, from 0.3 mile south of Wages Creek Bridge to Soldier Point Sidehill Viaduct. Remove slide debris, repair drainage systems, stabilize slope, reconstruct roadway, and conduct further geotechnical investigations to develop final scope of repairs.

Near Albion, from 0.4 mile south of Navarro Bluff Road to 0.2 mile north of Route 128. Remove debris from bridge pier and repair drainage systems.

Near Elk, from 0.5 mile north of Philo Greenwood Road to 0.5 mile south of Navarro Bluff Road. Repair slipout, repair sinkhole, and replace large-diameter culvert.

Near Point Arena and Fort Bragg, from 0.6 mile north of Haven Neck Drive to 0.1 mile north of South Fork Cotteneva Creek Bridge. Advance mitigation credit purchases (14 credits) for future SHOPP construction projects expected to impact wetlands.

Near Manchester and Fort Bragg, from Garcia River Bridge to 0.1 mile north of Abalobadiah Creek. Advance mitigation credit purchases (7 credits) for future SHOPP construction projects expected to impact sensitive streams.

In and near Fort Bragg, from Pudding Creek Bridge to 0.6 mile north of Wages Creek Bridge. Pavement rehabilitation.Near Albion, from 3.0 miles north of route 128 junction to 0.2 mile north of Albion River Bridge No. 10-0136. Bridge Replacement. (G13 Contingency Project)

Near Albion, from 2.2 miles north of Route 128 junction to 0.2 mile north of Salmon Creek Bridge No. 10-0134. Bridge replacement. (G13 Contingency Project)

In and near Fort Bragg at Little River Bridge No. 10-0178, at Jack Peters Bridge No. 10-0150 and at Pudding Creek Bridge No. 10-0158. Upgrade and replace barrier rails and bridge replacement.

Near Ukiah, from east of Route 101 to east of Road 144 at Russian River Bridge and Overhead No. 10-0182. Rehabilitate bridge deck. (G13 Contingency Project)

Near Calpella, from 0.1 mile west of Cold Creek Bridge No. 1 to Cold Creek Bridge No. 2. Install safety improvements at the intersection.

01 Mendocino 20 16.9/17.2 0E860 4613 0115000038 201.010 18-19 $ 88 $ 1,339 $ - STP $ 782 $ 1,117 $ 129 $ 1,063 $ 4,518 14.0 Collision(s) reduced

01 Mendocino 20 24.7/24.9 0G430 4650 0116000188 201.010 19-20 $ 17 $ 1,303 $ - STP $ 603 $ 843 $ 175 $ 718 $ 3,659 8.0 Collision(s) reduced

01 Mendocino 20 20.8 0G760 4659 0117000057 201.130 16-17 $ 15 $ 500 $ 500 1/24/17 NH $ - $ - $ 15 $ 175 $ 705 1.0 Location(s)

01 Mendocino 20 36.4 0G940 4667 0117000077 201.130 16-17 $ 10 $ 1,500 $ 1,500 4/27/17 NH $ - $ - $ 10 $ 350 $ 1,870 1.0 Location(s)

01 Mendocino 101 47.1/47.6 0B830 4564 0112000188 201.378 16-17 $ 183 $ 1,841 $ 1,894 1/17/17 NH $ 351 $ 695 $ 112 $ 514 $ 3,696 10.0 Curb ramp(s)

01 Mendocino 101 58.9/82.5 0C450 4574 0112000285 201.235 19-20 $ 3 $ 6,322 $ - NH $ 365 $ 2,260 $ 46 $ 1,232 $ 10,228 3.0 Location(s)

01 Mendocino 101 R0.7/3.0 0C760 4580 0113000050 201.010 16-17 $ 12 $ 3,053 $ 2,356 1/30/17 STP $ 674 $ 764 $ 89 $ 442 $ 5,034 7.0 Collision(s) reduced

01 Mendocino 101 48.1/49.1 0G380 4649 0116000177 201.110 16-17 $ - $ 4,140 $ 4,148 12/7/16 HBRR-S $ - $ 848 $ 12 $ 1,507 $ 6,507 1.0 Bridge(s)

01 Mendocino 101 R24.5 0G560 4653 0117000020 201.130 16-17 $ 10 $ 1,100 $ 1,100 9/21/16 NH $ - $ - $ 10 $ 75 $ 1,195 1.0 Location(s)

01 Mendocino 101 49.4 0G590 4655 0117000025 201.130 16-17 $ 10 $ 915 $ 915 10/27/16 NH $ - $ - $ 10 $ 240 $ 1,175 1.0 Location(s)

01 Mendocino 101 R104.7/R105.3 0G650 4657 0117000043 201.130 16-17 $ 30 $ 1,200 $ 1,200 12/19/16 NH $ - $ - $ 30 $ 450 $ 1,710 1.0 Location(s)

01 Mendocino 101 R43.2 0G790 4662 0117000060 201.130 16-17 $ 10 $ 2,000 $ 2,000 2/16/17 NH $ - $ - $ 15 $ 400 $ 2,425 1.0 Location(s)

01 Mendocino 101 R87.5 0G970 4668 0117000081 201.130 16-17 $ 25 $ 2,000 $ 2,000 3/6/17 NH $ - $ - $ 15 $ 600 $ 2,640 1.0 Location(s)

01 Mendocino 101 97.1 0H090 4671 0117000099 201.130 16-17 $ 15 $ 1,200 $ 1,200 4/6/17 NH $ - $ - $ 15 $ 400 $ 1,630 1.0 Location(s)

01 Mendocino 101 64.0/82.0 0H110 4672 0117000104 201.130 16-17 $ 5 $ 8,000 $ 8,000 4/17/17 NH $ - $ - $ 10 $ 2,000 $ 10,015 1.0 Location(s)

01 Mendocino 101 R84.0/R85.5 0H120 4673 0117000105 201.130 16-17 $ 25 $ 6,000 $ 6,000 4/27/17 NH $ - $ - $ 25 $ 950 $ 7,000 3.0 Location(s)

01 Mendocino 101 37.0/40.0 0H420 4687 0117000171 201.130 16-17 $ 25 $ 3,000 $ 3,000 6/14/17 NH $ - $ - $ 25 $ 850 $ 3,900 1.0 Location(s)

01 Mendocino 101 R33.0/42.0 0H760 4701 0118000101 201.130 17-18 $ 10 $ 5,000 $ 5,000 10/30/17 NH $ - $ - $ 25 $ 1,250 $ 6,285 1.0 Location(s)

01 Mendocino 101 R0.1/R9.6 46630 4442 0116000024 201.121 18-19 $ 1 $ 13,289 $ - NH $ 362 $ 635 $ 4 $ 1,724 $ 16,015 36.2 Lane mile(s)

01 Mendocino 128 0.5/1.5 0H080 4670 0117000098 201.130 16-17 $ 10 $ 750 $ 750 4/6/17 NH $ - $ - $ 10 $ 250 $ 1,020 1.0 Location(s)

01 Mendocino 128 39.7 0H710 4700 0118000076 201.130 17-18 $ 25 $ 2,000 $ 2,000 8/21/17 NH $ - $ - $ 25 $ 750 $ 2,800 1.0 Location(s)

01 Mendocino 128 0.0/17.9 41550 4598 0114000107 201.121 17-18 $ 6 $ 17,419 $ - NH $ 807 $ 1,093 $ 21 $ 1,887 $ 21,233 43.0 Lane mile(s)

01 Mendocino 162 11.5/11.8 0B530 4553 0114000035 201.131 18-19 $ 355 $ 7,630 $ - NH $ 2,060 $ 1,650 $ 170 $ 1,700 $ 13,565 1.0 Location(s)

01 Mendocino 162 16.1 0B550 4555 0112000137 201.131 16-17 $ 150 $ 5,120 $ 6,140 6/28/17 NH $ 270 $ 1,865 $ 75 $ 1,400 $ 8,880 1.0 Location(s)

Near Fort Bragg, from 0.34 mile west of Road 200A to 0.13 mile west of Road 200A. Widen shoulders, install center and edge-line rumble strips, and install guardrail.

Near Willits, from 1.0 mile to 0.8 mile west of Three Chop Road. Widen eastbound shoulders, construct guard railing, place High Friction Surface Treatment (HFST), and extend an existing culvert.

Near Willits, at 0.8 mile east of James Creek Bridge. Remove slide debris and stabilize slope.

Near Calpella, at East Fork Russian River Bridge No. 10-0184. Repair bridge deck.In Willits, from south of Willits Creek Bridge to north of Casteel Lane. Upgrade pedestrian facilities.

Near Laytonville, at Moss Cove Safety Roadside Rest Area (SRRA); also at Irvine Lodge SRRA (PM 61.8) and Empire Camp SRRA (PM 82.5). Upgrade potable and wastewater systems.

Near Hopland, from 0.1 mile north of the Russian River Bridge and Overhead to 0.1 mile south of Comminsky Station Road. Install median barrier.

Near Willits, from 1.6 miles north of Route 20 to 2.3 miles north of Route 20, at Upp Creek Bridge No. 10-0070. Replace existing box culvert with bridge to improve fish barrier passage.

In Ukiah, at East Perkins Street Overcrossing No. 10-0193. Repair bridge from high load hit, four of six concrete girders have been struck.Near Willits, at 1.3 miles north of Upp Creek. Remove and replace failed box culvert crossing, reconstruct roadway, and install erosion control measures.

Near Piercy, from 0.9 mile north of Route 101/271 Separation (Piercy) to 1.3 miles south of South Fork Eel River Bridge. Remove slide debris and stabilize slope.

Near Willits, at 0.8 mile south of Route 20. Remove slide debris, stabilize and reconstruct slope.Near Cummings, at 0.2 mile south of Route 271. Remove slide debris, stabilize slope, dewater saturated soils, repair and improve drainage system, and reconstruct shoulder.

Near Leggett, at 0.3 mile south of Bridges Creek. Remove slide debris, install rockfall protection measures, and restore roadway.Near Laytonville, from 0.7 mile south of Sloan Road to 0.8 mile north of Bell Springs Road. Repair accelerated pavement failure.In Cummings, from Rattlesnake Creek to 0.8 mile north of Route 271 Separation; also on Route 271, from Route 101 to 0.7 mile south of Marion Lane (PM 0.0 to PM 4.0). Stabilize slide and reconstruct roadway.

Near Willits, from 1.8 miles north of Heart Arrow Trail to 0.4 mile south of Mariposa Creek Road. Stabilize slope and repair roadway.Near Ukiah, from 0.2 mile north of West Road to 0.1 mile south of South Willits Overhead bridge. Repair fire damage facilities.Near Hopland, from 0.7 mile south of Geysers Road to Hopland Overhead. Pavement rehabilitation.Near Albion, from 0.5 mile east of Route 1 to 1.5 miles east of Route 1. Repair sinkhole and repair drainage systems, and restore roadway.Near Yorkville, at 1.3 miles south of Hibbard Road. Construct Cast in Drilled Hole (CIDH) pile retaining wall and repair roadway.Near Navarro, from Route 1 to Mill Creek Bridge; also near Philo, from Indian Creek Bridge to Con Creek Arch Culvert (PM 23.3/R26.8). Pavement rehabilitation.

Near Dos Rios, from 1.4 to 1.7 miles east of Rodeo Creek Bridge. Construct soldier pile walls and drainage galleries.Near Dos Rios, at 0.9 mile east of Laytonville-Dos Rios Road. Stabilize roadway.

01 Mendocino 162 17.4/17.8 0G480 4652 0117000009 201.010 18-19 $ 6 $ 1,042 $ - STP $ 553 $ 672 $ 123 $ 723 $ 3,119 14.0 Collision(s) reduced

01 Mendocino 162 R0.0/16.2 0G900 4665 0117000072 201.130 16-17 $ 30 $ 2,000 $ 2,000 2/22/17 NH $ - $ - $ 20 $ 450 $ 2,500 1.0 Location(s)

01 Mendocino 175 1.6 0G780 4660 0117000059 201.130 16-17 $ 10 $ 550 $ 550 1/24/17 NH $ - $ - $ 10 $ 175 $ 745 1.0 Location(s)

01 Mendocino 175 5.0/9.0 0H210 4681 0117000130 201.130 16-17 $ 50 $ 2,750 $ 2,750 4/27/17 NH $ - $ - $ 50 $ 850 $ 3,700 2.0 Location(s)

01 Mendocino 253 1.4/1.8 0B560 4556 0112000138 201.131 16-17 $ 266 $ 3,800 $ 3,427 12/7/16 NH $ 319 $ 1,320 $ 56 $ 785 $ 6,546 1.0 Location(s)

01 Mendocino 253 0.0/13.0 0H130 4674 0117000106 201.130 16-17 $ 10 $ 1,700 $ 1,700 4/6/17 NH $ - $ - $ 15 $ 425 $ 2,150 1.0 Location(s)

01 Mendocino 271 17.7/18.0 0A840 4545 0113000058 201.110 17-18 $ 464 $ 4,934 $ - HBRR-S $ 1,588 $ 973 $ 162 $ 1,696 $ 9,817 1.0 Bridge(s)

01 Mendocino VAR 0C430 4572 0112000293 201.111 16-17 $ 239 $ 518 $ 515 8/16/17 HBRR-S $ 550 $ 462 $ 146 $ 446 $ 2,361 3.0 Bridge(s)

01 Mendocino VAR 0E240 4589 0114000002 201.110 17-18 $ - $ 5,500 $ - HBRR-S $ 74 $ 63 $ 66 $ 73 $ 5,776 0.0 Bridge(s)

02 Butte 70 22.0/48.0 0H560 3588 0215000051 201.151 19-20 $ 290 $ 2,525 $ - NH $ 780 $ 760 $1,060 $ 850 $ 6,265 25.0 Drainage system(s)

02 Lassen 36 6.1/14.3 4E460 3468 0200020287 201.120 19-20 $ 1,302 $ 22,789 $ - NH $ 1,650 $ 1,600 $ 340 $ 2,173 $ 29,854 20.9 Lane mile(s)

02 Lassen 36 7.2/7.4 4F560 3512 0213000006 201.110 19-20 $ 45 $ 3,611 $ - HBRR-S $ 1,500 $ 1,280 $ 60 $ 1,419 $ 7,915 1.0 Bridge(s)

02 Lassen 36 22.4/R29.4 4F990 3529 0213000057 201.121 16-17 $ 165 $ 10,700 $ 12,733 8/16/17 NH $ 1,400 $ 1,430 $ 840 $ 1,205 $ 15,740 20.1 Lane mile(s)

02 Lassen 44 31.9/32.6 1H440 3609 0216000005 201.010 18-19 $ 104 $ 2,896 $ - STP $ 484 $ 645 $ 187 $ 859 $ 5,175 16.0 Collision(s) reduced

02 Lassen 139 6.3/7.2 0H630 3594 0215000063 201.010 17-18 $ 45 $ 3,548 $ - STP $ 450 $ 620 $ 200 $ 660 $ 5,523 20.0 Collision(s) reduced

02 Lassen 299 25.6 1H110 3600 0215000106 201.352 18-19 $ 20 $ 12,850 $ - ST-CASH $ 260 $ 2,650 $ 40 $ 3,200 $ 19,020 1.0 Location(s)

02 Lassen 299 18.5/25.6 4E450 3467 0200020286 201.120 19-20 $ 281 $ 14,317 $ - NH $ 1,540 $ 1,330 $ 280 $ 2,150 $ 19,898 16.8 Lane mile(s)

02 Lassen 395 15.1/R16.0 1H490 3681 0217000094 201.130 16-17 $ - $ 1,500 $ 1,500 2/23/17 NH $ - $ - $ - $ 450 $ 1,950 2.0 Location(s)

02 Modoc 299 51.9/52.5 1H330 3607 0215000150 201.010 18-19 $ 15 $ 3,214 $ - STP $ 580 $ 680 $ 90 $ 840 $ 5,419 18.0 Collision(s) reduced

02 Modoc 299 4F210 3484 0212000072 201.110 17-18 $ 131 $ 5,600 $ - HBRR-S $ 1,820 $ 940 $ 485 $ 1,860 $ 10,836 2.0 Bridge(s)

02 Modoc 299 23.1/23.6 4F570 3513 0213000008 201.111 17-18 $ 35 $ 1,850 $ 2,034 1/31/18 HBRR-S $ 572 $ 704 $ 70 $ 985 $ 4,216 1.0 Bridge(s)

02 Modoc 299 23.1/33.5 4F770 3522 0213000031 201.120 17-18 $ 340 $ 14,100 $ 16,410 1/31/18 NH $ 750 $ 760 $ 50 $ 2,295 $ 18,295 18.7 Lane mile(s)

02 Plumas 70 11.5/11.9 0H450 3578 0215000017 201.010 17-18 $ 168 $ 1,964 $ - STP $ 690 $ 406 $ 19 $ 600 $ 3,847 20.0 Collision(s) reduced

02 Plumas 70 0.0/70.0 0H550 3587 0215000050 201.151 19-20 $ 290 $ 2,525 $ - NH $ 1,060 $ 710 $1,090 $ 920 $ 6,595 50.0 Drainage system(s)

Near Dos Rios, from 1.0 mile east of the Middle Way to 1.3 miles east of the Middle Way. Increase safety by improving roadway cross slope at curve, installing High Friction Surface Treatment (HFST), and installing an underdrain system.

Near Laytonville, from Route 101 to 1.0 mile east of Middle Fork Eel River Bridge. Remove slide debris, stabilize slope, repair drainage systems, and repair roadway.

Near Hopland, at 0.4 mile east of Harrison Street. Reconstruct embankment washout, install rock slope protection (RSP), replace culvert, and repair roadway.

Near Hopland, from 1.0 mile east of Buckman Drive Road to 0.5 mile east of McDowell Sidehill Viaduct. Construct soldier pile retaining walls and repair roadway.

Near Boonville, from 0.9 mile east to 1.3 miles east ofNear Boonville, from Route 128 to 0.1 mile east of Butler Ranch Road. Repair and replace culverts, repair slipouts, and restore roadway.Near Piercy, from 0.7 mile north of Routes 271/101 separation Bridge No. 10-0217 to 0.4 mile south of Sidehill Viaduct No. 10-0100. Replace bridge.

On Route 101, in Willits at Baechtel Creek Bridge No. 10-0013 (PM 45.89); on Route 128, at 34.1 miles west of Ukiah at Beebe Creek Bridge No. 10-0052 (PM 38.8); also on Route 20, at 8.5 miles east of Route 101 at North Fork Cold Creek Bridge No. 10-0072 (PM R41.87). Scour mitigation.

In Mendocino County, at various routes and at various locations. Mitigate environmental impacts.

Near Pulga, from 3.0 miles west of Coal Canyon Road to Plumas County line at various locations. Drainage system restoration.Near Westwood, from 1.2 miles west of Goodrich Creek Bridge to 1.3 miles west of Willard Creek Road. Rehabilitate roadway.Near Westwood, at Goodrich Creek Bridge No. 07-0048. Replace bridge.In and near Susanville, from 0.3 mile east of Eagle Lake Road to Route 395. Rehabilitate pavement.

Near Susanville, from 0.3 mile west to 0.4 mile east of Big Springs Road. Curve improvement.Near Susanville, from 1.0 to 0.1 mile south of Antelope Radio Street. Curve improvement.Near Adin, at the Adin Maintenance Station (L5701). Construct new facility.Near Adin, from west of Boyd Hill Lookout Road to Butte Creek Bridge; also in Modoc County from Ash Creek Bridge to east of County Road 87 (PM 0.0/0.5 and PM 1.0/1.8). Roadway rehabilitation.

Near Doyle, from 0.8 mile north of Red Rock Road to Scott Road. Stabilize scoured embankment and bridge with rock slope protection (RSP) and repair roadway.

Near Cedarville from 0.6 mile west of Cedar Pass Ski Tow Road to Cedar Pass Ski Tow Road. Curve improvement.Near Adin, at Butte Creek Bridge No. 03-001 and at Ash Creek Bridge No. 03-002. Replace bridges.

Near Canby, at Caldwell Creek Bridge No. 03-0028. Near Alturas, from 0.3 mile west to 0.3 mile east of Caldwell Creek Bridge No. 03-0028.bridge.

Near Alturas, from 1.1 miles east of Caldwell Creek Bridge to 1.7 miles west of County Road 75. Rehabilitate roadway.Near Belden, from 2.1 miles to 1.6 miles west of Chipps Creek Bridge. Curve Improvement.In Plumas County from Butte County line to east of Moach Road at various locations. Drainage rehabilitation.

02 Plumas 70 90.3/96.0 0H760 3599 0215000086 201.122 18-19 $ 51 $ 20,547 $ - NH $ 1,030 $ 900 $ 70 $ 1,440 $ 24,038 18.0 Lane mile(s)

02 Plumas 70 14.9 1C750 3208 0200000080 201.113 16-17 $ 400 $ 7,800 $ 9,180 3/15/17 HBRR-S $ 1,620 $ 1,820 $ 140 $ 2,398 $ 14,178 1.0 Bridge(s)

02 Plumas 70 0.0/11.0 1H530 3682 0217000095 201.130 16-17 $ 10 $ 3,400 $ 3,400 2/23/17 NH $ - $ - $ - $ 500 $ 3,910 1.0 Location(s)

02 Plumas 70 R61.8/R63.5 1H750 3645 0217000086 201.130 16-17 $ 10 $ 750 $ 750 2/14/17 NH $ - $ - $ 10 $ 200 $ 970 2.0 Location(s)

02 Plumas 70 11.0/26.0 1H760 3646 0217000087 201.130 16-17 $ 10 $ 1,500 $ 1,500 2/16/17 NH $ - $ - $ 10 $ 500 $ 2,020 1.0 Location(s)

02 Plumas 70 7.3/14.2 3H100 3677 0217000056 201.130 16-17 $ 10 $ 950 $ 950 1/17/17 NH $ - $ - $ 50 $ 400 $ 1,410 3.0 Location(s)

02 Plumas 70 34.6 3H670 3698 0218000008 201.130 17-18 $ 10 $ 1,700 $ 1,700 8/24/17 NH $ - $ - $ 10 $ 500 $ 2,220 1.0 Location(s)

02 Plumas 70 27.4 3H750 3704 0218000028 201.130 17-18 $ - $ 2,000 $ 2,000 8/24/17 NH $ - $ - $ 5 $ 600 $ 2,605 1.0 Location(s)

02 Plumas 89 29.8/30.2 0E180 3349 0200000022 201.113 16-17 $ 465 $ 9,810 $ 8,830 8/16/17 HBRR-S $ 1,100 $ 2,155 $ 70 $ 2,400 $ 16,000 1.0 Bridge(s)

02 Plumas 89 11.6/11.9 3H090 3676 0217000055 201.130 16-17 $ - $ 1,500 $ 1,500 1/18/17 NH $ - $ - $ - $ 550 $ 2,050 1.0 Location(s)

02 Plumas 147 1.0/8.0 3H550 3694 0217000141 201.130 16-17 $ 10 $ 1,610 $ 1,610 6/7/17 NH $ - $ - $ 10 $ 200 $ 1,830 1.0 Location(s)

02 Plumas Var 3H330 3686 0217000099 201.130 16-17 $ - $ 2,500 $ 2,500 3/14/17 NH $ - $ - $ - $ 700 $ 3,200 1.0 Location(s)

02 Shasta 5 R54.6 2H670 3666 0217000005 201.130 16-17 $ 10 $ 1,300 $ 1,300 7/26/16 NH $ - $ - $ - $ 400 $ 1,710 1.0 Location(s)

02 Shasta 5 R3.8/R7.0 3H730 3702 0218000024 201.120 18-19 $ 1,221 $ 18,081 $ - NH $ - $ 3,000 $ 220 $ 3,900 $ 26,422 6.4 Lane mile(s)

02 Shasta 5 0.0/67.0 4F510 3506 0213000001 201.015 17-18 $ 780 $ 5,600 $ - STP $ 1,300 $ 900 $ 800 $ 1,300 $ 10,680 402.0 Collision(s) reduced

02 Shasta 5 4G41U 3543 0218000047 201.110 18-19 $ 36 $ 16,860 $ - HBRR-S $ 1,250 $ 2,880 $ 260 $ 4,799 $ 26,085 2.0 Bridge(s)

02 Shasta 5 R28.0/R29.0 4G520 3548 0214000022 201.119 17-18 $ 345 $ 9,300 $ 9,300 1/31/18 HBRR-S $ 360 $ 630 $ 70 $ 1,900 $ 12,605 1.0 Bridge(s)

02 Shasta 5 1.0/R26.3 4G570 3551 0214000026 201.235 17-18 $ 13 $ 2,590 $ - NH $ 300 $ 500 $ 100 $ 470 $ 3,973 22.0 Location(s)

02 Shasta 5 R31.0/31.7 4G580 3552 0214000027 201.235 19-20 $ 3 $ 3,007 $ - NH $ 400 $ 1,180 $ 140 $ 940 $ 5,670 1.0 Location(s)

02 Shasta 44 51.6/52.2 2H990 3673 0217000045 201.010 19-20 $ 14 $ 3,100 $ - STP $ 670 $ 810 $ 80 $ 730 $ 5,404 14.0 Collision(s) reduced

In Plumas and Lassen Counties near Chilcoot, from west of Summit School Drive Road to Route 395 (Lassen PM 0.0/3.9). Roadway rehabilitation.

Near Belden, at Yellow Creek Bridge No. 09-0008. Replace bridge.In and near Tobin, from Butte County line to 1.1 miles east of Rogers Flat PG&E Maintenance Street. Embankment stabilization and roadway repair.

In Two Rivers, at 0.3 mile east of Camp Layman Road to 0.5 mile east of Parkers Road. Replace failed culvert, reconstruct embankment, and repair roadway.

Near Tobin, from 0.9 mile east of Rogers Flat PG&E Maintenance Street to 0.4 mile west of Oldmill Drive. Remove multiple slide debris including rock blasting and hazardous tree removal, install rock slope protection (RSP), and repair roadway.

Near Tobin, at various locations from 0.2 mile east of Tobin Underpass to 0.7 mile west of Yellow Creek Bridge. Remove slide debris and clear drainage obstructions.

Near Keddie, at 0.7 mile west of Spanish Creek Campground. Construct soldier pile tie back wall in front of failing historic rock wall.In Twain, at 0.5 mile east of Twain Store Road. Reinforce existing crib wall with steel pile and tie backs. Reconstruct roadway surface and Metal Beam Guard Rail (MBGR).

Near Canyon Dam, from 0.2 mile south to 0.3 mile north of Lake Almanor Spillway Bridge No. 09-0044. Replace bridge.Near Greenville, from 0.1 mile north of Indian Falls Road to 0.5 mile north of Indian Falls Road (PM 11.6/11.9); also at 0.3 mile north of Greenville Wolf Creek Road (PM 24.5). Reconstruct slope washout, reconstruct roadway, and repair drainage systems.

Near Canyondam, from 1.0 mile north of Route 89 to 0.7 mile north of Big Springs Road. Remove and replace damaged roadway pavement and stabilize embankment.

In Plumas County on various routes at various locations, Route 49 (PM 0.0 to PM 7.5), Route 70 (PM 26.0 to PM 95.7), and Route 89 (PM 0.0 to 8.7); also in Lassen County, on Route 70 (PM 0.0 to PM 3.9). Reconstruct multiple embankment slipouts, reconstruct shoulder, re-grade drainage ditches, install rock slope protection (RSP) at bridge abutments, repair drainage systems, and reconstruct roadway.Near Castella, at 1.3 miles north of Gibson Road. Stabilize slope, remove debris and reconstruct bench.In and near Anderson, from Route 273 to Sacramento River Bridge. Roadway rehabilitation, update signage and lighting, and add Intelligent Transportation System (ITS) elements.

In and near Redding, from the Tehama County Line to the Siskiyou County Line. Improve roadside clear recovery zone.Near Dunsmuir, at Crag View Drive Undercrossing Bridge No. 06-0095 (PM 66.8); also, at Sims Road Undercrossing No. 06-0111 (PM 57.4). Replace bridges

Near the city of Shasta Lake, from 0.2 mile south to 0.9 mile north of Pitt River Bridge Overhead No. 06-0021. Replace bridge deck overlay and rehabilitate bridge catwalk.

In Shasta County, from 0.1 mile north of Fourth Street Overcrossing to 0.3 mile north of Fawndale Overcrossing at various locations. Improvements to reduce maintenance worker exposure.

Near Shasta Lake City, at OBrien Safety Roadside Rest Area (SRRA). Upgrade potable water system and wastewater systems.Near Viola, from 0.4 mile east to 1.1 mile east of Bridge

02 Shasta 44 R4.6/R6.4 36841 3595 0215000066 201.310 16-17 $ 500 $ 3,550 $ 3,550 6/28/17 NH $ 200 $ 1,500 $ 210 $ 2,220 $ 8,180 16.0 1,000 vehicle hour(s)/yr

02 Shasta 44 59.4/59.8 4F200 3483 0212000071 201.110 17-18 $ 484 $ 5,180 $ - HBRR-S $ 1,120 $ 1,130 $ 400 $ 1,530 $ 9,844 1.0 Bridge(s)

02 Shasta 89 21.7/43.3 1H830 3683 0217000092 201.130 16-17 $ 10 $ 1,500 $ 1,500 3/2/17 NH $ - $ - $ 10 $ 400 $ 1,920 5.0 Location(s)

02 Shasta 151 5.5/R5.8 4F790 3524 0213000033 201.378 17-18 $ 146 $ 1,683 $ 1,429 10/18/17 NH $ 205 $ 505 $ 522 $ 450 $ 3,511 21.0 Structure(s)

02 Shasta 273 3.8/7.1 4G420 3544 0214000011 201.121 17-18 $ 233 $ 8,520 $ - NH $ 880 $ 990 $ 500 $ 990 $ 12,113 20.6 Lane mile(s)

02 Shasta 299 7.6/18.3 3E740 3456 0200020160 201.121 17-18 $ 15 $ 14,310 $ - NH $ 2,480 $ 840 $ 90 $ 1,430 $ 19,165 6.6 Lane mile(s)

02 Shasta 299 47.7 3H010 3675 0217000052 201.130 16-17 $ 50 $ 1,500 $ 1,500 12/21/16 NH $ - $ - $ 50 $ 400 $ 2,000 1.0 Location(s)

02 Shasta 299 62.0/62.1 3H510 3693 0217000133 201.130 16-17 $ - $ 1,300 $ 1,300 5/11/17 NH $ - $ - $ - $ 400 $ 1,700 3.0 Location(s)

02 Shasta 299 77.8/79.7 4E020 3449 0200020196 201.120 17-18 $ 238 $ 6,900 $ 7,491 10/18/17 NH $ 500 $ 670 $ 443 $ 1,140 $ 9,891 6.0 Lane mile(s)

02 Shasta VAR 4F780 3523 0213000032 201.235 17-18 $ 296 $ 7,400 $ - NH $ 1,200 $ 1,070 $ 330 $ 1,410 $ 11,706 17.0 Location(s)

02 Siskiyou 5 2.5/3.0 1H480 3614 0216000019 201.110 21-22 $ - $ - $ - HBRR-S $ 1,440 $ - $ - $ - $ 1,440 1.0 Bridge(s)

02 Siskiyou 5 R56.1/R59.5 2H890 3671 0217000032 201.999 17-18 $ 7 $ 529 $ - ST-CASH $ 70 $ 225 $ 30 $ 190 $ 1,051 1.0 Location(s)

02 Siskiyou 5 2.7/R15.9 3H320 3685 0217000097 201.122 21-22 $ - $ - $ - NH $ 1,620 $ - $ - $ - $ 1,620 25.4 Lane mile(s)

02 Siskiyou 5 2.6 3H390 3689 0217000105 201.130 16-17 $ 10 $ 2,500 $ 2,500 4/6/17 NH $ - $ - $ - $ 700 $ 3,210 1.0 Location(s)

02 Siskiyou 5 6.0/R13.5 3H400 3690 0217000107 201.130 16-17 $ - $ 2,500 $ 2,500 4/6/17 NH $ - $ - $ - $ 500 $ 3,000 2.0 Location(s)

02 Siskiyou 5 3H640 3696 0218000003 201.322 20-21 $ - $ - $ - NH $ 2,790 $ - $ - $ - $ 2,790 8.0 Bridge(s)

02 Siskiyou 5 R58.0 4E670 3476 0212000031 201.250 16-17 $ 10 $ 3,300 $ 3,770 10/19/16 NH $ 2,150 $ 550 $ 36 $ 1,612 $ 7,658 1.0 Location(s)

02 Siskiyou 5 R15.3/R16.5 4F540 3509 0213000004 201.110 17-18 $ 68 $ 8,600 $ - HBRR-S $ 500 $ 1,200 $ 190 $ 2,040 $ 12,598 1.0 Bridge(s)

02 Siskiyou 5 R25.2 4G240 3535 0213000095 201.322 16-17 $ 39 $ 4,000 $ 4,758 8/16/17 NH $ 680 $ 938 $ 40 $ 1,000 $ 6,697 2.0 Bridge(s)

02 Siskiyou 5 2.7/R11.4 4G550 3560 0214000036 201.122 16-17 $ 464 $ 53,600 $ 56,655 5/17/17 NH $ 850 $ 5,300 $ 270 $ 7,610 $ 68,094 21.0 Lane mile(s)

Near Palo Cedro, from Clough Creek bridge to 0.6 mile west of Deschutes Road Overcrossing. Traffic operational improvements.Near Old Station, from 0.1 mile west to 0.3 mile east of Sugar Loaf Drive at Hat Creek Bridge No.06-0084. Replace Bridge.In Shasta County (PM 21.7/43.3) and Siskiyou County (PM 0.0/R34.6), at various locations. Remove washout debris, replace failed culverts, regrade drainage ditches, and repair eroded shoulder and roadway.

In Shasta Lake City, from Pancake Hill Drive to Locust Avenue. Upgrade curbs, sidewalks and crosswalks.In and near Anderson, on Route 273 at PM 3.8/7.1 and PM 11.0/12.7; also near Redding, on Route 5 at PM R3.3/R3.8. Rehabilitate pavement.

In and near the town of Shasta, from west of Crystal Creek Road to Trinity Alley. Rehabilitate pavement.Near Ingot, at 1.0 mile east of Oak Run Road. Remove slide debris and stabilize slope.Near Burney, from 0.9 mile east of Supan Road to 0.7 mile west of Buffum Road; also from 0.1 mile east of Terry Mill Road to 0.3 mile east of Terry Mill Road (PM 68.35 to PM 62.14); also at 0.9 mile east of Terry Mill Road (PM 69.22). Stabilize slope, modify drainage systems.

Near Burney, from 0.2 mile west of Sonoma Street to 0.3 mile west of Route 89. Rehabilitate roadway.

In Shasta, Butte, Lassen, Siskiyou and Trinity counties, on various routes at various locations. Upgrade chain control facilities.In Dunsmuir, from Central Dunsmuir Undercrossing to 0.1 mile north of Siskiyou Avenue at Sacramento River Bridge and Overhead No. 02-0002. Replace southbound bridge deck.

Near Hornbrook at Randolf Collier Safety Roadside Rest Area (SRRA), from 2.0 miles south of Klamath River Road Undercrossing to 1.2 miles north of Route 96; also on Route 96 at 2.0 miles east of Route 263. Transportation infrastructure improvement for zero-emission vehicle charging.

In and near Dunsmuir and Mt. Shasta, from Sacramento River Bridge Overhead to Black Butte Overhead. Roadway rehabilitation.In Dunsmuir, at 0.1 mile north of Dunsmuir Avenue. Remove slide debris, install drainage and restore roadway.Near Mt. Shasta, from 0.1 mile north of Mott Road to 0.4 mile north of Abrams Lake Road; also near Yreka, from Juniper Creek Bridge to Greenhorn Creek Bridge (PM R44 to PM R46). Remove and replace damaged asphalt concrete pavement.

In and near Yreka at Louie Road Overcrossing (OC) No. 02-0137 (PM R31.2), Moonlit Oaks Avenue Undercrossing (UC) No. 02-0159R&L (PM R45.6), Miner Street UC No. 02-0158R&L (PM R47.6), and North Yreka Separation No. 02-0150R&L (PM R48.2); also, in Redding, Shasta County, at N273-N5 Connector OC No. 06-0137G (PM R18.5). Establish standard vertical clearance and improve to standard truck capacity.In Siskiyou County, at the Collier Safety Roadside Rest Area; also in Sacramento County, at 0.1 mile south of Route 275 (PM 23.3). Rehabilitate the potable water supply and waste water system.

Near Weed, from south of Deetz Road Undercrossing No. 02-0161 to north of Black Butte Overhead No. 02-0004. Bridge replacement.

Near Edgewood, at the North Edgewood Overhead No. 02-0032L&R. Strengthen and upgrade bridges.In and near Dunsmuir, from Sacramento River Bridge to 0.6 mile south of North Mount Shasta Underpass. Rehabilitate roadway.

02 Siskiyou 5 4G630 3556 0214000030 201.315 18-19 $ 196 $ 3,600 $ - NH $ 390 $ 710 $ 140 $ 720 $ 5,756 16.0 Field element(s)

02 Siskiyou 89 20.9/21.2 4F550 3519 0213000005 201.110 17-18 $ 81 $ 3,700 $ 3,350 8/16/17 HBRR-S $ 550 $ 860 $ 150 $ 1,200 $ 6,541 1.0 Bridge(s)

02 Siskiyou 96 23.0/103.4 1H090 3601 0215000105 201.151 19-20 $ 200 $ 2,070 $ - NH $ 1,040 $ 730 $ 530 $ 1,060 $ 5,630 20.0 Drainage system(s)

02 Siskiyou 96 0.0/75.0 3H260 3678 0217000075 201.130 16-17 $ 20 $ 1,500 $ 1,500 2/1/17 NH $ - $ - $ - $ 400 $ 1,920 1.0 Location(s)

02 Siskiyou 96 23.4/54.5 4C150 3314 0213000132 201.151 17-18 $ 200 $ 1,679 $ - NH $ 1,200 $ 600 $ 92 $ 700 $ 4,471 28.0 Drainage system(s)

02 Siskiyou 97 21.8 4E680 3477 0212000032 201.235 17-18 $ 12 $ 2,100 $ 2,122 12/6/17 NH $ 490 $ 420 $ 60 $ 630 $ 3,712 1.0 Location(s)

02 Siskiyou 263 57.1 2E480 3424 0200000586 201.110 17-18 $ 440 $ 15,300 $ - HBRR-S $ 2,700 $ 1,600 $ 280 $ 2,620 $ 22,940 1.0 Bridge(s)

02 Tehama 5 R25.4 4F590 3515 0213000010 201.113 19-20 $ 56 $ - $ - HBRR-S $ 1,592 $ 1,659 $ 280 $ - $ 3,587 2.0 Bridge(s)

02 Tehama 32 8.6/9.3 0H200 3573 0214000143 201.010 17-18 $ 65 $ 2,735 $ 2,700 5/26/17 STP $ 281 $ 502 $ 178 $ 682 $ 4,443 16.0 Collision(s) reduced

02 Tehama 32 1H800 3648 0217000089 201.130 16-17 $ - $ 1,600 $ 1,600 2/23/17 NH $ - $ - $ - $ 300 $ 1,900 1.0 Location(s)

02 Tehama 36 36.4/36.8 0H110 3590 0215000053 201.010 17-18 $ 344 $ 2,150 $ - STP $ 579 $ 574 $ 195 $ 604 $ 4,446 14.0 Collision(s) reduced

02 Tehama 36 87.8/88.8 1H740 3641 0216000052 201.010 19-20 $ 401 $ 4,324 $ - STP $ 840 $ 751 $ 50 $ 1,240 $ 7,606 24.0 Collision(s) reduced

02 Tehama 36 12.6/13.1 1H970 3640 0216000051 201.010 19-20 $ 109 $ 3,000 $ - STP $ 390 $ 670 $ 210 $ 670 $ 5,049 20.0 Collision(s) reduced

02 Tehama 36 26.6/27.6 2H630 3663 0216000156 201.010 19-20 $ 476 $ 3,200 $ - STP $ 695 $ 885 $ 685 $ 1,200 $ 7,141 16.0 Collision(s) reduced

02 Tehama 36 42.1/46.0 3E720 3453 0200020154 201.121 16-17 $ 97 $ 4,920 $ 5,200 8/16/17 NH $ 260 $ 650 $ 440 $ 720 $ 7,087 13.6 Lane mile(s)

02 Tehama 36 40.3/42.1 4G540 3558 0214000024 201.121 19-20 $ 122 $ 6,600 $ - NH $ 700 $ 650 $ 240 $ 1,020 $ 9,332 10.1 Lane mile(s)

02 Tehama 36 0.0/100.0 4G560 3550 0214000025 201.151 19-20 $ 351 $ 2,525 $ - NH $ 760 $ 660 $ 620 $ 1,310 $ 6,226 25.0 Drainage system(s)

02 Tehama 99 12.0/12.6 1H320 3606 0215000126 201.378 18-19 $ 891 $ - $ - NH $ 310 $ 460 $ 230 $ - $ 1,891 28.0 Curb ramp(s)

02 Tehama Var 1H640 3627 0216000031 201.240 18-19 $ 1,357 $ - $ - NH $ - $ - $ 100 $ - $ 1,457 6.0 Location(s)

02 Tehama VAR 4G530 3549 0214000023 201.119 19-20 $ 147 $ 1,400 $ - HBRR-S $ 780 $ 720 $ 50 $ 600 $ 3,697 9.0 Bridge(s)

02 Trinity 3 30.0/T85.0 0H540 3586 0215000049 201.151 19-20 $ 365 $ 3,443 $ - NH $ 1,390 $ 850 $1,450 $ 1,580 $ 9,078 35.0 Drainage system(s)

02 Trinity 3 1H500 3633 0216000045 201.119 21-22 $ - $ - $ - HBRR-S $ 900 $ - $ - $ - $ 900 4.0 Bridge(s)

02 Trinity 3 40.0/41.5 3H000 3674 0217000046 201.131 17-18 $ - $ 330 $ 330 8/16/17 NH $ - $ - $ 10 $ 270 $ 610 1.0 Location(s)

In Siskiyou and Shasta counties on Routes 5 and 89 at various locations. Upgrade Transportation Management System (TMS) field elements.

Near McCloud, from 0.2 mile south to 0.2 mile north of Mud Creek Bridge No. 02-0046. Replace bridge.Near Happy Camp, from 0.3 miles west of Swillup Creek Bridge to Route 263. Drainage system restoration.Near Somes Bar, at various locations from Humboldt County line to 0.8 mile west of Bar Road. Remove slide debris, repair slipouts, and replace culverts.

In and near Happy Camp, from 0.1 mile east of Swillup Creek Bridge to 2.1 miles east of Thompson Creek Bridge at various locations. Drainage system restoration.

Near Macdoel, at Grass Lake Safety Roadside Rest Area (SRRA). Upgrade water and wastewater systems.Near Yreka, at Klamath River Bridge. Replace bridge.In Red Bluff, at Sacramento River Bridge No. 08-0095R/L. Retrofit Bridges. (G13 Contingency Project)Near Chico, from 0.2 mile west to 0.5 mile east of Diamond Match Haul Road. Curve improvement.

Near Butte Meadows at various locations; also in Butte County on Route 32 at various locations; also in Plumas County on Route 36 at various locations. Repair water saturated asphalt pavement with asphalt overlay and digout repairs.

Near Red Bluff, from Nevis Road to 0.5 mile east of Nevis Road. Improve curve.Near Mineral, from 0.1 mile to 1.2 miles east of Route 89. Curve improvement.Near Red Bluff, from 2.3 miles east to 2.8 miles east of Dry Creek Bridge. Curve improvement.Near Red Bluff, from west of Basler Road to east of Diamond Star Road. Curve improvement.In and near Red Bluff, from East Sand Slough Bridge to 0.6 mile east of Stice Road. Rehabilitate pavement.In Red Bluff, from east of Baker Road to east of East Sand Slough Bridge. Pavement rehabilitation.

Near Red Bluff, from Shasta County line to Route 32 at various locations. Drainage system restoration.Near Los Molinos, from Josephine Street to Los Molinos Creek Bridge. Construct curb ramps, sidewalks, lighting and drainage improvements. (G13 Contingency Project)

In Tehama, Lassen, Modoc, Plumas, Shasta, and Trinity counties at various locations. Advance mitigation credit purchases for future SHOPP construction projects expected to impact sensitive habitats.

In Tehama County on Routes 5, 32, and 36 at various locations; also in Shasta County on Routes 5 and 44; also in Lassen County on Route 299 at various locations. Bridge scour prevention at 9 bridges.

Near Trinity Center, from 0.9 miles south of Trinity River Bridge to Siskiyou County line at various locations. Drainage system restoration.In Trinity County, at Dobbins Gulch Bridge No. 05-0042 (PM 0.6), Stuart Fork Bridge No. 05-0055 (PM 43.9), and Mule Creek Bridge No. 05-0056 (PM 48.5); also, on Route 299 at Grass Valley Creek Bridge No. 05-0013 (PM 65.5). Repair unsound concrete, replace bearings and joint seals, repair bridge decks, and install barrier and approach slabs.

Near Weaverville, from 1.4 miles south to 0.2 mile north of Slate Creek Road. Continue revegetation and 5 year plant establishment for storm damage EA 02-2H560. (This is a Financial Contribution Only (FCO) to Trinity County Resource Conservation District (TCRCD).)

02 Trinity 3 15.4 3H300 3679 0217000082 201.130 16-17 $ 10 $ 750 $ 750 2/6/17 NH $ - $ - $ 10 $ 200 $ 970 1.0 Location(s)

02 Trinity 3 58.7/61.9 4F220 3485 0212000073 201.110 19-20 $ 820 $ 8,627 $ - HBRR-S $ 930 $ 1,680 $ 100 $ 2,090 $ 14,247 1.0 Bridge(s)

02 Trinity 3 32.8/39.8 4G250 3536 0213000094 201.335 17-18 $ 126 $ 1,800 $ 2,142 8/16/17 NH $ 800 $ 420 $ 190 $ 748 $ 4,084 84.0 Acre(s) treated/pollutant

02 Trinity 36 1H850 3684 0217000093 201.130 16-17 $ 10 $ 2,000 $ 2,000 3/7/17 NH $ - $ - $ - $ 400 $ 2,410 3.0 Location(s)

02 Trinity 36 R34.7/R35.3 2H050 3653 0216000093 201.010 19-20 $ 52 $ 5,280 $ - STP $ 760 $ 1,130 $ 130 $ 1,680 $ 9,032 12.0 Collision(s) reduced

02 Trinity 36 14.1/14.6 3H350 3687 0217000100 201.130 16-17 $ - $ 1,000 $ 1,000 3/29/17 NH $ - $ - $ - $ 350 $ 1,350 1.0 Location(s)

02 Trinity 36 R1.6/R9.1 3H440 3692 0217000126 201.130 16-17 $ - $ 3,100 $ 3,100 5/11/17 NH $ - $ - $ - $ 1,000 $ 4,100 3.0 Location(s)

02 Trinity 36 26.8/27.1 4F860 3526 0213000043 201.010 17-18 $ 110 $ 5,300 $ - STP $ 1,420 $ 1,150 $ 250 $ 1,750 $ 9,980 18.0 Collision(s) reduced

02 Trinity 299 10.9/11.2 0H410 3579 0215000019 201.150 19-20 $ 22 $ 2,079 $ - NH $ 200 $ 470 $ 70 $ 500 $ 3,341 1.0 Location(s)

02 Trinity 299 43.1/43.3 0H690 3592 0215000055 201.150 19-20 $ 32 $ 3,000 $ - NH $ 330 $ 580 $ 200 $ 630 $ 4,772 1.0 Location(s)

02 Trinity 299 23.3 2H740 3665 0216000169 201.130 16-17 $ 10 $ 4,500 $ 4,500 7/13/16 NH $ - $ - $ 50 $ 1,400 $ 5,960 1.0 Location(s)

02 Trinity 299 1.6/45.2 2H810 3668 0217000012 201.151 21-22 $ - $ - $ - NH $ 930 $ - $ - $ - $ 930 18.0 Drainage system(s)

02 Trinity 299 39.2 3H380 3688 0217000104 201.130 16-17 $ - $ 1,750 $ 1,750 4/6/17 NH $ - $ - $ - $ 650 $ 2,400 1.0 Location(s)

02 Trinity 299 54.9/60.2 3H430 3691 0217000110 201.999 17-18 $ - $ 250 $ - ST-CASH $ 70 $ 175 $ 3 $ 170 $ 668 1.0 Location(s)

02 Trinity 299 36.0/44.0 3H780 3705 0218000032 201.130 17-18 $ 30 $ 1,600 $ 1,600 9/21/17 NH $ - $ - $ - $ 500 $ 2,130 1.0 Location(s)

02 Trinity 299 9.5/10.5 3H880 3708 0218000044 201.130 17-18 $ 10 $ 2,000 $ 2,000 12/6/17 NH $ - $ - $ 20 $ 500 $ 2,530 1.0 Location(s)

02 Trinity 299 4F600 3516 0213000012 201.119 19-20 $ 22 $ 6,771 $ - HBRR-S $ 950 $ 1,400 $ 150 $ 1,910 $ 11,203 9.0 Bridge(s)

02 Trinity 299 1.9/2.3 4G500 3557 0214000031 201.015 19-20 $ 166 $ 4,100 $ - STP $ 550 $ 1,655 $ 70 $ 2,135 $ 8,676 3.0 Collision(s) reduced

02 Trinity 299 4G610 3555 0214000028 201.235 18-19 $ 79 $ 2,500 $ - NH $ 425 $ 745 $ 160 $ 775 $ 4,684 12.0 Location(s)

02 Trinity 299 3.6 4G620 3559 0214000029 201.235 19-20 $ - $ 2,300 $ - NH $ 470 $ 860 $ 50 $ 590 $ 4,270 1.0 Location(s)

03 Butte 32 7.6/7.9 2H240 2114 0317000084 201.010 19-20 $ 1,789 $ 2,332 $ - STP $ 650 $ 663 $ 756 $ 565 $ 6,755 58.0 Collision(s) reduced

03 Butte 32 R9.1/R9.2 4F260 2110 0314000091 201.010 16-17 $ 10 $ 2,000 $ 1,308 10/21/16 STP $ 200 $ 430 $ 200 $ 637 $ 3,477 18.0 Collision(s) reduced

Near Hayfork, at 1.4 miles north of Carr Creek Bridge. Remove slide debris, stabilize slope, and strengthen embankment armament.Near Trinity Center, from north of Preacher Meadows Road to north of El Dorado Way. Replace Swift Creek Bridge No. 05-0059.Near Weaverville, at various locations from 0.1 mile north of East Weaver Road to 0.4 mile north of Rush Creek Campground Road. Storm water improvements.

Near Mad River, at 0.5 mile west of Mad River Bridge (PM R2.2); also at 0.5 mile east of Feldmiller Road (PM R4.4 to PM R4.5); also in Shasta County, at 2.4 miles west of Harrison Gulch Road. Remove slide debris, reconstruct scoured embankment and redirect stream channel, replace damaged culverts, excavate slope for bench and material catchment grading, and repair roadway.

Near Platina, from 3.7 miles to 3.0 miles west of Hayfork Creek Bridge. Curve improvement.Near Forest Glen, from 0.3 mile west of Klondike Mine Road to 0.2 mile east of Klondike Mine Road. Reconstruct roadway shoulder slipout, replace failed culverts and drainage inlets, and repair roadway.

Near Mad River, from 0.3 mile east of Mad River Rock Lookout Road to 1.0 mile west of South Fork Mountain Road; also at 0.8 mile west of Trinity Pines Road (PM 24.0). Stabilize embankment, construct tie-back retaining wall, and reconstruct roadway.

Near Forest Glen, from 0.5 to 0.1 mile west of Route 3. Curve improvement.Near Burnt Ranch,from 0.4 mile east of Hennessey Road to 0.3 mile west of Burnt Ranch Road. Install rockfall drapery system.Near Junction City, at west of Canyon Creek Bridge. Install rockfall drapery systemNear Del Loma, at Big French Creek Road. Construct a catchment area at the toe of slope.Near Salyer, at various locations from 0.1 mile west of White House Gulch Road to 0.4 mile west of Slattery Pond Road. Rehabilitate culverts.

Near Junction City, at 1.0 mile west of Valdor Drive. Repair slipout and construct soldier pile tie back retaining wall.Near Douglas City at Moon Lim Lee Safety Roadside Rest Area (SRRA), from 0.4 mile east of Little Browns Creek Bridge to 0.8 mile west of Steel Bridge Road. Transportation infrastructure improvement for zero-emission vehicle charging.

Near Helena, from 0.9 mile west of E Fork Road to Sky Ranch Road. Replace burnt timber lagging, repair roadway structural section, replace metal beam guardrailing, replace roadside signs, remove hazard tress/debris, and rock scale slopes.

Near Burnt Ranch, from 0.2 mile west of Veterans Hall Road to 0.1 mile east of Hennessey Road. Repair damaged culverts, repair roadway, and pressure grout voids in embankment fill.

In Trinity County on Routes 299 and 36 and in Siskiyou County on Route 96 at various locations. Bridge preventative maintenance at 9 bridges.

Near Salyer, from 0.1 mile east to 0.6 mile east of White House Gulch Road. Improve roadside clear recovery zone.In Trinity County on Route 299 and Route 3 at various locations; also, in Shasta County on Route 299 at PM 0.1. Make worker safety improvements.

Near Salyer, at the Francis B. Matthews Safety Roadside Rest Area (SRRA). Upgrade potable water system and wastewater system.In Chico, from West Sacramento Avenue (East) to West Sacramento Avenue (West). Construct two roundabouts.In Chico, at Ivy Street in eastbound (W 9th Street) and westbound (W 8th Street) directions. Install traffic signals.

03 Butte 32 R8.8/9.5 4F800 2112 0314000288 201.361 18-19 $ - $ - $ - NH $ 405 $ 650 $ 375 $ - $ 1,430 34.0 Curb ramp(s)

03 Butte 70 2H140 2438 0317000067 201.240 19-20 $ 1,764 $ - $ - NH $ 53 $ 16 $ 61 $ - $ 1,894 2.0 Location(s)

03 Butte 70 41.5 2H750 2290 0317000180 201.130 16-17 $ 40 $ 3,460 $ 3,460 1/24/17 NH $ 140 $ - $ 20 $ 590 $ 4,250 1.0 Location(s)

03 Butte 70 35.7/48.0 3H000 2291 0317000216 201.130 16-17 $ 10 $ 1,000 $ 1,000 3/14/17 NH $ 10 $ - $ 10 $ 150 $ 1,180 1.0 Location(s)

03 Butte 70 46.0/47.0 3H170 2292 0317000238 201.130 16-17 $ - $ 1,510 $ 1,510 4/6/17 NH $ 20 $ - $ - $ 170 $ 1,700 1.0 Location(s)

03 Butte 70 46.0/47.0 3H540 2293 0318000012 201.131 20-21 $ - $ - $ - NH $ 1,700 $ - $ - $ - $ 1,700 1.0 Location(s)

03 Butte 70 8.8/11.8 3H710 2294 0318000053 201.010 19-20 $ 480 $ 23,130 $ - STP $ 850 $ 2,240 $2,320 $ 3,700 $ 32,720 58.0 Collision(s) reduced

03 Butte 70 5.6/8.8 3H720 2295 0318000054 201.010 19-20 $ 3,220 $ 25,350 $ - STP $ 980 $ 2,180 $1,590 $ 3,540 $ 36,860 35.0 Collision(s) reduced

03 Butte 70 0.0/3.8 3H930 2296 0318000102 201.010 20-21 $ - $ - $ - STP $ 3,400 $ - $ - $ - $ 3,400 35.0 Collision(s) reduced

03 Butte 70 22.1/28.2 4F050 2287 0314000018 201.121 16-17 $ - $ 4,274 $ 4,219 1/18/17 NH $ 235 $ 469 $ 19 $ 776 $ 5,773 12.4 Lane mile(s)

03 Butte 99 14.9/15.7 0F290 2425 0314000101 201.111 19-20 $ 590 $ 6,814 $ - HBRR-S $ 700 $ 1,390 $ 270 $ 2,200 $ 11,964 1.0 Bridge(s)

03 Butte 99 13.3/45.9 0H330 2433 0315000145 201.112 19-20 $ 363 $ 5,235 $ - HBRR-S $ 610 $ 1,230 $ 160 $ 1,425 $ 9,023 999.0 Linear feet

03 Butte 99 R34.6/R34.9 1H320 2436 0316000094 201.010 16-17 $ 50 $ 1,300 $ 1,231 2/7/17 STP $ 100 $ 200 $ 50 $ 200 $ 1,900 24.0 Collision(s) reduced

03 Butte 99 28.3/T37.8 1H860 2437 0317000010 201.315 20-21 $ - $ - $ - NH $ 561 $ - $ - $ - $ 561 9.4 Mile(s) of cable

03 Butte 162 18.5/19.9 2H630 2635 0317000166 201.010 19-20 $ 1,645 $ 14,075 $ - STP $ 927 $ 1,769 $2,023 $ 1,913 $ 22,352 50.0 Collision(s) reduced

03 Butte 162 15.8/18.0 3H210 2636 0317000243 201.130 16-17 $ - $ 700 $ 700 4/6/17 NH $ 5 $ - $ - $ 140 $ 845 1.0 Location(s)

03 Butte 162 21.6 3H270 2637 0317000301 201.130 16-17 $ 5 $ 300 $ 300 6/9/17 NH $ 5 $ - $ 5 $ 65 $ 380 1.0 Location(s)

03 Butte 191 6.8/8.6 3F760 2705 0313000165 201.010 16-17 $ 5,300 $ 18,000 $ 20,468 9/13/16 STP $ 1,150 $ 1,350 $ 750 $ 2,700 $ 29,250 140.0 Collision(s) reduced

03 Colusa 5 R24.3 4F430 2793 0314000162 201.235 18-19 $ 16 $ - $ - NH $ 420 $ 460 $ 30 $ - $ 926 1.0 Location(s)

03 Colusa 20 31.8/32.8 2F980 2950 0312000026 201.120 16-17 $ 200 $ 9,700 $ - NH $ 1,100 $ 500 $ 500 $ 1,500 $ 13,500 4.0 Lane mile(s)

03 Colusa 20 5.1/12.5 3H160 2952 0317000237 201.130 16-17 $ 20 $ 2,320 $ 2,320 4/6/17 NH $ 40 $ - $ 10 $ 230 $ 2,620 1.0 Location(s)

03 Colusa VAR 3H260 3854 0317000300 201.130 16-17 $ - $ 760 $ 760 5/30/17 NH $ 10 $ - $ - $ 140 $ 910 5.0 Location(s)

In Chico, from Walnut Street to Poplar Street. Upgrade ADA facilities. (G13 Contingency Project)

In Butte County on Route 70 at approximately 7.0 miles south of Oroville; also, in Colusa County on Route 20 at approximately 4.0 miles east of Colusa. Advance mitigation credit purchases for future SHOPP construction projects expected to impact sensitive habitats.

Near Pulga, at 0.5 mile east of North Fork Feather River Bridge. Remove debris, reconstruct embankment slipout, construct soldier pile retaining wall, install barrier rail, and repair roadway.

Near Pulga, from 0.3 mile east of Deadwood Road to 0.8 mile east of Arch Rock Tunnel. Remove multiple slide debris and hazardous trees, repair roadway, replace damaged guardrail with Midwest Guardrailing System (steel post), and repair roadway.

Near Cresta, from 0.4 mile west of Bear Creek to 0.2 mile east of Arch Rock Tunnel. Reconstruct RSP embankment and repair flooded roadway.

Near Paradise, from 0.8 mile west to 0.2 mile east of Shady Rest Area. Restore and repair damaged roadway by raising the existing vertical alignment by approximately five feet and protecting the embankment against future flooding with Rock Slope Protection (RSP) or a retaining structure.

Near Oroville, from south of Palermo Road to north of Ophir Road. Widen for two-way left-turn lane and standard shoulders, and provide a roadside clear recovery zone.

Near Oroville, from 0.3 mile north of Cox Lane to south of Palermo Road. Widen for two-way left-turn lane and standard shoulders, and provide a roadside clear recovery zone.

Near Oroville, from Yuba County Line to south of East Gridley Road/Stimpson Road; also, in Yuba County on Route 70 from PM 25.7 to PM 25.8. Widen for two-way left-turn lane and standard shoulders.

Near Oroville, from 0.2 miles east of Route191 to West Bridge Feather River. Rehabilitate pavement.

Near Richvale, at Cottonwood Creek Bridge No. 12-0120, from 0.3 mile south to 0.5 mile north of Nelson Avenue. Replace and realign scour-critical bridge.

In and near Chico, from north of Route 162 to north of Broyles Road. Bridge rail upgrade at six locations.In Chico, at the northbound off-ramp to East Avenue. Widen ramp to provide a left-turn lane.In and near Chico, from Estates Drive to Garner Lane. Install intelligent transportation system (ITS) elements.In and near Oroville, from Foothill Boulevard to the Gold Country Casino entrance. Construct two-way left-turn lane and widen shoulders.In Oroville, from Route 70 to Lower Wyandotte Road. Repair pavement from large-scale truck haul from Oroville Dam Spillway work.In Oroville, at Quincy Place. Replace failed culvert and repair roadway sinkhole.Near Paradise, from 1.9 miles north of Clear Creek Bridge to Airport Road. Roadway improvements.

Near Maxwell, at the Maxwell Safety Roadside Rest Area. Upgrade water and wastewater systems to current standards. (G13 Contingency Project)

In Colusa, between Market Street and Butte Vista Way. Rehabilitate roadway.Near Wilbur Springs, from 1.6 miles east of Route 16 to 0.7 mile east of Leesville Road. Remove slide debris, repair embankment slipout, and repair roadside safety elements.

In Colusa County, Butte County, and Glenn County, on Routes 5, 20, 45, and 162 at various locations. Repair damaged shoulder backing.

03 El Dorado 49 37.3/37.8 2H530 3132 0317000148 201.130 16-17 $ - $ 3,000 $ 3,000 12/21/16 NH $ - $ - $ - $ 600 $ 3,600 3.0 Location(s)

03 El Dorado 49 11.3/11.7 3H760 3328 0318000059 201.130 17-18 $ 10 $ 610 $ 610 9/5/17 NH $ - $ - $ 5 $ 140 $ 765 1.0 Location(s)

03 El Dorado 49 16.9 3H990 3153 0318000121 201.130 17-18 $ 25 $ 450 $ 450 10/31/17 NH $ - $ - $ 20 $ 200 $ 695 1.0 Location(s)

03 El Dorado 50 R27.9/R29.8 0H341 6923 0317000152 201.110 19-20 $ 53 $ 8,850 $ - HBRR-S $ 230 $ 690 $ 11 $ 1,660 $ 11,494 1.0 Bridge(s)

03 El Dorado 50 0.0/80.4 0H500 3311 0315000200 201.015 18-19 $ 16 $ 3,450 $ - STP $ 150 $ 360 $ 55 $ 475 $ 4,506 5.0 Collision(s) reduced

03 El Dorado 50 0.0/80.4 0H520 3312 0315000202 201.315 19-20 $ 150 $ 9,150 $ - NH $ 500 $ 1,000 $ 580 $ 1,620 $ 13,000 51.0 Field element(s)

03 El Dorado 50 6.5 1H440 3316 0316000153 201.010 18-19 $ 83 $ 1,200 $ - STP $ 150 $ 530 $ 9 $ 450 $ 2,422 16.0 Collision(s) reduced

03 El Dorado 50 38.0/58.0 2F130 3300 0300020539 201.335 17-18 $ 350 $ 4,000 $ - NH $ 548 $ 535 $ 236 $ 728 $ 6,397 4.0 Acre(s) treated/pollutant

03 El Dorado 50 67.3 3F530 3304 0313000135 201.110 17-18 $ 60 $ 7,360 $ - HBRR-S $ 2,000 $ 1,100 $ 16 $ 1,502 $ 12,038 1.0 Bridge(s)

03 El Dorado 50 36.6/38.5 3H020 3319 0317000218 201.130 16-17 $ 10 $ 780 $ 780 3/14/17 NH $ 10 $ - $ 10 $ 130 $ 940 2.0 Location(s)

03 El Dorado 50 37.6 3H100 3320 0317000230 201.130 16-17 $ 20 $ 7,890 $ 7,890 3/16/17 NH $ 280 $ - $ 20 $ 800 $ 9,010 1.0 Location(s)

03 El Dorado 50 37.6 3H110 3321 0317000231 201.130 16-17 $ 10 $ 1,530 $ 1,530 3/16/17 NH $ 30 $ - $ 10 $ 130 $ 1,710 1.0 Location(s)

03 El Dorado 50 43.7/50.0 3H120 3322 0317000232 201.130 16-17 $ 30 $ 3,900 $ 3,900 4/6/17 NH $ 10 $ - $ 10 $ 500 $ 4,450 1.0 Location(s)

03 El Dorado 50 21.6/34.1 3H180 3323 0317000239 201.130 16-17 $ 20 $ 2,340 $ 2,340 4/6/17 NH $ 15 $ - $ 10 $ 275 $ 2,660 5.0 Location(s)

03 El Dorado 50 33.9/36.2 3H230 3324 0317000245 201.130 16-17 $ 10 $ 590 $ 590 5/11/17 NH $ 15 $ - $ 5 $ 550 $ 1,170 2.0 Location(s)

03 El Dorado 50 48.8/49.0 3H240 3325 0317000264 201.130 16-17 $ 20 $ 750 $ 750 5/11/17 NH $ 25 $ - $ 25 $ 100 $ 920 1.0 Location(s)

03 El Dorado 50 21.9/24.5 4E620 3290 0314000039 201.010 18-19 $ 3,000 $ 32,000 $ - STP $ 2,500 $ 3,500 $1,200 $ 5,800 $ 48,000 117.0 Collision(s) reduced

03 El Dorado 50 70.6 4F840 3303 0314000305 201.010 17-18 $ 35 $ 3,445 $ - STP $ 290 $ 550 $ 150 $ 770 $ 5,240 25.0 Collision(s) reduced

03 El Dorado 89 13.5/14.5 2H440 3464 0317000112 201.130 16-17 $ 10 $ 1,370 $ 1,370 10/27/16 NH $ 10 $ - $ 2 $ 100 $ 1,492 1.0 Location(s)

03 El Dorado 89 2H940 3465 0317000208 201.130 16-17 $ - $ 450 $ 450 3/13/17 NH $ 5 $ - $ 10 $ 90 $ 555 1.0 Location(s)

03 El Dorado 89 16.0/16.8 3H360 3466 0317000330 201.130 16-17 $ 20 $ 4,420 $ 4,420 6/30/17 NH $ - $ - $ - $ 880 $ 5,320 2.0 Location(s)

Near Auburn, from 0.4 mile to 0.9 mile south of North Fork American River Bridge. Repair slipout and construct soldier pile retaining wall.In Diamond Springs, from 0.1 mile north of Missouri Flat Road to Diamond Meadows Way. Replace damage culverts, regrade drainage ditches, and repair roadway.

Near Placerville, at 0.5 mile north of Diana Street. Replace failed culvert, reconstruct embankment, and repair roadway.Near Pollock Pines, at Sawmill Undercrossing No. 25-0041; also at Sly Park Road (PM R30.17/R31.3). Replace bridge, restore culverts, and add highway lighting.

In El Dorado County, from the Sacramento County line to east of Stateline Avenue. Upgrade guard rail to current standards.In El Dorado County, from the Sacramento County line to east of Stateline Avenue. Upgrade new Transportation Management System elements.

In Cameron Park, at Cameron Park Drive. Improve sight distance and upgrade curb ramps.Near Placerville, from 0.8 mile east of Bridal Veil Falls Road to Strawberry Lodge Drive. Construct traction sand traps.Near South Lake Tahoe, west of South Lake Tahoe at Echo Summit Sidehill Viaduct Bridge No. 25-0044. Rehabilitate or replace bridge.Near Pollock Pines, from 1.4 miles east of Peavine Ridge Road to 1.2 miles west of Ice House Road. Remove slide debris and hazardous trees, construct Midwest Guardrailing System (steel post), repair sinkhole, and install slope drainage.

Near Pollock Pines, at 2.2 miles west of Ice House Road. Reconstruct embankment slipout, construct soldier pile retaining wall, install drainage, and repair roadway.

Near Pollock Pines, at 2.2 miles west of Ice House Road. Stabilize slipout, install temporary shoring of embankment, and provide traffic control measure to re-establish both directions of travel.

Near Kyburz, from 0.4 mile west of South Fork American River Bridge to 0.8 mile east of Kyburz Road. Remove slides, reconstruct embankment slipouts, and restore roadway.

In and near Camino, from 0.2 mile east of Parkway Drive to 0.3 mile west of Old Carson Road. Repair slides, reconstruct embankment slipouts, and restore roadway.

Near Pollock Pines, from 0.5 mile west of Outer Limits Lane to 0.6 mile east of Hazel Valley Road. Repair asphalt pavement and support geotechnical drilling investigations.

In Kyburz, from 0.1 mile west of Kyburz Drive to 0.1 mile east of Capachi Drive. Abandon existing drainage system and install new drainage system.

Near Placerville and Camino, from 0.2 mile west of Still Meadows Road to 0.4 mile east of Upper Carson Road. Install median barrier, widen shoulders, construct acceleration/deceleration lane, construct an undercrossing, and construct access to the undercrossing from local roads.

