_________________________________________________________________________________________________________________________________________________________________________________ MGNREGS/Paschim Medinipur MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15 (Rs. In lakh) Name of Block Sector name Scheme name Location Details Unit Estimated Cost Panchayat KM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1 01 Nayagram 1 1/1 Excavation of Dhasole bundh Patina Fulbani Patina 7 1.89 - - 4.89 0.93 5.82 3240 2 01 Nayagram 1 1/2 Excavation of Bhurlipura Patina Fulbani Patina 7 1.89 - - 4.89 0.93 5.82 3240 3 01 Nayagram 1 1/3 Excavation Dhirida Bundh Patina Patina 7 1.89 - - 4.89 0.93 5.82 3240 4 01 Nayagram 1 1/4 Excavation of Bhola Bundh Patina Patina 7 1.26 - - 4.49 0.81 5.30 2970 5 01 Nayagram 1 1/5 Excavation of Gugu Dahi Bundh Patina Patina 7 1.75 - - 4.49 0.81 5.29 2970 6 01 Nayagram 1 1/6 patina Fulbani Patina 7 1.45 - - 4.49 0.81 5.29 2970 7 01 Nayagram 1 1/7 Excavation of Nakbindi Pond Patina Patina 7 2.52 - - 4.89 0.85 5.74 3240 8 01 Nayagram 1 1/8 7 6.58 - - 7.70 1.48 9.18 5097 9 01 Nayagram 1 1/9 Kasia Kasia 20 0.98 - - 4.07 0.78 4.86 2698 10 01 Nayagram 1 1/10 Kasia Kasia 20 1.50 - - 5.30 0.85 6.15 3510 11 01 Nayagram 1 1/11 Kasia Kasia 20 1.25 - - 5.30 0.85 6.15 3510 12 01 Nayagram 1 1/12 Kasia Kasia 20 1.85 - - 4.89 0.95 5.85 3240 13 01 Nayagram 1 1/13 50 3.31 - - 5.71 0.91 6.62 3780 14 01 Nayagram 1 1/14 Excavation of Baila Sole Pond 50 2.18 - - 5.30 0.88 6.18 3510 15 01 Nayagram 1 1/15 50 3.03 - - 6.12 0.94 7.06 4050 16 01 Nayagram 1 1/16 50 2.50 - - 5.30 1.16 6.46 3510 17 01 Nayagram 1 1/17 54 1.50 - - 4.49 0.81 5.29 2970 18 01 Nayagram 1 1/18 Excavation of Asit Mahat Pond 54 1.75 - - 4.49 0.81 5.29 2970 19 01 Nayagram 1 1/19 62 4.31 - - 6.52 2.31 8.84 4320 20 01 Nayagram 1 1/20 38 2.50 - - 3.67 0.74 4.41 2430 21 01 Nayagram 1 1/21 Excavation of Kanti Desh Pond 38 3.50 - - 6.12 0.92 7.03 4050 22 01 Nayagram 1 1/22 38 1.50 - - 3.67 0.73 4.40 2430 23 01 Nayagram 1 1/23 Excavation of Rukhnimara Pond 40 1.75 - - 4.08 0.76 4.84 2700 Programme Implementing Agency : Nayagram Panchayat Samity Sl. No. PS _c d Panchaya t Samiti Se ct _c d Sch_ sl Person days to be generate Estima ted outcom e Sansad name Name of Revenue Mouza J.L. No. Plot No. Owners hip of Land PL / IL 000 cu.m . Hec t Unskill ed wage Other cost Total cost Water Conservation & Water Conservation & Water Conservation & Damadorp ur Water Conservation & Damadorp ur Water Conservation & Damadorp ur Water Conservation & Excavation of Bundh at West of Bhanu Charan Khilari pond Water Conservation & Nichu Patina Water Conservation & Excavation of Chandabila BPHC pond Chandabi la Chandabi la Chandabi la Water Conservation & Excavation of Bimal mahata Pond Chandabi la Water Conservation & Excavation of Biplab Mahata Pond Chandabi la Water Conservation & Excavation of Hiren Mahata Pond Chandabi la Water Conservation & Excavation of Prasanta Mahata's Pond Chandabi la Water Conservation & Excavation of Gyanendra Mahata Pond Chandabi la Gokhurpa l Gokhurpa l Water Conservation & Chandabi la Gokhurpa l Gokhurpa l Water Conservation & Excavation of Jitendra Mahata Pond Chandabi la Gokhurpa l Gokhurpa l Water Conservation & Excavation of Subash Mahata Pond Chandabi la Gokhurpa l Gokhurpa l Water Conservation & Excavation of Abani Mahata & Mrinal Mahata Pond Chandabi la Tungadhu a Tungadhu a Water Conservation & Chandabi la Tungadhu a Tungadhu a Water Conservation & Excavation of Pond at Rangamatia Barakhan kri Rukhnima ra Rangamat ia 330/1, 111 Water Conservation & Excavation of Parimal Singh Pond at Bacvhhurkhoar Barakhan kri Bachhurk hoard Bachhurk hoard Water Conservation & Barakhan kri Bachhurk hoard Bachhurk hoard Water Conservation & Excavation of Anil Bera Pond at Bachurkhoard Barakhan kri Bachhurk hoard Bachhurk hoard Water Conservation & Barakhan kri Rukhnima ra Rukhnima ra

Upload: builien

Post on 28-Jul-2018

260 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

1/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 241 01 Nayagram 1 1/1 Excavation of Dhasole bundh Patina Fulbani Patina 7 1.89 - - 4.89 0.93 5.82 3240 Sep-Oct

2 01 Nayagram 1 1/2 Excavation of Bhurlipura Patina Fulbani Patina 7 1.89 - - 4.89 0.93 5.82 3240 Sep-Oct

3 01 Nayagram 1 1/3 Excavation Dhirida Bundh Patina Patina 7 1.89 - - 4.89 0.93 5.82 3240 Sep-Oct

4 01 Nayagram 1 1/4 Excavation of Bhola Bundh Patina Patina 7 1.26 - - 4.49 0.81 5.30 2970 Sep-Oct

5 01 Nayagram 1 1/5 Excavation of Gugu Dahi Bundh Patina Patina 7 1.75 - - 4.49 0.81 5.29 2970 Sep-Oct

6 01 Nayagram 1 1/6 patina Fulbani Patina 7 1.45 - - 4.49 0.81 5.29 2970 Sep-Oct

7 01 Nayagram 1 1/7 Excavation of Nakbindi Pond Patina Patina 7 2.52 - - 4.89 0.85 5.74 3240 Sep-Oct

8 01 Nayagram 1 1/8 Excavation of Chandabila BPHC pond Chandabila Chandabila Chandabila 7 6.58 - - 7.70 1.48 9.18 5097 Sep-Oct

9 01 Nayagram 1 1/9 Excavation of Bimal mahata Pond Chandabila Kasia Kasia 20 0.98 - - 4.07 0.78 4.86 2698 Sep-Oct

10 01 Nayagram 1 1/10 Excavation of Biplab Mahata Pond Chandabila Kasia Kasia 20 1.50 - - 5.30 0.85 6.15 3510 Sep-Oct

11 01 Nayagram 1 1/11 Excavation of Hiren Mahata Pond Chandabila Kasia Kasia 20 1.25 - - 5.30 0.85 6.15 3510 Sep-Oct

12 01 Nayagram 1 1/12 Excavation of Prasanta Mahata's Pond Chandabila Kasia Kasia 20 1.85 - - 4.89 0.95 5.85 3240 Sep-Oct

13 01 Nayagram 1 1/13 Excavation of Gyanendra Mahata Pond Chandabila Gokhurpal Gokhurpal 50 3.31 - - 5.71 0.91 6.62 3780 Sep-Oct

14 01 Nayagram 1 1/14 Excavation of Baila Sole Pond Chandabila Gokhurpal Gokhurpal 50 2.18 - - 5.30 0.88 6.18 3510 Sep-Oct

15 01 Nayagram 1 1/15 Excavation of Jitendra Mahata Pond Chandabila Gokhurpal Gokhurpal 50 3.03 - - 6.12 0.94 7.06 4050 Sep-Oct

16 01 Nayagram 1 1/16 Excavation of Subash Mahata Pond Chandabila Gokhurpal Gokhurpal 50 2.50 - - 5.30 1.16 6.46 3510 Sep-Oct

17 01 Nayagram 1 1/17 Chandabila Tungadhua Tungadhua 54 1.50 - - 4.49 0.81 5.29 2970 Sep-Oct

18 01 Nayagram 1 1/18 Excavation of Asit Mahat Pond Chandabila Tungadhua Tungadhua 54 1.75 - - 4.49 0.81 5.29 2970 Sep-Oct

19 01 Nayagram 1 1/19 Excavation of Pond at Rangamatia 62 4.31 - - 6.52 2.31 8.84 4320 Sep-Oct

20 01 Nayagram 1 1/20 38 2.50 - - 3.67 0.74 4.41 2430 Sep-Oct

21 01 Nayagram 1 1/21 Excavation of Kanti Desh Pond 38 3.50 - - 6.12 0.92 7.03 4050 Sep-Oct

22 01 Nayagram 1 1/22 38 1.50 - - 3.67 0.73 4.40 2430 Sep-Oct

23 01 Nayagram 1 1/23 Excavation of Rukhnimara Pond 40 1.75 - - 4.08 0.76 4.84 2700 Sep-Oct

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

Water Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water Harvesting

Damadorpur

Water Conservation & Water Harvesting

Damadorpur

Water Conservation & Water Harvesting

Damadorpur

Water Conservation & Water Harvesting

Excavation of Bundh at West of Bhanu Charan Khilari pond

Water Conservation & Water Harvesting

Nichu Patina

Water Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water Harvesting

Excavation of Abani Mahata & Mrinal Mahata Pond

Water Conservation & Water HarvestingWater Conservation & Water Harvesting

Barakhankri

Rukhnimara

Rangamatia

330/1,111

Water Conservation & Water Harvesting

Excavation of Parimal Singh Pond at Bacvhhurkhoar

Barakhankri

Bachhurkhoard

Bachhurkhoard

Water Conservation & Water Harvesting

Barakhankri

Bachhurkhoard

Bachhurkhoard

Water Conservation & Water Harvesting

Excavation of Anil Bera Pond at Bachurkhoard

Barakhankri

Bachhurkhoard

Bachhurkhoard

Water Conservation & Water Harvesting

Barakhankri

Rukhnimara

Rukhnimara

Page 2: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

2/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

24 01 Nayagram 1 1/24 Excavation of Rangamatia Pond 40 2.00 - - 4.49 0.79 5.28 2970 Sep-Oct

25 01 Nayagram 1 1/25 Excavation of Yudhistir Mahata Pond 40 1.00 - - 4.49 0.79 5.28 2970 Sep-Oct

26 01 Nayagram 1 1/26 Excavation of Bibhuti Paria Pond Bardanga 40 3.00 - - 5.30 0.85 6.15 3510 Sep-Oct

27 01 Nayagram 1 1/27 Kadamdiha Kadamdiha 77 1.50 - - 3.67 0.73 4.40 2430 Sep-Oct

28 01 Nayagram 1 1/28 Excavation of Subash Mahata & other 4 Kadamdiha Kadamdiha 77 2.50 - - 3.67 0.73 4.40 2430 Sep-Oct

29 01 Nayagram 1 1/29 Excavation of Totasai Nichupara Pond Totasai Totasai 59 3.20 - - 5.30 0.85 6.15 3510 Sep-Oct

30 01 Nayagram 1 1/30 Totasai 63 2.50 - - 3.26 0.69 3.96 2160 Sep-Oct

31 01 Nayagram 1 1/31 Excavation of Laxman Hansda Pond Malam Kopbibhole Kharsola 120 0.75 - - 3.67 0.73 4.40 2430 Sep-Oct

32 01 Nayagram 1 1/32 Excavation of Sadasib Routh Pond Malam Banspat 219 1.89 - - 4.49 0.79 5.28 2970 Sep-Oct

33 01 Nayagram 1 1/33 Excavation of Bhim Singh Pond Malam 74 1.89 - - 4.49 0.90 5.38 2970 Sep-Oct

34 01 Nayagram 1 1/34 Excavation of Pond at Baranegui Baranegui Baranegui Baranegui 52 1.26 - - 4.08 0.78 4.86 2700 Sep-Oct

35 01 Nayagram 1 1/35 Excavation of Baranegui Pond Baranegui Baranegui Baranegui 52 1.58 - - 4.49 0.79 5.28 2970 Sep-Oct

36 01 Nayagram 1 1/36 Excavation of Jamsola Pond Baranegui Morchi Morchi 83 1.50 - - 3.67 0.73 4.40 2430 Sep-Oct

37 01 Nayagram 1 1/37 Excavation of Pond at Tentulia Baranegui Bonisole Tentulia 90 2.52 - - 4.89 0.82 5.71 3240 Sep-Oct

38 01 Nayagram 1 1/38 148 6.58 - - 5.71 0.89 6.59 3780 Sep-Oct

39 01 Nayagram 1 1/39 Excavation of Pond at Kukrasole Kukrasole Kukrasole 206 47 0.98 - - 3.26 0.72 3.98 2160 Sep-Oct

40 01 Nayagram 1 1/40 Excavation of Khanamuri Pond Kuji Kuji 131 1.45 - - 4.08 0.76 4.84 2700 Sep-Oct

41 01 Nayagram 1 1/41 Nayagram Kurchiboni Kurchiboni 140 211 1.45 - - 4.08 0.71 4.79 2700 Sep-Oct

42 01 Nayagram 1 1/42 Excavation of Mrigen Hatui's Pond Nayagram Kurchiboni Kurchiboni 140 212 2.50 - - 4.49 0.92 5.41 2970 Sep-Oct

43 01 Nayagram 1 1/43 Excavation of Arjun Ghosh Pond Nayagram Kurchiboni Kurchiboni 140 1.58 - - 4.08 0.71 4.79 2700 Sep-Oct

44 01 Nayagram 1 1/44 Excavation of Nemainagar MSK Pond Nayagram 128 5.49 - - 7.34 1.23 8.57 4860 Sep-Oct

45 01 Nayagram 1 1/45 Excavation of Sitalpura Natun Para Pond Nayagram Sitalpura Sitalpura 146 271 3.31 - - 4.89 0.85 5.74 3240 Sep-Oct

46 01 Nayagram 1 1/46 Excavation of Gentaboni Pond Jamirapal Atmajhia Gentaboni 244 37 3.31 - - 4.89 0.85 5.74 3240 Sep-Oct

Water Conservation & Water Harvesting

Barakhankri

Rukhnimara

Rukhnimara

Water Conservation & Water Harvesting

Barakhankri

Rukhnimara

Rukhnimara

Water Conservation & Water Harvesting

Barakhankri

Rukhnimara

Water Conservation & Water Harvesting

Excavation of Gangadhar Mahali & Sristidhar Mahata Pond

Barakhankri

Water Conservation & Water Harvesting

Barakhankri

Water Conservation & Water Harvesting

Barakhankri

Water Conservation & Water Harvesting

Excavation of Raimani Saren Pond at Bhalukghora

Barakhankri

Bhalukghora

Water Conservation & Water HarvestingWater Conservation & Water Harvesting

Narsinghapur

Water Conservation & Water Harvesting

Chhotojharia

Chhotojharia

Water Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water Harvesting

Excavation of Pond near Kharikamathani Hut

Kharikamathani

Kharikamatnani

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Water Conservation & Water Harvesting

Excavation of Kurchiboni Sitalamandir Pond

Water Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water Harvesting

Nemainagar Nemainagar

Water Conservation & Water HarvestingWater Conservation & Water Harvesting

Page 3: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

3/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

47 01 Nayagram 1 1/47 Excavation of Muraboni pond Jamirapal Bhuasai Muraboni 251 4,5, 2.18 - - 4.08 0.78 4.86 2700 Sep-Oct

48 01 Nayagram 1 1/48 Excavation of Jamirapal Pond Jamirapal Jamirapal Jamirapal 235 3.03 - - 4.08 0.78 4.86 2700 Sep-Oct

49 01 Nayagram 1 1/49 Excavation of Tikrapara Pond Jamirapal Tikrapara Tikrapara 215 2.50 - - 4.08 0.79 4.87 2700 Sep-Oct

50 01 Nayagram 1 1/50 Excavation of Pond at Chilkipada Kuilisuta Chilikpada 185 1.23 - - 3.26 0.69 3.96 2160 Sep-Oct

51 01 Nayagram 1 1/51 Excavation of Chandrarekha pond 187 2.21 - - 4.49 0.74 5.22 2970 Sep-Oct

- - - 238.47 44.36 282.84 157930

52 01 Nayagram 2 Drought Proofing 2/1 Plantation at Khemasola ground Baligeria Kustikara Khemasole 287 - 0.45 - 2.45 2.83 5.28 1620 Sep-Oct

53 01 Nayagram 2 Drought Proofing 2/2 Plantation at Nichupatina Patina Nichupatina Khasjangal 6 - 1.02 - 2.85 3.31 6.17 1890

54 01 Nayagram 2 Drought Proofing 2/3 Patina Pratappur Pratappur - 2.05 - 2.85 4.18 7.03 1890

55 01 Nayagram 2 Drought Proofing 2/4 Patina 2,5 - 1.20 - 2.85 3.30 6.15 1890

56 01 Nayagram 2 Drought Proofing 2/5 Afforestation at Mritunjoy Khilari land Patina Fulbani Fuldaha 6 315 - 0.75 - 2.45 2.83 5.28 1620

57 01 Nayagram 2 Drought Proofing 2/6 River side plantation at Patina Patina Deulbar Deulbar 8 - 0.75 - 2.45 2.83 5.28 1620

58 01 Nayagram 2 Drought Proofing 2/7 Plantation at Patina football ground Patina Patina Patina 6 308 - 1.05 - 2.85 2.86 5.71 1890

59 01 Nayagram 2 Drought Proofing 2/8 Plantation at Dipak Chowdhury Patina Patina Patina 6 1997 - 1.05 - 2.85 3.30 6.15 1890

60 01 Nayagram 2 Drought Proofing 2/9 Plantation at Biriberia school ground Biriberia Biriberia 33 - 0.85 - 2.45 3.27 5.71 1620

61 01 Nayagram 2 Drought Proofing 2/10 Plantation at Radhankanta Pani Land 78 - 0.75 - 2.45 2.39 4.84 1620

62 01 Nayagram 2 Drought Proofing 2/11 Plantation at Bibhuti Pani land 78 - 0.50 - 2.45 2.83 5.28 1620

63 01 Nayagram 2 Drought Proofing 2/12 Plantation at Beldanga Beldanga Beldanga - 0.25 - 2.45 2.39 4.84 1620

64 01 Nayagram 2 Drought Proofing 2/13 Plantation at Priyanath Patra's Land 78 - 0.25 - 2.45 2.39 4.84 1620

65 01 Nayagram 2 Drought Proofing 2/14 Plantation at Bhusan Routh land 78 - 0.85 - 2.45 1.91 4.35 1620

66 01 Nayagram 2 Drought Proofing 2/15 101 - - 2.00 3.26 4.21 7.47 2160

67 01 Nayagram 2 Drought Proofing 2/16 Biriberia 33 - - 1.50 3.26 3.33 6.59 2160

Water Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water HarvestingWater Conservation & Water Harvesting

Chandrarekha

Water Conservation & Water Harvesting

Chandrarekha

Biswanathpur

Chandrarekha

Water Conservation & Water Harvesting Total

290/175

July-Aug

Road side Plantation from Pratappur chawk to Upar Patina Bank

July-Aug

Plantation of frouts trees at Jahira than , Damodarpur, and bihankuria

Damadorpur

Damodarpur

229,158

July-AugJuly-AugJuly-AugJuly-AugJuly-Aug

Barakhankri

July-Aug

Barakhankri

Barakhankri

Barakhankri

July-Aug

Barakhankri

Barakhankri

Barakhankri

July-Aug

Barakhankri

July-Aug

Barakhankri

Barakhankri

Barakhankri

July-Aug

Barakhankri

Barakhankri

Barakhankri

July-Aug

Road side plantation from Ramchandrapur to Bachhurkhoard

Barakhankri

Ramchandrapur

Ramchandrapur

July-Aug

Road side plantation from Bachhurkhoard to Biriberia

Barakhankri

Bachhurkhoard

July-Aug

Page 4: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

4/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

68 01 Nayagram 2 Drought Proofing 2/17 Rangamatia 62 - - 1.50 3.26 3.33 6.59 2160

69 01 Nayagram 2 Drought Proofing 2/18 Rangamatia Chakusai 7 - - 1.50 3.26 3.33 6.59 2160

70 01 Nayagram 2 Drought Proofing 2/19 Rangamatia Bhaliaghati 71 - - 1.50 3.26 3.33 6.59 2160

71 01 Nayagram 2 Drought Proofing 2/20 Murakati 78 - - 1.50 3.26 3.33 6.59 2160

72 01 Nayagram 2 Drought Proofing 2/21 Tungadhua 53 - - 2.00 3.26 4.21 7.47 2160

73 01 Nayagram 2 Drought Proofing 2/22 Tungadhua 53 - - 2.00 3.26 4.21 7.47 2160

74 01 Nayagram 2 Drought Proofing 2/23 Baligeria 166 - 1.20 - 4.08 3.41 7.48 2700

75 01 Nayagram 2 Drought Proofing 2/24 Plantation (Social Forestry) at Baligeria Baligeria Baligeria 199 - 1.61 - 4.08 4.27 8.35 2700

76 01 Nayagram 2 Drought Proofing 2/25 Baligeria Banskuthi 196 30, - 0.80 - 4.08 4.27 8.35 2700

77 01 Nayagram 2 Drought Proofing 2/26 Plantation (Social Forestry) at Kenduboni Baligeria Banskuthi Kenduboni 153 11/340 - 1.21 - 4.08 3.84 7.91 2700

78 01 Nayagram 2 Drought Proofing 2/27 Plantation at Dhobagobindapur mouza Baligeria Kustikara 314 - 0.40 - 2.45 3.71 6.15 1620

79 01 Nayagram 2 Drought Proofing 2/28 Road side planttion at Amladangri road Baligeria Amladangri 300 - 0.85 - 3.26 4.65 7.91 2160

80 01 Nayagram 2 Drought Proofing 2/29 Plantation at Rukhni Mouza Baligeria Rukhni rukhni 282 167 - 0.25 - 2.45 3.27 5.71 1620

81 01 Nayagram 2 Drought Proofing 2/30 Nusrey at Block Campus Baligeria Baligeria Baligeria - 0.25 - 6.52 6.66 13.19 4320

82 01 Nayagram 2 Drought Proofing 2/31 Berajal Nekrasole Nekrasole 295 - 0.85 - 2.85 3.75 6.61 1890

83 01 Nayagram 2 Drought Proofing 2/32 Plantation at Jugisole High School Berajal Jugisole Jugisole 260 - 1.20 - 2.45 3.28 5.73 1620

84 01 Nayagram 2 Drought Proofing 2/33 Plantation at Murgapahari Pry School Berajal Nekrasole 307 - 0.25 - 2.45 3.28 5.72 1620

85 01 Nayagram 2 Drought Proofing 2/34 Plantation at Dolgram High School Berajal Dolgram Dolgram 301 - 0.85 - 2.85 3.31 6.17 1890

86 01 Nayagram 2 Drought Proofing 2/35 Nursery at Jugisole Mouza Berajal Jugisole Dolgram 301 9 - 2.50 - 5.43 5.73 11.17 3598

87 01 Nayagram 2 Drought Proofing 2/36 Nursery at Rukhni Mouza Berajal Rukhni Rukhni 297 118 - 1.50 - 3.62 4.70 8.32 2398

88 01 Nayagram 2 Drought Proofing 2/37 Nursery at Asurhata Berajal Asurhata Asurhata 296 216 - 1.05 - 2.85 3.30 6.15 1890

89 01 Nayagram 2 Drought Proofing 2/38 Nursery at Dolgram Berajal Dolgram Dolgram 301 88 - 1.50 - 2.85 3.74 6.59 1890

Road side plantation from Rameswar to Rangamatia

Barakhankri

Rangamatia

July-Aug

Road side plantation from Rangamatia to Chakusai

Barakhankri

July-Aug

Road side plantation from Bhaliaghati to Murakati

Barakhankri

July-Aug

Road side plantation from Murakati to Barakhankri

Barakhankri

Barakhankri

July-Aug

Road side plantation from Barakhankri to Tungadhua

Barakhankri

Barakhankri

July-Aug

Road side plantation from Tungadhua to Neguia

Barakhankri

Barakhankri

July-Aug

Plantation(Social Forestry) at Patharbundh Mouza

Baligeria High

Patharbandh

161,2,30,57,

July-Aug

Baligeria Pry.