Near Myers, at Route 89 South. Construct roundabout.Near South Lake Tahoe, from 0.3 mile north of Spring Creek Road to 0.3 mile south of Cascade Road. Repair fire damaged slope/ embankment, replace guard rail, remove hazardous trees, and repair erosion control measures.

Near South Lake Tahoe, at various locations from Alpine County line to Placer County line (PM 0.0 to PM 27.4); also in Placer County at various locations (PM 0.0 to PM 21.6). Remove and dispose of hazardous trees 100 feet from centerline on each side of roadway.

Near Emerald Bay, from 0.2 mile south of Bayview Campground to 0.3 mile south of Eagle Falls Campground. Construct soldier pile wall, construct barrier rail, and repair roadway.

03 El Dorado 89 3.4/5.7 3H420 3467 0317000345 201.130 16-17 $ 20 $ 1,600 $ 1,600 6/30/17 NH $ - $ - $ 5 $ 400 $ 2,025 3.0 Location(s)

03 El Dorado 193 1H600 3631 0316000188 201.131 18-19 $ 13 $ 6,042 $ - NH $ 1,039 $ 1,201 $ 106 $ 1,144 $ 9,545 2.0 Location(s)

03 El Dorado 193 23.3 2H890 3632 0317000197 201.130 16-17 $ 20 $ 970 $ 970 2/14/17 NH $ 10 $ - $ 20 $ 115 $ 1,135 1.0 Location(s)

03 El Dorado 193 24.4/26.4 3H060 3633 0317000223 201.130 16-17 $ 20 $ 520 $ 520 3/16/17 NH $ 15 $ - $ 10 $ 105 $ 670 1.0 Location(s)

03 El Dorado 193 19.8/26.9 3H070 3634 0317000224 201.130 16-17 $ 10 $ 990 $ 990 5/11/17 NH $ 50 $ - $ 20 $ 200 $ 1,270 1.0 Location(s)

03 El Dorado 193 26.4 3H130 3635 0317000233 201.130 16-17 $ 40 $ 2,960 $ 2,960 3/16/17 NH $ 95 $ - $ 20 $ 605 $ 3,720 1.0 Location(s)

03 El Dorado Var 2H680 3135 0317000171 201.131 17-18 $ 16 $ 3,794 $ - NH $ 407 $ 266 $ 806 $ 593 $ 5,882 1,042.0 Location(s)

03 Glenn 5 0H490 3711 0315000199 201.170 17-18 $ - $ 1,105 $ 1,200 1/31/18 NH $ 113 $ 207 $ 11 $ 267 $ 1,703 239.0 Lighting fixture(s)

03 Glenn 5 2H550 5129 0317000154 201.999 17-18 $ 11 $ 1,934 $ - ST-CASH $ 300 $ 300 $ 20 $ 300 $ 2,865 6.0 Location(s)

03 Glenn 5 0.0/20.0 4F060 2792 0314000019 201.121 16-17 $ 21 $ 32,120 $ 30,726 6/29/16 NH $ 1,350 $ 1,070 $ 350 $ 3,800 $ 38,711 80.0 Lane mile(s)

03 Glenn 5 R14.6 4F420 3710 0314000161 201.235 19-20 $ 20 $ 4,100 $ - NH $ 540 $ 550 $ 60 $ 1,180 $ 6,450 1.0 Location(s)

03 Glenn 32 L0.0/0.8 4F810 3788 0314000291 201.361 19-20 $ 88 $ 700 $ - NH $ 240 $ 405 $ 465 $ 260 $ 2,158 113.0 Curb ramp(s)

03 Nevada 20 29.7/30.9 0H240 3994 0315000116 201.010 19-20 $ 613 $ 8,237 $ - STP $ 1,096 $ 976 $ 291 $ 1,286 $ 12,499 46.0 Collision(s) reduced

03 Nevada 20 37.1/39.8 2H620 4000 0317000165 201.010 19-20 $ 1,380 $ 27,480 $ - STP $ 3,920 $ 2,810 $ 410 $ 3,480 $ 39,480 52.0 Collision(s) reduced

03 Nevada 49 0.0/7.5 0H210 4124 0315000112 201.151 21-22 $ - $ - $ - NH $ 513 $ - $ - $ - $ 513 24.0 Drainage system(s)

03 Nevada 49 7.5/R14.4 0H220 4123 0315000113 201.151 18-19 $ 80 $ - $ - NH $ 440 $ 550 $ 350 $ - $ 1,420 38.0 Drainage system(s)

03 Nevada 49 0H420 4125 0315000166 201.315 19-20 $ 30 $ 9,200 $ - NH $ 1,000 $ 1,000 $ 180 $ 1,800 $ 13,210 470.0 Field element(s)

03 Nevada 49 20.8/21.0 2H730 4129 0317000176 201.130 16-17 $ - $ 500 $ 500 2/1/17 NH $ 10 $ - $ - $ 60 $ 570 3.0 Location(s)

03 Nevada 49 17.5/R32.6 2H820 4131 0317000187 201.130 16-17 $ - $ 1,250 $ 1,250 2/1/17 NH $ 20 $ - $ - $ 80 $ 1,350 5.0 Location(s)

03 Nevada 49 22.5 2H880 4132 0317000196 201.130 16-17 $ 20 $ 2,100 $ 2,100 3/14/17 NH $ 130 $ - $ 20 $ 540 $ 2,810 1.0 Location(s)

Near Meyers, from 0.1 mile north of S. Upper Truckee Road to 0.3 mile south of Grass Lake Road. Repair washouts and improve drainage system.

Near Placerville, at 1.1 miles north of the South Fork American River Bridge (PM 22.8/22.9); also at 2.5 miles north of the South Fork American River Bridge (PM 24.2/24.3). Restore embankment slope slip-outs.

Near Placerville, at 0.6 mile north of Rock Creek Road. Stabilize embankment and armor slope with rock slope protection (RSP).Near Placerville, from 0.3 mile north of South Fork American River Bridge to 0.5 mile north of Route 49. Reconstruct embankment slipout, stabilize slope, remove debris and hazardous trees, install temporary barriers (K-rail), and provide traffic control.

Near Placerville, from 0.2 mile east of Spanish Flat Road to Route 49. Remove mudslide debris, repair drainage systems, and grade slopes.Near Placerville, at 0.5 mile north of Route 49. Reconstruct embankment slipout, construct soldier pile retaining wall, install drainage, and repair roadway.

In El Dorado County, on Routes 49 and 193 at various locations. Remove dead or dying trees.In Sacramento County on Routes 51, 80, 99, 160, and 244 at various locations. Upgrade sign panels and lighting to make standard.At Northbound (NB) and Southbound (SB) Willows Safety Roadside Rest Area (SRRA) (PM R14.6/R14.7); also, in Colusa County at NB and SB Maxwell SRRA (PM R24.4/R24.5), and in Nevada County on Route 80 at the WB and EB Donner Pass SRRA (PM R5.5L/R5.5R). Transportation infrastructure improvement for zero-emission vehicle charging.

In and near Willows, from Colusa County Line to 0.2 miles north of County Road 28. Rehabilitate pavement.Near Willows, at the Willows Safety Roadside Rest Area (SRRA). Upgrade potable water and wastewater systems.In Orland, from Route 5 to Woodward Avenue. Upgrade pedestrian infrastructure to meet Americans with Disabilities Act (ADA) requirements.

Near Nevada City, from 0.1 mile east of White Cloud Campground to 0.9 mile west of Washington Road. Curve improvement, shoulder widening and improve clear recovery zone.

Near Emigrant Gap, from 0.3 mile west of Excelsior Point Road to 1.3 mile west of Zeibright Road. Curve improvement and widen shoulders.

Near Higgins Corner, from the Placer County line to 0.3 milenorth of Lime Kiln Road; also, in Placer County at PM R8.42 and PM R10.23. Rehabilitate drainage systems.In and near Grass Valley, from Lime Kiln Road to Route 20. Rehabilitate culverts. (G13 Contingency Project)In various counties on various routes at various locations. Repair and install vehicle census count stations.Near Nevada City, from 1.1 miles south of South Yuba River Bridge to 0.9 mile south of South Yuba River Bridge. Repair and/or replace multiple failed culverts, install rock slope protection (RSP), install a detention basin, and repair eroded embankments.

Near Nevada City, from Newtown Road to Yuba County Line; also in Yuba County, from Nevada County Line to 0.1 mile south of Marysville Road (PM R0.0/3.5). Remove mudslide debris, take out hazardous trees and loose rocks on failed slope, and repair drainage system.

Near Nevada City, at 0.6 mile north of South Yuba River Bridge. Reconstruct embankment slipout, replace damaged metal beam guardrail, construct soldier pile retaining wall, and reconstruct roadway.

03 Nevada 49 R14.0 2H920 4133 0317000203 201.130 16-17 $ 10 $ 700 $ 700 3/14/17 NH $ 15 $ - $ 10 $ 135 $ 870 1.0 Location(s)

03 Nevada 49 22.7 2H960 4134 0317000211 201.130 16-17 $ 5 $ 2,920 $ 2,920 3/13/17 NH $ 80 $ - $ 10 $ 530 $ 3,545 1.0 Location(s)

03 Nevada 49 R13.4 3H280 4135 0317000305 201.130 16-17 $ 10 $ 1,100 $ 1,100 5/23/17 NH $ 10 $ - $ 10 $ 200 $ 1,330 2.0 Location(s)

03 Nevada 49 23.2/R32.6 4F740 4122 0314000265 201.121 16-17 $ - $ 5,708 $ 6,783 10/19/16 NH $ 465 $ 485 $ 60 $ 1,065 $ 7,783 19.0 Lane mile(s)

03 Nevada 80 18.3/19.3 1H260 4295 0316000079 201.131 16-17 $ 12 $ 2,349 $ 1,935 6/28/17 NH $ 405 $ 558 $ 87 $ 572 $ 3,983 1.0 Location(s)

03 Nevada 80 R9.2/R9.6 2H720 4300 0317000175 201.130 16-17 $ - $ 410 $ 410 2/1/17 NH $ 10 $ - $ - $ 40 $ 460 1.0 Location(s)

03 Nevada 80 24.7/24.9 2H980 4301 0317000214 201.130 16-17 $ 30 $ 1,930 $ 1,930 3/14/17 NH $ 20 $ - $ 10 $ 470 $ 2,460 1.0 Location(s)

03 Nevada 80 29.1/29.4 3F250 4287 0312000133 201.150 18-19 $ 200 $ 9,690 $ - NH $ 570 $ 840 $ 110 $ 1,110 $ 12,520 1.0 Location(s)

03 Nevada 80 19.1/27.4 3F920 4296 0313000239 201.352 17-18 $ 17 $ 2,478 $ 2,601 10/18/17 ST-CASH $ 801 $ 416 $ 80 $ 625 $ 4,417 1.0 Location(s)

03 Nevada 80 24.9/31.8 3H040 4302 0317000220 201.130 16-17 $ - $ 500 $ 500 3/14/17 NH $ 10 $ - $ - $ 65 $ 575 1.0 Location(s)

03 Nevada 80 R12.5/21.2 3H050 4303 0317000221 201.130 16-17 $ - $ 5,370 $ 5,370 3/14/17 NH $ 5 $ - $ - $ 425 $ 5,800 1.0 Location(s)

03 Nevada 80 R2.5/L0.0 3H290 4304 0317000306 201.130 16-17 $ - $ 2,450 $ 2,450 5/23/17 NH $ 15 $ - $ - $ 335 $ 2,800 5.0 Location(s)

03 Nevada 80 31.0/31.8 3H810 4307 0318000066 201.130 17-18 $ 100 $ 3,500 $ 3,500 9/5/17 NH $ - $ - $ 30 $ 410 $ 4,040 1.0 Location(s)

03 Nevada 80 0.0/20.0 4F600 4288 0314000228 201.015 18-19 $ 5 $ 12,308 $ - STP $ 410 $ 660 $ 30 $ 950 $ 14,363 24.0 Collision(s) reduced

03 Nevada 89 2H650 5287 0317000168 201.131 17-18 $ 16 $ 2,287 $ - NH $ 308 $ 321 $1,500 $ 346 $ 4,778 356.0 Location(s)

03 Nevada 174 2H910 4452 0317000200 201.130 16-17 $ 20 $ 1,430 $ 1,430 2/14/17 NH $ 10 $ - $ 10 $ 150 $ 1,620 4.0 Location(s)

03 Nevada 174 9.7/10.1 3F680 4450 0313000047 201.361 20-21 $ 150 $ 1,660 $ - NH $ 180 $ 330 $ 86 $ 360 $ 2,766 85.7 Curb ramp(s)

03 Nevada 174 2.7/4.6 4F370 4451 0314000152 201.010 18-19 $ 2,503 $ 17,000 $ - STP $ 1,700 $ 2,100 $2,300 $ 3,200 $ 28,803 72.0 Collision(s) reduced

03 Nevada Var 2H660 4128 0317000169 201.131 17-18 $ 16 $ 2,464 $ - NH $ 305 $ 246 $ 806 $ 395 $ 4,232 534.0 Location(s)

03 Placer 20 R42.4/43.9 3H430 4628 0317000350 201.130 16-17 $ - $ 750 $ 750 6/30/17 NH $ - $ - $ - $ 200 $ 950 1.0 Location(s)

In Grass Valley, at 0.4 mile north of E. McKnight Way. Repair storm damaged culvert, replace headwall, and repair roadway.Near Nevada City, at 0.8 mile north of South Yuba River Bridge. Reconstruct embankment slipout, replace damaged metal beam guardrail, construct soldier pile retaining wall, and reconstruct roadway.

In Grass Valley, at 0.2 mile south of McKnight Way. Replace failed culvert and repair roadway sinkhole.

Near Nevada City, from 1.3 miles north of South Yuba River Bridge to Yuba County Line. Rehabilitate pavement.In Truckee, from Polaris Undercrossing to Donner Pass Commercial Vehicle Enforcement Facility. Construct water supply line.In Truckee, from 0.1 mile west of Donner Lake Road to 0.5 mile west of Donner Lake Road. Remove mudslide debris from roadway, remove loose rocks on failed slope, and reconstruct eroded slope.

Near Floriston, from 2.4 miles east of Hirschdale Road to 2.4 miles west of Floriston Way. Remove slide debris, stabilize slope, install slope drainage system, and re-grade drainage ditches.

Near Truckee, from east of Floriston Road to west of Farad Undercrossing. Stabilize cut-slope.

In Truckee, at the Donner Pass Inspection Facility (PM 19.1); also in Nevada County at Floriston, at the Floriston sand and salt houses (PM 27.4). Construct new sand/salt house and demolish existing.

Near Floriston, from 1.3 miles east of Hinton Road to Sierra County line; also in Sierra County from Nevada County line to Nevada State line (PM 0.0/1.6). Remove multiple slide debris, stabilize slope, repair and unclog drainage systems, repair roadway shoulder, and re-grade roadside drainage ditches.

Near Truckee, from 0.7 mile west of Donner Pass Road to 0.1 mile east of Truckee River Bridge. Restore roadway drainage and remove water saturated delamination in roadway, construct rumble strips, and replace joint seals.

Near Kingvale, from Soda Springs Overcrossing to Placer County line; also in Placer County, from Nevada County line to Kingvale Undercrossing (PM 69.2). Replace failed culverts and repair roadway sinkholes.

Near Floriston, from 0.5 mile east of Farad Undercrossing to Sierra County line; also in Sierra County, from the Nevada County line to the Nevada state line. Remove slide debris, construct debris detention basins, and regrade drainage ditches.

In and near Truckee, from east of Kingvale Undercrossing to west of Union Mills Bridge and Overhead. Replace guardrail with concrete barrier.

In Nevada, Placer and El Dorado Counties on Routes 28, 89 and 267 at various locations. Remove dead or dying trees.Near Colfax, from 0.3 mile east of Redberry Road to Bertino Road; also in Placer County, from 0.2 mile east of Hill Drive to Rollins Lake Road. Remove slide debris, stabilize slopes, and repair sinkhole in roadway.

In Grass Valley, from Park Street to Route 20. Upgrade pedestrian infrastructure to meet Americans with Disabilities Act (ADA) requirements.

Near Rollins Lake, from Maple Way to You Bet Road. Realign roadway curves.In Nevada, Placer, and Yuba Counties on Routes 49 and 174 at various locations. Remove dead or dying trees.Near Camp Spaulding, from 0.2 mile east of Bear Valley Road to Nevada County line; also in Nevada County, from Placer County line to 0.5 mile west of Route 80. Remove slide debris, regrade drainage, and repair roadway.

03 Placer 49 2.2/2.4 1H240 4785 0316000077 201.010 19-20 $ 764 $ 1,697 $ - STP $ 732 $ 1,003 $ 306 $ 819 $ 5,321 50.0 Collision(s) reduced

03 Placer 49 3.1/7.5 2F340 4781 0300020616 201.120 17-18 $ 555 $ 29,000 $ - NH $ 2,400 $ 1,300 $1,250 $ 4,300 $ 38,805 22.0 Lane mile(s)

03 Placer 65 R5.9 0F352 6913A 0316000081 201.315 16-17 $ 20 $ 2,800 $ 2,600 8/16/17 NH $ 230 $ 400 $ 500 $ 1,000 $ 4,950 1.0 Field element(s)

03 Placer 65 R5.0/R6.6 0H260 5108 0315000118 201.010 16-17 $ 150 $ 15,050 $ 17,600 8/16/17 STP $ 1,100 $ 2,500 $ 300 $ 2,600 $ 21,700 184.0 Collision(s) reduced

03 Placer 65 R19.5 1H530 4899 0316000177 201.240 19-20 $ 64 $ 1,175 $ - NH $ 653 $ 434 $ 7 $ 306 $ 2,639 1.0 Location(s)

03 Placer 65 R23.6/R23.8 3H940 4900 0318000112 201.130 17-18 $ 10 $ 540 $ 540 11/6/17 NH $ - $ - $ 10 $ 180 $ 740 1.0 Location(s)

03 Placer 80 0H400 4291 0315000164 201.315 19-20 $ - $ 1,600 $ - NH $ 190 $ 210 $ 30 $ 500 $ 2,530 62.0 Field element(s)

03 Placer 80 2.8 0H460 5113 0315000174 201.310 19-20 $ 270 $ - $ - NH $ 700 $ 700 $ 130 $ - $ 1,800 563.0 1,000 vehicle hour(s)/yr

03 Placer 80 31.5/36.9 1E050 5079 0300020600 201.151 19-20 $ 150 $ 3,170 $ - NH $ 230 $ 440 $ 140 $ 600 $ 4,730 22.0 Drainage system(s)

03 Placer 80 38.3/41.5 1H030 5114 0316000049 201.151 20-21 $ - $ - $ - NH $ 429 $ - $ - $ - $ 429 32.0 Drainage system(s)

03 Placer 80 29.6 1H890 5128 0317000017 201.130 16-17 $ 20 $ 1,660 $ 1,660 8/2/16 NH $ 8 $ - $ 8 $ 200 $ 1,896 1.0 Location(s)

03 Placer 80 28.7/R63.5 2F570 5097 0300020615 201.110 19-20 $ 200 $ - $ - HBRR-S $ 2,720 $ 6,350 $ 485 $ - $ 9,755 6.0 Bridge(s)

03 Placer 80 28.5/31.5 3E050 5096 0300020597 201.151 17-18 $ 82 $ 1,043 $ 1,241 12/6/17 NH $ 290 $ 260 $ 60 $ 380 $ 2,115 9.0 Drainage system(s)

03 Placer 80 41.4/42.2 3F480 5103 0313000017 201.235 16-17 $ - $ 1,836 $ 3,167 6/28/17 NH $ 570 $ 730 $ 60 $ 475 $ 3,671 2.0 Location(s)

03 Placer 80 47.3 3H010 5130 0317000217 201.130 16-17 $ 10 $ 1,200 $ 1,200 3/16/17 NH $ 20 $ - $ 10 $ 300 $ 1,540 1.0 Location(s)

03 Placer 80 R50.7/R51.0 3H680 5135 0318000038 201.130 17-18 $ - $ 2,000 $ 2,000 8/10/17 NH $ - $ - $ - $ 300 $ 2,300 1.0 Location(s)

03 Placer 80 25.9/28.5 4F250 5105 0314000086 201.151 18-19 $ 70 $ 3,070 $ - NH $ 220 $ 430 $ 140 $ 610 $ 4,540 26.0 Drainage system(s)

03 Placer 80 43.5 4H010 5136 0318000125 201.130 17-18 $ - $ 1,000 $ 1,000 11/6/17 NH $ - $ - $ - $ 250 $ 1,250 3.0 Location(s)

03 Placer 89 13.1/21.7 3H200 5288 0317000242 201.130 16-17 $ - $ 5,500 $ 5,500 6/5/17 NH $ 10 $ - $ - $ 400 $ 5,910 1.0 Location(s)

03 Placer 174 2.3 2H760 5500 0317000181 201.130 16-17 $ 10 $ 400 $ 400 2/1/17 NH $ 10 $ - $ 5 $ 80 $ 505 1.0 Location(s)

03 Placer 193 9.8 2H970 5582 0317000212 201.130 16-17 $ 5 $ 340 $ 340 3/13/17 NH $ 15 $ - $ 8 $ 88 $ 456 1.0 Location(s)

03 Sacramento 5 13.0/24.9 0H100 5854 0315000076 201.120 17-18 $ 400 $220,000 $ - NH $ 6,000 $14,000 $2,000 $25,000 $ 267,400 67.0 Lane mile(s)

03 Sacramento 5 23.6/24.3 1H610 5863 0316000190 201.322 21-22 $ - $ - $ - NH $ 5,700 $ - $ - $ - $ 5,700 2.0 Bridge(s)

In Auburn, from 0.3 mile south of Lincoln Way/Borland Avenue to Lincoln Way/Borland Avenue. Realign curves.In Auburn, from 0.1 mile south of Routes 49/80 Separation to 0.1 mile north of Dry Creek Road. Rehabilitate pavement.In Roseville, at Galleria Boulevard/Stanford Ranch Road. Install ramp meter.In and near Roseville and Rocklin, from Route 80 to 0.5 mile south of Pleasant Grove Overcrossing. Construct northbound auxiliary lane.

Near Lincoln, on McCourtney Road between Riosa Road and Kilaga Springs Road at the Coon Creek Conservation (C4) Ranch. Advance mitigation construction (4 acres) for future SHOPP projects expected to impact Near Wheatland, from 0.2 mile south of Bear River Bridge to Bear River Bridge. Repair eroded embankment, replace asphalt dike, and repair roadway.

In various Counties on various routes at various locations. Upgrade Extinguishable Message Signs (EMS) to LED.In Roseville, at the Atlantic Street/Eureka Road westbound on-ramp. Install ramp meters and widen ramp for storage capacity. (G13 Contingency Project)

In and near Colfax, from west of Illinoistown Overcrossing to east of Cape Horn Undercrossing. Drainage system rehabilitation.Near Magra, from Secret Town Overcrossing to the GoldRun Safety Roadside Rest Area. Rehabilitate drainageNear Weimar, at 0.3 mile north of Weimar Cross Road Overcrossing. Replace corroded large diameter culvert.In Placer and Nevada Counties, at various locations. Rehabilitate or replace bridges at six locations. (G13 Contingency Project)In and near Colfax, from 0.3 mile south of Weimar Cross Road Overhead to 0.3 mile south of Illinoistown Overcrossing. Rehabilitate culvert.

Near Gold Run, at the Gold Run Safety Roadside Rest Area. Remove and replace on-site wastewater treatment system.Near Baxter, at 0.4 mile east of Baxter Overcrossing. Remove slide debris and hazardous trees, stabilize slope, and install underdrain system.

Near Baxter, at Whitmore Maintenance Station. Repair embankment and install geostabilization.Near Weimar, from west of Applegate Road to west of Weimar Cross Road. Drainage system rehabilitation.Near Baxter, at 0.3 mile east of Ridge Road; also at 0.4 mile east of Baxter Overcrossing (PM 47.32); also in Nevada County, near Hinton at 0.4 mile west of Hirschdale Road (PM 21.98). Reconstruct eroded embankment, repair drainage systems, and repair roadway.

Near Tahoe City, from Truckee River Bridge to Nevada County line; also, in Nevada County, from Deerfield Drive to 0.3 mile north of Alder Drive. Remove and Repair damaged roadway pavement.

Near Colfax, at 0.5 mile east of Bear River Bridge. Repair slope washout, install drainage, and reconstruct roadway.Near Newcastle, at 0.1 mile south of Taylor Road. Repair sinkhole, replace failed culvert and drainage inlet, and repair roadway.In and near the city of Sacramento, from Beach Lake Bridge at Morrison Creek to the American River Bridge. Roadway rehabilitation.In the city of Sacramento, at the West End Viaduct No. 24-0069R/L. Improve to standard truck capacity.

03 Sacramento 5 13.0/13.2 1H750 5864 0316000267 201.130 16-17 $ - $ 710 $ 710 7/13/16 NH $ 8 $ - $ - $ 75 $ 793 1.0 Location(s)

03 Sacramento 5 1H850 6411 0317000009 201.315 20-21 $ - $ - $ - NH $ 320 $ - $ - $ - $ 320 4.0 Field element(s)

03 Sacramento 5 2H700 8920 0317000173 201.315 18-19 $ 15 $ 1,403 $ - NH $ 148 $ 249 $ 22 $ 507 $ 2,344 48.0 Field element(s)

03 Sacramento 5 15.5/18.2 3H370 5867 0317000335 201.130 16-17 $ 10 $ 420 $ 420 6/23/17 NH $ - $ - $ 2 $ 100 $ 532 3.0 Location(s)

03 Sacramento 5 22.1/26.7 3H390 5868 0317000340 201.322 21-22 $ - $ - $ - NH $16,780 $ - $ - $ - $ 16,780 3.0 Bridge(s)

03 Sacramento 5 10.8/11.6 3H570 5870 0318000015 201.010 17-18 $ 7 $ 673 $ - STP $ 40 $ 70 $ 10 $ 440 $ 1,240 20.0 Collision(s) reduced

03 Sacramento 5 23.6 3H880 5871 0318000083 201.130 17-18 $ - $ 400 $ 400 10/18/17 NH $ - $ - $ - $ 50 $ 450 1.0 Location(s)

03 Sacramento 5 33.1 4F400 5852 0314000159 201.321 17-18 $ 6 $ 2,100 $ - ST-CASH $ 210 $ 240 $ 25 $ 360 $ 2,941 1.0 Location(s)

03 Sacramento 5 9.7/22.7 4F450 5846 0314000164 201.315 16-17 $ 600 $ 6,600 $ - NH $ 540 $ 900 $ 440 $ 1,500 $ 10,580 13.0 Mile(s) of cable

03 Sacramento 5 33.7 4F580 5848 0314000186 201.235 18-19 $ 4 $ 3,000 $ - NH $ 380 $ 370 $ 50 $ 810 $ 4,614 1.0 Location(s)

03 Sacramento 5 0.1/34.6 4F640 5850 0314000232 201.015 18-19 $ 15 $ 2,280 $ - STP $ 335 $ 565 $ 115 $ 295 $ 3,605 8.0 Collision(s) reduced

03 Sacramento 12 0.4/0.9 2H640 5961 0317000167 201.010 19-20 $ 6 $ 2,468 $ - STP $ 310 $ 560 $ 100 $ 1,030 $ 4,474 26.0 Collision(s) reduced

03 Sacramento 12 0.0/0.4 3F570 5959 0313000139 201.110 16-17 $ 6 $ 32,000 $ 32,000 5/17/17 HBRR-S $ 461 $ 635 $ 55 $ 5,400 $ 38,557 1.0 Bridge(s)

03 Sacramento 50 L0.6/R5.3 0H080 6177 0315000074 201.120 19-20 $ 3,900 $216,000 $ - NH $ 7,800 $17,000 $1,800 $31,800 $ 278,300 56.0 Lane mile(s)

03 Sacramento 50 R3.5 0H580 6242 0315000211 201.310 18-19 $ 130 $ 1,300 $ - NH $ 250 $ 450 $ 130 $ 460 $ 2,720 1,000.0 1,000 vehicle hour(s)/yr

03 Sacramento 50 R2.6/R3.8 1F190 6200 0300001105 201.310 18-19 $ 6 $ 3,080 $ - NH $ 155 $ 265 $ 4 $ 420 $ 3,930 32.0 1,000 vehicle hour(s)/yr

03 Sacramento 50 12.5/23.1 1H820 6248 0317000006 201.315 20-21 $ - $ - $ - NH $ 240 $ - $ - $ - $ 240 12.3 Mile(s) of cable

03 Sacramento 50 R7.5/17.0 3F930 6235 0313000240 201.235 16-17 $ - $ 1,250 $ 1,255 1/17/17 NH $ 118 $ 200 $ 30 $ 460 $ 2,058 21.0 Location(s)

03 Sacramento 50 L0.0/R5.1 4F460 6239 0314000165 201.315 17-18 $ 800 $ 6,000 $ - NH $ 400 $ 700 $ 400 $ 1,200 $ 9,500 8.0 Mile(s) of cable

03 Sacramento 50 L0.3/L2.4 4F610 6241 0314000229 201.015 17-18 $ 20 $ 3,000 $ - STP $ 200 $ 480 $ 20 $ 650 $ 4,370 8.0 Collision(s) reduced

03 Sacramento 51 2.0/3.5 3F070 6402 0312000054 201.110 21-22 $ 2,000 $ - $ - HBRR-S $ 4,340 $12,000 $ 600 $ - $ 18,940 1.0 Bridge(s)

03 Sacramento 80 M1.2/R11.3 0H470 6711 0315000197 201.121 18-19 $ 25 $ 10,515 $ - NH $ 550 $ 1,110 $ 105 $ 2,000 $ 14,305 0.1 Lane mile(s)

Near Elk Grove, from Beach Lake to 1.6 miles south of Cosumnes River Boulevard Overcrossing. Repair failed concrete base and concrete pavement slabs.

In the city of Sacramento, at various locations and routes at the Route 5/99 interchange connector ramps and the eastbound Route 51/160 interchange connector ramp. Install connector ramp meters.

In Placer, Sacramento, and Yolo Counties, on routes 5, 80, 99, and 113. Replace obsolete Microwave Vehicle Detection System (MVDS) elements.

In the city of Sacramento, from 0.1 mile south of Freeport Boulevard to Gloria Drive; also, at 0.8 mile east of Watt Avenue (PM R6.2). Repair sound walls.

In the city of Sacramento, from 0.5 mile south of Route 50 to Route 80 at South Connector Undercrossing No. 24-0267 (PM 22.42) and at American River Viaduct No. 24-0068R/L (PM 24.82). Improve to standard truck capacity.

Near Elk Grove, from Elk Grove Boulevard Overcrossing to 0.4 mile south of Laguna Boulevard Overcrossing. Extend Elk Grove Boulevard onramp merge lane in the northbound direction.

In the city of Sacramento, at West End Viaduct No. 24-0069L. Repair bridge deck and replace damaged bridge rail.Near the city of Sacramento, at 0.3 mile north of Airport Boulevard. Rehabilitate weigh-in-motion station.In Sacramento, from 1.1 miles south of Elk Grove Boulevard to Route 50. Install fiber optic cable.

Near the city of Sacramento, at the Elkhorn Safety Roadside Rest Area (SRRA). Upgrade potable water and wastewater systems.In Sacramento County on Routes 5, 80, and 99 at various locations; also in Yolo County on Route 80 (PM 0.0/R11.7). Upgrade guard rail to current standards.

Near Rio Vista, at Route 160. Intersection improvements.In Sacramento and Solano counties PM26.3 to 26.4), near Rio Vista at the Sacramento River Bridge No. 23-0024. Clean and repaint steel surfaces.

In the city of Sacramento, from Route 5 to Watt Avenue. Roadway rehabilitation.In the city of Sacramento, at Hornet Drive eastbound off-ramp. Widen ramp, add signal and right-turn lane.In the city of Sacramento, from 65th Street to east of Howe Avenue. Construct westbound auxiliary lane.In and near Rancho Cordova and Folsom, from Sunrise Boulevard to the county line; also in El Dorado County near El Dorado Hills, from the county line to Silva Valley Parkway (PM 0.0/1.7). Install fiber optic cable.

In and near Rancho Cordova and Folsom, from 0.2 mile west of Bradshaw Road to Folsom Boulevard at various locations. Pave narrow areas, install vegetation control and construct roadside signs.

In Sacramento, from Yolo County line to 0.2 mile west of Watt Avenue Overcrossing. Install fiber optic cable.In the city of Sacramento, from Route 5 to Route 51; also, on Route 51 from Route 50 to east of Arden Way (PM 0.0/4.2). Upgrade guardrail to current standards.

In the city of Sacramento, at the American River Bridge No.24-0003 from north of B Street Underpass to north of Exposition Boulevard Overcrossing. Widen and replace bridge deck. (G13 Contingency Project)

In and near the city of Sacramento, from west of West El Camino Avenue to east of Route 244. Pavement rehabilitation.

03 Sacramento 80 15.2/17.0 0H530 6712 0315000203 201.321 18-19 $ 50 $ 3,700 $ - ST-CASH $ 350 $ 600 $ 100 $ 740 $ 5,540 1.0 Location(s)

03 Sacramento 80 M0.1/18.0 0H540 6713 0315000204 201.315 19-20 $ 50 $ 12,200 $ - NH $ 1,200 $ 1,200 $ 300 $ 1,800 $ 16,750 18.4 Mile(s) of cable

03 Sacramento 80 M9.6/12.9 1H190 6714 0316000065 201.121 21-22 $ - $ - $ - NH $ 50 $ - $ - $ - $ 50 35.6 Lane mile(s)

03 Sacramento 80 2H570 6717 0317000157 201.315 18-19 $ 15 $ 922 $ - NH $ 94 $ 211 $ 22 $ 365 $ 1,629 300.0 Field element(s)

03 Sacramento 80 M0.4 2H740 6718 0317000178 201.130 16-17 $ - $ 360 $ 360 1/31/17 NH $ 6 $ - $ - $ 80 $ 446 1.0 Location(s)

03 Sacramento 99 7.1/9.4 0F280 6912 0312000069 201.112 19-20 $ 6,000 $113,000 $ - HBRR-S $ 1,700 $ 3,500 $ 600 $14,200 $ 139,000 3,178.0 Linear feet

03 Sacramento 99 15.7/23.8 0F351 6913 0316000080 201.315 16-17 $ 10 $ 16,300 $ 16,334 5/17/17 NH $ 770 $ 1,700 $ 500 $ 4,300 $ 23,580 14.0 Field element(s)

03 Sacramento 99 21.9/23.6 0H342 6923B 0317000153 201.110 19-20 $ 5 $ 4,560 $ - HBRR-S $ 210 $ 240 $ 3 $ 825 $ 5,843 1.0 Bridge(s)

03 Sacramento 99 0.2/1.6 0H480 6924 0315000198 201.121 18-19 $ 22 $ - $ - NH $ 850 $ 1,700 $ 80 $ - $ 2,652 67.8 Lane mile(s)

03 Sacramento 99 10.0/R24.3 0H670 6925 0316000005 201.315 21-22 $ - $ - $ - NH $ 700 $ - $ - $ - $ 700 14.0 Mile(s) of cable

03 Sacramento 99 4.9 3F540 6916 0313000136 201.111 18-19 $ 500 $ 20,270 $ - HBRR-S $ 872 $ 2,000 $ 50 $ 3,100 $ 26,792 4.0 Bridge(s)

03 Sacramento 99 R32.1 4F100 6707 0314000024 201.113 19-20 $ - $ 1,900 $ - HBRR-S $ 321 $ 759 $ 18 $ 691 $ 3,689 2.0 Bridge(s)

03 Sacramento 160 L4.2/10.8 0F320 7279 0300020595 201.121 16-17 $ - $ 5,072 $ 5,072 6/29/16 NH $ 420 $ 570 $ 20 $ 1,100 $ 7,182 12.8 Lane mile(s)

03 Sacramento 160 L4.5/L9.4 2H860 7290 0317000191 201.130 16-17 $ - $ 1,640 $ 1,640 2/1/17 NH $ 10 $ - $ - $ 215 $ 1,865 1.0 Location(s)

03 Sacramento 160 20.9 3F090 5832 0312000056 201.113 17-18 $ 300 $ 27,000 $ - HBRR-S $ 4,381 $ 3,000 $ 200 $ 3,800 $ 38,681 4.0 Bridge(s)

03 Sacramento 160 L7.9/L8.2 3H860 6253 0318000080 201.130 17-18 $ - $ 2,500 $ 2,500 10/2/17 NH $ - $ - $ - $ 300 $ 2,800 1.0 Location(s)

03 Sacramento 220 2.5/3.1 3H080 7439 0317000225 201.130 16-17 $ - $ 560 $ 560 4/6/17 NH $ 10 $ - $ - $ 70 $ 640 2.0 Location(s)

In Citrus Heights, from east of Elkhorn Boulevard/Greenback Lane to west of Riverside Avenue. Upgrade weigh-in-motion (WIM) station and widen the westbound auxiliary lane to the Antelope Truck Scales.

In and near the cities of Sacramento and Citrus Heights, from east of the Yolo County line to the Placer County line.; also in Placer County in the City of Roseville from the Sacramento County line to east of the Sacramento County line (PM 0.0/0.7). Install fiber optic communication line.

Near the City of Sacramento, from 0.2 mile east of Longview Drive to 0.4 mile east of Madison Avenue. Pavement rehabilitation.In various counties, on various routes. Repair or replace damaged inductive loop vehicle detection elements.Near the city of Sacramento, at the Sacramento River Bridge Overhead. Reconstruct eroded embankment and install erosion control measures.

In and near Elk Grove, from 0.3 mile south of Dillard Road Overcrossing to south of Grant Line Road (replace Consumnes River Bridge No. 24-0020R/L, and Consumnes River Overflow Bridge No. 24-0021R/L; upgrade bridge rails at Dillard Road Overcrossing No. 24-0163; Construct new McConnell Overhead No. 24-0048L). Bridge seismic retrofit, bridge scour retrofit, bridge rail replacement, and bridge replacement.

In and near the city of Sacramento, on Routes 51 and 99 from Cosumnes River Boulevard to 0.2 mile east of Arden Way Undercrossing at various locations. Install ramp meters.

In the city of Sacramento, at 21st Avenue Undercrossing No. 24-0154. Replace bridge deck.

In Galt, from the San Joaquin County line to Simmerhorn Road; also, in the cities of Elk Grove and Sacramento, from 0.7 mile south of Elk Grove Boulevard to Martin Luther King Jr. Boulevard (PM 11.9/21.5). Pavement rehabilitation. (G13 Contingency Project)

In and near the cities of Elk Grove and Sacramento, from Grant Line Road to Route 50; also, on Route 51 from Route 50 to 0.1 mile south of the Fort Sutter Viaduct (PM 0.0 to 0.1). Install fiber optic cable.

On Route 99, at South Lagoon Creek Bridge No. 24 -0028L, Lagoon Creek Bridge No. 24-0045L (PM 5.0), and North Lagoon Creek Bridge No. 24-0027L (PM 5.1); also on Route 160 (PM R44.5) at American River Bridge No. 24-0001L. Scour mitigation and bridge replacement.

In the city of Sacramento, at Southbound Route 99/5 Connector Overcrossing No. 24-0241F; also, on Route 80 at Longview Ramp Overcrossing No. 24-0281K (PM M9.15). Seismic retrofit two structures.

In Isleton, from 1.4 miles south of Sherman Island Levee Road to Route 12. Rehabilitate pavement.

Near Rio Vista, from 0.3 mile east of W Sherman Island Road to 1.5 miles west of Route 12. Repair failed slope, reconstruct roadway, and reset guardrail. A pavement rehabilitation project currently in winter suspension will address extending the service life of the pavement.

In the city of Sacramento, at Sacramento River Bridge No. 24-0053 and North Sacramento Undercrossing No. 24-0111L; also in San Joaquin County, at Mokelumne River Bridge No. 29-0197R/L. Seismic retrofit.

Near Rio Vista, from 0.4 mile south of W Brannan Island Road to 0.1 mile south of W Brannan Island Road. Repair eroded embankment, place rock slope protection (RSP), and repair roadway.

Near Ryde, from Tina Lake Lane to River Road. Reconstruct embankment slipout and restore roadway.

03 Sacramento VAR 1H880 6249 0317000015 201.010 17-18 $ - $ 1,300 $ 1,079 10/19/17 STP $ 110 $ 120 $ 10 $ 170 $ 1,710 98.0 Collision(s) reduced

03 Sacramento Var 2H850 5866 0317000190 201.130 16-17 $ - $ 2,000 $ 2,000 2/8/17 NH $ 5 $ - $ - $ 220 $ 2,225 65.0 Location(s)

03 Sacramento Var 4H020 3855 0318000128 201.010 18-19 $ 55 $ 2,820 $ - STP $ 330 $ 400 $ 120 $ 390 $ 4,115 125.0 Collision(s) reduced

03 Sierra 49 3.1 2H560 7799 0317000156 201.130 16-17 $ - $ 380 $ 380 1/3/17 NH $ - $ - $ - $ 35 $ 415 1.0 Location(s)

03 Sierra 49 18.1 2H710 7801 0317000174 201.130 16-17 $ - $ 500 $ 500 2/14/17 NH $ 10 $ - $ - $ 100 $ 610 1.0 Location(s)

03 Sierra 49 2.5 2H790 7802 0317000184 201.130 16-17 $ - $ 1,500 $ 1,500 2/8/17 NH $ 5 $ - $ - $ 115 $ 1,620 1.0 Location(s)

03 Sierra 49 20.5/27.1 2H800 4130 0317000185 201.130 16-17 $ - $ 550 $ 550 2/8/17 NH $ 3 $ - $ - $ 58 $ 611 2.0 Location(s)

03 Sierra 49 0.0/23.3 2H830 7803 0317000188 201.130 16-17 $ - $ 2,000 $ 2,000 2/1/17 NH $ 40 $ - $ - $ 160 $ 2,200 10.0 Location(s)

03 Sierra 49 45.2 2H990 7804 0317000215 201.130 16-17 $ 10 $ 3,040 $ 3,040 3/14/17 NH $ 30 $ - $ 10 $ 630 $ 3,720 1.0 Location(s)

03 Sierra 49 2.4/2.6 3H030 7805 0317000219 201.130 16-17 $ 20 $ 4,980 $ 4,980 3/14/17 NH $ 150 $ - $ 10 $ 600 $ 5,760 1.0 Location(s)

03 Sierra 49 45.2 3H350 7806 0317000327 201.130 16-17 $ 10 $ 6,500 $ 6,500 6/13/17 NH $ - $ - $ - $ 900 $ 7,410 1.0 Location(s)

03 Sierra 49 9.2 3H740 7808 0318000056 201.130 17-18 $ - $ 2,000 $ 2,000 8/22/17 NH $ - $ - $ - $ 320 $ 2,320 1.0 Location(s)

03 Sierra 49 0.0/15.9 4F630 7778 0314000231 201.015 18-19 $ 60 $ 1,410 $ - STP $ 85 $ 605 $ 10 $ 590 $ 2,760 13.0 Collision(s) reduced

03 Sierra 89 6.4/15.6 3H220 8009 0317000244 201.130 16-17 $ 20 $ 2,880 $ 2,880 4/6/17 NH $ 20 $ - $ 10 $ 195 $ 3,125 1.0 Location(s)

03 Sierra Var 2H670 7800 0317000170 201.131 17-18 $ 16 $ 3,520 $ - NH $ 356 $ 267 $ 392 $ 558 $ 5,109 936.0 Location(s)

03 Sutter 20 5.0/11.3 1A920 8132 0300020608 201.120 17-18 $ 1,248 $ 21,614 $ - NH $ 2,000 $ 1,809 $1,323 $ 2,771 $ 30,765 11.4 Lane mile(s)

03 Sutter 20 17.0 3H250 8143 0317000266 201.130 16-17 $ - $ 2,110 $ 2,110 4/17/17 NH $ 30 $ - $ 6 $ 261 $ 2,407 1.0 Location(s)

03 Sutter 99 39.4/41.0 1H150 8378 0316000061 201.120 19-20 $ - $ 18,100 $ - NH $ 20 $ 380 $ 50 $ 1,500 $ 20,050 4.8 Lane mile(s)

03 Sutter 99 0.0/42.4 1H520 8380 0316000176 201.240 18-19 $ 1,400 $ - $ - NH $ 62 $ 4 $ 43 $ 1 $ 1,510 9.0 Location(s)

03 Sutter 99 40.0/40.5 2H230 8381 0317000083 201.010 19-20 $ 100 $ 3,800 $ - STP $ 500 $ 630 $ 620 $ 660 $ 6,310 51.0 Collision(s) reduced

03 Yolo 5 4.4/R28.9 0F760 8563 0317000031 201.322 20-21 $ - $ - $ - NH $ 744 $ - $ - $ - $ 744 3.0 Bridge(s)

In Sacramento and Placer Counties, on Routes 50, 80, and 99 at various locations. Improve pavement friction and wet weather conditions.In Sacramento County on Route 5 and Route 50 at various locations; also in Yolo County on Route 50 and Route 80 at various locations. Remove and replace numerous water saturated concrete pavement slabs.

In Sacramento, Yolo, Placer, and Glenn Counties on Routes 5, 16, 45, 49, 50, 65, 80, 99, 113, and 174 at various locations. Install traffic operations elements such as queue warning systems, flashing beacons, and lighting, and modify existing signals to new standards.

Near Camptonville, at 0.6 mile south of North Yuba River Bridge. Reconstruct failed slope and install new drainage system.Near Downieville, at 1.3 miles north of Pearl Street. Remove rock slide debris and stabilize slope.

Near Camptonville, at 0.2 mile south of Lager Beer Sidehill Viaduct. Remove slide debris and replace guardrail.Near Downieville, at 1.0 miles north of Jim Crow Canyon Creek Road to 0.6 mile south of Loganville Lane. Repair failed culverts, repair eroded slope, and install rock slope protection (RSP).

Near Camptonville, from Oak Valley Road to 0.7 mile west of Ladies Canyon Creek Bridge. Remove slide debris, take out hazardous trees and loose rocks on failed slope, and repair damaged roadway.

Near Sattley, at 4.0 miles north of Yuba Pass Road. Repair embankment slipout, remove hazardous trees, install soldier pile retaining wall, install drainage facilities, and repair roadway.

Near Oak Valley, from 0.2 mile south of Lager Beer Sidehill Viaduct to Lager Beer Sidehill Viaduct. Remove slide debris, stabilize slope, install guardrailing, and construct three soldier pile retaining walls.

Near Sattley, at 2.3 miles south of Route 89. Construct viaduct and reopen lanes of travel.Near Downnieville, at 1.3 miles south of Ramshorn Road. Reconstruct failed Rock Slope Protection (RSP) embankment and perform geotechnical drilling.

In Sierra, and El Dorado counties on Routes 49, 89 and 193 at various locations. Upgrade guard rail to current standards.Near Sierraville, from Henness Pass Road to 0.3 mile north of Perry Creek; also on Route 49 from Lincoln Street to 1.0 mile south of Lemon Canyon Road. Remove flood debris, repair drainage systems, replace sidewalk, and restore roadway.

In Sierra County on Routes 49 and 89 at various locations. Remove dead or dying trees.Near Yuba City, from east end of Sutter Bypass to Lytle Road. Rehabilitate roadway, widen shoulders, and replace Wadsworth Canal Bridge No.18-0003.

Near Yuba City, at Feather River Bridge Overhead No. 18-0009. Repair bridge scour with RSP.

In Live Oak, from 0.1 mile north of Coleman Avenue to 0.2 mile north of Ramsdell Drive. Roadway rehabilitation.In Sutter, Glenn, Colusa, Yuba, Placer, Yolo, and Sacramento counties at various locations. Advance mitigation credit purchases for future SHOPP construction projects expected to impact sensitive species.

In Live Oak, at Elm Street and Pennington Road. Intersection safety improvements.Near Woodland at Wye Line Road Overcrossing (OC) No. 22-0158 (PM 4.49), County Road 6 OC No. 22-0138 (PM R25.57), County Line Road OC No. 22-0139 (R28.92). Establish standard vertical clearance.

03 Yolo 5 0H270 9157 0315000119 201.010 17-18 $ 45 $ 555 $ 551 11/28/17 STP $ 80 $ 135 $ 50 $ 140 $ 1,005 20.0 Collision(s) reduced

03 Yolo 5 0H410 8571 0315000165 201.315 18-19 $ 80 $ 9,400 $ - NH $ 1,000 $ 1,000 $ 190 $ 1,900 $ 13,570 69.0 Field element(s)

03 Yolo 5 R6.5/R17.6 3F140 5833 0312000072 201.361 18-19 $ - $ - $ - NH $ 110 $ 140 $ 30 $ - $ 280 23.0 Curb ramp(s)

03 Yolo 5 3H391 5869 0317000349 201.322 19-20 $ - $ - $ - NH $ 1,700 $ - $ - $ - $ 1,700 5.0 Bridge(s)

03 Yolo 5 0.4/R28.9 4F830 8572 0314000300 201.235 18-19 $ 10 $ 1,940 $ - NH $ 240 $ 400 $ 20 $ 420 $ 3,030 32.0 Location(s)

03 Yolo 16 20.5/31.6 0C472 8655A 0314000272 201.010 16-17 $ 7,989 $ 19,390 $ - STP $ - $ 2,570 $2,500 $ 4,850 $ 37,299 330.0 Collision(s) reduced

03 Yolo 16 20.8 2H770 8665 0317000182 201.130 16-17 $ - $ 310 $ 310 1/31/17 NH $ 3 $ - $ - $ 48 $ 361 1.0 Location(s)

03 Yolo 16 1.5/1.7 3H150 8666 0317000236 201.130 16-17 $ 20 $ 8,610 $ 8,610 4/6/17 NH $ 200 $ - $ 10 $ 930 $ 9,770 1.0 Location(s)

03 Yolo 16 0.0/5.5 3H190 8667 0317000240 201.130 16-17 $ 30 $ 2,770 $ 2,770 4/6/17 NH $ 60 $ - $ 10 $ 275 $ 3,145 1.0 Location(s)

03 Yolo 16 4.0 3H460 8668 0318000002 201.131 18-19 $ 55 $ 1,800 $ - NH $ 500 $ 550 $ 80 $ 220 $ 3,205 1.0 Location(s)

03 Yolo 16 25.2/28.3 4F170 8663 0314000063 201.015 18-19 $ 408 $ 1,492 $ - STP $ 380 $ 490 $ 140 $ 390 $ 3,300 29.0 Collision(s) reduced

03 Yolo 80 R11.3 0F250 8901 0300000075 201.110 19-20 $ 482 $ - $ - HBRR-S $ 990 $ 1,550 $ 75 $ - $ 3,097 2.0 Bridge(s)

03 Yolo 80 2.4/R11.3 1F230 6701 0300001109 201.315 17-18 $ - $ 8,000 $ - NH $ 734 $ 1,300 $ 220 $ 2,200 $ 12,454 14.0 Field element(s)

03 Yolo 80 5.8 3H380 8921 0317000336 201.130 16-17 $ 10 $ 2,000 $ 2,000 6/26/17 NH $ - $ - $ - $ 400 $ 2,410 1.0 Location(s)

03 Yolo 84 13.3/15.7 2H260 9057 0317000087 201.130 16-17 $ - $ 1,230 $ 1,230 9/26/16 NH $ 10 $ - $ - $ 100 $ 1,340 1.0 Location(s)

03 Yolo 84 13.3/15.7 2H460 9058 0317000114 201.131 19-20 $ 7,200 $ 51,950 $ - NH $ 2,080 $ 1,930 $ 990 $ 5,890 $ 70,040 1.0 Location(s)

03 Yolo 128 3.7 2H780 9304 0317000183 201.130 16-17 $ - $ 300 $ 300 1/31/17 NH $ 5 $ - $ - $ 60 $ 365 1.0 Location(s)

03 Yolo 275 13.1 3F550 9427 0313000137 201.110 17-18 $ 41 $ 10,710 $ - HBRR-S $ 700 $ 950 $ 135 $ 2,380 $ 14,916 1.0 Bridge(s)

03 Yuba 20 13.3/R17.8 0A570 9579 0300020593 201.120 18-19 $ 9,400 $ - $ - NH $ 3,700 $ 2,210 $2,300 $ - $ 17,610 9.9 Lane mile(s)

03 Yuba 20 0.5/R2.0 2F080 9580 0300020462 201.361 17-18 $ 159 $ 3,353 $ 3,783 12/6/17 NH $ 356 $ 944 $1,377 $ 858 $ 7,047 35.0 Curb ramp(s)

03 Yuba 20 8.0/10.2 2F320 9587 0300020594 201.120 18-19 $ 1,400 $ - $ - NH $ 1,160 $ 1,610 $ 950 $ - $ 5,120 4.4 Lane mile(s)

In Woodland, at various locations at the Routes 5 and 113 ramp intersections with Main Street. Modify and coordinate state and city signal controllers to reduce queuing and congestion.

In various counties on various routes at various locations. Repair and install permanent Automatic Vehicle Classification (AVC) truck data collection stations.

In and near Woodland, from East Main Street to County Road 13 at various locations. Upgrade ADA facilities. (G13 Contingency Project)Near Woodland, at County Road 96 Overcrossing (OC) No. 22-0155 (PM R14.27), County Road 95 OC No. 22-0156 (PM R15.85), and Zamora OC No. 22-0157 (PM R17.62); also in Colusa County in and near Williams at E Street OC No. 15-0067 (PM R17.98) and Lurline Avenue OC No. 15-0075 (PM R22.74). Establish standard vertical clearance.

In and near Woodland, from the Sacramento County line to Colusa County line. Improvements to reduce maintenance worker exposure.

Near Cadenasso, from 0.4 mile west of County Road 79 to 0.4 mile east of County Road 79; also from Esparto to 0.2 mile west of Route 505. Shoulder widening, curve correction, left-turn channelization, signalization and two-way left-turn lanes.

Near Esparto, at 0.1 mile west of County Road 79. Repair scour damaged embankment, remove and reinstall culvert, and reconstruct roadway.Near Rumsey, at 1.5 miles west of Colusa County line. Repair slipout and construct soldier pile retaining wall.Near Rumsey, from the Colusa County line to 0.9 mile west of Rumsey Canyon Bridge. Remove multiple slide debris, repair drainage system, and restore roadway.

Near Esparto, west of Cache Creek Bridge No. 22-0019. Install rock fall barrier to stabilize slope and minimize rock fall onto the traveled way.Near Capay, from Capay Canal Bridge to County Road 85; also, in Esparto from Orleans Street to County Road 21A (PM 27.5/28.3). Improve pedestrian safety and operations for bicycles and motorists.

In West Sacramento, at the Sacramento River Bridge and Overhead No. 22-0026L/R. Rehabilitate bridge. (G13 Contingency Project)In Yolo, Placer and Sacramento Counties, on Routes 65, 80 and 99 at various locations. Install ramp meters.Near Davis, at Yolo Causeway West Bridge No. 22-0044. Replace approach slabs and repair drainage system.Near the city of West Sacramento, from Levee Road (South) to End of Route 84. Reconstruct failed roadway section and install geotextile fabric for soil stabilization.

Near West Sacramento, from 3.7 miles north of Clarksburg Road to Levee Access Road. Permanent restoration of damaged pavement and supporting levee embankment.

Near Winters, at 1.1 miles east of Pleasants Valley Road (County Road 86). Repair slipout and reconstruct roadway.In West Sacramento, at the Tower Bridge (Sacramento River Bridge No. 22-0021). Replace fender system.Near Marysville, from Marysville Road to Yuba River (Parks Bar) Bridge. Rehabilitate roadway. (G13 Contingency Project)In Marysville, at various locations from I Street to Buchanan Street; also on Route 70 from 1st Street to 18th Street (PM 14.1 to 15.2). Upgrade pedestrian infrastructure.Near Marysville, from 0.1 mile east of Loma Rica Road to 0.2 mile west of Spring Valley Road. Rehabilitate roadway. (G13 Contingency Project)

03 Yuba 20 20.1/21.6 2F590 9588 0300020624 201.015 17-18 $ 1,480 $ 19,200 $ - STP $ 1,570 $ 1,780 $1,300 $ 3,450 $ 28,780 62.0 Collision(s) reduced

03 Yuba 20 R18.0/20.3 3F510 9590 0313000020 201.015 18-19 $ 2,750 $ 48,500 $ - STP $ 4,700 $ 3,500 $1,000 $ 6,871 $ 67,321 20.0 Collision(s) reduced

03 Yuba 20 0.1 3F560 8140 0313000033 201.111 20-21 $ 1,887 $ - $ - HBRR-S $ 1,240 $ 2,700 $ 200 $ - $ 6,027 1.0 Bridge(s)

03 Yuba 49 6.1/6.7 2H950 9682 0317000210 201.130 16-17 $ 30 $ 3,590 $ 3,590 3/14/17 NH $ 40 $ - $ 20 $ 600 $ 4,280 2.0 Location(s)

03 Yuba 70 14.9/15.6 0H160 9820 0315000082 201.120 20-21 $ 5,000 $ 85,000 $ - NH $ 3,000 $ 3,500 $2,500 $ 5,500 $ 104,500 5.0 Lane mile(s)

03 Yuba 70 R11.0/13.6 0H510 9821 0315000201 201.015 18-19 $ 10 $ 5,200 $ - STP $ 350 $ 500 $ 40 $ 590 $ 6,690 3.0 Collision(s) reduced

03 Yuba 70 15.5/16.5 1E060 9812 0312000068 201.111 18-19 $ 3,800 $ 68,500 $ - HBRR-S $ 1,600 $ 3,050 $ 750 $ 5,200 $ 82,900 1.0 Bridge(s)

03 Yuba 70 3F130 9817 0312000071 201.361 17-18 $ 12 $ 1,850 $ - NH $ 360 $ 440 $ 20 $ 800 $ 3,482 104.0 Curb ramp(s)

03 Yuba 70 16.2/25.8 4F380 9819 0314000153 201.010 19-20 $ 9,858 $ 70,735 $ - STP $ 3,906 $ 4,884 $6,227 $ 9,030 $ 104,640 80.0 Collision(s) reduced

04 Alameda 13 0J470 0488Q 0414000003 201.015 18-19 $ 260 $ 3,320 $ - STP $ 788 $ 1,393 $ 200 $ 680 $ 6,641 33.0 Collision(s) reduced

04 Alameda 13 10.8/12.1 2G460 0124M 0400020859 201.378 19-20 $ 120 $ 1,389 $ - NH $ 619 $ 543 $ 75 $ 423 $ 3,169 47.9 Curb ramp(s)

04 Alameda 13 12.1/13.4 2G482 0124L 0415000362 201.378 18-19 $ 125 $ 3,500 $ - NH $ 455 $ 1,000 $ 200 $ 793 $ 6,073 34.0 Structure(s)

04 Alameda 13 T9.8/10.8 2G660 0144A 0400021103 201.378 18-19 $ 200 $ - $ - NH $ 870 $ 740 $ 140 $ - $ 1,950 36.7 Curb ramp(s)

04 Alameda 13 3J110 1487Q 0415000088 201.015 18-19 $ 50 $ 4,040 $ - STP $ 786 $ 1,000 $ 214 $ 572 $ 6,662 939.0 Collision(s) reduced

04 Alameda 13 4.9 4J260 1490H 0415000355 201.131 17-18 $ - $ 200 $ 190 6/28/17 NH $ - $ 100 $ - $ 200 $ 500 1.0 Location(s)

04 Alameda 13 R9.2 4K250 1456C 0417000285 201.130 16-17 $ - $ 2,000 $ 2,000 1/31/17 NH $ - $ - $ - $ 900 $ 2,900 1.0 Location(s)

04 Alameda 13 4.4 4K470 1457K 0417000313 201.130 16-17 $ 150 $ 6,000 $ 6,000 3/16/17 NH $ - $ 900 $ 80 $ 2,000 $ 9,130 1.0 Location(s)

04 Alameda 61 19.8/21.2 2K710 1452J 0417000013 201.121 20-21 $ - $ - $ - NH $ 1,220 $ - $ - $ - $ 1,220 5.6 Lane mile(s)

04 Alameda 80 2.1 01411 0064Q 0414000436 201.352 17-18 $ 20 $ 14,930 $ 14,929 8/16/17 ST-CASH $ 170 $ 8,000 $ 125 $ 4,500 $ 27,745 1.0 Location(s)

04 Alameda 80 15500 0064A 0414000106 201.315 16-17 $ 63 $ 31,762 $ 36,833 10/18/17 BOND-SH $ 2,220 $ 2,970 $ 270 $ 4,140 $ 41,425 26.0 Field element(s)

04 Alameda 80 1.9/4.0 2J830 1483H 0415000006 201.315 19-20 $ 12 $ 5,135 $ - NH $ 760 $ 760 $ 260 $ 1,044 $ 7,971 29.0 Field element(s)

04 Alameda 80 5.8 2K830 1452H 0417000030 201.322 19-20 $ - $ - $ - NH $ 3,380 $ - $ - $ - $ 3,380 1.0 Bridge(s)

04 Alameda 80 4.5/R7.6 3J700 1488S 0415000183 201.010 19-20 $ 25 $ 14,587 $ - STP $ 2,750 $ 2,750 $ 100 $ 2,625 $ 22,837 185.0 Collision(s) reduced

04 Alameda 80 4.6/5.7 4G230 1003J 0412000357 201.015 16-17 $ 50 $ 2,200 $ 2,200 10/19/16 STP $ 343 $ 400 $ 100 $ 505 $ 3,598 4.5 Collision(s) reduced

04 Alameda 80 4K810 1460R 0417000363 201.322 19-20 $ - $ - $ - NH $ 6,600 $ - $ - $ - $ 6,600 4.0 Bridge(s)

Near Lake Wildwood, from 0.4 mile east of McGanney Lane to Yuba/Nevada County line; also in Nevada County, from Yuba/Nevada County line to Mooney Flat Road. Shoulder widening and curve improvements.

Near Smartsville, from the Yuba River Bridge to east of Smartsville Road. Realign and widen roadway.In Marysville, at the Feather River Bridge No. 18-009. Scour mitigation and retrofit piers. (G13 Contingency Project)Near Camptonville, from 0.7 mile north of Camptonville Road to 0.6 mile south of Coloma Way. Repair embankment slipout, stabilize slope, remove hazardous trees, construct soldier pile wall, and reconstruct roadway.

In and near Marysville, from 14th Street to Cemetery Road. Roadway rehabilitation.Near Linda and Marysville, from 0.3 mile south of Feather River Boulevard to Yuba River Bridge. Install concrete median barrier.Near Marysville, from 0.1 mile north of Binney Junction Underpass to 0.3 mile north of Laurellen Road, at Simmerly Slough Bridge No. 16-0019. Replace bridge.

In Yuba, Sacramento, Placer, El Dorado and Butte counties, on various Routes at various locations. Upgrade pedestrian facilities.Near Marysville, from Laurellen Road to South Honcut Creek Bridge. Widen shoulders and improve clear recovery zone.In various cities, on Routes 13, 61, and 123 at various locations; also in Contra Costa County, on Route 123, at Eureka Avenue. Crosswalk safety enhancements.

In Berkeley, from Claremont Avenue to west of Shattuck Avenue. Upgrade curb ramps and repair sidewalks to meet ADA standards.In Berkeley, from Shattuck Avenue to 7th Street. Upgrade curb ramps and sidewalks.In Oakland and Berkeley, from Hiller Drive to Claremont Avenue at various locations. Upgrade ADA facilities. (G13 Contingency Project)In various cities, on various routes, at various locations. Crosswalk safety enhancements.In Oakland, at 0.1 mile south of Carson Street. Plant establishment and biological monitoring.In Oakland, at 0.1 mile north of Broadway Terrace. Backfill sinkhole, replace damaged culvert, and reconstruct roadway.In Oakland, at Calaveras Avenue. Reconstruct embankment slipout, stabilize slope, and construct soldier pile retaining wall.In the city of Alameda, from Broadway/Encinal Avenue to Sherman Street. Pavement rehabilitation, upgrade ADA curb ramps, and improve crosswalks.Near Oakland, at the San Francisco Oakland Bay Bridge (SFOBB) Maintenance Complex. Construct SFOBB Maintenance Complex Phase 3 Training Facility.

In Alameda, Contra Costa, and Solano Counties, on Routes 80, 580 and 980 at various locations. Install traffic operations systems (TOS).

In Emeryville and Oakland, from San Francisco-Oakland Bay Bridge Toll Plaza to north of Powell Street; also in Oakland on Routes 580 and 880, at various locations. Upgrade/replace Transportation Management System elements.

In Berkeley, at University Avenue Overcrossing No. 33-0023. Establish standard vertical clearance. (PA&ED Only)In Berkeley and Albany, from Route 13 to east of El Cerrito Separation. Install concrete median barriers and lighting.In Berkeley, from Potter Street/Ashby Avenue on-ramp to University Avenue off-ramp. Replace metal beam guard rail with concrete barrier.In Oakland, at the Routes 80/580/680 MacArthur Maze (Bridge No. 33-0061R, 33-0061L, 33-0061L and 33-0611L). Establish standard vertical clearance. (PA&ED Only)

04 Alameda 84 17.0/17.4 0J550 0481M 0414000012 201.111 21-22 $ 500 $ 13,000 $ - HBRR-S $ 1,863 $ 3,600 $ 250 $ 3,600 $ 22,813 1.0 Bridge(s)

04 Alameda 84 12.0/13.0 0P010 1461B 0417000388 201.130 16-17 $ 25 $ 1,000 $ 1,000 5/31/17 NH $ - $ - $ 20 $ 230 $ 1,275 5.0 Location(s)

04 Alameda 84 13.0/13.6 16030 0084B 0400000429 201.110 18-19 $ 275 $ - $ - HBRR-S $ 6,500 $ 6,000 $ 299 $ - $ 13,074 1.0 Bridge(s)

04 Alameda 84 1J600 0448R 0414000287 201.015 18-19 $ 150 $ 2,803 $ - STP $ 453 $ 657 $ 23 $ 453 $ 4,539 27.0 Collision(s) reduced

04 Alameda 84 10.8/18.0 2A332 0076B 0414000039 201.010 18-19 $ 2,000 $ 19,500 $ - STP $11,000 $ 2,800 $ 500 $ 4,000 $ 39,800 90.0 Collision(s) reduced

04 Alameda 84 R0.7/R3.1 4J750 1493F 0416000005 201.010 19-20 $ 3,280 $ 15,560 $ - STP $ 2,000 $ 2,500 $ 240 $ 2,500 $ 26,080 23.0 Collision(s) reduced

04 Alameda 84 R22.2/R22.5 4K760 1459G 0417000349 201.130 16-17 $ 75 $ 2,450 $ 2,450 4/13/17 NH $ - $ - $ 45 $ 860 $ 3,430 5.0 Location(s)

04 Alameda 92 R4.0/R5.5 2J440 1482K 0414000515 201.010 17-18 $ 10 $ 3,300 $ - STP $ 574 $ 806 $ 77 $ 748 $ 5,515 27.0 Collision(s) reduced

04 Alameda 123 2.8 In Berkeley, at Bancroft Way. Install traffic signal. 1J700 0481X 0414000329 201.010 17-18 $ 20 $ 850 $ - STP $ 309 $ 632 $ 25 $ 362 $ 2,198 12.0 Collision(s) reduced

04 Alameda 123 0.2 2K460 1451E 0416000421 201.130 16-17 $ - $ 5,850 $ 5,850 9/2/16 NH $ - $ - $ - $ 1,600 $ 7,450 1.0 Location(s)

04 Alameda 185 3.3/9.8 1G910 0091P 0400020582 201.378 19-20 $ 50 $ 2,252 $ - NH $ 446 $ 655 $ 102 $ 450 $ 3,955 66.2 Curb ramp(s)

04 Alameda 185 3J190 1487P 0415000099 201.015 18-19 $ 10 $ 1,711 $ - STP $ 550 $ 550 $ 66 $ 550 $ 3,437 231.0 Collision(s) reduced

04 Alameda 238 R14.5/16.6 0P200 1461N 0417000409 201.130 16-17 $ - $ 1,250 $ 1,250 5/11/17 NH $ - $ - $ - $ 360 $ 1,610 1.0 Location(s)

04 Alameda 238 R14.5/16.7 2J670 1482N 0414000544 201.010 17-18 $ 100 $ 4,840 $ - STP $ 780 $ 1,150 $ 150 $ 1,050 $ 8,070 63.0 Collision(s) reduced

04 Alameda 238 R14.6 4H080 0448E 0413000097 201.119 17-18 $ 20 $ 7,164 $ - HBRR-S $ 864 $ 720 $ 72 $ 2,091 $ 10,931 3.0 Bridge(s)

04 Alameda 580 R8.0 0J520 0480J 0414000009 201.110 19-20 $ 140 $ 5,979 $ - HBRR-S $ 600 $ 900 $ 120 $ 1,000 $ 8,739 1.0 Bridge(s)

04 Alameda 580 R35.0 0K470 1494K 0416000091 201.110 19-20 $ - $ 360 $ - HBRR-S $ - $ 398 $ 21 $ 212 $ 991 1.0 Bridge(s)

04 Alameda 580 R1.3/R6.0 0K680 1495F 0416000125 201.010 19-20 $ 493 $ 4,211 $ - STP $ 962 $ 806 $ 104 $ 962 $ 7,538 65.0 Collision(s) reduced

04 Alameda 580 R30.8/R41.5 27010 0135A 0412000131 201.121 17-18 $ 57 $ 36,000 $ - NH $ 1,400 $ 2,385 $ 120 $ 5,400 $ 45,362 85.6 Lane mile(s)

04 Alameda 580 0.0/7.8 3G59C 8315X 0416000157 201.122 18-19 $ 2,100 $ - $ - NH $ - $ - $ 150 $ - $ 2,250 53.0 Lane mile(s)

04 Alameda 580 R30.8/46.5 3J050 1487A 0415000075 201.315 19-20 $ 10 $ 17,970 $ - NH $ 2,700 $ 2,700 $ 50 $ 3,600 $ 27,030 89.0 Field element(s)

04 Alameda 580 44.3 4G790 0135Q 0413000064 201.110 16-17 $ 5 $ 5,300 $ 2,694 5/17/17 HBRR-S $ - $ 1,250 $ 36 $ 1,250 $ 7,841 1.0 Bridge(s)

04 Alameda 580 R26.8/R27.2 4G800 0130B 0413000050 201.110 17-18 $ 27 $ 4,000 $ 2,613 8/16/17 HBRR-S $ 781 $ 1,100 $ 36 $ 871 $ 6,815 1.0 Bridge(s)

04 Alameda 580 R41.4/R41.5 4H260 0133H 0413000123 201.378 16-17 $ 10 $ 1,956 $ 1,956 8/17/16 NH $ 177 $ 1,060 $ 53 $ 423 $ 3,679 10.0 Curb ramp(s)

Near Sunol, at Arroyo De La Laguna Bridge No. 33-0043. Replace/rehabilitate bridge for scour mitigation, bridge rail upgrade, and seismic retrofit.