61,81,83,85,63,144,226,41

July-Aug

Plantation (Social Forestry) at Kusumkuthi Mouza

Kusumkuthi

July-AugJuly-Aug

Dhobagobindapur

201,202,203,224

July-Aug

Amladangri

July-AugJuly-AugJuly-Aug

Plantation at Nekrasole High School Campus

July-Aug

Murgapahari

July-AugJuly-AugJuly-AugJuly-AugJuly-AugJuly-Aug

Page 5: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

5/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

90 01 Nayagram 2 Drought Proofing 2/39 Berajal Jugisole Jugisole 260 - - 2.00 3.26 3.77 7.03 2160

91 01 Nayagram 2 Drought Proofing 2/40 Berajal Asurhata Asurhata 296 - - 2.00 3.26 3.77 7.03 2160

92 01 Nayagram 2 Drought Proofing 2/41 Berajal Asurhata Asurhata 296 - - 1.50 2.85 2.86 5.71 1890

93 01 Nayagram 2 Drought Proofing 2/42 Berajal Nekrasole Asurhata 296 - - 1.50 2.85 3.30 6.15 1890

94 01 Nayagram 2 Drought Proofing 2/43 Berajal Harimaity Nekrasole 295 - - 2.50 2.85 2.86 5.71 1890

95 01 Nayagram 2 Drought Proofing 2/44 Berajal Harimaity Harimaity - - 1.50 2.85 3.30 6.15 1890

96 01 Nayagram 2 Drought Proofing 2/45 Berajal Harimaity Radhapara 303 - - 1.25 2.04 3.24 5.28 1350

97 01 Nayagram 2 Drought Proofing 2/46 Berajal Joykhunta 306 - - 2.00 2.85 4.18 7.03 1890

98 01 Nayagram 2 Drought Proofing 2/47 Berajal Harimaity Harimaity - - 1.50 2.45 3.71 6.15 1620

99 01 Nayagram 2 Drought Proofing 2/48 Berajal Harimaity Harimaity - - 1.50 2.85 3.74 6.59 1890

100 01 Nayagram 2 Drought Proofing 2/49 Berajal Dolgram Sitarampur 308 - - 2.50 3.26 4.65 7.91 2160

101 01 Nayagram 2 Drought Proofing 2/50 Berajal Dolgram Dolgram 301 - - 1.50 2.04 3.24 5.28 1350

102 01 Nayagram 2 Drought Proofing 2/51 Berajal Nekrasole 307 - - 2.50 3.26 5.09 8.35 2160

103 01 Nayagram 2 Drought Proofing 2/52 Berajal Dhansola Dhansola - - 1.75 2.45 4.59 7.03 1620

104 01 Nayagram 2 Drought Proofing 2/53 Berajal Berajal Kenduboni 259 - - 2.50 3.67 5.12 8.79 2430

105 01 Nayagram 2 Drought Proofing 2/54 Chandabila Narda Pukuria 46 - 6.92 - 5.30 4.82 10.12 3510

106 01 Nayagram 2 Drought Proofing 2/55 Chandabila Raisole Raisole 52 - - 1.85 3.26 4.65 7.91 2160

107 01 Nayagram 2 Drought Proofing 2/56 Chandabila Negui Gakhurpal 50 - - 1.75 3.26 4.65 7.91 2160

108 01 Nayagram 2 Drought Proofing 2/57 Chandabila Gakurpal Narda 42 - - 1.50 2.45 3.71 6.15 1620

109 01 Nayagram 2 Drought Proofing 2/58 Chandabila Chandabila Narda 42 - - 2.00 2.45 3.71 6.15 1620

110 01 Nayagram 2 Drought Proofing 2/59 Chandabila Kashia Kadokatha 19 - - 2.00 2.85 3.74 6.59 1890

111 01 Nayagram 2 Drought Proofing 2/60 Chandabila Pukuria 48 - - 1.50 2.85 3.30 6.15 1890

112 01 Nayagram 2 Drought Proofing 2/61 Plantation from Gakhurpal to Sananegui Chandabila Gakhurpal Sananegui 40 - - 2.50 2.85 5.06 7.91 1890

Road side plantation from Jugisole Party Office to Kustikara Chawk

July-Aug

Road side plantation from Salboni to Asurhata Road

July-Aug

Road side plantation from Asurhata to Mina Khal

July-Aug

Road side plantation from Asurhata to Nekrasole School

July-Aug

Road side plantation from Nekrasole Pry. School to Harimaity chawk

July-Aug

Road side plantation from Harimaity village to PIREP road

July-Aug

Road side plantation from Radhapara to Harimaity

July-Aug

Road side plantation from Joykhunta to Murgapahari

Murgapahari

July-Aug

Road side plantation from PIREP to Orissa Border

July-Aug

Road side plantation from Harimaity to Sitarampur

July-Aug

Road side plantation from Sitarampur to Orissa border

July-Aug

Road side plantation from Olda to Dolgram

July-Aug

Road side plantation from Nekrasole Dompara to Murgapahari

Murgapahari

July-Aug

Road side plantation from Dhansola chawk to Orissa border

July-Aug

Road side plantation from Berajal to Kenduboni

July-Aug

Plantation from Narda Bandh to Pukuria canel pard

July-Aug

Road side plantation from Raisole to Astia road

July-Aug

Road side plantation from Negui to Gakhurpal

July-Aug

Road side plantation from Gakurpal to Narda

July-Aug

Road side plantation from Narda to Chandabila

July-Aug

Road side plantation from Kashia to Kadokatha

July-Aug

Plantation from Pukuria to Uparbankinala cannel

Uparbankinala

July-AugJuly-Aug

Page 6: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

6/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

113 01 Nayagram 2 Drought Proofing 2/62 Chandabila Pukuria Pukuria 46 - - 1.50 2.85 3.30 6.15 1890

114 01 Nayagram 2 Drought Proofing 2/63 Chandabila Pukuria Pukuria 46 - - 2.85 2.85 5.37 8.22 1890

115 01 Nayagram 2 Drought Proofing 2/64 Chandabila Raisole Raisole 52 - - 1.85 2.85 5.06 7.91 1890

116 01 Nayagram 2 Drought Proofing 2/65 Chandabila Telia Telia 28 - - 1.85 2.85 5.06 7.91 1890

117 01 Nayagram 2 Drought Proofing 2/66 Chandabila Garurghata Garurghata 45 - - 0.75 2.85 2.42 5.28 1890

118 01 Nayagram 2 Drought Proofing 2/67 Chandabila Kashia Kashia 20 - - 1.25 2.85 3.74 6.59 1890

119 01 Nayagram 2 Drought Proofing 2/68 Chandabila Chandabila Bankinala 47 - - 1.25 2.85 3.74 6.59 1890

120 01 Nayagram 2 Drought Proofing 2/69 Plantation from Bhalukghagri to Pukuria Chandabila Chandabila 44 - - 2.50 2.85 3.74 6.59 1890

121 01 Nayagram 2 Drought Proofing 2/70 Kaju Plantation at Mohanpur Mohanpur Mohanpur 181 - 5.85 - 5.30 4.81 10.11 3510

122 01 Nayagram 2 Drought Proofing 2/71 Kaju Plantation at Chilkipada Chilkipada Chilikpada 185 - 5.75 - 4.08 3.84 7.91 2700

123 01 Nayagram 2 Drought Proofing 2/72 Plantation at Satpoutia Satoputia Satoputia 190 - 4.75 - 3.67 3.80 7.47 2430

124 01 Nayagram 2 Drought Proofing 2/73 Plantation at Amdiha Amdiha Amdiha 181 - 3.75 - 2.85 4.18 7.03 1890

125 01 Nayagram 2 Drought Proofing 2/74 Plantation at Lohaberia Amdiha Lohaberia 189 - 5.78 - 5.30 4.37 9.67 3510

126 01 Nayagram 2 Drought Proofing 2/75 Chilkipada Chilikpada 185 - 5.56 - 4.08 4.27 8.35 2700

127 01 Nayagram 2 Drought Proofing 2/76 182 - - 2.50 2.85 5.06 7.91 1890

128 01 Nayagram 2 Drought Proofing 2/77 Dhansola Dhansola 190 - - 3.00 2.85 5.06 7.91 1890

129 01 Nayagram 2 Drought Proofing 2/78 Satoputia 190 - - 2.50 2.85 5.06 7.91 1890

130 01 Nayagram 2 Drought Proofing 2/79 Satoputia Satoputia 190 - - 2.00 2.85 4.18 7.03 1890

131 01 Nayagram 2 Drought Proofing 2/80 187 - - 1.50 2.85 3.74 6.59 1890

132 01 Nayagram 2 Drought Proofing 2/81 Kuilisuta Kuilisuta 185 - - 1.50 2.85 3.74 6.59 1890

133 01 Nayagram 2 Drought Proofing 2/82 Bamanda 169 - - 1.50 2.85 3.30 6.15 1890

134 01 Nayagram 2 Drought Proofing 2/83 Bamunda Madhupura 165 - - 2.50 2.85 5.06 7.91 1890

135 01 Nayagram 2 Drought Proofing 2/84 Bamunda Chilikpada 185 - - 2.85 2.85 5.37 8.22 1890

Road side plantation from Narda to Pukuria

July-Aug

Road side plantation from Pukuria to Orissa border

July-Aug

Road side plantation from Raisole to Orissa border

July-Aug

Road side plantation from Chandabila to Telia

July-Aug

Road side plantation from Garurghata to Orissa border

July-Aug

Road side plantation from Kasia to Katash

July-Aug

Plantation from Pukuria to Upar Bankinala Khal

July-Aug

Bhalukghagri

July-Aug

Chandrarekha

July-Aug

Chandrarekha

July-Aug

Chandrarekha

July-Aug

Chandrarekha

July-Aug

Chandrarekha

July-Aug

Road side plantation from Chilkipada to Kesharrekha

Chandrarekha

July-Aug

Road side plantation from Kesharrekha to Nagripada

Chandrarekha

Kesharrekha

Kesharrekha

July-Aug

Road side Plantation from Dhansola to Kuilisuta

Chandrarekha

July-Aug

Road side planttion from Kesharrekha to Satpoutia

Chandrarekha

Kesharrekha

Road side planttion from Satpoutia to Palasia

Chandrarekha

July-Aug

Road side planttion from Biswanathpur to Chandrarekha

Chandrarekha

Biswanathpur

Chandrarekha

July-Aug

Road side planttion from Kuilisuta to Orissa border

Chandrarekha

July-Aug

Road side planttion from Kesharrekha to Bamanda

Chandrarekha

Kesharrekha

July-Aug

Road side planttion from Bamanda to Madhupura

Chandrarekha

July-Aug

Road side planttion from Chilkipada to Bamunda

Chandrarekha

July-Aug

Page 7: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

7/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

136 01 Nayagram 2 Drought Proofing 2/85 Bamunda Satoputia 190 - - 3.50 4.08 5.15 9.23 2700

137 01 Nayagram 2 Drought Proofing 2/86 Tulsiboni 71 - - 3.00 4.08 5.59 9.67 2700

138 01 Nayagram 2 Drought Proofing 2/87 Telia Banskuti 159 - - 3.00 4.08 5.59 9.67 2700

139 01 Nayagram 2 Drought Proofing 2/88 Baligeria Baligeria 266 - 1.50 - 3.26 3.77 7.03 2160

140 01 Nayagram 2 Drought Proofing 2/89 Plantation at Khemasole ground Baligeria Kustikara Khemasole 287 - 1.20 - 3.26 4.65 7.91 2160

141 01 Nayagram 2 Drought Proofing 2/90 38 - 0.75 - 2.85 2.86 5.71 1890

142 01 Nayagram 2 Drought Proofing 2/91 Plantation at Dahi Mouza Nayagram Dahi Dahi 121 - 1.25 - 2.04 4.56 6.60 1350

143 01 Nayagram 2 Drought Proofing 2/92 Plantation at Baura Mouza Nayagram Dahi Dahi 141 - 4.50 - 3.67 4.69 8.36 2430

144 01 Nayagram 2 Drought Proofing 2/93 Nayagram Dahi Dahi 142 850 - 7.00 - 4.89 3.90 8.79 3240

145 01 Nayagram 2 Drought Proofing 2/94 Nayagram Kurchiboni Kurchiboni 140 396 - 0.50 - 2.04 2.80 4.84 1350

146 01 Nayagram 2 Drought Proofing 2/95 Nayagram Kurchiboni Nisikanta 140 36/400 - 1.00 - 2.85 3.31 6.17 1890

147 01 Nayagram 2 Drought Proofing 2/96 Nayagram Kurchiboni Kurchiboni 140 128/260 - 1.70 - 2.45 3.71 6.15 1620

148 01 Nayagram 2 Drought Proofing 2/97 Nayagram Kurchiboni Kurchiboni 140 - 0.50 - 2.45 2.83 5.28 1620

149 01 Nayagram 2 Drought Proofing 2/98 Nayagram Kurchiboni Kurchiboni 140 158 - 1.00 - 2.45 3.28 5.73 1620

150 01 Nayagram 2 Drought Proofing 2/99 Plantation at Tufuria Nagen Palui's Land Nayagram Kurchiboni Tufuria 211 80 - 0.75 - 2.45 2.39 4.84 1620

151 01 Nayagram 2 Drought Proofing 2/100 Plantation on Bank of Tufuria Pond Nayagram Kurchiboni Tufuria 211 660 - 0.50 - 2.45 1.95 4.40 1620

152 01 Nayagram 2 Drought Proofing 2/101 Malam Kamalapur Kamalapur 212 - 0.15 - 2.85 2.86 5.71 1890

153 01 Nayagram 2 Drought Proofing 2/102 Plantation at nayagram mouza Nayagram Nayagram 143 - 1.25 - 2.45 4.60 7.04 1620

154 01 Nayagram 2 Drought Proofing 2/103 Nayagram Nayagram 143 536 - 0.80 - 2.45 2.84 5.29 1620

155 01 Nayagram 2 Drought Proofing 2/104 Plantation at Kachi Singh's Land Nayagram Nayagram Nayagram 143 820 - 0.40 - 1.63 3.21 4.84 1080

156 01 Nayagram 2 Drought Proofing 2/105 Plantation at Radhashyam singh's Land Nayagram Nayagram 143 910 - 0.40 - 2.04 3.24 5.28 1350

157 01 Nayagram 2 Drought Proofing 2/106 Nayagram Sital Pura Siralpura 144 - 1.00 - 2.85 3.31 6.17 1890

158 01 Nayagram 2 Drought Proofing 2/107 Nayagram Sital Pura Sitalpura 146 381,21 - - 3.00 2.85 5.50 8.35 1890

Road side planttion from Satpoutia to Kasumkuti

Chandrarekha

July-Aug

Road side planttion from Tulsiboni to Chandrarekha

Chandrarekha

Chandrarekha

July-Aug

Road side planttion from Telia to Banskuti

Chandrarekha

July-Aug

Plantation at Tapase Deys land at Baligeria

Baligeria Pry.

63,45,81,83,85,

July-AugJuly-Aug

Plantation at Bachhurkhoard School ground

Barakhankri

Bachhurkhoard

Bachhurkhoard

July-AugJuly-AugJuly-Aug

Plantation from Dahi Muja to Gakul nagar

July-Aug

Plantation at Kurchiboni Kanai Soren's Land

July-Aug

Plantation at Kurchiboni Nisikanta Maity's Land

July-Aug

Plantation at Kurchiboni Sadashib Ghosh's Land

July-Aug

Plantation at Kurchi boni Foot ball Ground

July-Aug

Plantation at Badal Kurmar Mandal's Land

July-AugJuly-AugJuly-Aug

Plantation at Subarna Rekha river Bank at Nichu Kamalapur

July-Aug

Nayagram (S)

July-Aug

Plantation at Nayagram Gouranga Dhauria's Land

Nayagram (S)

July-AugJuly-Aug

Nayagram (S)

July-Aug

Kaju Plantation on embankment of Subarna rekaha at Gokulnagar

106,112,113,119

July-Aug

Road side plantation from Sitalpura Desh pukur to Itbhata

July-Aug

Page 8: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

8/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

159 01 Nayagram 2 Drought Proofing 2/108 Plantation on Sitalpura Desh Pukur Nayagram Sital Pura Sitalpura 146 - 4.85 - 3.67 3.36 7.03 2430

160 01 Nayagram 2 Drought Proofing 2/109 Nayagram Jarka Jarka 210 606 - 0.50 - 2.85 1.98 4.84 1890

161 01 Nayagram 2 Drought Proofing 2/110 Nayagram Jarka Jarka 210 37 - 0.50 - 2.85 1.98 4.84 1890

162 01 Nayagram 2 Drought Proofing 2/111 Plantation at Chittarajan Hatui 's Land Nayagram Nayagram Nayagram 212 22,66 - 0.25 - 2.04 3.25 5.28 1350

163 01 Nayagram 2 Drought Proofing 2/112 Plantation at Nayagram Football groud Nayagram Nayagram 143 - 1.00 - 2.85 3.31 6.17 1890

164 01 Nayagram 2 Drought Proofing 2/113 Nayagram Nayagram 143 97,98,99, - 2.85 - 2.04 4.12 6.15 1350

165 01 Nayagram 2 Drought Proofing 2/114 Plantation(Social Forestry)at Banksole Ghoratoria Banksole 200 88,2, - 9.00 - 4.89 5.67 10.56 3240

166 01 Nayagram 2 Drought Proofing 2/115 Mango Plantation at Dihikhelar Jamboni Dokra jamboni 155 - 4.00 - 3.67 5.58 9.25 2430

167 01 Nayagram 2 Drought Proofing 2/116 Plantation(Social Forestry) at Ghoratoria Ghoratoria Ghoratoria 112 - 9.00 - 5.71 5.74 11.44 3780

168 01 Nayagram 2 Drought Proofing 2/117 Social Forestary at Dihikhelar - Jamboni Dihikhelar jamboni 238 - 1.25 - 2.45 6.80 9.25 1620

169 01 Nayagram 2 Drought Proofing 2/118 Dokra Dokra 198 - 1.02 - 2.45 3.28 5.73 1620

170 01 Nayagram 2 Drought Proofing 2/119 Ghoratoria Ghoratoria 112 - - 2.50 4.08 5.15 9.23 2700

171 01 Nayagram 2 Drought Proofing 2/120 151 121 - - 2.50 4.08 5.15 9.23 2700

172 01 Nayagram 2 Drought Proofing 2/121 Plantation at Salboni mouza Dokra Salboni 156 - 1.50 - 4.08 3.41 7.48 2700

173 01 Nayagram 2 Drought Proofing 2/122 Ghoratoria Saripura 154 - 3.45 - 4.40 3.42 7.82 2916

174 01 Nayagram 2 Drought Proofing 2/123 Dokra 156 151,15 - 1.75 - 2.45 2.83 5.28 1620

175 01 Nayagram 2 Drought Proofing 2/124 148 - 0.85 - 2.45 3.28 5.73 1620

176 01 Nayagram 2 Drought Proofing 2/125 Plantation at Jharia Khas Land Nayagram Jharia Jharia 262 522 - 1.50 - 2.45 3.28 5.73 1620

177 01 Nayagram 2 Drought Proofing 2/126 Plantation at Prafulla Mahata's land Jharia Jharia 262 521 - 2.00 - 3.26 3.33 6.59 2160

178 01 Nayagram 2 Drought Proofing 2/127 Plantation at Anil Mahat's Land at Jharia Jharia Jharia 262 532 - 1.00 - 2.85 3.31 6.17 1890

179 01 Nayagram 2 Drought Proofing 2/128 Jharia Kadokata 205 - - 2.00 3.67 4.24 7.91 2430

180 01 Nayagram 2 Drought Proofing 2/129 Plantation at Sialia Mouza Jharia Sialia 113 - 1.00 - 2.85 3.31 6.17 1890

July-Aug

Plantation at Jarka Kalachand Soren's Land

July-Aug

Plantation at Puspendu and Ardhendu at Jarka

July-AugJuly-Aug

Nayagram (N)

139,140,141,143,

July-Aug

Plantaion at Guruprasad and Girish Karan's land

Nayagram (N)

July-Aug

Kharikamathani

July-Aug

Kharikamathani

July-Aug

Kharikamathani

July-Aug

Kharikamathani

July-Aug

Kaju Plantation at Kalisankar Patra's at Dokra

Kharikamathani

11,283,278,300

July-Aug

Road side plantation from Ghoratoria to Kurmipathra via Ghagri sole

Kharikamathani

July-Aug

Plantation at Priyanath Ghosh nath Ghosh land

Kharikamathani

Kharikamathani

Kharikamathani

July-Aug

Kharikamathani

66158

July-Aug

Plantation at Saripura mouza of Susishankar Barik

Kharikamathani

346,362,371,372

July-Aug

Plantation at Ramkrishan & Pradip De 's Land at dokra

Kharikamathani

Ramkrishnapur

July-Aug

Plantation at Kalipada patra's Land at Kharikamathani

Kharikamathani

Kharikamathani

Kharikamathani

408409

July-AugJuly-Aug

Kharikamathani

July-Aug

Kharikamathani

July-Aug

Road side plantation from Jharia chawk to Kadokata

Kharikamathani

July-Aug

Kharikamathani

6 ,7,8,98,10,11,12,13

,14,

July-Aug

Page 9: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

9/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

181 01 Nayagram 2 Drought Proofing 2/130 Plantation at Barabundh Jharia Jharia 114 - 1.35 - 2.85 5.06 7.91 1890

182 01 Nayagram 2 Drought Proofing 2/131 Kukrasole 149 542 - 1.85 - 2.45 2.83 5.28 1620

183 01 Nayagram 2 Drought Proofing 2/132 Ghoratoria Charpada 200 200 - 7.50 - 4.89 4.34 9.23 3240

184 01 Nayagram 2 Drought Proofing 2/133 Barakati 201 149 - 9.00 - 4.89 4.78 9.67 3240

185 01 Nayagram 2 Drought Proofing 2/134 Ghoratoria Ghoratoria 200 200 - - 3.00 3.67 5.56 9.23 2430

186 01 Nayagram 2 Drought Proofing 2/135 Ghoratoria Khanamuri 147 106 - - 3.00 3.67 5.56 9.23 2430

187 01 Nayagram 2 Drought Proofing 2/136 Khanamuri 147 - 1.50 - 2.85 3.31 6.17 1890

188 01 Nayagram 2 Drought Proofing 2/137 148 187 - 1.00 - 2.04 3.25 5.29 1350

189 01 Nayagram 2 Drought Proofing 2/138 148 84,85 - 1.00 - 2.45 3.28 5.73 1620

190 01 Nayagram 2 Drought Proofing 2/139 148 - 0.85 - 2.45 3.28 5.73 1620

191 01 Nayagram 2 Drought Proofing 2/140 Plantation at Kharika Kanchan Giri Land 148 170 - 0.75 - 2.45 2.39 4.84 1620

192 01 Nayagram 2 Drought Proofing 2/141 148 - 1.00 - 2.26 3.27 5.53 1499

193 01 Nayagram 2 Drought Proofing 2/142 Plantation at Mritunjoy Murmu's Land 148 639 - 1.00 - 2.26 3.27 5.53 1499

194 01 Nayagram 2 Drought Proofing 2/143 Plantation at Gopinathpur football ground Jamirapal Jamirapal Gopinath 245 - 1.25 - 2.45 2.06 4.51 1620

195 01 Nayagram 2 Drought Proofing 2/144 Plantation at Jamirapal Nadighat Jamirapal Jamirapal Jamboni 238 - 1.75 - 3.26 3.33 6.59 2160

196 01 Nayagram 2 Drought Proofing 2/145 Jamirapal Methia 220 - - 2.50 2.12 2.04 4.16 1406

197 01 Nayagram 2 Drought Proofing 2/146 Jamirapal 237 - - 3.50 4.08 5.15 9.23 2700

198 01 Nayagram 2 Drought Proofing 2/147 Jamirapal Jamirapal Pachageria 246 - - 3.50 4.08 5.15 9.23 2700

199 01 Nayagram 2 Drought Proofing 2/148 Jamirapal Jamirapal Bhuasai 249 - - 2.50 2.12 2.04 4.16 1406

200 01 Nayagram 2 Drought Proofing 2/149 Plantation at Jamirapal Garpukur Par Jamirapal Jamirapal Jamirapal 235 - 2.50 - 2.45 2.83 5.28 1620

201 01 Nayagram 2 Drought Proofing 2/150 Plantation at Fuldaha Ahar Pond Jamirapal Fuldaha Fuldaha 225 - 3.85 - 2.85 2.86 5.71 1890

202 01 Nayagram 2 Drought Proofing 2/151 Jamirapal Sirishboni Jadukata - - 3.50 4.08 5.15 9.23 2700

203 01 Nayagram 2 Drought Proofing 2/152 Plantation at Bhuasai Pry. School Ground Jamirapal Sirishboni Bhuasai 249 - 3.50 - 2.85 3.30 6.15 1890

Kharikamathani

139,140,141,161,

July-Aug

Plantation at Satrughna Patra's Land at Bhathbhanga

Kharikamathani

Bhatbhanga

July-Aug

Plantation at Dayal Mahata's & Others land at Charpada

Kharikamathani

July-Aug

Plantation at Dhananajoy Mahata & other at Barakati Mouza

Kharikamathani

Kharikamathani

July-Aug

Road side plantation from Barakati Mahapara to Ghoratoria Rd

Kharikamathani

July-Aug

Road side Plantation from Adibasi to Khanamuri Mahata Para

Kharikamathani

July-Aug

Plantation at Khanamuri Premchand Mahata's Land

Kharikamathani

Kharikamathani

248,149,250

July-Aug

Plantation at Kharimamathani Harish Paria's Land

Kharikamathani

Kharikamathani

Kharimathani

July-Aug

Plantation at Kharika Jibanananda Mahakul Land

Kharikamathani

Kharikamathani

Kharikamathani

July-Aug

Plantation at Kharika Pranabananda Mahakul Land

Kharikamathani

Kharikamathani

Kharikamathani

647,84,85,

July-Aug

Kharikamathani

Kharikamathani

Kharikamathani

July-Aug

Plantation at Panchakahania Ananda Tudu's Land

Kharikamathani

Panchakahania

Panchakahania

July-Aug

Kharikamathani

Panchakahania

Panchakahania

July-AugJuly-AugJuly-Aug

Road side Plantation from Mathia to Kusumkuria

Kusumkuria

July-Aug

Road side Plantation from Kusumkuria to Deyanbur check at Jagganathpur

Jagganathpur

Jagannathpur

July-Aug

Road side Plantation from Jagannathpur to Pachageria

July-Aug

Road plantation from Bhuasai to Chunkhulia

July-AugJuly-AugJuly-Aug

Road side Plantation from Sirish boni to Jadukata

July-AugJuly-Aug

Page 10: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

10/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

204 01 Nayagram 2 Drought Proofing 2/153 Plantation at Banspat MSK Pond Jamirapal Banspat Banspat 219 - 3.50 - 2.85 3.30 6.15 1890

205 01 Nayagram 2 Drought Proofing 2/154 Road side Plantation at Bhuasai Jamirapal Jamirapal Bhuasai 249 - 2.50 - 2.45 3.27 5.71 1620

206 01 Nayagram 2 Drought Proofing 2/155 River side plantation at Jamirapal Jamirapal Jamirapal Jamirapal 235 - 1.50 - 1.81 3.23 5.04 1199

207 01 Nayagram 2 Drought Proofing 2/156 Jamirapal Jamirapal Jamirapal 235 - 4.80 - 3.67 2.92 6.59 2430

208 01 Nayagram 2 Drought Proofing 2/157 Plantation at Tusur kanti Club Jamirapal Jamirapal Jamirapal 235 - 2.85 - 2.45 3.27 5.71 1620

209 01 Nayagram 2 Drought Proofing 2/158 Plantation at Jamirapal GP office Jamirapal Jamirapal Jamirapal 235 - 3.50 - 2.85 3.30 6.15 1890

210 01 Nayagram 2 Drought Proofing 2/159 Plantation at Fuldaha Sib Mandir Jamirapal Fuldaha Fuldaha 225 - 3.40 - 2.04 3.24 5.28 1350

211 01 Nayagram 2 Drought Proofing 2/160 Jamirapal Tikrapara Tikrapara 215 - - 3.50 4.08 5.15 9.23 2700

212 01 Nayagram 2 Drought Proofing 2/161 Nursery at Jamirapal Jamirapal Jamirapal Jamirapal 235 - 2.50 - 2.45 3.27 5.71 1620

213 01 Nayagram 2 Drought Proofing 2/162 Plantation at dumuria Jr. High School Arrah Arrah dumuria 322 - 3.50 - 2.85 3.30 6.15 1890

214 01 Nayagram 2 Drought Proofing 2/163 Arrah Arrah dumuria 322 - 4.50 - 3.67 3.36 7.03 2430

215 01 Nayagram 2 Drought Proofing 2/164 Plantation at Jurighati Pry. School Arrah Arrah Jurighati 324 - 2.85 - 2.45 3.27 5.71 1620

- - - 502.32 621.80 1124.12 332663

216 01 Nayagram 3 3/1 Re-excavation of Bhole Daha canal Patina Upar Patina 7 896,897, - 0.85 - 4.08 1.64 5.71 2700

217 01 Nayagram 3 3/2 Patina Fulboni Kenduboni 14 - 0.65 - 4.08 0.76 4.84 2700

218 01 Nayagram 3 3/3 Patina 17 - 1.25 - 4.89 0.82 5.71 3240

219 01 Nayagram 3 3/4 Patina 17 - 0.85 - 4.08 0.78 4.85 2700

220 01 Nayagram 3 3/5 Patina 17 - 0.75 - 3.26 0.71 3.97 2160

221 01 Nayagram 3 3/6 Chandabila Chandabila - 1.25 - 4.08 1.07 5.14 2700

222 01 Nayagram 3 3/7 Chandabila Chandabila Narda 42 - 1.25 - 4.08 0.78 4.85 2700

223 01 Nayagram 3 3/8 Repair of Gulfa bundh and cannel Chandabila Gulfa Gulfa 21 - 0.95 - 4.08 0.78 4.85 2700

224 01 Nayagram 3 3/9 Chandabila 25 - 0.35 - 3.26 0.69 3.96 2160

225 01 Nayagram 3 3/10 Chandabila Garurghata Garurghata 45 - 0.95 - 3.26 0.76 4.03 2160

July-AugJuly-AugJuly-Aug

Plantation at Jamirapal Pry. School ground

July-AugJuly-AugJuly-AugJuly-Aug

Road side plantation from Tikrapara Jamirapal Panchayat Office

July-AugJuly-AugJuly-Aug

Plantation at Dumuria Monoranjan Maitie's Land

July-AugJuly-Aug

Drought Proofing TotalMicro Irrigation Works

Upar Patina

July-Aug

Micro Irrigation Works

Repair of bundh from Kenduboni to Mazra to Rajbundh

May-June

Micro Irrigation Works

Excavation of Chamarbundh Dakshin sai village canel

Chamarbundh

Chamarbund

May-June

Micro Irrigation Works

Excavation of Chamarbundh Upar Para village Canal

Chamarbundh

Chamarbund

May-June

Micro Irrigation Works

Excavation of Chamarbundh high to Canal

Chamarbundh

Chamarbund

May-June

Micro Irrigation Works

Const. of Irrigation canal from Bhangabund to Jambundh

Bhangabundh

May-June

Micro Irrigation Works

Re-excavation of canal from Narda Dihi to Topabon Math

May-June

Micro Irrigation Works

May-June

Micro Irrigation Works

Re-excavtion of Pathardahara bundh canal with hume pipe

Pathardahara

Pathardahara

May-June

Micro Irrigation Works

Repair of Chak bundh from Garurghata to Madhya para

May-June

Page 11: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

11/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

226 01 Nayagram 3 3/11 Repair of Jarka bundh canal Chandabila Jarka Jarka - 0.85 - 3.26 0.69 3.96 2160

227 01 Nayagram 3 3/12 Chandabila Chandabila Khasjangal 53 - 0.36 - 3.26 0.69 3.96 2160

228 01 Nayagram 3 3/13 Repair of Ghagrasole bundh and cannel Chandabila Chandabila Ghagrasole 53 - 0.62 - 3.26 0.69 3.96 2160

229 01 Nayagram 3 3/14 Berajal Dolgram Dolgram 301 299 - 0.55 - 3.26 0.71 3.97 2160

230 01 Nayagram 3 3/15 Berajal Sitarampur Sitarampur 308 - 0.45 - 2.85 0.46 3.31 1890

231 01 Nayagram 3 3/16 Berajal Dhansola Chunkhulia 258 - 0.15 - 3.17 5.98 9.15 2099

232 01 Nayagram 3 3/17 Berajal Dhansola Chunkhulia 258 - 0.60 - 3.17 4.66 7.83 2099

233 01 Nayagram 3 3/18 Berajal Gobindapur Jharaboni 259 - 1.50 - 4.98 0.86 5.84 3298

234 01 Nayagram 3 3/19 Kukrasoel Kukrasole 138 - 0.62 - 2.72 0.67 3.39 1799

235 01 Nayagram 3 3/20 78 - 0.85 - 3.26 5.97 9.23 2160

236 01 Nayagram 3 3/21 Kadamdiha Kadamdiha 77 - 0.45 - 4.08 7.35 11.43 2700

237 01 Nayagram 3 3/22 Jamirapal Kukrasoe Banspat 219 - 1.50 - 4.98 0.86 5.84 3298

238 01 Nayagram 3 3/23 Banspat Banspat 219 - 0.58 - 4.98 0.86 5.84 3298

239 01 Nayagram 3 3/24 Re-excavation of Nichu Patina canel Patina Nichupatia 7 1082 - 0.21 - 4.98 0.86 5.84 3298

240 01 Nayagram 3 3/25 Patina Upa patina Patina 7 - 1.20 - 4.89 5.67 10.57 3240

241 01 Nayagram 3 3/26 Berajal Dolgram Dolgram 301 301 - 0.75 - 3.17 0.71 3.88 2099

242 01 Nayagram 3 3/27 Berajal Dolgram Dolgram 301 - 0.55 - 3.62 0.75 4.37 2398

243 01 Nayagram 3 3/28 Re-excava of Jharaboni canel Berajal Gobindapur Jharaboni 293 - 0.65 - 3.17 0.71 3.88 2099

244 01 Nayagram 3 3/29 Baligeria 199 - 0.55 - 3.40 0.73 4.12 2249

245 01 Nayagram 3 3/30 187 - 0.56 - 7.15 6.86 14.01 4733

246 01 Nayagram 3 3/31 Repair of Kakranala bundh and canel Malam 72 - 0.85 - 6.12 2.68 8.79 4050

Micro Irrigation Works

May-June

Micro Irrigation Works

Const. of Canal from Bhaktusole to Khasjangal with hume pipe

May-June

Micro Irrigation Works

May-June

Micro Irrigation Works

Re-excavation of canal from Hijal Bunh to Paca bundh

May-June

Micro Irrigation Works

Re-excavation of canal from Sitarampur to Baramthan

May-June

Micro Irrigation Works

Const. of canal from Dhansola bund to Chunkhulia with guardwall & Lock gate

May-June

Micro Irrigation Works

Const. of canal from Berjal bundh to Chunkhulia canal with guardwall

May-June

Micro Irrigation Works

Const. of canel from Kenduboni to Jharaboni (rajabundh Orissa)

313,190,194,

May-June

Micro Irrigation Works

Const. of canal from Kukrasole Bundh to Raibera

Barakhankri

May-June

Micro Irrigation Works

Repair of Gaham bundh to Desh bundh cannel with guardwall and chatal

Barakhankri

Barakhankri

Barakhankri

May-June

Micro Irrigation Works

Const. of 10 Nos protection bundh of Kadamdiha Khal

Barakhankri

May-June

Micro Irrigation Works

Const. of canal from Kukrasole bundh to Banspat

May-June

Micro Irrigation Works

Const. of canal from Banspat to Panchageria

Barakhankri

May-June

Micro Irrigation Works

Nichupatina

May-June

Micro Irrigation Works

Re-excavation of Bholdaha canel with Pucca drain both side

May-June

Micro Irrigation Works

Const. of Sech bund and over Dolgram Khal and excavation of Sech canel

May-June

Micro Irrigation Works

Re-excavation of Dolgram Pacca bundh, upar bundh and cannel

499812

May-June

Micro Irrigation Works

May-June

Micro Irrigation Works

Re-excavation of cannel with out let at Dhina bundh

Baligeri High

Patharbandh

May-June

Micro Irrigation Works

Const. of bundh with Lock get at Chandrarekha

Chandrarekha

Chandrarekha

Chandrarekha

May-June

Micro Irrigation Works

Narasinghapur

Narasinghapur

May-June

Page 12: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

12/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

247 01 Nayagram 3 3/32 Repair of Garkhelar Kanjim bundh Baranegui Garkhelar Garkhelar 102 - 0.75 - 5.30 1.73 7.03 3510

248 01 Nayagram 3 3/33 Baranegui Garkhelar Garkhelar 102 - 0.65 - 5.30 1.73 7.03 3510

249 01 Nayagram 3 3/34 Repair of Tentulmuri bundh cannel Baranegui Garkhelar Garkhelar 102 - 0.45 - 5.30 1.73 7.03 3510

250 01 Nayagram 3 3/35 Repair of Chaytan bundh cannel Baranegui Garkhelar Garkhelar 102 - 0.54 - 4.89 1.26 6.15 3240

251 01 Nayagram 3 3/36 Repair of Morchibundh cannel Baranegui Morchi Morchi 83 - 0.58 - 4.89 1.26 6.15 3240

252 01 Nayagram 3 3/37 147 - - 0.50 5.30 1.47 6.77 3510

253 01 Nayagram 3 3/38 Ragiam Rangiam 245 - 1.05 - 5.30 1.51 6.81 3510

254 01 Nayagram 3 3/39 Rangiam Rangiam 108 - 0.75 - 4.49 1.45 5.93 2970

255 01 Nayagram 3 3/40 Const. of irrigation bundh at Ambisole Rangiam Ambisole 115 - 0.85 - 4.89 2.14 7.03 3240

256 01 Nayagram 3 3/41 Rangiam Rangiam 108 - 0.75 - 8.15 1.96 10.11 5401

257 01 Nayagram 3 3/42 Const. of bundh at Panchkahania 107 - 0.45 - 6.12 1.58 7.69 4050

258 01 Nayagram 3 3/43 Const. of Lock get at Sataiburi Khal Nayagram Dahi Dahi 142 - 0.25 - 6.93 2.30 9.23 4590

259 01 Nayagram 3 3/44 Nayagram Nimainagar 128 - 0.25 - 6.12 1.36 7.47 4050

260 01 Nayagram 3 3/45 Nayagram Tufuria Tufuria 211 - - 1.25 6.52 1.39 7.91 4320

261 01 Nayagram 3 3/46 Nayagram Sitalpura Sitalpura 146 - 0.35 - 5.43 3.98 9.41 3598

262 01 Nayagram 3 3/47 Baligeria Jhagri Khudgar 278 - 0.35 - 5.43 3.98 9.41 3598

- - - 213.24 89.04 302.29 141221

263 01 Nayagram 5 5/1 Baligeria Bhuruboni Buruboni 283 0.06 - - 6.52 1.39 7.91 4320

264 01 Nayagram 5 5/2 Berajal Asurhata Asurhata 296 1.20 - - 2.45 3.71 6.15 1620

265 01 Nayagram 5 5/3 Berajal Jugisole Rukhni 297 45,45 2.42 - - 4.07 0.87 4.95 2698 Sep-Oct

266 01 Nayagram 5 5/4 Satpoutia Satoputia 190 1.70 - - 3.67 4.40 8.07 2430 Sep-Oct

Micro Irrigation Works

May-June

Micro Irrigation Works

Repair of Srirampur Magurdoba bundh cannel

May-June

Micro Irrigation Works

May-June

Micro Irrigation Works

May-June

Micro Irrigation Works

May-June

Micro Irrigation Works

Repair of Ranjan Mahata's Land to Mahuli bundh cannel

Kharikamathani

Kharikamathani

Kharikamathani

May-June

Micro Irrigation Works

Const. of Irrigation bundh at Rangiam Dakshin Para

Kharikamathani

108, 115

May-June

Micro Irrigation Works

Const. of irrigation bundh at Rangiam Madhyapara

Kharikamathani

May-June

Micro Irrigation Works

Kharikamathani

May-June

Micro Irrigation Works

Const. of canel from Hadhadi Desh bundh to Makapara towards

Kharikamathani

May-June

Micro Irrigation Works

Kharikamathani

Panchkahania

Panchkahania

May-June

Micro Irrigation Works

May-June

Micro Irrigation Works

Const. of bundh between Nimainagar and Kaluasanda

Nimainagar

May-June

Micro Irrigation Works

Const . Of Canel from Khanamuri pond to Tufuria Khal

May-June

Micro Irrigation Works

Const. of Check get at Baino Dhauria Land

May-June

Micro Irrigation Works

Const. of Khudgar Budh with Guard wall out let

May-June

Micro Irrigation Works TotalRenovation of Traditional Water Bodies

Re-excavation of Pailot chawk pond at Buruboniboni

May-June

Renovation of Traditional Water Bodies

Re-excavation of Khas pond at Asurhata with guard wall

10,11,

Renovation of Traditional Water Bodies

Re-excavation of Rukhni Khas pond at Rukhni

Renovation of Traditional Water Bodies

Re-excavation of Bamun Pukur at Satpoutia with in let out let

Chandrarekha

Page 13: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

13/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

267 01 Nayagram 5 5/5 Re-excavation of Bamunda Jana Pond Bamunda Bamanda 169 1.85 - - 3.67 5.34 9.01 2430 Sep-Oct

268 01 Nayagram 5 5/6 Re-excavation of Biswanatpur Pond 183 1.65 - - 4.40 0.78 5.19 2916 Sep-Oct

269 01 Nayagram 5 5/7 Re-excavation of Chandrarekha Pond 187 1.35 - - 3.67 0.74 4.41 2430 Sep-Oct

270 01 Nayagram 5 5/8 Baligeria Buruboni Benachui 271 3.97 - - 3.62 0.75 4.37 2398 Sep-Oct

271 01 Nayagram 5 5/9 Baligeria Belajhor 268 6.62 - - 6.34 0.98 7.31 4197 Sep-Oct

272 01 Nayagram 5 5/10 Baligeria Amladangri 300 164 5.85 - - 5.30 0.87 6.17 3510 Sep-Oct

273 01 Nayagram 5 5/11 Baligeria Amladangri 300 4.58 - - 6.12 0.92 7.03 4050 Sep-Oct

274 01 Nayagram 5 5/12 Baligeria Amladangri 300 125 3.85 - - 4.08 0.76 4.84 2700 Sep-Oct

275 01 Nayagram 5 5/13 Re-excavation of Mridul Bera's Pond Baligeria Amladangri 300 419 2.85 - - 4.89 0.82 5.71 3240 Sep-Oct

276 01 Nayagram 5 5/14 Baligeria Amladangri 300 198,209, 3.50 - - 3.67 0.68 4.35 2430 Sep-Oct

277 01 Nayagram 5 5/15 Re-excavation of Paramananda Pond Baligeria Amladangri 300 166 3.50 - - 4.49 0.79 5.28 2970 Sep-Oct

278 01 Nayagram 5 5/16 Re-excavation of Pitha Hansda Pond Baligeria Amladangri 300 297 2.50 - - 4.49 0.79 5.28 2970 Sep-Oct

279 01 Nayagram 5 5/17 Baligeria Kustikara Khamasole 287 3.50 - - 4.49 0.79 5.28 2970 Sep-Oct

280 01 Nayagram 5 5/18 Baligeria Kuifulia Kuifulia 290 4.50 - - 4.49 0.79 5.28 2970 Sep-Oct

281 01 Nayagram 5 5/19 Re-excavation of Kustikara Gramin Pond Baligeria Kustikara Kustikra 184 133 4.50 - - 4.89 0.82 5.71 3240 Sep-Oct

Renovation of Traditional Water Bodies

Chandrarekha

Renovation of Traditional Water Bodies

Chandrarekha

Binwanathpur

Biswanathpur

Renovation of Traditional Water Bodies

Chandrarekha

Chandrarekha

Chandrarekha

Renovation of Traditional Water Bodies

Re-excavation of Laxman Mandi at Benachui

Renovation of Traditional Water Bodies

Re-excavation of Bhanukanka Murmu's Pond at Dakshin Belajhor

Baligeria Pry.