Near Fremont, from 1.2 miles east of Mission Boulevard to Palomares Road. Construct rockfall fence.In Fremont, at Alameda Creek Bridge No. 33-36. Replace bridge. (G13 Contingency Project)In Oakland, San Leandro, Hayward and Fremont on Routes 84, 92, 112, 185 and 238 at various locations. Crosswalk safety enhancements.In Fremont, from Route 238 (Mission Boulevard) to Route 680. Widen shoulders, install traffic signals and upgrade barriers.In Fremont, from north end of Dumbarton Bridge to south of the Toll Plaza. Install outer separation barrier between route and frontage road.

Near Livermore, from 0.8 mile west of Ruby Hill Drive to 0.5 mile west of Ruby Hill Drive. Remove slide debris and repair concrete lined drainage ditches.

In Hayward, from west of Clawiter Road to west of Hesperian Boulevard. Install safety lighting and upgrade lighting.

In Emeryville, at MacArthur Boulevard ramps to Route 580 and San Pablo Avenue Overcrossing (Route 123). Construct subsurface and horizontal drains, and reconstruct pavement.

In Oakland and San Leandro, from Plaza Drive to 55th Avenue; also in Contra Costa County, in El Cerrito on Route 123 (PM 0.18/0.29) and in Pleasant Hill on Route 680 (PM 16.85), at various locations. Reinstall and/or upgrade existing curb ramps and sidewalks to ADA standards.

In Oakland, San Leandro, Hayward, Union City and Fremont on Routes 185, 238, and 262 at various locations. Crosswalk safety enhancements.

In Hayward, from Route 580 to Route 880. Repair storm damaged roadway.In and near San Lorenzo, from east of Mission Boulevard to 0.4 mile west of Hesperian Boulevard. Install and upgrade safety lighting.Between Livermore and Hayward, at East Connector Separation Bridge No. 33-0524F, N238/S880 Connector Bridge No. 33-0540G and I-580 Arroyo Seco Bridge No. 33-0066. Bridge maintenance.

Near Livermore, near Greenville Road at Greenville Overhead Bridge No. 33-0121R. Rehabilitate westbound structure.In Oakland, at Foothill Boulevard Undercrossing No. 33-0334K. Bridge deck rehabilitation.Near Livermore, from Flynn Road to Grant Line Road. Install safety lighting and establish electrical serviceIn San Leandro and Oakland, from Routes 580/238 Separation to Fruitvale Avenue Undercrossing. Rehabilitate pavement.Near Livermore, from San Joaquin county line to east of Greenville Overcrossing; also on Route 205 (PM 0.0/1.0) from San Joaquin county line to Midway Road Undercrossing. Environmental mitigation for EA 3G590.

In and near Oakland and San Leandro, from Route 238 to Route 80. Install and upgrade Transportation Management System elements.In Oakland, at Oakland Avenue Undercrossing No. 33-0288. Rehabilitate bridge deck.In Castro Valley, from 0.3 mile west of Sunnyslope Avenue to 0.4 mile east of Old Dublin Road at eastbound East Castro Valley Boulevard Undercrossing No. 33-0235L. Replace bridge deck.

In Oakland, from Fruitvale Avenue to Champion Street and between Harold Street and Montana Street, at the Fruitvale Park and Ride Lot. Upgrade sidewalk and curb ramps.

04 Alameda 580 R1.5/R3.9 4K260 1456D 0417000289 201.130 16-17 $ - $ 2,000 $ 2,000 2/6/17 NH $ - $ - $ - $ 900 $ 2,900 1.0 Location(s)

04 Alameda 580 R36.8/R38.5 4K920 1460K 0417000364 201.130 16-17 $ - $ 1,150 $ 1,150 4/20/17 NH $ - $ - $ - $ 400 $ 1,550 3.0 Location(s)

04 Alameda 680 R12.4/R21.9 0J620 0481P 0414000019 201.122 19-20 $ 75 $109,853 $ - NH $ 7,150 $ 7,150 $1,500 $16,400 $ 142,128 63.0 Lane mile(s)

04 Alameda 680 M0.4 0P210 1461P 0417000410 201.130 16-17 $ - $ 600 $ 600 4/13/17 NH $ - $ - $ - $ 150 $ 750 1.0 Location(s)

04 Alameda 680 M4.0/R12.4 3G601 0587E 0414000483 201.120 16-17 $ 10 $ 25,360 $ 30,200 6/28/17 NH $ 883 $ 2,830 $ 170 $ 4,200 $ 33,453 30.0 Lane mile(s)

04 Alameda 680 M0.0/M4.0 3G602 0587J 0414000484 201.122 16-17 $ 160 $ 17,600 $ 19,450 8/16/17 NH $ - $ 2,470 $ 80 $ 3,300 $ 23,610 15.0 Lane mile(s)

04 Alameda 680 M0.0/R21.9 4G113 1463D 0414000305 201.315 18-19 $ 800 $ 28,300 $ - NH $ - $ 5,600 $ 100 $ 5,600 $ 40,400 46.0 Field element(s)

04 Alameda 680 M0.0/M4.0 4G114 0521M 0417000129 201.315 16-17 $ 180 $ 8,500 $ 9,573 8/16/17 NH $ - $ - $ - $ 1,700 $ 10,380 2.0 Field element(s)

04 Alameda 680 R6.8/R21.9 4G115 0521K 0417000130 201.315 17-18 $ 523 $ 14,000 $ 13,534 8/16/17 NH $ - $ - $ 50 $ 2,800 $ 17,373 22.0 Field element(s)

04 Alameda 880 11.3/12.3 0J530 0480A 0414000010 201.110 19-20 $ 427 $ - $ - HBRR-S $ 2,200 $ 1,980 $ 704 $ - $ 5,311 1.0 Bridge(s)

04 Alameda 880 4.6/7.4 15148 0012B 0400000421 201.315 17-18 $ - $ 13,281 $ - NH $ - $ - $ - $ 2,741 $ 16,022 9.0 Field element(s)

04 Alameda 880 28.5/29.0 1A683 0044Q 0412000335 201.120 17-18 $ 100 $ 8,000 $ - NH $ 10 $ 2,000 $ 100 $ 2,100 $ 12,310 4.0 Lane mile(s)

04 Alameda 880 20.9 1J010 0488J 0414000123 201.010 17-18 $ 10 $ 765 $ - STP $ 220 $ 440 $ 22 $ 286 $ 1,743 11.0 Collision(s) reduced

04 Alameda 880 2.4 1SS43 0070A 0412000602 201.131 16-17 $ 80 $ 6,016 $ 4,409 5/17/17 NH $ 850 $ 950 $ 64 $ 1,150 $ 9,110 1.0 Location(s)

04 Alameda 880 14.7 2J320 1482G 0414000488 201.321 18-19 $ 5 $ - $ - ST-CASH $ - $ 1,121 $ 63 $ - $ 1,189 2.0 Location(s)

04 Alameda 880 27.2 2J760 1483D 0415000005 201.119 21-22 $ - $ - $ - HBRR-S $ 1,000 $ - $ - $ - $ 1,000 1.0 Bridge(s)

04 Alameda 880 4.8/11.3 2J810 1483N 0415000008 201.235 18-19 $ 10 $ 4,918 $ - NH $ 660 $ 880 $ 44 $ 880 $ 7,392 83.0 Location(s)

04 Alameda 880 30.5 4A800 0050N 0400001164 201.110 17-18 $ 6,800 $ 4,450 $ - HBRR-S $ 620 $ 1,100 $ 300 $ 1,200 $ 14,470 1.0 Bridge(s)

04 Alameda 880 10.7 4G880 0086Q 0413000058 201.113 17-18 $ 20 $ 5,400 $ - HBRR-S $ 846 $ 1,874 $ 90 $ 1,700 $ 9,930 1.0 Bridge(s)

04 Alameda 880 20.4/22.9 4H010 0085X 0413000132 201.235 16-17 $ 5 $ 2,864 $ 2,080 5/17/17 NH $ 288 $ 426 $ 47 $ 500 $ 4,130 67.0 Location(s)

04 Alameda 880 11.8/27.5 4H580 0483W 0413000162 201.121 16-17 $ 40 $ 44,446 $ 46,273 8/16/17 NH $ 654 $ 5,200 $ 166 $ 6,600 $ 57,106 107.0 Lane mile(s)

04 Alameda 880 20.9 4J730 1491G 0416000001 201.010 19-20 $ 150 $ 3,445 $ - STP $ 1,200 $ 1,250 $ 125 $ 1,250 $ 7,420 74.0 Collision(s) reduced

04 Alameda 880 16.5/18.3 4K570 1458J 0417000323 201.130 16-17 $ - $ 3,970 $ 3,970 6/12/17 NH $ - $ - $ - $ 1,400 $ 5,370 1.0 Location(s)

04 Alameda 980 1.2 0P370 1464L 0417000430 201.315 19-20 $ 10 $ 2,570 $ - NH $ 110 $ 392 $ 10 $ 262 $ 3,354 1.0 Field element(s)

Near Livermore, from 1.5 miles west of the San Joaquin County line to 1.9 miles east of North Flynn Road. Repair water saturated asphalt pavement with asphalt overlay and digout repairs.

In Oakland, from Oak Knoll Boulevard to 0.4 mile east of Seminary Avenue. Stabilize embankment settlement, repair drainage systems, and restore roadway.

In and near Pleasanton and Dublin, from north of Route 84 to Alcosta Boulevard. Roadway rehabilitation.In Fremont, at Scott Creek Road southbound off-ramp. Repair embankment slipout and place RSP.

In and near Fremont, from Auto Mall Parkway to Koopman Road. Rehabilitate roadway.In Fremont, from south of Scott Creek Road to Auto Mall Parkway. Rehabilitate roadway.In and near Fremont, Pleasanton, and Dublin, from 0.3 mile south of Scott Creek Road to 0.3 mile north of Alcosta Boulevard. Install ramp meters, ramp HOV bypass lanes, and traffic operations systems (TOS).

In Fremont, from south of Scott Creek Road to Auto Mall Parkway. Ramp metering.In and near Fremont, Pleasanton, and Dublin from 0.4 miles north of Mission Boulevard (Route 238) to 0.3 mile north of Alcosta Boulevard. Ramp metering.

In Fremont, from 0.5 mile south to 0.5 mile north of Patterson Slough Bridge No. 33-0250 (PM 11.8). Bridge rehabilitation. (G13 Contingency Project)

In Fremont, from Auto Mall Parkway to Mowry Avenue; also, in Newark on Route 84 from Thornton Avenue to Newark Boulevard (PM R3.8 to R4.9). Widen ramps and install ramp metering.

In Oakland, from 23rd to 29th Street. Rehabilitate roadway.In San Leandro at the southbound off-ramp to southbound Route 238. Improve safety visibility by installing lighting and improving signs.In Fremont, at Warren Avenue. Install pressure grouting.In Hayward, at 500 feet north of Industrial Parkway West. Install weigh-in-motion system in both directions. (G13 Contingency Project)In Oakland, at East Creek Slough Bridge No. 33-0143. Mitigate eroded channel side-slope tidal scour and replace bridge approach slabs.In Fremont, from north of Auto Mall Parkway to south of Fremont Boulevard at various locations. Highway worker safety improvements.In Oakland, at Lake Merrit Channel Bridge No. 33-0027 and 5th Avenue overhead. Bridge replacement.In Fremont, at Crandall Creek Bridge No. 33-0273. Seismic retrofit.In San Leandro, between Washington Avenue and Marina Boulevard. Pave side slope areas.In and near Fremont, Union City, Hayward, San Leandro, and Oakland from 0.4 mile north of Fremont Boulevard Overcrossing to High Street Separation and Overhead. Rehabilitate pavement.

In San Leandro, at the southbound Route 880/238 connector off-ramp to Washington Avenue. Reconstruct and signalize off-ramp.In Hayward, from 0.2 mile north of Route 92 to 0.1 mile south of West A Street; also, in San Leandro, from 0.4 mile south of Fairway Drive to 0.3 mile north of 16th Avenue (PM 22.0 to PM 30.0). Repair saturated roadway pavement.

In Oakland, at the District 4 Transportation Management Center (TMC). Upgrade or replace legacy TMC hardware components and related software by service contract to improve reliability and functionality.

04 Alameda 980 1.2 1K670 1499J 0416000284 201.999 19-20 $ - $ 3,687 $ - ST-CASH $ 111 $ 553 $ 12 $ 431 $ 4,794 1.0 Location(s)

04 Alameda VAR 0G221 0142F 0413000470 201.361 17-18 $ 20 $ 700 $ - NH $ 375 $ 1,150 $ 60 $ 350 $ 2,655 7.0 Curb ramp(s)

04 Alameda VAR 0J000 0820P 0413000370 201.015 16-17 $ 10 $ 2,466 $ 1,841 8/16/17 STP $ 270 $ 310 $ 100 $ 390 $ 3,546 191.0 Collision(s) reduced

04 Alameda Var 0P380 1464M 0417000431 201.315 19-20 $ 10 $ 15,990 $ - NH $ 450 $ 1,340 $ 10 $ 3,000 $ 20,800 800.0 Field element(s)

04 Alameda VAR 17247 0085S 0415000329 201.010 16-17 $ - $ 1,400 $ 2,240 10/19/16 STP $ - $ 345 $ 5 $ - $ 1,750 0.0

04 Alameda VAR 1J370 0488M 0414000250 201.010 17-18 $ 25 $ 6,715 $ - STP $ 726 $ 1,370 $ 28 $ 1,370 $ 10,234 607.0 Collision(s) reduced

04 Alameda VAR 3K310 1488T 0417000131 201.315 17-18 $ 10 $ 4,549 $ - NH $ 64 $ 393 $ 10 $ 901 $ 5,927 248.0 Field element(s)

04 Alameda VAR 4G970 0481F 0413000125 201.235 16-17 $ 5 $ 1,519 $ 2,782 3/15/17 NH $ 280 $ 390 $ 80 $ 700 $ 2,974 22.0 Location(s)

04 Alameda VAR 4J370 16543 0415000334 201.315 17-18 $ - $ 16,000 $ 16,000 6/28/17 NH $ 450 $ 1,340 $ 10 $ 3,000 $ 20,800 800.0 Field element(s)

04 Contra Costa 4 R16.4/R20.7 2J000 1480F 0414000412 201.010 17-18 $ 217 $ 2,837 $ - STP $ 830 $ 830 $ 125 $ 747 $ 5,586 62.0 Collision(s) reduced

04 Contra Costa 4 12.9/R14.4 2J001 1480Z 0418000182 201.010 17-18 $ - $ 1,096 $ - STP $ - $ - $ - $ - $ 1,096 23.0 Collision(s) reduced

04 Contra Costa 4 48.1/48.3 2J590 1484C 0414000535 201.131 17-18 $ 5 $ 2,527 $ - NH $ 894 $ 511 $ 38 $ 445 $ 4,420 2.0 Location(s)

04 Contra Costa 4 0.0/T31.5 4G980 0481D 0413000122 201.235 16-17 $ 5 $ 4,925 $ 5,801 8/16/17 NH $ 950 $ 860 $ 90 $ 700 $ 7,530 225.0 Location(s)

04 Contra Costa 24 1.0/R2.5 1J990 1418C 0414000411 201.010 18-19 $ 313 $ 2,955 $ - STP $ 736 $ 420 $ 64 $ 480 $ 4,968 65.0 Collision(s) reduced

04 Contra Costa 80 0.0/13.5 0K160 1497F 0416000044 201.010 21-22 $ - $ - $ - STP $ 6,869 $ - $ - $ - $ 6,869 460.0 Collision(s) reduced

04 Contra Costa 80 0.0/14.1 2J820 1483P 0415000009 201.235 19-20 $ 5 $ 2,630 $ - NH $ 455 $ 637 $ 5 $ 692 $ 4,424 27.0 Location(s)

04 Contra Costa 80 10.1/13.5 3J070 1487E 0415000077 201.122 21-22 $ - $ - $ - NH $ 3,083 $ - $ - $ - $ 3,083 21.9 Lane mile(s)

04 Contra Costa 80 0.0/10.1 4J340 1490E 0415000331 201.121 16-17 $ 85 $ 37,770 $ 37,770 3/15/17 NH $ - $ 1,254 $ 33 $ 5,500 $ 44,642 85.8 Lane mile(s)

04 Contra Costa 242 R0.0/R3.4 26980 0269H 0412000159 201.121 19-20 $ 15 $ 11,774 $ - NH $ 990 $ 1,210 $ 110 $ 1,430 $ 15,529 20.4 Lane mile(s)

04 Contra Costa 242 R1.6 4G810 0250B 0413000055 201.110 16-17 $ 495 $ 1,824 $ 1,944 8/16/17 HBRR-S $ 360 $ 840 $ 265 $ 426 $ 4,210 1.0 Bridge(s)

04 Contra Costa 580 1.2 2J720 1482Q 0415000016 201.110 19-20 $ 5 $ 5,828 $ - HBRR-S $ 700 $ 876 $ 117 $ 876 $ 8,402 1.0 Bridge(s)

04 Contra Costa 580 5.8 4G890 0086R 0413000059 201.113 16-17 $ 500 $ 4,460 $ 12,372 10/18/17 HBRR-S $ 350 $ 2,167 $ 180 $ 850 $ 8,507 2.0 Bridge(s)

04 Contra Costa 680 R11.0/R12.0 0J380 0482S 0413000462 201.131 17-18 $ 500 $ 5,750 $ - NH $ 563 $ 1,226 $ 150 $ 1,474 $ 9,663 2.0 Location(s)

In Oakland, at the District 4 Transportation Management Center (TMC). Upgrade or replace legacy TMC software applications and interface components, and related system devices by service contract.

In Alameda and Contra Costa Counties at various locations. Construct curb ramps and sidewalks.

In Alameda and Contra Costa counties, on various routes at various intersection locations. Enhance pedestrian crossings.In various counties, on various routes at various locations. Restore non-operational Transportation Management System (TMS) field elements by use of on-call Task Order service contracts.

Near Oakland, at the McCosker property on East Bay Regional Parks District (EBRPD) land. Required environmental mitigation (site 2) for EA 17240, EFIS 04 0000 0455, PPNO 0086Z. (Financial Contribution Only.)

In Alameda and Contra Costa Counties on various routes at various locations. Apply high friction surface treatment.In Alameda County, on Routes 24, 80, 84, 92, 238, 580, 680, 880, and 980 at various locations. Repair and replace existing Transportation Management System elements.

In Oakland, at various locations on Route 13 between post mile 4.3 to 10.1, and on Route 24 between post mile R1.8 to R5.9. Pave beyond gore areas.

In various counties, on various routes, at various locations. On-call service contract to restore non-operational Transportation Management System elements.

In and near Concord and Pittsburg, from west of Willow Pass Road to east of Bailey Road at two locations. Install safety lighting, high reflective striping and markings.

In and near Concord, from Route 680 to Route 242. Install safety lighting, high reflective striping and markings.Near Discovery Bay, at 0.1 mile west of Old River Bridge. Construct retaining walls to repair storm damage slip-outs.Near Concord, at various locations on Route 4 from Route 80 to Route 160; also on Route 24 east of Caldecott Tunnel to Route 680 (PM R0.3 to 9.2) at various locations. Place vegetation control, Maintenance Vehicle Pullout (MVP) and pave beyond gore.

In Orinda and Lafayette, from east of the Caldecott Tunnel to east of Camino Pablo and at Acalanes Road (PM R4.2/R4.99); also in Oakland on Route 13, at Redwood Road (PM 5.2/5.5). Install safety lighting.

In various cities, from Alameda County line to 0.6 mile west of Solano County line; also, in Alameda County in Albany, from 0.4 mile west to the Contra Costa County line (PM R7.6/8.0). Install lighting and upgrade concrete barrier.

In various cities from the Alameda County line to the Solano County line; also on Route 242, 580, and 680 at various locations. Construct maintenance worker safety improvements

In and near Hercules, Rodeo, and Crocket, from Route 4 to the Carquinez Bridge. Roadway Rehabilitation.In Richmond, El Cerrito, San Pablo, Pinole and Hercules, from Alameda County line to Route 4. Pavement rehabilitation.In Concord, from Route 680 to Route 4. Pavement rehabilitation.In Concord, at Buchanan Field Viaduct No. 28-0186. Rehabilitate bridge.In Richmond, at Stege Drain Bridge No. 28-0091. Bridge rehabilitation.In Richmond, at Scofield Avenue Undercrossing No. 28-140L/R. Seismic retrofit.Near Alamo, from south of Rudgear Road to 0.2 mile south of Livorna Road. Repair slide.

04 Contra Costa 680 13.9/22.7 0K840 1496B 0416000148 201.010 17-18 $ 100 $ 18,943 $ - STP $ 947 $ 1,894 $ 190 $ 1,894 $ 23,968 258.0 Collision(s) reduced

04 Contra Costa VAR 3K320 1488V 0417000132 201.315 17-18 $ 10 $ 3,644 $ - NH $ 50 $ 314 $ 10 $ 722 $ 4,750 235.0 Field element(s)

04 Marin 1 28.5 0G642 0756K 0413000350 201.113 20-21 $ 6,500 $ - $ - HBRR-S $ 4,187 $ 2,850 $ 750 $ - $ 14,287 1.0 Bridge(s)

04 Marin 1 33.4 0J570 0480C 0414000014 201.119 18-19 $ 450 $ 4,020 $ - HBRR-S $ 1,620 $ 1,080 $ 180 $ 830 $ 8,180 1.0 Bridge(s)

04 Marin 1 0.1 0P000 1461F 0417000387 201.130 16-17 $ 30 $ 1,100 $ 1,100 4/20/17 NH $ - $ - $ 25 $ 400 $ 1,555 1.0 Location(s)

04 Marin 1 11.5 0P130 1461G 0417000402 201.130 16-17 $ 200 $ 8,000 $ 8,000 4/13/17 NH $ - $ 200 $ 160 $ 2,500 $ 11,060 1.0 Location(s)

04 Marin 1 9.8 0Q260 2021H 0418000059 201.130 17-18 $ 10 $ 1,100 $ 1,100 12/7/17 NH $ - $ - $ - $ 360 $ 1,470 1.0 Location(s)

04 Marin 1 22.8/31.2 1J960 1480A 0414000403 201.121 19-20 $ 517 $ 13,783 $ - NH $ 1,320 $ 1,254 $ 66 $ 1,540 $ 18,480 27.8 Lane mile(s)

04 Marin 1 2.2 1SS58 0312T 0412000635 201.131 16-17 $ 55 $ 2,400 $ 2,278 12/7/16 NH $ 400 $ 1,300 $ 50 $ 880 $ 5,085 1.0 Location(s)

04 Marin 1 0.0/0.8 2G690 0434H 0400021211 201.378 18-19 $ 842 $ 1,976 $ - NH $ 510 $ 1,000 $ 300 $ 850 $ 5,478 28.0 Structure(s)

04 Marin 1 0.3 2J560 1485J 0414000529 201.131 17-18 $ 150 $ 1,515 $ - NH $ 750 $ 1,200 $ 18 $ 1,200 $ 4,833 1.0 Location(s)

04 Marin 1 6.6 3S900 0713F 0400001043 201.131 16-17 $ 285 $ 5,860 $ 6,230 6/13/17 NH $ - $ 3,500 $ 434 $ 1,000 $ 11,079 1.0 Location(s)

04 Marin 1 7.7/7.8 3S910 0713G 0400001044 201.131 16-17 $ 157 $ 6,174 $ 6,100 6/13/17 NH $ 168 $ 2,700 $ 284 $ 1,000 $ 10,483 1.0 Location(s)

04 Marin 1 3.1/50.5 4H870 0487P 0413000295 201.010 16-17 $ 5 $ 5,061 $ 3,864 7/13/17 STP $ 1,000 $ 1,000 $ 50 $ 1,300 $ 8,416 83.0 Collision(s) reduced

04 Marin 1 4.0/5.0 4K150 1455E 0417000271 201.130 16-17 $ 200 $ 7,000 $ 7,000 1/20/17 NH $ - $ 1,000 $ 100 $ 2,100 $ 10,400 2.0 Location(s)

04 Marin 1 10.9 4K240 1456B 0417000284 201.130 16-17 $ 200 $ 3,000 $ 3,000 1/31/17 NH $ - $ 800 $ 100 $ 1,500 $ 5,600 1.0 Location(s)

04 Marin 1 1.6/2.5 4K490 1458A 0417000315 201.130 16-17 $ 30 $ 2,500 $ 2,500 3/16/17 NH $ - $ - $ 40 $ 900 $ 3,470 3.0 Location(s)

04 Marin 1 33.4 4K500 1458B 0417000316 201.130 16-17 $ 30 $ 2,600 $ 2,600 3/29/17 NH $ - $ - $ 75 $ 1,000 $ 3,705 1.0 Location(s)

04 Marin 1 7.8 4K690 1458N 0417000337 201.130 17-18 $ 150 $ 2,400 $ 2,400 7/28/17 NH $ - $ 200 $ 120 $ 720 $ 3,590 1.0 Location(s)

04 Marin 1 8.2/8.5 4K840 1460B 0417000368 201.130 16-17 $ 200 $ 3,790 $ 3,790 6/6/17 NH $ - $ 200 $ 80 $ 1,140 $ 5,410 2.0 Location(s)

04 Marin 1 22.8 4K850 1460C 0417000378 201.130 16-17 $ 250 $ 4,000 $ 4,000 4/13/17 NH $ - $ - $ 80 $ 1,400 $ 5,730 2.0 Location(s)

04 Marin 1 35.3 4K860 1460D 0417000379 201.130 16-17 $ 30 $ 1,400 $ 1,400 4/13/17 NH $ - $ - $ 25 $ 350 $ 1,805 1.0 Location(s)

04 Marin 1 8.1 4S660 0308J 0400001256 201.131 16-17 $ 100 $ 2,200 $ 2,206 3/15/17 NH $ 1,311 $ 600 $ 128 $ 950 $ 5,289 1.0 Location(s)

04 Marin 1 24.7 4S780 0315D 0400020145 201.131 17-18 $ 90 $ 2,650 $ 3,000 1/31/18 NH $ 400 $ 3,200 $ 100 $ 700 $ 7,140 1.0 Location(s)

In and near Walnut Creek, Pleasant Hill, and Concord, from Olympic Boulevard to Arthur Road. Install safety lighting.In Contra Costa County, on Routes 4, 24, 80, 242, 580, and 680 at various locations. Repair and replace existing Transportation Management System elements.

Near Point Reyes Station, at Lagunitas Creek Bridge No. 27-0023. Replace bridge. (G13 Contingency Project)Near Point Reyes Station, at Millerton Gulch Bridge No. 27-0114. Repair damaged embankment and construct retaining wall.Near Mill Valley, at Richardson Bay Bridge and Separation. Modify drainage systems, relocate electrical facilities, and repair roadway.Near Stinson Beach, at 0.6 mile south of Panoramic Highway. Repair slipout, construct soldier pile retaining wall, and restore roadway.Near Stinson Beach, at Lone Tree Creek. Remove and reconstruct fifty-four inch CSP culvert and repair sinkhole.Near Point Reyes Station and Olema, from Olema Creek Bridge to north of Cypress Road; also, near Tomales, from south of Tomales-Petaluma Road to south of Valley Ford Road (PM 45.0/50.5). Pavement rehabilitation.

Near Mill Valley, at 0.2 mile north of Loring Avenue. Construct an earth retaining system and improve drainage.In Almonte, near Route 101 off-ramp to Route 1; also from Coyote Creek to Flamingo Road. Upgrade pedestrian facilities.Near Mill Valley, at Tennessee Valley Road. Repair roadway slip-out.Near Muir Beach, 0.3 mile north of Seacape Drive. Construct tie-back wall.Near Muir Beach, 0.2 mile north of Cold Stream Fire Road. Construct tie-back wall.In Marin County, near Tamalpais-Homestead Valley, from 0.2 mile west of Erica Road to Valley Ford Road at various locations; also in Napa County, on Route 29, from PM 48.0 to PM 48.6 at various locations. Install centerline rumble strips.

Near Muir Beach, from 0.7 mile to 1.7 miles north of Panoramic Highway South. Repair slope failure by constructing soldier pile retaining wall and replace culvert.

Near Stinson Beach, at 1.3 miles south of Panoramic Highway north. Repair slope slipout by constructing soldier pile retaining wall.Near Muir Beach, from 0.1 mile north of Shasta Way to W. California Avenue. Reconstruct embankment slipout, construct sheet pile wall shoring, construct timber retaining wall, and install rock slope protection (RSP) to temporarily stabilize roadway.

Near Point Reyes Station, at Millerton Gulch Bridge No. 27-0114. Reconstruct embankment washout, strengthen bio-armoring of slope, repair drainage system, and construct sheet pile retaining wall.

Near Muir Beach, at 0.8 mile north of Muir Beach Overlook. Construct soldier pile retaining wall and stabilize embankment slipout.

Near Stinson Beach, from 2.6 miles south of Rocky Point Road to 2.3 miles north of Muir Woods Road. Construct soldier pile walls.Near Olema, at Olema Creek Bridge No. 27-0020. Construct sheet pile retaining wall and replace culvert.Near Marshall, at 3.2 miles south of Marshall Petaluma Road. Reconstruct embankment washout and modify drainage system.Near Muir Beach, at 2.2 miles north of Muir Woods Road. Construct retaining wall.Near Olema, 1.8 miles south of Sir Francis Drake Boulevard. Replace culvert with a bridge.

04 Marin 37 R11.7/12.0 4K330 1456J 0417000297 201.130 16-17 $ 20 $ 8,000 $ 8,000 2/28/17 NH $ - $ 1,000 $ - $ 2,400 $ 11,420 1.0 Location(s)

04 Marin 101 11.3 0K510 1493K 0416000096 201.119 21-22 $ - $ - $ - HBRR-S $ 1,100 $ - $ - $ - $ 1,100 1.0 Bridge(s)

04 Marin 101 0.3/9.0 15161 0334J 0414000446 201.315 18-19 $ 110 $ 9,700 $ - NH $ - $ 1,500 $ 50 $ 1,600 $ 12,960 11.0 Field element(s)

04 Marin 101 6.0/6.9 1K630 1498J 0416000277 201.131 16-17 $ - $ 1,500 $ 1,500 10/19/16 NH $ - $ - $ - $ 550 $ 2,050 1.0 Location(s)

04 Marin 101 10.1 2J480 1487B 0414000521 201.131 16-17 $ 10 $ 2,661 $ 2,658 6/28/17 NH $ 300 $ 456 $ 53 $ 515 $ 3,995 3.0 Location(s)

04 Marin 101 0.0/4.0 3G210 2119Q 0412000027 201.361 16-17 $ 351 $ 1,682 $ 992 8/16/17 NH $ 450 $ 650 $ 126 $ 270 $ 3,529 32.0 Curb ramp(s)

04 Marin 101 10.6/10.9 4G820 0350H 0413000049 201.110 17-18 $ 570 $ 8,546 $ - HBRR-S $ 900 $ 1,900 $ 300 $ 2,571 $ 14,787 1.0 Bridge(s)

04 Marin 101 15.4 4G871 0487Q 0416000152 201.111 16-17 $ 50 $ 965 $ 934 8/16/17 HBRR-S $ 278 $ 286 $ 10 $ 286 $ 1,875 1.0 Bridge(s)

04 Marin 101 4.7/5.6 4H980 0820K 0413000351 201.010 17-18 $ 200 $ 5,514 $ - STP $ 1,198 $ 1,392 $ 155 $ 1,120 $ 9,579 8.5 Collision(s) reduced

04 Marin 101 0.2 4J420 1492J 0415000344 201.131 19-20 $ 13 $ 909 $ - NH $ 837 $ 850 $ 100 $ 850 $ 3,559 2.0 Location(s)

04 Napa 29 11.4 2J100 1488P 0414000426 201.010 16-17 $ 280 $ 3,780 $ - STP $ - $ 250 $ - $ 1,144 $ 5,454 48.0 Collision(s) reduced

04 Napa 29 32.1/42.8 2J770 1482P 0415000003 201.119 19-20 $ 495 $ 2,844 $ - HBRR-S $ 900 $ 710 $ 236 $ 850 $ 6,035 3.0 Bridge(s)

04 Napa 29 39.1 2J880 1483E 0415000021 201.119 19-20 $ 317 $ 1,100 $ - HBRR-S $ 1,320 $ 1,100 $ 330 $ 1,100 $ 5,267 1.0 Bridge(s)

04 Napa 29 36.9/38.0 3G140 0371Q 0412021276 201.361 16-17 $ 561 $ 1,422 $ 1,165 8/16/17 NH $ 700 $ 500 $ 175 $ 300 $ 3,658 25.0 Curb ramp(s)

04 Napa 29 37.0 3G641 0587G 0416000348 201.111 16-17 $ 1,282 $ 8,704 $ 7,932 10/19/16 HBRR-S $ 1,840 $ 1,900 $ 610 $ 2,500 $ 16,836 1.0 Bridge(s)

04 Napa 29 37.0 3G64A 0587M 0416000349 201.111 18-19 $ 85 $ 500 $ - HBRR-S $ - $ 640 $ 400 $ 150 $ 1,775 1.0 Bridge(s)

04 Napa 29 47.0/47.2 4A09A 0382E 0415000012 201.111 16-17 $ 5 $ 100 $ 100 12/7/16 HBRR-S $ - $ 90 $ 5 $ 80 $ 280 1.0 Bridge(s)

04 Napa 29 11.9 4G490 0116Q 0412000491 201.015 16-17 $ 10 $ 1,242 $ 1,212 5/17/17 STP $ 306 $ 486 $ 18 $ 107 $ 2,169 3.0 Collision(s) reduced

04 Napa 29 13.5/25.5 4H200 0378E 0413000258 201.121 16-17 $ 153 $ 17,100 $ 18,629 8/16/17 NH $ 1,500 $ 1,900 $ 35 $ 2,100 $ 22,788 36.0 Lane mile(s)

04 Napa 29 29.3/36.9 4J300 1490D 0415000320 201.121 20-21 $ - $ - $ - NH $ 900 $ - $ - $ - $ 900 15.2 Lane mile(s)

04 Napa 29 1.7/5.1 4J410 1453K 0415000343 201.151 21-22 $ - $ - $ - NH $ 1,086 $ - $ - $ - $ 1,086 2.0 Drainage system(s)

04 Napa 121 17.4/18.3 0P140 1461C 0417000403 201.130 16-17 $ 10 $ 1,400 $ 1,400 5/30/17 NH $ - $ - $ - $ 420 $ 1,830 6.0 Location(s)

04 Napa 121 9.2/9.4 2A32A 0380N 0416000347 201.111 17-18 $ 100 $ 100 $ - HBRR-S $ - $ 50 $ 30 $ 70 $ 350 1.0 Bridge(s)

04 Napa 121 20.5/20.7 2J570 1485Q 0414000530 201.131 17-18 $ 65 $ 1,822 $ - NH $ 600 $ 427 $ 42 $ 295 $ 3,251 2.0 Location(s)

04 Napa 121 14.8 3J740 1488Q 0415000191 201.131 17-18 $ 144 $ 891 $ 891 12/6/17 NH $ 400 $ 360 $ 85 $ 190 $ 2,070 1.0 Location(s)

04 Napa 121 0.5/1.0 4G210 0775G 0412000310 201.010 19-20 $ 1,852 $ 12,247 $ - STP $ 1,750 $ 1,530 $ 90 $ 3,000 $ 20,469 0.0 Collision(s) reduced

04 Napa 121 0.5/1.0 4G21A 0775H 0418000217 201.010 21-22 $ - $ 1,000 $ - STP $ - $ - $ - $ 900 $ 1,900 0.0 Collision(s) reduced

In and near Novato, from Route 101 to Novato Creek Bridge. Stabilize embankment slipout, install drainage system, construct concrete barrier, and repair flooded and saturated roadway.

In San Rafael, at Irwin Creek Bridge No. 27-0097. Rehabilitate corrugated metal arch culvert bridge and adjoining deteriorated culvert structures.

In and near Sausalito, Corte Madera, and Larkspur, from north of Golden Gate Bridge to 0.3 mile north of Sir Francis Drake Boulevard. Install ramp metering and traffic operations system (TOS) elements.

In and near Corte Madera, from 1.4 miles to 0.5 mile south of Tamalpais Drive. Reconstruct culvert riser and repair slope.In San Rafael, at the Route 101/580 interchange. Repair sinking pavement and drainage systems.

In and near Sausalito, Corte Madera, and Larkspur at various locations; also, in Tiburon on Route 131 (PM 4.0 to 4.392) at various locations. Upgrade curb ramps, driveways and sidewalks.

In San Rafael, from Route 101 northbound off-ramp to 2nd Street at San Rafael Harbor Bridge No. 27-0033. Replace bridge.Near San Rafael on Route 101 at Miller Creek Bridge No. 27-0004. Scour mitigation.Near Mill Valley, from Redwood Highway Frontage Road to Route 131 (Tiburon Boulevard). Install concrete barrier.Near Sausalito, at 0.1 mile south of Alexander Avenue. Restore damaged drainage systems.In Napa, at northbound ramps and 1st Street. Construct roundabout.In and near Saint Helena and Calistoga, at Mill Creek Bridge No. 21-0056, Garnett Creek Branch Bridge No. 21-0111, and No Name Creek Bridge No. 21-0100. Bridge preventive maintenance.

Near Calistoga, at Garnett Creek Bridge No. 21-0005. Bridge preventative maintenance.In Calistoga, on Route 29 from postmile 36.9 to 38.0 at various locations; also on Route 128 from postmile 4.0 to 4.5 at various locations. Construct ADA ramps.

In Calistoga, at Napa River Bridge No. 21-0018. Replace bridge.In Calistoga, at Napa River Bridge No. 21-0018. Environmental mitigation and plant establishment for bridge replacement project.Near Calistoga, at Troutdale Creek Bridge No. 21-0004. Plant establishment.In the city of Napa, at southbound on-ramp from Lincoln Avenue/Solano Avenue to Route 29. Construct concrete barrier.In and near Napa and Yountville, from 0.4 mile north of Trancas Street/Redwood Road to Mee Lane. Rehabilitate pavement.In and near St. Helena and Calistoga, from York Creek Bridge to Route 128. Pavement rehabilitation.In American Canyon, at Rio Del Mar; also, near American Canyon at 0.3 mile south of North Kelly Road (PM 5.1).Near Napa, from 1.2 miles north of Wooden Valley Road to 0.2 mile south of Circle Oaks Drive. Replace failed culverts and repair roadway.

Near Napa, at Sarco Creek Bridge No. 21-0008. Plant establishment for bridge replacement project.

Near the city of Napa, at south of Route 128. Embankment stabilization and culvert repair.Near the city of Napa, at 1.5 miles south of Wooden Valley Road. Install rock bolts and flexible cable mesh to mitigate rockfall.Near Napa, at Huichica Creek (PM 0.75). Roadway widening.Near Napa, at Huichica Creek (PM 0.75). Mitigation planting, monitoring. and reporting for EA 4G210.

04 Napa 121 6.4 4G920 0086U 0413000062 201.119 17-18 $ 262 $ 2,170 $ - HBRR-S $ 378 $ 357 $ 208 $ 512 $ 3,887 1.0 Bridge(s)

04 Napa 121 18.6 4J210 1489K 0415000288 201.110 19-20 $ 225 $ 2,440 $ - HBRR-S $ 490 $ 735 $ 100 $ 735 $ 4,725 1.0 Bridge(s)

04 Napa 128 R7.4 1G430 0587H 0412000126 201.111 17-18 $ 3,800 $ 7,165 $ - HBRR-S $ 1,188 $ 2,200 $ 950 $ 2,600 $ 17,903 1.0 Bridge(s)

04 Napa 128 19.7/20.7 4G840 0830B 0413000051 201.110 17-18 $ 239 $ 12,710 $ - HBRR-S $ 1,560 $ 1,560 $ 216 $ 2,600 $ 18,885 1.0 Bridge(s)

04 Napa 128 17.8 4K340 1456M 0417000299 201.130 16-17 $ 10 $ 400 $ 400 2/6/17 NH $ - $ - $ - $ 200 $ 610 1.0 Location(s)

04 Napa Var 0Q910 0269S 0418000172 201.130 17-18 $ 10 $ 6,800 $ 6,800 10/24/17 NH $ - $ - $ - $ 2,100 $ 8,910 4.0 Location(s)

04 San Francisco 1 R0.7/5.9 0J700 0481V 0414000027 201.315 17-18 $ 115 $ 4,628 $ - NH $ - $ 750 $ 340 $ 750 $ 6,583 9.0 Field element(s)

04 San Francisco 1 6.0 1A905 1067C 0414000340 201.335 19-20 $ 1,050 $ 785 $ - NH $ 1,020 $ 315 $ 50 $ 336 $ 3,556 9.6 Acre(s) treated/pollutant

04 San Francisco 1 6.3/6.6 3J300 1490A 0415000147 201.170 18-19 $ 5 $ 3,956 $ - NH $ 220 $ 440 $ 25 $ 790 $ 5,436 380.0 Lighting fixture(s)

04 San Francisco 1 3J890 1489B 0415000221 201.015 19-20 $ 5 $ 5,800 $ - STP $ 440 $ 914 $ 91 $ 914 $ 8,164 55.0 Collision(s) reduced

04 San Francisco 1 R0.0/R6.9 4C130 0585E 0400001180 201.121 17-18 $ 180 $ 17,143 $ - NH $ 800 $ 1,319 $ 35 $ 1,319 $ 20,796 41.4 Lane mile(s)

04 San Francisco 101 4.1/R5.1 2J800 1483S 0415000034 201.110 19-20 $ 62 $ - $ - HBRR-S $ 2,500 $ 9,200 $ 300 $ - $ 12,062 2.0 Bridge(s)

04 San Francisco 101 T4.7/6.7 3E601 0832J 0414000083 201.121 16-17 $ - $ 7,300 $ 7,300 8/17/16 NH $ 180 $ - $ 30 $ - $ 7,510 12.0 Lane mile(s)

04 San Francisco 101 6.7/8.1 3E602 0480T 0414000084 201.121 17-18 $ 200 $ 3,495 $ - NH $ 290 $ 616 $ 44 $ 616 $ 5,261 8.4 Lane mile(s)

04 San Francisco 101 2.0 3G620 0587D 0412000141 201.110 18-19 $ 20 $ - $ - HBRR-S $ 4,000 $ 3,000 $ 20 $ - $ 7,040 1.0 Bridge(s)

04 San Francisco 101 0.0/4.2 4J390 1490F 0415000340 201.010 19-20 $ 20 $ 21,970 $ - STP $ 1,500 $ 1,700 $ 30 $ 3,000 $ 28,220 261.0 Collision(s) reduced

04 San Francisco VAR 4H751 0158G 0416000119 201.015 16-17 $ 80 $ 4,650 $ 4,547 8/16/17 STP $ 416 $ 3,100 $ 130 $ 1,100 $ 9,476 24.0 Collision(s) reduced

04 San Mateo 1 0.0/10.6 0C930 0622B 0414000094 201.121 19-20 $ 10 $ 11,671 $ - NH $ 1,403 $ 1,081 $ 46 $ 1,081 $ 15,292 21.2 Lane mile(s)

04 San Mateo 1 0.3 0J210 0482K 0413000444 201.131 17-18 $ 40 $ 740 $ - NH $ 235 $ 165 $ 165 $ 205 $ 1,550 1.0 Location(s)

04 San Mateo 1 13.5/15.1 0P160 1461H 0417000405 201.130 16-17 $ 50 $ 3,600 $ 3,600 5/11/17 NH $ - $ - $ 75 $ 1,260 $ 4,985 5.0 Location(s)

04 San Mateo 1 39.6/40.1 2K910 1452M 0417000049 201.131 16-17 $ 25 $ 1,975 $ 1,975 8/17/16 NH $ - $ - $ 25 $ 1,500 $ 3,525 3.0 Location(s)

04 San Mateo 1 4.2 4G650 0045Q 0412000624 201.131 16-17 $ 100 $ 2,800 $ 1,339 8/16/17 NH $ 1,200 $ 560 $ 100 $ 450 $ 5,210 1.0 Location(s)

04 San Mateo 1 R44.1 4G850 0681Q 0413000052 201.110 16-17 $ 5 $ 4,445 $ 4,412 8/16/17 HBRR-S $ 500 $ 1,750 $ 125 $ 1,400 $ 8,225 1.0 Bridge(s)

04 San Mateo 1 37.9/R48.0 4H210 0636S 0413000140 201.121 16-17 $ 50 $ 15,163 $ 14,710 8/16/17 NH $ 1,400 $ 1,120 $ 60 $ 1,120 $ 18,913 20.2 Lane mile(s)

04 San Mateo 1 17.0/17.5 4K460 1457J 0417000312 201.130 16-17 $ 210 $ 3,000 $ 3,000 2/16/17 NH $ - $ 500 $ 75 $ 1,250 $ 5,035 1.0 Location(s)

In Napa, at Tulucay Creek Bridge No. 21-0003. Repair bridge girders.Near Napa, at Capell Creek Bridge No. 21-0064. Bridge rehabilitation.Near Rutherford, at Conn Creek Bridge No. 21-0021. Replace bridge.Near Napa, at Capell Creek Bridge No. 21-0078. Rehabilitate bridge.Near Rutherford, at 1.2 miles west of Berryessa Knoxville Road. Remove slide debris and stabilize slope.In Napa, Sonoma, and Lake Counties, at various locations. Repair fire damaged facilities.In the City and County of San Francisco, from Junipero Serra Boulevard to Lake Street. Upgrade and interconnect traffic signals.In the city of San Francisco, at Presidio National Park. Water quality improvements.In the City and County of San Francisco, from north of Lake Street to south of Route 101 at the McArthur Tunnel. Replace existing lighting system with LED lighting system.

In the City of San Francisco, on Routes 1, 35, 80, 101 and 280 at various locations. Crosswalk safety enhancements.In San Francisco, from Route 280 to Ruckman Avenue Undercrossing. Rehabilitate roadway.In the City and County of San Francisco, at the Central Viaduct No. 34-0077 from south of 17th Street to S. Van Ness Avenue ; also, on Route 80 at the Bayshore Viaduct No. 34-0088 from Route 101 to 4th Street (PM 3.9/4.8). Paint superstructure steel members. (G13 Contingency Project)

In the City and County of San Francisco, on Van Ness Avenue from Mission Street to Lombard Street. Rehabilitate pavement.(Financial Contribution Only)

In the City and County of San Francisco, from Van Ness Avenue to Lyon Street. Rehabilitate pavement.Near San Francisco, at Alemany Circle Undercrossing No. 34-0033. Rehabilitate bridge. (G13 Contingency Project)In the city and county of San Francisco, from San Mateo County Line to Route 101/80 junction. Overlay existing pavement with open graded asphalt, groove concrete pavement, and upgrade drainage system.

In the City and County of San Francisco, on Routes 80 and 82 at various locations; also in Santa Clara County, on Routes 82, 130, and 152 at various locations. Install pedestrian crosswalk safety enhancements.

Near Pescadero, from Santa Cruz County Line to south of Bean Hollow Road. Pavement rehabilitation.Near Pigeon Point, at 0.3 mile north of the Santa Cruz County line. Construct rock slope protection (RSP) and install drainage system.Near Pescadero, from 0.1 mile south of Pescadero Creek Road to 1.5 miles north of Pescadero Creek. Construct gabion retaining wall, place RSP, and construct sheet pile retaining wall.

Near Pacifica, at the Tom Lantos Tunnels. Perform outstanding environmental mitigation commitments.

Near Ano Nuevo Park, at Rossi Road. Repair slipout.In Pacifica, at San Jose avenue Pedestrian Overcrossing No. 35-0240. Replace bridge.In and near Montara, Pacifica and Daly City, from 1.3 miles north of 2nd Street to Sullivan Avenue Overcrossing (Route 280). Rehabilitate pavement.

Near San Gregorio, from 1.2 miles south of Route 84 to 0.7 mile south of Route 84. Repair slipout, construct soldier pile tie-back retaining wall, and install rock slope protection (RSP).

04 San Mateo 35 26.1/28.9 0P260 1461K 0417000416 201.130 16-17 $ 25 $ 800 $ 800 5/31/17 NH $ - $ - $ 20 $ 300 $ 1,145 3.0 Location(s)

04 San Mateo 35 13.1 4K210 1456F 0417000279 201.130 16-17 $ 150 $ 1,800 $ 1,800 3/2/17 NH $ - $ 350 $ 40 $ 750 $ 3,090 1.0 Location(s)

04 San Mateo 35 9.8 4K480 1457M 0417000314 201.130 16-17 $ 210 $ 3,000 $ 3,000 2/22/17 NH $ - $ 500 $ 75 $ 1,250 $ 5,035 1.0 Location(s)

04 San Mateo 35 11.5 4K550 1458G 0417000321 201.130 16-17 $ 200 $ 6,000 $ 6,000 3/29/17 NH $ - $ 600 $ 150 $ 1,800 $ 8,750 1.0 Location(s)

04 San Mateo 82 19.8 0K670 1450J 0416000124 201.131 20-21 $ - $ - $ - NH $ 500 $ - $ - $ - $ 500 1.0 Location(s)

04 San Mateo 82 13.7 1G020 0686 0400002011 201.010 19-20 $ 1,765 $ 2,610 $ - STP $ 2,900 $ 1,300 $ 450 $ 700 $ 9,725 120.0 Collision(s) reduced

04 San Mateo 84 16.3/17.6 0P490 1462D 0417000452 201.130 16-17 $ 300 $ 4,330 $ 4,330 5/11/17 NH $ - $ 300 $ 90 $ 1,300 $ 6,320 2.0 Location(s)

04 San Mateo 84 15.4/15.5 4K160 1455F 0417000272 201.130 16-17 $ 200 $ 3,500 $ 3,500 1/20/17 NH $ - $ 500 $ 100 $ 1,500 $ 5,800 1.0 Location(s)

04 San Mateo 84 7.8/8.8 4K890 1460G 0417000372 201.130 16-17 $ 30 $ 1,200 $ 1,200 4/20/17 NH $ - $ - $ 30 $ 400 $ 1,660 2.0 Location(s)

04 San Mateo 84 12.0/12.5 4K900 1460H 0417000376 201.130 16-17 $ 5 $ 450 $ 450 4/20/17 NH $ - $ - $ - $ 150 $ 605 1.0 Location(s)

04 San Mateo 92 6.0 0J140 0482D 0413000437 201.131 17-18 $ 65 $ 615 $ - NH $ 435 $ 250 $ 40 $ 300 $ 1,705 1.0 Location(s)

04 San Mateo 92 0.9 0P150 1461Q 0417000404 201.130 16-17 $ 200 $ 2,000 $ 2,000 4/13/17 NH $ - $ 200 $ 40 $ 600 $ 3,040 1.0 Location(s)

04 San Mateo 101 16.5/23.0 3J060 1487J 0415000080 201.121 19-20 $ 100 $ 16,500 $ - NH $ 1,056 $ 1,342 $ 132 $ 1,628 $ 20,758 58.6 Lane mile(s)

04 San Mateo 101 11.9 3K130 1453M 0417000093 201.130 16-17 $ - $ 500 $ 500 10/11/16 NH $ - $ - $ - $ 225 $ 725 1.0 Location(s)

04 San Mateo 101 17.5/26.1 4K280 1456G 0417000291 201.130 16-17 $ - $ 1,500 $ 1,500 4/27/17 NH $ - $ - $ - $ 450 $ 1,950 1.0 Location(s)

04 San Mateo 101 3.5/12.6 4K320 1456K 0417000296 201.130 16-17 $ - $ 700 $ 700 2/23/17 NH $ - $ - $ - $ 350 $ 1,050 1.0 Location(s)

04 San Mateo 280 R0.2/R3.4 0J670 0481J 0414000024 201.235 18-19 $ 10 $ 5,286 $ - NH $ 440 $ 880 $ 40 $ 770 $ 7,426 61.0 Location(s)

04 San Mateo 280 7.0/7.7 0J720 1487G 0414000030 201.335 19-20 $ 204 $ 2,008 $ - NH $ 874 $ 763 $ 77 $ 564 $ 4,490 7.8 Acre(s) treated/pollutant

04 San Mateo 280 8.5/10.0 0P250 1461J 0417000415 201.130 16-17 $ - $ 1,220 $ 1,220 5/30/17 NH $ - $ - $ - $ 400 $ 1,620 3.0 Location(s)

04 San Mateo 280 R20.4 0P280 1461R 0417000418 201.130 16-17 $ 30 $ 850 $ 850 4/13/17 NH $ - $ - $ 25 $ 300 $ 1,205 1.0 Location(s)

04 San Mateo 280 6.7 3K270 1453N 0417000122 201.999 18-19 $ - $ - $ - ST-CASH $ 130 $ - $ - $ - $ 130 1.0 Location(s)

04 San Mateo 280 9.4 4G592 0729R 0414000367 201.131 16-17 $ - $ 400 $ 400 12/7/16 NH $ - $ 60 $ - $ 10 $ 470 1.0 Location(s)

Near Daly City, from 0.1 mile south of Westborough Boulevard to 0.3 mile north of Route 1. Replace damaged culverts and stabilize embankment with rock slope protection (RSP).

Near Sky Londa, at 0.1 mile north of Bear Gulch Road. Repair slipout and construct soldier pile retaining wall.Near Sky Londa, at 0.1 mile north of Chapman Road. Repair slipout with constructing soldier pile tie-back retaining wall.Near Sky Londa, at 0.6 mile north of Morse Lane. Stabilize slide, construct sheet pile retaining wall, and construct two tie-back retaining walls.

In South San Francisco, at 0.1 mile north of Francisco Drive. Permanent embankment restoration by installing retaining wall and drainage improvements.

Near Burlingame and Hillsborough city limits, at the intersection of Route 82 and Floribunda Avenue. Install left turn signal.Near Sky Londa, from 0.3 mile east of Friars Lane to 0.5 mile west of Fox Hill Road. Reconstruct embankment slipouts and construct soldier pile retaining walls.

Near Sky Londa, at Grandview Drive. Repair slope failure by constructing soldier pile tie-back retaining wall and repair pavement.Near La Honda, from 0.5 mile west of Pescadero Creek Road to 0.5 mile east of Pescardero Creek Road. Reconstruct embankment washouts and place RSP.

Near Sky Londa, from 0.3 mile west of Old La Honda Road to 0.2 mile east of Old La Honda Road. Stabilize slide, replace culvert and restore roadway.

Near San Mateo, east of Route 35. Construct rock slope protection (RSP).Near Half Moon Bay, at 0.7 mile east of Main Street. Repair slipout, construct soldier pile retaining wall, and restore roadway.In the cities of Burlingame, Millbrae, San Bruno and South San Francisco, from Broadway to Oyster Point Boulevard. Pavement rehabilitation.In the city of San Mateo, at Route 92/101 Separation No. 35-0252R. Replace failed bridge joint seal.In Millbrae, from 0.4 mile south of Millbrae Avenue to San Francisco County line; also in San Francisco, from Alana Way to Silver Avenue (PM 0.0 to PM 1.8). Repair storm damaged roadway.

In and near Redwood City, from Marsh Road to Route 92. Repair water saturated asphalt pavement with asphalt overlay and digout repairs.

In and near Woodside, at various locations (also Santa Clara County PM 20.4); also in the City and County of San Francisco on Route 101 at San Bruno Avenue off-ramp (PM 1.7). Construct maintenance worker safety improvements.

Near Redwood City, north of Edgewood Road; also on Route 84 from Hildebrand Road to north of La Honda Creek Bridge (PM 9.4/10.0). Stabilize soil and erosion control to mitigate for storm water quality.

Near Belmont, from 1.8 miles north of Edgewood Road to 0.8 mile south of Route 92. Replace failed culverts, backfill sinkholes, and repair roadway shoulder.

In San Bruno, at 0.2 mile north of Jenevein Avenue. Reconstruct embankment washout, replace culverts, and place RSP.Near Redwood City, at Edgewood Road at Edgewood Park-and-Ride lot. Transportation infrastructure improvement for zero-emission vehicle charging.

Near Belmont, at 1.4 miles south of Route 92. Repair pipe system and backfill sinkhole environmental mitigation.

04 San Mateo 280 R0.0/R21.0 4J850 1498G 0416000028 201.113 21-22 $ - $ - $ - HBRR-S $ 600 $ - $ - $ - $ 600 6.0 Bridge(s)

04 San Mateo VAR 3J900 1489C 0415000222 201.010 17-18 $ 25 $ 3,970 $ - STP $ 596 $ 500 $ 10 $ 580 $ 5,681 188.0 Collision(s) reduced

04 San Mateo VAR 3K340 1488X 0417000134 201.315 17-18 $ 10 $ 2,747 $ - NH $ 37 $ 236 $ 10 $ 545 $ 3,585 144.0 Field element(s)

04 Santa Clara 9 4.9 3G630 0386F 0412000409 201.110 19-20 $ 6,779 $ 11,668 $ - HBRR-S $ 2,800 $ 1,400 $ 396 $ 1,526 $ 24,569 1.0 Bridge(s)

04 Santa Clara 9 0.0/4.8 4K270 1456E 0417000290 201.130 16-17 $ 10 $ 1,500 $ 1,500 2/1/17 NH $ - $ - $ - $ 450 $ 1,960 1.0 Location(s)

04 Santa Clara 17 2.8/13.9 1J970 1480B 0414000404 201.121 19-20 $ 20 $ - $ - NH $ 1,750 $ 2,750 $ 150 $ - $ 4,670 50.0 Lane mile(s)

04 Santa Clara 17 5.8 4K230 1456A 0417000283 201.130 16-17 $ 60 $ 2,600 $ 2,600 3/6/17 NH $ - $ 300 $ 50 $ 1,040 $ 4,050 1.0 Location(s)

04 Santa Clara 17 3.0/3.1 4K410 1457D 0417000307 201.130 16-17 $ 10 $ 2,100 $ 2,100 2/28/17 NH $ - $ - $ - $ 900 $ 3,010 2.0 Location(s)

04 Santa Clara 35 9.5/10.5 4K640 1458S 0417000330 201.130 16-17 $ 10 $ 1,000 $ 1,000 2/23/17 NH $ - $ - $ - $ 500 $ 1,510 2.0 Location(s)

04 Santa Clara 35 9.5 4K710 1459A 0417000340 201.130 16-17 $ 200 $ 3,000 $ 3,000 3/16/17 NH $ - $ 300 $ 50 $ 1,200 $ 4,750 1.0 Location(s)

04 Santa Clara 35 10.5 4K800 1459K 0417000352 201.130 16-17 $ 2,000 $ 27,610 $ 27,610 4/13/17 NH $ - $ 1,500 $ 400 $ 5,900 $ 37,410 1.0 Location(s)

04 Santa Clara 35 12.4 4K930 1460L 0417000366 201.130 16-17 $ 50 $ 1,300 $ 1,300 4/20/17 NH $ - $ - $ 30 $ 455 $ 1,835 1.0 Location(s)

04 Santa Clara 82 R11.3/13.6 4H752 0158H 0416000120 201.015 16-17 $ - $ 766 $ 500 5/17/17 STP $ 104 $ - $ - $ - $ 870 24.0 Collision(s) reduced

04 Santa Clara 82 R10.4/14.4 4J281 1490C 0417000519 201.121 17-18 $ 20 $ 8,000 $ - NH $ 469 $ 870 $ 20 $ 400 $ 9,779 22.6 Lane mile(s)

04 Santa Clara 82 9.8/R10.4 4J282 1490Q 0417000520 201.121 18-19 $ 180 $ 2,711 $ - NH $ - $ 603 $ 180 $ 703 $ 4,377 3.4 Lane mile(s)

04 Santa Clara 85 18.0/24.1 2G730 0434G 0400021202 201.361 18-19 $ 50 $ 1,853 $ - NH $ 442 $ 663 $ 102 $ 730 $ 3,840 38.0 Curb ramp(s)

04 Santa Clara 85 R19.9/R20.2 4G830 0440Q 0413000054 201.110 16-17 $ 10 $ 4,319 $ 3,829 3/15/17 HBRR-S $ 360 $ 500 $ 72 $ 710 $ 5,971 1.0 Bridge(s)

04 Santa Clara 85 2.0/4.6 4G990 0085V 0413000234 201.235 16-17 $ 5 $ 2,075 $ 1,983 3/15/17 NH $ 144 $ 400 $ 36 $ 450 $ 3,110 73.0 Location(s)

04 Santa Clara 87 0.0/6.1 4J910 1492C 0416000010 201.122 21-22 $ - $ - $ - NH $ 2,767 $ - $ - $ - $ 2,767 29.5 Lane mile(s)

04 Santa Clara 101 0J560 0481H 0414000013 201.112 19-20 $ 30 $ - $ - HBRR-S $ 1,800 $ 2,250 $ 30 $ - $ 4,110 5,956.0 Linear feet

04 Santa Clara 101 R26.7 0P460 1462B 0417000440 201.130 16-17 $ - $ 1,100 $ 1,100 4/20/17 NH $ - $ - $ - $ 400 $ 1,500 1.0 Location(s)

04 Santa Clara 101 R5.1 2J460 1485C 0414000518 201.131 17-18 $ 10 $ 564 $ 509 12/6/17 NH $ 220 $ 118 $ 10 $ 200 $ 1,122 1.0 Location(s)

In and near Menlo Park and San Bruno, from Alpine Road to Route 380 at Alpine Road Undercrossing No. 35-0009L/R (PM R0.05), Sand Hill Road Overcrossing (OC) (South) No. 35-0007 (PM R1.56), Sand Hill Road OC (North) No. 35-0008 (PM R1.62), and Route 280/380 Separation No. 35-0217L/R (PM R20.97). Structure seismic retrofit.

On Routes 92, 101 and 280 in Daly City, San Bruno and San Mateo at four locations. Wet pavement conditions safety improvements.In San Mateo and San Francisco Counties, on Routes 80, 92, 101, and 280 at various locations. Repair and replace existing Transportation Management System elements.

Near Saratoga, at Saratoga Creek Bridge No. 37-0074. Replace bridge.Near Saratoga, from Santa Cruz County line to Sanborn Road. Remove slide debris, repair roadway, and establish safe working conditions of failed slope to initiate geotechnical investigations.

In and near Los Gatos, Campbell and San Jose, from Hebard Way to Route 280. Pavement rehabilitation. (G13 Contingency Project)Near Los Gatos, at 0.7 mile south of East Main Street. Remove slide debris, stabilize slope, and construct soil nail retaining wall.Near Los Gatos, at 0.5 mile north of Idylwild Road. Reconstruct embankment sinkhole, reconstruct slope, inject grout in voids, and repair culverts.

Near Los Gatos, from 0.3 mile north of Las Cumbres Road to 1.2 miles north of Las Cumbres Road. Stabilize slipout, construct detour, and provide traffic control to escort local traffic.

Near Los Gatos, at 0.3 mile north of Las Cumbres Road. Repair embankment slipout, construct tieback retaining wall, and repair roadway.

Near Los Gatos, at 1.2 miles north of Las Cumbres Road. Construct soldier pile walls, reconstruct embankment washout, restore roadway.

Near Saratoga, at 1.6 miles south of Route 9. Repair sinkhole and repair culvert.In the city of Santa Clara, from Harrison Street to Alpine Avenue at various locations. Install pedestrian crosswalk safety enhancements. (Financial Contribution Only)

In the city of Santa Clara, from El Camino Real to Lawrence Expressway. Pavement rehabilitation.

In the cities of San Jose and Santa Clara, from McKendrie Street to El Camino Real. Pavement rehabilitation and ADA upgrades.In Cupertino, Sunnyvale and Mountain View, from Stevens Creek Boulevard to Route 101; also in various cities, on Route 80 (PM 2.5/8.0), at various locations. Install and/or upgrade existing curb ramps and pedestrian facilities to ADA standards.

In Sunnyvale and Mountain View, from Fremont Avenue Undercrossing to 0.2 mile north of Stevens Creek Bridge No. 37-0185. Overlay southbound deck with polyester concrete and overlay northbound deck with reinforced concrete.

In San Jose, from Cottle Road to south of Route 87 at various locations. Pave between edge of shoulder and sound wall.In San Jose, from Route 85 to West Julian Street. Roadway Rehabilitation.In various cities, on Routes 101 and 237 at various locations. Bridge rail upgrade at 8 locations. (G13 Contingency Project)In San Jose, at Route 101-85/S101 HOV Connector Separation No. 37-0628E. Repair approach slabs and roadway settlement.In Gilroy, at 0.5 mile north of Monterey Road at the southbound Monterey Road off-ramp. Fill voids under pavement and repair eroded embankment slope.

04 Santa Clara 101 R9.0/R16.8 2J890 1483F 0415000022 201.010 18-19 $ 10 $ 1,760 $ - STP $ 230 $ 300 $ 75 $ 450 $ 2,825 85.0 Collision(s) reduced

04 Santa Clara 101 4G950 0086X 0413000235 201.235 16-17 $ 5 $ 1,980 $ 1,090 12/7/16 NH $ 210 $ 1,721 $ 50 $ 450 $ 4,416 30.0 Location(s)

04 Santa Clara 101 R28.5/40.7 4H000 0085Y 0413000236 201.235 16-17 $ 10 $ 2,181 $ 1,571 6/28/17 NH $ 144 $ 288 $ 36 $ 342 $ 3,001 21.0 Location(s)

04 Santa Clara 101 R0.8/R0.9 4K130 1455D 0417000266 201.131 17-18 $ 50 $ 5,220 $ 5,220 10/18/17 NH $ 50 $ 450 $ 50 $ 1,000 $ 6,820 1.0 Location(s)

04 Santa Clara 101 52.2 4K790 1459J 0417000348 201.130 16-17 $ - $ 1,050 $ 1,050 4/13/17 NH $ - $ - $ - $ 400 $ 1,450 1.0 Location(s)

04 Santa Clara 130 9.3 4K680 1458V 0417000335 201.130 16-17 $ 150 $ 3,770 $ 3,770 3/6/17 NH $ - $ 500 $ 75 $ 1,500 $ 5,995 1.0 Location(s)

04 Santa Clara 152 21.8/R35.2 0J800 0480K 0414000067 201.010 19-20 $ 60 $ 10,984 $ - STP $ 1,800 $ 1,227 $ 65 $ 1,766 $ 15,902 79.0 Collision(s) reduced

04 Santa Clara 152 13.8/14.7 1G870 0730F 0400020620 201.010 16-17 $ 441 $ 4,660 $ 4,639 7/14/17 STP $ 721 $ 1,050 $ 370 $ 795 $ 8,037 62.0 Collision(s) reduced

04 Santa Clara 152 0.0/6.2 2A251 0483Q 0413000402 201.010 17-18 $ 1,000 $ 1,100 $ - STP $ - $ 750 $ 300 $ 650 $ 3,800 0.0 Collision(s) reduced

04 Santa Clara 152 0.0/5.2 2A252 0483R 0413000403 201.010 16-17 $ 2,000 $ 1 $ - STP $ - $ 350 $ 150 $ - $ 2,501 0.0 Collision(s) reduced

04 Santa Clara 152 16.2/19.5 2A442 0485Q 0412000582 201.010 17-18 $ 913 $ 1 $ - STP $ - $ 350 $ 250 $ - $ 1,514 0.0 Collision(s) reduced

04 Santa Clara 152 7.6/M10.2 2K750 1452D 0417000019 201.121 19-20 $ 125 $ 14,165 $ - NH $ 1,400 $ 1,600 $ 58 $ 1,800 $ 19,148 7.9 Lane mile(s)

04 Santa Clara 152 6.1/6.5 44884 0487M 0400021236 201.111 16-17 $ - $ 800 $ 441 10/19/16 HBRR-S $ - $ 200 $ 130 $ - $ 1,130 1.0 Bridge(s)

04 Santa Clara 152 6.1/R35.2 4H860 0487N 0413000292 201.015 16-17 $ 6 $ 1,632 $ 1,603 5/17/17 STP $ 457 $ 234 $ 72 $ 306 $ 2,707 87.0 Collision(s) reduced

04 Santa Clara 152 1.5 4K380 1457A 0417000304 201.130 16-17 $ 10 $ 2,500 $ 2,500 2/23/17 NH $ - $ - $ - $ 950 $ 3,460 1.0 Location(s)

04 Santa Clara 152 R17.0 4K420 1457E 0417000308 201.130 16-17 $ 5 $ 2,000 $ 2,000 3/2/17 NH $ - $ - $ - $ 900 $ 2,905 1.0 Location(s)

04 Santa Clara 152 7.9/9.4 4K620 1458Q 0417000328 201.130 16-17 $ - $ 1,000 $ 1,000 5/11/17 NH $ - $ - $ - $ 300 $ 1,300 1.0 Location(s)

04 Santa Clara 237 7.0/8.0 0K250 1492B 0416000061 201.310 21-22 $ - $ - $ - NH $ 3,120 $ - $ - $ - $ 3,120 121.0 1,000 vehicle hour(s)/yr

04 Santa Clara 237 3.0 0P520 1462E 0417000461 201.130 17-18 $ - $ 1,050 $ 1,050 7/26/17 NH $ - $ - $ - $ 380 $ 1,430 1.0 Location(s)

04 Santa Clara 237 R0.0/R0.2 2J660 1482M 0414000542 201.010 16-17 $ 50 $ 2,352 $ 1,340 5/23/17 STP $ - $ 450 $ 27 $ 518 $ 3,397 3.0 Collision(s) reduced

04 Santa Clara 280 1K520 1498E 0416000257 201.130 16-17 $ - $ 2,220 $ 2,220 10/11/16 NH $ - $ - $ - $ 560 $ 2,780 4.0 Location(s)

04 Santa Clara 280 18.2/18.6 2G350 0501A 0400020738 201.010 16-17 $ 10 $ 802 $ 802 12/6/17 STP $ 150 $ 130 $ 24 $ 150 $ 1,266 18.0 Collision(s) reduced

04 Santa Clara 280 R2.9/17.8 2J750 1483K 0415000338 201.113 18-19 $ 90 $ 2,414 $ - HBRR-S $ 1,144 $ 1,034 $ 66 $ 550 $ 5,298 3.0 Bridge(s)

04 Santa Clara 280 11.5/20.6 3J320 0449A 0415000131 201.121 18-19 $ 50 $ 47,574 $ - NH $ 1,853 $ 3,284 $ 48 $ 6,661 $ 59,470 90.0 Lane mile(s)

04 Santa Clara 280 11.3 3J710 1488N 0415000184 201.010 19-20 $ 180 $ 982 $ - STP $ 432 $ 285 $ 45 $ 285 $ 2,209 20.0 Collision(s) reduced

04 Santa Clara 280 15.0 4H880 0211Z 0413000296 201.010 16-17 $ 10 $ 868 $ 1,040 1/24/17 STP $ - $ 1,800 $ 10 $ 400 $ 3,088 35.0 Collision(s) reduced

In and near Morgan Hill, from south of Masten Avenue to East Main Avenue. Install edgeline and shoulder rumble strips, concrete barrier and enhanced wet-night visibility striping.