Renovation of Traditional Water Bodies

Re-excavation of Gourishankar Bera's Pond at Amladangri

Amladangri

Renovation of Traditional Water Bodies

Re-excavation of Gobardhan Bera's Pond at Amladangri

Amladangri

128,129,130/131

Renovation of Traditional Water Bodies

Re-excavation of Gagu Murmu at Amladangri

Amladangri

Renovation of Traditional Water Bodies

Amladangri

Renovation of Traditional Water Bodies

Re-excavation of Tusarkanti Bera's Pond at Amladangri

Amladangri

Renovation of Traditional Water Bodies

Amladangri

Renovation of Traditional Water Bodies

Amladangri

Renovation of Traditional Water Bodies

Re-excavation of Chapta Pukur at Khamasole

Renovation of Traditional Water Bodies

Re-excavation of Madhab Pukur at Kuifulia

Renovation of Traditional Water Bodies

Page 14: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

14/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

282 01 Nayagram 5 5/20 Re-excavation of Kali Pradhan's Pond Baligeria Kustikara Kustikara 120 94 6.50 - - 4.89 0.82 5.71 3240 Sep-Oct

283 01 Nayagram 5 5/21 Re-excavation of Purba Kuifulia Pond Baligeria Kustikara Kuifulia 120 103 6.50 - - 4.89 0.82 5.71 3240 Sep-Oct

284 01 Nayagram 5 5/22 Re-excavation of Nirbhay Pal Pond Baligeria Kustikara Kuifulia 120 22 7.50 - - 5.71 0.89 6.59 3780 Sep-Oct

285 01 Nayagram 5 5/23 Baligeria Banskuti Banskuti 159 203 2.50 - - 4.89 0.82 5.71 3240 Sep-Oct

286 01 Nayagram 5 5/24 Re-excavation of Dudhiasole Desh Pukur Baligeria Bhuruboni Dudiasole 272 3.50 - - 4.89 0.82 5.71 3240 Sep-Oct

287 01 Nayagram 5 5/25 Re-excavation of Kustikara village drain Baligeria Kustikara Kustikara 288 3.50 - - 4.89 0.82 5.71 3240 Sep-Oct

288 01 Nayagram 5 5/26 Bardanga Nuyasai 38 0.80 - - 2.72 0.67 3.39 1799 Sep-Oct

289 01 Nayagram 5 5/27 Bhaliaghati Bhaliaghati 71 3.58 - - 3.17 0.71 3.88 2099 Sep-Oct

290 01 Nayagram 5 5/28 38 4.56 - - 4.98 0.86 5.84 3298 Sep-Oct

291 01 Nayagram 5 5/29 Murakati 56 2.27 - - 4.28 0.88 5.16 2835 Sep-Oct

292 01 Nayagram 5 5/30 Murakati 56 1.89 - - 3.67 0.86 4.53 2430 Sep-Oct

293 01 Nayagram 5 5/31 Deulbar Deulbar 8 1.21 - - 5.89 3.54 9.42 3898 Sep-Oct

294 01 Nayagram 5 5/32 Bardanga Nuyasai 38 3.50 - - 6.93 1.64 8.57 4590 Sep-Oct

295 01 Nayagram 5 5/33 38 3.50 - - 2.85 0.66 3.52 1890 Sep-Oct

296 01 Nayagram 5 5/34 Re-excavation of Kanti Desh pond Kati 64 2.50 - - 4.08 0.76 4.84 2700 Sep-Oct

Renovation of Traditional Water BodiesRenovation of Traditional Water BodiesRenovation of Traditional Water BodiesRenovation of Traditional Water Bodies

Re-excavation of Pradip Kr. Mahakul Pond at Banskuti

Renovation of Traditional Water BodiesRenovation of Traditional Water BodiesRenovation of Traditional Water Bodies

Re-excavation of Nuyasai Jahira Pond at Nuyasai

Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Bhalia Ghati PMGSY pond at Bhaliaghati

Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Bachhurkhoard High School pond

Barakhankri

Bachhurkhoard

Bachhurkhoard

Renovation of Traditional Water Bodies

Re-excavation of Sahoo Pond at Murakati Barakhankri

Rukhnimara

Renovation of Traditional Water Bodies

Re-excavation of Murakati Bundhgora Bund at Murakati

Barakhankri

Rukhnimara

Renovation of Traditional Water Bodies

Re-excavation of Remeswar Mandir pond Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Nuyasai Jaharibundh pond with chatal

Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Parimal Singhs Pond at Bachhurkhoard

Barakhankri

Bachhurkhoard

Bachhurkhoard

Renovation of Traditional Water Bodies

Barakhankri

Bachhurkhoard

Page 15: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

15/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

297 01 Nayagram 5 5/35 Re-excavation of Dhirughutu bundh Dhirughutu 1.50 - - 5.30 0.87 6.17 3510 Sep-Oct

298 01 Nayagram 5 5/36 Re-excavation of Kuthisai Pond Kuthisai 2.50 - - 4.08 0.78 4.85 2700 Sep-Oct

299 01 Nayagram 5 5/37 Re-excavation of Rukhnimara Pond 40 3.50 - - 2.85 0.66 3.52 1890 Sep-Oct

300 01 Nayagram 5 5/38 78 3.50 - - 5.55 1.75 7.30 3672 Sep-Oct

301 01 Nayagram 5 5/39 79 4.50 - - 4.49 0.79 5.28 2970 Sep-Oct

302 01 Nayagram 5 5/40 Re-excavation of Thur bundh 38 3.50 - - 4.08 0.76 4.84 2700 Sep-Oct

303 01 Nayagram 5 5/41 38 2.50 - - 4.89 0.82 5.71 3240 Sep-Oct

304 01 Nayagram 5 5/42 Re-excavation of Kuthi Pukur 38 5.50 - - 5.30 0.85 6.15 3510 Sep-Oct

305 01 Nayagram 5 5/43 Re-excavation of Bhajar Bundh 38 - 0.85 - 4.89 0.82 5.71 3240 Sep-Oct

306 01 Nayagram 5 5/44 Re-excavation of Kurbundh 38 - 0.95 - 2.45 0.63 3.08 1620 Sep-Oct

307 01 Nayagram 5 5/45 Re-excavation of Darkhuli bundh Darkhuli 41 - 0.75 - 4.49 0.79 5.28 2970 Sep-Oct

308 01 Nayagram 5 5/46 Kadamdiha Kadamdiha 77 184 4.50 - - 4.49 5.63 10.11 2970 Sep-Oct

309 01 Nayagram 5 5/47 Kadamdiha Kadamdiha 77 214 3.50 - - 2.85 0.66 3.52 1890 Sep-Oct

310 01 Nayagram 5 5/48 Kadamdiha Kadamdiha 77 198 2.50 - - 4.28 0.77 5.06 2835 Sep-Oct

311 01 Nayagram 5 5/49 Totasai Totasai 59 3.50 - - 4.08 0.76 4.84 2700 Sep-Oct

Renovation of Traditional Water Bodies

Barakhankri

Barakhankri

Renovation of Traditional Water Bodies

Barakhankri

Barakhankri

Renovation of Traditional Water Bodies

Barakhankri

Barakhankri

Rukhnimara

Renovation of Traditional Water Bodies

Re-excavation of Gaham bundh and chatal

Barakhankri

Barakhankri

Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Khankri bundh with chatal

Barakhankri

Barakhankri

Barakhankri

Renovation of Traditional Water Bodies

Barakhankri

Bachhurkhoard

Bachhurkhoard

Renovation of Traditional Water Bodies

Re-excavation of Bachhurkhoard Pond and bundh

Barakhankri

Bachhurkhoard

Bachhurkhoard

Renovation of Traditional Water Bodies

Barakhankri

Bachhurkhoard

Bachhurkhoard

Renovation of Traditional Water Bodies

Barakhankri

Bachhurkhoard

Bachhurkhoard

Renovation of Traditional Water Bodies

Barakhankri

Bachhurkhoard

Bachhurkhoard

Renovation of Traditional Water Bodies

Barakhankri

Bachhurkhoard

Renovation of Traditional Water Bodies

Re-excavation of Kadamdiha pond with guard wall

Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Kadamdiha Puratan Hut Tala Pond

Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Kadamdiha Pandra Pukur

Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Totasai High School Pond

Barakhankri

Page 16: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

16/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

312 01 Nayagram 5 5/50 Totasai Thuria 59 4.50 - - 4.49 0.79 5.28 2970 Sep-Oct

313 01 Nayagram 5 5/51 Berajal Kustikara Jugisole 260 236 0.80 - - 4.08 0.78 4.86 2700 Sep-Oct

314 01 Nayagram 5 5/52 Re-excavation of Rukhni Pond at Rukhni Berajal Asurhata Rukhni 297 44,45, 2.42 - - 4.08 0.78 4.86 2700 Sep-Oct

315 01 Nayagram 5 5/53 Re-excavation of Radhapara Bundh Berajal Harimaity Radhapara 303 299 0.80 - - 4.08 0.78 4.86 2700 Sep-Oct

316 01 Nayagram 5 5/54 Berajal Harimaity Harimaity 304 323 1.21 - - 4.08 0.78 4.86 2700 Sep-Oct

317 01 Nayagram 5 5/55 Berajal Harimaity Harimaity 304 1402 1.21 - - 4.08 0.78 4.86 2700 Sep-Oct

318 01 Nayagram 5 5/56 Re-excavation of Murgapahari Pond Berajal Harimaity 307 187 0.80 - - 4.08 0.77 4.84 2700 Sep-Oct

319 01 Nayagram 5 5/57 Patina Upar Patina Taldangra 6 0.95 - - 3.17 0.69 3.86 2099 Sep-Oct

320 01 Nayagram 5 5/58 Patina Rangamatia Nagbindhi 6 3.58 - - 4.49 0.79 5.28 2970 Sep-Oct

321 01 Nayagram 5 5/59 Berajal Dolgram Dolgram 301 122 1.41 - - 3.17 0.71 3.88 2099 Sep-Oct

322 01 Nayagram 5 5/60 Berajal Dolgram Dolgram 301 4.00 - - 6.93 1.42 8.35 4590 Sep-Oct

323 01 Nayagram 5 5/61 Jamirapal Jamirapal Jamirapal 235 2.59 - - 5.71 1.33 7.03 3780 Sep-Oct

324 01 Nayagram 5 5/62 Berajal Dolgram Sitarampur 308 112 2.02 - - 4.08 0.78 4.85 2700 Sep-Oct

325 01 Nayagram 5 5/63 Re-excavation of Pucca Bundh Berajal Dolgram Dolgram 301 1.95 - - 3.26 0.69 3.96 2160 Sep-Oct

326 01 Nayagram 5 5/64 Re-excavation of Upar bundh Berajal Dolgram Dolgram 301 412 0.95 - - 4.08 0.36 4.44 2700 Sep-Oct

Renovation of Traditional Water Bodies

Re-excavation of Thuria Pry. School Pond

Barakhankri

Renovation of Traditional Water Bodies

Re-excavation of Jugisole pond at Jugisole

Renovation of Traditional Water BodiesRenovation of Traditional Water BodiesRenovation of Traditional Water Bodies

Re-excavation of Harimaity bundh at Harimaity

Renovation of Traditional Water Bodies

Re-excavation of Harimaity pond at Harimaity

Renovation of Traditional Water Bodies

Murgapahari

Renovation of Traditional Water Bodies

Re-excavation of Bhutia Khal at Taldangar

1015,1016

Renovation of Traditional Water Bodies

Re-excavation of Bhudhar Mandal's Pond at Nakbidhi

Renovation of Traditional Water Bodies

Re-excavation of Raidiha Pond at Dolgram

Renovation of Traditional Water Bodies

Re-excavation of Dolgram Pond at Dolgram

Renovation of Traditional Water Bodies

Re-excavation of Gardpukur at Jamirapal

Renovation of Traditional Water Bodies

Re-excavation of Sitarampur Pond at Sitarampur

Renovation of Traditional Water Bodies

499453

Renovation of Traditional Water Bodies

Page 17: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

17/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

327 01 Nayagram 5 5/65 Re-excavation of Jugisole Pond Berajal Jugisole Jugisole 260 350 0.75 - - 3.67 0.73 4.40 2430 Sep-Oct

328 01 Nayagram 5 5/66 Re-excavation of Berajal Khas Pond Berajal Berajal Berajal 258 0.50 - - 3.67 0.73 4.40 2430 Sep-Oct

329 01 Nayagram 5 5/67 Re-excavation of Chunkhulia Khas Pond Berajal Chunkhulia Chunkhulia 258 0.35 - - 3.67 0.73 4.40 2430 Sep-Oct

330 01 Nayagram 5 5/68 Re-excavation of Nekrasole Desh Pond Berajal Nekrasole Nekrasole 295 1.50 - - 4.89 0.82 5.71 3240 Sep-Oct

331 01 Nayagram 5 5/69 Chandabila Topabon 26 212 1.21 - - 3.17 0.71 3.88 2099 Sep-Oct

332 01 Nayagram 5 5/70 Chandabila Pukuria Raisole 52 0.08 - - 4.07 0.78 4.86 2698 Sep-Oct

333 01 Nayagram 5 5/71 Chandabila 25 0.05 - - 3.26 5.09 8.35 2160 Sep-Oct

334 01 Nayagram 5 5/72 Chandabila Kashia Pairabhari 22 0.04 - - 3.67 3.36 7.03 2430 Sep-Oct

335 01 Nayagram 5 5/73 Chandabila Telia Garurghata 45 1.25 - - 3.26 0.69 3.96 2160 Sep-Oct

336 01 Nayagram 5 5/74 Chandabila Telia Telia 28 0.85 - - 3.26 0.69 3.96 2160 Sep-Oct

337 01 Nayagram 5 5/75 Re-excavation Kuldia Pond at Kuldiha Chandabila Telia Kuldiha 24 0.75 - - 3.26 0.69 3.96 2160 Sep-Oct

338 01 Nayagram 5 5/76 Re-excavation of Dulki Pond at Narda Chandabila Gokhurpal Narda 46 0.85 - - 2.85 0.66 3.52 1890 Sep-Oct

339 01 Nayagram 5 5/77 Chandabila Gokhurpal Bailasole 49 0.95 - - 4.08 0.76 4.84 2700 Sep-Oct

340 01 Nayagram 5 5/78 Re-excavation of Nichubanki Nala Pond Chandabila Raisole 22 0.45 - - 2.85 0.66 3.52 1890 Sep-Oct

341 01 Nayagram 5 5/79 Chandabila Tungadhua Ghagrasole 53 1.50 - - 4.49 2.55 7.03 2970 Sep-Oct

Renovation of Traditional Water BodiesRenovation of Traditional Water BodiesRenovation of Traditional Water BodiesRenovation of Traditional Water Bodies

8182

Renovation of Traditional Water Bodies

Re-excavation of Topabon (Darkhuli Pond)

Pathardahara

Renovation of Traditional Water Bodies

Re-excavation of Murari Mahata Pond at Raisole

Renovation of Traditional Water Bodies

Re-excavation of Pathardahara bundh with cannel and hume pipe

Pathardahara

Pathardahara

Renovation of Traditional Water Bodies

Re-excavation of Panchayat bundh at Pairabhari with culvert

Renovation of Traditional Water Bodies

Re-excavation of Bhabani routh pond at Garurughata

Renovation of Traditional Water Bodies

Re-excavation of Naresh Mahata's pond at Telia

Renovation of Traditional Water BodiesRenovation of Traditional Water BodiesRenovation of Traditional Water Bodies

Re-excavatio of Bailasole bundh at Bailasole

Renovation of Traditional Water Bodies

Nichubankinala

Renovation of Traditional Water Bodies

Re-excavation of Ghagrasole bundh and cannel

Page 18: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

18/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

342 01 Nayagram 5 5/80 Baranegui Barsole Jamboni 104 4.92 - - 5.43 3.98 9.41 3598 Sep-Oct

343 01 Nayagram 5 5/81 Baranegui Barsole Bhaliadiha 99 3.78 - - 6.79 1.01 7.80 4497 Sep-Oct

344 01 Nayagram 5 5/82 Re-excavation of Baranegui Bundh Baranegui Baranegui Baranegui 52 4.73 - - 5.43 2.18 7.62 3598 Sep-Oct

345 01 Nayagram 5 5/83 Baranegui Rangamatia 92 4.92 - - 5.43 2.18 7.62 3598 Sep-Oct

346 01 Nayagram 5 5/84 Baranegui Barsole Parasia 106 3.78 - - 7.24 2.37 9.61 4797 Sep-Oct

347 01 Nayagram 5 5/85 Baranegui Morchi Jamsola 82 4.92 - - 8.15 5.96 14.11 5397 Sep-Oct

348 01 Nayagram 5 5/86 Baranegui Morchi 83 3.78 - - 6.34 2.25 8.59 4197 Sep-Oct

349 01 Nayagram 5 5/87 Re-excavation of Ramchandrapur bundh Baranegui 101 3.50 - - 5.30 2.17 7.47 3510 Sep-Oct

350 01 Nayagram 5 5/88 Re-excavation of Morchi bund Baranegui Morchi Morchi 83 1.50 - - 4.49 4.31 8.79 2970 Sep-Oct

351 01 Nayagram 5 5/89 Kuilisuta Gangana 167 2.84 - - 5.44 3.87 9.31 3601 Sep-Oct

352 01 Nayagram 5 5/90 Baligeria Banskuthi 159 3.78 - - 4.53 4.78 9.31 2998 Sep-Oct

353 01 Nayagram 5 5/91 Re-excavation of in let out let at Jamboni Arrah Baramara Baramara 334 3.97 - - 4.07 0.78 4.86 2698 Sep-Oct

354 01 Nayagram 5 5/92 Arrah Baramara Baramara 334 6.62 - - 5.89 0.94 6.82 3898 Sep-Oct

355 01 Nayagram 5 5/93 Dokra Dehikhelar 155 0.60 - - 4.53 0.82 5.35 2998 Sep-Oct

356 01 Nayagram 5 5/94 Re-excavation of Dokra Ashram Pond Dokra Dokra 199 6.55 - - 5.43 0.99 6.42 3598 Sep-Oct

Renovation of Traditional Water Bodies

Re-excavation of Jamboni Kuthi pukur at Jamboni

Renovation of Traditional Water Bodies

Re-excavation of Bhaliadiha Bundh at Bhaliadiha

Renovation of Traditional Water BodiesRenovation of Traditional Water Bodies

Re-excavation of Tentulmuri Bundh at Tentulmuri

Tentulmuria

Renovation of Traditional Water Bodies

Re-excavation of Parasia Lodha Bundh at Parasia

Renovation of Traditional Water Bodies

Re-excavation of Surya Bundh with spill way at Jamsola

Renovation of Traditional Water Bodies

Re-excavation of Baradhansola Dukshupukur with Protection wall

Baradhansola

Renovation of Traditional Water Bodies

Ramchandrapur

Ramkrishnapur

Renovation of Traditional Water Bodies

519442552

Renovation of Traditional Water Bodies

Re-excavation of Gangana bundh with in let out let guar wall

Chandrarekha

Renovation of Traditional Water Bodies

Re-excavation of Kusumkuthi bundh with Guard wall

Kusumkuthi

Renovation of Traditional Water BodiesRenovation of Traditional Water Bodies

Re-excavation of Baramara Pond with in let out let

Renovation of Traditional Water Bodies

Re-excavation of Benudhar Dandapat Pond at Dehikhelar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Page 19: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

19/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

357 01 Nayagram 5 5/95 Ghoratoria Dehikhelar 155 11.47 - - 8.48 1.54 10.03 5618 Sep-Oct

358 01 Nayagram 5 5/96 Ghoratoria Banksole 200 8.19 - - 6.70 1.09 7.79 4437 Sep-Oct

359 01 Nayagram 5 5/97 Re-excavation of Bipul Singha Pond Gohaldiha 123 6.55 - - 5.79 1.02 6.81 3838 Sep-Oct

360 01 Nayagram 5 5/98 202 46 6.50 - - 4.89 1.26 6.15 3240 Sep-Oct

361 01 Nayagram 5 5/99 Khanamuri 202 345 4.54 - - 5.30 0.85 6.15 3510 Sep-Oct

362 01 Nayagram 5 5/100 Khanamuri Khanamuri 149 5.74 - - 4.89 0.82 5.71 3240 Sep-Oct

363 01 Nayagram 5 5/101 Nayagram Kurchiboni Kurchiboni 141 63 5.00 - - 4.89 0.82 5.71 3240 Sep-Oct

364 01 Nayagram 5 5/102 Re-excavation of Rani bundh at Tufuria Nayagram Tufuria Tufuria 211 5.80 - - 4.89 0.82 5.71 3240 Sep-Oct

365 01 Nayagram 5 5/103 Re-excavation of Bimal Patra's Pond Nayagram Tufuria Tufuria 211 4.50 - - 4.49 0.79 5.28 2970 Sep-Oct

366 01 Nayagram 5 5/104 Re-excavation of Pun Giri Bundh Nayagram Pungiri 149 3,4,5, 3.50 - - 4.08 0.76 4.84 2700 Sep-Oct

367 01 Nayagram 5 5/105 Re-excavation of Nimainagar MSK pond Nayagram Nimainagar 128 3.50 - - 3.26 0.69 3.96 2160 Sep-Oct

368 01 Nayagram 5 5/106 Nayagram Nayagram 128 2.65 - - 4.08 0.76 4.84 2700 Sep-Oct

369 01 Nayagram 5 5/107 Arrah Balimundi Dudiasole 272 4.85 - - 4.49 1.23 5.71 2970 Sep-Oct

370 01 Nayagram 5 5/108 Re-excavation of Dumuria Desh Bundh Arrah Dumuria Dumuria 322 1.95 - - 4.89 1.26 6.15 3240 Sep-Oct

371 01 Nayagram 5 5/109 Re-excavation of Banskhali Bundh Arrah Dumuria Banskhali 322 4.85 - - 5.30 1.29 6.59 3510 Sep-Oct