In Santa Clara, San Mateo and San Francisco Counties, on various routes, various locations. Upgrade pump houses.Near San Jose, from Blossom Hill Road to Trimble Road at various locations. Pave beyond gore areas.Near Gilroy, at Sargent Bridge Overhead No. 37-0006R. Replace existing damaged bridge rails with standard concrete barrier railing.In Palo Alto, at Embarcadero Road Overcrossing No. 37-0150. Replace reinforced concrete girder.Near San Jose, at 2.0 miles west of Quimby Road. Repair washout conditions of roadway with constructing tie-back retaining wall and sheet pile retaining wall.

Near Gilroy, from east of Dunne Street/San Felipe Road to the Merced County line. Place median barrier.Near Gilroy, from 0.6 mile west to 0.2 mile east of the Prunedale Avenue. Construct shoulders, install rumble strips and soft median barrier.Near Gilroy, at various locations from Pole Line Road to Burchell Road. Planting and environmental mitigation.In Santa Clara, from Hecker Pass to Uvas Creek. Environmental species mitigation.Near Gilroy, from Old Lake Road to San Felipe Road. Environmental species mitigation.In Gilroy, from 0.3 miles west of Santa Teresa Boulevard to Route 101. Rehabilitate pavement.Near Gilroy, at Uvas Creek. Required environmental species mitigation for bridge replacement project EA 04-44880.In and near Gilroy, from 1.1 miles east of Watsonville Road to Merced County line. Install rumble strips.Near Gilroy, at 1.5 miles east of Pole Line Road. Remove slide debris, stabilize slope, and construct debris barrier.Near Gilroy, at 0.8 mile east of Lake Road. Repair washout, construct sheet pile retaining wall, and repair roadway.In Gilroy, from Santa Teresa Boulevard to Monterey Road. Repair storm damaged roadway.

In San Jose, in the westbound direction from Zanker Road to North First Street. Construct auxiliary lane.In Sunnyvale, at North Mathilda Avenue Undercrossing No. 37-0179. Reconstruct portions of bridge deck, diaphragms, and girders.

In Mountain View, at Church Street. Install median barrier.In San Jose at various locations, the Southwest Expressway pump station (PM 2.9), Bird Avenue pump station (PM 3.8) and Menker Avenue pump station (PM 4.4); also in San Mateo County, at Ravenswood pump station (PM 28.0). Replace and/or repair failed pump station components.

In and near Los Altos Hills, at 0.2 mile south to 0.2 mile north of Page Mill Road. Improve signing and striping at ramp intersections with local road.

In San Jose, at Bird Avenue Overcrossing Bridge No. 37-0267 (PM R2.78); also in Los Altos Hills at Arastradero Road Undercrossing Bridge No. 37-0251 L/R (PM 17.8). Bridge seismic restoration.

In and Near Los Altos, Los Altos Hills, and Palo Alto, from Foothill Boulevard to north of Sand Hill Road (also, in San Mateo County PM R0.0/R2.1). Pavement rehabilitation.

In Cupertino, at northbound off-ramp to Foothill Expressway. Upgrade traffic signal system for right-turn movement.In Los Altos Hills, on northbound off-ramp at El Monte Avenue. Realign off-ramp.

04 Santa Clara 680 M0.0/M9.9 0J660 0481T 0414000023 201.235 18-19 $ 10 $ 8,814 $ - NH $ 440 $ 1,320 $ 110 $ 1,320 $ 12,014 160.0 Location(s)

04 Santa Clara 880 1.3/1.4 1G860 0730C 0400020618 201.015 16-17 $ 53 $ 1,830 $ 1,827 6/28/17 STP $ 119 $ 400 $ 72 $ 475 $ 2,949 6.0 Collision(s) reduced

04 Santa Clara VAR 2J780 1482R 0415000017 201.119 19-20 $ 10 $ 2,391 $ - HBRR-S $ 900 $ 750 $ 44 $ 600 $ 4,695 5.0 Bridge(s)

04 Santa Clara VAR 3K330 1488W 0417000133 201.315 17-18 $ 10 $ 4,801 $ - NH $ 68 $ 415 $ 10 $ 951 $ 6,255 295.0 Field element(s)

04 Solano 12 19.2 4G560 8060A 0412000504 201.010 17-18 $ 71 $ 4,671 $ - STP $ 1,174 $ 684 $ 54 $ 468 $ 7,122 9.0 Collision(s) reduced

04 Solano 12 7.4/R17.1 4K650 1458T 0417000331 201.130 16-17 $ - $ 2,200 $ 2,200 5/11/17 NH $ - $ - $ - $ 660 $ 2,860 1.0 Location(s)

04 Solano 37 R9.8 0P330 1461S 0417000426 201.130 17-18 $ 10 $ 680 $ 680 8/3/17 NH $ - $ - $ - $ 280 $ 970 2.0 Location(s)

04 Solano 80 1.1/34.5 0J600 0480N 0414000017 201.119 19-20 $ 423 $ 1,379 $ - HBRR-S $ 990 $ 880 $ 66 $ 880 $ 4,618 4.0 Bridge(s)

04 Solano 80 1.8/4.4 0J710 0481R 0414000029 201.322 18-19 $ 10 $ 15,951 $ - NH $ 1,870 $ 2,154 $ 154 $ 1,859 $ 21,998 6.0 Bridge(s)

04 Solano 80 1.1 2K840 1452F 0417000031 201.322 19-20 $ - $ - $ - NH $ 2,057 $ - $ - $ - $ 2,057 1.0 Bridge(s)

04 Solano 80 13.9 3G690 8315N 0412000153 201.110 17-18 $ 145 $ 2,600 $ - HBRR-S $ 1,200 $ 592 $ 50 $ 600 $ 5,187 1.0 Bridge(s)

04 Solano 80 30.6/38.4 4A110 0876B 0412000497 201.010 17-18 $ 10 $ 14,700 $ - STP $ - $ 2,200 $ 200 $ 2,600 $ 19,710 78.0 Collision(s) reduced

04 Solano 80 14.6 4G872 0487R 0416000153 201.111 19-20 $ 5 $ 760 $ - HBRR-S $ 850 $ 600 $ 20 $ 600 $ 2,835 2.0 Bridge(s)

04 Solano 80 1.1/R25.1 4G960 0481C 0413000147 201.235 16-17 $ 15 $ 2,573 $ 2,553 8/17/16 NH $ 216 $ 866 $ 54 $ 450 $ 4,174 34.0 Location(s)

04 Solano 84 12.1/12.2 0G660 0886 0400000343 201.110 18-19 $ 2,884 $ - $ - HBRR-S $ 3,000 $ 3,500 $1,098 $ - $ 10,482 1.0 Bridge(s)

04 Solano 113 5.5 4K170 1455G 0417000273 201.130 16-17 $ 10 $ 1,000 $ 1,000 1/20/17 NH $ - $ - $ - $ 600 $ 1,610 1.0 Location(s)

04 Solano 113 4.0/17.0 4K940 1460M 0417000374 201.130 16-17 $ - $ 1,800 $ 1,800 5/11/17 NH $ - $ - $ - $ 540 $ 2,340 1.0 Location(s)

04 Solano 128 0.4/0.5 4K180 1455H 0417000274 201.130 16-17 $ 10 $ 800 $ 800 1/20/17 NH $ - $ - $ - $ 300 $ 1,110 1.0 Location(s)

04 Solano 220 2.1 0P780 1463E 0417000533 201.130 16-17 $ 5 $ 400 $ 400 6/30/17 NH $ - $ - $ - $ 200 $ 605 1.0 Location(s)

04 Solano 680 R1.9/R2.0 4J040 1498M 0415000246 201.131 19-20 $ 38 $ 1,040 $ - NH $ 560 $ 514 $ 22 $ 521 $ 2,695 1.0 Location(s)

04 Sonoma 1 15.1/15.8 0A020 0748E 0400000129 201.131 17-18 $ 5,000 $ 24,300 $ - NH $ 8,000 $ 5,000 $ 500 $ 4,000 $ 46,800 1.0 Location(s)

04 Sonoma 1 22.5 1J750 1481A 0414000348 201.131 17-18 $ 10 $ 1,370 $ - NH $ 551 $ 300 $ 10 $ 220 $ 2,461 1.0 Location(s)

04 Sonoma 1 30.8/40.6 1K730 1453J 0416000307 201.151 21-22 $ - $ - $ - NH $ 744 $ - $ - $ - $ 744 22.0 Drainage system(s)

04 Sonoma 1 41.5/54.6 1K750 1462M 0416000309 201.151 21-22 $ - $ - $ - NH $ 1,050 $ - $ - $ - $ 1,050 26.0 Drainage system(s)

04 Sonoma 1 24.3/24.4 2J540 1485P 0414000527 201.131 17-18 $ 150 $ 4,180 $ - NH $ 1,200 $ 1,500 $ 100 $ 1,180 $ 8,310 1.0 Location(s)

04 Sonoma 1 25.1/25.2 4K390 1457B 0417000305 201.130 16-17 $ 210 $ 5,000 $ 5,000 2/14/17 NH $ - $ 900 $ 100 $ 1,500 $ 7,710 1.0 Location(s)

In San Jose and Milpitas, from Route 101 to Scott Creek Road at various locations. Construct maintenance worker safety improvements.

In San Jose, on northbound Route 880 off-ramp to westbound Bascom Avenue; also on southbound Route 880 off-ramp to Bascom Avenue. Construct concrete median barriers.

In various cities on various routes at Saratoga Creek Bridge, Carnadero Creek Bridge, San Francisco Creek Bridge, San Tomas Aquino Creek Bridge, and Bodfish Creek Bridge. Bridge preventative maintenance.

In Santa Clara County, on Routes 17, 85, 87, 101, 152, 237, 280, and 680 at various locations. Repair and replace existing Transportation Management System elements.

Near Rio Vista, at the intersection of Route 12 and Route 113. Install roundabout.Near Fairfield, from 0.1 mile west of Lawler Ranch Parkway to 0.1 mile west of Olsen Road. Repair storm damaged roadway.Near Vallejo, at the W37-N&S29 Connector Overhead No. 23-0222F; also in Vacaville, on Route 80 at Ulatis Creek No. 23-0052R. Replace joint seals and elastomeric bearing pads.

In and near Vallejo, Dixon and Vacaville, at Route 80/29 Separation Bridge No. 23-0087, McCune Creek Bridge No. 23-0084 L/R and Horse Creek Bridge No. 23-0077 L. Bridge preventative maintenance.

In Vallejo, from Magazine Street Overcrossing No. 23-0066 to Redwood Street Overcrossing No. 23-0114. Increase vertical clearance at six overcrossing structures.

In Vallejo, at Route 80/29 Separation Bridge No. 23-0087. Replace bridge.Near Fairfield, at Dan Wilson Creek Bridge No. 23-0006. Rehabilitate bridge.In and near Vacaville and Dixon, from west of Gibson Canyon Creek Bridge to Curry Road. Upgrade median barrier.Near Fairfield, at Suisun Creek Bridge No. 23-0007. Scour mitigation.In and near Vallejo, Fairfield and Vacaville, from Route 29 to Alamo Drive; also in Vallejo on Route 37 at Route 80 (PM R11.45). Install roadside safety improvements.

Near Rio Vista, at Miner Slough Bridge No. 23-0035. Replace bridge. (G13 Contingency Project)

Near Dixon, at 1.5 miles north of Creed Road. Stabilize slope washout, reconstruct culvert and repair pavement.Near Dixon, from Robinson Road to 0.3 mile south of Midway Road. Repair storm damaged roadway.

Near Winters, from 0.2 mile west of Yolo County line to 0.3 mile west of the Yolo County line. Remove slide debris requiring rock blasting and pavement repair.

Near Ryer Island, at 0.9 mile west of East Ryer Road. Reconstruct embankment with shoulder backing.In Benicia, from north of Industrial Way to south of Lake Herman Road. Repair slip-outs and stabilize slope.Near Camet, 0.1 mile north of Del Sol Road. Realign roadway.Near Jenner, at 2.4 miles north of Route 116. Repair fire damaged retaining wall.Near Jenner, from south of Fort Ross Road to north of Moon Rock Campground at various locations. Rehabilitate drainage culverts.Near Gualala, from north of Moon Rock Campground to 0.1 mile north of Vantage Road. Rehabilitate drainage culverts.Near Jenner, at 1.5 miles south of Myers Grade Road. Repair roadway slip-outs.Near Jenner, from 0.6 mile north of Russian Gulch State Beach to 1.2 miles south of Meyers Grade Road. Repair slipout, construct soldier pile tie-back retaining wall, and repair roadway.

04 Sonoma 1 31.9 4K660 1458U 0417000333 201.130 16-17 $ 10 $ 600 $ 600 2/23/17 NH $ - $ - $ - $ 300 $ 910 1.0 Location(s)

04 Sonoma 1 19.6 4S920 1770A 0400020569 201.131 16-17 $ 100 $ 1,450 $ 1,450 1/17/17 NH $ 282 $ 1,194 $ 100 $ 900 $ 4,026 1.0 Location(s)

04 Sonoma 12 9.5/31.3 0J680 0480E 0414000025 201.235 18-19 $ 10 $ 2,190 $ - NH $ 308 $ 550 $ 44 $ 550 $ 3,652 27.0 Location(s)

04 Sonoma 12 T17.6/18.5 0P180 1461E 0417000407 201.130 16-17 $ - $ 400 $ 400 5/11/17 NH $ - $ - $ - $ 175 $ 575 1.0 Location(s)

04 Sonoma 12 35.1/38.9 1J360 0488K 0414000202 201.121 19-20 $ 5 $ 6,208 $ - NH $ 808 $ 870 $ 62 $ 746 $ 8,699 7.6 Lane mile(s)

04 Sonoma 12 17.7/18.2 4G220 0775F 0412000314 201.010 16-17 $ 225 $ 7,000 $ 7,000 7/13/17 STP $ 600 $ 1,000 $ 250 $ 1,730 $ 10,805 5.0 Collision(s) reduced

04 Sonoma 12 25.8/33.3 4H050 0269M 0413000080 201.111 19-20 $ 150 $ 9,000 $ - HBRR-S $ 1,519 $ 2,650 $ 500 $ 2,000 $ 15,819 2.0 Bridge(s)

04 Sonoma 37 2.6 1A210 0763L 0414000487 201.321 18-19 $ 10 $ 2,280 $ - ST-CASH $ 506 $ 592 $ 20 $ 554 $ 3,962 2.0 Location(s)

04 Sonoma 37 0.3 2J500 1487C 0414000523 201.131 17-18 $ 10 $ 1,805 $ - NH $ 250 $ 700 $ 30 $ 620 $ 3,415 1.0 Location(s)

04 Sonoma 101 9.0 0J100 0481B 0413000408 201.131 18-19 $ 850 $ 800 $ - NH $ 423 $ 850 $ 150 $ 850 $ 3,923 1.0 Location(s)

04 Sonoma 101 29.3/R54.3 0J642 1482F 0414000476 201.122 18-19 $ 890 $ 68,200 $ - NH $ 5,149 $ 6,799 $ 170 $ 7,600 $ 88,808 43.2 Lane mile(s)

04 Sonoma 101 22.4 1J020 0481W 0414000127 201.010 17-18 $ 5 $ 2,295 $ 2,295 6/29/17 STP $ - $ 500 $ 30 $ 520 $ 3,350 183.0 Collision(s) reduced

04 Sonoma 101 33.5 2J550 1485H 0414000528 201.131 17-18 $ 40 $ 3,850 $ - NH $ 630 $ 610 $ 100 $ 770 $ 6,000 1.0 Location(s)

04 Sonoma 101 3J080 1487D 0415000078 201.119 21-22 $ - $ - $ - HBRR-S $ 982 $ - $ - $ - $ 982 2.0 Bridge(s)

04 Sonoma 101 33.5/R43.4 4G480 0780G 0412000490 201.010 16-17 $ 10 $ 1,090 $ 1,075 1/30/17 STP $ 200 $ 700 $ 50 $ 235 $ 2,285 30.0 Collision(s) reduced

04 Sonoma 101 1.2 4K360 1456P 0417000301 201.130 16-17 $ - $ 1,000 $ 1,000 4/17/17 NH $ - $ - $ - $ 350 $ 1,350 1.0 Location(s)

04 Sonoma 101 37.1/37.2 4K450 1457H 0417000311 201.130 16-17 $ 210 $ 3,000 $ 3,000 2/16/17 NH $ - $ 800 $ 75 $ 1,350 $ 5,435 1.0 Location(s)

04 Sonoma 116 26.6/R26.9 1G840 0730E 0400020616 201.378 17-18 $ 140 $ 2,790 $ 3,241 8/16/17 NH $ 240 $ 750 $ 590 $ 850 $ 5,360 42.0 Structure(s)

04 Sonoma 116 8.5/10.5 2J840 1487F 0415000085 201.335 19-20 $ 370 $ 2,816 $ - NH $ 685 $ 670 $ 80 $ 655 $ 5,276 12.1 Acre(s) treated/pollutant

04 Sonoma 116 31.0/31.3 4G380 0817Q 0412000463 201.010 17-18 $ 125 $ 6,446 $ - STP $ 1,197 $ 1,500 $ 200 $ 1,200 $ 10,668 54.0 Collision(s) reduced

04 Sonoma 116 0.0/46.8 4J120 1490B 0415000260 201.240 16-17 $ 5,000 $ - $ - NH $ 520 $ - $ 80 $ - $ 5,600 1.0 Location(s)

04 Sonoma 116 43.3 4K290 1456H 0417000292 201.130 16-17 $ 10 $ 1,000 $ 1,000 2/1/17 NH $ - $ - $ - $ 450 $ 1,460 1.0 Location(s)

04 Sonoma 116 39.9/40.1 4K960 1460P 0417000381 201.130 16-17 $ 200 $ 1,700 $ 1,700 4/11/17 NH $ - $ - $ 40 $ 600 $ 2,540 2.0 Location(s)

04 Sonoma 121 3.4/6.5 0G680 0738 0400020007 201.010 19-20 $ 6,264 $ 25,000 $ - STP $ 2,500 $ 3,750 $1,800 $ 4,200 $ 43,514 13.0 Collision(s) reduced

Near Fort Ross State Park, at 1.1 miles south of Fort Ross Road. Stabilize slide, construct retaining wall, and repair asphalt roadway.Near Jenner, 0.1 mile south of Russian River Bridge. Construct retaining wall.In various cities on Routes 12, 101, and 116 at various locations; also in Marin County on Route 101 at various locations. Highway worker safety improvements.

In Santa Rosa, from 0.2 mile west of Hoen Avenue to 0.1 mile east of Brush Creek Road. Repair storm damaged roadway.In and near Sonoma, from Vallejo Avenue to east of Leveroni Road/Napa Road. Pavement rehabilitation.In Santa Rosa, from Farmers Lane to 0.2 mile west of Brush Creek Road. Install concrete median barrier and Midwest Guardrail System.In and near Sonoma, at Sonoma Creek Bridge No. 20-0027 and Hooker Creek Bridge No. 20-0030. Scour mitigation.Near Vallejo, at east of Route 121. Replace Weigh In Motion (WIM) systems.Near Novato, at the Petaluma River Bridge No. 27-0013. Restore eastern bridge approach settlement.

Near Petaluma, north of Pepper Road. Repair slide.In and near Windsor, Healdsburg, and Cloverdale, from Old Redwood Highway to 2 miles south of Mendocino County line. Roadway rehabilitation.

In Sonoma County on Routes 12, 101, 116 and 121 at various locations; also, in Napa County on Route 128 near Calistoga from PM 0.5 to 1.0. Place high friction surface treatment.

In and near Healdsburg, at Old Redwood Highway/Grant Undercrossing Bridge No. 20-0067L/R. Upgrade drainage elements and restore erosion and settlement damage.

Near Petaluma, at San Antonio Creek Bridges No. 20 -0019R/L. Abutment scour mitigation and channel sediment cleaning to address flooding.In and near Healdsburg, from Grant Undercrossing to Route 101/128 Separation at various locations. Upgrade electroliers.Near Petaluma, at 0.3 mile south of Tunzi Road. Stabilize slope, place RSP, and repair drainage system.In Healdsburg, at 0.9 mile north of Dry Creek Road. Remove slide debris and construct soldier pile tieback retaining wall.In Sebastopol, from Keating Avenue to Willow Street in southbound direction (Main Street); also from McKinley Street to Joe Rodora Trail in northbound direction (Petaluma Avenue). Upgrade curb ramps, driveways and sidewalks.

Near Monte Rio and Cloverdale, on Routes 116 and 128; also in Marin County, on Route 101, at 0.4 mile north of Sir Francis Drake Boulevard (PM 9.25). Stabilized soil and erosion control to mitigate for storm water quality.

Near Sebastopol, at the intersection of Route 116 and Llano Road. Construct left-turn and merge lanes.In various cities, from Route 1 to Route 101; also in Alameda, Marin, Napa, and Sonoma counties, on various routes, at various locations. Advance banking credits for environmental mitigation. Financial Contribution Only (FCO).

Near Temelec, at 0.1 mile east of County Dump Road. Reconstruct slipout embankment and replace storm damaged culvert.Near Lakeville, from 0.6 mile east of Lakeville Highway to 0.9 mile east of Lakeville Highway. Reconstruct embankment slipout and repair roadway.

Near Schellville, from north of Tolay Creek Bridge to south of Yellow Creek Bridge. Widen for standard shoulders, upgrade curves to standard, and install rumble strips.

04 Sonoma 128 16.2 4K200 1455K 0417000278 201.130 16-17 $ 10 $ 1,500 $ 1,500 1/24/17 NH $ - $ - $ - $ 700 $ 2,210 1.0 Location(s)

04 Sonoma 128 1.3 4K430 1457F 0417000309 201.130 16-17 $ 210 $ 2,500 $ 2,500 2/16/17 NH $ - $ 600 $ 50 $ 1,250 $ 4,610 1.0 Location(s)

04 Sonoma Var 0Q900 0779F 0418000171 201.130 17-18 $ 10 $ 7,600 $ 7,600 10/18/17 NH $ - $ - $ - $ 2,300 $ 9,910 4.0 Location(s)

04 Sonoma VAR 3K350 1488Y 0417000135 201.315 17-18 $ 10 $ 6,929 $ - NH $ 101 $ 600 $ 10 $ 1,371 $ 9,021 392.0 Field element(s)

05 Monterey 1 20.4 0Q500 2230 0500020288 201.151 19-20 $ 23 $ 1,527 $ - NH $ 936 $ 1,124 $ 113 $ 575 $ 4,298 1.0 Drainage system(s)

05 Monterey 1 58.3/59.8 1A000 2313 0500020284 201.015 17-18 $ 30 $ 5,349 $ - STP $ 675 $ 983 $ 35 $ 1,154 $ 8,226 5.0 Collision(s) reduced

05 Monterey 1 2.5/67.3 1F080 2478 0513000052 201.151 17-18 $ 300 $ 3,279 $ - NH $ 400 $ 1,154 $ 344 $ 783 $ 6,260 7.0 Drainage system(s)

05 Monterey 1 39.8/74.6 1F680 2534 0514000046 201.121 18-19 $ 31 $ 24,335 $ - NH $ 858 $ 1,427 $ 41 $ 2,828 $ 29,520 72.1 Lane mile(s)

05 Monterey 1 63.0 1H460 2654 0516000077 201.110 20-21 $ - $ - $ - HBRR-S $ 700 $ - $ - $ - $ 700 1.0 Bridge(s)

05 Monterey 1 49.0/51.2 1H770 2687 0516000150 201.130 16-17 $ 10 $ 800 $ 800 1/20/17 NH $ 20 $ 35 $ 2 $ 160 $ 1,027 1.0 Location(s)

05 Monterey 1 8.0/23.0 1H780 2688 0516000151 201.130 16-17 $ 20 $ 2,500 $ 2,500 1/31/17 NH $ 25 $ 100 $ 5 $ 750 $ 3,400 1.0 Location(s)

05 Monterey 1 28.2/28.4 1J110 2711 0517000062 201.130 16-17 $ 10 $ 600 $ 600 2/16/17 NH $ 10 $ 10 $ 5 $ 180 $ 815 1.0 Location(s)

05 Monterey 1 45.5 1J130 2713 0517000064 201.130 16-17 $ 20 $ 3,000 $ 3,000 3/2/17 NH $ 50 $ 500 $ 50 $ 400 $ 4,020 1.0 Location(s)

05 Monterey 1 47.0/58.0 1J320 2717 0517000087 201.130 16-17 $ 20 $ 1,000 $ 1,000 3/14/17 NH $ 10 $ 40 $ 5 $ 350 $ 1,425 4.0 Location(s)

05 Monterey 1 23.0/45.4 1J340 2719 0517000089 201.130 16-17 $ 50 $ 5,500 $ 5,500 5/11/17 NH $ 40 $ 100 $ 20 $ 1,400 $ 7,110 8.0 Location(s)

05 Monterey 68 L4.0/R18.1 0N190 4019 0513000142 201.315 16-17 $ 200 $ 3,220 $ 1,179 5/17/17 NH $ 260 $ 787 $ 100 $ 290 $ 4,857 28.0 Field element(s)

05 Monterey 68 1.6/L4.0 1C250 2378 0512000107 201.015 17-18 $ 359 $ 3,600 $ - STP $ 715 $ 1,093 $ 17 $ 786 $ 6,570 7.0 Collision(s) reduced

05 Monterey 68 1.6/L4.1 1G450 2604 0515000031 201.010 17-18 $ 14 $ 2,900 $ 2,850 8/3/17 STP $ 276 $ 491 $ 34 $ 361 $ 4,076 276.0 Collision(s) reduced

Near Kellogg, at Maacama Creek. Install temporary rock slope protection (RSP) until water levels recede, then construct permanent bio-armament to strengthen eroded embankment.

Near Cloverdale, at 3.5 miles west of North Cloverdale Boulevard. Repair slipout and construct soldier pile tieback retaining wall.In Sonoma County, on various routes at various locations. In Santa Rosa, on Route 101, from College Avenue to 0.3 mile south of Airport Boulevard (PM 20.7 to PM 26.0); also near Kellogg, on Route 128, from 0.1 west of Franz Valley Road to 0.7 mile east of Foss Hill Road (PM 21.8 to PM 24.7); also in Napa County, on Route 128 from Sonoma County line to Petrified Forest Road (PM 0.0 to PM 3.6); also near Kenwood, on Route 12, from Hoff Road to Madrone Road (PM 25.7 to PM 32.9); also near Sears Point, on Route 37, from 0.1 mile west of Reclamation Road to Sears Point Road (PM 21.8 to PM 24.7). Reconstruct guardrailing, replace roadside elements, and repair roadway.

In Sonoma, Marin, Napa, and Solano Counties, on Routes 12, 29, 37, 80, 101, 580, 680, and 780 at various locations. Repair and replace existing Transportation Management System elements.

Near Lucia, at 0.6 mile south of Limekiln Creek Bridge. Replace culvert.North of Big Sur, from south of Bixby Creek Bridge to south of Rocky Creek Bridge. Widen shoulders and upgrade guardrails.South of Carmel, at seven (7) locations from north of the San Luis Obispo County line to south of Malpaso Creek Bridge. Rehabilitate and/or replace culverts.

In and near Big Sur and Carmel, from Torre Canyon Bridge to San Luis Avenue. Pavement rehabilitation.Near Carmel-By-The Sea, at Garrapata Creek No. 44-0018. Rehabilitate bridge to extend the service life and mitigate corrosion by applying Electrochemical Chloride Extraction (ECE) process and waterproofing to the structure.

Near Big Sur, from 0.2 mile north of Clear Ridge Road to Coast Road. Reconstruct slope washout and install rock slope protection (RSP) on adjacent river bank.

Near Gorda, 0.9 mile north of Villa Creek Bridge to 1.7 miles north of Rain Rocks Sidehill Viaduct. Remove slide debris, reconstruct roadway, and repair drainage systems.

Near Lucia, from 0.1 mile south of Cow Cliffs Sidehill Viaduct to 0.1 mile north of Cow Cliffs Sidehill Viaduct. Remove slide debris, repair rock fall barrier, replace guard railing and repair roadway.

Near Posts, at Pfeiffer Canyon Bridge No. 44-0060. Investigate landslide damaged bridge, construct temporary access, and support geotechnical investigations.

Near Big Sur, from 0.2 mile north of Pfeiffer Big Sur Road to 0.8 mile south of Coast Road. Remove slide debris, reconstruct embankment washouts, repair drainage systems, and reconstruct roadway.

Near Big Sur, from 2.9 miles south of Vicente Creek Bridge to 0.9 mile north of Coast Ridge Road. Remove slide debris, support geotechnical investigations, and repair drainage systems.

Near the cities of Monterey and Salinas, from Route 1 to Spreckels Boulevard. Install Traffic Management System (TMS) elements.Near Pacific Grove, from south of Piedmont Avenue to Scenic Drive. Widen shoulders, install rumble strips, and upgrade guardrail..In and near Monterey, from Piedmont Avenue to 0.1 mile east of Scenic Drive. Pavement overlay and install centerline rumble strips.

05 Monterey 68 1.1/L4.3 1H000 2631 0516000011 201.121 20-21 $ - $ - $ - NH $ 482 $ - $ - $ - $ 482 6.5 Lane mile(s)

05 Monterey 68 11.9 1J140 2714 0517000065 201.130 16-17 $ 10 $ 400 $ 400 3/2/17 NH $ 10 $ 25 $ 15 $ 100 $ 560 1.0 Location(s)

05 Monterey 101 62.1/63.2 0F970 9700 0513000017 201.110 19-20 $ 1,578 $ 7,358 $ - HBRR-S $ 34 $ 2,006 $ 58 $ 1,535 $ 12,569 1.0 Bridge(s)

05 Monterey 101 86.0/95.8 0N200 0064Q 0516000016 201.315 18-19 $ 9 $ 1,500 $ - NH $ 260 $ 1,000 $ 45 $ 420 $ 3,234 11.0 Field element(s)

05 Monterey 101 R41.5/49.8 0T991 2312Y 0516000125 201.015 19-20 $ - $ 816 $ - STP $ - $ 344 $ - $ 483 $ 1,643 2.0 Location(s)

05 Monterey 101 87.3/R91.5 1C890 2474 0513000009 201.122 17-18 $ 95 $ 43,740 $ - NH $ 780 $ 2,060 $ 180 $ 5,324 $ 52,179 17.2 Lane mile(s)

05 Monterey 101 R41.4/R41.8 1C960 2454 0513000019 201.113 17-18 $ 1,007 $ 29,850 $ - HBRR-S $ 2,203 $ 4,875 $ 80 $ 6,840 $ 44,855 2.0 Bridge(s)

05 Monterey 101 53.2 1E051 2470Y 0515000079 201.015 17-18 $ - $ 122 $ 98 1/31/18 STP $ - $ 407 $ 18 $ 246 $ 793 30.0 Collision(s) reduced

05 Monterey 101 73.8/87.3 1F700 2540 0514000055 201.121 18-19 $ 70 $ 19,400 $ - NH $ - $ 2,100 $ 90 $ 2,300 $ 23,960 54.0 Lane mile(s)

05 Monterey 101 R28.0/R30.6 1F740 2546 0514000049 201.122 18-19 $ - $ - $ - NH $ 11 $ 1,820 $ 42 $ - $ 1,873 10.5 Lane mile(s)

05 Monterey 101 R36.9/47.7 1F750 2548 0514000050 201.122 17-18 $ 15 $ 56,260 $ - NH $ - $ 2,382 $ 70 $ 8,177 $ 66,904 17.2 Lane mile(s)

05 Monterey 101 R6.7 1F820 2565 0514000064 201.113 19-20 $ 841 $ 7,734 $ - HBRR-S $ 1,529 $ 1,800 $ 15 $ 2,236 $ 14,155 2.0 Bridge(s)

05 Monterey 101 73.0/96.8 1F900 2571 0514000073 201.235 19-20 $ 456 $ 4,368 $ - NH $ 715 $ 1,216 $ 175 $ 1,355 $ 8,285 52.0 Location(s)

05 Monterey 101 53.9/57.1 1G380 2596 0515000007 201.010 16-17 $ 5 $ 4,190 $ 3,622 3/6/17 STP $ - $ 1,030 $ 56 $ 1,240 $ 6,521 32.0 Collision(s) reduced

05 Monterey 101 R41.6/47.7 1H620 2673 0516000104 201.010 17-18 $ 5 $ 6,510 $ - STP $ - $ 1,415 $ 51 $ 1,834 $ 9,815 41.0 Collision(s) reduced

05 Monterey 101 R91.5/101.3 1H690 2679 0516000140 201.122 21-22 $ - $ - $ - NH $ 4,500 $ - $ - $ - $ 4,500 49.0 Lane mile(s)

05 Monterey 101 R3.1/R5.2 1J040 2705 0517000054 201.999 18-19 $ - $ - $ - ST-CASH $ - $ 480 $ 18 $ - $ 498 3.0 Location(s)

05 Monterey 101 93.5 1J330 2718 0517000088 201.130 16-17 $ 10 $ 500 $ 500 4/12/17 NH $ 15 $ 30 $ 5 $ 100 $ 660 1.0 Location(s)

05 Monterey 156 R1.1/R2.1 0A090 0900A 0513000028 201.112 19-20 $ 467 $ 5,050 $ - HBRR-S $ 70 $ 1,800 $ 130 $ 1,340 $ 8,857 392.0 Linear feet

05 Monterey 183 R2.0/R8.6 1G390 2597 0515000008 201.010 17-18 $ - $ 1,390 $ 1,119 12/1/16 STP $ 280 $ 473 $ 35 $ 297 $ 2,475 23.0 Collision(s) reduced

05 Monterey 198 22.4/22.8 1C660 2420 0512000186 201.010 16-17 $ 51 $ 1,805 $ 1,518 2/27/17 STP $ 650 $ 834 $ 315 $ 584 $ 4,239 20.0 Collision(s) reduced

05 Monterey 198 R0.1/25.8 1H820 2698 0516000165 201.010 17-18 $ - $ 805 $ 581 6/1/17 STP $ - $ 449 $ 33 $ 251 $ 1,538 25.0 Collision(s) reduced

05 Monterey VAR 1C990 2458 0513000022 201.235 17-18 $ 18 $ 3,057 $ 3,100 1/31/18 NH $ 430 $ 935 $ 30 $ 901 $ 5,371 63.0 Location(s)

05 Monterey VAR 1G310 2595 0514000140 201.015 18-19 $ 48 $ 1,852 $ - STP $ 754 $ 1,044 $ 35 $ 552 $ 4,285 1,107.0 Collision(s) reduced

In and near Pacific Grove, from Forest Avenue to Route 1. Upgrade ADA curb ramps, cold plane pavement and place rubberized hot mix asphalt concrete (RHMA).

Near Salinas, at 0.7 mile east of Laureles Grade. Excavate and repair sinkhole, replace culvert, and restore embankment and roadway.Near Soledad, from Route 146 to Front Street at the North Soledad Overhead No. 44-91R. Rehabilitate bridge.In and near Salinas, from 0.4 mile north of Airport Boulevard Overcrossing to 0.3 mile south of San Miguel Canyon Road Overcrossing. Install vehicle detection systems, changeable message signs, cameras, and a vehicle pullout.

In and near King City, from 0.1 mile south of Broadway Street to 0.1 mile north of Broadway Street and from Jolon Road to 0.2 mile north of Jolon Road. Landscape mitigation.

In Salinas, from East Market Street to south of Russell/Espinosa Road. Rehabilitate pavement.In and near King City, at the Salinas River Bridge No 44- 32. Bridge seismic retrofit and bridge rail replacement.In Greenfield, near Maple Avenue. Landscape mitigation for PPNO 2470.In and near Salinas, from north of North Gonzales Overcrossing to East Market Street. Pavement rehabilitation.Near King City, from south of Paris Valley Road Overcrossing to Rancho Undercrossing. Roadway rehabilitation. (G13 Contingency Project)

In and near King City, from 0.2 mile south of Wild Horse Road to Teague Avenue. Rehabilitate pavement.Near Paso Robles, at San Antonio River Bridge No 44-0141L/R. Bridge seismic restoration.In Monterey and San Benito counties from north of North Gonzalez Overcrossing to the Santa Clara County line. Roadside safety improvements.

In and near Greenfield, from Walnut Avenue Overcrossing to 1.2 miles north of Hudson Road. Install median barrier, construct inside shoulder rumble strip and widen shoulder.

Near King City, from 0.3 mile south of Jolon Undercrossing to Teague Avenue. Install median barrier, widen inside shoulders and include rumble strip.

Near Salinas, from 0.4 mile south of Espinosa Road Undercrossing to San Benito County line. Reconstruct embankment, widen shoulders, improve drainage systems, upgrade barrier railing, cold plane pavement, place Rubberized Hot Mix Asphalt concrete (RHMA) and place Hot Mix Asphalt (HMA) to rehabilitate roadway.

At Camp Roberts Safety Roadside Rest Areas; also in San Luis Obispo County on Route 46 at Shandon Safety Roadside Rest Area (PM 49.5). Transportation infrastructure improvement for zero-emission vehicle charging.

Near Prunedale, at 0.4 mile north of Ralph Lane. Repair box culvert and restore roadway.Near Castroville, from Route 183 to Castroville Boulevard. Upgrade bridge railing and widen overhead.In and near Salinas, from Davis Road to Blackie Road. Install centerline/shoulder rumble strips and resurface pavement.Near San Lucas, from 0.2 mile west to 0.2 mile east of North Fork Road. Widen and repave roadway to correct cross-slope.Near San Lucas, from Route 101 to the Fresno County line. Construct ground-in centerline and edge line rumble strips.In and near Carmel, Monterey, and Seaside, on Routes 1 and 68 at various locations. Roadside maintenance safety improvements.In Monterey, Santa Cruz and San Benito counties, on various routes at various locations. Replace and install advance curve warning signs.

05 Monterey Var 1H970 2704 0517000040 201.240 18-19 $ 2,919 $ - $ - NH $ - $ 140 $ 80 $ - $ 3,139 3.0 Location(s)

05 Monterey Var 1H990 2735 0517000047 201.315 19-20 $ 21 $ 3,200 $ - NH $ 585 $ 1,160 $ 20 $ 465 $ 5,451 78.0 Field element(s)

05 San Benito 25 25.9/26.3 1C260 2379 0512000108 201.015 17-18 $ 356 $ 2,750 $ - STP $ 1,044 $ 1,647 $ 242 $ 1,030 $ 7,069 3.0 Collision(s) reduced

05 San Benito 25 R49.9/R52.2 1F430 2514 0513000151 201.015 17-18 $ 208 $ 6,720 $ - STP $ 284 $ 1,055 $ 227 $ 741 $ 9,235 3.0 Collision(s) reduced

05 San Benito 25 18.8/19.1 1H810 2697 0516000164 201.010 19-20 $ 363 $ 4,265 $ - STP $ 1,181 $ 1,756 $ 345 $ 1,506 $ 9,416 14.0 Collision(s) reduced

05 San Luis Obispo 1 32.6 0L721 0072 0515000097 201.110 19-20 $ 906 $ 5,200 $ - HBRR-S $ 1,424 $ 2,300 $ 275 $ 2,400 $ 12,505 1.0 Bridge(s)

05 San Luis Obispo 1 34.5 0L722 0072A 0515000098 201.110 19-20 $ 450 $ 4,200 $ - HBRR-S $ 1,399 $ 1,900 $ 200 $ 1,900 $ 10,049 1.0 Bridge(s)

05 San Luis Obispo 1 34.5/44.4 1G140 2587 0514000111 201.121 17-18 $ 10 $ 14,469 $ - NH $ - $ 1,194 $ 30 $ 2,157 $ 17,860 25.6 Lane mile(s)

05 San Luis Obispo 1 10.0/16.8 1G980 2630 0516000009 201.121 21-22 $ - $ - $ - NH $ 1,156 $ - $ - $ - $ 1,156 13.5 Lane mile(s)

05 San Luis Obispo 1 28.1 1J360 2724 0517000091 201.130 16-17 $ 10 $ 400 $ 400 4/6/17 NH $ 10 $ 25 $ 5 $ 100 $ 550 1.0 Location(s)

05 San Luis Obispo 1 64.0/R66.9 49282 4928Z 0515000030 201.150 17-18 $ - $ 3,843 $ - NH $ - $ 1,013 $ 57 $ 1,376 $ 6,289 1.0 Location(s)

05 San Luis Obispo 1 R66.9/R67.2 49283 4928W 0517000044 201.150 16-17 $ - $ 180 $ 180 1/17/17 NH $ - $ 32 $ - $ 369 $ 581 1.0 Location(s)

05 San Luis Obispo 1 R66.9/R67.2 49284 4928X 0517000045 201.150 18-19 $ - $ 140 $ - NH $ - $ 110 $ - $ 229 $ 479 1.0 Location(s)

05 San Luis Obispo 1 R66.9/R67.2 49285 4928Y 0517000046 201.150 19-20 $ 11 $ 7,464 $ - NH $ - $ 1,057 $ 56 $ 2,424 $ 11,012 1.0 Location(s)

05 San Luis Obispo 41 14.2/15.9 1F630 2532 0514000040 201.361 18-19 $ 679 $ 3,550 $ - NH $ 827 $ 1,333 $1,082 $ 1,141 $ 8,612 126.0 Curb ramp(s)

05 San Luis Obispo 41 43.8/50.4 1H300 2652 0516000059 201.010 17-18 $ - $ 416 $ 299 2/27/17 STP $ - $ 269 $ 19 $ 125 $ 829 7.0 Collision(s) reduced

05 San Luis Obispo 41 6.0 1H760 2686 0516000149 201.130 16-17 $ 20 $ 1,500 $ 1,500 1/17/17 NH $ 30 $ 70 $ 15 $ 300 $ 1,935 1.0 Location(s)

05 San Luis Obispo 46 R17.2/R17.6 1H930 2701 0517000017 201.010 19-20 $ 47 $ 5,549 $ - STP $ - $ 1,895 $ 105 $ 1,806 $ 9,402 14.0 Collision(s) reduced

05 San Luis Obispo 58 3.1 0L723 0072B 0515000099 201.110 19-20 $ 308 $ 5,987 $ - HBRR-S $ 1,419 $ 2,500 $ 210 $ 2,900 $ 13,324 1.0 Bridge(s)

05 San Luis Obispo 101 63.5/65.2 0G041 0040C 0515000019 201.120 18-19 $ - $ 270 $ - NH $ - $ 223 $ 28 $ 479 $ 1,000 8.0 Lane mile(s)

05 San Luis Obispo 101 31.5/59.1 0N220 4022 0516000007 201.315 20-21 $ - $ - $ - NH $ 380 $ - $ - $ - $ 380 107.0 Field element(s)

05 San Luis Obispo 101 16.4 1C370 2387 0512000135 201.111 17-18 $ 275 $ 2,442 $ - HBRR-S $ 930 $ 1,116 $ 185 $ 846 $ 5,794 1.0 Bridge(s)

05 San Luis Obispo 101 1F370 2508 0513000135 201.015 19-20 $ 7 $ 3,800 $ - STP $ 834 $ 970 $ 92 $ 843 $ 6,546 33.0 Collision(s) reduced

05 San Luis Obispo 101 36.6/55.7 1F490 2518 0514000002 201.015 19-20 $ 50 $ 2,687 $ - STP $ 395 $ 1,097 $ 50 $ 805 $ 5,084 29.0 Collision(s) reduced

In Santa Barbara, San Luis Obispo, Monterey and San Benito counties, at various locations. Advance mitigation banking credits.In various counties, on various routes, and at various locations. Replace and upgrade existing detection field elements for the Traffic Management System (TMS).

Near Hollister, from 0.1 mile south of La Gloria Road to 0.2 mile north of La Gloria Road. Realign roadway.In and near Hollister, from Sunnyslope/Tres Pinos Road to San Felipe Road. Roadway safety improvements.Near Pinnacles National Park, from 0.7 miles north of San Benito Lateral/Old Hernandez Road to 2.4 miles south of Route 146. Improve curve and flatten slope.

In Morro Bay, at Toro Creek Bridge. Replace bridge.Near Morro Bay, at Old Creek Bridge No. 05-49-0070R. Replace bridge.In and near Cayucos, from Old Creek Bridge to north of Harmony Valley Road. Rehabilitate pavement and construct shoulders on ramps.In and near Pismo Beach, from Gracia Way to North Pismo (Route 101/Route 1) Separation. Upgrade ADA curb ramps, cold plane pavement and place rubberized hot mix asphalt concrete (RHMA).

Near Morro Bay, at 0.2 mile north of South Bay Boulevard. Repair sinkhole, replace culvert, and restore roadway.Near San Simeon, from Piedras Blancas Lighthouse Road to Arroyo De La Cruz Bridge. On-site landscape mitigation for PPNO 4928A.Near San Simeon, from the Arroyo de la Cruz Bridge to 0.3 mile north of the Arroyo de la Cruz Bridge. Native seed collection and propagation.Near San Simeon, from the Arroyo de la Cruz Bridge to 0.3 mile north of the Arroyo de la Cruz Bridge. Plant propagation.Near San Simeon, from the Arroyo de la Cruz Bridge to 0.3 mile north of the Arroyo de la Cruz Bridge. Planting, wetland and California Red-legged Frog mitigation.

In Atascadero, from San Gabriel Road to Route 101 Southbound ramps. Improve and construct new ADA accessible pedestrian pathways and install Accessible Pedestrian Signal (APS) systems.

Near Cholame, from East Junction Route 46 to the Kern County line. Construct centerline rumble strip and replace striping and pavement markers.

Near Atascadero, at 1.3 miles south of Cerro Alto Road. Remove slide debris and repair rock netting.

Near Paso Robles, at Route 46 West intersection with Vineyard Drive. Construct roundabout.

Near Santa Margarita, at Trout Creek Bridge No. 05-49-0091. Replace bridge.In San Luis Obispo County near Paso Robles from 0.1 mile south to 0.1 mile north of San Marcos Creek Bridge and from 0.1 mile south to 0.1 mile north of South San Miguel Undercrossing. Landscape mitigation.

In San Luis Obispo County, from 0.3 mile north of Reservoir Canyon Road to 0.3 mile north of North Paso Robles Overhead at various locations. Install vehicle detection systems, changeable message signs, cameras, and loop detectors.

In Pismo Beach, at Pismo Creek Bridge No. 49-0015K. Scour prevention.In the city of San Luis Obispo, from north of Marsh Street Bridge to Broad Street; also in Atascadero on Route 41 from Old Morro Road to Atascadero Creek Bridge (PM 12.5/13.3). Upgrade highway safety features.

In and near Atascadero, from Santa Margarita Creek to South Paso Robles Overhead. Improve clear recovery and install barrier.

05 San Luis Obispo 101 51.5/58.8 1G770 2613 0515000100 201.010 17-18 $ - $ 393 $ 302 6/15/17 STP $ - $ 352 $ 25 $ 160 $ 930 187.0 Collision(s) reduced

05 Santa Barbara 1 15.6 0A050 1501 0500000007 201.111 17-18 $ 195 $ 6,500 $ - HBRR-S $ 2,445 $ 2,819 $ 139 $ 2,000 $ 14,098 1.0 Bridge(s)

05 Santa Barbara 1 R0.0/19.3 1F710 2542 0514000054 201.121 17-18 $ - $ 14,229 $ 14,209 12/6/17 NH $ - $ 950 $ 87 $ 1,742 $ 17,008 42.6 Lane mile(s)

05 Santa Barbara 1 R36.4/49.2 1G130 2586 0514000110 201.121 19-20 $ 795 $ 9,583 $ - NH $ 515 $ 916 $ 104 $ 905 $ 12,818 18.6 Lane mile(s)

05 Santa Barbara 101 22.3/23.0 0G071 0707Y 0513000101 201.150 17-18 $ - $ 658 $ 632 12/6/17 NH $ - $ 369 $ 40 $ 645 $ 1,712 2.0 Bridge(s)

05 Santa Barbara 101 45.5 0K330 3330 0512000068 201.151 19-20 $ 146 $ 3,600 $ - NH $ 780 $ 1,430 $ 245 $ 1,111 $ 7,312 1.0 Drainage system(s)

05 Santa Barbara 101 45.7/46.4 0T631 2292Y 0515000084 201.010 16-17 $ - $ 220 $ 240 5/18/16 STP $ - $ 70 $ 5 $ 320 $ 615 127.0 Collision(s) reduced

05 Santa Barbara 101 2.6/9.2 1C820 2426 0512000236 201.120 19-20 $ 5,560 $ - $ - NH $ 9,200 $ 9,530 $ 940 $ - $ 25,230 26.4 Lane mile(s)

05 Santa Barbara 101 17.2/45.9 1C970 2456 0513000020 201.235 16-17 $ 10 $ 1,890 $ 2,257 5/17/17 NH $ 280 $ 770 $ 12 $ 800 $ 3,762 120.0 Location(s)

05 Santa Barbara 101 46.5/68.9 1E000 2460 0513000023 201.235 19-20 $ 3 $ 2,578 $ - NH $ 520 $ 840 $ 34 $ 698 $ 4,673 56.0 Location(s)

05 Santa Barbara 101 46.9 1E010 2462 0513000024 201.235 18-19 $ 5 $ 2,800 $ - NH $ 240 $ 1,060 $ 10 $ 1,180 $ 5,295 2.0 Location(s)

05 Santa Barbara 101 11.0 1E040 2468 0513000027 201.361 19-20 $ 970 $ 2,904 $ - NH $ 70 $ 1,875 $ 303 $ 1,136 $ 7,258 2.0 Curb ramp(s)

05 Santa Barbara 101 70.9 1F500 2522 0514000003 201.110 19-20 $ 100 $ 7,000 $ - HBRR-S $ 650 $ 1,800 $ 250 $ 2,100 $ 11,900 2.0 Bridge(s)

05 Santa Barbara 101 56.0 1F790 2561 0514000061 201.112 19-20 $ 99 $ 5,304 $ - HBRR-S $ 910 $ 1,789 $ 211 $ 1,218 $ 9,531 773.0 Linear feet

05 Santa Barbara 101 21.6 1H430 2649 0516000073 201.110 21-22 $ - $ - $ - HBRR-S $ 1,400 $ - $ - $ - $ 1,400 2.0 Bridge(s)

05 Santa Barbara 101 12.3/12.4 1H740 2684 0516000147 201.130 16-17 $ 10 $ 1,000 $ 1,000 12/13/16 NH $ 20 $ 40 $ 5 $ 200 $ 1,275 1.0 Location(s)

05 Santa Barbara 101 46.2/R52.3 1H860 2700 0517000002 201.121 21-22 $ - $ - $ - NH $ 2,160 $ - $ - $ - $ 2,160 27.8 Lane mile(s)

05 Santa Barbara 135 R7.2 1F830 2567 0514000065 201.113 19-20 $ 132 $ 1,978 $ - HBRR-S $ 676 $ 1,228 $ 23 $ 640 $ 4,677 1.0 Bridge(s)

05 Santa Barbara 135 11.7/17.8 1G970 2629 0516000008 201.121 20-21 $ - $ - $ - NH $ - $ 1,869 $1,832 $ - $ 3,701 24.4 Lane mile(s)

05 Santa Barbara 154 R7.8/R8.3 0T001 2267Y 0513000169 201.010 16-17 $ - $ 135 $ 151 3/15/17 STP $ - $ 222 $ - $ 478 $ 835 0.0 Collision(s) reduced

05 Santa Barbara 154 R2.6 1C410 2391 0512000139 201.119 19-20 $ 56 $ 922 $ - HBRR-S $ 1,125 $ 1,055 $ 50 $ 350 $ 3,558 1.0 Bridge(s)

05 Santa Barbara 154 R31.8/R32.1 1H450 2651 0516000075 201.110 21-22 $ - $ - $ - HBRR-S $ 928 $ - $ - $ - $ 928 2.0 Bridge(s)

05 Santa Barbara 192 15.4/15.6 39610 0335 0500000514 201.111 19-20 $ 905 $ 6,845 $ - HBRR-S $ 960 $ 4,266 $ 692 $ 1,310 $ 14,978 1.0 Bridge(s)

05 Santa Barbara 217 0.8/1.4 1C360 2386 0512000134 201.110 21-22 $ 158 $ - $ - HBRR-S $ 3,887 $ 3,459 $ 156 $ - $ 7,660 1.0 Bridge(s)

05 Santa Barbara 246 1H010 2632 0516000012 201.121 21-22 $ 350 $ - $ - NH $ - $ 3,630 $2,460 $ - $ 6,440 9.0 Lane mile(s)

05 Santa Barbara VAR 1G300 2594 0514000138 201.015 18-19 $ 48 $ 2,084 $ - STP $ 780 $ 1,125 $ 41 $ 629 $ 4,707 1,277.0 Collision(s) reduced

In and near Paso Robles, from Las Tablas Road to North Paso Robles Overhead. Construct rumble strips and place fog seal, striping and pavement markers to reduce the number of roadway departure collisions.

Near Lompoc, at the Salsipuedes Creek Bridge No. 51-0095. Replace Bridge (scour mitigation).In and near Lompoc, from Las Cruces Separation to Route 246. Pavement rehabilitation.

Near Santa Maria, from Solomon Road to Route 166. Pavement rehabilitation.In Goleta, from 0.2 mile east to 0.7 mile west of the Fairview Avenue Overcrossing. Landscape mitigation for PPNO 0707.Near Gaviota State Park. Rehabilitate and upgrade existing drainage system.In Gaviota, from 0.8 mile north of Beckstead Overcrossing to 0.8 mile south of Gaviota Gorge Tunnel. Planting mitigation.In Carpinteria, from Casitas Pass Overcrossing to 0.2 miles north of Sheffield Avenue Undercrossing. Rehabilitate roadway. (G13 Contingency Project)

In Santa Barbara County, at various locations from 0.6 mile north of Las Positas Road Overcrossing to 1.3 mile south of Gaviota Tunnel. Roadside safety In and near Buellton, from Gaviota State Park Entrance to north of Alisos Canyon Road. Roadside safety improvements.Near Gaviota, at the Gaviota Safety Roadside Rest Area. Upgrade wastewater system.In the city of Santa Barbara, at Butterfly Lane Pedestrian Undercrossing. Construct pedestrian ramps and sidewalks to comply with ADA standards.

In Los Alamos, at Route 101/135 Separation No. 51-0073L/R. Replace bridge decks.Near Buellton, at Nojoqui Creek Bridge No. 51-0018L/R. Bridge rail replacement and widening.In Goleta, at San Jose Creek Bridge No. 51-0163L/R. Replace bridges to maintain standards of safety and reliability.In the city of Santa Barbara, from Sycamore Creek Bridge to 0.1 mile north of Sycamore Creek Bridge. Reconstruct fire damaged drainage system.

Near Gaviota, from 1.0 mile south of Gaviota Gorge Tunnel to 0.1 mile north of Nojoqui Creek Bridge. Upgrade guard railing, widen shoulders, place High Friction Surface Treatment (HSFT), construct retaining walls, cold plane pavement, Place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA).

Near Los Alamos, at San Antonio Creek Bridge No. 51-0006. Bridge seismic restoration.In and near Santa Maria, from Lakeview Road to Route 101. Upgrade ADA curb ramps, cold plane pavement, and place rubberized hot mix asphalt concrete (RHMA).

Near Santa Ynez, at and near Route 246 intersection. Landscape mitigation.Near Los Olivos, at Alamo Pintado Pedestrian Bridge No. 51-0076Y. Remove bridge.In the city of Santa Barabara, at La Colina Road Undercrossing (UC) No. 51-0256 (PM R31.82) and at Primavera Road UC No. 51-0257 (PM R32.07). Upgrade bridge railing and reconstruct abutment for bridge rehabilitation.

Near Carpinteria, at Arroyo Parida Creek Bridge No. 51-113. Replace bridge (scour).Near Goleta, from 0.2 mile south to 0.4 mile north of San Jose Creek Bridge No. 51-0217. Replace bridge. (G13 Contingency Project)In Lompoc, at combined segment of Route 246 and Route 1; on Route 246, from 0.3 mile west of V Street to H Street; also on Route 1, from H Street to 12th Street. Upgrade ADA curb ramps, cold plane pavement and place hot mix asphalt concrete (HMA).

In Santa Barbara and San Luis Obispo counties, on various routes at various locations. Replace and install advance curve warning signs.

05 Santa Barbara Var 1J100 2710 0517000061 201.130 16-17 $ 10 $ 1,200 $ 1,200 3/2/17 NH $ 10 $ 20 $ 5 $ 200 $ 1,445 7.0 Location(s)

05 Santa Cruz 1 31.9/35.7 0J200 1967 0512000069 201.151 21-22 $ - $ - $ - NH $ 964 $ - $ - $ - $ 964 4.0 Drainage system(s)

05 Santa Cruz 1 10.2/17.5 1C850 2432 0512000240 201.121 18-19 $ 19 $ 14,952 $ - NH $ 606 $ 1,030 $ 10 $ 1,082 $ 17,699 32.0 Lane mile(s)

05 Santa Cruz 1 R0.0/R8.1 1C980 2452 0513000021 201.235 18-19 $ 5 $ 2,900 $ - NH $ 652 $ 1,097 $ 49 $ 1,225 $ 5,928 69.0 Location(s)

05 Santa Cruz 1 1F520 2585 0514000005 201.112 18-19 $ - $ 4,167 $ - HBRR-S $ - $ 902 $ 47 $ 1,059 $ 6,175 1,375.0 Linear feet

05 Santa Cruz 1 16.7/17.0 1H060 2636 0516000020 201.010 19-20 $ 658 $ 5,811 $ - STP $ 792 $ 1,930 $ 217 $ 1,973 $ 11,381 140.0 Collision(s) reduced

05 Santa Cruz 1 13.3 1H480 2736 0516000079 201.119 21-22 $ - $ - $ - HBRR-S $ 1,591 $ - $ - $ - $ 1,591 1.0 Bridge(s)

05 Santa Cruz 1 R4.0/R4.3 1H700 2680 0516000143 201.130 16-17 $ 10 $ 750 $ 750 7/25/16 NH $ 15 $ 75 $ 10 $ 250 $ 1,110 1.0 Location(s)

05 Santa Cruz 1 R3.7/R3.9 1H730 2683 0516000146 201.130 16-17 $ 20 $ 2,000 $ 2,000 12/13/16 NH $ 20 $ 40 $ 20 $ 300 $ 2,400 1.0 Location(s)

05 Santa Cruz 9 22.1/23.8 1C650 2418 0512000185 201.015 17-18 $ 20 $ 7,658 $ - STP $ 1,938 $ 1,842 $ 63 $ 1,687 $ 13,208 73.0 Collision(s) reduced

05 Santa Cruz 9 0.1/7.5 1F920 2569 0514000075 201.335 19-20 $ 86 $ 2,024 $ - NH $ 745 $ 1,192 $1,287 $ 812 $ 6,146 6.3 Acre(s) treated/pollutant

05 Santa Cruz 9 13.6/15.5 1H470 2655 0516000078 201.110 21-22 $ - $ - $ - HBRR-S $ 2,692 $ - $ - $ - $ 2,692 2.0 Bridge(s)

05 Santa Cruz 9 11.0 1J400 2730 0517000095 201.130 17-18 $ 30 $ 4,400 $ 4,400 9/6/17 NH $ 75 $ 125 $ 20 $ 400 $ 5,050 1.0 Location(s)

05 Santa Cruz 17 0.7/1.4 0Q601 1989Y 0514000145 201.335 18-19 $ - $ 507 $ - NH $ - $ 500 $ 18 $ 537 $ 1,562 10.0 Acre(s) treated/pollutant

05 Santa Cruz 17 0.2/0.5 1C670 2422 0512000194 201.010 17-18 $ 181 $ 5,713 $ - STP $ 1,101 $ 1,451 $ 198 $ 1,413 $ 10,057 100.0 Collision(s) reduced

05 Santa Cruz 17 6.0/12.6 1F760 2538 0514000051 201.121 17-18 $ 7 $ 15,381 $ - NH $ - $ 1,932 $ 64 $ 1,660 $ 19,044 26.0 Lane mile(s)

05 Santa Cruz 17 9.4/9.6 1G260 2593 0514000131 201.240 19-20 $ 138 $ - $ - NH $ 738 $ 2,013 $ 226 $ - $ 3,115 1.0 Location(s)

05 Santa Cruz 17 5.9/12.6 1J080 2708 0517000059 201.130 16-17 $ 20 $ 500 $ 500 2/1/17 NH $ 5 $ 5 $ 2 $ 90 $ 622 1.0 Location(s)

05 Santa Cruz 17 9.8/10.8 1J120 2712 0517000063 201.130 16-17 $ 10 $ 500 $ 500 3/2/17 NH $ 25 $ 50 $ 25 $ 150 $ 760 1.0 Location(s)

05 Santa Cruz 129 1.8/9.5 1F030 2476 0513000037 201.010 16-17 $ 61 $ 5,508 $ 3,814 10/28/16 STP $ - $ 2,115 $ 579 $ 1,424 $ 9,687 131.0 Collision(s) reduced

05 Santa Cruz 129 3.0/3.5 1F350 2506 0513000103 201.010 17-18 $ 457 $ 2,700 $ - STP $ 587 $ 1,132 $ 401 $ 757 $ 6,034 31.0 Collision(s) reduced

05 Santa Cruz 129 1.4 1G990 2625 0516000010 201.010 19-20 $ 749 $ 4,481 $ - STP $ 782 $ 1,341 $ 441 $ 1,335 $ 9,129 46.0 Collision(s) reduced

In Santa Barbara County, on Route 101 and Route 154 at various locations. Remove slide debris, stabilize slope, reconstruct rock nets, repair rock fall barriers, and repair roadway.

Near Davenport, from 1.4 miles north of Swanton Road to 0.6 mile south of Waddell Creek. Replace and upgrade existing corrugated metal pipe (CMP) culverts with reinforced concrete pipe (RCP) culverts.

Near the city of Santa Cruz, from North Aptos Underpass to Route 9. Rehabilitate pavement.In Santa Cruz and Monterey Counties, from south of Salinas Road to south of Larkin Valley Road Undercrossing. Construct maintenance vehicle pull outs, repairing guardrail, improve gate access and relocate irrigation equipment.

Near the city of Santa Cruz, on Routes 1 and 17 at various locations. Bridge rail replacement and upgrades.In and near Santa Cruz, from 0.1 mile south of Route 1/17 Separation to 0.4 mile south of Pasatiempo Overcrossing; also on Route 17 (PM 0.0/0.3). Realign southbound Route 17 connector to southbound Route 1.

In Capitola, at Soquel Creek Bridge No. 36-0013. Place Rock Slope Protection (RSP) to protect bridge foundation.Near Watsonville, at Buena Vista Drive Undercrossing. Repair sinkholes, drainage system and install erosion control measures.Near Watsonville, from 0.4 mile south of Buena Vista Avenue to 0.2 mile south of Buena Vista Drive. Reconstruct embankment and failed drainage systems.

In Castle Rock State Park, from 5 miles south to 3.3 miles south of Route 35. Construct centerline rumble strips, widen shoulders, and replace guardrail and super elevation corrections.

In and near the city of Santa Cruz, from Route 1 to north of Fall Creek Drive. Stormwater improvements.Near Boulder Creek, at San Lorenzo River Bridge No. 36 -0052 (PM 13.61) and Kings Creek Bridge No. 36-0054 (PM 15.49). Replace bridges to maintain standards of safety and reliability.

Near Brookdale, at 0.1 mile south of Western Avenue. Construct sidehill viaduct structure.In Santa Cruz, from 0.7 mile north of Route 1/17 Separation to Beulah Park Undercrossing. Landscape mitigation for EA 0Q600.Near the city of Santa Cruz, from southbound exit ramp to Route 1 to entrance ramp from Pasatiempo Drive. Widen shoulder and construct retaining wall.

In and near Scotts Valley, from north of Santas Village Road to the Santa Clara County line. Pavement rehabilitation.Near Scotts Valley, from 0.06 miles south of Laurel Road to 0.25 miles north of Laurel Road. Construct wildlife undercrossing. Funding for PA&ED, PS&E and R/W only. Local contributions to fund remaining components.

In and near Scotts Valley, from 0.4 mile east of Granite Creek Road to Santa Clara County line. Remove slide debris, stabilize slope, repair rock net/debris barrier, and repair roadway.

Near Scotts Valley, from 0.4 mile north of Laurel Drive to 0.2 mile north of Glenwood Drive. Reconstruct slipout embankment, stabilize roadway shoulder with 8-inchmicro piles and repair drainage.

Near Watsonville, from east of Lakeview Road to west of Old Chittenden Road; also in San Benito county from the Santa Cruz/San Benito county line to School Road (PM 0.0/0.4). Place open graded friction pavement and upgrade guardrail.

Near Watsonville, realign Carlton Road. Construct a new intersection and a left-turn channelization.

Near Watsonville, at Lakeview Road. Construct roundabout and improve street lighting.

05 Santa Cruz 129 8.2 1J070 2707 0517000058 201.130 16-17 $ 10 $ 500 $ 500 2/1/17 NH $ 10 $ 10 $ 2 $ 75 $ 607 1.0 Location(s)

05 Santa Cruz 152 1.3/R2.0 1E020 2464 0513000025 201.378 17-18 $ 195 $ 1,709 $ - NH $ 350 $ 716 $ 331 $ 467 $ 3,768 55.0 Structure(s)

05 Santa Cruz 152 3.7/8.3 1G400 2598 0515000009 201.010 16-17 $ - $ 463 $ 270 5/18/16 STP $ - $ 452 $ 33 $ 218 $ 1,166 13.0 Collision(s) reduced

05 Santa Cruz 152 4.1/8.3 1J090 2709 0517000060 201.130 16-17 $ 10 $ 500 $ 500 2/8/17 NH $ 10 $ 10 $ 5 $ 120 $ 655 3.0 Location(s)

05 Santa Cruz VAR 1G160 2590 0514000118 201.361 18-19 $ 11 $ 1,700 $ - NH $ 272 $ 883 $ 20 $ 486 $ 3,372 176.0 Curb ramp(s)

05 Santa Cruz VAR 1H790 2689 0516000152 201.130 16-17 $ 40 $ 2,000 $ 2,000 2/1/17 NH $ 30 $ 100 $ 10 $ 750 $ 2,930 14.0 Location(s)

06 Fresno 5 44.4/45.4 0S830 6725 0615000046 201.110 19-20 $ 79 $ - $ - HBRR-S $ 850 $ 1,900 $ 4 $ - $ 2,833 2.0 Bridge(s)

06 Fresno 5 0.0/1.7 0T230 6736 0615000040 201.235 18-19 $ 102 $ 4,350 $ - NH $ 122 $ 783 $ 4 $ 1,000 $ 6,361 2.0 Location(s)

06 Fresno 5 21.0/31.0 0U080 6753 0615000209 201.121 17-18 $ 20 $ 21,000 $ - NH $ 147 $ 600 $ 11 $ 1,012 $ 22,790 40.0 Lane mile(s)

06 Fresno 5 5.5/8.8 0W100 6858 0617000159 201.130 16-17 $ - $ 500 $ 500 2/1/17 NH $ - $ - $ - $ 225 $ 725 1.0 Location(s)

06 Fresno 5 24.0/30.0 0W300 6864 0617000206 201.130 16-17 $ - $ 750 $ 750 3/14/17 NH $ - $ - $ - $ 275 $ 1,025 1.0 Location(s)

06 Fresno 5 39.5/48.5 0W320 6872 0617000233 201.130 16-17 $ - $ 800 $ 800 4/11/17 NH $ - $ - $ - $ 275 $ 1,075 1.0 Location(s)

06 Fresno 33 69.3/70.9 0T250 6747 0615000043 201.361 18-19 $ 273 $ 2,085 $ - NH $ 221 $ 780 $ 240 $ 475 $ 4,074 29.0 Curb ramp(s)

06 Fresno 33 0U000 6773 0615000296 201.119 20-21 $ - $ - $ - HBRR-S $ 538 $ - $ - $ - $ 538 4.0 Bridge(s)

06 Fresno 41 0Q630 6697 0613000151 201.235 15-16 $ 30 $ 2,834 $ 3,188 5/18/16 NH $ 247 $ 734 $ 26 $ 576 $ 4,447 20.0 Location(s)

06 Fresno 41 R22.0/R22.6 0U160 6771 0615000310 201.119 18-19 $ 291 $ 7,050 $ - HBRR-S $ 237 $ 750 $ 20 $ 1,574 $ 9,922 2.0 Bridge(s)

06 Fresno 41 R20.0/33.4 0V780 6881 0616000234 201.315 20-21 $ - $ - $ - NH $ 619 $ - $ - $ - $ 619 89.0 Field element(s)

06 Fresno 43 0.0/7.3 0V980 6886 0617000082 201.010 18-19 $ - $ 1,026 $ - STP $ - $ 750 $ 22 $ 202 $ 2,000 16.0 Collision(s) reduced

06 Fresno 99 22.7/28.1 0K290 6744 0600020018 201.315 16-17 $ 104 $ 5,893 $ 5,212 5/17/17 NH $ 755 $ 1,062 $ 522 $ 1,288 $ 9,624 5.0 Field element(s)

06 Fresno 99 R0.9/R5.0 0S460 6727 0615000038 201.122 18-19 $ 25 $ 24,086 $ - NH $ 577 $ 1,496 $ 43 $ 2,705 $ 28,932 8.1 Lane mile(s)

Near Watsonville, at 1.0 mile east of Rogge Lane. Remove slide debris, reconstruct embankment washout, repair damaged drainage system, replace damaged guardrail, and reconstruct roadway.

In Watsonville, from Wagner Avenue to Holohan Road. Construct pedestrian infrastructure.Near Watsonville, from the Casserly/Carlton Road intersection to the Santa Clara County line. Construct rumble strip and place pavement striping and marking.

Near Watsonville, 0.4 mile east of Carlton Road to Santa Clara County line. Remove slide debris, stabilize slope, and repair drainage system.In Santa Cruz County, on Routes 1, 9, 17, 129, and 152 at various locations. Install Accessible Pedestrian Signals (APS).In Santa Cruz County, at various locations on Route 1, 9, 35, and 236. Remove slide debris, reconstruct embankment washouts, repair guardrails and drainage systems, and reconstruct roadway.

Near Mendota, at Tumey Gulch Bridge No. 42-0246L/R. Replace bridge. (G13 Contingency Project)Near Coalinga and Kettleman City, at the Coalinga-Avenal Safety Roadside Rest Area from Kings County line to Quist Undercrossing; also in Kings County, from 0.2 mile south of Avenal Cutoff Road to Fresno County line (PM 26.4/26.7). Repair aging water and wastewater systems.

Near Mendota, from Tuolumne Avenue Overcrossing to north of Route 33. Pavement rehabilitation.Near Avenal, from Jayne Avenue to Phelps Equipment Undercrossing. Replace water-saturated failed concrete pavement slabs. A separate overlay project will address long term needs.

Near Coalinga, from 9.1 miles north of Route 198 to 8.4 miles south of W. Kamm Avenue. Remove and replace water saturated failed concrete pavement slabs with full-depth asphalt concrete.

Near Coalinga, from 1.1 miles north of W. Kamm Avenue to 0.5 mile south of W. Panoche Road. Remove and replace failed pavement.In Firebaugh, from south of Morris Kyle Drive to Clyde Fannon Drive. Construct continuous accessible pedestrian path to comply with ADA standards.

In Fresno County, at Colony Main Canal Bridge No. 42-0031, Helm Canal Bridge No. 42-0033 and Poso Canal Bridge No. 42-0034; also in Kern County on Route 58 at Main Drain Canal Bridge No. 50-0013. Repair erosion, clean and encase piers in concrete.

In Fresno and Madera Counties at various locations in and near the city of Fresno. Roadside safety improvementsIn Fresno, at the South Fresno Viaduct No. 42-0226L/R. Replace failed joint seals and rehabilitate worn bridge decks with polyester concrete overlay

In and near the city of Fresno, from 0.1 mile south of North Avenue to the Madera County line; also on Route 99 (PM 19.36 to PM 21.9), Route 168 (PM R0.2L/R to PM R9.7), and Route 180 (PM R58.55 to PM R59.85). Replace and upgrade existing communication elements for the Traffic Management System (TMS).

Near Selma, from Kings County Line to East Mountain View Avenue. Construct rumble strips and update pavement delineation.In the city of Fresno, from Belmont Avenue to Shaw Avenue. Install ramp meters and construct auxiliary lanes.In and near Kingburg, from Route 201 to south of Second Street. Roadway rehabilitation.

06 Fresno 99 0.0/14.9 0T360 6738 0615000066 201.235 17-18 $ 10 $ 3,189 $ - NH $ 192 $ 720 $ 2 $ 540 $ 4,653 31.0 Location(s)

06 Fresno 99 R5.7/11.1 0U420 6800 0616000004 201.120 19-20 $ 56 $ 86,000 $ - NH $ 845 $ 2,000 $ 24 $11,000 $ 99,925 32.4 Lane mile(s)

06 Fresno 99 0V910 6875 0617000062 201.999 17-18 $ 46 $ 4,000 $ - ST-CASH $ - $ 600 $ 50 $ 600 $ 5,296 10.0 Location(s)

06 Fresno 99 0V930 6883 0617000067 201.315 19-20 $ 119 $ 3,036 $ - NH $ 800 $ 1,017 $ 450 $ 1,056 $ 6,478 20.0 Field element(s)

06 Fresno 99 R0.9/6.5 0W000 6852 0617000100 201.130 16-17 $ - $ 900 $ 900 11/14/16 NH $ - $ 25 $ - $ 50 $ 975 1.0 Location(s)

06 Fresno 168 R0.0/R11.7 0E350 1772 0612000136 201.235 16-17 $ 1 $ 2,700 $ 3,173 3/15/17 NH $ 107 $ 830 $ 1 $ 490 $ 4,129 114.0 Location(s)

06 Fresno 168 R36.0/65.4 0H11U 6326 0616000132 201.151 17-18 $ 690 $ 6,000 $ 2,700 1/31/18 NH $ 1,050 $ 506 $ 590 $ 1,370 $ 10,206 59.0 Drainage system(s)

06 Fresno 168 45.8/65.9 0U090 6754 0615000210 201.121 17-18 $ 35 $ 12,700 $ 10,500 1/31/18 NH $ 512 $ 1,035 $ 6 $ 1,125 $ 15,413 40.2 Lane mile(s)

06 Fresno 168 18.6/T25.5 0U450 6809 0615000298 201.121 19-20 $ 5 $ 5,000 $ - NH $ 750 $ 1,230 $ 1 $ 1,140 $ 8,126 14.6 Lane mile(s)

06 Fresno 168 11.7/R36.2 0V320 6866 0616000136 201.010 18-19 $ 1 $ 742 $ - STP $ 220 $ 635 $ 1 $ 404 $ 2,003 26.0 Collision(s) reduced

06 Fresno 168 49.3/49.5 0W620 6890 0618000022 201.130 17-18 $ - $ 550 $ 550 7/26/17 NH $ - $ - $ - $ 300 $ 850 1.0 Location(s)

06 Fresno 180 26.9 0Q510 6680 0613000189 201.119 16-17 $ 14 $ 1,785 $ 689 1/17/17 HBRR-S $ 482 $ 861 $ 11 $ 650 $ 3,803 1.0 Bridge(s)

06 Fresno 180 92.2 0Q900 6766 0614000047 201.112 18-19 $ 4 $ 3,153 $ - HBRR-S $ 480 $ 923 $ 10 $ 814 $ 5,384 535.0 Linear feet

06 Fresno 180 77.2 0U120 6751 0615000207 201.110 18-19 $ - $ 1,200 $ 1,200 10/19/16 HBRR-S $ - $ - $ - $ 400 $ 1,600 1.0 Bridge(s)

06 Fresno 180 127.9/128.1 0W280 6862 0617000192 201.130 16-17 $ - $ 500 $ 500 3/2/17 NH $ - $ - $ - $ 350 $ 850 1.0 Location(s)

06 Fresno 198 R14.5/R18.2 0R110 6802 0614000030 201.151 18-19 $ 165 $ 1,206 $ - NH $ - $ 1,184 $ 463 $ 454 $ 3,472 7.0 Drainage system(s)

06 Fresno 198 0V310 6811 0616000130 201.010 16-17 $ 1 $ 850 $ 808 1/27/17 STP $ - $ 450 $ 1 $ 350 $ 1,652 25.0 Collision(s) reduced

06 Fresno 269 10.7/12.3 39460 2184 0600020595 201.150 17-18 $ - $ 18,500 $ - NH $ 2,200 $ 2,500 $ 300 $ 4,000 $ 27,500 1.0 Location(s)

06 Fresno VAR 0V920 6880 0617000066 201.315 17-18 $ - $ 1,284 $ - NH $ - $ 319 $ 8 $ 166 $ 1,777 38.0 Field element(s)

06 Kern 5 54.1 0Q620 6662 0613000150 201.235 16-17 $ 10 $ 2,000 $ 2,350 5/17/17 NH $ 530 $ 980 $ 10 $ 1,050 $ 4,580 2.0 Location(s)

06 Kern 5 5.6/8.8 0Q820 6749 0613000243 201.151 18-19 $ 150 $ 5,100 $ - NH $ 375 $ 670 $ 100 $ 690 $ 7,085 5.0 Drainage system(s)

Near Fresno, from the Tulare County line to American Avenue; also in Tulare County, from 0.9 mile north of Kings River Bridge to Fresno County line (R53.60/R53.94). Pave gore and miscellaneous areas, construct maintenance vehicle pull outs and repair irrigation systems.

In and near Selma and Fowler, from 0.1 south of Rose Avenue Undercrossing to Merced Street Undercrossing. Replace pavement with Continuous Reinforced Concrete Pavement (CRCP). Update curb ramps to meet current ADA standards.

In Fresno and Tulare Counties at various locations; also in Kern County on Route 5 at various locations. Transportation infrastructure improvement for zero-emission vehicle charging.

In Fresno County, on Routes 99, 41, 168, and 180 at various locations; also in Madera County on Route 99 at various locations. Repair vehicle detection systems.

In and near Kingsburg and Selma, from 0.9 mile north of the Tulare County line to 0.1 mile north of Route 43. Remove and replace failed concrete pavement slabs with asphalt concrete.

In Fresno and Clovis, at various location from Route 180 to Shepherd Avenue. Roadside maintenance safety improvements.Near Shaver Lake, from west of Prather Pond Road to west of Rancheria Creek Bridge. Repair drainage culverts.In and near Shaver Lake, from east of Warbler Lane to Kaiser Pass Road. Roadway rehabilitation.

Near Prather, from Sample Road to Oak Creek Road. Upgrade barrier railing, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA).In Fresno County, between Shepherd Avenue and Lockwood Lane and Lodge Road Park and Ride and Tollhouse/Auberry Roads. Construct centerline rumble strip.

Near Shaver Lake, from 1.4 miles east of Dalton Avenue to 0.2 mile west of Huntington Lake Road. Reconstruct failed embankment and repair gabion wall.Near Mendota, at Fresno Slough (Kings River-Whites Bridge) No. 42-0041. Repair bridge.Near Squaw Valley, at Mill Creek Bridge No. 42-0080; also near Cedar Grove at South Fork Kings River Bridge No. 42-0024 (PM 130.1). Bridge rail upgrade.

Near the city of Fresno, at Kings River Overflow Bridge No. 42-0074. Replace bridge.Near Cedar Grove, from 19.8 miles east of Route 245 to 2 miles west of South Fork Kings River Bridge. Remove rockslide debris, stabilize slope, and repair roadway.

In Fresno County, at various locations; also in Kern County on Route 119 at various locations. Replace damaged drainage systems.In and near Coalinga, from the Monterey County line to Kings County line at various locations (PM 0.0/42.7). Install centerline rumble strip.Near Huron, from 1.1 miles north of Palmer Avenue to 0.4 miles south of Route 198. Construct new bridge and raise profile grade. (Additional funding from Fresno sales tax Measure C - not shown)

In Fresno County, on Routes 41, 99, 168 and 180; also in Kern County on Route 99 and Madera County on Route 41. Repair detection systems with wire theft prevention measures.

Near Buttonwillow, at the northbound and southbound Buttonwillow safety roadside rest areas. Upgrade water and waste water systems.

Near Lebec, from north Lebec Road to south of Grapevine Road. Rehabilitate drainage systems.

06 Kern 5 82.0/87.0 0U470 6820 0615000301 201.122 19-20 $ 65 $ 21,500 $ - NH $ 440 $ 1,200 $ 25 $ 1,900 $ 25,130 21.0 Lane mile(s)

06 Kern 5 R7.5/R9.0 0W160 6884 0617000097 201.151 19-20 $ 132 $ 8,162 $ - NH $ 955 $ 2,173 $ 29 $ 2,763 $ 14,214 4.0 Drainage system(s)

06 Kern 5 4.5/9.5 0W270 6861 0617000188 201.130 16-17 $ - $ 500 $ 500 3/2/17 NH $ - $ - $ - $ 250 $ 750 1.0 Location(s)

06 Kern 5 8.9 0W290 6863 0617000194 201.130 16-17 $ - $ 400 $ 400 3/14/17 NH $ - $ - $ - $ 200 $ 600 1.0 Location(s)

06 Kern 5 R15.8 0W430 6876 0617000222 201.322 18-19 $ - $ - $ - NH $ 1,600 $ - $ - $ - $ 1,600 1.0 Bridge(s)

06 Kern 5 12.5 0W460 6877 0617000225 201.322 18-19 $ - $ - $ - NH $ 1,910 $ - $ - $ - $ 1,910 2.0 Bridge(s)

06 Kern 14 L16.7 0T301 6814 0616000183 201.352 17-18 $ 520 $ 2,757 $ - BOND-SH $ - $ 938 $ 230 $ 1,250 $ 5,695 1.0 Location(s)

06 Kern 43 0.1/0.4 0P900 6698 0612000293 201.010 17-18 $ 1,160 $ 4,200 $ - STP $ 1,323 $ 1,348 $ 880 $ 850 $ 9,761 38.0 Collision(s) reduced

06 Kern 43 0.1/9.3 0U100 6755 0615000211 201.121 19-20 $ 23 $ - $ - NH $ 450 $ 435 $ 81 $ - $ 989 22.2 Lane mile(s)

06 Kern 46 57.3/57.8 0K460 6601 0612000105 201.110 16-17 $ 1,265 $ 19,375 $ 22,265 1/17/17 HBRR-S $ 701 $ 2,920 $ 900 $ 3,200 $ 28,361 1.0 Bridge(s)

06 Kern 46 49.0/50.9 0U480 6810 0615000299 201.121 19-20 $ 90 $ 4,600 $ - NH $ 710 $ 950 $ 360 $ 900 $ 7,610 6.3 Lane mile(s)

06 Kern 46 26.8/47.0 0W410 6865 0617000214 201.010 18-19 $ 5 $ 1,309 $ - STP $ 375 $ 525 $ 5 $ 390 $ 2,609 17.0 Collision(s) reduced

06 Kern 58 R52.4/R55.5 0G851 6678 0614000009 201.120 17-18 $ 30 $ 21,370 $ 22,987 1/31/18 NH $ - $ 1,771 $ 35 $ 3,410 $ 26,616 10.4 Lane mile(s)

06 Kern 58 R94.2 0Q180 6673 0613000145 201.112 17-18 $ 25 $ 1,425 $ - HBRR-S $ - $ 711 $ 25 $ 680 $ 2,866 1,135.0 Linear feet

06 Kern 58 R99.0/R100.3 0Q190 6674 0613000152 201.110 17-18 $ 60 $ 11,000 $ - HBRR-S $ 414 $ 2,327 $ 60 $ 2,768 $ 16,629 2.0 Bridge(s)

06 Kern 58 R55.4/R59.7 0S470 6730 0615000048 201.122 16-17 $ 20 $ 28,700 $ 33,898 6/28/17 NH $ 966 $ 1,917 $ 38 $ 3,341 $ 34,982 8.6 Lane mile(s)

06 Kern 58 76.0/77.0 0W310 6867 0617000219 201.130 16-17 $ - $ 500 $ 500 4/6/17 NH $ - $ - $ - $ 250 $ 750 1.0 Location(s)

06 Kern 65 1.6/25.2 0U990 6780 0616000084 201.010 17-18 $ 20 $ 850 $ 700 11/1/17 STP $ 350 $ 490 $ 10 $ 400 $ 2,120 27.0 Collision(s) reduced

06 Kern 99 23.6/R28.4 0Q280 6661 0613000051 201.120 17-18 $ 70 $ 86,000 $ - NH $ 3,000 $ 4,000 $ 20 $ 9,300 $ 102,390 34.4 Lane mile(s)

06 Kern 99 10.4/21.2 0Q920 6681 0614000010 201.122 19-20 $ 30 $ 45,440 $ - NH $ 700 $ 2,300 $ 20 $ 4,800 $ 53,290 41.4 Lane mile(s)

06 Kern 99 10.5/20.5 0R140 3036 0614000038 201.122 16-17 $ 3 $ 24,000 $ 24,000 6/28/17 NH $ 800 $ 1,350 $ 20 $ 2,800 $ 28,973 10.0 Lane mile(s)

06 Kern 99 23.1/27.3 0S450 6707 0614000155 201.010 17-18 $ 121 $ 2,350 $ - STP $ 320 $ 650 $ 100 $ 435 $ 3,976 199.0 Collision(s) reduced

06 Kern 99 0.0/11.2 0T200 6731 0615000035 201.122 18-19 $ 120 $ 48,000 $ - NH $ 1,160 $ 1,600 $ 100 $ 5,200 $ 56,180 33.0 Lane mile(s)

06 Kern 99 21.6/24.7 0T280 6735 0615000052 201.210 18-19 $ 1 $ 1,156 $ - NH $ 41 $ 200 $ 3 $ 180 $ 1,581 12.4 Acre(s) treated/pollutant

Near Kettleman City, from 0.34 mile south of Twisselman Road Overcrossing to Kings County line. Cold plane pavement, repair concrete pavement panels, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA) to rehabilitate roadway.

In Kern County, from 2.4 miles north of Fort Tejon Overcrossing to 1.2 miles south of Grapevine Undercrossing at four locations. Repair reinforced concrete box culverts.

Near Lebec (PM 4.5/9.5R), from 4.5 miles north of Los Angeles County Line to 6.4 miles south of Route 99. Remove slide debris, stabilize slope, and repair drainage system.

Near Grapevine (PM 8.9R), at 1.3 miles south of Grapevine Road East. Reconstruct embankment washout, remove channel debris, repair double box culvert, and install slope drainage.Near the Grapevine, at the Route 5/99 Separation No. 50-0240 R. Lower roadway profile to obtain standard vertical clearance. (PA&ED Only)

Near the Grapevine, at the California Aqueduct No. 50-0321L/R. Improve to standard load capacity. (PA&ED Only)In Mojave, at the Mojave Maintenance Station (L-5713). Demolish deteriorated facilities and construct new crew room, equipment storage building and modifications to the existing wash pad.

Near Bakersfield, at the intersection of Routes 43 and 119. Intersection improvement.Near Bakersfield, from Route 119 to south of Noriega Road; also on Route 119 from Enos Lane to Route 5 (PM 18.1/19.8). Pavement rehabilitation. (G13 Contingency Project)

Near Wasco, at Route 46/99 Separation Bridge No. 50-0184E from 0.5 mile west of Route 46/99 Separation to 0.1 mile east of Route 46/99 Separation; also on Route 99 from PM R43.9 to 44.6. Replace bridge and realign southbound ramps.

In and near Wasco, from Magnolia Avenue to Route 43 South. Upgrade ADA curb ramps, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA).

In and near Wasco, from 0.7 mile west of Brown Material Road to Scofield Avenue. Install centerline and shoulder rumble strips.In Bakersfield from Route 99 Separation to Cottonwood Road. Rehabilitate roadway.In Tehachapi, at the Summit Overhead Bridge No. 50-343L/R. Upgrade bridge rail.Near Tehachapi, at Cache Creek Bridge No.50-346L/R. Replace Bridge.Near Bakersfield, from Cottonwood Road to 0.3 mile east of Routes 58/184 Separation. Pavement rehabilitation.Near Bakersfield, from 16.5 miles east of Route 184 to 1.4 miles east of Route 223. Remove and replace failed pavement slabs.Near Bakersfield, from Imperial Street to County Line Road. Construct center line and shoulder rumble strips.In Bakersfield, from Brundage Lane Overcrossing to Beardsley Canal Bridge. Rehabilitate roadway.

In and near Bakersfield, from 0.5 mile south of Old US 99 Overcrossing to 0.1 mile north of White Lane. Rehabilitate pavement.Near Bakersfield, from north of Herring Road to Pacheco Road (Truck lane-southbound only). Rehabilitate pavement.Near Bakersfield, from Belle Terrace to Minkler Underpass Bridge No. 50-049. Repaint lane lines and add lighting at Interchanges.In and near Bakersfield, from Route 5 to 0.3 mile north of Old US 99 Overcrossing. Roadway rehabilitation.In Bakersfield, from Planz Road to north of California Avenue. Upgrade irrigation system to improve water efficiency.

06 Kern 155 R1.1/R1.9 0P290 6636 0612000106 201.010 16-17 $ 1,010 $ 2,540 $ 2,933 10/24/16 STP $ 391 $ 1,100 $ 432 $ 500 $ 5,973 28.0 Collision(s) reduced

06 Kern 155 45.9/R57.6 0V690 6817 0617000064 201.130 16-17 $ 50 $ 4,000 $ 4,000 8/22/16 NH $ - $ 200 $ 75 $ 900 $ 5,225 1.0 Location(s)

06 Kern 166 17.3/17.7 0S050 6726 0615000047 201.110 20-21 $ 1,100 $ 30,000 $ - HBRR-S $ 1,045 $ 5,100 $ 600 $ 6,200 $ 44,045 1.0 Bridge(s)

06 Kern 178 1.7/6.9 0E320 3729 0613000037 201.235 18-19 $ - $ 2,644 $ - NH $ 220 $ 587 $ 10 $ 808 $ 4,269 61.0 Location(s)

06 Kern 184 0.8/8.2 0U290 6803 0616000001 201.120 21-22 $ - $ - $ - NH $ 2,425 $ - $ - $ - $ 2,425 18.5 Lane mile(s)

06 Kern 184 8.1/12.1 0U430 6798 0616000033 201.120 20-21 $ - $ - $ - NH $ 1,020 $ - $ - $ - $ 1,020 11.0 Lane mile(s)

06 Kern 184 L0.9/L1.1 0V280 6791 0616000124 201.010 19-20 $ 950 $ 3,600 $ - STP $ 1,100 $ 1,300 $ 530 $ 970 $ 8,450 16.0 Collision(s) reduced

06 Kern 204 5.1/6.7 0U490 6889 0616000002 201.121 19-20 $ 10 $ 3,290 $ - NH $ 450 $ 740 $ 65 $ 550 $ 5,105 4.7 Lane mile(s)

06 Kern 223 21.0/21.3 0S510 6709 0614000162 201.010 18-19 $ 74 $ 1,396 $ - STP $ 348 $ 775 $ 345 $ 530 $ 3,468 6.0 Collision(s) reduced

06 Kern VAR 0S610 6724 0614000253 201.131 16-17 $ 112 $ 21,263 $ 14,462 5/17/17 NH $ 647 $ 2,550 $1,019 $ 2,647 $ 28,238 700.0 Location(s)

06 Kern Var 0U240 6796 0615000294 201.151 19-20 $ 122 $ 5,080 $ - NH $ 650 $ 2,190 $ 610 $ 2,150 $ 10,802 11.0 Drainage system(s)

06 Kern Var 0U940 6878 0616000133 201.131 17-18 $ 10 $ 15,353 $ - NH $ 670 $ 945 $ 30 $ 2,350 $ 19,358 10,000.0 Location(s)

06 Kern VAR 0V300 6792 0616000129 201.010 17-18 $ 5 $ 1,100 $ 800 9/12/17 STP $ - $ 680 $ 5 $ 380 $ 2,170 25.0 Collision(s) reduced

06 Kings 5 0.0/9.0 0S490 6729 0615000050 201.122 17-18 $ 35 $ 25,000 $ 23,357 12/6/17 NH $ 650 $ 1,300 $ 140 $ 2,100 $ 29,225 36.0 Lane mile(s)

06 Kings 5 6.5/9.0 0W120 6859 0617000163 201.130 16-17 $ - $ 500 $ 500 2/3/17 NH $ - $ - $ - $ 225 $ 725 1.0 Location(s)

06 Kings 41 34.5/35.0 0T240 6734 0615000041 201.010 17-18 $ 100 $ 1,370 $ - STP $ 600 $ 700 $ 200 $ 480 $ 3,450 20.0 Collision(s) reduced

06 Kings 41 30.6/33.0 0V110 6873 0616000208 201.110 21-22 $ - $ - $ - HBRR-S $ 2,300 $ - $ - $ - $ 2,300 1.0 Bridge(s)

06 Kings 41 8.1/R48.3 0V860 6816 0617000039 201.010 17-18 $ 5 $ 2,681 $ - STP $ - $ 690 $ 20 $ 550 $ 3,946 62.0 Collision(s) reduced

06 Kings 41 33.0/39.0 0W060 6856 0617000146 201.130 16-17 $ - $ 450 $ 450 1/24/17 NH $ - $ - $ - $ 180 $ 630 1.0 Location(s)

06 Kings 43 3.7/18.0 0T950 6804 0615000119 201.010 17-18 $ 2 $ 782 $ 745 9/7/17 STP $ - $ 430 $ 20 $ 350 $ 1,584 29.0 Collision(s) reduced

06 Kings 198 R15.5 0Q320 6651 0613000034 201.010 17-18 $ 240 $ 3,200 $ 3,813 12/15/17 STP $ 925 $ 1,475 $ 725 $ 806 $ 7,371 46.0 Collision(s) reduced

06 Kings 198 8.3/R19.4 0T290 6737 0615000053 201.235 18-19 $ 13 $ 4,700 $ - NH $ 350 $ 950 $ 40 $ 600 $ 6,653 47.0 Location(s)

06 Kings 198 R18.4 0T510 6746 0615000096 201.010 16-17 $ 35 $ 890 $ 700 4/5/17 STP $ 350 $ 600 $ 50 $ 400 $ 2,325 8.0 Collision(s) reduced

In and near Delano, from 0.4 mile west of Browning Road to 0.4 mile east of Browning Road. Construct roundabout.Near Lake Isabella, in Sequoia National Forest boundaries, 13.4 miles west of Route 155/178 Junction. Remove and dispose of hazardous trees and fire fuel.

Near Mettler, at California Aqueduct Bridge No. 50-0323. Bridge rehabilitation.In Bakersfield, from M Street to east of Fairfax Road at various locations. Roadside safety improvements.Near Bakersfield, from south of Hickory Lane to north of Brundage Lane. Upgrade ADA curb ramps, install bike lanes, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA).

In and near Bakersfield, from 0.2 mile south of Edison Highway to Route 178. Upgrade ADA curbs and barrier railing, widen shoulders, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA) to rehabilitate roadway.

Near Lamont, from 0.1 mile south to 0.1 mile north of Sunset Boulevard. Construct roundabout at intersection of Route 184/Sunset Boulevard.In Bakersfield, from F Street to Route 99. Cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA).

In and Near Arvin, at Derby Street. Install traffic signals.In Kern, Kings, and Fresno Counties at various locations on Routes 5, 46, 58, 99, 178, and 204. Repair traffic operation and irrigation systems.In Kern and Kings Counties, on Route 99, 198 and 204 at various locations. Upgrade existing pumps and control systems at 11 pumping plants.

In Kern, Tulare and Fresno Counties on various routes and at various locations. Remove dead trees.Near Taft, on Routes 33 and 119 at various locations. Construct centerline rumble strips.Near Lost Hills, from Kern/Kings County line to south of Utica Avenue. Roadway rehabilitation.Near Kettleman City, from 6.5 miles north of Kern County line to 3.4 miles south of Utica Avenue. Remove and replace water saturated failed pavement.

Near Stratford, from 0.3 mile north of Kings Avenue to 0.3 mile north of Kansas Avenue. Install left turn channelization and right turn widening.

In and near Stratford, from 22nd Street to Laurel Avenue at the Kings River Bridge No. 45-0007. Replace 73 year old bridge due to extensive superstructure and substructure In and near Kettleman City and Lemoore, from Route 33 to the Fresno County line at various locations. Construct shoulder and centerline rumble strips.

In and near Stratford, from Laurel Avenue to 1.0 mile south of Route 198. Remove and replace unstable pavement.In Kings County, from 1.4 miles south of Nevada Avenue to 0.2 mile south of Route 198 Junction; also on Route 43 (PM 22.3/27.3) and Route 33 (PM 0.0/7.8). Construct ground-in centerline and shoulder rumble strips.

Near Hanford, at the Hanford-Armona Road Undercrossing. Improve intersection.In and near Lemoore and Hanford, from Route 41 to 10th Avenue Undercrossing. Pave areas beyond gore and bridge slopes.In the city of Hanford, at the ramp intersection of 4th Street and Redington Avenue. Install traffic signals.

06 Kings VAR 0U300 6797 0616000027 201.131 19-20 $ 130 $ 15,000 $ - NH $ 640 $ 1,880 $1,000 $ 1,850 $ 20,500 296.0 Location(s)

06 Madera 41 36.3/40.8 0R160 6716 0614000043 201.121 17-18 $ 37 $ 3,396 $ - NH $ 600 $ 703 $ 192 $ 698 $ 5,626 7.0 Lane mile(s)

06 Madera 41 6.3/9.2 0R210 6708 0614000058 201.120 19-20 $ 3,160 $ 10,184 $ - NH $ 2,463 $ 2,390 $1,296 $ 2,722 $ 22,215 21.6

06 Madera 41 0U710 6790 0616000025 201.010 17-18 $ 10 $ 650 $ 507 8/10/17 STP $ - $ 618 $ 20 $ 341 $ 1,639 41.0 Collision(s) reduced

06 Madera 99 10.0/26.8 0Q610 6675 0613000149 201.235 16-17 $ 10 $ 2,000 $ 2,058 1/17/17 NH $ 153 $ 610 $ 13 $ 500 $ 3,286 33.0 Location(s)

06 Madera 99 22.7/29.4 0T210 6732 0615000037 201.122 18-19 $ 30 $ - $ - NH $ 499 $ 1,885 $ 30 $ - $ 2,444 26.0 Lane mile(s)

06 Madera 99 9.7 0U170 6887 0616000206 201.110 19-20 $ 30 $ 2,700 $ - HBRR-S $ 950 $ 1,600 $ 1 $ 1,300 $ 6,581 1.0 Bridge(s)

06 Madera 99 13.1/19.6 0U520 6789 0616000003 201.121 18-19 $ 27 $ 11,210 $ - NH $ - $ 1,118 $ 19 $ 1,379 $ 13,753 26.0 Lane mile(s)

06 Madera 99 R7.0/R7.5 0V120 6857 0616000207 201.110 21-22 $ - $ - $ - HBRR-S $ 2,400 $ - $ - $ - $ 2,400 3.0 Bridge(s)

06 Madera VAR 0U020 6750 0615000176 201.240 18-19 $ - $ 1,800 $ - NH $ 5 $ 130 $ 5 $ 60 $ 2,000 5.0 Location(s)

06 Madera Var 0U950 6870 0616000134 201.131 17-18 $ 10 $ 23,000 $ - NH $ 928 $ 1,350 $ 39 $ 3,871 $ 29,198 15,650.0 Location(s)

06 Tulare 65 31.6/39.6 0G980 6349 0613000022 201.121 16-17 $ 115 $ 5,507 $ 4,624 6/28/17 NH $ - $ 1,326 $ 254 $ 860 $ 8,062 16.0 Lane mile(s)

06 Tulare 65 R20.1/31.5 0Q260 6654 0613000049 201.121 16-17 $ 1 $ 13,500 $ 8,704 8/17/16 NH $ - $ 1,300 $ 30 $ 1,100 $ 15,931 41.6 Lane mile(s)

06 Tulare 99 19.4 0Q910 6679 0614000005 201.110 19-20 $ 343 $ 7,521 $ - HBRR-S $ 453 $ 1,730 $ 54 $ 1,354 $ 11,455 1.0 Bridge(s)

06 Tulare 99 28.9/31.0 0R170 6700 0614000051 201.235 18-19 $ - $ 2,700 $ - NH $ 255 $ 624 $ 24 $ 430 $ 4,033 26.0 Location(s)

06 Tulare 99 0U230 6795 0615000297 201.151 19-20 $ 65 $ 5,140 $ - NH $ 650 $ 2,060 $ 620 $ 2,230 $ 10,765 11.0 Drainage system(s)

06 Tulare 190 34.7/39.7 0H140 6286 0616000194 201.151 19-20 $ 246 $ 2,850 $ - NH $ 800 $ 950 $ 210 $ 800 $ 5,856 7.0 Drainage system(s)

06 Tulare 190 R15.1/16.9 0S310 3032 0614000105 201.010 17-18 $ 4 $ 4,750 $ 3,140 10/20/17 STP $ 450 $ 1,200 $ 14 $ 605 $ 7,023 20.0 Collision(s) reduced

06 Tulare 190 R15.1/16.9 0S311 3032A 0618000088 201.010 18-19 $ - $ 400 $ - STP $ - $ 330 $ - $ 490 $ 1,220 0.0 Collision(s) reduced

06 Tulare 190 0.0/8.0 46150 6508 0600020148 201.120 16-17 $ 6,000 $ 17,000 $ 14,700 6/28/17 NH $ 1,500 $ 2,400 $1,760 $ 2,200 $ 30,860 16.0 Lane mile(s)

06 Tulare 198 R4.2/R4.9 0R050 6713 0614000001 201.010 16-17 $ 41 $ 2,630 $ 2,973 8/9/16 STP $ 240 $ 680 $ 14 $ 662 $ 4,267 21.0 Collision(s) reduced

06 Tulare 198 R11.7/R19.8 0S340 3034 0614000114 201.122 16-17 $ 10 $ 23,850 $ 26,270 8/16/17 NH $ 545 $ 1,525 $ 55 $ 3,700 $ 29,685 32.4 Lane mile(s)

06 Tulare 198 10.4/11.2 0U720 6793 0616000026 201.010 17-18 $ 4 $ 915 $ 758 10/17/17 STP $ 450 $ 425 $ 24 $ 215 $ 2,033 12.0 Collision(s) reduced

06 Tulare 201 0H200 6521 0612000157 201.112 16-17 $ 450 $ 9,371 $ - HBRR-S $ 1,728 $ 3,900 $ 617 $ 2,357 $ 18,423 1,188.0 Linear feet

06 Tulare 245 1.4 0U280 6787 0615000293 201.110 20-21 $ - $ - $ - HBRR-S $ 1,325 $ - $ - $ - $ 1,325 2.0 Bridge(s)

In Kings and Tulare Counties, on Routes 63, 99,137, 198 and 216. Repair and replace stolen and damaged electrical systems and protect electrical and irrigation facilities. The work is required to restore incident management, emergency readiness, mobility, functionality, and operation efficiency.

In and near Oakhurst, from north of Road 426 to north of Allen Road. Rehabilitate pavement.Near Fresno, from north of Avenue 15 to south of Route 145. Roadway rehabilitation. Additional $22,000 from Local/Private contribution.In Madera County, on Route 41 at various locations; also on Routes 49 and 145 at various locations. Construct center line and shoulder rumble strips.

In and near the cities of Madera and Chowchilla, from Route 145/99 Separation to the N99 & 233 Connector at various locations. Roadside maintenance safety improvements.

In and near Chowchilla, from Route 152 to the Merced County line. Roadway rehabilitation. (G13 Contingency Project)Near the city of Madera, at South Gateway Drive Overcrossing No. 41-0046K. Replace bridge railing, grind deck, and place reinforced portland cement concrete (PCC) to rehabilitate bridge.

In and near Madera, from 0.3 mile north of Avenue 16 Overcrossing to 0.9 mile north of Avenue 20 Overcrossing. Rehabilitate pavement on mainline and ramps.

Near the city of Madera, at Cottonwood Creek Bridge No. 41-0065R, No. 41-0065L, and No. 41-0065S. Replace bridges to mitigate corrosion by chloride latent concrete.

In various counties and on various routes. Establish mitigation bank for future Caltrans projects in Districts 6 and 10 to protect the California Tiger Salamander.

In Tulare, Fresno and Madera Counties, at various locations. Remove dead trees to eliminate potential fall hazards.In Exeter, from Route 137 to Route 198. Rehabilitate pavement.Near Porterville, from south of Henderson Avenue to Route 137. Rehabilitate pavement.In Tipton, at Avenue 152 Overcrossing No. 46-0191. Replace bridge.In Tulare, from north of Bardsley Avenue to north of Prosperity Avenue. Roadside safety improvements.In Tulare, Fresno and Madera Counties, on Route 99 at various locations. Upgrade existing pumps and control systems at 11 pumping plants.

Between Springville and Camp Nelson, from east of Balch Park Road to west of Wishon Drive. Replace deteriorated culverts and upgrade existing Guardrail.

Near Porterville, from west of Route 65 to S. Plano Road. Construct concrete median barrier.Near Porterville, from west of Route 65 to S. Plano Road. Landscape mitigation.Tulare County, from west of Route 99/190 Separation to west of Road 184. Rehabilitate roadway.In Visalia, from 0.6 mile west of Road 80 to Road 80; also from Akers Street to 0.2 mile east of County Center Drive (PM 6.8/R8.3). Construct median barrier.

In Visalia, from Lovers Lane to west of Route 245. Rehabilitate pavement.In Visalia, from Burke Street to 0.7 mile east of Ben Maddox Way. Widen inside shoulder and construct rumble strip.Near Kingsburg, on Route 201 at Sand Creek and Friant-Kern Canal Bridge; also on Route 216 at Kaweah River Bridge. Bridge rail replacement.

Near Woodlake, at Yokohl Creek Bridge No. 46-0011 (PM 1.39); also at Kaweah River Bridge No. 46-0073 (PM 4.19). Replace bridges to upgrade to current standards, facilitate bike lane shoulders, and upgrade guard railing.

06 Various Co 41 4.2/4.4 0W130 6860 0617000172 201.130 16-17 $ - $ 1,000 $ 1,000 2/16/17 NH $ - $ - $ - $ 450 $ 1,450 1.0 Location(s)

07 Los Angeles 1 41.8/42.8 1XC20 5172 0717000216 201.130 16-17 $ 50 $ 1,310 $ 1,310 2/3/17 NH $ - $ - $ 50 $ 300 $ 1,710 1.0 Location(s)

07 Los Angeles 1 50.3/51.1 1XE60 5265 0717000291 201.130 16-17 $ 50 $ 2,300 $ 2,300 5/11/17 NH $ - $ - $ - $ 550 $ 2,900 1.0 Location(s)

07 Los Angeles 1 8.6/8.8 1XF00 5270 0717000344 201.130 17-18 $ 100 $ 2,900 $ 2,900 9/6/17 NH $ - $ - $ 100 $ 750 $ 3,850 1.0 Location(s)

07 Los Angeles 1 38.3/38.7 27510 4159 0700000519 201.015 17-18 $ 2,575 $ 6,100 $ - STP $ 744 $ 2,352 $ 485 $ 1,095 $ 13,351 11.0 Collision(s) reduced

07 Los Angeles 1 0.1/4.0 28660 4390 0700020900 201.335 16-17 $ 10 $ 10,000 $ 11,942 8/16/17 NH $ - $ 2,977 $ 300 $ 2,600 $ 15,887 78.1 Acre(s) treated/pollutant

07 Los Angeles 1 56.5/56.9 29140 4498 0712000094 201.110 18-19 $30,000 $ 11,628 $ - HBRR-S $ 2,342 $ 2,123 $ 740 $ 3,100 $ 49,933 1.0 Bridge(s)

07 Los Angeles 1 3.5 29910 4632 0713000302 201.015 18-19 $ 11 $ 2,326 $ - STP $ 478 $ 1,028 $ 20 $ 607 $ 4,470 59.0 Collision(s) reduced

07 Los Angeles 1 49.3/50.2 29930 4650 0713000310 201.010 17-18 $ 23 $ 4,405 $ - STP $ 650 $ 800 $ 80 $ 1,000 $ 6,958 7.0 Collision(s) reduced

07 Los Angeles 1 17.4/62.8 30490 4722 0714000086 201.335 18-19 $ 427 $ 4,740 $ - NH $ 800 $ 1,961 $ 62 $ 1,691 $ 9,681 24.0 Acre(s) treated/pollutant

07 Los Angeles 1 9.9 30560 4729 0714000102 201.119 19-20 $ 245 $ 3,883 $ - HBRR-S $ 305 $ 1,237 $ 203 $ 826 $ 6,699 1.0 Bridge(s)

07 Los Angeles 1 37.7/62.8 31350 4846 0715000090 201.151 20-21 $ 8,200 $ 7,900 $ - NH $ 1,950 $ 3,250 $1,850 $ 2,750 $ 25,900 20.0 Drainage system(s)

07 Los Angeles 1 35.1/35.4 31690 4903 0715000227 201.170 18-19 $ 15 $ 5,180 $ - NH $ 150 $ 592 $ 50 $ 1,903 $ 7,890 150.0 Lighting fixture(s)

07 Los Angeles 1 8.3/9.9 31770 4913 0715000261 201.335 19-20 $ 85 $ 1,545 $ - NH $ 400 $ 1,310 $ 70 $ 772 $ 4,182 0.9 Acre(s) treated/pollutant

07 Los Angeles 1 0.0/19.0 32160 4998 0716000049 201.121 21-22 $ - $ - $ - NH $ 1,680 $ - $ - $ - $ 1,680 99.4 Lane mile(s)

07 Los Angeles 1 19.0/33.3 32580 5034 0716000090 201.121 21-22 $ - $ - $ - NH $ 1,960 $ - $ - $ - $ 1,960 104.9 Lane mile(s)

07 Los Angeles 1 R34.5/35.2 32720 5041 0716000121 201.315 20-21 $ - $ - $ - NH $ 539 $ - $ - $ - $ 539 129.0 Field element(s)

07 Los Angeles 1 6.5 33020 5076 0716000212 201.010 17-18 $ 126 $ 525 $ - STP $ - $ 235 $ 60 $ 200 $ 1,146 32.0 Collision(s) reduced

Near Fish Camp, from 0.6 mile north of White Chief Mountain Road to 0.8 mile north of White Chief Mountain Road. Repair slipout, stabilize slope, and repair roadway.

In Malibu, from 0.4 mile north of Tuna Canyon Road to 0.3 mile south of Big Rock Drive. Remove rock slide debris, stabilize slope, and repair drainage system.

Near Malibu, from 0.7 mile south of Corral Canyon Road to 0.2 mile north of Latigo Canyon Drive; also in Ventura County, from 0.6 mile south of Deer Creek Road to 0.1 mile north of Calleguas Creek Road. Remove slide debris and repair drainage systems.

In Long Beach, from 0.1 mile north of E Road to 0.3 mile south of East O Street. Replace corroded and damaged crib wall sections.In the city of Los Angeles (Pacific Palisades), from north of Temescal Canyon Road to Bay Club Drive. Construct shoulders and upgrade guardrail.

In Long Beach, Signal Hill and Lakewood on various routes at various locations. Mitigate for stormwater quality by installing bio-filtration swales, basins, media filters and gross solid removal devices, and other best management practices (BMPs).

In Malibu, from Guernsey Avenue to Trancas Canyon Road/Broad Beach Road. Replace bridge.

In Long Beach, at Lakewood Boulevard (Route 19) and Los Alamitos Traffic Circle. Install pavement delineation, overhead guide signs and associated roadway improvements.

In Malibu, from Puerco Canyon Road to Corral Canyon Road. Reconstruct raised median island.

In various cities, from Calle Mayor to Ventura County line; also on Routes 23 and 27, at various locations. Construct storm water treatment Best Management Practices.

In the city of Los Angeles, at Wilmington Overhead Bridge No. 53-0352. Paint and repair bridge deck.

In the cities of Los Angeles and Malibu, from south of Tenescal Canyon Road to Ventura County line; also in Ventura County, from Los Angeles County line to Tonga Street (PM 0.0/0.9). Rehabilitate culverts.

In Santa Monica, at McClure Tunnel Bridge No. 53-0008. Enhance safety lighting inside tunnel.In Los Angeles and Ventura Counties, on various routes, at various locations. Stabilize soil and erosion control.In and near Redondo Beach, from Orange County line to south of Topaz Street. Upgrade ADA curb ramps, upgrade metal beam guardrail, cold plane pavement, and place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA) to rehabilitate pavement.In and near Redondo Beach, from Topaz Street to Dewey Street. Upgrade ADA curb ramps and metal beam guardrail, repair concrete pavement, replace asphalt concrete pavement with portland cement concrete at intersections, cold plane pavement, and place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete (RHMA) to rehabilitate pavement.

In and near Santa Monica, from Lincoln Boulevard to McClure Tunnel; also on Route 10 (PM 2.1/18.3), Route 2 (PM R18.7), Route 101 (PM 11.8), and Route 105 (PM R1.95). Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring, data transmission, and network connectivity including the Los Angeles Regional Transportation Management Center (LARTMC) and communication hubs at Route 10, Route 101 and Route 105.

In Long Beach, at Pacific Avenue. Install left-turn phasing, ladder striping crosswalks and upgrade signals and curb ramps to meet current standards.

07 Los Angeles 1 10.7 33170 5085 0716000234 201.010 17-18 $ 185 $ 515 $ - STP $ - $ 750 $ 215 $ 665 $ 2,330 13.0 Collision(s) reduced

07 Los Angeles 1 51.5/51.8 33340 5180 0716000306 201.131 17-18 $ 1,029 $ 10,432 $ 7,945 3/15/17 NH $ 50 $ 500 $ 400 $ 3,510 $ 15,921 1.0 Location(s)

07 Los Angeles 1 6.0 33980 5239 0717000160 201.010 19-20 $ 87 $ 442 $ - STP $ - $ 1,040 $ 16 $ 728 $ 2,313 32.0 Collision(s) reduced

07 Los Angeles 1 42.5 4X970 5059 0716000335 201.131 21-22 $ - $ - $ - NH $ 1,600 $ - $ - $ - $ 1,600 1.0 Location(s)

07 Los Angeles 2 76.9 1XF20 5272 0717000338 201.130 17-18 $ 100 $ 600 $ 600 7/10/17 NH $ - $ - $ 100 $ 300 $ 1,100 1.0 Location(s)

07 Los Angeles 2 13.1/14.3 28830 4420 0700021024 201.335 19-20 $ 50 $ 6,790 $ - NH $ 995 $ 2,447 $ 95 $ 2,200 $ 12,577 48.4 Acre(s) treated/pollutant

07 Los Angeles 2 R18.6 30460 4719 0714000073 201.315 16-17 $ 10 $ 6,714 $ 7,136 6/28/17 NH $ 81 $ 1,028 $ 2 $ 1,762 $ 9,597 94.0 Field element(s)

07 Los Angeles 2 14.8/R22.6 34060 5245 0717000174 201.315 17-18 $ 750 $ 17,254 $ - NH $ - $ 3,047 $ 200 $ 4,840 $ 26,091 215.0 Field element(s)

07 Los Angeles 5 26.6/31.3 1XE00 5260 0717000254 201.130 16-17 $ - $ 650 $ 650 3/14/17 NH $ - $ - $ - $ 120 $ 770 1.0 Location(s)

07 Los Angeles 5 R45.4/R61.2 25262 3725B 0700021272 201.120 16-17 $ 101 $156,000 $156,000 12/7/16 NH $ - $ 6,410 $ 40 $ 9,138 $ 171,689 124.8 Lane mile(s)

07 Los Angeles 5 25.7 29230 4505 0712000109 201.015 16-17 $ 25 $ 3,784 $ 3,357 10/18/17 STP $ 1,100 $ 1,753 $ 37 $ 1,040 $ 7,739 3.0 Collision(s) reduced

07 Los Angeles 5 38.8/40.5 29510 4586 0713000016 201.235 17-18 $ 1 $ 2,053 $ - NH $ 250 $ 1,334 $ 30 $ 800 $ 4,468 74.0 Location(s)

07 Los Angeles 5 16.1/17.0 29640 4594 0713000031 201.235 16-17 $ 10 $ 5,117 $ 5,772 8/16/17 NH $ 135 $ 1,540 $ 27 $ 843 $ 7,672 214.0 Location(s)

07 Los Angeles 5 28.9/29.4 30130 4702 0714000019 201.122 17-18 $ 10 $ 14,890 $ - NH $ 170 $ 1,300 $ 230 $ 1,900 $ 18,500 4.0 Lane mile(s)

07 Los Angeles 5 19.2/19.9 30800 4775 0714000224 201.121 16-17 $ 10 $ 2,100 $ 2,510 8/16/17 NH $ - $ 1,300 $ 34 $ 900 $ 4,344 2.4 Lane mile(s)

07 Los Angeles 5 39.2/R43.8 30970 4805 0714000300 201.122 19-20 $ 120 $ 41,600 $ - NH $ 1,013 $ 5,710 $ 150 $ 7,421 $ 56,014 46.5 Lane mile(s)

07 Los Angeles 5 R81.8/R87.8 31250 4835 0715000065 201.335 17-18 $ 18 $ 11,025 $ - NH $ 1,545 $ 1,800 $ 100 $ 1,500 $ 15,988 62.0 Acre(s) treated/pollutant

07 Los Angeles 5 R75.0/R81.8 31260 4836 0715000067 201.335 17-18 $ 63 $ 8,730 $ - NH $ 1,498 $ 2,100 $ 60 $ 1,500 $ 13,951 45.1 Acre(s) treated/pollutant

07 Los Angeles 5 R70.4 31360 4847 0715000092 201.151 18-19 $ 20 $ - $ - NH $ 180 $ 350 $ 20 $ - $ 570 2.0 Drainage system(s)

07 Los Angeles 5 34.6 31420 4853 0715000116 201.119 19-20 $ 49 $ 7,200 $ - HBRR-S $ 500 $ 1,200 $ 200 $ 1,800 $ 10,949 1.0 Bridge(s)

07 Los Angeles 5 11.0/13.9 31750 4910 0715000246 201.151 18-19 $ 10 $ - $ - NH $ 360 $ 1,038 $ 30 $ - $ 1,438 9.0 Drainage system(s)

In the city of Los Angeles, at North Fries Avenue. Install new traffic signal and surveillance system, safety lighting, pedestrian crosswalks and upgrade ADA cub ramps.

In Malibu, from Sea Vista Drive to Via Escondido Drive. Construct tie back anchor system and micro/sheet piles on southbound side of highway and shoring wall with tie backs on northbound side of highway to prevent further landslide distress and restore the integrity of the roadway.

In Long Beach, at Atlantic Avenue. Install protected left-turn signal phases for northbound and southbound movements, and upgrade signal poles, mast arms, and hardware.

In Malibu, south of Big Rock Drive. Shoreline embankment restoration by installing rock slope protection (RSP) armament.Near Big Pines, at 0.5 mile west of Grassy Hollow Visitor Center. Replace damaged drainage pipe, fill the sinkhole and repair the pavement.

In Los Angeles County in various cities on routes 60, 66, 164 and 210 at various locations. Construct and install storm water treatment Best Management Practices.

Near Glendale; also in various cities, on various routes, at various locations. Upgrade the existing communication system to all fiber optic communications.

In Los Angeles and Ventura Counties, on various routes and at various locations. Repair and Rehabilitate Ramp Metering Systems (RMS) and Vehicle Detection Systems (VDS).

In Burbank, from 0.2 mile north of North Zoo Drive to Winona Avenue. Repair water saturated failed pavement concrete slabs, repair drainage system, and repair asphalt roadway with asphalt overlay and asphalt digout repairs.

In and near Santa Clarita, from 0.5 miles south of I-5/SR-14 Separation to 1.7 miles north of Lake Hughes Road Undercrossing. Rehabilitate pavement.

In the city of Los Angeles, near Glendale, at the northbound and southbound off-ramps to Colorado Freeway Extension. Widen off-ramp, replace MBGR with concrete barrier and widen Los Angeles River Bridge to reduce truck off-tracking.

In the city of Los Angeles from Filmore Street to Rinaldi Street, also on Route 118 from Route 405 to west of San Fernando Road. Enhance highway worker safety by paving misc. areas, install access gates and maintenance vehicle pullout areas.

In the city of Los Angeles, at Route 5/10/60 Interchange. Enhance highway worker safety by modifying irrigation, miscellaneous paving, and other measures.

In Burbank, from Verdugo Avenue to Magnolia Boulevard. Rehabilitate pavement.In the cities of Los Angeles, Glendale and Burbank, from Main street to south of Verdugo Avenue. Pavement rehabilitation.In San Fernando, from Route 118 to Route 210. Rehabilitate roadway.Near Gorman, from Route 138 to south of Frazier Mountain Park Road, at various locations. Install storm water mitigation devices.Near Gorman, from north of Vista Del Lago Road to Route 138, at various locations. Construct storm water mitigation devices.Near Pyramid Lake, 4.4 miles north of Templin Highway. Remove and replace two sections of damaged reinforced concrete pipe. (G13 Contingency Project)

In the city of Los Angeles, at Sun Valley Overhead Bridge No. 53-1134. Paint bridge and replace deck drain systems.In the cities of Los Angeles, Hollywood, Long Beach and Signal Hill from Simons Underpass to Eastern Avenue; on Routes 101, 405 and 710 at various locations. Replace 9 pump plants. (G13 Contingency Project)

07 Los Angeles 5 18.0/19.0 31840 4904 0715000297 201.010 17-18 $ 31 $ 3,150 $ - STP $ 15 $ 600 $ 10 $ 600 $ 4,406 43.0 Collision(s) reduced

07 Los Angeles 5 R59.7/R73.7 32340 5013 0716000064 201.121 20-21 $ - $ - $ - NH $ 100 $ - $ - $ - $ 100 112.0 Lane mile(s)

07 Los Angeles 5 1.7 32570 5031 0716000089 201.351 17-18 $ 50 $ 23,400 $ - ST-CASH $ 180 $ 4,600 $ 230 $ 5,751 $ 34,211 1.0 Location(s)

07 Los Angeles 5 18.3 33270 5153 0716000290 201.010 18-19 $ 10 $ 2,600 $ - STP $ 215 $ 1,152 $ 15 $ 1,095 $ 5,087 62.0 Collision(s) reduced

07 Los Angeles 5 20.8 33800 5223 0717000053 201.151 19-20 $ 10 $ 1,654 $ - NH $ 709 $ 2,548 $ 123 $ 2,462 $ 7,506 1.0 Drainage system(s)

07 Los Angeles 5 8.2/20.4 34040 5247 0717000172 201.315 17-18 $ 173 $ 23,670 $ 23,670 1/31/18 NH $ - $ 2,962 $ 18 $ 4,704 $ 31,527 602.0 Field element(s)

07 Los Angeles 5 27.0/66.5 34210 5281 0717000244 201.322 19-20 $ - $ - $ - NH $15,640 $ - $ - $ - $ 15,640 12.0 Bridge(s)

07 Los Angeles 10 16.6/30.1 26080 3923 0712000104 201.335 19-20 $ 480 $ 24,000 $ - NH $ 3,000 $ 3,305 $ 578 $ 5,500 $ 36,863 33.0 Acre(s) treated/pollutant

07 Los Angeles 10 R11.0/R14.0 29600 4597 0713000034 201.235 17-18 $ - $ 1,749 $ 1,894 5/17/17 NH $ 110 $ 985 $ 5 $ 600 $ 3,449 85.0 Location(s)

07 Los Angeles 10 R14.0/19.0 29660 4599 0713000057 201.110 16-17 $ 2,400 $ 65,640 $ 59,856 8/16/17 HBRR-S $ - $ 3,024 $ 550 $ 5,904 $ 77,518 1.0 Bridge(s)

07 Los Angeles 10 2.1/18.4 30150 4700 0714000020 201.121 17-18 $ 168 $ 33,000 $ - NH $ 74 $ 7,462 $ 126 $ 4,361 $ 45,191 160.0 Lane mile(s)

07 Los Angeles 10 31.2/37.2 30390 4712 0714000044 201.120 19-20 $ 147 $ 60,496 $ - NH $ 990 $ 4,670 $ 23 $ 8,444 $ 74,770 50.4 Lane mile(s)

07 Los Angeles 10 R2.1/R11.1 30420 4715 0714000055 201.235 18-19 $ 30 $ 5,464 $ - NH $ 100 $ 1,560 $ 48 $ 1,100 $ 8,302 214.0 Location(s)

07 Los Angeles 10 18.3/21.1 30430 4716 0714000058 201.235 18-19 $ 30 $ 2,553 $ - NH $ 139 $ 1,100 $ 34 $ 1,060 $ 4,916 106.0 Location(s)

07 Los Angeles 10 28.3 31680 4902 0715000220 201.110 19-20 $ 15 $ 2,553 $ - HBRR-S $ 550 $ 1,346 $ 27 $ 1,627 $ 6,118 1.0 Bridge(s)

07 Los Angeles 10 22.3/28.2 31800 4916 0715000280 201.119 16-17 $ - $ 8,265 $ 4,278 8/16/17 HBRR-S $ 486 $ 1,894 $ 159 $ 1,908 $ 12,712 30.0 Bridge(s)

07 Los Angeles 10 29.4 32870 5070 0716000182 201.119 21-22 $ - $ - $ - HBRR-S $ 141 $ - $ - $ - $ 141 1.0 Bridge(s)

07 Los Angeles 10 R12.3/R15.5 33260 5152 0716000287 201.010 19-20 $ 63 $ 18,394 $ - STP $ 1,391 $ 3,888 $ 276 $ 3,544 $ 27,556 404.0 Collision(s) reduced

07 Los Angeles 10 S0.2/47.7 34050 5246 0717000173 201.315 17-18 $ 54 $ 15,515 $ 15,513 1/31/18 NH $ - $ 2,295 $ 18 $ 3,645 $ 21,527 384.0 Field element(s)

In the city of Los Angeles, from State Street to north of Route 10; also on Route 10 from west of Route 5 to west of Soto Street (PM S0.4/19.0) Apply High Friction Surface Treatment (HFST) to connectors and ramp.

Near Castaic and Valencia, from 0.2 mile north of Lake Hughes Road Undercrossing to 0.7 mile south of Vista Del Lago Road Overcrossing. Cold plane pavement and place Rubberized Hot Mix Asphalt concrete (RHMA), repair drainage systems, and perform upgrades to overhead signs, drainage curbs and guardrail.In Santa Fe Springs at 14044 Freeway Drive adjacent to I-5 between Valley View Ave and Alondra Boulevard. Construct Southern Region Equipment Repair Shop to serve District 7 and 12.

In the City of Los Angeles, at the westbound Route 10 connector to southbound Route 5. Apply High Friction Surface Treatment (HFST) and upgrade lighting.

In the city of Los Angeles, on the northbound connector at the Route 5/110 Separation. Replace compromised 18 inch Reinforced Concrete Culvert (RCP).

In Los Angeles County, on various routes and at various locations. Repair and Rehabilitate Ramp Metering Systems (RMS) and Vehicle Detection Systems (VDS).

In Los Angeles County, at various locations. Establish standard vertical clearance. (PA&ED Only)In the cities of Los Angeles, Alhambra, El Monte, Monterey Park and Rosemead, from Central Avenue to Cogswell Road; also on Route 405 from Cherry Avenue to South Alameda Street (PM 4.8/8.5). Construct storm water treatment Best Management Practices.

In the city of Los Angeles, from West Boulevard Overcrossing to 0.2 mile east of Vermont Avenue Undercrossing. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In the city of Los Angeles, at Santa Monica Viaduct Bridge No. 53-1301. Paint and rehabilitate bridge.

In the cities of Santa Monica and Los Angeles, from Route 1 to Route 5/101 interchange; also on Route 1 from McClure Tunnel to Lincoln Boulevard. Rehabilitate pavement.

In Baldwin Park and West Covina, from Route 605 to Citrus Avenue. Rehabilitate roadway.In the cities of Los Angeles and Santa Monica, from Route 1/10 separation bridge to west of Crenshaw Boulevard. Roadside safety improvements.

In the city of Los Angeles, from Route 5 to west of Route 710. Roadside safety improvements.In El Monte, at Rio Hondo Busway Bridge No. 53-2637. Replace bridge deck.In Alhambra, Monterey Park, San Gabriel, Rosemead and El Monte, from Fremont Avenue Undercrossing No. 53-647 to Rio Hondo No. 53-657. Reconstruct, repair, clean and seal bridge decks. Repair bridge railing, repair or replace approach/departure slabs and joint seals.

In El Monte, at Peck Road Undercrossing No. 53-0661. Paint steel portion of bridge for preventative maintenance to preserve and extend the life of bridge.Near Culver City, from Arlington Avenue to Broadway Street. Replace raised islands on mainline and collector-distributor roads with concrete barrier (Type 60) and install new lights from Arlington Avenue to Hoover Street (PM R12.3/14.2). Also install high mast LED lighting at Route 10/110 Interchange.

In Los Angeles County, on various routes and at various locations. Repair and Rehabilitate Ramp Metering Systems (RMS) and Vehicle Detection Systems (VDS).

07 Los Angeles 14 32.5/36.5 1XA20 5162 0717000019 201.130 16-17 $ 60 $ 1,000 $ 1,000 8/10/16 NH $ - $ - $ 20 $ 350 $ 1,430 1.0 Location(s)

07 Los Angeles 14 R27.6/R28.6 1XE50 5266 0717000283 201.130 16-17 $ - $ 475 $ 475 4/17/17 NH $ - $ - $ - $ 100 $ 575 2.0 Location(s)

07 Los Angeles 14 33.2/R58.3 29100 4492 0712000077 201.378 16-17 $ 219 $ 980 $ 939 8/16/17 NH $ 144 $ 1,000 $ 60 $ 600 $ 3,003 14.0 Structure(s)

07 Los Angeles 14 R24.8/R31.4 31080 4809 0715000007 201.235 18-19 $ 30 $ 3,152 $ - NH $ 118 $ 1,100 $ 48 $ 1,400 $ 5,848 102.0 Location(s)

07 Los Angeles 14 R54.6/R66.2 31110 4811 0715000006 201.235 19-20 $ 30 $ 3,257 $ - NH $ 118 $ 1,200 $ 48 $ 1,430 $ 6,083 92.0 Location(s)

07 Los Angeles 14 R25.5/R35.0 31230 4833 0715000063 201.335 17-18 $ 702 $ 9,226 $ - NH $ 1,310 $ 3,325 $ 240 $ 2,100 $ 16,903 55.6 Acre(s) treated/pollutant

07 Los Angeles 14 35.0/R53.5 31280 4838 0715000069 201.335 17-18 $ 34 $ 5,628 $ - NH $ 1,310 $ 2,351 $ 75 $ 1,360 $ 10,758 22.2 Acre(s) treated/pollutant

07 Los Angeles 14 R30.6 31700 4958 0715000234 201.010 17-18 $ 20 $ 695 $ 734 12/18/17 STP $ 40 $ 432 $ 10 $ 251 $ 1,448 37.0 Collision(s) reduced

07 Los Angeles 14 28.9 33760 5219 0717000036 201.151 19-20 $ 10 $ 2,719 $ - NH $ 556 $ 1,881 $ 23 $ 1,262 $ 6,451 1.0 Drainage system(s)

07 Los Angeles 19 5.5/8.4 28990 4485 0712000015 201.160 16-17 $ - $ 2,910 $ 4,500 5/17/17 NH $ 836 $ 1,050 $ - $ - $ 4,796 11.5 Structure(s)

07 Los Angeles 23 0.9/1.3 1XA80 5168 0717000205 201.130 16-17 $ 30 $ 863 $ 863 1/24/17 NH $ - $ - $ 30 $ 172 $ 1,095 1.0 Location(s)

07 Los Angeles 27 0.0/11.0 1XC00 5170 0717000210 201.130 16-17 $ 250 $ 2,000 $ 2,000 2/3/17 NH $ - $ - $ 250 $ 800 $ 3,300 1.0 Location(s)

07 Los Angeles 27 7.9/10.1 29960 4652 0713000314 201.235 16-17 $ - $ 1,100 $ - NH $ 101 $ 700 $ 10 $ 389 $ 2,300 12.0 Location(s)

07 Los Angeles 47 0.8 32610 5036 0716000112 201.131 17-18 $ 10 $ 1,600 $ 1,618 12/6/17 NH $ 79 $ 552 $ 20 $ 707 $ 2,968 1.0 Location(s)

07 Los Angeles 57 R8.0/R8.4 1XC80 5178 0717000235 201.130 16-17 $ - $ 304 $ 304 3/29/17 NH $ - $ - $ - $ 50 $ 354 1.0 Location(s)

07 Los Angeles 57 R7.7/R12.2 29120 4494 0712000008 201.361 16-17 $ 252 $ 2,515 $ 891 8/16/17 NH $ 200 $ 900 $ 450 $ 800 $ 5,117 48.0 Curb ramp(s)

07 Los Angeles 57 R7.7/R11.8 30180 4706 0714000032 201.235 18-19 $ 30 $ 2,768 $ - NH $ 100 $ 1,200 $ 48 $ 1,150 $ 5,296 55.0 Location(s)

07 Los Angeles 57 R0.0/R4.5 30450 4718 0714000067 201.122 18-19 $ 70 $ - $ - NH $ - $ 9,900 $ 10 $ - $ 9,980 44.5 Lane mile(s)

07 Los Angeles 60 R3.7/R6.3 29580 4595 0713000037 201.235 16-17 $ - $ 2,684 $ 3,070 8/16/17 NH $ 113 $ 1,222 $ 5 $ 600 $ 4,624 47.0 Location(s)

07 Los Angeles 60 R3.2/11.8 30110 4699 0714000009 201.122 17-18 $ 165 $ 75,000 $ - NH $ 1,173 $ 8,889 $ 481 $ 8,880 $ 94,588 80.0 Lane mile(s)

07 Los Angeles 60 0.0/R30.5 31730 4906 0715000237 201.170 19-20 $ 15 $ 2,665 $ - NH $ 398 $ 1,081 $ 5 $ 1,156 $ 5,320 96.0 Lighting fixture(s)

In and near Santa Clarita, from Lost Canyon Road Undercrossing to Spring Canyon Road Undercrossing. Remove fire debris and sediment, reconstruct barrier railing and install erosion control measures.

In Santa Clarita, from 0.5 mile south of Placenta Canyon Road to 0.5 mile north of Placenta Canyon Road; also near Agua Dulce, at 0.4 mile north of Escondido Canyon Road (PM 42.9). Remove slide debris, place temporary barrier railing and repair rockfall netting.

In and near Santa Clarita and Palmdale, from Sand Canyon Road Overcrossing to Avenue S Undercrossing. Upgrade curb ramps and sidewalks to Americans with Disabilities Act (ADA) standards.

In and near Santa Clarita, from Route 5 to Canyon Park Boulevard. Construct roadside safety improvements.In and near Lancaster, from Vincent Ramp Undercrossing to Avenue K 8 Overcrossing. Roadside safety improvements.In and near Santa Clarita, from north of Sierra Highway to south of Soledad Canyon Road, at various locations. Install storm water mitigation devices.

Near Santa Clarita and Palmdale at various locations, from south of Soledad Canyon Road to south of Mountain Spring Road. Install storm water mitigation devices.

In Santa Clarita, at the Sierra Highway southbound on-ramp; also in Palmdale at the Palmdale Boulevard (Route 138) northbound off-ramp (PM R59.55). Apply High Friction Surface Treatment (HFST) on ramps.