Renovation of Traditional Water Bodies

Re-excavation of Dehikhelar Darkhuli Pond

Kharikamathani

Renovation of Traditional Water Bodies

Re-excavation of Banksole Lodhapara Pond

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kharikamathani

451,452, 453

Renovation of Traditional Water Bodies

Re-excavation of Pailot Pukur at Kurmipathra

Kharikamathani

Kharikamathani

Kurmipathra

Renovation of Traditional Water Bodies

Re-excavation of Thakur bundh at Kurmipathra

Kharikamathani

Kharikamathani

Renovation of Traditional Water Bodies

Re-excavation of Satrughna Patra's Pond at Khanamuri

Kharikamathani

14514635

Renovation of Traditional Water Bodies

Re-excavation of Arjun Ghosh Pond at Kurchiboni

Renovation of Traditional Water BodiesRenovation of Traditional Water Bodies

470556

Renovation of Traditional Water Bodies

Nayagram (S)

Renovation of Traditional Water Bodies

Nimainagar

Renovation of Traditional Water Bodies

Re-excavation of Nayagram Food ball ground Pond

Nayagram(S)

Renovation of Traditional Water Bodies

Re-excavation of Dudhiasole Bhanga bundh

Renovation of Traditional Water BodiesRenovation of Traditional Water Bodies

Page 20: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

20/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

372 01 Nayagram 5 5/110 Arrah Baksha Baksa 175 3.54 - - 4.08 0.76 4.84 2700 Sep-Oct

373 01 Nayagram 5 5/111 Re-excavation of Bhaliachati Bundh Malam Bhaliachati Bhaliaghati 71 5.40 - - 4.89 0.85 5.74 3240 Sep-Oct

374 01 Nayagram 5 5/112 Malam Koptibhole Koptibhole 120 3.95 - - 4.49 0.90 5.39 2970 Sep-Oct

375 01 Nayagram 5 5/113 Re-excavation of Ichhapur Pond Malam Icchapura 60 2.95 - - 4.28 0.79 5.08 2835 Sep-Oct

376 01 Nayagram 5 5/114 Jamirapal 237 1.21 - - 4.98 0.86 5.84 3298 Sep-Oct

377 01 Nayagram 5 5/115 Jamirapal Khudmorai Fuldaha 225 0.40 - - 6.79 1.01 7.80 4497 Sep-Oct

378 01 Nayagram 5 5/116 Re-excavation of Bagmacha Pond Jamirapal Khudmorai Bagmacha 224 4.85 - - 4.89 0.82 5.71 3240 Sep-Oct

379 01 Nayagram 5 5/117 Re-excavation of Tikrapara Pond Jamirapal Tikrapara Tikrapara 215 4.45 - - 4.49 0.79 5.28 2970 Sep-Oct

- - - 535.87 152.20 688.07 354879

380 01 Nayagram 6 Land Development 6/1 Land leveling of Kesharrekha sub-centra 182 - 0.80 - 4.98 0.86 5.84 3298 Sep-Oct

381 01 Nayagram 6 Land Development 6/2 Chandabila Pukuria Pukuria 46 - 0.95 - 4.49 0.86 5.35 2970 Sep-Oct

382 01 Nayagram 6 Land Development 6/3 Land leveling of Balaram Mahata's Land Chandabila Raisole Raisole 52 - 1.25 - 4.49 0.79 5.28 2970 Sep-Oct

383 01 Nayagram 6 Land Development 6/4 Land leveling of Purnapani ICDS center Chandabila Raisole Purnapani 53 - 0.85 - 3.67 0.73 4.40 2430 Sep-Oct

384 01 Nayagram 6 Land Development 6/5 Land leveling at Tungadhua Mouza Chandabila Tungadhua Tungadhua 48 - 2.40 - 5.30 0.85 6.15 3510 Sep-Oct

385 01 Nayagram 6 Land Development 6/6 Land leveling at Chitta Danga Kadamdiha Kadamdiha 77 390 - 0.95 - 4.49 0.79 5.28 2970 Sep-Oct

386 01 Nayagram 6 Land Development 6/7 Thuria Thuria 59 - 1.00 - 4.49 0.79 5.28 2970 Sep-Oct

387 01 Nayagram 6 Land Development 6/8 Baranegui Morchi 83 316 - 1.25 - 5.30 0.87 6.17 3510 Sep-Oct

388 01 Nayagram 6 Land Development 6/9 Berajal Nekrasole Nekrasole 295 - 0.25 - 4.98 0.86 5.84 3298 Sep-Oct

Renovation of Traditional Water Bodies

Re-excavation of Baksa Madhyapara Setch bund

Renovation of Traditional Water BodiesRenovation of Traditional Water Bodies

Re-excavation of Niranjan Mahata's Pond

Renovation of Traditional Water Bodies

Narasinghapur

Renovation of Traditional Water Bodies

Re-excavation of Jagannathpur Darkhuli Pond

Jagannathpur

Jagannathpur

Renovation of Traditional Water Bodies

Re-excavation of Jhapa Khal from Fuldaha to Khudmorai

Renovation of Traditional Water BodiesRenovation of Traditional Water BodiesRenovation of Traditional Water Bodies Total

Chandrarekha

Biswanathpur

Kesharrekha

Land leveling and const. of play ground at Pukuria Pry. & Upper Pry School

Barakhankri

Land leveling at Thuria Pry school Math & Const. of Play ground

Barakhankri

Land leveling at Golapnath SC High School ground

Baradhansola

Land leveling with drain at Nekrasole High School ground

288289

Page 21: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

21/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

389 01 Nayagram 6 Land Development 6/10 Malam Chaltabera Chaltabera 67 - 0.50 - 4.07 0.78 4.86 2698 Sep-Oct

390 01 Nayagram 6 Land Development 6/11 Land leveling at Baligeria SSK school Baligeria Baligeria Baligeria 194 - 0.15 - 4.89 0.84 5.74 3240 Sep-Oct391 01 Nayagram 6 Land Development 6/12 Arrah Tasarboni Tasarboni 319 165 - 0.15 - 4.89 0.84 5.74 3240 Sep-Oct

392 01 Nayagram 6 Land Development 6/13 Jamirapal Jamirapal Jamirapal 235 - 0.25 - 4.89 0.84 5.74 3240 Sep-Oct

393 01 Nayagram 6 Land Development 6/14 Jamirapal Jamirapal Gentaboni 244 - 0.58 - 4.89 0.84 5.74 3240 Sep-Oct

394 01 Nayagram 6 Land Development 6/15 Jamirapal 237 - 1.21 - 4.89 0.84 5.74 3240 Sep-Oct

395 01 Nayagram 6 Land Development 6/16 Land leveling at Khudmorai SSK ground Jamirapal Kudhmorai Khudmorai 232 - 1.21 - 4.89 0.84 5.74 3240 Sep-Oct

396 01 Nayagram 6 Land Development 6/17 Land leveling of Jamirapal PHC complex Jamirapal Jamirapal Jamirapal - - - 4.89 0.82 5.71 3240 Sep-Oct

397 01 Nayagram 6 Land Development 6/18 148 - 1.21 - 4.89 0.84 5.74 3240 Sep-Oct

398 01 Nayagram 6 Land Development 6/19 Kenduboni 153 - 0.95 - 4.49 0.81 5.29 2970 Sep-Oct

399 01 Nayagram 6 Land Development 6/20 - 0.75 - 4.49 0.79 5.28 2970 Sep-Oct

- - - 94.36 16.51 110.86 62489

400 01 Nayagram 7 7/1 Const. of Dhagobindapur village drain Baligeria Baligeria - - 0.75 4.89 6.36 11.25 3240

401 01 Nayagram 7 7/2 Bhaliaghati 71 1.53 - - 3.26 0.47 3.74 2160 Sep-Oct

402 01 Nayagram 7 7/3 Baranegui Baranegui Baranegui 52 2.50 - - 4.49 6.94 11.43 2970 Sep-Oct

403 01 Nayagram 7 7/4 Dokra Dihikhelar 155 - - 1.25 5.89 5.33 11.22 3898

404 01 Nayagram 7 7/5 Ghoratoria Ghoratoria 112 - - 1.00 4.07 5.18 9.25 2698

405 01 Nayagram 7 7/6 Arrah Dhumsai Dhumsai 323 - - 0.62 4.07 8.23 12.31 2698

406 01 Nayagram 7 7/7 Baligeria Belajhor 268 - - 1.05 4.07 5.18 9.25 2698

407 01 Nayagram 7 7/8 Dokra Dihikhelar 155 - - 0.62 3.26 5.11 8.37 2160

408 01 Nayagram 7 7/9 Dokra Dihikhelar 155 - - 1.06 4.08 6.05 10.13 2700

409 01 Nayagram 7 7/10 Malam 72 400 - - 0.95 4.08 6.03 10.11 2700

Sand removing at Chaltabera Khal with guard wall

Land leveling at Tasarboni Dakshinpada SSKLand leveling at Jamirapal Pathagar club football ground Land leveling at Gentaboni football groundLand leveling at Jagannath SSK football ground

Jagannathpur

Jagannathpur

Land leveling at Nayagram Block Health center and Rehabilitation center at Kharikamathani

Kharikamathani

Kharikamathani

Kharikamathani

Land leveling of Kenduboni football ground

Kharikamathani

Kharikamathani

Land leveling at Kharikamathani BPHC complex

Kharikamathani

Kharikamathani

Kharikamathani

Land Development TotalFlood Control & Protection

Dhogobindpur

Flood Control & Protection

Re-excavation of Bhaliaghati PMGSY appoch bundh

Barakhankri

Barakhankri

Flood Control & Protection

Re-excavation of Chatal bundh and cannel

Flood Control & Protection

RCC water drainage from Daityari Sahoo House to Upar Para at Dihikhelar village pond both side

Kharikamathani

Flood Control & Protection

RCC wate drainage at Ghoratoria Bera Para to harimandir at Ghoratoria (Both side road)

Kharikamathani

April-May

Flood Control & Protection

Water drainage from Dhumsai hut Tala to Suknakhnakhal

April-May

Flood Control & Protection

Water pacca drainage from Balai house to Matilal House at Baligeria

Baligeria Pry.

April-May

Flood Control & Protection

Water drainage from Arabindda Sau House to Dainimary Khal at Dihikhelar

Kharikamathani

April-May

Flood Control & Protection

Water Drainage from Haradhan babu's House to Pukur Par

Kharikamathani

April-May

Flood Control & Protection

Const. of Protection wall near Narasinghapur Mandir

Narasinghapur

Narasinghapur

April-May

Page 22: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

22/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

410 01 Nayagram 7 7/11 Malam Banspat 219 19 - - 0.85 3.67 5.34 9.01 2430

411 01 Nayagram 7 7/12 Berajal Berajal Berajal 258 - - 0.79 3.17 5.98 9.15 2099

412 01 Nayagram 7 7/13 Nayagram Tufiria Tufuria 211 - - 0.35 5.71 9.27 14.98 3780

413 01 Nayagram 7 7/14 Nayagram Sitalpura Sitalpura 146 - - 1.00 3.67 6.02 9.69 2430

414 01 Nayagram 7 7/15 Nayagram Kamalapur Kamalapur 212 - - 1.25 4.07 6.06 10.13 2698

415 01 Nayagram 7 7/16 Nayagram Kurchiboni 140 - - 1.06 3.62 6.02 9.64 2398

416 01 Nayagram 7 7/17 Dokra Dihikhelar 155 - - 0.85 3.62 5.23 8.85 2398

417 01 Nayagram 7 7/18 Chandabila Pukuria Murakati 56 - - 0.85 2.85 7.70 10.55 1890

418 01 Nayagram 7 7/19 Const. of culvert at Murali kahl Chandabila Pukuria Murakati 56 - - 0.75 3.26 6.85 10.11 2160

419 01 Nayagram 7 7/20 Berajal Berajal Guripukur 301 802 - - 0.53 4.07 6.06 10.13 2698

420 01 Nayagram 7 7/21 Berajal Berajal Berajal 258 542 - - 0.89 2.85 5.95 8.81 1890

421 01 Nayagram 7 7/22 Berajal Berajal Berajal 258 - - 0.95 3.17 5.10 8.27 2099

422 01 Nayagram 7 7/23 Deulbar Deulbar 8 - - 0.53 4.07 6.06 10.13 2698

423 01 Nayagram 7 7/24 Deulbar Bardanga 38 - - 1.00 3.17 5.98 9.15 2099

424 01 Nayagram 7 7/25 Deulbar Bardanga 38 - - 2.00 5.89 11.05 16.93 3898

425 01 Nayagram 7 7/26 Patina Fulbni Rajpahari 1 - - 0.79 4.98 7.45 12.43 3298

426 01 Nayagram 7 7/27 Patina Singdhui Jamsola - - 0.95 2.85 6.82 9.67 1890

427 01 Nayagram 7 7/28 Nagripada Kuldiha 188 - - 0.85 6.12 5.88 11.99 4052

428 01 Nayagram 7 7/29 187 - - 0.85 5.32 3.78 9.10 3522

429 01 Nayagram 7 7/30 Repair of speel way at Bhola bundh Bhola Bhola 162 - - 0.75 3.84 5.36 9.20 2544

430 01 Nayagram 7 7/31 Baligeria Baligeria 194 - - 0.65 2.85 2.87 5.73 1890

- - - 125.01 185.74 310.75 82787

Flood Control & Protection

Boulder petching fonts side of banspat sansad

Narasinghapur

April-May

Flood Control & Protection

Paka drain from Susan Mahata House to Suknakhal

April-May

Flood Control & Protection

Const. of Guardwall and pickup ware at Tufuria Khal

April-May

Flood Control & Protection

Const. of Sitalpura bundh and canal with guard wall

April-May

Flood Control & Protection

Excavation of Khal from Dahi to Kamalapur

April-May

Flood Control & Protection

Excavation of khal from Nemainagar to Kurchiboni

Nemainagar April-May

Flood Control & Protection

Excavation of cananl from at Dihikhelar to Manmatha House

Kharikamathani

April-May

Flood Control & Protection

Const. of sluis get over Murali Khal at Pukuria

April-May

Flood Control & Protection

April-May

Flood Control & Protection

Const. of bothside drain from Guripukur Math to Padmapukur

April-May

Flood Control & Protection

Const. of both drain from Pry. School to High School

April-May

Flood Control & Protection

Const. of bothside drain from Mahakur para to Padmapukur

April-May

Flood Control & Protection

Const. of canal from Deulbar Sitanala Khal to Deulbar Tentulata

Barakhankri

April-May

Flood Control & Protection

Subarnarekha Nadi par protection from Khandarpara to Baisbetia Daharroad

Barakhankri

April-May

Flood Control & Protection

Subarnarekha Nadi par protection from Baisbetia to Thuria Feri Ghat

Barakhankri

April-May

Flood Control & Protection

Repair of Subarnarekha River Embankment from Rajpahari to Bhabridanga

April-May

Flood Control & Protection

Const. of Jamsola Paharia Bundh & chatal

April-May

Flood Control & Protection

Protection of Kuldiha spill way with re-excavation of cannel

Chandrarekha

April-May

Flood Control & Protection

Const. of drain at Chandrarekha Sastha kendra

Chandrarekha

Chandrarekha

Chandrarekha

April-May

Flood Control & Protection

Chandrarekha

April-May

Flood Control & Protection

Const. of Drain from Baligeria culvert to Shubendu land

Baligeria High

April-May

Flood Control & Protection Total

Page 23: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

23/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

431 01 Nayagram 8 Rural Connectivity 8/1 Arrah Jadahara 327 - - 2.50 3.17 4.20 7.37 2099

432 01 Nayagram 8 Rural Connectivity 8/2 Arrah Jamdahara 327 - - 2.50 3.17 4.20 7.37 2099 Nov Dec

433 01 Nayagram 8 Rural Connectivity 8/3 Arrah Bhalukchua 332 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

434 01 Nayagram 8 Rural Connectivity 8/4 Arrah Dumuria Dumuria 323 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

435 01 Nayagram 8 Rural Connectivity 8/5 Arrah Salgeria Salgeria 329 - - 2.00 3.17 5.08 8.25 2099 Nov Dec

436 01 Nayagram 8 Rural Connectivity 8/6 Arrah Kundalboni 177 - - 2.50 3.62 4.24 7.86 2398 Nov Dec

437 01 Nayagram 8 Rural Connectivity 8/7 Arrah Baramara Baramara 334 - - 2.50 3.62 4.24 7.86 2398 Nov Dec

438 01 Nayagram 8 Rural Connectivity 8/8 Arrah Kuldiha Nagripada 178 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

439 01 Nayagram 8 Rural Connectivity 8/9 Arrah Nagripada Bamdiha 179 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

440 01 Nayagram 8 Rural Connectivity 8/10 Arrah Nagripada Balimundi 179 - - 3.00 2.85 5.50 8.35 1890 Nov Dec

441 01 Nayagram 8 Rural Connectivity 8/11 Repair of Rd from Nagripada to Baksha Arrah Nagripada Baksa 175 - - 3.50 2.45 4.59 7.03 1620 Nov Dec

442 01 Nayagram 8 Rural Connectivity 8/12 Arrah Nagripada Panchami 170 - - 2.00 3.17 5.08 8.25 2099 Nov Dec

443 01 Nayagram 8 Rural Connectivity 8/13 Arrah Nagripada Rakhalban 178 - - 2.00 3.17 5.08 8.25 2099 Nov Dec

444 01 Nayagram 8 Rural Connectivity 8/14 Arrah - - 2.50 2.04 4.12 6.15 1350 Nov Dec

445 01 Nayagram 8 Rural Connectivity 8/15 Arrah Baramara - - 2.50 2.45 4.15 6.59 1620

446 01 Nayagram 8 Rural Connectivity 8/16 Arrah Nagripada Barsole 178 - - 1.50 3.14 4.20 7.34 2079

447 01 Nayagram 8 Rural Connectivity 8/17 Arrah Nagripada Nagripada 178 - - 4.00 4.49 6.07 10.55 2970 Nov Dec

448 01 Nayagram 8 Rural Connectivity 8/18 Arrah Balimundi Dudhiasole - - 2.50 2.04 4.12 6.15 1350 Nov Dec

449 01 Nayagram 8 Rural Connectivity 8/19 Arrah Baksha Rakhalban 175 - - 2.50 3.62 4.24 7.86 2398

450 01 Nayagram 8 Rural Connectivity 8/20 Arrah Balimundi Balimundi 179 - - 3.00 2.85 5.50 8.35 1890 Nov Dec

Repair of Rd from Dhiral Baligeria to Jhanrusole

Dhiral Baligeri

April-May

Repair of Rd from Dhiral Baligeria to Salgeria

Dhiral Baligeri

Repair of Rd from Kumsol to Bhalukchua

Bhalukchua

Repair for Rd from Dumuria to RamkrishnapurRepair of Rd with culvert from Salgeria to Jarighati with morrum and boulderRepair of Rd with culvert from Kundalboni to Orissa Border with morrum and boulder

Kundalbani

Repair of Rd with culvert from Baramara to Dhumsai with morrum and boulder

Repair of Rd with causeway from Kuldiha to Nagripada with morrum and boulderRepair of Rd from Bamdiha to PMGSY with culvertRepair of Rd from Nagripada to Balimundi with culvert

Repair of Rd from Panchami to Balimundi with culvertRepair of Rd from Nagripada to Rakhalban with culvertRepair of Rd from Pailot to Dhiralbaligeria

Dhiralbaligeria

Pailotchawk

Repair of Rd from Baramara to Dhiral Baligeria

Dhiral Baligeri

Repair of Rd from Hatitop to Barsole with culvertRepair of Rd from Nagripada Rathtala to Orissa Border with culvertRepair of Rd from Balimondi MSK to DudiasoleReair of rd with cause way from Rakhalban to BakshaRepair of Rd with culvert from PWD Guripukur to Balimundi MSK with morrum and boulder

Page 24: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

24/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

451 01 Nayagram 8 Rural Connectivity 8/21 Arrah Nagripada Nagripada 178 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

452 01 Nayagram 8 Rural Connectivity 8/22 Repair of Rd from Kundalboni to Orissa Arrah Kundalboni Kuldalbani 177 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

453 01 Nayagram 8 Rural Connectivity 8/23 Arrah 176 - - 2.50 3.17 4.20 7.37 2099 Nov Dec

454 01 Nayagram 8 Rural Connectivity 8/24 Arrah Balimundi Rakhalban 176 - - 2.00 3.17 4.64 7.81 2099 Nov Dec

455 01 Nayagram 8 Rural Connectivity 8/25 Repair of Rd from Baksa to Nagripada Arrah Nagripada Rakhalban 176 - - 2.50 2.04 4.12 6.15 1350 Nov Dec

456 01 Nayagram 8 Rural Connectivity 8/26 Arrah Nagripada Rakhalban 176 - - 2.50 2.04 4.12 6.15 1350

457 01 Nayagram 8 Rural Connectivity 8/27 Arrah Balimundi 175 - - 2.00 3.17 4.22 7.39 2099

458 01 Nayagram 8 Rural Connectivity 8/28 Arrah Panchami Dudiasole 272 - - 1.50 2.45 5.03 7.47 1620 Nov Dec

459 01 Nayagram 8 Rural Connectivity 8/29 Arrah Panchami Salgeria 329 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

460 01 Nayagram 8 Rural Connectivity 8/30 Arrah Kudalboni Kudalboni 317 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

461 01 Nayagram 8 Rural Connectivity 8/31 Arrah Kuldiha 327 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

462 01 Nayagram 8 Rural Connectivity 8/32 Arrah Dumuria Baksa 175 - - 2.50 2.65 4.16 6.81 1755 Nov Dec

463 01 Nayagram 8 Rural Connectivity 8/33 Repair of Road from Paika to Jhurisole Arrah Paika Paika - - 1.50 2.04 3.68 5.71 1350 Nov Dec

464 01 Nayagram 8 Rural Connectivity 8/34 Arrah Kuldiha Bamdiha 179 - - 1.85 2.85 4.18 7.03 1890

465 01 Nayagram 8 Rural Connectivity 8/35 Arrah Nagripada 176 - - 2.50 2.65 4.16 6.81 1755 Nov Dec

466 01 Nayagram 8 Rural Connectivity 8/36 Arrah Dhumsai Dhumsai 322 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

467 01 Nayagram 8 Rural Connectivity 8/37 Arrah Dhumsai Jamboni 318 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

468 01 Nayagram 8 Rural Connectivity 8/38 Baligeria Baramchati 267 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

469 01 Nayagram 8 Rural Connectivity 8/39 Baligeria Neguria Betjharia 194 - - 2.50 3.17 5.08 8.25 2099 Nov Dec

470 01 Nayagram 8 Rural Connectivity 8/40 Baligeria Andharisole 279 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

471 01 Nayagram 8 Rural Connectivity 8/41 Baligeria Buruboni Buruboni 283 - - 2.00 3.17 4.64 7.81 2099 Nov Dec

472 01 Nayagram 8 Rural Connectivity 8/42 Baligeria Dhobasole Dhobasole 285 - - 2.00 3.17 5.08 8.25 2099 Nov Dec

Repair of Rd with culver from Nagripada to Bamunda t with morrum and boulder

Repair of Rd from Ramkrishnapur to Orissa via MSK

Ramkrishnapur

Ramkrishnapur

Repair of Rd from Rakhalban gramin rd with culvert

Repair of rd from Rakhalban to NagripadaRepair of Bhalukbasa gramin rd with culvert

Bhalukbasa

Repair of Rd with moorum boulder from Panchami to DudiasoleRepair of Rd with moorum boulder from Panchami to SalgeriaRepair of Rd with moorum boulder from Kudalboni to Salgeria RoadRepair of Rd with moorum boulder from Kuldiha to Dhiral Baligeria

Dhiral Baligeri

Repair of Rd with moorum boulder from Dumuria PWD to Baksa

Repair of Rd with moorum boulder from Kuldiha to BamdihaRepair of Rd with moorum boulder from Nagripada to Ramkrishnapur

Ramkrishnapur

Repair of Rd with moorum boulder from Dhumsai to Orissa borderRepair of Rd with moorum boulder from Dhumsai to JamboniRoad repair from Gaya Das House to Rabi Maity's House with box culvert

Baligeria Pry.