In Los Angeles County, near southbound offramp to Sierra Highway. Replace damaged drainage system that includes In Bellflower, from 0.04 mile south of Rose Street to Gardendale Street. Relinquish route.In Malibu, from 0.4 mile south of Decker Edison Road to Decker Edison Road. Remove unstable slide material and debris, install rock netting, repair roadway, and stabilize slope.

Near Malibu, from Route 1 to 0.1 mile south of Mulholland Drive. Remove slide debris and hazardous trees, stabilize slope, and clear debris from drainage system.

Near Glenview, from Entrado Drive to Woodland Crest Drive. Enhance highway worker safety by installing weed control under existing guardrail.In Los Angeles, at San Pedro II Facility, approximately 0.1 mile south of Vincent Thomas Bridge. Construct solder pile wall to stabilize the existing eroding slope and repair drainage system.

In San Dimas, from 0.3 mile north of Route 10 to 0.3 mile south of Via Verde. Repair slope washout and remove debris, repair and improve drainage system, and construct debris flow barriers.

In San Dimas and Glendora from Route 10 to Route 210, also on Route 60 in and near the cities of Los Angeles, Monterey Park, and Montebello. Construct Americans with Disabilities Act (ADA) curb ramp improvements.

In San Dimas and Glendora, from Route 10 to Route 210. Roadside safety improvements.In and near Diamond Bar, from the Orange County line to Route 60. Pavement rehabilitation. (G13 Contingency Project)In and near Monterey Park and Montebello, from Mednick Avenue to Markland drive. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In and near Monterey Park, Montebello, Rosemead, and South El Monte, from Route 710 to Route 605. Rehabilitate pavement.In various cities, from Route 5 to San Bernardino County line; also on Route 710, from Ocean Boulevard to Valley Boulevard (PM 5.6/T27.4). Replace existing signs with retro-reflective sheeting.

07 Los Angeles 60 R0.6/11.8 32710 5040 0716000120 201.315 20-21 $ - $ - $ - NH $ 30 $ - $ - $ - $ 30 62.0 Field element(s)

07 Los Angeles 60 15.9/19.5 34330 5297 0718000009 201.322 20-21 $ - $ - $ - NH $ 3,320 $ - $ - $ - $ 3,320 4.0 Bridge(s)

07 Los Angeles 66 0.0/3.2 30650 4744 0714000177 201.361 18-19 $ - $ 3,800 $ - NH $ 753 $ 800 $ 30 $ 650 $ 6,033 67.0 Curb ramp(s)

07 Los Angeles 91 R6.3/R8.4 28670 4387 0700020923 201.335 16-17 $ 55 $ 18,720 $ 12,333 8/16/17 NH $ - $ 6,101 $ 30 $ 5,000 $ 29,906 124.0 Acre(s) treated/pollutant

07 Los Angeles 91 R11.4 29170 4500 0712000095 201.112 16-17 $ - $ 1,446 $ 1,734 8/16/17 HBRR-S $ 73 $ 252 $ 12 $ 295 $ 2,078 1,100.0 Linear feet

07 Los Angeles 91 R11.8/R14.1 29620 4592 0713000029 201.235 16-17 $ 72 $ 1,977 $ 1,600 6/28/17 NH $ 73 $ 745 $ 20 $ 835 $ 3,722 51.0 Location(s)

07 Los Angeles 91 R10.2/R10.4 30160 4704 0714000024 201.113 19-20 $ 50 $ - $ - HBRR-S $ 2,260 $ 3,500 $ 150 $ - $ 5,960 5.0 Bridge(s)

07 Los Angeles 91 R13.9/R16.6 30410 4714 0714000057 201.235 18-19 $ 90 $ 3,601 $ - NH $ 99 $ 1,720 $ 48 $ 1,320 $ 6,878 23.0 Location(s)

07 Los Angeles 91 R6.1/R20.7 33860 5226 0717000060 201.315 21-22 $ - $ - $ - NH $ 511 $ - $ - $ - $ 511 68.0 Field element(s)

07 Los Angeles 101 30.9/38.1 29110 4493 0712000068 201.378 16-17 $ 205 $ 1,969 $ 1,947 8/16/17 NH $ 616 $ 400 $ 241 $ 800 $ 4,231 97.0 Structure(s)

07 Los Angeles 101 R1.3/6.3 29860 4630 0713000276 201.235 16-17 $ - $ 1,300 $ 1,400 6/28/17 NH $ 47 $ 740 $ 3 $ 700 $ 2,790 91.0 Location(s)

07 Los Angeles 101 0.5/29.3 30040 4676 0713000435 201.335 16-17 $ 50 $ 24,902 $ 19,860 8/16/17 NH $ 960 $ 4,363 $ 20 $ 2,655 $ 32,950 102.0 Acre(s) treated/pollutant

07 Los Angeles 101 0.0/S1.9 30080 4680 0713000489 201.121 16-17 $ 3,087 $ 12,840 $ 8,213 8/16/17 NH $ 88 $ 1,726 $ 761 $ 1,503 $ 20,005 23.0 Lane mile(s)

07 Los Angeles 101 7.7/27.7 30370 4709 0714000035 201.015 18-19 $ 27 $ 35,300 $ - STP $ 550 $ 4,800 $ 27 $ 6,000 $ 46,704 60.0 Collision(s) reduced

07 Los Angeles 101 11.8/35.3 30750 4770 0714000217 201.121 19-20 $ 2,389 $ 9,995 $ - NH $ 370 $ 2,224 $ 124 $ 1,607 $ 16,709 0.1 Lane mile(s)

07 Los Angeles 101 1.8/8.4 30790 4774 0714000223 201.121 16-17 $ 37 $ 2,073 $ 363 8/16/17 NH $ 67 $ 941 $ 40 $ 637 $ 3,795 0.0 Lane mile(s)

In and near the city of Los Angeles, from EB Route 60/5 Separation to Route 605; also on Route 2 (PM R18.7), Route 5 (PM 6.8), Route 10 (PM 18.3), and Route 605 (PM 20.2). Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring, data transmission, and network connectivity including the Los Angeles Regional Transportation Management Center (LARTMC) on Route 2, Route 5, Route 10, and Route 605.

In the City of Industry at Hacienda Boulevard Undercrossing (UC) No. 53-1789 (PM 15.93), Stemson Avenue UC No. 53 -1784 (PM 16.30), Azusa Avenue Overcrossing No. 53 -1785 (PM 17.97) and Fullerton Road UC No. 53-1786 (PM 19.46). Improve freight corridor movement by modifying and replacing bridges to meet vertical clearance and loadcarrying capacity standards.

In La Verne and Pomona, from Baseline Road to Towne Avenue. Construct and upgrade curb ramps and sidewalks to comply with ADA standards.

In the cities of Los Angeles, Long Beach, Signal Hill, Lakewood, Carson and Hawthorn. Mitigate Stormwater quality by using Best Management Practices.

In Long Beach, at Butler-Artesia Undercrossing No. 53-2169. Replace barrier and flashing beacons.

In Long Beach, from the Los Angeles River Bridge to Downey Avenue. Enhance highway worker safety by miscellaneous paving, relocating irrigation, and other measures.

In Compton, at Compton Creek Bridge Overhead and offramp No. 53-2235 and No. 53-2237S and Artesia-Santa Fe Undercrossing No. 53-2238K; also in Long Beach on Routes 710 and 110, at Harbor Scenic Drive Overhead No. 53-2934 (PM 6.0) and Gaffy Street Bridge No. 53-0397Y (PM R0.8). Bridge seismic retrofit and bridge rail upgrade. (G13 Contingency Project)

In Long Beach, Bellflower and Cerritos, from 0.2 mile west of Downey Avenue Undercrossing to 0.2 mile east of San Gabriel River Bridge. Roadside safety improvements.

In and near Carson, from Route 110 to Orange County line; also on Route 2 (PM R18.7), Route 5 (PM 6.8), Route 405 (PM 21.1). Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring, data transmission, and network connectivity including the various communication hubs on Route 2, Route 5, and Route 405.

In and near Calabasas, Agoura Hills and West Lake Village, from Las Virgenes Road to Lindero Canyon Road; also in and near the cities of Camarillo, Oxnard, and Ventura from Pleasant Valley Road to Padre Juan Canyon Road. Upgrade to ADA standards.

In the city of Los Angeles, from Grand Avenue to Sunset Boulevard. Enhance highway worker safety by modifying irrigation, miscellaneous paving, and other measures.

In the cities of Los Angeles and Calabasas, at various locations from Alameda Street to Mureau Road. Mitigate for stormwater quality by installing best management practices (BMPs) and stabilizing soil erosion.

In the city of Los Angeles, from Route 5 to Route 110. Rehabilitate pavement.In the city of Los Angeles, from Highland Avenue to south of Parkway Calabasas. Upgrade median concrete barrier to meet the current standards.

In the cities of Los Angeles, Calabasas and Agoura Hills, from Route 170 to Kanan Road. Rehabilitate pavement, construct and upgrade ADA curb ramps.

In the city of Los Angeles, near Hollywood, from Route 110 to north of Pilgrimage Overcrossing. Pavement rehabilitation.

07 Los Angeles 101 1.7/6.8 31140 4814 0715000010 201.335 18-19 $ 30 $ 4,468 $ - NH $ 310 $ 1,200 $ 48 $ 1,043 $ 7,099 50.0 Acre(s) treated/pollutant

07 Los Angeles 101 20.0 31790 4915 0715000277 201.110 18-19 $ 1,067 $ 6,685 $ - HBRR-S $ 1,033 $ 3,205 $ 500 $ 1,361 $ 13,851 1.0 Bridge(s)

07 Los Angeles 101 0.0/R17.1 33780 5221 0717000054 201.315 21-22 $ - $ - $ - NH $ 438 $ - $ - $ - $ 438 98.0 Field element(s)

07 Los Angeles 105 R14.1/R17.2 31640 4893 0715000209 201.235 19-20 $ 30 $ 1,301 $ - NH $ 125 $ 900 $ 30 $ 705 $ 3,091 81.0 Location(s)

07 Los Angeles 105 R7.8/R10.3 31740 4908 0715000241 201.335 18-19 $ 30 $ - $ - NH $ 150 $ 890 $ 50 $ - $ 1,120 17.5 Acre(s) treated/pollutant

07 Los Angeles 107 0.0/2.1 1XE70 5267 0717000352 201.130 17-18 $ - $ 5,850 $ 5,850 7/10/17 NH $ - $ - $ - $ 1,000 $ 6,850 1.0 Location(s)

07 Los Angeles 107 4.2/4.8 2X010 5062 0717000253 201.130 16-17 $ - $ 1,760 $ 1,760 3/14/17 NH $ - $ - $ - $ 350 $ 2,110 1.0 Location(s)

07 Los Angeles 107 0.0/4.8 30700 4749 0714000198 201.361 18-19 $ 1,055 $ - $ - NH $ 961 $ 2,553 $1,223 $ - $ 5,792 107.0 Curb ramp(s)

07 Los Angeles 107 0.0/4.8 31180 4818 0715000014 201.121 18-19 $ - $ - $ - NH $ 137 $ 1,289 $ 100 $ - $ 1,526 36.2 Lane mile(s)

07 Los Angeles 110 21.6 1XF60 5276 0718000050 201.130 17-18 $ - $ 310 $ 310 9/13/17 NH $ - $ - $ - $ 80 $ 390 1.0 Location(s)

07 Los Angeles 110 13.4/23.1 23830 3279 0714000081 201.335 18-19 $ 10 $ 11,000 $ - NH $ 740 $ 1,855 $ 30 $ 2,234 $ 15,869 30.8 Acre(s) treated/pollutant

07 Los Angeles 110 3.8/6.5 27610 4174 0700000525 201.335 18-19 $ 65 $ 9,900 $ - NH $ 940 $ 1,568 $ 300 $ 1,900 $ 14,673 29.6 Acre(s) treated/pollutant

07 Los Angeles 110 8.0/9.0 29370 4552 0713000239 201.310 16-17 $ 1,000 $ 32,970 $ 24,535 6/28/17 NH $ - $ 4,946 $ 180 $ 6,594 $ 45,690 1.4 1,000 vehicle hour(s)/yr

07 Los Angeles 110 24.1/31.9 29530 4588 0713000017 201.235 16-17 $ - $ 2,028 $ 2,318 8/16/17 NH $ 113 $ 333 $ - $ 466 $ 2,940 62.0 Location(s)

07 Los Angeles 110 17.9/20.0 29590 4596 0713000033 201.235 16-17 $ - $ 1,645 $ 1,200 6/28/17 NH $ 49 $ 883 $ 4 $ 600 $ 3,181 26.0 Location(s)

07 Los Angeles 110 23.6/30.0 29750 4617 0713000194 201.015 16-17 $ 23 $ 6,031 $ 8,660 8/16/17 STP $ 897 $ 1,116 $ 33 $ 710 $ 8,810 45.0 Collision(s) reduced

07 Los Angeles 110 R0.7/24.1 3009U 4681 0714000238 201.121 16-17 $ 20 $ 33,823 $ 33,403 8/16/17 NH $ 1,439 $ 2,050 $ 150 $ 3,000 $ 40,482 192.0 Lane mile(s)

07 Los Angeles 110 25.5 30570 4730 0714000105 201.119 17-18 $ 133 $ 5,631 $ - HBRR-S $ 50 $ 900 $ 50 $ 900 $ 7,664 2.0 Bridge(s)

07 Los Angeles 110 18.8/23.8 30910 4785 0714000264 201.015 18-19 $ 25 $ 4,520 $ - STP $ 306 $ 2,280 $ 45 $ 1,357 $ 8,533 13.0 Collision(s) reduced

In the city of Los Angeles, from Beaudry Avenue to 0.1 mile south of N. Gower Street. Stabilize soil and erosion control.Near Encino, at Encino Pedestrian Overcrossing. Replace pedestrian overcrossing.In Los Angeles County, from Routes 5/10 to Route 405, Route 2 at Route 134 (PM R18.7) and Route 10 at Route 5/10 (PM 18.3). Upgrade Transportation Management System (TMS) elements including Closed Circuit Television (CCTV) cameras, Ramp Metering Systems (RMS), Vehicle Detection Stations (VDS), Highway Advisory Radio (HAR), Changeable Message Signs (CMS) and the communication system network.

In and near Downey, from Garfield Avenue to east of Woodruff Avenue. Roadside safety improvements.In Willowbrook and Lynwood, from Main Street to Mona Boulevard. Storm water mitigation including planting of vegetation and the installation of irrigation systems. (G13 Contingency Project)

In Torrance, from Route 1 to Fashion Way. Replace Asphalt Concrete (AC) pavement and overlay, repair localized failed areas and slurry left turn pockets in both directions.

In Redondo Beach, from 182nd Street to Redondo Beach Boulevard. Repair multiple water saturated failed asphalt pavement areas with a variety of remedies including fulldepth replacement, asphalt overlay and asphalt digout repairs.

In Torrance, from Route 1 to Redondo Beach Boulevard. Construct curb ramps and reconstruct driveways/sidewalks to meet ADA standards. (G13 Contingency Project)

In Torrance, from Route 1 to Redondo Beach Boulevard. Pavement rehabilitation. (G13 Contingency Project)In the city of Los Angeles, at northbound Pico Boulevard offramp. Remove and replace damaged culverts, replace curb and gutter, and repair roadway.

In the city of Los Angeles, from 120th Street to 3rd Street at various locations. Construct gross solid removal devices, biofiltration devices, and detention basin.

In the cities of Los Angeles and Carson, from L Street to 223rd Street. Construct storm water treatment Best Management Practices.In Los Angeles County, from 405/110 Interchange to Torrance Boulevard Off-ramp. Improvements and construct Auxiliary lane.In cities of Los Angeles, South Pasadena, and Pasadena, from West Sunset Boulevard to East Glenarm Street. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In the city of Los Angeles, in Southeast Los Angeles, from Slauson Avenue to 37th Street. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In the cities of Los Angeles, Pasadena and South Pasadena, from Stadium Way to Arroyo Drive and on northbound off-ramp to Route 5. Upgrade metal beam guardrail, install concrete barrier, removed raised island, and install safety lighting.

In and near the cities of Los Angeles and Carson, from Gaffey Street to College Street. Extend service life of existing pavement and install concrete barrier and metal beam guardrail.

In the city of Los Angeles, at Los Angeles River Bridge No. 53-0421R/L. Spot blast, clean, and paint steel bridge members.In the city of Los Angeles, from Vernon Avenue to Route 101. Upgrade Metal Beam Guardrail to Midwest Guardrail System, end treatments, and crash attenuators.

07 Los Angeles 110 0.7/25.7 31200 4830 0715000051 201.315 18-19 $ 702 $ 29,000 $ - NH $ 20 $ 3,720 $ 105 $ 5,000 $ 38,547 219.0 Field element(s)

07 Los Angeles 110 11.0 31380 4849 0715000095 201.151 18-19 $ 50 $ 2,820 $ - NH $ 110 $ 1,325 $ 20 $ 1,200 $ 5,525 1.0 Drainage system(s)

07 Los Angeles 110 28.7/29.4 32660 5037 0716000117 201.010 18-19 $ 11 $ 2,059 $ - STP $ 600 $ 1,265 $ 15 $ 885 $ 4,835 436.0 Collision(s) reduced

07 Los Angeles 110 25.8/30.6 33150 5083 0716000231 201.010 19-20 $ 4,982 $ 25,284 $ - STP $ 2,835 $ 3,735 $1,318 $ 5,390 $ 43,544 504.0 Collision(s) reduced

07 Los Angeles 110 9.7 33160 5084 0716000233 201.010 18-19 $ 10 $ 1,585 $ - STP $ 304 $ 558 $ 13 $ 756 $ 3,226 30.0 Collision(s) reduced

07 Los Angeles 110 R0.7/8.8 33500 5188 0716000346 201.315 20-21 $ - $ - $ - NH $ 40 $ - $ - $ - $ 40 76.0 Field element(s)

07 Los Angeles 118 R9.0/R10.1 31070 4808 0715000004 201.235 18-19 $ 20 $ 2,654 $ - NH $ 118 $ 1,058 $ 20 $ 1,027 $ 4,897 30.0 Location(s)

07 Los Angeles 134 R13.1 29180 4591 0712000096 201.113 18-19 $ 20 $ 5,360 $ - HBRR-S $ - $ 2,400 $ 63 $ 2,000 $ 9,843 2.0 Bridge(s)

07 Los Angeles 134 2.6/4.8 31160 4816 0715000011 201.335 19-20 $ 30 $ 2,318 $ - NH $ 120 $ 1,050 $ 48 $ 1,100 $ 4,666 12.5 Acre(s) treated/pollutant

07 Los Angeles 134 0.0/R13.3 31170 4817 0715000013 201.121 18-19 $ 376 $ 34,034 $ - NH $ 973 $ 3,800 $ 254 $ 5,735 $ 45,172 112.0 Lane mile(s)

07 Los Angeles 134 R6.3/R8.2 31370 4848 0715000093 201.151 18-19 $ 10 $ - $ - NH $ 200 $ 1,200 $ 50 $ - $ 1,460 3.0 Drainage system(s)

07 Los Angeles 134 0.0/R13.3 33790 5222 0717000052 201.315 21-22 $ - $ - $ - NH $ 454 $ - $ - $ - $ 454 69.0 Field element(s)

07 Los Angeles 138 46.7/50.0 30740 4769 0714000219 201.121 17-18 $ 100 $ 9,608 $ 8,600 12/6/17 NH $ 45 $ 1,329 $ 50 $ 1,458 $ 12,590 16.0 Lane mile(s)

07 Los Angeles 138 0.0/36.9 31040 4804 0715000001 201.121 18-19 $ 128 $ - $ - NH $ 510 $ 1,810 $ 22 $ - $ 2,470 77.0 Lane mile(s)

07 Los Angeles 138 49.5 33290 5155 0716000297 201.010 19-20 $ 141 $ 888 $ - STP $ 329 $ 988 $ 140 $ 711 $ 3,197 17.0 Collision(s) reduced

07 Los Angeles 187 3.5/8.9 30300 4691 0713000493 201.160 17-18 $ 10 $ 10,500 $ 14,500 10/19/16 NH $ 100 $ 3,631 $ 30 $ - $ 14,271 31.4 Lane mile(s)

07 Los Angeles 210 R20.6 1XC30 5173 0717000223 201.130 16-17 $ - $ 465 $ 465 2/22/17 NH $ - $ - $ - $ 90 $ 555 1.0 Location(s)

07 Los Angeles 210 R11.1/R14.8 1XF80 5278 0718000110 201.130 17-18 $ - $ 4,935 $ 4,935 10/20/17 NH $ - $ - $ 150 $ 1,250 $ 6,335 1.0 Location(s)

07 Los Angeles 210 R0.0/R9.7 25940 3884 0714000104 201.335 18-19 $ 106 $ 15,000 $ - NH $ 700 $ 3,600 $ 100 $ 3,000 $ 22,506 33.0 Acre(s) treated/pollutant

In the cities of San Pedro, Carson, Gardena and Los Angeles, from Gaffey Street To Route 5; also on Route 2 at the TMC Building (PM 18.7), Route 5 at Route 10 Interchange (PM 16.9) and Route 405 at Route 105 Interchange (PM 21.3). Upgrade and completion of TMS.

Near Gardena, south of Redondo Beach Boulevard. Replace culvert.In Highland Park and South Pasadena, from south of Avenue 60 to north of Avenue of 64. Place high friction surface treatment (HFST).In the city of Los Angeles and South Pasadena, between Figueroa Street and Orange Grove Avenue. Convert outside lane to a dynamic lane/shoulder that can switch between the two depending on prevailing traffic conditions. This will require Dynamic Message Signs (DMS) monitored by the TMC.

In the city of Los Angeles, at the northbound Route 110 connector to eastbound Route 91. Apply High Friction Bauxite Surface Treatment (HFBST), install high visibility thermoplastic lane and edge lines and upgrade guardrail to current standards.

In Los Angeles County, from Gaffey Street to Route 405; also on Route 210 (PM R0.0/R35.8), Route 605 (PM 19.9/26.0), Route 710 (PM 5.0/9.4) and Route 2 (PM R18.7). Install wireless Bluetooth™ detection system to monitor travel time.

In Mission Hills, from Woodley Avenue to Route 405. Pave areas beyond gore, install access gates, construct maintenance vehicle and shoulder pullouts, upgrade and relocate irrigation systems.

In Pasadena, at Orange Grove Boulevard-E134/134 Overcrossing No. 53-2269S; also on Route 710, at Union Street Overcrossing No. 53-2537 (PM R32.5). Bridge seismic retrofit and bridge rail upgrade.

In and near Burbank, from Bob Hope Drive to Victory Boulevard/Riverside Drive. Stabilize soil and erosion control.In the cities of Los Angeles, Burbank, Glendale and Pasadena, from Route 170 to Route 210. Rehabilitate pavement, upgrade guardrail and ADA curb ramps to current standards.

In Glendale, from east of Concord Street Overcrossing to west of Chevy Chase Drive Undercrossing at three locations. Restore culvert systems. (G13 Contingency Project)

In the city of Los Angeles, from Route 170 to Routes 210/710; also on Route 2 at Route 134 (PM R18.7), on Route 10 at Routes 5/10 (PM 18.3), and on Route 101 near Pleasant Valley Road (PM 11.8). Upgrade Transportation Management System (TMS) elements including Closed Circuit Television (CCTV) cameras, Ramp Metering Systems (RMS), Vehicle Detection Stations (VDS), Highway Advisory Radio (HAR), Changeable Message Signs (CMS) and the communication system network.

In Palmdale, from 30th Street E. to E. Avenue S. Pavement rehabilitation.Near Gorman and Lancaster, from Route 5 to Route 14. Rehabilitate pavement. (G13 Contingency Project)In Palmdale, at the intersection of Avenue R-8. Upgrade traffic signal system, curb ramps and install drainage inlets.In the city of Los Angeles, on Venice Boulevard, from Lincoln Boulevard to Route 10. Rehabilitate pavement.In La Cañada Flintridge, at Gould Avenue. Repair storm damaged culverts and slope stabilization.

In the city of Los Angeles, from Sundland Boulevard to 0.6 mile east of La Tuna Canyon Road. Repair fire damaged facilities.Near Sylmar, San Fernando and Sunland, from Route 5 to Wheatland Avenue. Construct storm water treatment Best Management Practices to reduce Trash Total Maximum Daily Load (TMDL).

07 Los Angeles 210 R15.6/R18.5 29520 4587 0713000019 201.235 16-17 $ - $ 1,800 $ 1,300 6/28/17 NH $ 73 $ 750 $ 3 $ 770 $ 3,396 216.0 Location(s)

07 Los Angeles 210 R18.5/R24.9 29690 4604 0713000112 201.235 17-18 $ 30 $ 1,974 $ - NH $ 101 $ 998 $ 30 $ 950 $ 4,083 16.0 Location(s)

07 Los Angeles 210 R33.7/R39.8 30170 4705 0714000033 201.335 19-20 $ 30 $ 3,662 $ - NH $ 144 $ 1,175 $ 30 $ 1,054 $ 6,095 18.3 Acre(s) treated/pollutant

07 Los Angeles 210 R32.8/R44.7 30190 4707 0714000030 201.235 18-19 $ 30 $ 5,488 $ - NH $ 220 $ 1,270 $ 26 $ 1,252 $ 8,286 44.0 Location(s)

07 Los Angeles 210 R25.0/R32.8 30360 4708 0714000031 201.235 18-19 $ 30 $ 2,624 $ - NH $ 144 $ 854 $ 31 $ 850 $ 4,533 47.0 Location(s)

07 Los Angeles 210 R38.6/R38.9 30930 4788 0714000281 201.113 19-20 $ 130 $ 6,395 $ - HBRR-S $ 225 $ 1,137 $ 20 $ 1,600 $ 9,507 5.0 Bridge(s)

07 Los Angeles 210 R0.0/R9.7 30960 4801 0714000299 201.122 18-19 $ 490 $120,000 $ - NH $ 500 $ 6,000 $ 500 $16,500 $ 143,990 51.7 Lane mile(s)

07 Los Angeles 210 R24.6/R25.3 31100 4810 0715000005 201.235 19-20 $ 30 $ 2,970 $ - NH $ 118 $ 950 $ 30 $ 990 $ 5,088 53.0 Location(s)

07 Los Angeles 213 2.7/3.9 25310 3734 0700000457 201.151 19-20 $ 260 $ - $ - NH $ 234 $ 923 $ 310 $ - $ 1,727 3.0 Drainage system(s)

07 Los Angeles 213 0.0/8.0 30660 4743 0714000178 201.361 18-19 $ 176 $ - $ - NH $ 1,087 $ 500 $ 50 $ - $ 1,813 188.0 Curb ramp(s)

07 Los Angeles 405 48.0/48.5 1XC70 5177 0717000234 201.130 16-17 $ 50 $ 536 $ 536 3/23/17 NH $ - $ - $ 10 $ 100 $ 696 1.0 Location(s)

07 Los Angeles 405 11.7/12.2 28910 4457 0700021123 201.321 16-17 $ 20 $ 4,872 $ - ST-CASH $ 210 $ 1,400 $ 5 $ 1,050 $ 7,557 1.0 Location(s)

07 Los Angeles 405 0.7/6.7 29610 4598 0713000035 201.235 17-18 $ 1 $ 2,165 $ - NH $ 220 $ 1,130 $ 5 $ 700 $ 4,221 105.0 Location(s)

07 Los Angeles 405 R21.5/26.3 29630 4593 0713000030 201.235 17-18 $ 1 $ 2,130 $ - NH $ 220 $ 1,150 $ 5 $ 750 $ 4,256 44.0 Location(s)

07 Los Angeles 405 33.0/35.5 29850 4629 0713000270 201.310 17-18 $ 750 $ 14,830 $ - NH $ 480 $ 2,120 $ 60 $ 2,930 $ 21,170 3,000.0 1,000 vehicle hour(s)/yr

07 Los Angeles 405 8.8 30480 4721 0714000084 201.119 19-20 $ 395 $ 1,574 $ - HBRR-S $ 301 $ 525 $ 203 $ 351 $ 3,349 1.0 Bridge(s)

07 Los Angeles 405 42.9 30510 4724 0714000097 201.321 18-19 $ - $ 2,195 $ - ST-CASH $ 528 $ 983 $ 12 $ 890 $ 4,608 1.0 Location(s)

07 Los Angeles 405 28.0/39.0 30780 4773 0714000222 201.121 16-17 $ 96 $ 1,687 $ 1,590 8/16/17 NH $ 124 $ 953 $ 151 $ 773 $ 3,784 2.4 Lane mile(s)

07 Los Angeles 405 32100 4984 0716000044 201.111 21-22 $ - $ - $ - HBRR-S $ 2,140 $ - $ - $ - $ 2,140 3.0 Bridge(s)

07 Los Angeles 605 R17.0/R19.5 30400 4713 0714000056 201.235 18-19 $ - $ 2,779 $ - NH $ 168 $ 900 $ 60 $ 1,283 $ 5,190 60.0 Location(s)

07 Los Angeles 605 R15.5/R19.5 30770 4772 0714000221 201.121 16-17 $ 163 $ 1,227 $ 1,455 8/16/17 NH $ 30 $ 637 $ 50 $ 221 $ 2,328 0.1 Lane mile(s)

In and near Glendale and La Canada Flintridge, from Lowell Avenue to Waltonia Drive. Enhance highway worker safety by installing access gates and maintenance vehicle pullouts, and pave misc. areas.

In and near La Canada Flintridge and Pasadena from Waltonia Drive to Route 134/210 interchange. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In the cities of Monrovia, Duarte, Irwindale and Azusa, from Myrtle Avenue to Azusa Avenue. Stabilize soil and erosion control.In the cities of Monrovia, Duarte, Irwindale, Azusa and Glendora, from Huntington Drive to Route 57. Roadside safety improvements.In Pasadena, Arcadia and Monrovia, from Route 710 to Huntington Drive. Roadside safety improvements.In Los Angeles County on Routes 210, 405 and 605 at various locations. Bridge seismic retrofit and bridge rail upgrade at five locations.In the city of Los Angeles, from Route 5 to North Wheatland Avenue. Rehabilitate roadway.In Pasadena, at the Route 210/134/710 Interchange. Roadside safety improvements.In Rancho Palos Verdes, from Caddington Drive to Peninsula Verde Drive. Replace two damaged drainage systems. (G13 Contingency Project)

In the cities of Rancho Palos Verdes, Lomita and Los Angeles, from W 25th Street to W Carson Street at various locations. Upgrade curb ramps, sidewalks and driveways to meet ADA standards. (G13 Contingency Project)

In Mission Hills, from 0.2 mile north of Rinaldi Street to Route 5. Repair slope washout and remove debris, repair and improve drainage system, and install Rolled Erosion Control Product (netting) on stabilized slopes.

In Carson, from Avalon Boulevard to Main Street. Reconstruct commercial vehicle enforcement facility.In Long Beach and Signal Hill, from Los Cerritos Channel to Pacific Avenue. Enhance highway worker safety by miscellaneous paving, relocating irrigation, and other measures.

In and near the cities of Inglewood, Los Angeles, and Culver City, from 105 to Port Road. Enhance highway worker safety by replacing crash cushions, miscellaneous paving, and other measures.

In the city of Los Angeles, near Bel Air, from Sunset Boulevard to south of Bel Air Crest Road. Upgrade existing temporary ramps.In Carson, at Dolores Yard Overhead Bridge No. 53-1168. Upgrade bridge drainage system.In Van Nuys, near Saticoy Street. Replace and install Weight In Motion system.In the city of Los Angeles, near Westwood and Sherman Oaks, from Venice Boulevard to Route 101. Pavement rehabilitation.In Long Beach, at the San Gabriel River (Bridge No. 53 -1185) and SB LA-605 to NB I-405 connector (Bridge No. 53 -1737H); also in Orange County on I-405 at the SB 405 to NB 605 connector (Bridge No. 55-0413F; 12-Ora-405-PM 24.1). Retrofit scour critical bridges to preserve the structural integrity of the bridges by enlarging and deepening pile cap, adding Cast in Drilled Hole (CIDH) piles and reinforcing the area with Rock Slope Protection (RSP).

In and near Industry, from south of Route 60 to Valley Boulevard. Roadside safety improvements.

In and near Pico Rivera and Industry, from Rose Hills Road to Valley Boulevard. Pavement rehabilitation.

07 Los Angeles 605 R10.1/15.7 30980 4799 0714000304 201.010 16-17 $ 12 $ 4,618 $ 3,368 7/21/17 STP $ 70 $ 690 $ 20 $ 690 $ 6,100 363.0 Collision(s) reduced

07 Los Angeles 605 R0.0/26.0 31190 4819 0715000016 201.315 18-19 $ - $ 10,562 $ - NH $ 20 $ 2,299 $ 2 $ 2,490 $ 15,373 115.0 Field element(s)

07 Los Angeles 605 23.4/23.6 31880 4963 0716000001 201.010 19-20 $ 1,077 $ 3,520 $ - STP $ - $ 1,232 $ 276 $ 1,340 $ 7,445 203.0 Collision(s) reduced

07 Los Angeles 605 R0.0/R10.2 32030 4979 0716000033 201.122 21-22 $ - $ - $ - NH $ 1,960 $ - $ - $ - $ 1,960 104.0 Lane mile(s)

07 Los Angeles 605 20.2/26.0 32550 5029 0716000085 201.121 21-22 $ - $ - $ - NH $ 1,375 $ - $ - $ - $ 1,375 39.5 Lane mile(s)

07 Los Angeles 710 20.9/24.6 20212 4137A 0700020870 201.120 17-18 $34,261 $ 94,000 $ 96,367 6/28/17 NH $ 100 $ 2,000 $1,200 $21,300 $ 152,861 20.0 Lane mile(s)

07 Los Angeles 710 23.3/25.6 30440 4717 0714000061 201.335 18-19 $ 30 $ 3,425 $ - NH $ 54 $ 910 $ 63 $ 1,138 $ 5,620 46.4 Acre(s) treated/pollutant

07 Los Angeles 710 23.6/26.3 31340 4845 0715000089 201.151 18-19 $ 50 $ 1,207 $ - NH $ 100 $ 155 $ 47 $ 205 $ 1,764 10.0 Drainage system(s)

07 Los Angeles Var 1XC40 5174 0717000225 201.130 16-17 $ - $ 311 $ 311 2/16/17 NH $ - $ - $ - $ 30 $ 341 8.0 Location(s)

07 Los Angeles Var 1XC60 5176 0717000233 201.130 16-17 $ - $ 830 $ 830 3/10/17 NH $ - $ - $ - $ 160 $ 990 6.0 Location(s)

07 Los Angeles Var 1XE20 5262 0717000267 201.130 16-17 $ - $ 360 $ 360 4/6/17 NH $ - $ - $ - $ 72 $ 432 7.0 Location(s)

07 Los Angeles Var 1XE30 5263 0718000107 201.130 17-18 $ 50 $ 375 $ 375 11/8/17 NH $ - $ - $ 50 $ 120 $ 595 4.0 Location(s)

07 Ventura 1 0.8 1XF90 5279 0718000156 201.130 17-18 $ 50 $ 585 $ 585 11/29/17 NH $ - $ - $ 25 $ 150 $ 810 1.0 Location(s)

07 Ventura 1 28.2 29650 4601 0713000099 201.112 20-21 $ 818 $ 2,657 $ - HBRR-S $ 958 $ 2,300 $ 465 $ 2,000 $ 9,198 724.0 Linear feet

07 Ventura 1 21.2/28.5 2X050 5066 0717000273 201.130 16-17 $ 100 $ 3,215 $ 3,215 4/11/17 NH $ - $ - $ 50 $ 650 $ 4,015 1.0 Location(s)

In Pico Rivera and Whittier, from Telegraph Road to Rose Hills Road; also in El Monte and Baldwin Park from Ramona Boulevard to Route 210 (PM 20.9/25.6). Replace damaged concrete slabs, grind and groove concrete pavement to increase roadway surface friction during wet conditions.

In various cities, from Orange County line to Route 210; also on Route 2 at the TMC (PM R18.7) and Route 5 (PM 6.8). Upgrade Transportation Management System.

In Irwindale, at the Route 605 northbound ramp to westbound Live Oak Avenue. Realign and widen ramp, construct retaining wall, install concrete barrier and replace guardrail.

In various cities, from Orange County line to Telegraph Road. Replace structural section on lanes 3 and 4 and other damaged concrete slabs on other lanes. Cold plane and overlay Rubberized Hot Mix Asphalt (RHMA-G) on right shoulders and apply High Friction Surface Treatment (HFST) on ramps and connectors.

In the cities of Irwindale and Baldwin Park, from Route 10 Interchange to the end of the freeway at Route 210. Grind mainline pavement and replace damaged stabs with Jointed Plain Concrete Pavement (JPCP) rapid strength concrete and/or Individual Precast Slab Replacement (IPSR), cold plane and overlay median, shoulders, ramps with Hot Mix Asphalt (HMA), construct additional lane on southbound Arrow Highway off ramp/modify signal, install and upgrade guardrail.

In Bell, Vernon, Commerce and East Los Angeles, from 0.2 mile south of Slauson Avenue Overcrossing to 0.1 mile north of 3rd Street Overcrossing. Rehabilitate roadway including widening median, lane and shoulder to meet current standard widths.

In East Los Angeles, from Route 5 to north of Floral Drive; also on Route 60 (PM R2.9/R3.8), from west of Marina Avenue Pedestrian Overcrossing to Mednick Avenue. Stabilize soil and erosion control.

In the cities of Los Angeles and Monterey Park, from Olympic Boulevard to Ramona Boulevard. Rehabilitate culverts.Near Long Beach, on Route 47, 110, and 405 at various locations. Repair embankment washouts and repair sinkhole.In and near the city of Los Angeles, at various locations on Route 2 (PM 12.9 to PM 13.6), Route 5 (PM 23.6 to PM 30.8), Route 134 (PM 2.1 to PM 2.3), and Route 710 (PM 21.9 to PM 22.1), (PM 26.3 to PM 26.5), (PM T31.7 to T32.1). Repair water saturated failed asphalt pavement with asphalt overlay and asphalt digout repairs.

Near San Fernando, from Sheldon Street to Lankershim Boulevard; also near Santa Clarita, at 0.5 mile north of Weldon Canyon Road; also on Route 210 at various locations (PM R7.0, PM R9.2 to PM 9.6, and PM R9.6). Repair washed out slopes and repair drainage systems.

In Los Angeles County, on Routes 5 and 210 at various locations. Repair drainage systems, reconstruct embankments, and recompact bridge abutment slope.

In Malibu, at Tonga Street. Remove existing drainage pipe, construct drainage junction box, install a twentyfour inch CSP culvert, and repair sinkhole.

Near Sea Cliff, at Willow Creek Bridge No. 52-003; also in Ojai, on Route 33 at North Fork Matilija Bridges No. 52-0044 (PM 15.8) and No. 52-0173 (PM16.1). Upgrade bridge railings to meet current standards.

Near the City of Ventura, from Solimar Undercrossing to Mobile Pier Road; also on Route 101 from Main Street to Santa Barbara County line. Repair sinkhole, reconstruct washouts, and repair drainage systems.

07 Ventura 1 0.0/4.4 30330 4696 0714000008 201.121 17-18 $ 66 $ 4,875 $ - NH $ 44 $ 830 $ 60 $ 970 $ 6,845 14.1 Lane mile(s)

07 Ventura 1 4.0/4.2 31820 4930 0715000286 201.131 19-20 $ 766 $ 27,179 $ - NH $ 1,200 $ 1,900 $ 100 $ 2,600 $ 33,745 2.0 Location(s)

07 Ventura 1 21.5 31960 4972 0716000025 201.110 21-22 $ - $ - $ - HBRR-S $ 1,200 $ - $ - $ - $ 1,200 1.0 Bridge(s)

07 Ventura 1 4.5/4.6 33350 5181 0716000312 201.131 21-22 $ - $ - $ - NH $ 2,300 $ - $ - $ - $ 2,300 1.0 Location(s)

07 Ventura 23 R3.3/R11.5 30250 4688 0713000479 201.122 18-19 $ 860 $ 92,445 $ - NH $ 889 $ 7,500 $ 100 $17,000 $ 118,794 57.0 Lane mile(s)

07 Ventura 23 0.0/R3.3 30350 4698 0714000007 201.121 17-18 $ 20 $ 3,646 $ - NH $ 32 $ 750 $ 20 $ 900 $ 5,368 12.3 Lane mile(s)

07 Ventura 33 15.4/52.0 1XC90 5179 0717000266 201.130 16-17 $ 260 $ 2,700 $ 2,700 4/6/17 NH $ - $ - $ 100 $ 600 $ 3,660 1.0 Location(s)

07 Ventura 33 7.6 29130 4496 0712000083 201.111 18-19 $ 2,750 $ 2,460 $ - HBRR-S $ 1,640 $ 1,112 $ 600 $ 1,460 $ 10,022 1.0 Bridge(s)

07 Ventura 33 0.0/6.3 30340 4697 0714000006 201.121 17-18 $ 20 $ 12,309 $ - NH $ 80 $ 1,165 $ 5 $ 1,785 $ 15,364 24.6 Lane mile(s)

07 Ventura 33 16.1 32300 5008 0716000060 201.119 21-22 $ - $ - $ - HBRR-S $ 320 $ - $ - $ - $ 320 1.0 Bridge(s)

07 Ventura 34 10.4/12.1 1XC50 5175 0717000224 201.130 16-17 $ 40 $ 535 $ 535 3/14/17 NH $ - $ - $ 20 $ 50 $ 645 1.0 Location(s)

07 Ventura 101 29.8 29040 4490 0712000034 201.378 16-17 $ 31 $ 568 $ 428 3/15/17 NH $ 102 $ 850 $ 15 $ 500 $ 2,066 1.0 Structure(s)

07 Ventura 101 30.2/31.4 29540 4710 0713000018 201.235 17-18 $ - $ 1,931 $ - NH $ 115 $ 700 $ 2 $ 700 $ 3,448 25.0 Location(s)

07 Ventura 101 R36.7/R40.3 30240 4687 0713000488 201.122 19-20 $ 70 $ 19,270 $ - NH $ 100 $ 1,700 $ 200 $ 2,100 $ 23,440 21.6 Lane mile(s)

07 Ventura 101 27.5/31.0 31130 4813 0715000009 201.335 18-19 $ 20 $ 1,823 $ - NH $ 95 $ 1,196 $ 24 $ 959 $ 4,117 22.5 Acre(s) treated/pollutant

07 Ventura 118 12.0/13.2 1XA70 5167 0717000195 201.130 16-17 $ 20 $ 530 $ 530 1/18/17 NH $ - $ - $ 10 $ 190 $ 750 1.0 Location(s)

07 Ventura 118 19.1/30.5 30760 4771 0714000220 201.121 16-17 $ 150 $ 2,292 $ 1,255 8/16/17 NH $ 200 $ 750 $ 50 $ 800 $ 4,242 0.3 Lane mile(s)

07 Ventura 118 R24.1/R29.7 31650 4894 0715000210 201.235 18-19 $ 10 $ 3,250 $ - NH $ 677 $ 1,369 $ 39 $ 1,292 $ 6,637 100.0 Location(s)

07 Ventura 126 R13.6/R34.6 30140 4703 0714000021 201.121 16-17 $ 360 $ 20,445 $ 22,928 8/16/17 NH $ 220 $ 1,450 $ 130 $ 2,700 $ 25,305 84.0 Lane mile(s)

07 Ventura 126 0.0/R13.6 30220 4685 0713000481 201.121 16-17 $ 170 $ 12,800 $ 15,837 8/16/17 NH $ 120 $ 1,040 $ 50 $ 1,700 $ 15,880 40.0 Lane mile(s)

07 Ventura 126 R10.2/R12.7 31150 4815 0715000012 201.335 18-19 $ 30 $ - $ - NH $ 130 $ 916 $ 102 $ - $ 1,178 22.5 Acre(s) treated/pollutant

07 Ventura 126 1.0/R8.2 31220 4832 0715000066 201.335 17-18 $ 24 $ 4,930 $ - NH $ 706 $ 2,055 $ 20 $ 1,450 $ 9,185 44.1 Acre(s) treated/pollutant

Near Oxnard, from Los Angeles County line to south of Sycamore Canyon Road. Rehabilitate pavement.In Ventura County, south of Point Mugu State Park (PM 4.0) and Sycamore Canyon Road (PM 4.2). Construct secant walls at two locations as a permanent slope restoration solution to stabilize the slope and prevent continued erosion. Two previous Director Orders: 07-4X370 and 07-4X760 were executed to remove slide material and repair embankment, roadway and drainage systems.

Near the city of Ventura, at Ventura Overhead No. 52-0040. Replace corroded steel spans of bridge and upgrade bridge railing to current standards.

Near Point Mugu State Park, at Big Sycamore Creek No. 52 -0011. Shoreline embankment restoration by replacing Rock Slope Protection (RSP), constructing seawalls and secant retaining wall, and upgrade guardrail.

In and near cities of Thousand Oaks and Moorpark, from Route 101 to Route 118. Rehabilitate pavement.In Thousand Oaks, from Carlisle Road to Route 101. Rehabilitate pavement.Near Mira Monte, from Matilija Hot Springs Road to 1.9 miles south of Apache Canyon Road. Remove multiple slide debris, stabilize slopes, and repair drainage systems.

Near Oak View, at San Antonio Creek Bridge No. 52-0065. Scour mitigation and bridge rail upgrade.

In and near the city of Ventura, from Route 101 to south of Park View Drive. Rehabilitate pavement.

Near Ojai, at North Fork Matilija Creek No. 52-0173. Paint steel portion of bridge and replace missing rivets of bottom flanges for preventative maintenance to preserve and extend the life of bridge.

In Camarillo, from Los Posas Road to 0.4 mile west of Pleasant Valley Road. Remove and replace damaged drainage systems, remove debris from channel, and repair roadway.

In the city of Ventura, at Ash Street Pedestrian Overcrossing. Upgrade pedestrian overcrossing to Americans with Disabilities Act (ADA) standards.

In the city of Ventura, at the Route 33 interchange. Enhance highway worker safety by miscellaneous paving, replacing crash cushions, and other measures.

Near Sea Cliff, from Padre Juan Canyon Road Overcrossing to Punta Gorda Pedestrian Undercrossing. Rehabilitate roadway.In the city of Ventura, from south of Seaward Avenue to Ventura River. Stabilize soil and erosion control.Near Camarillo, from Sand Canyon Road to Balcom Canyon Road. Repair slope washout and drainage systems.In Moorpark and Simi Valley, from east of Arroyo Simi Overhead to 2.1 miles west of the Los Angeles County line. Pavement rehabilitation.

In Simi Valley, from First Street to Yosemite Street. Construct maintenance vehicle pullouts and access roads, pave gore areas, install smart irrigation controllers and access gates. Plant vines at bridge wingwalls.

In and near Fillmore, from Haun Creek Bridge to Los Angeles County line. Pavement rehabilitation.

In and near the cities of Ventura and Santa Paula, from Route 101 to Haun Creek Bridge. Rehabilitate pavement.In Santa Paula, from Peck Road to Santa Paula Creek. Stabilize soil and install irrigation system. (G13 Contingency Project)In and near the city of Ventura, at various locations from west of Victoria Avenue to east of Route 118. Install storm water mitigation devices.

07 Ventura 126 R8.2/R12.8 31240 4834 0715000064 201.335 16-17 $ 168 $ 5,680 $ 2,326 8/16/17 NH $ 570 $ 2,000 $ 50 $ 1,400 $ 9,868 31.9 Acre(s) treated/pollutant

07 Ventura 150 1.6/8.5 1XE10 5261 0717000255 201.130 16-17 $ 25 $ 655 $ 655 3/14/17 NH $ - $ - $ 20 $ 120 $ 820 2.0 Location(s)

07 Ventura 150 20.2 1XG00 5299 0718000157 201.130 17-18 $ 25 $ 500 $ 500 11/20/17 NH $ - $ - $ 25 $ 125 $ 675 1.0 Location(s)

07 Ventura 150 16.6/34.4 30670 4746 0714000179 201.361 19-20 $ 556 $ 4,549 $ - NH $ 908 $ 1,000 $ 100 $ 1,000 $ 8,113 134.0 Curb ramp(s)

07 Ventura VAR 31330 4842 0715000085 201.335 17-18 $ 37 $ 530 $ - NH $ 175 $ 1,100 $ 17 $ 1,098 $ 2,957 1.0 Acre(s) treated/pollutant

08 Riverside 10 R29.3/R33.1 0Q890 0010C 0800020582 201.119 16-17 $ 55 $ 1,906 $ 1,525 8/16/17 HBRR-S $ 210 $ 652 $ 40 $ 600 $ 3,463 9.0 Bridge(s)

08 Riverside 10 44.4/R52.3 1C060 0015N 0812000256 201.121 17-18 $ 5 $ 15,210 $ 7,723 8/16/17 NH $ 396 $ 924 $ 30 $ 1,350 $ 17,915 48.0 Lane mile(s)

08 Riverside 10 R60.9/R74.0 1C081 3008A 0816000086 201.122 21-22 $ - $ - $ - NH $ 7,000 $ - $ - $ - $ 7,000 52.4 Lane mile(s)

08 Riverside 10 R105.0/R134.0 1C082 3008Y 0816000087 201.122 19-20 $ 10 $263,010 $ - NH $16,900 $21,800 $ 153 $37,500 $ 339,373 116.0 Lane mile(s)

08 Riverside 10 R134.0/R156.5 1C083 3009K 0816000090 201.122 21-22 $ - $ - $ - NH $ 9,000 $ - $ - $ - $ 9,000 90.0 Lane mile(s)

08 Riverside 10 6.8/9.6 1C210 0005U 0812000305 201.235 17-18 $ 7 $ 1,229 $ - NH $ 184 $ 226 $ 21 $ 198 $ 1,865 90.0 Location(s)

08 Riverside 10 8.2/R25.1 1C380 0007N 0812000303 201.122 17-18 $ 25 $178,910 $ - NH $ 5,191 $10,591 $ 291 $11,215 $ 206,223 153.9 Lane mile(s)

08 Riverside 10 27.7 1E570 3002F 0814000051 201.110 18-19 $ 20 $ 12,399 $ - HBRR-S $ 953 $ 1,645 $ 8 $ 2,300 $ 17,325 2.0 Bridge(s)

08 Riverside 10 R74.1 1E720 3002G 0814000087 201.119 18-19 $ 30 $ 1,472 $ - HBRR-S $ 350 $ 660 $ 20 $ 660 $ 3,192 7.0 Bridge(s)

08 Riverside 10 0.0/R156.4 1F372 3005C 0815000162 201.170 18-19 $ 10 $ - $ - NH $ 333 $ 722 $ 45 $ - $ 1,110 758.0 Sign(s)

08 Riverside 10 R110.5 1F410 3002L 0814000216 201.112 18-19 $ 10 $ 1,846 $ - HBRR-S $ 139 $ 342 $ 10 $ 1,567 $ 3,914 520.0 Linear feet

08 Riverside 10 6.0/70.0 1F560 3002Q 0814000249 201.240 18-19 $ 7,600 $ - $ - NH $ 150 $ - $ 15 $ - $ 7,765 30.0 Location(s)

08 Riverside 10 R3.2/R5.3 1F920 3002T 0815000059 201.315 17-18 $ 10 $ 3,228 $ - NH $ 425 $ 450 $ 20 $ 550 $ 4,683 6.0 Field element(s)

08 Riverside 10 29.6 1F950 3004F 0815000076 201.010 16-17 $ 35 $ 441 $ 376 11/29/16 STP $ 196 $ 345 $ 11 $ 160 $ 1,188 19.0 Collision(s) reduced

08 Riverside 15 4.8/6.5 1C140 0016M 0812000264 201.235 16-17 $ 7 $ 1,623 $ 1,075 10/19/16 NH $ 224 $ 271 $ 28 $ 232 $ 2,385 62.0 Location(s)

08 Riverside 15 6.5/8.2 1C200 0019P 0812000279 201.235 17-18 $ 7 $ 2,435 $ - NH $ 347 $ 433 $ 41 $ 358 $ 3,621 258.0 Location(s)

In and near Santa Paula, from east of Todd Road to west of S. Hallock Drive. Storm water mitigation.

Near Mira Monte, from 1.0 mile east of Mission Ranch Road to 2.8 miles west of Santa Ana Road. Remove rock slide debris, stabilize slope including removing loose boulders, and install a cable netting drapery system on slope.

Near Ojai, about 0.2 mile east of Reeves Road. Replace existing reinforced concrete box culvert with a precast reinforced concrete box culvert and repair roadway.

In and near cities of Ojal and Santa Paula, from Route 33 to Route 126. Construct and upgrade curb ramps and sidewalks to comply with ADA standards.

In various cities, at various locations on various Routes. Install storm water mitigation devices.In Riverside and San Bernardino counties, on Routes 10, 111, and 215 at various locations. Rehabilitate 9 structures.In and near Indio, from Monterey Avenue to Jefferson Overcrossing. Rehabilitate pavement.In and near Coachella, from 0.5 mile east of Coachella Canal to Hazy Gulch Bridge. Cold plane pavement and overlay with Portland Cement Concrete (PCC). Construct eastbound truck climbing lane. A one-lane temporary detour will be constructed in the median for traffic handling.

Near Blythe, from Rice Road/SR-177 to Teed Ditch Bridge. Cold plane mainline pavement and overlay with Portland Cement Concrete (PCC). The shoulders and ramps will be milled and overlaid with Hot Mix Asphalt (HMA-A). A two lane temporary detour will be constructed in the median for traffic handling.

In and near Blythe, from Teed Ditch Bridge to Arizona State line. Cold plane mainline pavement and overlay with Portland Cement Concrete (PCC). The shoulders and ramps will be milled and overlaid with Hot Mix Asphalt (HMA-A). A two lane temporary detour will be constructed in the median for traffic handling.

In Beaumont, from Route 60 westbound off-ramp to Highland Springs Avenue. Roadside safety improvements.In and near Beaumont and Banning, from Pennsylvania Avenue to Route 111. Rehabilitate pavement.Near Palm Springs, at Whitewater River Bridge No. 56-0004 L/R. Bridge rehabilitation and scour mitigation.In Riverside County, on Routes 10 and 91, at various locations; also in San Bernardino County, on Routes 10 and 15, at various locations. Repair bridge decks.

In Riverside County, on Routes 10, 15, 71 and 215 at various locations. Replace existing guide signs with Type XI reflectivity. (G13 Contingency Project)

Near Desert Center, at Palen Ditch Bridge No. 56-0040 R/L. Bridge rail replacement.In Riverside County, on Routes 10, 62, 74, 86, 86S, 111 and 95 at various locations. Advance mitigation. (Financial Contribution Only)In the cities of Calimesa and Beaumont, from Cherry Valley Boulevard to 14th Street/ San Timoteo Canyon Road; also on Routes 60 and 86 at various locations. Install Changeable Message Signs.

In Whitewater, at the West Route 62 to East Route 10 Connector Overcrossing. Apply high friction surface treatment.In Temecula, from 0.2 mile south of Rancho California Overcrossing to 0.1 mile south of Winchester Road Overcrossing. Roadside safety improvements.

In Temecula, from Route 79/Winchester Road to southbound on-ramp from Route 215. Roadside safety improvements.

08 Riverside 15 0.0/4.8 1C220 0014J 0812000277 201.235 16-17 $ 7 $ 1,130 $ 1,163 1/17/17 NH $ 183 $ 221 $ 23 $ 198 $ 1,762 45.0 Location(s)

08 Riverside 15 45.6/47.3 1C610 0028C 0812000336 201.335 16-17 $ 7 $ 1,667 $ 697 10/19/16 NH $ 213 $ 267 $ 27 $ 346 $ 2,527 28.0 Acre(s) treated/pollutant

08 Riverside 15 R0.0/3.0 1F141 3003K 0815000231 201.122 19-20 $ 10 $ - $ - NH $ 1,014 $ 1,200 $ 10 $ - $ 2,234 24.0 Lane mile(s)

08 Riverside 15 23.9/33.4 1F142 3003L 0815000232 201.121 18-19 $ 10 $ - $ - NH $ 1,108 $ 926 $ 10 $ - $ 2,054 57.0 Lane mile(s)

08 Riverside 15 38.2/51.5 1F143 3003M 0815000233 201.121 19-20 $ 10 $ 24,040 $ - NH $ 1,022 $ 930 $ 10 $ 4,771 $ 30,783 79.8 Lane mile(s)

08 Riverside 15 23.8/33.4 1F870 3004G 0815000063 201.010 16-17 $ 10 $ 706 $ 557 2/13/17 STP $ 294 $ 546 $ 20 $ 359 $ 1,935 187.0 Collision(s) reduced

08 Riverside 15 R2.2/R2.9 1H310 3005V 0817000012 201.130 16-17 $ - $ 500 $ 500 8/3/16 NH $ - $ 60 $ - $ 150 $ 710 1.0 Location(s)

08 Riverside 60 22.2/26.6 0Q180 0045G 0800020220 201.010 18-19 $ 250 $ 25,000 $ - STP $ 2,000 $ 1,500 $ 200 $ 3,700 $ 32,650 330.0 Collision(s) reduced

08 Riverside 60 22.1/26.6 1C090 0033N 0812000287 201.121 18-19 $ - $ 15,000 $ - NH $ - $ - $ - $ - $ 15,000 17.6 Lane mile(s)

08 Riverside 60 R12.2/21.4 1C160 0033P 0812000262 201.235 17-18 $ 7 $ 2,007 $ - NH $ 303 $ 361 $ 34 $ 376 $ 3,088 70.0 Location(s)

08 Riverside 60 R0.0/12.2 1C640 0033R 0812000339 201.315 16-17 $ 7 $ 1,928 $ 1,604 12/7/16 NH $ 174 $ 520 $ 75 $ 634 $ 3,338 24.0 Field element(s)

08 Riverside 60 R0.0/7.5 1E650 0033S 0814000059 201.010 16-17 $ 10 $ 16,250 $ 13,015 9/22/16 STP $ 630 $ 1,403 $ 113 $ 1,753 $ 20,159 486.0 Collision(s) reduced

08 Riverside 60 R0.0/22.3 1F371 0022K 0815000163 201.170 19-20 $ 10 $ 1,592 $ - NH $ 125 $ 260 $ 15 $ 210 $ 2,212 221.0 Lighting fixture(s)

08 Riverside 60 16.6 1H140 3006X 0816000162 201.010 18-19 $ 90 $ 646 $ - STP $ 397 $ 546 $ 99 $ 566 $ 2,344 14.0 Collision(s) reduced

08 Riverside 62 R6.7/9.2 1E840 0023C 0814000113 201.121 19-20 $ 2,209 $ 35,355 $ - NH $ 1,450 $ 2,800 $1,110 $ 4,520 $ 47,444 85.5 Lane mile(s)

08 Riverside 74 28.1/37.5 0N670 0056H 0800000536 201.010 17-18 $ 5,545 $ 24,896 $ - STP $ 2,450 $ 2,215 $1,860 $ 3,950 $ 40,916 26.0 Collision(s) reduced

08 Riverside 74 11.8/14.4 0R310 0050M 0812000057 201.378 17-18 $ 158 $ 1,280 $ - NH $ 465 $ 962 $ 463 $ 521 $ 3,849 22.0 Structure(s)

08 Riverside 74 52.1/92.0 0R780 0050L 0812000165 201.015 16-17 $ 117 $ 4,976 $ 4,454 6/28/17 STP $ 800 $ 705 $ 80 $ 1,289 $ 7,967 126.0 Collision(s) reduced

08 Riverside 74 7.0/R14.4 1C590 3001Y 0812000334 201.335 18-19 $ 10 $ 2,918 $ - NH $ 310 $ 452 $ 20 $ 495 $ 4,205 12.0 Acre(s) treated/pollutant

08 Riverside 74 13.2/34.0 1C680 3002C 0812000343 201.112 19-20 $ 50 $ 6,245 $ - HBRR-S $ 505 $ 2,700 $ 80 $ 2,800 $ 12,380 800.0 Linear feet

08 Riverside 74 0.0/5.8 1C850 0050P 0813000047 201.010 19-20 $ 20 $ 53,600 $ - STP $ 3,934 $ 2,590 $ 20 $ 4,985 $ 65,149 298.0 Collision(s) reduced

08 Riverside 74 R14.8/15.2 1E050 0050N 0813000139 201.010 16-17 $ 100 $ 1,782 $ 1,163 6/30/17 STP $ 911 $ 800 $ 100 $ 730 $ 4,423 41.0 Collision(s) reduced

08 Riverside 74 37.7/44.7 1E460 3001J 0814000026 201.010 17-18 $ 131 $ 9,328 $ - STP $ 500 $ 1,070 $ 300 $ 1,670 $ 12,999 70.0 Collision(s) reduced

In and near Temecula, from the San Diego County line to the southbound on-ramp at Rancho California Overcrossing. Roadside safety improvements.

In and near Norco, from 6th Street to 0.2 mile south of 68th Street. Sediment stabilization and erosion control.In and near Temecula, from Rainbow Valley Boulevard to Front Street. Rehabilitate roadway. (G13 Contingency Project)In and near Terra Cotta, from Nichols Road to north of Glen Ivy. Concrete pavement slab replacement. (G13 Contingency Project)In and near Corona, from south of Ontario Avenue to Route 60. Concrete pavement slab replacement.In and near Lake Elsinore, from Nichols Road to Temescal Canyon Road. Construct rumble strips.

In Temecula, from 1.1 miles north of Truck Inspection Station to Temecula River Bridge. Remove fire damaged trees, reconstruct barrier railing and install erosion control measures.

Near Beaumont, from Gilman Springs Road to 1.4 miles west of Jack Rabbit Trail. Construct left and right shoulders for westbound direction.Near Beaumont, from Gilman Springs Road to 1.4 miles west of Jack Rabbit Trail. Rehabilitate pavement.In Moreno Valley, from Route 60/215 Separation to Theodore Street westbound off ramp. Roadside safety improvements.In and near the city of Riverside, on Route 60 from Milliken Avenue to Routes 60/91/215 Junction; also on Route 91 from Spruce Street to Routes 60/91/215 Junction. Replace transportation wireless communication system with fiber optic infrastructure.

Near Ontario, from the San Bernardino County line to Valley Way Undercrossing. Install double luminaire mast arms in median and upgrade lighting facilities and median barrier.

In the cities of Eastvale, Jurupa Valley, Riverside and Moreno Valley, from Hamner Avenue to Gilman Spring Road; also on Route 91 from Route 15 to Madison Street. Replace existing guide signs with retro-reflective sheeting.

In Moreno Valley, at the Sunnymead Boulevard eastbound on-ramp. Install traffic signal.In and near Yucca Valley and Twentynine Palms, from north of Indian Avenue to Utah Trail; Also, in San Bernardino County (PM 0.0/15.1 and PM 29.3/33.6). Pavement rehabilitation.

In and near Menifee and Hemet, from 0.6 mile east of Route 215 to 0.3 mile west of Acacia Avenue. Construct raised curb median.In Lake Elsinore, from west of Grand avenue to north of Lakeshore Drive. Reconstruct sidewalks and curb ramps.In and near Palm Desert, from 1.2 miles west of Strawberry Creek bridge to 1.3 miles west of Cahuilla Hills Road. Install metal beam guardrail.

In and near Lake Elsinore, from 1.7 miles east of El Cariso Road to Lehr Drive. Stabilize slopes to decrease sediment transport.In and near the cities of Lake Elsinore, Perris, Menifee and Hemet, at Leach Canyon Channel Bridge No. 56-0750 and Blue Ridge Wash Bridge No. 56-0257; also on Routes 79 and 371, at Arroyo Seco Bridge No. 56-0189, Temecula Creek Bridge, and Cahuilla Bridge No. 56-0490. Bridge rail replacement, replace two bridges, and extend one culvert.

Near Lake Elsinore, from the Orange County Line to Monte Vista Street. Widen for standard lane widths and shoulders and construct ground-in rumble strips.

In Lake Elsinore, at Gunnerson Street and Strickland Avenue. Left turn channelization.In Hemet, from West Acacia Avenue to Ramona Expressway. Construct raised median curb.

08 Riverside 74 11.0 1E770 3002J 0814000102 201.150 18-19 $ 10 $ 1,082 $ - NH $ 140 $ 250 $ 20 $ 400 $ 1,902 1.0 Location(s)

08 Riverside 74 36.9/43.6 1F590 3003P 0814000256 201.361 19-20 $ 30 $ 2,753 $ - NH $ 710 $ 1,815 $ 467 $ 1,320 $ 7,095 93.0 Curb ramp(s)

08 Riverside 74 17.3/19.6 1H171 3006M 0817000022 201.160 16-17 $ - $ 2,200 $ 2,200 3/15/17 NH $ - $ - $ - $ - $ 2,200 2.3 Lane mile(s)

08 Riverside 74 17.7/25.8 1H172 3006N 0817000023 201.160 16-17 $ - $ 5,800 $ 5,800 3/15/17 NH $ - $ - $ - $ - $ 5,800 7.3 Lane mile(s)

08 Riverside 79 25.6/26.4 1F600 3002R 0814000257 201.361 19-20 $ 379 $ 1,117 $ - NH $ 450 $ 900 $ 670 $ 600 $ 4,116 102.0 Curb ramp(s)

08 Riverside 79 0.0/15.6 1F690 0066Q 0815000016 201.121 18-19 $ 10 $ - $ - NH $ 240 $ 560 $ 17 $ - $ 827 32.5 Lane mile(s)

08 Riverside 79 5.4/11.4 1G670 3006G 0816000049 201.010 21-22 $ - $ - $ - STP $ 4,900 $ - $ - $ - $ 4,900 108.0 Collision(s) reduced

08 Riverside 91 7.4/15.6 1G192 3005X 0816000194 201.310 18-19 $ 10 $ 463 $ - NH $ 33 $ 96 $ 10 $ 162 $ 774 126.0 1,000 vehicle hour(s)/yr

08 Riverside 91 R2.2 1H780 3007A 0817000134 201.130 16-17 $ 20 $ 480 $ 480 3/17/17 NH $ 75 $ 100 $ - $ 150 $ 825 1.0 Location(s)

08 Riverside 91 R0.0/R1.1 1J520 3009W 0818000061 201.130 17-18 $ 10 $ 1,100 $ 1,100 10/20/17 NH $ 80 $ 150 $ 50 $ 350 $ 1,740 1.0 Location(s)

08 Riverside 95 14.0/36.2 1G000 3002U 0815000107 201.131 19-20 $ 600 $ 8,170 $ - NH $ 926 $ 901 $ 63 $ 2,462 $ 13,122 20.0 Location(s)

08 Riverside 111 47.3/55.3 0R301 0105C 0817000223 201.378 17-18 $ 30 $ 1,855 $ - NH $ 1,657 $ 805 $ 30 $ 908 $ 5,285 25.0 Structure(s)

08 Riverside 111 47.3/55.3 0R302 3007U 0817000230 201.378 19-20 $ 2,125 $ 5,300 $ - NH $ - $ 1,547 $3,339 $ 2,590 $ 14,901 130.0 Structure(s)

08 Riverside 111 0.0/10.5 1C620 0098F 0812000337 201.335 16-17 $ 20 $ 1,442 $ 1,309 8/16/17 NH $ 223 $ 426 $ 20 $ 285 $ 2,416 38.0 Acre(s) treated/pollutant

08 Riverside 111 0.0/18.3 1F840 3005E 0815000057 201.010 17-18 $ 38 $ 1,407 $ 1,128 9/15/17 STP $ 768 $ 911 $ 64 $ 688 $ 3,876 133.0 Collision(s) reduced

08 Riverside 215 R9.0/R16.0 1C660 3002A 0812000341 201.335 19-20 $ 10 $ 7,080 $ - NH $ 1,184 $ 1,795 $ 20 $ 1,209 $ 11,298 36.0 Acre(s) treated/pollutant

08 Riverside 215 R12.7/R15.0 1G870 3005N 0816000094 201.010 18-19 $ 10 $ 2,990 $ - STP $ 600 $ 732 $ 10 $ 770 $ 5,112 23.0 Collision(s) reduced

08 Riverside 243 6.2/19.8 1H890 3007C 0817000163 201.130 16-17 $ 100 $ 1,400 $ 1,400 4/11/17 NH $ - $ 200 $ 10 $ 300 $ 2,010 6.0 Location(s)

08 Riverside 371 60.2/67.7 1F850 3004K 0815000062 201.010 17-18 $ 10 $ 775 $ 746 10/17/17 STP $ 440 $ 560 $ 40 $ 295 $ 2,120 32.0 Collision(s) reduced

08 Riverside VAR 0R350 0107F 0812000071 201.113 16-17 $ 20 $ 5,031 $ 4,298 8/16/17 HBRR-S $ 456 $ 1,467 $ 21 $ 1,112 $ 8,107 2.0 Bridge(s)

08 Riverside Var 1H530 3006W 0817000074 201.315 18-19 $ 10 $ 4,260 $ - NH $ 346 $ 912 $ 90 $ 1,274 $ 6,892 188.0 Field element(s)

Near Lake Elsinore, at 0.8 mile west of Grand Avenue. Stabilize slope to protect safety of traveling public.In Hemet, from Warren Avenue to Soboba Street. Construct and upgrade pedestrian facilities to current Americans with Disability Act standards.