Repair of Rd from Bethjharia to Dudhiasole with 2 culvertConst. Approch road at Andharisole Upasastha Kendra with morrum boulder

Andharisole

Repair of Rd from Buruboni to Batighara Bhanga Mandi with culvertRepair of rd from Dhobasole to Goursai with box culvert

Page 25: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

25/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

473 01 Nayagram 8 Rural Connectivity 8/43 Baligeria Belajhor 268 - - 2.50 3.17 5.08 8.25 2099 Nov Dec

474 01 Nayagram 8 Rural Connectivity 8/44 Baligeria Kumsole Dhobasole 285 - - 1.50 2.85 5.50 8.35 1890 Nov Dec

475 01 Nayagram 8 Rural Connectivity 8/45 Baligeria 199 - - 1.50 3.47 5.11 8.57 2295 Nov Dec

476 01 Nayagram 8 Rural Connectivity 8/46 Baligeria Dhobasole 300 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

477 01 Nayagram 8 Rural Connectivity 8/47 Baligeria Banskuti 159 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

478 01 Nayagram 8 Rural Connectivity 8/48 Baligeria Kumsole 287 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

479 01 Nayagram 8 Rural Connectivity 8/49 Baligeria Kustikara Kustikara 288 - - 2.50 3.17 4.64 7.81 2099 Nov Dec

480 01 Nayagram 8 Rural Connectivity 8/50 Baligeria Banskuthi Banskuti 159 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

481 01 Nayagram 8 Rural Connectivity 8/51 Baligeria 314 - - 3.50 2.45 3.73 6.17 1620 Nov Dec

482 01 Nayagram 8 Rural Connectivity 8/52 Baligeria Jhagri 279 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

483 01 Nayagram 8 Rural Connectivity 8/53 Baligeria 199 - - 0.50 1.36 4.06 5.42 899 Nov Dec

484 01 Nayagram 8 Rural Connectivity 8/54 Repair of Rd from MSK to Pitambarpur Baligeria - - 1.50 2.04 3.24 5.28 1350 Nov Dec

485 01 Nayagram 8 Rural Connectivity 8/55 Baligeria Salgeria - - 1.50 2.45 4.15 6.59 1620

486 01 Nayagram 8 Rural Connectivity 8/56 Repair of rd from Kuifullia to Ketkenesia Baligeria Kustikara Kuifullia - - 1.50 2.45 4.15 6.59 1620

487 01 Nayagram 8 Rural Connectivity 8/57 Baligeria 199 - - 1.00 2.45 5.03 7.47 1620

488 01 Nayagram 8 Rural Connectivity 8/58 Baligeria Jhagri Jhagri 276 - - 1.50 2.85 4.18 7.03 1890 Nov Dec

489 01 Nayagram 8 Rural Connectivity 8/59 Baligeria Baramchati 267 - - 2.50 3.67 4.68 8.35 2430 Nov Dec

490 01 Nayagram 8 Rural Connectivity 8/60 Baligeria Baligeria 267 - - 2.50 3.17 4.20 7.37 2099 Nov Dec

Repair of rd from Ramkrishan Das 's House via Dakshin Belajhor's toward Asutosh Khan's House

Baligeria High

Approch road with guard wall at Andharaisole upasatha Kendra with moorum boulderRepair of rd from Patharbundh Harijan para Bakul tala to Dina bundh with culvert with morrum and boulder

Paligeria Pry

Patharbandh

Repair of Rd from Dakshin Dhobasole chawk to Amladangri Pry School with guardwall

Amladangri

Const. of Rd. from Baligeria to Collega Rd

Baligeria Pry.

Repair of Rd from Baligeria Chack post to Dhansole with morrum boulder

Baligeri High

Repair of Rd from Jharia to Kustikara with morrum and boulderRepair of Rd from Banskuthi to Garduyara with morrum and boulderRepair of Rd from Dhobagobindapur to Orissa border with morrum and boulder

Dhobagobindapur

Dhobagobindapur

Const. of approch road at Andharisole Upastha Kendra

Andharisole

Repair of Rd from Purana Post office to Patharbandh ICDS with drain

Baligeri high

Patharbandh

Pitambarpur

Pitambarpur

Repair of Rd from Dhabagobindapur to Salgeria

Dhabagobindapur

Repair of Rd from Pith road to Dina bundh via Sitala Mandir

Baligeri High

Patharbandh

Repair of Rd from from Jhagri to Mission rd with guardwallRepair of rd from ITDP Quarter to Baligeria Collage Math with culvert with morrum and boulder

Baligeria Pry.

Repair of Rd with morrum and boulder from pitch rd (Satyapani, Ramkrishna Das & ICDS) to Puratan Hut Patharbundh with morrum and boulder

Patharbandh

Page 26: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

26/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

491 01 Nayagram 8 Rural Connectivity 8/61 Baligeria Amladangri 300 - - 2.50 3.17 5.08 8.25 2099 Nov Dec

492 01 Nayagram 8 Rural Connectivity 8/62 Baligeria Amladangri 300 - - 2.85 2.45 5.91 8.35 1620 Nov Dec

493 01 Nayagram 8 Rural Connectivity 8/63 Baligeria Bhuruboni Bhuruboni 283 - - 2.55 2.45 5.03 7.47 1620 Nov Dec

494 01 Nayagram 8 Rural Connectivity 8/64 Baligeria Dhobasole Belaguri 159 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

495 01 Nayagram 8 Rural Connectivity 8/65 Baligeria Goursai Dhobasole 285 - - 2.45 3.17 4.64 7.81 2099 Nov Dec

496 01 Nayagram 8 Rural Connectivity 8/66 Baligeria Bhuruboni Bhuruboni 285 - - 2.00 3.17 5.30 8.47 2099 Nov Dec

497 01 Nayagram 8 Rural Connectivity 8/67 Baligeria Bhuruboni Bhuruboni 285 - - 3.00 2.85 5.94 8.79 1890 Nov Dec

498 01 Nayagram 8 Rural Connectivity 8/68 Baligeria Bhuruboni Bhuruboni 285 - - 2.50 3.67 5.56 9.23 2430

499 01 Nayagram 8 Rural Connectivity 8/69 Baligeria Banskuthi Banskuti - - 4.50 4.49 6.94 11.43 2970

500 01 Nayagram 8 Rural Connectivity 8/70 Baligeria Banskuthi Banskuti - - 4.50 4.49 5.63 10.11 2970

501 01 Nayagram 8 Rural Connectivity 8/71 Baligeria Bhuruboni Bhuruboni 285 - - 2.50 4.44 9.14 13.58 2943

502 01 Nayagram 8 Rural Connectivity 8/72 Baligeria Pilotchawk Pilotchawk - - 3.50 4.08 4.71 8.79 2700

503 01 Nayagram 8 Rural Connectivity 8/73 Baligeria Neguira Garduyara - - 2.50 2.85 3.74 6.59 1890

504 01 Nayagram 8 Rural Connectivity 8/74 Baligeria Jhagri Jhagri - - 2.00 3.17 4.20 7.37 2099

505 01 Nayagram 8 Rural Connectivity 8/75 Baligeria Balichuria Balichuria 48 - - 1.50 3.14 4.20 7.34 2079

506 01 Nayagram 8 Rural Connectivity 8/76 Baligeria Buruboni Buruboni 48 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

507 01 Nayagram 8 Rural Connectivity 8/77 Baligeria Rukhni Rukhni 48 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

Repair of Rd with moorum boulder from Bharuruboni to Amladangri with culvert

Amladangri

Repair of Rd with moorum boulder from Amladangri to Dolgram

Amladangri

Repair of Rd with moorum boulder from Bhuruboni to Gopalpur with cualvert

Repair of Rd with moorum boulder from Dhobasole to BelaguriRepair of Rd with moorum boulder from Goursai to DhobasaiRepair of Rd with moorum boulder from Bhuruboni to Dhobasole with culvert

Repair of Rd from Bhuruboni to Gopalpur with moorum boulder and culvert

Repair of Rd from Balichuria to Talbund with moorum boulder and culvert

Repai of Rd from Banskuti to Orissa Border with moorum boulder Repair of Rd from Banskuti to Ramchandrapur via Garkhelar with moorum and boulder Repair of Rd from Dudhiasole pitch to Dudhia sole Upar Para with moorum boulder and guardwal and 3 culvert Repair of Rd from Pailot chawk to Orissa borderConst. of New road from Garduyara Pry. School to Murali Khal with moorum boulderReair of rd from Batighora to Jhagri with moorum boulderRepair of Rd with moorum boulder from Balichuria to Batighora with culvert

Repair of Rd with moorum boulder from Bururboni to Batighora with culvert

Repair of Rd with moorum boulder from Rukhni PWD to Batighora with culvert

Page 27: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

27/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

508 01 Nayagram 8 Rural Connectivity 8/78 Baligeria Jharia Palasia - - 3.50 2.85 5.94 8.79 1890 Nov Dec

509 01 Nayagram 8 Rural Connectivity 8/79 Baligeria Chandua Chandua 280 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

510 01 Nayagram 8 Rural Connectivity 8/80 Baligeria 310 - - 1.50 3.14 5.52 8.66 2079 Nov Dec

511 01 Nayagram 8 Rural Connectivity 8/81 Baligeria Salboni Salboni 176 - - 2.50 2.45 4.59 7.03 1620 Nov Dec

512 01 Nayagram 8 Rural Connectivity 8/82 Baligeria Bhaluktara Bhaluktara 149 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

513 01 Nayagram 8 Rural Connectivity 8/83 Baligeria Khemasole Khemasole 287 - - 2.50 2.45 4.59 7.03 1620 Nov Dec

514 01 Nayagram 8 Rural Connectivity 8/84 Baligeria Benachui Benachui 271 - - 3.50 3.62 5.56 9.18 2398 Nov Dec

515 01 Nayagram 8 Rural Connectivity 8/85 38 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

516 01 Nayagram 8 Rural Connectivity 8/86 Bardanga Biriberia 33 - - 2.50 3.17 3.78 6.95 2099 Nov Dec

517 01 Nayagram 8 Rural Connectivity 8/87 40 - - 2.50 2.26 3.71 5.97 1499 Nov Dec

518 01 Nayagram 8 Rural Connectivity 8/88 78 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

519 01 Nayagram 8 Rural Connectivity 8/89 Kadamdiha 77 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

520 01 Nayagram 8 Rural Connectivity 8/90 78 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

521 01 Nayagram 8 Rural Connectivity 8/91 Thuria Thuria 59 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

522 01 Nayagram 8 Rural Connectivity 8/92 Bardanga Nuyasai 38 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

523 01 Nayagram 8 Rural Connectivity 8/93 Deulbar Deulbar 8 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

524 01 Nayagram 8 Rural Connectivity 8/94 78 - - 3.00 2.85 5.06 7.91 1890 Nov Dec

525 01 Nayagram 8 Rural Connectivity 8/95 79 - - 1.50 3.14 5.96 9.10 2079 Nov Dec

526 01 Nayagram 8 Rural Connectivity 8/96 Kadamdiha Kadamdiha 77 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

527 01 Nayagram 8 Rural Connectivity 8/97 Nuyasai Kusumtala - - 2.00 3.17 4.22 7.39 2099 Nov Dec

528 01 Nayagram 8 Rural Connectivity 8/98 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

Repair of Rd with moorum boulder from Palasia to JhagriRepair of Rd with moorum boulder from Chandua to Patash bagun with culvert

Repair of Rd with moorum boulder from PWD to Pitambarpur with culvert

Pitambarpur

Pitambarpur

Repair of Rd with moorum boulder from Salboni to Purba Kuifulia SSKRepair of Rd with moorum boulder from Bhaluktara to Jharna with culvertRepair of Rd with moorum boulder from Khemasole Nimtola to SSK with culvert

Repair of Rd with moorum boulder from Benachui to Majhibar with culvert

Repair of Rd from PMGSY to Bachhurkhoard Kusumtola

Barakhankri

Bachhurkhoard

Bachhurkhoard

Repair of Rd from Bereberia to Pathardahara

Barakhankri

Repair of Rd from Murakati chawk to Barakhankri

Barakhankri

Rukhnimara

Rukhnimara

Repair of Rd from Barakhankri to Pachkahania Forest Office

Barakhankri

Barakhankri

Barakhankri

Repair of Rd from Kadamdiha to Bagdoba PMGSY

Barakhankri

Barakhankri

Repair of Rd from Chaltabera PMGSY to Kadamdiha

Barakhankri

Barakhankri

Barakhankri

Repair of rd from Thuria to Baisbetia with 3 culvert

Barakhankri

Repair of rd from Nuyasia pitch to Khandarpara

Barakhankri

Repair of rd from Deulbar to Khandarpara with guardwall

Barakhankri

Repair of rd from Panchkahania to Benasuli

Barakhankri

Barakhankri

Barakhankri

Repair of rd from Chhokhankri to Chaltabera 3 culvert

Barakhankri

Chhotokhankri

Chhotokhanri

Repair of rd Kadamdiha to Chaltabera with guardwall

Barakhankri

Repair of rd with moorum boulder from Nuyasai PMGSY to Kusumtala

Barakhankri

Repair of rd with moorum boulder from Kusumtata to Khandarpara

Barakhankri

Khandarpara

Khandarpara

Page 28: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

28/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

529 01 Nayagram 8 Rural Connectivity 8/99 Deulbar 8 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

530 01 Nayagram 8 Rural Connectivity 8/100 Deulbar Deulbar 8 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

531 01 Nayagram 8 Rural Connectivity 8/101 Deulbar Gardhara - - 1.50 3.14 4.20 7.34 2079 Nov Dec

532 01 Nayagram 8 Rural Connectivity 8/102 Deulbar Deulbar 8 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

533 01 Nayagram 8 Rural Connectivity 8/103 Tiyakati Tiyakati 10 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

534 01 Nayagram 8 Rural Connectivity 8/104 Biriberia Biriberia 33 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

535 01 Nayagram 8 Rural Connectivity 8/105 Biriberia Biriberia 33 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

536 01 Nayagram 8 Rural Connectivity 8/106 Topaban Topabon 48 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

537 01 Nayagram 8 Rural Connectivity 8/107 Keyajaharia Kati 64 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

538 01 Nayagram 8 Rural Connectivity 8/108 Kuthisai - - 1.85 2.85 4.18 7.03 1890 Nov Dec

539 01 Nayagram 8 Rural Connectivity 8/109 Dhirughutu Dhirughutu - - 2.55 2.45 5.03 7.47 1620 Nov Dec

540 01 Nayagram 8 Rural Connectivity 8/110 Nuyasai Nuyasai 38 - - 2.55 2.45 5.03 7.47 1620 Nov Dec

541 01 Nayagram 8 Rural Connectivity 8/111 38 - - 2.15 3.17 4.20 7.37 2099 Nov Dec

542 01 Nayagram 8 Rural Connectivity 8/112 101 - - 1.75 2.65 4.16 6.81 1755 Nov Dec

543 01 Nayagram 8 Rural Connectivity 8/113 Bardanga Bardanga 38 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

544 01 Nayagram 8 Rural Connectivity 8/114 Dhurughutu Dhirughutu - - 1.50 3.14 4.20 7.34 2079 Nov Dec

545 01 Nayagram 8 Rural Connectivity 8/115 Murkati Murakati 56 - - 2.50 3.17 5.98 9.15 2099 Nov Dec

546 01 Nayagram 8 Rural Connectivity 8/116 Dhirughutu Dhirughutu - - 2.00 3.17 4.22 7.39 2099 Nov Dec

547 01 Nayagram 8 Rural Connectivity 8/117 Bhulasini Bhulasini - - 1.85 2.85 4.18 7.03 1890 Nov Dec

548 01 Nayagram 8 Rural Connectivity 8/118 38 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

549 01 Nayagram 8 Rural Connectivity 8/119 38 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

Repair of rd with moorum boulder from Khandarpara to Deulbar

Barakhankri

Khandarpara

Repair of rd with moorum boulder from Rameswar to Deulbar

Barakhankri

Repair of rd with moorum boulder from Deulbar to Gardhara

Barakhankri

Repair of rd with moorum boulder of Deulbar gramin rd

Barakhankri

Repair of rd with moorum boulder of Tiyakati Gramin Rd

Barakhankri

Repair of rd with moorum boulder at Biriberia Gramin Rd

Barakhankri

Repair of rd with moorum boulder from PMGSY to Biriberia

Barakhankri

Repair of rd with moorum boulder from Biriberia to Topaban

Barakhankri

Repair of rd with moorum boulder from Keyajharia Danga sai to Kaju bagun

Barakhankri

Repair of rd with moorum boulder from Bachhurkhoard to Kuthisai

Barakhankri

Bachhurkhoard

Repair of rd with moorum boulder from Kajubagan to Dhirughutu

Barakhankri

Repair of rd with moorum boulder from Nuyasai PMGSY to Kajubagan

Barakhankri

Repair of rd with moorum boulder from Purba Bachhurkhoard to Kajubagan

Barakhankri

Bachhurkhoard

Bachhurkhoard

Repair of rd with moorum boulder from Ramchandrapur PMGSY to Dahar with culver / chatal

Barakhankri

Ramhandrapur

Ramchandrapur

Repair of rd with moorum boulder from PMGSY to Bardanga Nadighat

Barakhankri

Repair of rd with moorum boulder from PMGSY to Dhirughutu

Barakhankri

Repair of rd with moorum boulder from Dhirughuru to Murakati Chalk

Barakhankri

Repair of rd with moorum boulder from Bhaliaghati to Dhirughutu

Barakhankri

Repair of rd with moorum boulder from Raban Para PMGSY to Bhulasini

Barakhankri

Repair of rdwith moorum boulder from Bachhurkhoard to Kiyajharia

Barakhankri

Bachhurkhoard

Bachhurkhoard

Repair of rd with moorum boulder from Kiyjharia to football ground

Barakhankri

Bachhurkhoard

Bachhurkhoard

Page 29: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

29/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

550 01 Nayagram 8 Rural Connectivity 8/120 38 - - 1.55 2.45 3.71 6.15 1620 Nov Dec

551 01 Nayagram 8 Rural Connectivity 8/121 Baranegui Barsole Jamboni 104 - - 3.00 2.85 4.62 7.47 1890 Nov Dec

552 01 Nayagram 8 Rural Connectivity 8/122 Baranegui Barsole Parasia 106 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

553 01 Nayagram 8 Rural Connectivity 8/123 Baranegui Morchi Amlakora 84 - - 2.50 3.17 4.64 7.81 2099 Nov Dec

554 01 Nayagram 8 Rural Connectivity 8/124 Baranegui Morchi Amlakora 84 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

555 01 Nayagram 8 Rural Connectivity 8/125 Baranegui Bonisole 89 - - 2.50 3.17 4.64 7.81 2099 Nov Dec

556 01 Nayagram 8 Rural Connectivity 8/126 Repair of Rd from PMGSY to Astia Baranegui Bonisole Astia 88 - - 3.00 2.85 4.62 7.47 1890 Nov Dec

557 01 Nayagram 8 Rural Connectivity 8/127 Baranegui Rangamatia 92 - - 2.50 3.17 4.64 7.81 2099 Nov Dec

558 01 Nayagram 8 Rural Connectivity 8/128 Baranegui Bankuti Hatitop 100 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

559 01 Nayagram 8 Rural Connectivity 8/129 Baranegui Banisole Bonisole 89 - - 2.50 3.17 4.64 7.81 2099 Nov Dec

560 01 Nayagram 8 Rural Connectivity 8/130 Baranegui Barsole 178 - - 3.00 2.85 4.62 7.47 1890 Nov Dec

561 01 Nayagram 8 Rural Connectivity 8/131 Baranegui Jamboni Jamboni 104 - - 2.45 3.17 4.64 7.81 2099 Nov Dec

562 01 Nayagram 8 Rural Connectivity 8/132 Baranegui Morchi Tentulia 90 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

563 01 Nayagram 8 Rural Connectivity 8/133 Berajal Joykhunta Harimaity 304 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

564 01 Nayagram 8 Rural Connectivity 8/134 Berajal Dolgram Dolgram 301 - - 2.50 2.26 4.57 6.84 1499 Nov Dec

565 01 Nayagram 8 Rural Connectivity 8/135 Berajal Jharia Jharia 261 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

566 01 Nayagram 8 Rural Connectivity 8/136 Berajal Jugisole Jugisole 260 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

567 01 Nayagram 8 Rural Connectivity 8/137 Repair of Rd from Salboni to Asurhata Berajal Salboni Asurhata 292 - - 2.50 2.26 4.57 6.84 1499 Nov Dec

568 01 Nayagram 8 Rural Connectivity 8/138 Berajal Gobindapur Jharaboni 293 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

569 01 Nayagram 8 Rural Connectivity 8/139 Repair of Rd from Jharaboni to Asurhata Berajal Asurhata Asurhata 296 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

570 01 Nayagram 8 Rural Connectivity 8/140 Berajal Asurhata Asurhata 296 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

571 01 Nayagram 8 Rural Connectivity 8/141 Berajal Harimaity 307 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

Repair of rd with moorum boulder from Kiyjharia football ground to Kutisai

Barakhankri

Bachhurkhoard

Bachhurkhoard

Repair of Rd from Barsole to Jamboni with morrum boulderRepair of Rd from Baradhansola to Pasia with moorum boulderRepair of Rd from Amlakora to Morchi with morrum boulderRepair of Rd from Baranegui Pitch road to AmlakoraRepair of Rd from Bonisole chawk to MSK

Chototalpada

Repair of Rd from Rangamatia Pry. School to Tentulmuri

Tentulmuria

Repair of Rd with moorum boulder from Hatitop chawk to BanskutiRepair of Rd with moorum boulder from Banisole pitch to Orissa borderRepair of Rd with moorum boulder from Barsole chawk to Panchkahania

Panchakahania

Repair of Rd with moorum boulder from Barsole chawk to Jamboni via village

Repair of Rd with moorum boulder from Morchi chawk to Tentulia khalRepair of Rd from Ulda to Harimaity with 2 box culvertRepair of Rd from Dolgram SKUS to Orissa borderRepair of Rd from Jharia chalk to KenduboniRepair of Rd from Jugisole High School to Kustikara chawk

Repair of Rd from Kustikara to Jharaboni

Repair of Rd from Asurhata to Orissa BorderRepair of Rd from Murgapahari to Orissa Border

Murgapahari

Page 30: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

30/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

572 01 Nayagram 8 Rural Connectivity 8/142 Berajal Asurhata Asurhata 296 150 - - 3.50 2.04 4.99 7.03 1350 Nov Dec

573 01 Nayagram 8 Rural Connectivity 8/143 Asurhata Gramin Rd Repair Berajal Asurhata Asurhata 296 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

574 01 Nayagram 8 Rural Connectivity 8/144 Berajal Asurhata Rukhni 297 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

575 01 Nayagram 8 Rural Connectivity 8/145 Berajal Gobindapur 291 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

576 01 Nayagram 8 Rural Connectivity 8/146 Berajal Gobindapur Jharaboni 293 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

577 01 Nayagram 8 Rural Connectivity 8/147 Const. earthen road at Jugisole mouza Berajal Jugisole Jugisole 260 137 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

578 01 Nayagram 8 Rural Connectivity 8/148 Repair of Jugisole Gramin Road Berajal Jugisole Jugisole 260 - - 2.55 2.45 5.03 7.47 1620 Nov Dec

579 01 Nayagram 8 Rural Connectivity 8/149 Berajal Berajal Gamaria 291 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

580 01 Nayagram 8 Rural Connectivity 8/150 Berajal Jharaboni Gamaria 291 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

581 01 Nayagram 8 Rural Connectivity 8/151 Repair of Gobindapur Gramin Rd Berajal Gobindapur 291 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

582 01 Nayagram 8 Rural Connectivity 8/152 Repair of Sathatia Gramin Rd Berajal Sathatia Sathatia 296 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

583 01 Nayagram 8 Rural Connectivity 8/153 Repair of Asurhata Gramin Rd Berajal Asurhata Asurhata 296 - - 1.50 2.85 4.18 7.03 1890 Nov Dec

584 01 Nayagram 8 Rural Connectivity 8/154 Repair of Salpathra Gramin Rd Berajal Salpathra Salpathra - - 1.50 2.45 5.03 7.47 1620 Nov Dec

585 01 Nayagram 8 Rural Connectivity 8/155 Repair of Radhapara Gramin Rd Berajal Radahapara Radhapara 303 - - 1.55 2.45 3.71 6.15 1620 Nov Dec

586 01 Nayagram 8 Rural Connectivity 8/156 Repair of Nekrasole Gramin Rd Berajal Nekrasole Nekrasole 295 - - 2.50 2.26 3.69 5.96 1499 Nov Dec

587 01 Nayagram 8 Rural Connectivity 8/157 Berajal Dolgram Dolgram 301 - - 1.25 2.45 3.27 5.71 1620 Nov Dec

588 01 Nayagram 8 Rural Connectivity 8/158 Repair of Dolgram Gramin Rd Berajal Dolgram Dolgram 301 - - 2.50 2.45 3.71 6.15 1620 Nov Dec

589 01 Nayagram 8 Rural Connectivity 8/159 Berajal Dolgram Dolgram 301 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

590 01 Nayagram 8 Rural Connectivity 8/160 Repair of Joykhunta Gramin Rd Berajal Joykhunta Joykhunta 306 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

591 01 Nayagram 8 Rural Connectivity 8/161 Berajal Joykhunta 307 - - 3.00 2.85 3.74 6.59 1890 Nov Dec

592 01 Nayagram 8 Rural Connectivity 8/162 Chandabila Gakurpal Gakhurpal 50 - - 4.00 4.49 5.63 10.11 2970 Nov Dec

593 01 Nayagram 8 Rural Connectivity 8/163 Chandabila Kashia Kashia 20 - - 3.50 2.85 4.62 7.47 1890 Nov Dec

Repair of Rd from Asurhata to Mina Khal with boulder morrum with culvert

Rokhni gramin Rd repair with boulder morrumRepair of Road from Gobindapur to Jharaboni to with culvert

Gobindapur

Repair of Rd from Jharaboni to Sathhatia with culvert

Repair of Rd with moorum boulder from Bhaluk tara to Gamaria Repair of Rd with moorum boulder from Gamaria Patharchatia to Jharaboni

Gobindapur

Repair of Rd with moorum boulder from Dolgram Chawk to Orissa border

Repair of Rd with moorum boulder from Dolgram High School to Charak Math

Repair of Rd with moorum boulder from Dhansola chawk to Murgapahari

Murgapahari

Repair of Rd from Negui Hut to Orissa border with one culvertRepair of Rd from with one cause way from Kashia to Orissa border

Page 31: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

31/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

594 01 Nayagram 8 Rural Connectivity 8/164 Chandabila Kadamtala - - 1.55 2.45 3.71 6.15 1620 Nov Dec

595 01 Nayagram 8 Rural Connectivity 8/165 Repair of Murakati Gramin Rd Chandabila Murakati 56 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

596 01 Nayagram 8 Rural Connectivity 8/166 Chandabila Atheldiha 43 - - 2.50 2.26 4.13 6.40 1499 Nov Dec

597 01 Nayagram 8 Rural Connectivity 8/167 Chandabila Topabon 26 - - 2.50 2.26 4.13 6.40 1499 Nov Dec

598 01 Nayagram 8 Rural Connectivity 8/168 Chandabila 25 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

599 01 Nayagram 8 Rural Connectivity 8/169 Chandabila 25 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

600 01 Nayagram 8 Rural Connectivity 8/170 Chandabila Kashia Kashia 20 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

601 01 Nayagram 8 Rural Connectivity 8/171 Chandabila Kashia Kashia 20 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

602 01 Nayagram 8 Rural Connectivity 8/172 Chandabila Kashia Kashia 20 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

603 01 Nayagram 8 Rural Connectivity 8/173 Chandabila Kashia Kadokatha 19 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

604 01 Nayagram 8 Rural Connectivity 8/174 Chandabila Kashia Kadokatha 19 - - 2.50 2.26 4.13 6.40 1499 Nov Dec

605 01 Nayagram 8 Rural Connectivity 8/175 Chandabila Telia Telia 28 - - 3.00 2.85 5.50 8.35 1890 Nov Dec

606 01 Nayagram 8 Rural Connectivity 8/176 Chandabila Telia Telia 28 - - 3.50 2.85 5.94 8.79 1890 Nov Dec

607 01 Nayagram 8 Rural Connectivity 8/177 Chandabila Telia Garurghata 45 - - 3.00 2.85 5.50 8.35 1890 Nov Dec

608 01 Nayagram 8 Rural Connectivity 8/178 Chandabila Telia 33 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

609 01 Nayagram 8 Rural Connectivity 8/179 Chandabila Telia Dulki 25 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

610 01 Nayagram 8 Rural Connectivity 8/180 Chandabila Telia Garurghata 45 - - 2.50 2.26 4.13 6.40 1499 Nov Dec

611 01 Nayagram 8 Rural Connectivity 8/181 Chandabila Sananegui Bailasole 49 - - 3.00 2.85 3.30 6.15 1890 Nov Dec

612 01 Nayagram 8 Rural Connectivity 8/182 Chandabila Sananegui Narda 42 - - 2.50 2.26 4.13 6.40 1499 Nov Dec

613 01 Nayagram 8 Rural Connectivity 8/183 Chandabila Gakhurpal Narda 42 - - 3.00 2.85 3.30 6.15 1890 Nov Dec

Repair of Rd from Kadamtala to Bhangabundh with hume pipe

PathardaharaPathardahara

Repair of Atheldiha Gramin Rd with culvert

Pathardahara

Repair of Rd from Topoban Darkhuli to Topoban Balmiki Mandir

Pathardahara

Repair of Rd from Pathardahara Pry. School to Mandi para with moorum boulder and humu pipe

Pathardahara

Pathardahara

Repair of rd from Chandabila to Pathardahara Pry. With moorum boulder and culvert

Pathardahara

Pathardahara

Repair of Rd from Kashia to Orissa border with moorum and culvertRepair of Rd from Kashia bus stand to Rukhni with moorum and culvertRepair of Rd from Kashia pitch rd to Katash with moorum boulder and culvert

Repair of rd from Kadokatha pitch to Chamarbumndh with moorum and culvertRepair of rd from Kadakatha to Katash with moorum and culvertRepair of Rd from Chandabila to Telia Pry. School with moorum and culvertRepair of Rd from Telia Pry. School to Orissa Border with moorum and culvert

Const. of Rd from Telia to Garurughata sadarghat with moorum and culvert

Const. of road from Talakuldiha to Gulfa with moorum

Talakuldiha

Repair of rd from Dulki to Orissa Border with moorum and culvertRepair of rd from Garurughata to Dukli with moorum and culvertRepair of rd from Sananegui to Bailasole with moorumRepair of rd from Sananegui to Narda (Bankata) with moorum and boulder Repair of rd from Narda to Topoban with moorum and boulder

Page 32: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

32/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

614 01 Nayagram 8 Rural Connectivity 8/184 Chandabila Pukuria Pukuria 46 - - 2.50 2.26 4.13 6.40 1499 Nov Dec

615 01 Nayagram 8 Rural Connectivity 8/185 Chandabila Pukuria Pukuria 46 - - 2.50 2.26 4.13 6.40 1499 Nov Dec

616 01 Nayagram 8 Rural Connectivity 8/186 Chandabila Pukuria Bankinala 47 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

617 01 Nayagram 8 Rural Connectivity 8/187 Const. of rd from Dadrasole to Aagar Chandabila Pukuria Pukuria 46 - - 1.50 3.14 5.08 8.22 2079 Nov Dec

618 01 Nayagram 8 Rural Connectivity 8/188 Chandabila Pukuria 46 - - 2.50 2.26 4.13 6.40 1499 Nov Dec

619 01 Nayagram 8 Rural Connectivity 8/189 Chandabila Pukuria 46 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

620 01 Nayagram 8 Rural Connectivity 8/190 Chandabila Raisole Raisole 52 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

621 01 Nayagram 8 Rural Connectivity 8/191 Satpoutia Satoputia 190 - - 3.00 2.85 3.16 6.01 1890 Nov Dec

622 01 Nayagram 8 Rural Connectivity 8/192 Chilkipada Kuilisuta 185 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

623 01 Nayagram 8 Rural Connectivity 8/193 Kuldiha Kuldiha 188 - - 2.50 3.29 4.21 7.50 2178 Nov Dec

624 01 Nayagram 8 Rural Connectivity 8/194 Paika Chilkipada - - 3.00 2.85 5.06 7.91 1890 Nov Dec

625 01 Nayagram 8 Rural Connectivity 8/195 Paika Chilkipada - - 2.00 3.17 3.32 6.49 2099 Nov Dec

626 01 Nayagram 8 Rural Connectivity 8/196 187 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

627 01 Nayagram 8 Rural Connectivity 8/197 Satpoutia Lohaberia 189 - - 2.50 2.41 4.14 6.56 1597 Nov Dec

628 01 Nayagram 8 Rural Connectivity 8/198 Bamanda 169 - - 3.00 2.85 3.63 6.48 1890 Nov Dec

629 01 Nayagram 8 Rural Connectivity 8/199 182 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

630 01 Nayagram 8 Rural Connectivity 8/200 Repair of Rd from Bamunda to Naradi Bamunda Bamanda 169 - - 2.50 2.41 4.14 6.56 1597 Nov Dec

631 01 Nayagram 8 Rural Connectivity 8/201 Telia Telia 169 - - 2.00 3.17 5.96 9.13 2099 Nov Dec

632 01 Nayagram 8 Rural Connectivity 8/202 Bhola Bhola - - 3.00 2.85 6.38 9.23 1890

633 01 Nayagram 8 Rural Connectivity 8/203 Patharasole Patharasole 164 - - 3.00 2.85 3.51 6.36 1890

634 01 Nayagram 8 Rural Connectivity 8/204 Satpoutia Satoputia 190 - - 2.50 3.29 3.66 6.95 2178 Nov Dec

Repair of rd from Sadarghat to Orissa BorderConst. of Road from Pukuria chawk to Mahulboni Repair of rd from Pukuria chawk to Upar Bankinala

Const of Rd from Mahulboni canal to Nichu bankinala

Nichubankinala

Repair of rd from Upar bankinala to Nichu Bankinala

Nichubankinala

Repair of rd from Orissa border to Sudhanshu babu's house Repair of Rd from Satpoutia to Batighora with Jhagri rd

Chandrarekha

Repair of Rd from Chilkipada to Kuilisuta Pry. School with moorum and boulder

Chandrarekha

Const. of Rd from Kuldiha to Tulsiboni Upasastha Kendra

Chandrarekha

Repair of Rd from Chilkipada MSK to Orissa Border

Chandrarekha

Repair of rd from Chilkipada to Nagripada

Chandrarekha

Const. of Approch road at Chandrarekha Jr. High School

Chandrarekha

Chandrarekha

Chandrarekha

Repair of Rd from Lohaberia to Raipal with moorum and boulder

Chandrarekha

Repair of Rd from Biswanathpur to Bamanda with moorum and boulder

Chandrarekha

Biswanathpur

Repair of Rd from Biswanathpur to Kesharrekha Helth Centre with moorum and boulder

Chandrarekha

Biswanathpur

Kesharrekha

Chandrarekha

Repair of Rd from Telia to Bhola towards gramin Rd cannel par with moorum boulder culvert

Chandrarekha

Repair of Rd from Bhola pitch to Chandrarekha with moorum boulder

Chandrarekha

Repair of Rd from Gangana to Pathrasole with moorum Boulder

Chandrarekha

Repair of Rd from Satpoutia to Amdiha with moorum boulder

Chandrarekha

Page 33: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

33/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

635 01 Nayagram 8 Rural Connectivity 8/205 Repair of Rd from Bhola to Garduara Garduara Bhola - - 1.50 2.04 2.80 4.84 1350 Nov Dec

636 01 Nayagram 8 Rural Connectivity 8/206 Pathrasole - - 2.00 3.17 2.45 5.61 2099 Nov Dec

637 01 Nayagram 8 Rural Connectivity 8/207 Bhola Bhola 162 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

638 01 Nayagram 8 Rural Connectivity 8/208 Lohaberia 189 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

639 01 Nayagram 8 Rural Connectivity 8/209 Palasia 182 - - 2.50 3.29 3.66 6.95 2178 Nov Dec

640 01 Nayagram 8 Rural Connectivity 8/210 182 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

641 01 Nayagram 8 Rural Connectivity 8/211 182 - - 1.50 1.81 7.19 9.00 1199 Nov Dec

642 01 Nayagram 8 Rural Connectivity 8/212 Repair o f Satpoutia Gramin road Satpoutia Satoputia 190 - - 1.25 2.04 3.24 5.28 1350 Nov Dec

643 01 Nayagram 8 Rural Connectivity 8/213 Repair of Hatitop Gramin road Mohanpur Hatitop 168 - - 2.50 3.29 3.66 6.95 2178 Nov Dec

644 01 Nayagram 8 Rural Connectivity 8/214 Madhupura 165 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

645 01 Nayagram 8 Rural Connectivity 8/215 182 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

646 01 Nayagram 8 Rural Connectivity 8/216 Kuilisuta Kuilisuta 185 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

647 01 Nayagram 8 Rural Connectivity 8/217 Repair of Biswanathpur Gramin Road 183 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

648 01 Nayagram 8 Rural Connectivity 8/218 Satpoutia Satpoutia - - 1.50 2.85 5.06 7.91 1890 Nov Dec

649 01 Nayagram 8 Rural Connectivity 8/219 Jamirapal Banspat Banspat 219 - - 2.00 3.17 5.04 8.21 2099

650 01 Nayagram 8 Rural Connectivity 8/220 Jamirapal Bhuasai Dojala 252 - - 1.50 2.45 4.15 6.59 1620 Nov Dec

651 01 Nayagram 8 Rural Connectivity 8/221 Repair of Karasai Gramin Rd Jamirapal Bhuasai Karasai 253 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

652 01 Nayagram 8 Rural Connectivity 8/222 Repair of Muraboni Gramin Rd Jamirapal Muraboni Muraboni 251 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

653 01 Nayagram 8 Rural Connectivity 8/223 Repair of Rd from Salboni to PIREP Jamirapal Salboni Salboni 256 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

654 01 Nayagram 8 Rural Connectivity 8/224 Repair of Banspat Gramin Rd Jamirapal Banspat Banspat 219 - - 1.50 2.85 4.18 7.03 1890 Nov Dec

655 01 Nayagram 8 Rural Connectivity 8/225 Jamirapal Jamirapal 217 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

656 01 Nayagram 8 Rural Connectivity 8/226 Jamirapal Banspat Banspat 219 - - 3.00 2.85 4.94 7.79 1890 Nov Dec

Chandrarekha

Repair of rd Chandrareka MSK to Patharasole

Chandrarekha

Chandrarekha

Repair of Rd with culvert from Telia to Bhola

Chandrarekha

Repair of Rd from Lohaberai to Patharsole with moorum and boulder

Chandrarekha

Biswanathpur

Repair of Rd from Palasia to Kesharrekha with moorum and boulder

Chandrarekha

Kesharrekha

Approch road with Guard wall at Kesharrekha Upasatha Kendra

Chandrarekha

Kesharrekha

Kesharrekha

Repair of wooden bridge over Muralikhal at Kesharrekha

Chandrarekha

Kesharrekha

Kesharrekha

ChandrarekhaChandrarekha

Repair of Rd with moorum boulder from kesharrekha to Madhupura

Chandrarekha

Biswanathpur

Repair of Rd with moorum boulder from Kesharrekha to Banskuti

Chandrarekha

Biswanathpur

Kesharrekha

Repair of Rd with moorum boulder from Kuilisuta to Orissa border

ChandrarekhaChandrarekha

Biswanathpur

Biswanathpur

Const. of Road from Satpoutia to Bamun Pukur with Guardwall

Chandrarekha

Repair of Rd from Banspath to Tufuria with morrum boulder with one culvertRepair of Rd from Dujola to Bhuasai PIREP

Repair of Rd from Kusumkuria to Jadukata bhunia Jangal

Kusumkuria

Repair of Rd from Banspat to Bhunia Jangal via Sirish boni

Page 34: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

34/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

657 01 Nayagram 8 Rural Connectivity 8/227 Jamirapal Jamirapal Pachageria 246 - - 3.00 2.85 4.94 7.79 1890 Nov Dec

658 01 Nayagram 8 Rural Connectivity 8/228 Jamirapal Fuldaha Fuldaha 225 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

659 01 Nayagram 8 Rural Connectivity 8/229 Jamirapal Fuldaha Fuldaha 225 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

660 01 Nayagram 8 Rural Connectivity 8/230 Jamirapal Jamirapal Jamirapal 235 - - 2.50 2.84 4.45 7.29 1881 Nov Dec

661 01 Nayagram 8 Rural Connectivity 8/231 Jamirapal Jamirapal Pachageria 246 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

662 01 Nayagram 8 Rural Connectivity 8/232 Jamirapal 215 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

663 01 Nayagram 8 Rural Connectivity 8/233 Jamirapal Darikapally 215 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

664 01 Nayagram 8 Rural Connectivity 8/234 Jamirapal Fuldaha Fuldaha 225 - - 1.50 3.14 5.04 8.18 2079 Nov Dec

665 01 Nayagram 8 Rural Connectivity 8/235 Jamirapal Fuldaha Jamirapal 235 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

666 01 Nayagram 8 Rural Connectivity 8/236 Jamirapal Sirishboni Sirisboni 209 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

667 01 Nayagram 8 Rural Connectivity 8/237 Jamirapal Jadukata - - 2.00 3.17 4.22 7.39 2099 Nov Dec

668 01 Nayagram 8 Rural Connectivity 8/238 Jamirapal Bhuasai Dojala 252 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

669 01 Nayagram 8 Rural Connectivity 8/239 Jamirapal Tufuria Banspat 219 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

670 01 Nayagram 8 Rural Connectivity 8/240 Jamirapal Fuldaha Tikrapara 215 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

671 01 Nayagram 8 Rural Connectivity 8/241 Jamirapal Chunkhulia 219 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

672 01 Nayagram 8 Rural Connectivity 8/242 Jamirapal Pachageria 246 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

673 01 Nayagram 8 Rural Connectivity 8/243 Jamirapal Pachageria Pachageria 246 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

674 01 Nayagram 8 Rural Connectivity 8/244 Jamirapal Kumarpur Kurmarpur 222 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

675 01 Nayagram 8 Rural Connectivity 8/245 Repair of Birkada village road Jamirapal Birkada Birkada 223 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

676 01 Nayagram 8 Rural Connectivity 8/246 Jamirapal Bagmacha Bagmacha 224 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

Repair of Rd from Kusumkuria to PachageriaRepair of Rd from Fuldaha to Tikrapara more via BhutiasaiRepair of rd from Fuldaha to Aharpukur with box culvertRepair of Rd from Jamirapal to Fuldaha NadighatRepair of Rd from Pachageria chack to Bhangabundh khalRepair of rd with moorum boulder from Kusumkuria to Darikapally

Kusumkuria

Darikapally

Repair of rd with moorum boulder from Jamirapal to Darikapally

Darikapally

Repair of rd with moorum boulder from Fuldaha to Aaharpukur with box culvert

Repair of rd with moorum boulder from Fuldaha Nadighat to JamirapalRepair of rd with moorum boulder from Jadukata to Sirishboni with 2 culvertRepair of rd with moorum boulder from Kusumkuria to Jadukata Bhunia Jangal

Kusumkuria

Repair of rd with moorum boulder from Dojala to Bhuasai PIREPRepair of rd with moorum boulder from Banspat to Tufuria with one culvertRepair of rd with moorum boulder from Fuldha to Tikrapara via Bhutia saiRepair of rd with moorum boulder from Kusumkuria to Chunkhulia with box culvert

Kusumkuria

Repair of rd with moorum boulder from Kusumkuria to Pachhageria

Kusumkuria

Repair of rd with moorum boulder from Pachageria to Orissa border with 2 box culvertRepair of rd with moorum boulder from Kumarpur to PIREP road

Repair of rd with moorum boulder from Bagmacha Gorachand house to birkada

Page 35: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

35/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

677 01 Nayagram 8 Rural Connectivity 8/247 Jamirapal Jamirapal Jamirapal 235 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