In Lake Elsinore, from Dexter Avenue to Mauricio Avenue. Relinquish this portion of route to the City of Lake Elsinore. (This is a Financial Contribution Only (FCO) to City of Lake Elsinore.)

In Riverside County, from east of Cambern Avenue (PM 17.70) to west of Trellis Lane (PM 18.83) and from Maurico Avenue (PM 19.62) to 7th Street (PM 25.75). Relinquish this portion of route to Riverside County. (This is a Financial Contribution Only (FCO) to County of Riverside.)

In Hemet, from East Florida Avenue to East Menlo Avenue. Construct and upgrade pedestrian facilities to current Americans with Disability Act standards.

Near Temecula, from San Diego County line to Temecula city limits. Pavement rehabilitation. (G13 Contingency Project)Near Temecula, from 3.1 miles north of Route 371 to 1.1 miles south of Pauba Road. Construct 8 foot shoulders and rumble strip.In the cities from Corona and Riverside, from Route 15/91 separator to Adams Street Overcrossing. Convert existing limited access HOV lanes to continuous access HOV lanes to allow safer ingress and egress movements for HOV.

Near Corona, at 0.1 mile north of Route 71. Reconstruct embankment washout, replace damaged fence and metal beam guardrailing, and repair damaged culvert.

In Corona, from Orange/Riverside County line to Green River Drive. Repair embankment and replace MBGR, and culverts.Near Blythe, from north of Palo Verde Dam Road to the San Bernardino County line. Restore storm eroded embankments with rock slope protection and replace culverts. A previous Emergency Opening EA 08-1F800 repaired roadway.

In Palm Springs, from Gateway Drive to Golf Club Drive. Reconstruct and construct curb ramps.

In Palm Springs, from Gateway Drive to Golf Club Drive. Reconstruct and construct curb ramps.

At Salton Sea, from the Riverside/Imperial County line to east of Cleveland Street. Sediment stabilization and erosion control.Near Salton Sea, from the Imperial County line to 66th Avenue; also 0.2 mile north of W Gateway Drive to Route 10 (PM 55.5/R63.3). Construct ground-in rumble strips along centerline and shoulder.

In Murrieta and Menifee, from Route 215 to north of Scott Road. Stabilize slopes to decrease sediment transport.In Murrieta, from 0.2 mile north of Clinton Keith Road Overcrossing to 0.5 mile south of Scott Road Overcrossing. Install concrete barrier at edge of shoulder.

Near Mountain Center, from 0.2 mile north of Franklin Drive to 0.6 mile south of Poppet Flats Road. Repair and replace culverts and reconstruct embankment washouts.

Near Cahuilla, from Wilson Valley Road to Cary Road; also from Kerby Road to Route 74 (PM 72.8/77.1). Construct rumble strips.Between Banning and Palm Springs on Routes 10 and 111, at Bridges No.56-0003, 56-0241R (PM R16.1) and 56-0596 (PM R60.5). Seismic retrofit.

In Riverside and San Bernardino Counties, on various routes and at various locations. Repair and replace vehicle detection equipment impacting the operations of the District TMC.

08 Riverside Var 1H730 3006Q 0817000112 201.130 16-17 $ 50 $ 500 $ 500 2/16/17 NH $ - $ 10 $ 20 $ 150 $ 730 3.0 Location(s)

08 San Bernardino 2 2.4 0H470 0127J 0812000074 201.112 17-18 $ 12 $ 3,237 $ - HBRR-S $ 324 $ 878 $ 36 $ 1,557 $ 6,044 120.0 Linear feet

08 San Bernardino 10 30.9/33.3 0K291 0159J 0812000098 201.122 16-17 $ 7 $ 25,055 $ 25,647 8/16/17 NH $ - $ 1,738 $ 45 $ 2,623 $ 29,468 9.6 Lane mile(s)

08 San Bernardino 10 R36.9/R39.1 0K293 0163C 0812000100 201.122 17-18 $ 10 $ 39,164 $ - NH $ - $ 2,700 $ 18 $ 6,400 $ 48,292 13.2 Lane mile(s)

08 San Bernardino 10 R23.8 0Q910 0133N 0800020580 201.110 17-18 $ 1,133 $ 23,171 $ - HBRR-S $ 1,025 $ 3,300 $ 64 $ 3,660 $ 32,353 3.0 Bridge(s)

08 San Bernardino 10 26.8/34.2 1C29U 3003F 0817000219 201.235 18-19 $ 10 $ 7,377 $ - NH $ 350 $ 695 $ 30 $ 860 $ 9,322 487.0 Location(s)

08 San Bernardino 10 34.2/R39.1 1C300 3001U 0812000270 201.235 19-20 $ 7 $ 1,899 $ - NH $ 358 $ 417 $ 43 $ 362 $ 3,086 120.0 Location(s)

08 San Bernardino 10 R21.6/R23.6 1C330 3001T 0812000282 201.235 17-18 $ 7 $ 2,203 $ - NH $ 354 $ 417 $ 43 $ 362 $ 3,386 110.0 Location(s)

08 San Bernardino 10 R21.6/R23.6 1F440 3002P 0814000226 201.210 17-18 $ 10 $ 1,585 $ - NH $ 172 $ 329 $ 10 $ 382 $ 2,488 24.8 Acre(s) treated/pollutant

08 San Bernardino 10 5.0/10.0 1F550 3005S 0814000248 201.010 17-18 $ - $ 8,213 $ - STP $ - $ - $ - $ - $ 8,213 336.0 Collision(s) reduced

08 San Bernardino 10 0.0/9.9 1H321 3008Q 0817000216 201.122 17-18 $ - $ 91,821 $ - NH $ - $ - $ - $ - $ 91,821 48.0 Lane mile(s)

08 San Bernardino 10 11.6/R22.4 1J210 3009R 0817000240 201.322 20-21 $ - $ - $ - NH $ 5,822 $ - $ - $ - $ 5,822 6.0 Bridge(s)

08 San Bernardino 10 29.4/R39.2 38423 3009A 0815000168 201.315 18-19 $ 10 $ 7,654 $ - NH $ 300 $ 1,000 $ 10 $ 1,600 $ 10,574 36.0 Field element(s)

08 San Bernardino 15 12.8/14.8 0K121 3003T 0815000245 201.122 19-20 $ 10 $ 26,073 $ - NH $ 570 $ 900 $ 10 $ 2,850 $ 30,413 16.0 Lane mile(s)

08 San Bernardino 15 30.8/42.5 0K122 3003U 0815000244 201.122 19-20 $ 10 $ - $ - NH $ 900 $ 1,500 $ 10 $ - $ 2,420 73.0 Lane mile(s)

08 San Bernardino 15 64.6/75.3 0K123 3003V 0815000242 201.121 19-20 $ 10 $ 26,798 $ - NH $ 600 $ 1,200 $ 10 $ 2,100 $ 30,718 64.2 Lane mile(s)

08 San Bernardino 15 R96.1/R124.3 1C720 3002E 0813000003 201.015 19-20 $ 10 $ 15,058 $ - STP $ 890 $ 920 $ 50 $ 3,160 $ 20,088 87.0 Collision(s) reduced

08 San Bernardino 15 37.8/40.2 1E010 0178R 0813000117 201.010 16-17 $ 10 $ 1,582 $ 1,526 6/22/16 STP $ 373 $ 1,015 $ 17 $ 976 $ 3,973 24.0 Collision(s) reduced

08 San Bernardino 15 174.0/175.0 1G460 3005M 0816000005 201.010 17-18 $ 10 $ 987 $ - STP $ 175 $ 406 $ 4 $ 570 $ 2,152 40.0 Collision(s) reduced

In Jurupa Valley and Ontario, on Route 15 at Philadelphia Street Uncrossing Bridge No. 56-0696; also in San Bernardino County on Route 15 in Rancho Cucamonga, at Fourth Street Undercrossing Bridge No. 54-0912 (PM 0.0 to PM 3.1) and on Route 210 in the City of San Bernardino at Cajon Boulevard Overhead Bridge No. 54-0946R (PM R21.7). Reconstruct eroded structural backfill of bridge embankments, repair eroded slopes, and repair drainage system.

Near Wrightwood, at Sheep Creek Bridge No. 54-0360. Upgrade bridge railing.In Redlands, from Route 38/Orange Street to Ford Street. Rehabilitate roadway.Near Redlands, from Live Oak Canyon Road to County Line Road. Rehabilitate roadway.In Colton, between Mt. Vernon Avenue and Routes 10/215 Junction at Santa Ana River (Bridge No. 54-0292L/R and 54-0292G). Seismic retrofit.

In Loma Linda and Redlands, from Richardson Street Overcrossing to 0.1 mile west of Wabash Avenue Overcrossing. Roadside safety improvements.

In Redlands and Yucaipa, from Wabash Avenue to County Line Road. Construct roadside safety improvements.In Colton, from west of Rancho Avenue to Warm Creek Bridge. Roadway safety improvements.In Colton, from west of Rancho Avenue to Warm Creek Bridge. Upgrade irrigation systems.In Ontario, from 0.2 mile west of 4th Street Undercrossing to 0.2 miles east of Route 15 Junction. Install double luminaire lighting, replace sign panels and install high mast lighting. This will be combined with EA 08-0C250 (SANBAG) as a FCO.

In and near Ontario, from the Los Angeles County line to Route 15 Separation. Rehabilitate and replace lanes 3 and 4 including auxiliary lanes, ramps and bridge approaches. Financial Contribution Only (FCO) to SBCTA to be included in the Express Lane Project EA 0C251.

In San Bernardino County, at the Etiwanda San Sevain FCC Bridge No. 54-0454L, Colton Overhead Bridge No. 54-0464R; also on Route 60 at Ramona Avenue Overcrossing Bridge No. 54-0745 (PM R1.37). In Riverside County, on Route 10 at Highland Springs Avenue Undercrossing Bridge No. 56 -0432 (PM 9.3) and at Eagle Mountain Road Bridge No. 56 -0575L/R (PM R102.0). Improve freight corridor movement by modifying and replacing bridges to meet vertical clearance and load-carrying capacity standards.

In and near Redlands, from Route 210/10 Junction to the Riverside County line. Install wireless VDS pole, CMS, CCTV, Data Node Cabinet and Fiber Optic elements.

In and near Fontana and Rialto, from Sierra Avenue to Glen Helen Parkway. Rehabilitate roadway.In Hesperia and Victorville, from Route 395 to north of Mojave Drive. Rehabilitate roadway. (G13 Contingency Project)In Barstow, from Outlet Center Drive to Mojave River Bridge. Rehabilitate pavement.Near Barstow, from 0.3 mile south of Harvard Road to Rasor Road. Re-grade and flatten median cross slope.In Victorville, from 0.2 mile north of Bear Valley Overcrossing to 0.3 mile south of Palmdale Road Overcrossing. Install northbound outer separation barrier.

Near Baker, from 2.5 miles north of Bailey Road to 1.5 miles south of Nipton Road. Cold plane and overlay with Open Graded Friction Course (OGFC).

08 San Bernardino 15 R110.0 1G740 3005L 0816000060 201.131 19-20 $ 128 $ 1,691 $ - NH $ 1,000 $ 540 $ 102 $ 540 $ 4,001 1.0 Location(s)

08 San Bernardino 15 37.4/41.4 1H270 3005T 0817000001 201.130 16-17 $ - $ 1,000 $ 1,000 7/13/16 NH $ 20 $ 75 $ - $ 100 $ 1,195 1.0 Location(s)

08 San Bernardino 15 40.3/40.7 1H271 3006T 0817000024 201.131 18-19 $ 10 $ 1,061 $ - NH $ 206 $ 493 $ 54 $ 577 $ 2,401 1.0 Location(s)

08 San Bernardino 15 14.8/32.5 1H370 3006A 0817000027 201.130 16-17 $ - $ 1,200 $ 1,200 9/2/16 NH $ - $ 60 $ - $ 150 $ 1,410 1.0 Location(s)

08 San Bernardino 15 14.8/32.5 1H371 3006E 0817000029 201.130 16-17 $ - $ 2,400 $ 2,400 9/8/16 NH $ - $ 100 $ - $ 350 $ 2,850 1.0 Location(s)

08 San Bernardino 15 R20.6/R20.9 1H390 3006U 0817000032 201.131 18-19 $ 10 $ 2,146 $ - NH $ 286 $ 488 $ 20 $ 550 $ 3,500 1.0 Location(s)

08 San Bernardino 15 R107.4 1H660 3007E 0817000103 201.999 18-19 $ 10 $ 1,183 $ - ST-CASH $ 259 $ 415 $ 33 $ 265 $ 2,165 4.0 Location(s)

08 San Bernardino 15 41.9/43.5 1H680 3006L 0817000105 201.130 16-17 $ 50 $ 1,450 $ 1,450 1/20/17 NH $ - $ 150 $ 20 $ 300 $ 1,970 1.0 Location(s)

08 San Bernardino 15 R18.5/R21.4 1H760 3006S 0817000129 201.130 16-17 $ 100 $ 2,900 $ 2,900 2/28/17 NH $ - $ 150 $ 40 $ 300 $ 3,490 2.0 Location(s)

08 San Bernardino 18 T8.0/R17.8 0G691 0184C 0815000184 201.151 21-22 $ - $ - $ - NH $ 742 $ - $ - $ - $ 742 63.0 Drainage system(s)

08 San Bernardino 18 101.5/115.9 0P390 0191G 0800001025 201.010 17-18 $ 7,248 $ 25,475 $ - STP $ 3,101 $ 2,060 $6,599 $ 4,055 $ 48,538 20.0 Collision(s) reduced

08 San Bernardino 18 99.4/100.9 0Q120 0191J 0800020125 201.010 17-18 $ 1,653 $ 9,101 $ - STP $ 1,123 $ 1,297 $ 893 $ 1,212 $ 15,279 15.0 Collision(s) reduced

08 San Bernardino 18 24.9/29.9 1C010 0182G 0812000236 201.015 16-17 $ 30 $ 2,037 $ 771 5/17/17 STP $ 300 $ 562 $ 45 $ 380 $ 3,354 6.0 Collision(s) reduced

08 San Bernardino 18 9.1/R17.8 1C100 0179G 0812000288 201.121 16-17 $ 10 $ 15,826 $ 14,492 6/28/17 NH $ 396 $ 995 $ 37 $ 1,485 $ 18,749 34.8 Lane mile(s)

08 San Bernardino 18 44.5/52.8 1C560 0186F 0812000331 201.335 16-17 $ 202 $ 3,186 $ 426 6/28/17 NH $ 911 $ 590 $ 59 $ 325 $ 5,273 4.5 Acre(s) treated/pollutant

08 San Bernardino 18 75.5/87.6 1E020 0190H 0813000118 201.010 16-17 $ - $ 290 $ 270 4/4/16 STP $ 216 $ 309 $ 3 $ 155 $ 973 50.0 Collision(s) reduced

08 San Bernardino 18 97.0/99.5 1E060 3006F 0813000140 201.010 19-20 $ 884 $ 5,087 $ - STP $ 920 $ 1,150 $ 480 $ 1,050 $ 9,571 25.0 Collision(s) reduced

08 San Bernardino 18 88.9/89.6 1E080 0190N 0813000142 201.010 16-17 $ 8 $ 1,290 $ 1,295 9/30/16 STP $ 267 $ 464 $ 38 $ 933 $ 3,000 10.0 Collision(s) reduced

08 San Bernardino 18 18.5 1H740 3006R 0817000113 201.130 16-17 $ 10 $ 590 $ 590 2/3/17 NH $ - $ 75 $ 20 $ 150 $ 845 1.0 Location(s)

08 San Bernardino 18 95.6 1J510 3009V 0818000059 201.130 17-18 $ 10 $ 375 $ 375 10/18/17 NH $ 50 $ 75 $ 50 $ 100 $ 660 1.0 Location(s)

08 San Bernardino 38 47.5/59.4 0G800 0205C 0812000111 201.151 19-20 $ 697 $ 2,397 $ - NH $ 600 $ 1,040 $1,900 $ 800 $ 7,434 43.0 Drainage system(s)

08 San Bernardino 38 30.9 0R340 0200J 0812000072 201.110 17-18 $ 20 $ 1,647 $ 1,325 10/18/17 HBRR-S $ 325 $ 682 $ 40 $ 838 $ 3,552 1.0 Bridge(s)

08 San Bernardino 38 50.4/59.4 0R431 0206U 0817000231 201.335 16-17 $ 39 $ 950 $ 950 8/16/17 NH $ 741 $ 330 $ 20 $ 376 $ 2,456 58.0 Acre(s) treated/pollutant

08 San Bernardino 38 50.4/59.4 0R432 3008W 0817000232 201.335 19-20 $ 150 $ 576 $ - NH $ - $ 86 $ 50 $ 200 $ 1,062 27.0 Acre(s) treated/pollutant

08 San Bernardino 38 8.5/15.0 1F910 3004H 0815000065 201.010 16-17 $ 10 $ 466 $ 339 1/17/17 STP $ 179 $ 341 $ 27 $ 182 $ 1,205 18.0 Collision(s) reduced

Near Baker, at 1.6 miles south of Afton Road Overcrossing. Reconstruct eroded earthen dike that protects the highway from inundation and flooding. The failed section of berm is located 750 yards from the southbound 1-15 outside shoulder.

Near Victorville, from 0.2 mile south of Bear Valley Road to Roy Rodgers Drive. Remove and dispose of fire damaged trees and reconstruct barrier rail.

In Victorville, near Palmdale Road (Route 18) and Route 15. Restore vegetation and irrigation system due to fire damage.Near San Bernardino, from Glen Helen Parkway to Route 15/395 junction. Place temporary concrete barrier in areas of burned/ damaged guard rail to allow re-opening of route.

Near San Bernardino, from Glen Helen Parkway to Route 15/395 Junction. Replace fire damaged guard rail with steel posts, clear drainage basin debris, and install erosion control.

Near Hesperia, from Cleghorn Road Undercrossing to Route 138 at the southbound Cajon Truck Facility. Reconstruct southbound truck scale that was destroyed by the Blue Cut Fire.

At Clyde V. Kane northbound (NB) and southbound (SB) Safety Roadside Rest Areas (SRRA); also at Valley Wells NB and SB SRRAs (PM 161.2). Transportation infrastructure improvement for zero-emission vehicle charging.

In Victorville, from Mojave Drive Overcrossing to Victorville Separation and Overhead. Remove and replace damaged bridge deck.Near Cajon Junction, from 1.5 miles south of Cleghorn Road to Route 138; also on Route 138 from Pine Lodge East Overhead to Route 15 (PM R14.8/R15.2). Reconstruct embankment slipout, clean drainage system, and repair collapsed roadway.

In and near Arrowhead, from 48th Street to Route 138. Repair, reline and replace culverts.In and near Adelanto, from Route 395 to west of Oasis Road. Widen shoulders and add centerline and shoulder rumble strips.In Victorville, from Cobalt Road to Route 395. Construct raised curb median.Near Lake Arrowhead, from 0.2 mile east of Route 173 to Nob Hill Drive. Install guardrail.Near Crestline, from Arrowhead Springs Road to Route 138. Rehabilitate pavement.In and near Big Bear Lake, from Route 38 to Gildart Drive. Sediment stabilization and erosion control.

Near Apple Valley and Lucerne Valley, from Custer Avenue to Pauhaska Road. Install ground-in rumble strips.In Victorville, from Amargosa Road to Cobalt Road. Construct raised curb median.In Apple Valley, from Navajo Road to Kiowa Road. Construct raised median curb.Near Crestline, at 0.7 mile east of Route 138. Reconstruct storm damaged cable netting and rock fence barrier.In Victorville, at 10th Street. Remove and replace damaged culverts, place slurry cement backfill, and repair roadway.Near Big Bear Lake, from Zaca Road to Route 18. Replace culverts.Near Redlands, at Santa Ana River Bridge No. 54-0407. Rehabilitate bridge and upgrade bridge railing.At various locations, from Eagle Mountain Drive to Route 38/18 Separation. Sediment control and stabilization.At various locations, from Eagle Mountain Drive to Route 38/18 Separation. Sediment control and stabilization.Near Yucaipa, from Bryant Street to Valley of the Falls Drive. Construct rumble strips.

08 San Bernardino 38 26.0/31.0 1G700 3004M 0816000062 201.131 16-17 $ 100 $ 3,100 $ 2,594 12/7/16 NH $ 700 $ 400 $ 25 $ 750 $ 5,075 7.0 Location(s)

08 San Bernardino 40 R105.3/R105.6 0G860 0206L 0814000132 201.250 19-20 $ 10 $ 5,340 $ - NH $ 1,400 $ 1,940 $ 10 $ 2,300 $ 11,000 2.0 Location(s)

08 San Bernardino 40 R125.0/R154.6 0R142 3003J 0815000201 201.015 19-20 $ 5,006 $ 19,134 $ - STP $ 2,900 $ 2,300 $ 200 $ 2,800 $ 32,340 88.0 Collision(s) reduced

08 San Bernardino 40 R75.0/R100.0 0R150 3001R 0812000025 201.015 18-19 $ 5,010 $ 21,178 $ - STP $ 3,000 $ 2,500 $ 200 $ 3,200 $ 35,088 150.0 Collision(s) reduced

08 San Bernardino 40 R50.0/R75.0 0R160 0206Y 0812000029 201.015 16-17 $ 2,065 $ 26,203 $ 22,723 10/18/17 STP $ 3,130 $ 2,157 $ 190 $ 3,000 $ 36,745 75.0 Collision(s) reduced

08 San Bernardino 40 R134.0 1F280 3001C 0814000196 201.119 16-17 $ 20 $ 833 $ 554 8/16/17 HBRR-S $ 119 $ 319 $ 10 $ 245 $ 1,546 1.0 Bridge(s)

08 San Bernardino 40 0.4 1H300 3005U 0817000010 201.130 16-17 $ 5 $ 1,495 $ 1,495 7/26/16 NH $ - $ 60 $ 10 $ 250 $ 1,820 1.0 Location(s)

08 San Bernardino 40 0.4 1H400 3006V 0817000031 201.131 19-20 $ 10 $ 6,951 $ - NH $ 390 $ 780 $ 20 $ 975 $ 9,126 1.0 Location(s)

08 San Bernardino 40 149.3 1J400 3009T 0818000038 201.130 17-18 $ 10 $ 400 $ 400 9/13/17 NH $ - $ 40 $ - $ 80 $ 530 1.0 Location(s)

08 San Bernardino 60 R7.3/R10.0 0E33U 3003N 0817000075 201.310 19-20 $ 710 $ 20,955 $ - NH $ 2,700 $ 4,170 $ 20 $ 7,107 $ 35,662 1,827.0 1,000 vehicle hour(s)/yr

08 San Bernardino 60 0.9/2.9 0F030 0033E 0800020358 201.110 17-18 $ 3,912 $ 20,472 $ - HBRR-S $ 2,243 $ 3,320 $1,030 $ 4,253 $ 35,230 3.0 Bridge(s)

08 San Bernardino 60 R4.6/R10.0 0Q75U 0224N 0817000114 201.122 17-18 $ 48 $133,242 $ - NH $ - $ 6,037 $ 70 $10,372 $ 149,769 105.0 Lane mile(s)

08 San Bernardino 60 R1.8/R2.8 1C170 0033Q 0812000266 201.235 16-17 $ 7 $ 1,558 $ 986 1/17/17 NH $ 223 $ 274 $ 43 $ 196 $ 2,301 21.0 Location(s)

08 San Bernardino 60 R0.0/R1.9 1C180 0218H 0812000267 201.235 16-17 $ 7 $ 1,321 $ 1,082 1/17/17 NH $ 216 $ 258 $ 27 $ 231 $ 2,060 25.0 Location(s)

08 San Bernardino 60 R2.9/R4.1 1C190 0219F 0812000268 201.235 16-17 $ 7 $ 1,321 $ 1,224 1/17/17 NH $ 216 $ 258 $ 27 $ 231 $ 2,060 83.0 Location(s)

08 San Bernardino 60 R0.0/R9.9 1F361 0178P 0815000160 201.170 19-20 $ 10 $ 1,271 $ - NH $ 125 $ 289 $ 12 $ 250 $ 1,957 68.0 Lighting fixture(s)

08 San Bernardino 62 1.8/7.7 0Q130 0046G 0800020212 201.010 15-16 $ 5 $ 5,185 $ 3,408 7/13/16 STP $ 630 $ 1,150 $ 20 $ 820 $ 7,810 56.0 Collision(s) reduced

08 San Bernardino 62 41.0/41.5 1E610 0225K 0814000055 201.010 17-18 $ 226 $ 3,002 $ - STP $ 1,117 $ 700 $ 575 $ 610 $ 6,230 36.0 Collision(s) reduced

08 San Bernardino 62 121.5/142.7 1F133 3004A 0816000003 201.121 19-20 $ 65 $ 11,314 $ - NH $ 400 $ 515 $ 87 $ 2,660 $ 15,041 42.4 Lane mile(s)

08 San Bernardino 62 124.0/142.0 1G010 3005P 0815000106 201.131 19-20 $ 107 $ 8,435 $ - NH $ 1,279 $ 902 $ 76 $ 1,940 $ 12,739 10.0 Location(s)

08 San Bernardino 62 34.2/34.5 1G450 3005K 0815000238 201.010 18-19 $ 25 $ 826 $ - STP $ 397 $ 486 $ 42 $ 590 $ 2,366 13.0 Collision(s) reduced

08 San Bernardino 71 R0.0/R8.5 0G790 3009N 0814000176 201.315 19-20 $ 99 $ 11,167 $ - NH $ 561 $ 1,361 $ 113 $ 1,657 $ 14,958 31.0 Field element(s)

08 San Bernardino 71 R6.9/R7.8 1C600 0234V 0812000335 201.335 16-17 $ 7 $ 944 $ 937 10/19/16 NH $ 164 $ 205 $ 20 $ 338 $ 1,678 20.0 Acre(s) treated/pollutant

08 San Bernardino 95 40.0/40.4 1E581 0238T 0816000072 201.010 17-18 $ - $ 1,126 $ - STP $ - $ - $ - $ 550 $ 1,676 11.0 Collision(s) reduced

In Barton Flats, from west of Glass Road to Burro Flats Road. Repair fire damage. Install debris flow barrier, concrete rock slope protection and replace drainage systems.

Near Needles, west of Goffs Road at John Wilkie Safety Roadside Rest Area. Reconstruct safety roadside rest areas.In and near Needles, from 4.5 miles east of Homer Wash to Arizona state line. Regrade and flatten median cross slope.Near Essex, from west of Kelbaker Road to Essex Road. Re-grade and flatten median cross slope.

Near Ludlow, from Crucero Road 0.4 mile west of Banger Wash. Regrade median cross-slope.Near Needles, at South Fork Piute Wash Bridge No. 54-0872R. Remove and reconstruct grouted rock slope protection.In Barstow, at Blair Ditch. Repair storm damaged concrete lined ditch.In Barstow, at 0.4 mile east of Route 15/40 Separation. Reconstruct a damaged section of trapezoidal channel.Near Needles, at 1.1 miles east of 5 Mile Road. Replace metal beam guardrail and repair roadway.

In Ontario, from Haven Avenue to Milliken Avenue/Hamner Avenue. Construct auxiliary lane and widen connector and ramps.In Chino, at Pipeline Avenue Overcrossing (OC) No. 54-0744, Monte Vista Avenue OC No. 54-0746, and Benson Avenue OC No. 54-0748. Replace bridges.

In Ontario, from Euclid Avenue to Riverside County line; also in Riverside County from San Bernardino County line to Country Village Road (PM R0.0/R3.0) and 0.7 mile west of Valley Way to Junction 60/91/215 (PM R6.9/R12.2). Replacement of two outside lanes and random concrete slabs.

In Chino, from Monte Vista Avenue to Benson Avenue. Roadside safety improvements.In Chino, from the Los Angeles County line to Monte Vista Avenue. Roadside safety improvements.In Chino, from Benson Avenue to San Antonio Avenue. Roadside safety improvements.In Pomona, Chino and Ontario, from Los Angeles County line to Riverside County line. Replace existing signs with retro-reflective sheeting.

In Morongo Valley, from East Drive to Yucca Park Road. Construct raised curb median and install double Thrie Beam Barrier.Near Twentynine Palms, from east of Godwin Road to west of Shelton Road; also at various locations. Widen shoulders and construct rumble strips.

Near Vidal, from 3.8 miles west of Route 95 to Arizona State line. Rehabilitate pavement and upgrade guardrail.Near Vidal Junction, from west of Route 95 to west of Parker Dam Road. Restore storm eroded embankments with rock slope protection. A previous Emergency Opening EA 08-1F660 repaired roadway.

In Twentynine Palms, from Utah Trail intersection to 0.3 mile east of Utah Trail. Install traffic signals meeting current ADA standards, crosswalks and flashing beacon system.

Near Chino Hills, from the Los Angeles County line to the Riverside County line; also in Riverside County, from San Bernardino County line to Route 91 (PM R0.0 to PM R3.0). Replace and upgrade existing communication elements, and install Closed Circuit Television Cameras (CCTV) for the Traffic Management System (TMS).

In Chino and Chino Hills, from 0.4 mile south of Euclid Avenue to 0.2 mile north of Pine Avenue. Sediment stabilization and erosion control.Near Needles, from 2.7 miles to 3.1 miles north of Havasu Lake Road. Widen shoulders and install ground-in rumble strips.

08 San Bernardino 95 65.4/66.0 1E582 3994Y 0816000073 201.010 17-18 $ 485 $ 1,820 $ - STP $ 750 $ 500 $ 160 $ 602 $ 4,317 10.0 Collision(s) reduced

08 San Bernardino 95 9.7/33.6 1F131 3002V 0815000211 201.121 19-20 $ 65 $ 9,567 $ - NH $ 450 $ 320 $ 10 $ 1,500 $ 11,912 47.8 Lane mile(s)

08 San Bernardino 95 64.5/80.5 1F132 3003Y 0815000212 201.121 19-20 $ 65 $ 4,389 $ - NH $ 200 $ 150 $ 10 $ 690 $ 5,504 32.0 Lane mile(s)

08 San Bernardino 95 9.6/56.5 1F780 3006H 0815000047 201.010 19-20 $ 10 $ 1,390 $ - STP $ 650 $ 700 $ 30 $ 450 $ 3,230 57.0 Collision(s) reduced

08 San Bernardino 127 28.0/R28.5 1E550 0216N 0814000049 201.010 17-18 $ 10 $ 1,000 $ - STP $ 579 $ 444 $ 54 $ 389 $ 2,476 11.0 Collision(s) reduced

08 San Bernardino 138 R24.1 0J851 0238P 0813000213 201.110 16-17 $ - $ 120 $ 120 1/17/17 HBRR-S $ - $ 20 $ - $ 60 $ 200 1.0 Bridge(s)

08 San Bernardino 142 3.9/5.7 0L710 0242K 0800000431 201.378 17-18 $ 240 $ 1,443 $ 1,663 12/6/17 NH $ - $ 1,226 $ 940 $ 298 $ 4,147 75.0 Structure(s)

08 San Bernardino 142 0.0/5.8 1E850 0241C 0814000114 201.121 17-18 $ 20 $ 7,560 $ - NH $ 356 $ 570 $ 36 $ 1,299 $ 9,841 20.0 Lane mile(s)

08 San Bernardino 173 18.7 1H290 3006J 0817000006 201.131 19-20 $ 10 $ 2,345 $ - NH $ 713 $ 1,080 $ 93 $ 1,376 $ 5,617 1.0 Location(s)

08 San Bernardino 173 L3.4/L7.8 1H360 3005Y 0817000026 201.130 16-17 $ 10 $ 490 $ 490 8/25/16 NH $ - $ 60 $ - $ 200 $ 760 1.0 Location(s)

08 San Bernardino 210 R29.3/R33.1 1F270 3001E 0814000195 201.119 16-17 $ 10 $ 1,178 $ 1,193 8/16/17 HBRR-S $ 126 $ 453 $ 10 $ 660 $ 2,437 15.0 Bridge(s)

08 San Bernardino 210 R21.7/R33.2 1F362 3005A 0816000011 201.170 18-19 $ 10 $ - $ - NH $ 301 $ 614 $ 32 $ - $ 957 149.0 Sign(s)

08 San Bernardino 210 50.4/59.4 1G191 3003Q 0816000193 201.310 16-17 $ 10 $ 649 $ 640 8/16/17 NH $ 34 $ 96 $ 10 $ 162 $ 961 215.0 1,000 vehicle hour(s)/yr

08 San Bernardino 210 10.5/12.7 1G210 3003X 0815000170 201.315 18-19 $ 19 $ 2,692 $ - NH $ 135 $ 390 $ 10 $ 450 $ 3,696 4.0 Field element(s)

08 San Bernardino 210 R26.3/R32.9 1J060 3009F 0817000193 201.122 17-18 $ - $ 33,696 $ - NH $ - $ 3,375 $ - $ 5,050 $ 42,121 24.3 Lane mile(s)

08 San Bernardino 215 0K840 3001P 0800020563 201.352 18-19 $ 10 $ 6,670 $ - ST-CASH $ 897 $ 1,248 $ 42 $ 1,755 $ 10,622 1.0 Location(s)

08 San Bernardino 215 14.8 1E810 3002K 0814000107 201.321 17-18 $ 10 $ 1,326 $ - ST-CASH $ 190 $ 270 $ 20 $ 480 $ 2,296 1.0 Location(s)

08 San Bernardino 215 2.4/3.0 1F730 3002S 0815000034 201.110 19-20 $ 3,726 $ - $ - HBRR-S $ 1,125 $ 2,870 $ 296 $ - $ 8,017 1.0 Bridge(s)

08 San Bernardino 215 4.8/5.8 1H770 3010E 0817000132 201.010 19-20 $ 10 $ 6,448 $ - STP $ 1,065 $ 1,615 $ 31 $ 1,950 $ 11,119 123.0 Collision(s) reduced

08 San Bernardino 215 7.6 1H790 3006Y 0817000133 201.130 16-17 $ 50 $ 400 $ 400 3/29/17 NH $ 20 $ 50 $ 20 $ 100 $ 640 1.0 Location(s)

08 San Bernardino 215 4.0/17.8 47642 3007S 0816000186 201.315 19-20 $ 10 $ 9,238 $ - NH $ 376 $ 842 $ 37 $ 1,930 $ 12,433 32.0 Field element(s)

08 San Bernardino 247 39.5/40.0 1E560 0253M 0814000050 201.010 17-18 $ 50 $ 987 $ - STP $ 562 $ 714 $ 133 $ 413 $ 2,859 26.0 Collision(s) reduced

Near Needles, from 1. 4 miles to 2.0 miles north of Goffs Road. Widen shoulders and install ground-in rumble strips.Near Needles, from Route 62 to south of Havasu Lake Road. Rehabilitate pavement.Near Needles, from Goffs Road to Nevada State line. Rehabilitate pavement.Near Needles, from Route 62 to 0.8 mile south of Route 40. Construct ground-in shoulder and centerline rumble strips.Near Baker, 28.0 miles north of Route 15 to south of Saratoga Springs Road. Construct shoulders and install ground-in rumble strips.Near Silverwood Lake, at Horsethief Creek Bridge No. 54-0816. Environmental mitigation work for bridge replacement.In Chino Hills, at various locations, from Carbon Canyon Road to Ramona Avenue. Construct sidewalks and upgrade curb ramps and other pedestrian facilities.

In Chino Hills, from Orange County Line to Route 71. Pavement rehabilitation.Near Cedar Glen, at 0.1 mile south of Hospital Road. Widen shoulder and replace guard rail with concrete barrier mounted on soldier pile wall.

Near Hesperia, from Twin F Ranch Road to Old Hesperia Road. Remove fire debris and sediment, reconstruct barrier railing, repair drainage, and install erosion control measures.

In Redlands and Highland, from north of West Pioneer Avenue to Baseline Street. Bridge maintenance.In San Bernardino County, on Routes 71, 210, 215 and 259 at various locations. Replace existing guide signs with Type XI reflectivity. (G13 Contingency Project)

In the cities of Upland and Rancho Cucamonga, from Los Angeles County line to 0.2 mile west of East Avenue Overcrossing. Convert existing limited access HOV lanes to continuous access HOV lanes to allow safer ingress and egress movements for HOV.

In Rancho Cucamonga and Fontana, from East Avenue to west of Beech Avenue; also on Route 15 at Route 210/15 Separation. Install Transportation Management System elements.

In Highland and Redland, from Sterling Avenue to Lugonia Avenue. Rehabilitate existing lanes, shoulders and auxiliary lanes by grinding rigid pavement/slab replacement, remove flexible pavement and construct Continuously Reinforced Concrete Pavement (CRCP). This is a Financial Contribution Only (FCO) to SBCTA to be included in the Express Lane Project EA 0C70U.

In the city of San Bernardino, at San Bernardino Maintenance Station (L5726) at 175 Cluster Street. Reconstruct maintenance station.Near Devore, at Little League Drive Overcrossing. Upgrade existing Weigh in Motion (WIM) system.

In Colton, from 0.3 mile south to 0.3 north of Washington Avenue Overcrossing No. 54-0530. Replace overcrossing. (G13 Contingency Project)

In the city of San Bernardino, from 0.2 mile south of Orange Show Road/ Auto Center Drive to 0.2 mile north of Inland Center Drive. Lane reconfiguration and pavement widening.

In the city of San Bernardino, at 0.5 mile north of W. 5th Street. Reconstruct embankment sinkhole, remove culvert debris, and replace failed culvert.

In and near the City of San Bernardino, from Route 215/10 Connector to Route 215/15 Junction; also on Route 259 from Route 259/215 Separation to Route 259/210 Junction. Install wireless VDS, CMS, CCTV and Fiber Optic elements.

Near Lucerne Valley, from east of Joshua Avenue to west of Camp Rock Road. Construct shoulders and install ground-in rumble strips.

08 San Bernardino 247 20.3/76.8 1F770 3006K 0815000051 201.010 19-20 $ 10 $ 1,953 $ - STP $ 600 $ 720 $ 60 $ 550 $ 3,893 65.0 Collision(s) reduced

08 San Bernardino 330 37.1/39.8 1E780 3002H 0814000103 201.150 18-19 $ 30 $ 2,955 $ - NH $ 370 $ 400 $ 20 $ 600 $ 4,375 2.0 Location(s)

08 San Bernardino 330 39.6/39.7 1F830 3001A 0815000055 201.131 17-18 $ 52 $ 3,358 $ - NH $ 700 $ 300 $ 25 $ 680 $ 5,115 1.0 Location(s)

08 San Bernardino 330 32.5/33.7 38852 0256C 0812000124 201.112 17-18 $ 30 $ 2,901 $ - HBRR-S $ 767 $ 725 $ 19 $ 700 $ 5,142 1,165.0 Linear feet

08 San Bernardino 395 39.0/45.9 0N971 0258P 0815000101 201.010 16-17 $ 2,754 $ 27,347 $ 24,856 6/28/17 STP $ 2,697 $ 2,032 $2,086 $ 3,741 $ 40,657 13.0 Collision(s) reduced

08 San Bernardino 395 35.5/39.1 0N972 0358P 0815000102 201.010 17-18 $ 1,567 $ 13,570 $ - STP $ 1,987 $ 2,278 $2,026 $ 3,467 $ 24,895 5.0 Collision(s) reduced

09 Inyo 6 4.3/8.4 36460 0660 0915000045 201.015 17-18 $ - $ 3,790 $ 3,708 10/18/17 STP $ 300 $ 974 $ 2 $ 1,119 $ 6,185 58.8 Collision(s) reduced

09 Inyo 127 22.7/31.5 35750 0614 0913000002 201.151 16-17 $ 81 $ 2,349 $ 2,349 3/15/17 NH $ 160 $ 630 $ 47 $ 580 $ 3,847 23.0 Drainage system(s)

09 Inyo 168 35210 0611 0900020090 201.378 17-18 $ 1,448 $ 3,270 $ 3,472 8/16/17 NH $ 643 $ 936 $1,730 $ 765 $ 8,792 211.0 Structure(s)

09 Inyo 178 43.4/44.2 36340 0653 0915000002 201.151 19-20 $ 800 $ 2,210 $ - NH $ 405 $ 620 $ 150 $ 405 $ 4,590 3.0 Drainage system(s)

09 Inyo 190 69.2/69.8 35320 0610 0912000007 201.015 17-18 $ 322 $ 4,323 $ - STP $ 535 $ 850 $ 130 $ 520 $ 6,680 26.0 Collision(s) reduced

09 Inyo 395 77.1/91.0 36580 0656 0915000041 201.121 17-18 $ - $ 3,916 $ 3,372 10/18/17 NH $ 94 $ 365 $ 1 $ 425 $ 4,801 28.4 Lane mile(s)

09 Inyo 395 54.6/57.4 36590 0657 0915000042 201.121 17-18 $ - $ 7,170 $ - NH $ 130 $ 490 $ 220 $ 890 $ 8,900 14.0 Lane mile(s)

09 Inyo 395 37270 2643 0917000054 201.999 17-18 $ - $ - $ - ST-CASH $ 300 $ 500 $ 100 $ - $ 900 6.0 Location(s)

09 Inyo VAR 36610 0652 0915000043 201.010 16-17 $ 1 $ 420 $ 420 10/19/16 STP $ 80 $ 150 $ 1 $ 265 $ 917 135.0 Collision(s) reduced

09 Kern 14 R5.7/R12.6 36740 2633 0916000025 201.122 19-20 $ 22 $ 40,515 $ - NH $ 370 $ 1,460 $ 190 $ 3,010 $ 45,567 27.6 Lane mile(s)

09 Mono 395 88.4/91.6 34940 2600 0912000033 201.015 18-19 $ 1,299 $ 7,352 $ - STP $ 2,170 $ 1,280 $ 350 $ 1,729 $ 14,180 49.5 Collision(s) reduced

09 Mono 395 80.6/84.1 35080 0604 0900020055 201.015 16-17 $ 101 $ 12,028 $ 11,316 3/15/17 STP $ 1,200 $ 1,055 $ 290 $ 1,900 $ 16,574 42.0 Collision(s) reduced

09 Mono 395 93.4/95.7 35780 0615 0913000007 201.015 17-18 $ 585 $ 5,455 $ 6,512 1/31/18 STP $ 270 $ 800 $ 190 $ 1,100 $ 8,400 28.0 Collision(s) reduced

09 Mono 395 60.0/69.9 36470 0658 0915000016 201.015 17-18 $ - $ 2,470 $ - STP $ 319 $ 420 $ 2 $ 355 $ 3,566 12.0 Collision(s) reduced

09 Mono 395 36670 2621 0916000009 201.240 19-20 $ 600 $ 2,300 $ - NH $ 200 $ 200 $ 100 $ 150 $ 3,550 11.0 Location(s)

09 Mono 395 52.5/54.5 36780 2630 0917000002 201.130 16-17 $ - $ 2,220 $ 2,220 7/14/16 NH $ 35 $ 50 $ 5 $ 300 $ 2,610 1.0 Location(s)

10 Alpine 4 0S680 3142 1014000100 201.151 19-20 $ 71 $ 3,319 $ - NH $ 870 $ 1,176 $ 359 $ 851 $ 6,646 36.0 Drainage system(s)

10 Alpine 4 27.6 1H570 3236 1017000158 201.130 16-17 $ - $ 700 $ 700 6/9/17 NH $ 10 $ 60 $ - $ 400 $ 1,170 2.0 Location(s)

In and near Barstow, from 0.1 mile north of Boone Road to 0.7 mile south of Rimrock Road. Construct ground-in shoulder and centerline rumble strips.

Near Smiley Park, from 6.9 miles south of Running Spring to 3.4 miles east of Fork City Creek Bridge. Construct rockfall barrier to stabilize hillside slopes.

Near Running Springs, between Route 210 and Route 18. Replace culverts.Near Highland, at City Creek Bridge No. 54-365, and at East Fork City Creek Bridge No. 54-345. Replace bridge rail and approach rail.Near Adelanto, from 2.5 miles north of Kramer Hills to Route 58. Widen median and shoulders; construct rumble strips.Near Adelanto, from 1.0 mile south of Kramer Hills to 2.6 miles north of Kramer Hills. Widen median and shoulders; contract rumble strips.In Inyo and Mono Counties, near Bishop, from 0.4 mile north of Silver Canyon Road to 0.1 mile north of Pumice Mill Road (Mno-6-0.0/0.8) Widen shoulder and construct rumble strips.

Near Shoshone, at various locations. Replace deteriorating culverts.In Bishop, from Pioneer Lane to Route 395; also on Route 395 from Jay Street to Wye Road (PM 114.9/116.4). Upgrade pedestrian facilities.Near Shoshone, from east of Route 127 to Chicago Valley Road. Replace and install culverts.

In Death Valley National Park near Panamint Springs, east of Panamint Valley Road. Widen shoulders and realign roadway curves.Near Independence, from north of North Fort Independence Road to south of Elna Road. Pavement rehabilitation.In and near Lone Pine, from 1.2 miles south of Route 136 to East Inyo Street; also on Route 136 at the Route 395 intersection (PM 0.0/0.1). Pavement rehabilitation.

In Inyo and Mono Counties at various locations; also in Kern County on Route 58. Transportation infrastructure improvement for zero-emission vehicle charging.

In Inyo and Mono Counties on various routes at various locations. Install rumble strips and signs at various locations.In Rosamond and Mojave, from 0.5 mile south of Dawn Road Overcrossing (OC) to 0.5 mile north of Silver Queen Road OC. Rehabilitate lanes and ramps by replacing slabs and grinding lane 1, construct Continuously Reinforced Concrete Pavement (CRCP) lane 2, cold plane and overlay ramps with Rubberized Hot Mix Asphalt (RHMA-G). Replace guardrail, construct rumble strip, replace signs using retroreflective sheeting and refresh pavementdelineation.

Near Bridgeport, from north of Devils Gate Summit to Burcham Flat Road. Widen shoulders and add rumble strip.Near Bridgeport, from 0.1 mile south of Buckeye Road to 2.7 miles south of Swauger Road. Widen shoulders and stabilize slopes.Near Bridgeport, from 0.3 mile south of Route 108 to 2 miles north of Route 108. Widen shoulders and install rumble strips.Near Bridgeport, from Conway Ranch Road to Route 270. Upgrade guardrail to meet current standards.In Mono County, at various locations. Advance mitigation banking credits.Near Lee Vining, from 0.6 mile north of Visitor Center Drive to 1.2 miles south of Cemetery Road. Restore fire damaged roadside safety elements, construct rockfall containment and slope stabilization.

In Alpine County on Routes 4, 88, and 89 at various locations. Rehabilitate culverts.Near Loope, at 0.4 mile west of Silver Creek Bridge; also on Route 89, at 0.2 mile north of Leviathan Mine Road. Reconstruct failed slope and repair roadway.

10 Alpine 4 22.0/23.6 1H610 3244 1017000163 201.130 16-17 $ - $ 1,400 $ 1,400 6/5/17 NH $ 40 $ 100 $ - $ 600 $ 2,140 1.0 Location(s)

10 Alpine 88 0S750 3138 1014000099 201.151 19-20 $ 269 $ 4,290 $ - NH $ 698 $ 1,043 $ 317 $ 762 $ 7,379 39.0 Drainage system(s)

10 Alpine 88 0X750 3134 1013000009 201.112 19-20 $ 313 $ 5,451 $ - HBRR-S $ 496 $ 1,460 $ 110 $ 1,484 $ 9,314 550.0 Linear feet

10 Alpine VAR 1F640 3222 1016000133 201.131 17-18 $ 18 $ 7,125 $ 4,850 10/18/17 NH $ 248 $ 1,183 $ 64 $ 2,952 $ 11,590 1,444.0 Location(s)

10 Amador 88 1C430 3178 1016000127 201.010 17-18 $ 2 $ 4,250 $ - STP $ 409 $ 837 $ 57 $ 870 $ 6,425 263.0 Collision(s) reduced

10 Amador 88 1C690 3119 1015000004 201.151 18-19 $ 26 $ 2,328 $ - NH $ 250 $ 448 $ 65 $ 616 $ 3,733 35.0 Drainage system(s)

10 Amador 88 54.0 1H680 3246 1017000198 201.130 16-17 $ - $ 500 $ 500 6/30/17 NH $ 12 $ 35 $ - $ 200 $ 747 1.0 Location(s)

10 Calaveras 4 1F641 3222A 1018000017 201.131 17-18 $ 6 $ 12,349 $ - NH $ - $ 825 $ 158 $ 2,800 $ 16,138 9,000.0 Location(s)

10 Calaveras 4 1F740 3220 1017000042 201.010 18-19 $ 5 $ 2,300 $ - STP $ 60 $ 840 $ 5 $ 640 $ 3,850 24.0 Collision(s) reduced

10 Calaveras 4 16.1 1H500 3255 1017000154 201.110 21-22 $ - $ - $ - HBRR-S $ 605 $ - $ - $ - $ 605 1.0 Bridge(s)

10 Calaveras 26 22.0/22.8 1G900 3213 1017000054 201.130 16-17 $ - $ 900 $ 900 11/29/16 NH $ 35 $ 145 $ - $ 450 $ 1,530 4.0 Location(s)

10 Calaveras 26 15.2 1H180 3223 1017000095 201.130 16-17 $ - $ 600 $ 600 2/1/17 NH $ 10 $ 110 $ - $ 300 $ 1,020 1.0 Location(s)

10 Calaveras 26 37.3 1H240 3224 1017000105 201.130 16-17 $ - $ 5,000 $ 5,000 2/23/17 NH $ 50 $ 400 $ 50 $ 1,500 $ 7,000 2.0 Location(s)

10 Mariposa 41 0.1/4.9 1E770 3158 1015000113 201.151 18-19 $ 16 $ 1,893 $ - NH $ 435 $ 929 $ 84 $ 905 $ 4,262 19.0 Drainage system(s)

10 Mariposa 49 0.3/18.5 1C040 3233 1017000034 201.121 19-20 $ 7 $ 16,197 $ - NH $ 403 $ 1,032 $ 9 $ 2,150 $ 19,798 34.6 Lane mile(s)

10 Mariposa 49 0.3/23.0 1E570 3201 1016000126 201.010 17-18 $ 2 $ 1,560 $ - STP $ 281 $ 725 $ 30 $ 363 $ 2,961 33.0 Collision(s) reduced

10 Mariposa 49 29.0/42.3 1H820 3261 1018000040 201.130 17-18 $ - $ 2,000 $ 2,000 8/28/17 NH $ 25 $ 75 $ 25 $ 875 $ 3,000 2.0 Location(s)

10 Mariposa 140 22.1/25.3 0G340 4736 1013000078 201.121 17-18 $ 13 $ 3,126 $ 2,843 1/31/18 NH $ 208 $ 410 $ 2 $ 314 $ 4,073 6.4 Lane mile(s)

10 Mariposa 140 21.2/21.8 0Y600 3131 1013000244 201.015 19-20 $ 159 $ 1,550 $ - STP $ 296 $ 528 $ 411 $ 390 $ 3,334 24.0 Collision(s) reduced

10 Merced 5 0.4/0.9 0W620 3008 1012000020 201.235 17-18 $ - $ 2,271 $ - NH $ 362 $ 589 $ - $ 827 $ 4,049 1.0 Location(s)

Near Loope, from 0.3 mile east of Upper Cascade Creek to 0.9 mile west of Raymond Meadow Creek. Reconstruct roadway and backfill shoulder.

In Alpine County on Routes 4, 88 and 207; in Amador County on Routes 16 and 49; and in Tuolumne County on Route 108; at various locations. Rehabilitate culverts.

Near Markleeville, on Routes 88, 89 and 4 at various locations. Bridge rail upgrade on four bridges.In Alpine, Amador, Calaveras, Tuolumne, Mariposa, Merced, San Joaquin, and Stanislaus Counties on Routes 4, 5, 26, 49, 88, 89, 108, 120, 140, and 207. Remove dead or dying drought damaged trees or trim.

In Amador and Alpine Counties on Routes 16, 49, 88, and 104 at various locations. Install centerline and shoulder rumble strips.In Amador County on Route 88 and in Tuolumne County of Routes 120,108 and 49, at various locations. Rehabilitate culverts.Near Bear River Reservoir, at Peddler Hill Maintenance Station. Clean up, repair and replace diesel fuel supply system for maintenance facility power generators.

In Calaveras County on Routes 4 and 26 at various locations; also, in Alpine County on Routes 4, 88, 89, and 207 at various locations; and in Amador County on Routes 26 and 88 at various locations. Remove dead or dying drought damaged trees or trim.

In Calaveras and Amador Counties, on Routes 4 and 26 at various locations. Install centerline and edge-line rumble strips.Near Angels Camp, at West Branch Cherokee Creek Bridge No. 30-0036. Replace bridge.Near Mokelumne Hill, at four spot locations (PM 22.0, 22.2, 22.5, and 22.8). Repair storm damaged slope, install culvert and headwall with rock slope protection (RSP), install overside drains and asphalt dikes, and install erosion control measures.

Near Mokelumne Hill, at 0.9 mile east of Paloma Road. Repair slope slipout, remove tall tree, install rock slope protection (RSP) and new culvert, and reconstruct roadway.

Near West Point, at 0.7 mile west of Iris Way; also in Amador County, at 1.7 miles west of Iris Way (PM 0.2). Remove rock slide debris and hazardous trees, stabilize slope, reconstruct embankment slipout, install rock slope protection (RSP), repair drainage system, and repair roadway.

Near Fish Camp, from south of Miami Mountain Road to south of Yosemite National Park boundary; also, in Madera County (PM D0.639/D1.841). Rehabilitate culverts.

Near the community of Mariposa, from Madera County line to the south junction with Route 140. Pavement rehabilitation.Near the community of Mariposa, from Mt. Bullion Cutoff Road to Madera County line at various locations; also, in Tuolumne County near Sonora on Route 49 from PM 0.5 to R27.5 at various locations. Install centerline, shoulder, and edgeline rumble strips.

Near Bear Valley, from 0.3 mile north of Pendola Garden Road to 0.9 mile south of Crown Lead Road; also on Route 140, from 0.8 mile east of Trower Road to Bumguardner Mountain Road (PM 11.3 to PM 18.7). Remove slide debris, repair drainage, and stabilize slope.

Near Mariposa, from the north Junction of Route 140 and 49 to Whitlock Road. Rehabilitate pavement.In the community of Mariposa, from Route 49 to 12th Street. Improve pedestrian access facilities to reduce collision severity.Near Firebaugh, at the John "Chuck" Erreca Safety Roadside Rest Area (SRRA). Upgrade water and wastewater system.

10 Merced 5 1C810 3102 1015000038 201.119 20-21 $ 1,894 $ 2,100 $ - HBRR-S $ 819 $ 950 $ 542 $ 1,100 $ 7,405 13.0 Bridge(s)

10 Merced 59 12.8/13.5 0U520 3005 1000020459 201.010 16-17 $ 818 $ 1,500 $ 1,500 1/9/17 STP $ 699 $ 727 $ 710 $ 380 $ 4,834 27.0 Collision(s) reduced

10 Merced 59 16.0/16.2 1E350 3164 1015000106 201.010 17-18 $ 396 $ 3,228 $ - STP $ 652 $ 631 $ 204 $ 1,406 $ 6,517 60.0 Collision(s) reduced

10 Merced 99 R12.7/17.6 1C170 3089 1014000144 201.122 19-20 $ 95 $ 46,000 $ - NH $ 1,600 $ 3,700 $ 122 $12,400 $ 63,917 19.6 Lane mile(s)

10 Merced 99 R35.9/R37.3 1C180 3091 1014000101 201.122 16-17 $ 10 $ 14,250 $ 14,120 8/16/17 NH $ 281 $ 954 $ 4 $ 2,100 $ 17,599 16.0 Lane mile(s)

10 Merced 99 1C470 3159 1015000112 201.010 16-17 $ - $ 2,091 $ 1,837 8/30/16 STP $ 186 $ 250 $ - $ 443 $ 2,970 393.0 Collision(s) reduced

10 Merced 99 20.1/24.3 3A720 5431 1013000259 201.122 18-19 $ 3,369 $ - $ - NH $ 1,973 $ 5,200 $ 677 $ - $ 11,219 16.8 Lane mile(s)

10 Merced 140 0.0/42.1 0Y110 3018 1013000108 201.015 19-20 $ 928 $ 2,940 $ - STP $ 1,442 $ 873 $ 280 $ 704 $ 7,167 36.0 Collision(s) reduced

10 Merced 140 6.1/35.8 0Y740 3023 1014000032 201.121 16-17 $ 30 $ 20,000 $ 14,160 10/19/16 NH $ 1,380 $ 1,450 $ 215 $ 2,693 $ 25,768 60.0 Lane mile(s)

10 Merced 152 0G830 3122 1012000316 201.113 19-20 $ 416 $ 6,530 $ - HBRR-S $ 982 $ 649 $ 19 $ 1,984 $ 10,580 7.0 Bridge(s)

10 Merced 152 0S120 3139 1015000005 201.151 19-20 $ 151 $ 1,768 $ - NH $ 622 $ 743 $ 124 $ 765 $ 4,173 19.0 Drainage system(s)

10 Merced 152 R2.4/R6.0 1C550 3101 1014000208 201.010 16-17 $ 6 $ 2,863 $ 2,089 2/23/17 STP $ 312 $ 405 $ 20 $ 352 $ 3,958 36.0 Collision(s) reduced

10 Merced 165 8.5/10.6 0X520 3149 1013000002 201.361 19-20 $ 1,280 $ 968 $ - NH $ 347 $ 477 $1,280 $ 505 $ 4,857 100.0 Curb ramp(s)

10 Merced 165 1E580 3196 1016000104 201.010 17-18 $ 3 $ 5,200 $ - STP $ 222 $ 760 $ 28 $ 1,079 $ 7,292 225.0 Collision(s) reduced

10 San Joaquin 4 R15.7/R19.2 0X690 3110 1013000241 201.235 18-19 $ 60 $ - $ - NH $ 650 $ 740 $ 10 $ - $ 1,460 102.0 Location(s)

10 San Joaquin 4 1C480 3204 1016000085 201.010 17-18 $ 5 $ 1,403 $ - STP $ 287 $ 295 $ 4 $ 330 $ 2,324 82.0 Collision(s) reduced

10 San Joaquin 4 T15.5/R16.6 1C500 3165 1016000026 201.122 19-20 $ 48 $ 30,576 $ - NH $ 538 $ 2,324 $ 19 $ 4,589 $ 38,094 9.5 Lane mile(s)

10 San Joaquin 4 1C800 3113 1015000037 201.119 19-20 $ 2,000 $ 4,079 $ - HBRR-S $ 490 $ 1,358 $ 55 $ 1,319 $ 9,301 1.0 Bridge(s)

10 San Joaquin 4 R16.6/R17.8 1C860 3198 1016000023 201.119 18-19 $ 115 $ 3,428 $ - HBRR-S $ 648 $ 848 $ 37 $ 631 $ 5,707 1.0 Bridge(s)

10 San Joaquin 4 4.1/4.9 1F460 3177 1016000139 201.010 19-20 $ 1,358 $ 7,335 $ - STP $ 1,081 $ 1,453 $ 274 $ 2,006 $ 13,507 50.0 Collision(s) reduced

10 San Joaquin 4 2.3/3.0 1H050 3218 1017000073 201.130 16-17 $ 40 $ 1,700 $ 1,700 1/18/17 NH $ 15 $ 100 $ - $ 640 $ 2,495 8.0 Location(s)

10 San Joaquin 5 0G720 0337 1012000039 201.113 16-17 $ - $ 2,195 $ 2,630 8/16/17 HBRR-S $ - $ 1,490 $ 10 $ 1,174 $ 4,869 5.0 Bridge(s)

10 San Joaquin 5 0P540 3118 1013000251 201.113 19-20 $ 263 $ 8,758 $ - HBRR-S $ 515 $ 1,992 $ 73 $ 1,783 $ 13,384 4.0 Bridge(s)

10 San Joaquin 5 R16.1/25.4 0X720 3112 1013000242 201.235 18-19 $ 10 $ - $ - NH $ 200 $ 470 $ 10 $ - $ 690 61.0 Location(s)

In Merced, San Joaquin, Mariposa and Stanislaus counties on various routes at various locations. Scour mitigation and preventative structural maintenance measures at 13 bridges.

In and near the city of Merced, from 0.3 mile south to 0.4 mile north of Mission Avenue/Dickenson Ferry Road. Left turn channelization.

In the city of Merced, from north of Cooper Avenue to South Fork Black Rascal Creek Bridge. Intersection safety improvements.In and near the city of Merced, from south of Childs Avenue to south of Franklin Road. Roadway rehabilitation.In Merced and Stanislaus Counties near Turlock, from 0.3 mile north of Bradbury Road to 0.2 mile north of the Stanislaus County line (STA PM R0.0/R0.2). Rehabilitate pavement.

In Merced, San Joaquin, and Stanislaus, counties, at various locations. Construct shoulder rumble strips and improve safety visibility by installing lighting.

In and near Atwater, from 0.4 mile south of Buhach Road to south of Westside Boulevard. Roadway rehabilitation. (G13 Contingency Project)

Near the city of Merced at various locations, from Route 5 to 6 miles east of the city of Merced. Upgrade metal beam guardrailsIn and near the city of Merced, from east Junction 33 to Route 99. Rehabilitate pavement.In Merced County, on Routes 152, 140, and 59 at various locations. Seismic retrofit and bridge rail upgrade of 7 bridges.In Merced County on Routes 152, 59, and 99 and in San Joaquin County on Routes 5 and 12, at various locations. Rehabilitate culverts.Near Los Banos, from Vista Point Access Road to San Luis Dam Service Road. Construct median barrier.In Los Banos, from 0.3 mile south of Route 152 to Dove Street at various locations. Upgrade ADA facilities.In Merced, Mariposa and Stanislaus counties on Routes 165 and 140, at various locations. Install centerline, edge-line, and shoulder rumble strips.

In Stockton, from Garfield Avenue to Route 99 at various locations. Highway worker safety improvements. (G13 Contingency Project)In San Joaquin and Stanislaus counties on Routes 4 and 88 at various locations. Install centerline, shoulder, and edge-line rumble strips.

In Stockton, from 0.1 mile east of Fresno Avenue to west of Center Street. Roadway rehabilitation.

Near Discovery Bay, at Old River Bridge No. 29-0045. Upgrade mechanical and electrical equipment on movable bridge.In Stockton, at Crosstown Freeway Viaduct No. 29-0269. Reconstruct hinge 32 (left and right) and three ramp joint seals.Near Holt, from 0.3 mile west to 0.5 mile east of Middle River Bridge. Realign curve, widen shoulders, upgrade guard rail, and install flashing beacons.

Near Discovery Bay, from 2.3 miles east of Old River Bridge to 1.4 miles west of Middle River Bridge. Repair slope slipout and install rock slope protection (RSP).

In Stockton, at Route 5/4 Separation Bridge No. 29-0232R/L, Route 4/5 Connector Undercrossing Bridge No. 29-0235R/L and Route 5/4 Connector viaduct Bridge No. 29-0233H. Seismic retrofit.

In San Joaquin County on Routes 5 and 580 and in Stanislaus County on Route 99, at various locations. Seismic retrofit of 4 bridges.In and near Lathrop and Stockton, from south of Louise Avenue to Charter Way; also, from south of Hammer Lane to north of Eight Mile Road (PM 32.3/35.7). Highway worker safety improvements. (G13 Contingency Project)

10 San Joaquin 5 3.5/49.0 1C200 3140 1014000098 201.151 19-20 $ 71 $ 3,178 $ - NH $ 870 $ 725 $ 199 $ 597 $ 5,640 31.0 Drainage system(s)

10 San Joaquin 5 1C530 3129 1015000002 201.170 18-19 $ 8 $ 1,538 $ - NH $ 353 $ 889 $ 52 $ 543 $ 3,383 23.0 Lighting fixture(s)

10 San Joaquin 5 1C620 3147 1015000001 201.315 18-19 $ 15 $ 3,462 $ - NH $ 333 $ 881 $ 138 $ 697 $ 5,526 24.0 Field element(s)

10 San Joaquin 5 26.5 1C940 3193 1016000020 201.110 19-20 $ 5 $ 4,766 $ - HBRR-S $ 335 $ 1,030 $ 10 $ 1,950 $ 8,096 2.0 Bridge(s)

10 San Joaquin 5 R21.4/27.9 1F400 3250 1016000053 201.315 21-22 $ - $ - $ - NH $ 820 $ - $ - $ - $ 820 22.0 Field element(s)

10 San Joaquin 5 R21.4 1H341 3235 1018000077 201.322 17-18 $ 10 $ 2,000 $ - NH $ 798 $ 300 $ 5 $ 700 $ 3,813 1.0 Bridge(s)

10 San Joaquin 5 10.7 1H342 3235B 1018000078 201.322 19-20 $ 440 $ 7,700 $ - NH $ 498 $ 925 $ 70 $ 1,700 $ 11,333 2.0 Bridge(s)

10 San Joaquin 12 17.1/17.7 0Y550 3079 1013000239 201.361 16-17 $ 37 $ 539 $ 565 8/16/17 NH $ 225 $ 495 $ 245 $ 307 $ 1,848 14.0 Curb ramp(s)

10 San Joaquin 12 R4.4 1F760 3273 1017000024 201.119 20-21 $ - $ - $ - HBRR-S $ 553 $ - $ - $ - $ 553 1.0 Bridge(s)

10 San Joaquin 26 1.1 1G640 3203 1017000012 201.130 16-17 $ 20 $ 880 $ 880 8/3/16 NH $ 20 $ 30 $ - $ 300 $ 1,250 1.0 Location(s)

10 San Joaquin 88 16.4/25.4 0Q180 0165 1013000256 201.121 17-18 $ 10 $ 6,100 $ - NH $ 219 $ 629 $ 10 $ 432 $ 7,400 18.0 Lane mile(s)

10 San Joaquin 88 13.5/14.1 0S740 3141 1013000260 201.151 20-21 $ 335 $ 3,160 $ - NH $ 795 $ 900 $ 290 $ 875 $ 6,355 30.0 Drainage system(s)

10 San Joaquin 88 22.1 1E531 3207 1016000031 201.010 19-20 $ 715 $ 5,500 $ - STP $ 434 $ 1,400 $ 460 $ 1,200 $ 9,709 18.0 Collision(s) reduced

10 San Joaquin 99 0L020 0321 1013000053 201.110 17-18 $ 480 $ 14,653 $ - HBRR-S $ 1,969 $ 3,031 $ 180 $ 3,250 $ 23,563 1.0 Bridge(s)

10 San Joaquin 99 17.2 0X310 3148 1013000265 201.322 19-20 $ 115 $ 5,776 $ - NH $ 673 $ 2,092 $ 147 $ 1,984 $ 10,787 1.0 Bridge(s)

10 San Joaquin 99 0.9 1C060 3156 1014000102 201.361 18-19 $ 8 $ 1,553 $ - NH $ 97 $ 530 $ 58 $ 550 $ 2,796 40.0 Curb ramp(s)

10 San Joaquin 99 30.9/31.3 1C280 3145 1014000134 201.310 18-19 $ 92 $ 11,110 $ - NH $ 910 $ 1,417 $ 75 $ 2,199 $ 15,803 80.0 1,000 vehicle hour(s)/yr

10 San Joaquin 99 0.0/6.8 1C300 5002 1014000145 201.310 16-17 $ 800 $ 29,424 $ 13,504 8/16/17 NH $ 2,061 $ 2,650 $ 122 $ 3,825 $ 38,882 4,970.0 1,000 vehicle hour(s)/yr

10 San Joaquin 99 21.7 1C880 3206 1016000022 201.119 18-19 $ 4 $ 1,170 $ - HBRR-S $ 172 $ 562 $ 7 $ 420 $ 2,335 1.0 Bridge(s)

10 San Joaquin 99 0.0/38.7 1F270 3212 1016000059 201.131 16-17 $ 10 $ 6,006 $ 6,418 6/28/17 NH $ 141 $ 363 $ 14 $ 1,809 $ 8,343 5,165.0 Location(s)

10 San Joaquin 99 5.3/5.7 1F730 3216 1016000144 201.010 17-18 $ 2 $ 361 $ - STP $ 129 $ 307 $ 2 $ 206 $ 1,007 3.0 Collision(s) reduced

10 San Joaquin 99 1G750 3227 1017000036 201.315 19-20 $ 7 $ 6,862 $ - NH $ 1,202 $ 1,719 $ 465 $ 1,310 $ 11,565 101.0 Field element(s)

10 San Joaquin 99 30.7 1J320 3287 1018000103 201.130 17-18 $ - $ 1,200 $ 1,200 11/6/17 NH $ 20 $ 80 $ - $ 600 $ 1,900 1.0 Location(s)

10 San Joaquin 120 R2.6/T7.1 0X710 3120 1013000247 201.235 18-19 $ 11 $ 3,491 $ - NH $ 409 $ 723 $ 9 $ 808 $ 5,451 38.0 Location(s)

10 San Joaquin 120 R0.6/R6.1 1C960 3230 1017000021 201.315 20-21 $ - $ - $ - NH $ 373 $ - $ - $ - $ 373 59.0 Field element(s)

In San Joaquin County on Routes 4, 5, and 99 at various locations. Rehabilitate culverts.In San Joaquin County on Routes 5 and 99, and in Stanislaus County on Routes 5, at various locations. Upgrade sign panels and replace overhead sign structures.

In various counties on various routes, at various locations. Upgrade Transportation Management System (TMS) elements.In Stockton, at the Stockton Channel Viaduct No. 29-0176L/R. Bridge deck rehabilitation at spot locations.In and near Stockton, on Routes 5, 4 (PM 14.6/21.2), and 99 (PM 15.8/18.5) at various locations. Install Intelligent Transportation System (ITS) elements.Near Lathrop, at Mathews Road Undercrossing 29-0218L. Improve to standard truck capacity.In and near Lathrop, at Deuel Overhead No. 29-0262R/L. Improve to standard truck capacity.In Lodi, from South School Street to South Central Street. Upgrade pedestrian curb ramps to ADA standards.Near Terminous, at Little Potato Slough Bridge No. 29-0101. Replace joint seals and bearing padsusing temporary pile supports.In Stockton, at Route 26/99 Separation (Bridge No. 29-0142). Repair steel bridge girders damaged by high-load hit.Near Lockeford, from east of Disch Road to the Amador County line. Rehabilitate pavement.Near Lockeford, from 0.1 mile south of East Jack Tone Road to north of North Tully Road intersection; also, near Kirkwood in Alpine County (PM 0.3/2.4). Replace culverts.

Near Clements, at Liberty Road. Improve intersection.In Ripon, at the Stanislaus River Bridge No. 29-0013L. Rehabilitate Bridge.In Stockton, at Route 4/99 Separation (Farmington Road) bridge no. 29-0155. Replace structure to provide standard vertical clearance.In Ripon, at Main Street Overcrossing; also in Lodi at Turner Road Overcrossing (PM 31.6). Upgrade pedestrian facilities to comply with Americans with Disabilities Act requirements.

In Lodi, from south of Route 12 (Victor Road) to south of Turner Road. Realign northbound on-ramp,increase bridge vertical clearance, and construct auxiliary lane.

In Stanislaus and San Joaquin Counties, from 0.8 mile south of Pelandale Avenue to 0.2 mile north of Yosemite Avenue (Route 120) junction (also STA PM R20.9/R24.7). Lengthen existing lane transitions and construct auxiliary lanes.Near Stockton, at Wilson Way Overcrossing No. 29-0118C. Remove existing damaged girder and build new overhang and barrier, resulting in reduced bridge width and increased vertical clearance.

On Route 99 in San Joaquin, Stanislaus and Merced Counties, at various locations. Remove and trim dead or drought damaged trees.In Manteca, from 0.4 mile to 0.8 mile north of Austin Road. Install median barrier.In San Joaquin, Merced, and Stanislaus counties, on Routes 5, 12, 59, 99, and 152 at various locations. Upgrade or replace inefficient and damaged Traffic Monitoring Station elements.

In Lodi, at East Pine Street Overcrossing No. 29-0149. Remove and replace damaged girder.In and near Manteca, from east of McKinley Avenue to Route 99. Highway worker safety improvements.In and near Manteca and Lathrop, from Route 5 to Route 99; also, on Route 5 at PM R13.34, and on Route 99 at PM 4.56. Install Intelligent Transportation System (ITS) field elements.

10 San Joaquin 120 1G990 3226 1017000074 201.315 20-21 $ - $ - $ - NH $ 632 $ - $ - $ - $ 632 59.0 Field element(s)

10 San Joaquin 205 2.3/R9.7 0X700 3111 1013000248 201.235 18-19 $ 33 $ 3,727 $ - NH $ 225 $ 877 $ 10 $ 861 $ 5,733 41.0 Location(s)

10 San Joaquin 205 R4.5/R9.0 1C330 3146 1014000146 201.315 20-21 $ 4,830 $ 13,257 $ - NH $ 1,057 $ 2,512 $ 979 $ 2,831 $ 25,466 14.0 Field element(s)

10 San Joaquin 205 1E590 3231 1017000014 201.010 18-19 $ - $ 4,150 $ - STP $ 288 $ 642 $ 31 $ 547 $ 5,658 264.0 Collision(s) reduced

10 San Joaquin VAR 0P550 0338 1012000055 201.113 17-18 $ 34 $ 23,373 $ - HBRR-S $ 1,224 $ 3,928 $ 50 $ 2,650 $ 31,259 10.0 Bridge(s)

10 Stanislaus 5 27.0/27.5 0W630 3009 1012000021 201.235 18-19 $ 5 $ 4,001 $ - NH $ 260 $ 904 $ 6 $ 806 $ 5,982 1.0 Location(s)

10 Stanislaus 5 27.0/27.5 1C270 3144 1014000097 201.250 17-18 $ 7 $ 5,477 $ - NH $ 381 $ 2,254 $ 10 $ 2,871 $ 11,000 2.0 Location(s)

10 Stanislaus 5 27.0/27.5 1G722 3209B 1018000068 201.999 17-18 $ 3 $ 1,070 $ - ST-CASH $ 154 $ 189 $ 6 $ 201 $ 1,623 2.0 Location(s)

10 Stanislaus 33 1.4/27.1 1C490 3128 1015000091 201.010 16-17 $ - $ 1,776 $ 725 8/2/16 STP $ 184 $ 206 $ - $ 340 $ 2,506 49.0 Collision(s) reduced

10 Stanislaus 99 R13.4/R13.8 0L870 0037 1015000003 201.310 19-20 $ 1,259 $ 3,750 $ - NH $ 1,110 $ 1,427 $ 141 $ 1,012 $ 8,699 110.0 1,000 vehicle hour(s)/yr

10 Stanislaus 99 R18.0/R21.2 0V110 3130 1014000158 201.015 17-18 $ 17 $ 8,300 $ - STP $ 685 $ 1,280 $ 10 $ 2,400 $ 12,692 18.0 Collision(s) reduced

10 Stanislaus 99 R18.0/R19.7 0X56Y 3011Y 1016000147 201.010 17-18 $ - $ 450 $ - STP $ 75 $ 320 $ 2 $ 434 $ 1,281 89.0 Collision(s) reduced

10 Stanislaus 99 R1.1/R7.3 0X660 3143 1013000249 201.235 18-19 $ 3 $ 2,093 $ - NH $ 306 $ 595 $ 18 $ 574 $ 3,589 40.0 Location(s)

10 Stanislaus 99 R0.0/R24.8 1C290 3088 1014000108 201.121 17-18 $ 3 $ 21,344 $ - NH $ 1,224 $ 1,710 $ 8 $ 4,057 $ 28,346 20.0 Lane mile(s)

10 Stanislaus 99 R13.9/R15.1 1C870 3192 1016000024 201.119 17-18 $ 30 $ 4,929 $ - HBRR-S $ 310 $ 845 $ 10 $ 1,040 $ 7,164 6.0 Bridge(s)

10 Stanislaus 99 R16.5/R16.7 1E700 3125 1015000115 201.330 18-19 $ 27 $ 2,400 $ - NH $ 813 $ 916 $ 18 $ 900 $ 5,074 3.0 Location(s)

10 Stanislaus 108 33.2 0H480 5411 1012000193 201.150 18-19 $ 52 $ 1,824 $ - NH $ - $ 1,439 $ 98 $ 631 $ 4,044 2.0 Location(s)

10 Stanislaus 108 0W901 3010 1017000142 201.361 17-18 $ 205 $ 970 $ - NH $ 609 $ 1,430 $ 530 $ 580 $ 4,324 33.0 Curb ramp(s)

10 Stanislaus 108 0W902 3010B 1017000155 201.361 18-19 $ 87 $ 310 $ - NH $ - $ 715 $ 180 $ 200 $ 1,492 6.0 Curb ramp(s)

10 Stanislaus 132 1.1/1.8 0T780 0348 1000000746 201.010 15-16 $ 2,100 $ 3,264 $ 2,822 7/13/16 STP $ 464 $ 1,190 $ 341 $ 617 $ 7,976 14.0 Collision(s) reduced

10 Tuolumne 108 32.3/34.6 0Y800 3137 1015000007 201.150 18-19 $ 43 $ 2,628 $ - NH $ 750 $ 625 $ 75 $ 560 $ 4,681 4.0 Location(s)

10 Tuolumne 108 R0.0/50.0 1C440 3195 1016000103 201.010 17-18 $ 8 $ 1,285 $ - STP $ 183 $ 427 $ 5 $ 364 $ 2,272 83.0 Collision(s) reduced

In San Joaquin, Amador, Calaveras, Merced, Mariposa, Stanislaus, and Tuolumne Counties, on Routes 4, 5, 26, 33, 49, 59, 88, 99, 104, 108, 120, 132, 140, 152 and 205 at various locations. Repair or replace damaged and nonfunctioning Traffic Management System (TMS) elements.

In and near Tracy, from Hansen Road to Paradise Road. Highway worker safety improvements.

In Tracy from Byron Road Undercrossing to Paradise Road Overcrossing. Install ramp meters and other Intelligent Transportation System (ITS) elements.

In San Joaquin, Stanislaus, and Tuolumne Counties, on Routes 4, 5, 99, 120, and 205 at various locations. Improve wet roadway surface conditions at 12 locations.

In San Joaquin, Merced, and Stanislaus counties at various bridge locations. Bridge seismic retrofit.

Near Westley, at the Westley Safety Roadside Rest Area (SRRA). Upgrade water and wastewater systems.Near Westley, at the Westley Safety Roadside Rest Area (SRRA). Replace SRRA buildings.At Northbound (NB) and Southbound (SB) Westley Safety Roadside Rest Area (SRRA). Transportation infrastructure improvement for zero-emission vehicle charging.

In Stanislaus and Merced Counties at various locations. Install centerline, edge line and shoulder rumble strips.Near Ceres and Modesto, in the northbound direction from Hatch Road on-ramp to S. 9th Street off-ramp. Construct auxiliary lane.In Modesto, from north of West Modesto Overhead to north of Beckwith Road/Standiford Avenue. Construct acceleration and deceleration lanes at 4 northbound ramps and 2 southbound ramps to reduce collisions.

In Modesto at Carpenter Road/Briggsmore Avenue southbound off-ramp. Mitigation replacement planting and irrigation system improvements.

In and near Turlock, from north of Golf Road to north of Taylor Road. Highway worker safety improvements.Near Turlock and Modesto, from the Merced County line to the San Joaquin County line. Rehabilitate pavement.In and near Modesto, from north of Hatch Road to south of Tuolumne Boulevard at Tuolumne River Bridge No. 38-0078L/R, South Modesto Undercrossing No. 38-0082L/R, and South Modesto Overhead No. 38-0076L/R. Replace bridge approach slabs and joint seals at six bridges, and repair bridge deck at one location.

In Modesto, from 0.1 mile south of Kansas Avenue and 0.4 mile north of Route 132 separation; also, on adopted Route 132 alignment right-of-way from 0.2 mile west of Emerald Avenue and 0.3 mile east of Emerald Avenue (PM 13.7/14.3). Hazardous waste mitigation.

In and near Riverbank, at 8th Street. Repair slope with retaining wall.Near Modesto and Riverbank, on Routes 108 and 132 at various locations. Upgrade curb ramps, sidewalk and crosswalks.Near Riverbank, at 2nd Street and 4th Street. Upgrade curb ramps, sidewalk and crosswalks.Near Vernalis, from 0.9 mile west of Mc Craken Road to 0.6 mile west of San Joaquin River Bridge.

Near Strawberry, from east of Old Strawberry Road to west of Beardsley Road. Rockfall mitigation at 4 locations.In and near Sonora, from Route 49 to east of Clarks Fork Road at various locations. Install centerline, shoulder, and edge-line rumble strips.

10 Tuolumne 108 L0.0/L0.3 1C540 3114 1015000029 201.010 17-18 $ 113 $ 4,090 $ - STP $ 629 $ 832 $ 177 $ 831 $ 6,672 18.0 Collision(s) reduced

10 Tuolumne 108 1F642 3222B 1018000018 201.131 17-18 $ 6 $ 6,156 $ - NH $ - $ 250 $ 130 $ 1,750 $ 8,292 4,000.0 Location(s)

10 Tuolumne 108 R16.1/R18.1 40160 0126 1013000049 201.121 17-18 $ - $ 2,046 $ 1,842 1/31/18 NH $ - $ 434 $ 11 $ 333 $ 2,824 4.0 Lane mile(s)

10 Tuolumne 108 R18.9/38.8 46210 0157 1013000266 201.121 20-21 $ - $ - $ - NH $ 687 $ - $ - $ - $ 687 51.6 Lane mile(s)

10 Tuolumne 120 32.7/R56.5 0E960 0335 1013000254 201.121 18-19 $ 6 $ 20,520 $ - NH $ 931 $ 1,070 $ 55 $ 2,793 $ 25,375 2.0 Lane mile(s)

10 Tuolumne 120 48.8/R50.5 0Y790 3136 1015000006 201.150 18-19 $ 12 $ 1,874 $ - NH $ 650 $ 493 $ 48 $ 363 $ 3,440 2.0 Location(s)

10 Tuolumne 120 1C460 3202 1016000075 201.010 17-18 $ 5 $ 1,579 $ - STP $ 195 $ 333 $ 4 $ 290 $ 2,406 54.0 Collision(s) reduced

10 Tuolumne 120 46.4 1H140 3221 1017000093 201.130 16-17 $ - $ 700 $ 700 2/3/17 NH $ 20 $ 100 $ - $ 400 $ 1,220 1.0 Location(s)

10 Tuolumne 120 R0.0/R24.1 3A730 0282 1013000050 201.121 16-17 $ 58 $ 29,200 $ 28,502 8/16/17 NH $ 1,680 $ 2,520 $ 280 $ 1,680 $ 35,418 62.0 Lane mile(s)

11 Imperial 78 62.3/73.8 42050 1283 1115000052 201.151 19-20 $ - $ 687 $ - NH $ 177 $ 409 $ - $ 201 $ 1,474 6.0 Drainage system(s)

11 Imperial 115 L10.4/19.8 42060 0602 1115000053 201.151 19-20 $ - $ 417 $ - NH $ 165 $ 371 $ - $ 190 $ 1,143 4.0 Drainage system(s)

11 San Diego 5 R28.6/R29.3 2T215 1136 1114000074 201.310 16-17 $ - $ 5,000 $ - NH $ - $ 1,000 $ - $ 750 $ 6,750 464.0 1,000 vehicle hour(s)/yr

11 San Diego 5 R34.6/R35.1 41750 1164 1114000028 201.335 19-20 $ - $ 1,875 $ - NH $ 241 $ 526 $ - $ 702 $ 3,344 73.0 Acre(s) treated/pollutant

11 San Diego 5 R25.9/R26.8 42010 1137 1115000047 201.310 17-18 $ 143 $ 6,403 $ - NH $ 400 $ 1,000 $ 125 $ 1,630 $ 9,701 344.0 1,000 vehicle hour(s)/yr

11 San Diego 5 R37.7/R48.9 42260 1192 1115000183 201.151 17-18 $ - $ 9,360 $ - NH $ - $ - $ - $ 2,675 $ 12,035 30.0 Drainage system(s)

11 San Diego 5 42440 1202 1116000039 201.010 17-18 $ - $ 3,031 $ - STP $ - $ 686 $ - $ 435 $ 4,152 101.0 Collision(s) reduced

11 San Diego 5 R19.5/R55.4 42560 1281 1116000101 201.315 19-20 $ 3 $ 19,621 $ - NH $ - $ 1,497 $ 122 $ 2,995 $ 24,238 103.0 Field element(s)

11 San Diego 5 R0.3/R15.2 42750 1241 1116000177 201.315 20-21 $ - $ - $ - NH $ 818 $ - $ - $ - $ 818 13.8 Mile(s) of cable

11 San Diego 5 R23.0/R24.0 43002 1266 1117000123 201.130 16-17 $ - $ 800 $ 800 2/8/17 NH $ - $ - $ 5 $ 300 $ 1,105 1.0 Location(s)

11 San Diego 8 9.0/15.3 40870 1062 1112000017 201.121 16-17 $ 90 $ 17,423 $ 17,269 8/16/17 NH $ 636 $ 1,715 $ 52 $ 2,988 $ 22,904 2.5 Lane mile(s)

11 San Diego 8 49.0 40910 1085 1112000043 201.235 18-19 $ 20 $ 3,275 $ - NH $ 698 $ 1,251 $ - $ 1,034 $ 6,278 1.0 Location(s)

Near Yosemite Junction and Jamestown, from Route 120 to 0.3 mile east of Route 120; also on Route 120 from 0.5 mile east of Obyrnes Ferry Road to 0.1 mile south of Route 108 (PM 11.9/12.2). Upgrade stop-controlled intersection.

In Tuolumne County on Routes 108 and 120 at various locations; also, in Mariposa County on Routes 120 and 140 at various locations. Remove dead or dying drought damaged trees or trim.

Near Long Barn, from Lyons Dam Road to 0.4 mile east of Long Barn Connection. Rehabilitate pavement.Near Long Barn, from 0.1 mile east of the east junction of Long Barn Road to 2.3 miles east of Cow Creek Road. Pavement rehabilitation.Near Buck Meadows, from Elder Lane to Yosemite National Park boundary. Pavement rehabilitation.

Near Haden Flat, from east of Cherry Lake Road to west of Packard Canyon Road. Stabilize slope erosion at two locations.In Tuolumne, Stanislaus, and Mariposa counties, on Routes 120 and 108 at various locations. Install centerline, shoulder, and edge-line rumble strips.

Near Buck Meadows, at 0.4 mile west of South Fork Tuolumne River Bridge. Reconstruct embankment slipout, repair failed slope, abandon damaged drainage culvert, and install new drainage culvert.

In Stanislaus County near Oakdale, from west of Lancaster Road to county line (STA PM 11.2/T18.2): also, in Tuolumne County near Sonora, from county line to Moccasin Creek Bridge (TUO PM R0.0/R24.1); also, on Route 108 from Route 120 to Route 49 (TUO PM L0.0/L2.8). Rehabilitate pavement.

In Imperial County, from west of Midway Well Road to east of Mitchell Camp Road at various locations. Culvert replacement.In Imperial County, from north of Alamo River Bridge to north of Gonder Road. Culvert replacement.In the city of San Diego, from north of La Jolla Village Drive to south of Genesee Avenue, on southbound. Construct a 1/2 mile auxiliary lane.In the city of San Diego, from 0.8 mile to 1.0 mile north of Del Mar Heights Road. Repair and enhance detention basin and regrade overflow channel and access road.

In the city of San Diego, from Route 52 to Gilman Drive. Construct auxiliary lane.In San Diego County, from 0.3 mile north of Lomas Santa Fe Drive Undercrossing to 0.2 mile north of Agua Hedionda Lagoon Bridge. Rehabilitate culverts. The project will be combined with I-5 NCC HOV Extension Phase 1 11-2T210, PPNO 0615C (STIP) for construction.

In San Diego County, at various locations. Groove pavement, place high friction surface treatment (HFST) and upgrade lighting.In San Diego County, from 0.6 mile south of Route 5/ 8 Separation to 1.5 miles north of Route 5/76 Separation. Install VDS, CMS, CCTV, Ramp Metering, Traffic Signal and Fiber Optic Network elements.

In San Diego County, at various locations; also on Route 905 (PM 2.5/5.4) and Route 805 (PM 0.2/14.0). Install fiber optic communication lines to improve regional traffic operations and mobility near the U.S./Mexico border.

In the city of San Diego, from 0.5 mile south of Balboa Avenue to 0.5 mile north of Balboa Avenue. Repair sinkhole in roadway shoulder and replace failed culvert.

In the cities of San Diego, La Mesa and El Cajon, from 0.6 mile west of Lake Murray Boulevard Overcrossing to Johnson Avenue Undercrossing. Pavement rehabilitation.Near Pine Valley, at Buckman Springs Safety Roadside Rest Area (SRRA). Rehabilitate SRRA sewer and water systems.

11 San Diego 8 2.8/5.0 41131 1165 1114000118 201.235 18-19 $ 3 $ 5,209 $ - NH $ 603 $ 2,167 $ 3 $ 770 $ 8,755 48.0 Location(s)

11 San Diego 8 5.0/6.0 41132 1166 1115000132 201.235 18-19 $ 3 $ 3,278 $ - NH $ 371 $ 1,330 $ 2 $ 474 $ 5,458 25.0 Location(s)

11 San Diego 8 6.0/12.0 41133 1167 1115000133 201.235 19-20 $ 3 $ 4,959 $ - NH $ 565 $ 2,029 $ 3 $ 721 $ 8,280 64.0 Location(s)

11 San Diego 8 R0.3/1.7 41480 1068 1112000193 201.010 16-17 $ 173 $ 13,077 $ 12,609 7/13/17 STP $ 895 $ 4,100 $ 301 $ 3,235 $ 21,781 468.0 Collision(s) reduced

11 San Diego 8 R23.0/R61.3 42210 1194 1115000178 201.151 19-20 $ 75 $ 11,773 $ - NH $ 1,077 $ 2,346 $ 519 $ 2,836 $ 18,626 27.0 Drainage system(s)

11 San Diego 8 R31.8/R41.7 42370 1255 1116000059 201.122 21-22 $ - $ - $ - NH $ 936 $ - $ - $ - $ 936 22.8 Lane mile(s)

11 San Diego 8 L0.7/R23.0 42810 1246 1117000028 201.151 19-20 $ 80 $ 8,367 $ - NH $ 1,173 $ 1,590 $ - $ 2,020 $ 13,230 65.0 Drainage system(s)

11 San Diego 8 5.8 42920 1254 1117000063 201.130 16-17 $ - $ 350 $ 350 10/27/16 NH $ - $ - $ - $ 140 $ 490 1.0 Location(s)

11 San Diego 8 10.5/10.8 43003 1267 1117000128 201.130 16-17 $ - $ 600 $ 600 2/1/17 NH $ - $ - $ 5 $ 240 $ 845 1.0 Location(s)

11 San Diego 8 10.3/10.5 43007 1271 1117000139 201.130 16-17 $ - $ 700 $ 700 3/9/17 NH $ - $ - $ - $ 280 $ 980 1.0 Location(s)

11 San Diego 15 M12.7 3A040 1261 1117000100 201.130 16-17 $ - $ 350 $ 350 12/21/16 NH $ - $ - $ - $ 150 $ 500 1.0 Location(s)

11 San Diego 15 R8.7 42910 1249 1117000047 201.130 16-17 $ - $ 1,100 $ 1,100 9/26/16 NH $ - $ 150 $ - $ 250 $ 1,500 1.0 Location(s)

11 San Diego 15 11.5/31.2 42980 1263 1117000103 201.315 18-19 $ - $ 3,324 $ - NH $ 372 $ 865 $ - $ 654 $ 5,215 62.0 Field element(s)

11 San Diego 15 M12.7 43016 1278 1117000204 201.130 16-17 $ - $ 3,500 $ 3,500 5/23/17 NH $ - $ - $ - $ 1,400 $ 4,900 1.0 Location(s)

11 San Diego 15 R52.1/R52.6 43022 1282 1118000013 201.130 17-18 $ - $ 700 $ 700 8/15/17 NH $ - $ - $ - $ 300 $ 1,000 1.0 Location(s)

11 San Diego 52 3.8/6.6 29280 1088 1113000044 201.335 17-18 $ - $ 2,751 $ 2,098 1/31/18 NH $ 246 $ 670 $ 11 $ 842 $ 4,520 3.6 Acre(s) treated/pollutant

11 San Diego 52 3.8/5.1 41950 1176 1115000036 201.121 17-18 $ - $ 15,248 $ - NH $ - $ 1,056 $ - $ 2,086 $ 18,390 29.2 Lane mile(s)

11 San Diego 52 0.0/14.8 42030 1135 1115000026 201.015 19-20 $ - $ 4,121 $ - STP $ 478 $ 1,015 $ - $ 1,317 $ 6,931 90.0 Collision(s) reduced

11 San Diego 52 13.3/14.8 42120 1180 1115000083 201.010 17-18 $ - $ 2,310 $ - STP $ - $ 742 $ - $ 524 $ 3,576 10.0 Collision(s) reduced

11 San Diego 52 5.4 43015 1277 1117000203 201.130 16-17 $ - $ 1,500 $ 1,500 5/23/17 NH $ - $ - $ - $ 600 $ 2,100 1.0 Location(s)

11 San Diego 54 T12.3 43006 1270 1117000136 201.130 16-17 $ - $ 600 $ 600 3/29/17 NH $ - $ - $ - $ 240 $ 840 1.0 Location(s)

In the city of San Diego, from east of Route 163 to east of Route 805; also on Route 805 from north of Adams Avenue to south of Route 8 (PM 17.3/17.5). Roadside safety improvements.

In the city of San Diego, from east of Route 805 to east of Route 15; also on Route 15 from north of Adams Avenue to north of Route 8 (PM M5.8/R6.3). Roadside safety improvements.

In the city of San Diego and La Mesa, from west of Mission Gorge Road to west of Route 125. Roadside safety improvements.In the city of San Diego, from 0.1 mile west of Morena Boulevard Undercrossing to 0.5 mile west of Hotel Circle Drive Undercrossing. Restripe westbound I-8, add an additional westbound lane and improve signage.

In San Diego County, from 0.7 mile west of Flinn Springs Road Undercrossing to 0.2 mile east of Crestwood Road Undercrossing. Rehabilitate culverts and energy dissipaters.

Near Alpine, from Viejas Creek Bridge to Pine Valley Creek Bridge. Grind, remove and replace Jointed Plain Concrete Pavement (JPCP) lanes, remove and replace asphalt concrete outside shoulders and cold plane and overlay inside shoulders. Upgrade guardrail, replace approach/departure slabs and construct rumble strips.

In San Diego County, at various locations, from 0.5 mile west of Midway Drive Undercrossing to 0.6 mile west of Flinn Springs Road Undercrossing. Repair, rehabilitate and replace culvert systems.

In the city of San Diego, at 0.2 mile east of Route 15. Repair sinkhole, grout voids around sewer line, and reconstruct median shoulder pavement.

In La Mesa, at concrete lined drainage channel adjacent to Route 8 near Fletcher Parkway. Repair washout conditions and broken sections of channel side slopes.

In La Mesa, from 0.7 mile east of Lake Murray Boulevard to 0.1 mile west of Fletcher Parkway. Reconstruct embankment washout, replace rock slope protection (RSP), and repair failed culverts.

In the city of San Diego, at 0.6 mile south of Miramar Way. Repair fire damaged pavement and overhead sign.In the city of San Diego, at 0.3 mile north of Aero Drive. Repair corroded 60-inch culvert, repair pavement section, and install erosion control measures.

In San Diego County, at various locations. Update Microwave Vehicle Detection System (MVDS) elements for traffic flow monitoring and data collections.

In the city of San Diego, at 0.6 mile south of Miramar Way. Replace failed culvert and repair roadway sinkhole.In Rainbow, from Rainbow Valley Boulevard to 0.5 mile north of Rainbow Valley Boulevard. Repair roadway damage due to wildfire.In the city of San Diego from Route 805 to Route 163. Repair median erosion and implement storm water quality measures.In the city of San Diego, from Route 805 to west of Convoy Street. Pavement rehabilitation.In the city of San Diego and Santee, from Route 5 to Route 125. Construct rumble strips, enhance pavement delineation and install barrier.

In the City of San Diego and Santee, from Mast Boulevard Undercrossing to Mission Gorge Road Undercrossing. Construct median barrier.In the city of San Diego, at 0.1 mile west of Convoy Street. Remove and replace failed culvert, backfill sinkhole, and repair roadway sinkhole.

In Rancho San Diego, at Brabham Street. Replace failed culvert, repair sinkhole in roadway and replace damaged sidewalk.

11 San Diego 75 R20.2/R22.2 26220 1063 1100000215 201.110 16-17 $ - $ 14,636 $ 13,192 5/17/17 HBRR-S $ 426 $ 1,671 $ - $ 2,406 $ 19,139 1.0 Bridge(s)

11 San Diego 76 22.2/40.0 29910 1067 1100000421 201.112 16-17 $ - $ 2,086 $ 1,897 8/16/17 HBRR-S $ 400 $ 1,344 $ 1 $ 1,015 $ 4,846 304.0 Linear feet

11 San Diego 78 2.5/2.7 41740 1125 1114000027 201.335 18-19 $ 120 $ 3,547 $ - NH $ 276 $ 651 $ 50 $ 984 $ 5,628 4.3 Acre(s) treated/pollutant

11 San Diego 78 N17.6/R21.4 41930 1162 1115000042 201.121 19-20 $ 3,136 $ 17,731 $ - NH $ 1,180 $ 2,790 $2,168 $ 2,643 $ 29,648 13.9 Lane mile(s)

11 San Diego 78 0.0/R16.5 42230 1247 1115000180 201.151 21-22 $ - $ - $ - NH $ 811 $ - $ - $ - $ 811 65.0 Drainage system(s)

11 San Diego 78 32.4 43005 1268 1117000132 201.130 16-17 $ - $ 1,550 $ 1,550 2/16/17 NH $ - $ - $ - $ 540 $ 2,090 1.0 Location(s)

11 San Diego 79 34.2/36.5 41430 1123 1114000024 201.112 16-17 $ - $ 2,587 $ 1,841 8/16/17 HBRR-S $ 330 $ 1,326 $ - $ 892 $ 5,135 507.0 Linear feet

11 San Diego 94 46.9/R58.9 40900 1064 1112000042 201.112 16-17 $ 40 $ 2,220 $ 1,173 10/19/16 HBRR-S $ 371 $ 981 $ 2 $ 1,094 $ 4,708 586.0 Linear feet

11 San Diego 94 5.8/9.3 41440 1124 1114000023 201.112 16-17 $ 80 $ 3,146 $ 2,785 6/28/17 HBRR-S $ 417 $ 1,363 $ 46 $ 1,161 $ 6,213 1,001.0 Linear feet

11 San Diego 94 29.6/29.8 41660 1163 1113000090 201.010 17-18 $ 572 $ 3,775 $ - STP $ - $ 2,123 $ 350 $ 1,056 $ 7,876 48.0 Collision(s) reduced

11 San Diego 94 8.3 41800 1111 1114000054 201.010 17-18 $ - $ 1,604 $ - STP $ - $ 569 $ - $ 494 $ 2,667 39.0 Collision(s) reduced

11 San Diego 94 R10.4/14.9 42000 1177 1115000041 201.121 19-20 $ 159 $ 11,312 $ - NH $ 505 $ 1,252 $ 10 $ 1,537 $ 14,775 21.2 Lane mile(s)

11 San Diego 125 9.8/12.4 29200 1087 1113000045 201.335 16-17 $ - $ 2,780 $ 3,238 5/17/17 NH $ 281 $ 904 $ 12 $ 919 $ 4,896 29.3 Acre(s) treated/pollutant

11 San Diego 125 13.0/22.3 42380 1257 1116000061 201.121 21-22 $ - $ - $ - NH $ 1,383 $ - $ - $ - $ 1,383 49.5 Lane mile(s)

11 San Diego 163 2.5/4.0 41530 1103 1113000018 201.015 16-17 $ 136 $ 6,193 $ 7,155 8/16/17 STP $ 448 $ 710 $ 82 $ 1,261 $ 8,830 10.0 Collision(s) reduced

11 San Diego 163 5.7 43009 1273 1117000144 201.130 16-17 $ - $ 1,000 $ 1,000 3/14/17 NH $ - $ - $ - $ 350 $ 1,350 1.0 Location(s)

11 San Diego 805 15.7/17.5 41080 1086 1112000137 201.235 16-17 $ - $ 3,241 $ 2,597 5/17/17 NH $ 315 $ 940 $ 14 $ 930 $ 5,440 85.0 Location(s)

11 San Diego 805 0.3/4.0 41120 1084 1112000141 201.235 17-18 $ 60 $ 3,825 $ 3,642 10/18/17 NH $ 425 $ 876 $ 27 $ 1,083 $ 6,296 41.0 Location(s)

11 San Diego 805 27.1/28.9 41990 1175 1115000038 201.121 17-18 $ 90 $ 8,120 $ - NH $ - $ 1,181 $ - $ 1,302 $ 10,693 14.4 Lane mile(s)

11 San Diego 805 7.0 43008 1272 1117000141 201.130 16-17 $ - $ 600 $ 600 3/16/17 NH $ - $ - $ - $ 150 $ 750 1.0 Location(s)

In San Diego County, at San Diego-Coronado Bay Bridge, from Toll Gates to North Junction Route 5. Rehabilitate and upgrade bridge electrical components.

Near Palomar Mountain State Park, at various locations from Gomez Creek Bridge No. 57-0158 to La Jolla Amago Creek Bridge No. 57-0169. Bridge rail upgrade.

In Oceanside, from 0.8 mile to 0.6 mile west of College Boulevard. Stormwater mitigation and slope erosion repair.In and near Escondido, from west of North Broadway to Teepee Drive. Pavement rehabilitation.In San Diego County, at various locations from 0.1 mile east of Route 78/5 Separation to Route 15/78 Separation. Rehabilitate and replace culverts including invert paving, joint repair grouting, Cured-in-Place Pipeliner (CIPP) and drainage inlet lid repair.

Near Ramona, at 0.6 mile west of Weekend Villa Road. Repair eroded embankment by constructing a retaining wall.Near Warner Springs, at Canada Verde Creek Bridge and at Agua Caliente Creek Bridge. Rehabilitate bridge railing.Near Campo, at Campo Creek Bridge No. 57-0118 (PM 46.9); also at Campo Creek Bridge No. 57-0686 (PM R58.9). Upgrade bridge rails and bridge approach rails.

In the city of San Diego at Kelton Road Overcrossing; also in Lemon Grove at Grove Street Overcrossing. Upgrade bridge rails.Near Dulzura, from north of Marron Valley Road to south of Dutchman Canyon Road. Roadway realignment, curve improvement, and shoulder widening.

In Lemon Grove and La Mesa, at the Massachusetts Avenue Undercrossing and also on Route 125 at the Panorama Drive Undercrossing (PM 13.8). Construct outer barrier, apply friction enhancement treatment and upgrade guardrail and end treatments.

In the city of San Diego, from Spring Street to Route 54. Pavement rehabilitation.In and near Lemon Grove, from Paradise Valley Road Overcrossing to 0.3 mile north of Troy Street. Repair median erosion and implement storm water quality measures.

Near La Mesa and in Santee, from 0.2 mile south of Route 125/94 separation to Mission Gorge Road. Rehabilitate pavement by grinding and replacing concrete slabs and cold plane and overlay shoulders with Rubberized Hot Mix Asphalt (RHMA-G).

In the city of San Diego, from Robinson Avenue Overcrossing to San Diego River. Safety enhancements that include lighting, rumble strips, striping, lighting, bridge rail end treatments and high friction surface treatment.

In the city of San Diego, at 0.1 mile south of Genessee Avenue. Reconstruct embankment sinkhole, repair and replace sections of failed drainage culvert.

In the city of San Diego, from Landis Street to Route 8. Improve maintenance worker safety by relocating equip. away from traffic, installing access gates, constructing Maintenance Vehicle Pullouts (MVP), replace MBGR with conc. barrier, and other measures.

At various locations, from south of San Ysidro Boulevard to north of Main Street at various locations. Construct Maintenance Vehicle Pullouts (MVP), paving, construct concrete barrier and other measures.

In the city of San Diego, from Mira Mesa Boulevard to north of Route 5. Pavement rehabilitation.

In Chula Vista, at 0.2 mile south of East H Street. Reconstruct embankment washout, reconstruct metal beam guardrailing, and repair roadway.

11 San Diego 905 9.6/11.4 28882 1035 1115000068 201.310 17-18 $ - $ 49,747 $ 49,747 12/6/17 BOND-SH $ - $ - $ - $ - $ 49,747 809.0 1,000 vehicle hour(s)/yr

11 San Diego VAR 2M820 1173 1115000099 201.119 16-17 $ - $ 2,325 $ 2,762 3/15/17 HBRR-S $ - $ 651 $ - $ 679 $ 3,655 34.0 Bridge(s)

11 San Diego VAR 40580 1022 1100020271 201.361 17-18 $ 300 $ 2,755 $ - NH $ 841 $ 1,856 $ 134 $ 1,137 $ 7,023 72.0 Curb ramp(s)

11 San Diego VAR 41090 1104 1112000138 201.235 16-17 $ 60 $ 3,101 $ 3,058 12/7/16 NH $ 399 $ 1,019 $ 25 $ 1,105 $ 5,709 41.0 Location(s)

11 San Diego Var 41110 1083 1112000140 201.235 17-18 $ - $ 3,808 $ - NH $ 523 $ 1,221 $ 40 $ 1,294 $ 6,886 50.0 Location(s)

11 San Diego VAR 41134 1168 1115000134 201.235 18-19 $ 3 $ 3,618 $ - NH $ 409 $ 1,469 $ 2 $ 522 $ 6,023 21.0 Location(s)

11 San Diego VAR 41810 1127 1114000056 201.361 19-20 $ 110 $ 2,766 $ - NH $ 881 $ 2,425 $ 101 $ 1,658 $ 7,941 108.0 Curb ramp(s)

11 San Diego VAR 41820 1134 1114000063 201.151 18-19 $ 483 $ 2,646 $ - NH $ 568 $ 988 $ 418 $ 718 $ 5,821 7.0 Drainage system(s)

11 San Diego VAR 41910 1129 1114000125 201.170 16-17 $ - $ 11,571 $ 9,711 5/17/17 NH $ 640 $ 1,334 $ - $ 986 $ 14,531 1,201.0 Sign(s)

11 San Diego VAR 41911 1130 1114000126 201.170 16-17 $ - $ 10,593 $ 8,813 3/15/17 NH $ 640 $ 1,224 $ - $ 986 $ 13,443 1,027.0 Sign(s)

11 San Diego VAR 42070 1171 1115000057 201.315 19-20 $ - $ 4,401 $ - NH $ - $ 585 $ - $ 886 $ 5,872 25.0 Field element(s)

11 San Diego VAR 42080 1174 1115000060 201.315 18-19 $ - $ 4,586 $ - NH $ 389 $ 585 $ - $ 886 $ 6,446 25.0 Field element(s)

11 San Diego Var 42150 1172 1115000126 201.119 16-17 $ - $ 1,835 $ 1,717 6/28/17 HBRR-S $ - $ 600 $ - $ 650 $ 3,085 46.0 Bridge(s)

11 San Diego VAR 42690 1221 1116000144 201.119 18-19 $ - $ 3,542 $ - HBRR-S $ - $ 663 $ - $ 733 $ 4,938 35.0 Bridge(s)

11 San Diego Var 42970 1262 1117000102 201.315 19-20 $ - $ 11,535 $ - NH $ 911 $ 2,160 $ - $ 2,264 $ 16,870 239.0 Field element(s)

11 San Diego Var 43010 1274 1117000145 201.130 16-17 $ - $ 800 $ 800 3/23/17 NH $ - $ - $ - $ 320 $ 1,120 11.0 Location(s)

12 Orange 1 4.9/5.5 0H150 2246 1216000055 201.121 19-20 $ 65 $ 7,071 $ - NH $ - $ 3,200 $ 400 $ 1,739 $ 12,475 15.6 Lane mile(s)

12 Orange 1 5.5/7.9 0H151 2246A 1218000057 201.121 20-21 $ - $ 3,206 $ - NH $ - $ - $ - $ 779 $ 3,985 9.5 Lane mile(s)

12 Orange 1 7.9/10.5 0H153 2246B 1218000058 201.121 19-20 $ - $ 3,473 $ - NH $ - $ - $ - $ 832 $ 4,305 10.8 Lane mile(s)

12 Orange 1 7.9/10.5 0M820 2300 1214000041 201.378 19-20 $ 2,100 $ 8,328 $ - NH $ 1,225 $ 1,825 $2,715 $ 1,600 $ 17,793 187.0 Curb ramp(s)

12 Orange 1 9.3 0M990 2293 1213000086 201.110 19-20 $ 800 $ 1,550 $ - HBRR-S $ 270 $ 650 $ 790 $ 600 $ 4,660 1.0 Bridge(s)

12 Orange 1 11.6/11.9 0N260 2314 1213000186 201.335 17-18 $ - $ 935 $ 353 8/16/17 NH $ 200 $ 470 $ 10 $ 335 $ 1,950 0.3 Acre(s) treated/pollutant

In and near San Diego, at the Route 11/125/905 Separation. Construct southbound freeway to freeway connectors from Route 125 to eastbound Route 905 and Route 11.

In San Diego County, at various locations. Repair bridge decks, rails, and replace approach slabs.

In and near the cities of Chula Vista, National City, Coronado and San Diego on Routes 5, 8, 52, 75, 163 and 805 at various locations. Upgrade curb ramps to comply with ADA standards.

In San Diego County, on Route 5, 75, and 905 at various locations. Construct pullouts and pave beyond gore areas to improve safety for maintenance personnel.

In San Diego County, at various locations on Routes 94 and 125. Improve maintenance worker safety by installing access gates and Maintenance Vehicle Pullouts (MVP), paving, construct concrete barrier and other measures.

In San Diego County, on various routes at various locations. Construct maintenance vehicle pullouts, pave areas beyond the gore, upgrade crash cushions, reduce maintenance intensive landscaping and relocate irrigation controls.

In San Diego County, on routes 5, 15, 75 and 163 at various locations. Construct and upgrade curb ramps, driveways and sidewalks to comply with ADA standards.

In San Diego County, on various routes at various locations. Culvert rehabilitation.In various cities, at various locations. Upgrade existing guide signs to current standards.In San Diego County, at various locations. Upgrade existing guide signs to current standards.

In San Diego County, on various routes at various locations. Replace Changeable Message Sign (CMS) panels with Advanced Variable Message Sign (AVMS) panels.

In San Diego County, on various routes at various locations. Replace Changeable Message Sign (CMS) panels with Advanced Variable Message Sign (AVMS) panels.

In San Diego County, on various routes at various locations. Repair bridge decks, rails, and replace approach slabs.In San Diego County at various locations. Apply methacrylate to bridge decks, replace joint seals, repair unsound concrete and replace approach slabs.

In San Diego County, at various locations. Repair and install Vehicle Detection Station (VDS) elements including Microwave Vehicle Detection Systems (MVDS) and loop detectors.

In San Diego County, on Route 78, Route 76, and Route 79 at various locations. Remove multiple rock slide debris, remove loose boulders, stabilize slopes, repair guardrail, and replace damaged roadway.

In Laguna Beach and Newport Beach, from 1,000 feet south of Vista Del Sol to Moss Street; also, from Ledroit Street to Newport Coast Drive (PM 10.5/14.1). Remove and replace existing pavement with Rubberized Hot Mix Asphalt (RHMA).

In Laguna Beach, from 7th Street to Moss Street. Remove and replace pavement and with Rubberized Hot Mix Asphalt (RHMA).In Laguna Beach, from south of Ruby Street to Ledroit Street. Remove and replace pavement with Rubberized Hot Mix Asphalt (RHMA).In Laguna Beach, from south of Ruby Street to Ledroit Street. Upgrade pedestrian facilities to Americans with Disabilities Act standards.In Laguna Beach, at Route 133 (Broadway Street). Replace bridge.Near Laguna Beach, from north of Irvine Cove Drive to Moro Ridge Road. Storm water mitigation.

12 Orange 1 24.9 0N850 2527 1214000116 201.010 18-19 $ 172 $ 960 $ - STP $ 150 $ 412 $ 750 $ 490 $ 2,934 47.0 Collision(s) reduced

12 Orange 1 R18.4 0N910 2382 1215000008 201.131 16-17 $ 30 $ 1,183 $ 1,183 5/17/17 NH $ 500 $ 700 $ - $ 475 $ 2,888 1.0 Location(s)

12 Orange 1 20.5/20.9 0N930 2403A 1215000009 201.151 18-19 $ 10 $ 1,095 $ - NH $ 250 $ 400 $ - $ 400 $ 2,155 14.0 Drainage system(s)

12 Orange 1 24.3 0P020 2442 1215000023 201.010 16-17 $ 98 $ 627 $ 695 6/30/17 STP $ 190 $ 330 $ 200 $ 330 $ 1,775 20.0 Collision(s) reduced

12 Orange 1 29.9/33.7 0P590 2499A 1215000149 201.121 20-21 $ 111 $ 8,770 $ - NH $ 1,720 $ 2,932 $1,245 $ 2,358 $ 17,136 14.9 Lane mile(s)

12 Orange 1 13.0/33.6 0P680 2330 1216000002 201.315 20-21 $ - $ - $ - NH $ 1,891 $ - $ - $ - $ 1,891 20.0 Field element(s)

12 Orange 1 27.0/29.9 0Q280 2470A 1216000120 201.010 19-20 $ - $ 1,148 $ - STP $ 515 $ 605 $ - $ 492 $ 2,760 2.0 Collision(s) reduced

12 Orange 5 23.2/30.2 0H028 2753B 1213000143 201.315 17-18 $ - $ 3,000 $ - NH $ 330 $ 780 $ - $ 750 $ 4,860 7.0 Field element(s)

12 Orange 5 33.3/34.5 0N080 2859A 1213000100 201.235 16-17 $ - $ 4,600 $ 4,600 5/17/17 NH $ 270 $ 490 $ 90 $ 550 $ 6,000 65.0 Location(s)

12 Orange 5 33.7 0N280 2860G 1213000191 201.010 16-17 $ 5 $ 585 $ 585 10/17/16 STP $ 30 $ 283 $ 11 $ 260 $ 1,174 17.0 Collision(s) reduced

12 Orange 5 31.0/33.3 0N510 2841 1214000054 201.235 18-19 $ - $ 1,900 $ - NH $ 285 $ 390 $ - $ 325 $ 2,900 36.0 Location(s)

12 Orange 5 34.5/37.4 0N640 2860M 1214000075 201.010 16-17 $ - $ 2,103 $ 2,503 6/23/17 STP $ 130 $ 690 $ - $ 650 $ 3,573 102.0 Collision(s) reduced

12 Orange 5 22.0/R24.3 0N650 2751B 1214000076 201.010 17-18 $ 8 $ 3,000 $ - STP $ 195 $ 405 $ - $ 425 $ 4,033 70.0 Collision(s) reduced

12 Orange 5 10.1/10.6 0P090 2632A 1215000034 201.335 19-20 $ - $ 2,729 $ - NH $ 400 $ 600 $ 50 $ 650 $ 4,429 2.5 Acre(s) treated/pollutant

12 Orange 5 35.0 0P390 2861D 1215000094 201.010 17-18 $ 7 $ 1,279 $ - STP $ - $ 647 $ 16 $ 615 $ 2,564 25.0 Collision(s) reduced

12 Orange 5 33.0/43.2 0P670 2859C 1215000160 201.315 19-20 $ - $ 13,673 $ - NH $ 2,380 $ 3,650 $ 320 $ 3,650 $ 23,673 311.0 Field element(s)

12 Orange 5 3.3 0P700 2563 1216000004 201.151 19-20 $ 15 $ 4,303 $ - NH $ 452 $ 963 $ 111 $ 1,080 $ 6,924 1.0 Drainage system(s)

12 Orange 5 37.3/37.4 0Q300 2861F 1216000123 201.010 18-19 $ 18 $ 1,432 $ - STP $ - $ 1,285 $ - $ 493 $ 3,228 38.0 Collision(s) reduced

12 Orange 5 19.7 0Q550 2728 1217000063 201.130 16-17 $ - $ 350 $ 350 1/31/17 NH $ 10 $ 10 $ - $ 120 $ 490 1.0 Location(s)

12 Orange 22 R3.9/R10.8 0M900 2941 1213000017 201.010 17-18 $ 20 $ 10,522 $ - STP $ 1,641 $ 3,000 $ 200 $ 2,100 $ 17,483 1,125.0 Collision(s) reduced

12 Orange 22 R9.1 0N920 2948 1215000010 201.151 19-20 $ 326 $ 1,149 $ - NH $ 234 $ 410 $ 30 $ 468 $ 2,617 8.0 Drainage system(s)

In Huntington Beach, at 6th Street; also in Seal Beach at Seal Beach Boulevard (PM 32.7). Modify traffic signals and install additional lighting.

In Newport Beach, at North Arm Newport Bay Bridge No. 55-0614. Rebuild failed slope paving and bike trail and construct cut-off wall.In Newport Beach, from north of Superior Avenue to 60th Street. Rehabilitate drainage system.In Huntington Beach, at Huntington Street. Modify traffic signal and add additional lighting.In Huntington Beach, from Warner Avenue to Los Angeles County line. Upgrade ADA curb ramps, cold plane pavement, and place Rubberized Hot Mix Asphalt concrete (RHMA).

In the cities of Newport Beach, Huntington Beach and Seal Beach, from Crystal Heights Drive to First Street. Replace traffic signals, upgrade non-standard curb ramps to meet ADA standards and modify drainage.

In Huntington Beach, from Seapoint Street to Warner Avenue at Boisa Chica State Beach. Construct rumble strips and install outer separation barrier in southbound direction.

In the cities of Santa Ana, Tustin and Irvine, from Route 133 to Route 55. Upgrade existing fiber optic communication system, closed circuit television and electronic equipment.

In the cities of Santa Ana and Orange, from Broadway to the Santa Ana River; also on Route 22 from Santa Ana River to Main Street, and on Route 57 from Route 5 to Chapman Avenue. Enhance highway worker safety with access gates and other measures.

In Santa Ana, at the northbound connector to westbound Route 22. Groove pavement, upgrade drainage system, and install new delineation to improve wet pavement conditions. Also, upgrade guardrail.

In Santa Ana, from south of 4th Street to Broadway. Roadside safety improvements.In the city of Orange and Anaheim from Santa Ana River to Harbor Boulevard. Grove existing concrete pavement.In Irvine, from north of Bake Parkway merge to south of Jeffrey Road. Overlay pavement with Open Graded Asphalt Concrete (OGAC) and install Midwest Guardrail System (MGS).

In San Juan Capistrano, from El Horno Street to south of Junipero Serra Road; also in Irvine, from Route 133 to south of Sand Canyon Avenue (PM 23.2/R23.7). Reconstruct slopes and apply vegetation to control sediment transport.

In the city of Orange, on Route 5 northbound off-ramp to State College Boulevard. Replace traffic signal system with overhead bridge signal structure including high visibility light emitting diodes (LED) signal heads facing southbound State College Boulevard.

In and near Anaheim, from south of Route 22 to south of Route 39; also on Route 57 (PM 10.7/16.6) and Route 91 (PM R2.6/R4.1 and (PM 0.0/7.2). Create interoperability of TMS by upgrading intelligent transportation system (ITS) elements between Caltrans and local agencies.

In San Clemente, adjacent to northbound Avenida Pico offramp. Restore hydraulic capacity of channel by repairing concrete panels in channel slope and bottom.

In Anaheim, on the northbound Harbor Boulevard offramp; also on the southbound Harbor Boulevard onramp. Modify traffic signal system and apply High Friction Surface Treatment (HFST).

In Laguna Hills, at southbound Lake Forest Drive on-ramp. Repair slope washout and replace damaged culvert.In the cities of Garden Grove, Orange and Santa Ana, from Route 39 (Beach Boulevard) to Route 5. Modify ramps and add auxiliary lane.In Garden Grove, at Haster Street westbound off-ramp. Upgrade drainage system.

12 Orange 22 R9.4/R10.1 0P520 2981 1215000137 201.010 19-20 $ 5 $ 3,815 $ - STP $ 591 $ 1,247 $ - $ 1,257 $ 6,915 36.0 Collision(s) reduced

12 Orange 22 R6.9 0P980 2930 1216000070 201.010 18-19 $ - $ 559 $ - STP $ - $ 381 $ - $ 327 $ 1,267 17.0 Collision(s) reduced

12 Orange 39 15.2/15.9 0F970 3230A 1212000031 201.151 19-20 $ 414 $ 2,226 $ - NH $ - $ 870 $ 153 $ 906 $ 4,569 24.0 Drainage system(s)

12 Orange 39 9.8/10.5 0H270 3184 1200000211 201.151 16-17 $ 341 $ 2,709 $ 2,703 8/17/16 NH $ 233 $ 825 $ 35 $ 650 $ 4,793 12.0 Drainage system(s)

12 Orange 39 12.4/17.4 0J400 3174 1200020177 201.121 16-17 $ 72 $ 7,322 $ 7,710 6/28/17 NH $ - $ 4,310 $ 270 $ 1,758 $ 13,732 14.0 Lane mile(s)

12 Orange 39 0.6/22.2 0M520 3089A 1212000096 201.010 17-18 $ 25 $ 2,300 $ 2,300 9/1/17 STP $ - $ 855 $ 15 $ 945 $ 4,140 165.0 Collision(s) reduced

12 Orange 39 5.7 0N710 3143A 1214000092 201.010 16-17 $ 20 $ 844 $ 567 4/25/17 STP $ 164 $ 445 $ - $ 609 $ 2,082 93.0 Collision(s) reduced

12 Orange 39 1.8 0N990 3104 1215000017 201.010 17-18 $ 56 $ 569 $ - STP $ 117 $ 330 $ 210 $ 293 $ 1,575 20.0 Collision(s) reduced

12 Orange 39 5.1/8.1 0P010 3167 1215000022 201.010 18-19 $ 400 $ 1,570 $ - STP $ 500 $ 750 $ 420 $ 720 $ 4,360 141.0 Collision(s) reduced

12 Orange 39 19.4 0Q290 3279 1216000122 201.010 18-19 $ 10 $ 820 $ - STP $ 185 $ 575 $ - $ 400 $ 1,990 25.0 Collision(s) reduced

12 Orange 39 17.2/17.3 0R050 3258A 1218000023 201.130 17-18 $ - $ 480 $ 480 8/24/17 NH $ 2 $ 18 $ - $ 180 $ 680 1.0 Location(s)

12 Orange 55 R8.0/R9.2 0G950 3483 1215000045 201.310 19-20 $24,500 $ 13,100 $ - NH $ 200 $ 3,500 $2,700 $ 2,800 $ 46,800 2,216.0 1,000 vehicle hour(s)/yr

12 Orange 55 12.0/13.4 0N500 3573 1214000053 201.235 17-18 $ - $ 1,900 $ - NH $ 285 $ 390 $ - $ 325 $ 2,900 33.0 Location(s)

12 Orange 55 13.2/R17.8 0N530 3535 1214000056 201.235 19-20 $ - $ 2,000 $ - NH $ 300 $ 440 $ - $ 360 $ 3,100 32.0 Location(s)

12 Orange 55 10.7 0N630 3510 1214000073 201.010 18-19 $ 11 $ 646 $ - STP $ 100 $ 427 $ - $ 318 $ 1,502 11.0 Collision(s) reduced

12 Orange 55 17.2 0P720 3575 1216000007 201.010 17-18 $ 63 $ 990 $ - STP $ - $ 519 $ 7 $ 513 $ 2,092 23.0 Collision(s) reduced

12 Orange 57 16.3/20.9 0M480 3799 1214000042 201.378 17-18 $ 20 $ 1,300 $ - NH $ 290 $ 875 $ 1 $ 850 $ 3,336 91.0 Curb ramp(s)

12 Orange 73 22.5/R25.7 0M960 4096M 1213000068 201.121 16-17 $ - $ 5,400 $ 6,185 5/17/17 NH $ - $ 514 $ 49 $ 800 $ 6,763 32.0 Lane mile(s)

12 Orange 73 10.0/28.0 0N720 4051A 1214000093 201.015 19-20 $ - $ 16,500 $ - STP $ 730 $ 2,600 $ 58 $ 3,200 $ 23,088 108.0 Collision(s) reduced

12 Orange 73 16.8/17.1 0N840 4096P 1214000115 201.010 18-19 $ - $ 980 $ - STP $ - $ 637 $ - $ 410 $ 2,027 57.0 Collision(s) reduced

12 Orange 73 24.0 0N860 4096R 1214000123 201.010 19-20 $ 388 $ 7,347 $ - STP $ 500 $ 1,500 $ 130 $ 1,531 $ 11,396 82.0 Collision(s) reduced

In the cities of Orange and Santa Ana, from Lewis Street Overcrossing to east of Bristol Street Undercrossing; also on Route 57, from PM 10.9/11.9. Replace concrete median barrier and add lighting in median.

In Garden Grove, at westbound on ramp from Euclid Street. Overlay with open graded friction course.In Buena Park, from Auto Center Drive to Craig Avenue. Rehabilitate drainage systems, install new inlets, reinforced concrete pipes (RCP) and replace flood damaged sections of curb and gutters.

In Stanton, from 0.1 mile south of Bever Place to 0.1 mile north of Stanton Storm Channel. Rehabilitate drainage system to alleviate flooding.

In Anaheim, Buena Park and La Mirada, at Lincoln Avenue (PM 12.4/12.9); at Route 91 (PM 14.3/14.5) and from Route 5 to Rosecrans Avenue (PM 15.1/17.4). Roadway rehabilitation.

In Huntington Beach, Anaheim and La Habra, from Atlanta Avenue to Cypress Street at various intersections. Modify traffic signals and enhance lighting.

In Huntington Beach at Center Avenue; also in Buena Park, at Route 91 off ramps (PM 14.4). Improve lighting and modify traffic signals.In the city of Huntington Beach, at Utica Avenue. Intersection improvement.In Huntington Beach, Westminster and Garden Grove, at the intersections of Heil Avenue (PM 5.14), MacDonald Street (PM 5.30) and Trask Avenue (PM 8.14); also on Route 90 in Brea at the intersection of Castlegate Lane/Placentia Avenue (PM 5.93). Modify existing signals and lighting and upgrade ADA facilities to current standards.

In the city of La Habra, at Fashion Square Lane. Modify traffic signal and add lighting.In and Near Buena Park, from Los Coyotes Drive to Rosecrans Avenue (Los Angeles County PM D17.28). Remove and replace corrugated metal pipe, repave roadway, and reconstruct raised center median.

In the cities of Santa Ana and Tustin, from Dyer Road on ramp to Edinger Avenue off ramp. Construct northbound auxiliary lane.In the cities of Orange and Tustin, from north of 17th Street to north of La Veta Avenue. Roadside safety improvements.In the city of Orange, from La Veta Avenue to Route 91. Roadside safety improvements.In Tustin, on the 4th Street northbound off-ramp. Modify traffic signals and install additional lighting.

In the City of Orange, on the Lincoln Avenue southbound off-ramp; also in Anaheim, on Route 91, on the Tustin Avenue eastbound off-ramp (PM 8.2). Place open graded asphalt concrete (OGAC), add safety lighting, striping and markings, upgrade ADA curb ramps and guardrail.

In Fullerton and Placentia, from Orangethorpe Avenue to Lambert Road. Upgrade pedestrian facilities to meet current ADA standards.In and near Irvine and Newport Beach, from Bonita Canyon Road/New Ford Road to 0.2 mile south of Red Hill Avenue. Rehabilitate pavement.In the cities of San Juan Capistrano, Laguna Nigel, Laguna Hills, Aliso Viejo, Laguna Beach, Irvine, Newport Beach, and Costa Mesa from Route 5 to Route 405. Upgrade highway safety features.

In Laguna Beach, on southbound Route 73, from Route 133 to 0.2 mile north of Route 133. Modify superelevation, install drainage inlets, place OGAC and place pavement delineation.

In Newport Beach, on the Route 73 southbound off-ramp to MacArthur Boulevard. Widen ramp, install traffic signal and guardrail.

12 Orange 74 2.9/5.1 0L722 4124B 1214000104 201.010 18-19 $ 20 $ 850 $ - STP $ - $ 400 $ - $ 620 $ 1,890 8.0 Collision(s) reduced

12 Orange 74 0.1/1.8 0M090 4097C 1200020302 201.361 18-19 $ 122 $ 1,620 $ - NH $ 290 $ 940 $ 600 $ 1,128 $ 4,700 48.0 Curb ramp(s)

12 Orange 74 11.5/16.6 0P030 4218 1215000024 201.010 19-20 $ 719 $ 35,611 $ - STP $ 2,965 $ 4,826 $1,018 $ 7,206 $ 52,345 160.0 Collision(s) reduced

12 Orange 74 3.1/5.6 0Q570 4150A 1217000067 201.130 16-17 $ 100 $ 1,500 $ 1,500 2/16/17 NH $ 150 $ 100 $ 150 $ 300 $ 2,300 3.0 Location(s)

12 Orange 90 0.6/8.0 0M910 4317 1213000036 201.378 16-17 $ 760 $ 4,472 $ 4,468 8/16/17 NH $ 740 $ 3,126 $2,500 $ 1,570 $ 13,168 51.0 Curb ramp(s)

12 Orange 90 2.6/5.1 0P580 4337 1215000148 201.121 19-20 $ - $ 8,208 $ - NH $ 478 $ 1,249 $ 129 $ 2,269 $ 12,333 11.7 Lane mile(s)

12 Orange 91 5.8/R9.3 0M610 4595 1212000121 201.010 16-17 $ 30 $ 5,180 $ 4,999 8/23/16 STP $ - $ 1,674 $ 30 $ 1,316 $ 8,230 188.0 Collision(s) reduced

12 Orange 91 5.2/6.4 0N090 4558A 1213000101 201.235 17-18 $ - $ 3,400 $ 3,400 12/6/17 NH $ 200 $ 340 $ 60 $ 400 $ 4,400 60.0 Location(s)

12 Orange 91 R13.8 0N270 4644A 1213000187 201.321 17-18 $ - $ 6,847 $ - ST-CASH $ 431 $ 1,442 $ 10 $ 1,419 $ 10,149 1.0 Location(s)

12 Orange 91 R9.8/R18.9 0N320 4609B 1213000196 201.121 18-19 $ - $ 5,750 $ - NH $ - $ 1,740 $ - $ 1,740 $ 9,230 90.0 Lane mile(s)

12 Orange 91 R13.6 0N490 4642A 1214000050 201.321 18-19 $ - $ 6,847 $ - ST-CASH $ 624 $ 1,391 $ 10 $ 1,332 $ 10,204 1.0 Location(s)

12 Orange 91 R2.8 0Q040 4533A 1216000078 201.010 18-19 $ - $ 540 $ - STP $ - $ 360 $ - $ 320 $ 1,220 17.0 Collision(s) reduced

12 Orange 91 R18.7/R18.8 0Q560 4693 1217000065 201.130 16-17 $ - $ 250 $ 250 6/29/17 NH $ 10 $ 10 $ - $ 40 $ 310 1.0 Location(s)

12 Orange 133 3.1/3.6 0N060 4793 1213000097 201.010 19-20 $ 1,230 $ 6,032 $ - STP $ 1,215 $ 1,820 $ 550 $ 2,109 $ 12,956 65.0 Collision(s) reduced

12 Orange 133 R7.8/13.7 0N100 4839A 1213000102 201.235 17-18 $ - $ 1,900 $ - NH $ 200 $ 340 $ 60 $ 400 $ 2,900 25.0 Location(s)

12 Orange 133 3.4/13.6 0N660 4795A 1214000077 201.015 18-19 $ - $ 9,500 $ - STP $ 830 $ 1,943 $ 70 $ 2,165 $ 14,508 63.0 Collision(s) reduced

12 Orange 133 0.9/1.2 0N870 4769 1214000124 201.010 18-19 $ 536 $ 1,189 $ - STP $ - $ 1,100 $ 150 $ 789 $ 3,764 34.0 Collision(s) reduced

12 Orange 133 3.1/R4.3 0Q360 4792 1216000133 201.151 19-20 $ 1,467 $ 2,095 $ - NH $ 1,125 $ 1,712 $ 766 $ 1,188 $ 8,353 2.0 Drainage system(s)

12 Orange 142 R0.8/2.9 0N600 5364 1214000066 201.121 16-17 $ 1,005 $ 5,750 $ 4,550 8/16/17 NH $ - $ 2,040 $ 780 $ 2,490 $ 12,065 11.0 Lane mile(s)

12 Orange 142 3.5/4.7 0N730 5380A 1214000095 201.335 19-20 $ 200 $ 3,400 $ - NH $ 456 $ 1,250 $ 380 $ 920 $ 6,606 1.7 Acre(s) treated/pollutant

12 Orange 241 18.3/18.7 0N300 5492E 1213000194 201.010 17-18 $ 3 $ 1,192 $ - STP $ 227 $ 576 $ 13 $ 413 $ 2,424 55.0 Collision(s) reduced

Near San Juan Capistrano, from east of Antonio Parkway/La Pata Avenue to west of Conrock entrance. Landscape and plant establishment project.

In San Juan Capistrano, from Route 5 to the San Juan Capistrano city line. Upgrade pedestrian facilities to meet current ADA standards.In the Cleveland National Forest, from 0.9 mile west of San Juan Fire Station to the Orange/Riverside County line. Super elevation corrections, shoulder widening, open graded asphalt concrete (OGAC) overlay and apply high friction surface treatment (HFST).

Near San Juan Capistrano, from 0.5 mile east of La Plata Avenue to 0.5 mile east of Cristianitos Road. Replace failed culvert, reconstruct eroded embankment, and repair roadway.

In La Habra, Fullerton, Brea, and Placentia, from Route 39 (Beach Blvd.) to west of Rose Drive. Americans with Disabilities Act (ADA) improvements.

In and near Brea, from Harbor Boulevard to Randolph Avenue. Cold plane pavement and place Rubberized Hot Mix Asphalt concrete (RHMA).

In Anaheim, at the Route 91/57 Separation and the Route 91/55 Separation at various locations. Install safety lighting, upgrade guardrails and end treatments.

In Anaheim and Placentia from State College Boulevard to La Palma Avenue; also on Route 57 from south of La Palma Avenue to south of Orangethorpe Avenue. Enhance highway worker safety with access gates, miscellaneous paving and other measures.

Near Anaheim, at the westbound Peralta Weigh Station. Rehabilitate Commercial Vehicle Enforcement Facility (CVEF).In the City of Anaheim, from west of Lakeview Avenue to Orange/Riverside County line. Pavement rehabilitation.In Anaheim, at the Commercial Vehicle Enforcement Facility (CVEF) Peralta Weigh Station (Eastbound). Rehabilitate and upgrade CVEF.

In Buena Park, on the 91 eastbound connector from northbound Route 39 (Beach Boulevard). Overlay Hot Mix Asphalt (HMA) Open Graded Friction Course (OGFC).

Near Corona, at Coal Canyon. Remove slide debris and repair drainage systems.In Laguna Beach, from 1700 feet south to 1300 feet north of El Toro Road. Extend lanes in both directions.In and near Irvine, from south of Route 405 to north of Route 241. Enhance highway worker safety with access gates, miscellaneous paving, and other measures.

In and near Laguna Beach and Irvine, from El Toro Road to Route 241. Flatten steep embankments, replace and upgrade guardrail and terminal systems, install thrie-beam median barrier and replace K-rail with concrete barrier.

In Laguna Beach, at and north of Canyon Acres Drive. Extend the northbound lane reduction transition.In Orange County, from 0.3 mile south of El Toro Road to 0.2 mile north of Route 73/133 Interchange. Construct detention basin, reconstruct channel, extend reinforced concrete box and re-grade to prevent adverse flow.

In and near Brea, from Route 90 to east of Brea Hills Avenue. Pavement rehabilitation.In Brea, from east of Chino Hills State Park entrance to east of Olinda Drive. Storm water mitigation.In Santa Margarita, at the Santa Margarita Parkway northbound off/on ramps. Improve corner sight distance on the off ramp and improve the vertical curve, cross slope, drainage and overlay open grade asphalt concrete on the on ramp.

12 Orange 241 33.0/39.1 0R110 5504B 1218000038 201.130 17-18 $ - $ 1,000 $ 1,000 10/18/17 NH $ 60 $ 100 $ - $ 200 $ 1,360 1.0 Location(s)

12 Orange 261 0.0/0.3 0Q130 4926F 1216000091 201.010 18-19 $ - $ 510 $ - STP $ - $ 412 $ - $ 320 $ 1,242 3.0 Collision(s) reduced

12 Orange 405 7.3/11.8 0N520 4999D 1214000055 201.235 19-20 $ - $ 1,900 $ - NH $ 285 $ 390 $ - $ 325 $ 2,900 20.0 Location(s)

12 Orange 405 6.9/10.3 0P220 4995A 1215000053 201.010 18-19 $ - $ 3,170 $ - STP $ 200 $ 1,300 $ - $ 1,200 $ 5,870 8.0 Collision(s) reduced

12 Orange VAR 0P42U 2859B 1216000097 201.315 19-20 $ - $ 8,820 $ - NH $ 1,323 $ 2,030 $ 180 $ 2,030 $ 14,383 24.8 Field element(s)

12 Orange Var 0Q690 1203 1217000088 201.315 19-20 $ 24 $ 6,530 $ - NH $ - $ 2,060 $ - $ 1,800 $ 10,414 754.0 Field element(s)

Near the city of Orange, from 0.5 mile north of E Santiago Canyon Road to Route 91; also on Route 91, from Route 241 to Riverside County line. Replace metal beam guardrailing, replace roadside elements, repair drainage systems, and repair roadway.

In Irvine, from Walnut Road to north of northbound Jamboree Road Overcrossing. Install double thrie-beam barrier to prevent cross-median collisions.

In Irvine, and Costa Mesa, from Von Karmen Avenue to west of Harbor Boulevard. Roadside safety improvements.In Irvine and Costa Mesa, from Jamboree Road to Route 73. Replace existing temporary railing with permanent concrete barrier.In the cities of Orange, Anaheim, Santa Ana, Fullerton and Buena Park, from PM 33.0 to PM 43.2, also on Route 57, from PM 10.7 to PM 16.6, also on Route 91, from PM R2.6 to PMR4.1 and PM 0.0 to PM 7.2. Install and modify Intelligent Transportation System (ITS) elements.

At various locations, on various routes. Replace and upgrade existing field elements for the Traffic Management