678 01 Nayagram 8 Rural Connectivity 8/248 Jamirapal Tikrapara Tikrapara 215 - - 3.50 2.85 4.18 7.03 1890 Nov Dec

679 01 Nayagram 8 Rural Connectivity 8/249 107 - - 4.00 4.49 5.63 10.11 2970 Nov Dec

680 01 Nayagram 8 Rural Connectivity 8/250 Dokra Dokra 198 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

681 01 Nayagram 8 Rural Connectivity 8/251 Dokra Dokra 198 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

682 01 Nayagram 8 Rural Connectivity 8/252 Ghoratorie Ghoratoria 112 - - 3.00 2.85 3.31 6.17 1890 Nov Dec

683 01 Nayagram 8 Rural Connectivity 8/253 Ambisole Ambisole 115 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

684 01 Nayagram 8 Rural Connectivity 8/254 Repair of Rd from Rangiam Village rd Rangiam Rangiam 108 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

685 01 Nayagram 8 Rural Connectivity 8/255 Saripura 154 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

686 01 Nayagram 8 Rural Connectivity 8/256 Ghagrisole 78 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

687 01 Nayagram 8 Rural Connectivity 8/257 Baratalpada 197 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

688 01 Nayagram 8 Rural Connectivity 8/258 Saripura 197 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

689 01 Nayagram 8 Rural Connectivity 8/259 Dokra Dokra 198 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

690 01 Nayagram 8 Rural Connectivity 8/260 148 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

691 01 Nayagram 8 Rural Connectivity 8/261 Kadakotha Chakusai 7 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

692 01 Nayagram 8 Rural Connectivity 8/262 148 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

693 01 Nayagram 8 Rural Connectivity 8/263 148 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

Repair of rd with moorum boulder from Aahar chatal to Cause way roadRepair of rd with moorum boulder from Tikrapara dhananjoy house to Sonamui bridgeRepair of Rd from Balibundh to Panchkahania

Kharikamathani

Panchkahania

Panchakahani

Repair of Rd from Dokra bakul tala Chawk to Balibundh with culvert

Kharikamathani

Repair of Rd from Siladitya Mazi house to Pry. School with wate drainage at Dokra

Kharikamathani

Repair of Rd from Ghoratoria to Marapada Pitch road with morrum boulder

Kharikamathani

Repair of Rd from Pitch road to Ambisole with morrum boulder

KharikamathaniKharikamathani

Repair of Rd with moorum boulder from Chowkapathra Pitch road to Saripura PMGSY via Ghagrisole ghoratoria

Kharikamathani

Chowkapathra

Repair of Rd with moorum boulder from Ghagrisole Harimandir To Baligeria College road via barakenduboni charpada

Kharikamathani

Barakhankri

Repair of Rd with moorum boulder from Baratalpada to Kusumkuti

Kharikamathani

Baratalpada

Repair of Rd with moorum boulder from Saripura to Baratalpada via Dokra

Kharikamathani

Baratalpada

Repair of Rd with moorum boulder from Dokra Bartala Chawk to Baligeri Pitch road

Kharikamathani

Repair of Rd with moorum boulder from Pry school to Market complex

Kharikamathani

Kharikamathani

Kharikamathani

Repair of Rd with moorum boulder from Kadakotha to Monoranjan Mahata's House

Kharikamathani

Repair of Rd with moorum boulder from Ananta Mahata's TO Bhiguram Mahata's House

Kharikamathani

Kharikamathani

Kharikamathani

Repair of Rd with moorum boulder from Sitaram House to Durga Pada Das 's land

Kharikamathani

Kharikamathani

Kharikamathani

Page 36: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

36/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

694 01 Nayagram 8 Rural Connectivity 8/264 Marapada Marapada 132 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

695 01 Nayagram 8 Rural Connectivity 8/265 Marapada Siyalia 113 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

696 01 Nayagram 8 Rural Connectivity 8/266 Siyalia Siyalia 113 - - 1.50 2.85 4.18 7.03 1890 Nov Dec

697 01 Nayagram 8 Rural Connectivity 8/267 Gholdiha Gholdiha 133 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

698 01 Nayagram 8 Rural Connectivity 8/268 Marapada Marapada 132 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

699 01 Nayagram 8 Rural Connectivity 8/269 148 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

700 01 Nayagram 8 Rural Connectivity 8/270 148 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

701 01 Nayagram 8 Rural Connectivity 8/271 Ambisole Rangiam 108 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

702 01 Nayagram 8 Rural Connectivity 8/272 Rangiam 108 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

703 01 Nayagram 8 Rural Connectivity 8/273 Dokra Ghagrisole 151 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

704 01 Nayagram 8 Rural Connectivity 8/274 Repair of Rd from Babuichati to Benasuli Malam Babuichati Benasuli 120 - - 1.00 1.63 3.20 4.84 1080 Nov Dec

705 01 Nayagram 8 Rural Connectivity 8/275 Malam Malam Chiripiti 120 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

706 01 Nayagram 8 Rural Connectivity 8/276 Malam Basiasole Marapada 132 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

707 01 Nayagram 8 Rural Connectivity 8/277 Repair of Rd from Rangiam to Naldam Malam Rangiam Rangiam 108 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

708 01 Nayagram 8 Rural Connectivity 8/278 Malam Kharsola Kharsola 120 - - 1.50 2.04 4.12 6.15 1350 Nov Dec

709 01 Nayagram 8 Rural Connectivity 8/279 Malam Banspat Icchapura 60 - - 2.50 2.45 3.28 5.73 1620 Nov Dec

710 01 Nayagram 8 Rural Connectivity 8/280 Malam Harimaity Chiripiti 120 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

711 01 Nayagram 8 Rural Connectivity 8/281 Malam Harimaity Chiripiti 120 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

712 01 Nayagram 8 Rural Connectivity 8/282 Malam Harimaity Bagdoba 67 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

Repair of Rd with moorum boulder from Marapada Amtala to Ghoratoria

Kharikamathani

Repair of Rd with moorum boulder from Kuji pukur to Sialia Kajubagan via Marapada

Kharikamathani

Repair of Rd with moorum boulder from Siyalia Nam Kuthi to Ghoratoria

Kharikamathani

Repair of Rd with moorum boulder from Ghaldiha School to Kharsola

Kharikamathani

Repair of Rd with moorum boulder from Natun Pukur to Marapada pitch rd

Kharikamathani

Repair of Rd with moorum boulder from Kharikamathani Jay chanti pitch to Datan main road.

Kharikamathani

Kharikamathani

Kharikamathani

Repair of Rd with moorum boulder from Hahadi pitch to Ghoratoria Babaji pukur

Kharikamathani

Kharikamathani

Kharikamathani

Repair of Rd with moorum boulder from Rangiam dakshin to Ambisole mission with culvert

Kharikamathani

Repair of Rd with moorum boulder from Rangiam school para to Chakur dahi with culvert

Kharikamathani

Kharikamathani

Repair of Rd from Ghagrisole to Block Office

Kharikamathani

Repair of Rd from Chhotojhari PMGSY to ChiripitiRepair of Rd from Marapada PWD to Basiasole

Const. of Rd with moorum boulder and culvert from Kharsola to English Mediam SchoolRepair of Rd with morrum boulder from Banspath to IchhapuraRepair of Rd with moorum boulder and culvert from Harimary to ChiripitiRepair of Rd with moorum boulder and culvert from Basiasole to ChiripitiRepair of rd with moorum boulder from Bhaliachati Pry. School to Bagdoba

Page 37: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

37/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

713 01 Nayagram 8 Rural Connectivity 8/283 Malam Malam Malam 125 - - 3.50 2.85 4.62 7.47 1890 Nov Dec

714 01 Nayagram 8 Rural Connectivity 8/284 Malam Koptibhole Chiripiti 120 - - 2.50 2.45 4.42 6.87 1620 Nov Dec

715 01 Nayagram 8 Rural Connectivity 8/285 Malam Koptibhole Koptibhoe 130 - - 2.50 2.45 4.16 6.61 1620 Nov Dec

716 01 Nayagram 8 Rural Connectivity 8/286 Malam Malam Khasjangal 119 - - 3.00 2.85 3.31 6.17 1890 Nov Dec

717 01 Nayagram 8 Rural Connectivity 8/287 Malam Ambisole Ambisole 115 - - 3.00 2.85 3.31 6.17 1890 Nov Dec

718 01 Nayagram 8 Rural Connectivity 8/288 Malam Harimari Khasjangal 119 - - 3.00 2.85 3.31 6.17 1890 Nov Dec

719 01 Nayagram 8 Rural Connectivity 8/289 Malam Banspat Icchapura 60 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

720 01 Nayagram 8 Rural Connectivity 8/290 Malam 75 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

721 01 Nayagram 8 Rural Connectivity 8/291 Repair of Kalmapukuria Gramin Rd Malam 75 - - 1.50 2.65 4.16 6.81 1755 Nov Dec

722 01 Nayagram 8 Rural Connectivity 8/292 Malam 75 - - 3.00 2.85 4.18 7.03 1890 Nov Dec

723 01 Nayagram 8 Rural Connectivity 8/293 Malam 74 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

724 01 Nayagram 8 Rural Connectivity 8/294 Malam 75 - - 3.00 2.85 3.31 6.17 1890 Nov Dec

725 01 Nayagram 8 Rural Connectivity 8/295 Malam 75 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

726 01 Nayagram 8 Rural Connectivity 8/296 Malam 75 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

727 01 Nayagram 8 Rural Connectivity 8/297 Malam Jadavpur 75 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

728 01 Nayagram 8 Rural Connectivity 8/298 Malam Malam 72 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

729 01 Nayagram 8 Rural Connectivity 8/299 Malam Malam Malam 125 - - 3.00 2.85 3.31 6.17 1890 Nov Dec

730 01 Nayagram 8 Rural Connectivity 8/300 Malam Malam 72 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

731 01 Nayagram 8 Rural Connectivity 8/301 Malam Malam Bhaliaghati 71 - - 3.00 2.85 5.06 7.91 1890 Nov Dec

Repair of Rd with moorum boulder from Marapada to KumparaRepair of Rd with moorum boulder from Koptibhole to Chiripiti with culvert

Repair of Rd with moorum boulder from Koptibhole to Purba Koptibhole Repair of Rd with moorum boulder from Parapada to KhasjangalRepair of Rd with moorum boulder from Basiasole to Ambisole with two culvert

Repair of Rd with moorum boulder from Harimari to KhasjangalRepair of Rd with moorum boulder from Banspat to IchhapuraRepair of Rd with moorum boulder from Sukdevpur to Kalmapukuria bridge

Kalmapukria

Kalmapukuria

Kalmapukria

Kalmapukuria

Repair of Rd with moorum boulder from Kalmapukuri sitala mandir to Palui Para Rd

Kalmapukria

Kalmapukuria

Repair of Rd with moorum boulder from Hatuipara to Chhotojharia Gramin Rd

Kalmapukria

Chhotojharia

Repair of Rd with moorum boulder from Ghosh Para to Jadavpur Feri Ghat

Kalmapukria

Kalmapukuria

Repair of Rd with moorum boulder from PMGSY to Thunpu Soren house

Kalmapukria

Kalmapukuria

Repair of Rd with moorum boulder from Bakultala chawk to Chhotojharia

Kalmapukria

Kalmapukuria

Repair of Rd with moorum boulder from Ananda Mahapatra to Jadavpur Gramin Rd

Kalmapukria

Repair of Rd with moorum boulder from Balipal to Nimainagar

Nimainagar

Repair of Rd with moorum boulder from Nilkuthi to Sib MandirRepair of Rd with moorum boulder from Padmalochan house to Balipal

Nimainagar

Repair of Rd with moorum boulder from Bagdoba kamar to Bhaliachati Pry. School

Page 38: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

38/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

732 01 Nayagram 8 Rural Connectivity 8/302 Malam Malam Bhaliaghati 71 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

733 01 Nayagram 8 Rural Connectivity 8/303 Nayagram Nayagram Kamalapur 212 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

734 01 Nayagram 8 Rural Connectivity 8/304 Nayagram Tufuria Tufuria 211 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

735 01 Nayagram 8 Rural Connectivity 8/305 Nayagram Tufuria Jarka 210 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

736 01 Nayagram 8 Rural Connectivity 8/306 Nayagram Dahi Dahi 142 - - 1.00 1.63 3.20 4.84 1080 Nov Dec

737 01 Nayagram 8 Rural Connectivity 8/307 Nayagram Dahi Dahi 142 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

738 01 Nayagram 8 Rural Connectivity 8/308 Nayagram Nayagram Pungiri 128 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

739 01 Nayagram 8 Rural Connectivity 8/309 Nayagram Kurchiboni 140 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

740 01 Nayagram 8 Rural Connectivity 8/310 Nayagram Nayagram - - 2.00 3.17 4.22 7.39 2099 Nov Dec

741 01 Nayagram 8 Rural Connectivity 8/311 Nayagram Kurchiboni Kurchiboni 140 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

742 01 Nayagram 8 Rural Connectivity 8/312 Nayagram Nayagram Nayagram 143 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

743 01 Nayagram 8 Rural Connectivity 8/313 Nayagram 143 - - 3.00 2.85 3.31 6.17 1890 Nov Dec

744 01 Nayagram 8 Rural Connectivity 8/314 Nayagram 129 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

745 01 Nayagram 8 Rural Connectivity 8/315 Nayagram Kurchiboni Kurchiboni 140 - - 3.00 2.85 3.31 6.17 1890 Nov Dec

746 01 Nayagram 8 Rural Connectivity 8/316 Nayagram Kurchiboni Kurchiboni 140 - - 1.00 1.63 3.20 4.84 1080 Nov Dec

747 01 Nayagram 8 Rural Connectivity 8/317 Nayagram Kurchiboni Kurchiboni 140 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

748 01 Nayagram 8 Rural Connectivity 8/318 Nayagram Tufuria Tufuria 211 - - 1.85 2.85 4.18 7.03 1890 Nov Dec

749 01 Nayagram 8 Rural Connectivity 8/319 Nayagram Tufuria Tufuria 211 - - 1.55 2.45 3.71 6.15 1620 Nov Dec

750 01 Nayagram 8 Rural Connectivity 8/320 Nayagram Tufuria Tufuria 211 - - 2.50 2.26 4.15 6.41 1499 Nov Dec

751 01 Nayagram 8 Rural Connectivity 8/321 Nayagram Tufuria Tufuria 211 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

752 01 Nayagram 8 Rural Connectivity 8/322 Nayagram Tufuria Tufuria 211 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

Repair of Rd with moorum boulder from Bhaliachati PMGSY to Adibasi Para

Repair of Rd from Uncha Kamalapur to Pry. School with morrum and boulderRepair of rd with moorum boulder from Nayagram to TufuriaRepair of rd with moorum boulder from Tufuria to JarkaRepair of rd with moorum boulder from Begunadahi pal rasta to Nadighat Repair of rd with moorum boulder from Sakamui pool to MagurapalRepair of rd with moorum boulder from Nayagram Thana Kali Mandir to Pungiri

Repair of rd with moorum boulder from Kurchiboni PMGSY to Nemainagar

Nemainagar

Repair of rd with moorum boulder from Baino Dhauria house to Gokulnagar

Gokulnagar

Const. of Rd from Kurchiboni bagan to NadighatRepair of rd with moorum boulder from Dhibarpara pitch rd to Nadi GhatRepair of rd with moorum boulder from Nemainagar to Uthan Nayagram

Nemainagar Nemainagar

Repair of rd with moorum boulder from Uthan nayagram to Kuji

Nayagram(S)

Uthan Nayagram

Repair of rd with moorum boulder from Bara bundh to Astha talaRepair of rd with moorum boulder from Susil Maity chawk to Pachha KhalRepair of rd with moorum boulder from Birenmaity chawk to Tapan maity's houseRepair of rd with moorum boulder from tufuria chawk to KhanamuriRepair of rd with moorum boulder from Tufuria chawk to KamalapurRepair of rd with moorum boulder from Kartik Dokan to KharikamathaniRepair of rd with moorum boulder from Palui bundh to BagdekhaRepair of rd with moorum boulder from Tetultala to Magramuk

Page 39: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

39/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

753 01 Nayagram 8 Rural Connectivity 8/323 Nayagram Kamalapur 212 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

754 01 Nayagram 8 Rural Connectivity 8/324 Nayagram Sitalpura 146 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

755 01 Nayagram 8 Rural Connectivity 8/325 Nayagram 144 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

756 01 Nayagram 8 Rural Connectivity 8/326 Nayagram Sitalpura Sitalpura 146 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

757 01 Nayagram 8 Rural Connectivity 8/327 Nayagram Sitalpura Sitalpura 146 - - 3.50 2.85 4.62 7.47 1890 Nov Dec

758 01 Nayagram 8 Rural Connectivity 8/328 Nayagram Sitalpura Sitalpura 146 - - 3.50 2.85 4.62 7.47 1890 Nov Dec

759 01 Nayagram 8 Rural Connectivity 8/329 Nayagram Jarka - - 2.50 2.85 4.19 7.05 1890 Nov Dec

760 01 Nayagram 8 Rural Connectivity 8/330 Nayagram Jarka Jarka 210 - - 2.50 2.85 4.19 7.05 1890 Nov Dec

761 01 Nayagram 8 Rural Connectivity 8/331 Nayagram Jarka Jarka 210 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

762 01 Nayagram 8 Rural Connectivity 8/332 Nayagram Nayagram 143 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

763 01 Nayagram 8 Rural Connectivity 8/333 Repair of Raibera Gramin Rd Nayagram Nayagram Raibera 138 - - 1.00 1.63 3.20 4.84 1080 Nov Dec

764 01 Nayagram 8 Rural Connectivity 8/334 Patina Fulbani 4 - - 1.50 3.14 5.08 8.22 2079 Nov Dec

765 01 Nayagram 8 Rural Connectivity 8/335 Patina 2 - - 3.00 2.85 4.18 7.03 1890 Nov Dec

766 01 Nayagram 8 Rural Connectivity 8/336 Patina Patina Patina 7 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

767 01 Nayagram 8 Rural Connectivity 8/337 Repair of rd from Fulbani to Damodarpur Patina Fulboni 2 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

768 01 Nayagram 8 Rural Connectivity 8/338 Repair of Rd from Ghaga to Rajpahari Patina Fulboni Rajpahari 1 - - 2.50 2.85 3.31 6.17 1890 Nov Dec

769 01 Nayagram 8 Rural Connectivity 8/339 Patina Patina Nakbindhi 7 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

770 01 Nayagram 8 Rural Connectivity 8/340 Patina Fulbani Rajpahari 1 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

771 01 Nayagram 8 Rural Connectivity 8/341 Patina Jamsola Basiabhole 13 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

772 01 Nayagram 8 Rural Connectivity 8/342 Patina 17 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

773 01 Nayagram 8 Rural Connectivity 8/343 Patina Patina 7 - - 4.00 4.49 5.63 10.11 2970 Nov Dec

Repair of rd with moorum boulder from Pukuria Pucca pool to Kamalapur

Nayagram (S)

Repair of rd with moorum boulder from Nayagram Pitch road to Sitalpura

Nayagram (S)

Repair of rd with moorum boulder from Nayagram to Gokulnagar

Nayagram (S)

Gokulnagar

Repair of rd with moorum boulder from Asidhar dhaura house to Gokulnagar NadighatRepair of rd with moorum boulder from Kamaltota Gayamandi house to Sitalpur Bimal De houseRepair of rd with moorum boulder from Subal paira house to Nityananda de house

Repair of rd with moorum boulder from Rangamatia chawk to Jarka Jahira than

Rangamatia

Repair of rd with moorum boulder from Pukur par to Chatina TalaRepair of rd with moorum boulder from Pucca bridge to Damukhan Repair of rd with moorum boulder from Bartala chawk to Gobind Rakshit house

Nayagram (N)

Repair of Rd from Fulboni Chawk to Ghagachawk

Ghagachawk

Repair of Rd from Chamarbandh to Damodarpur

Chamarbund

Damodarpur

Repair of Rd from Patina Bank to Fulbani

Damodarpur

Repair of rd from Nakbindhi chawk to JamsolaRepair of Rd from Rajpahari to DamodarpurRepair of Rd from Jamsola to Basiabhole

Repair of Rd from Chamarbandh to Jamrughutu

Chamarbund

Jamrughutu

Repair of rd from Patina PMGSY to Pathardahara

Pathardahara

Page 40: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

40/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

774 01 Nayagram 8 Rural Connectivity 8/344 Patina Singdui Chakusai 7 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

775 01 Nayagram 8 Rural Connectivity 8/345 Patina Pratappur Pratappur 12 - - 2.50 2.26 3.27 5.53 1499 Nov Dec

776 01 Nayagram 8 Rural Connectivity 8/346 Patina Pratappur Pratappur 12 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

777 01 Nayagram 8 Rural Connectivity 8/347 Patina Pratappur Pratappur 12 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

778 01 Nayagram 8 Rural Connectivity 8/348 Repair of Upar Patina Gramin Road Patina Patina 7 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

779 01 Nayagram 8 Rural Connectivity 8/349 Patina Kenduboni Kenduboni - - 1.00 3.67 3.36 7.03 2430 Nov Dec

780 01 Nayagram 8 Rural Connectivity 8/350 Repair of Chakkuchai Gramin Road Patina Patina Chakusai 7 - - 1.00 3.67 3.36 7.03 2430 Nov Dec

781 01 Nayagram 8 Rural Connectivity 8/351 Patina Patina Ghoga - - 1.00 2.45 3.27 5.71 1620 Nov Dec

782 01 Nayagram 8 Rural Connectivity 8/352 Patina Rajpahari Rajpahari 1 - - 2.00 3.17 4.86 8.03 2099 Nov Dec

783 01 Nayagram 8 Rural Connectivity 8/353 Patina 2 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

784 01 Nayagram 8 Rural Connectivity 8/354 Patina 2 - - 1.00 2.45 3.27 5.71 1620 Nov Dec

785 01 Nayagram 8 Rural Connectivity 8/355 Patina Fulboni Fulboni 4 - - 3.00 2.85 4.62 7.47 1890 Nov Dec

786 01 Nayagram 8 Rural Connectivity 8/356 Patina Fulboni Fulboni 4 - - 3.00 2.85 4.62 7.47 1890 Nov Dec

787 01 Nayagram 8 Rural Connectivity 8/357 Patina Fulboni Ghaga 5 - - 3.00 2.85 4.62 7.47 1890 Nov Dec

788 01 Nayagram 8 Rural Connectivity 8/358 Patina Fulboni Chakusai 7 - - 2.50 3.26 3.35 6.61 2160 Nov Dec

789 01 Nayagram 8 Rural Connectivity 8/359 Patina Patina Patina 7 - - 2.50 3.26 3.35 6.61 2160 Nov Dec

790 01 Nayagram 8 Rural Connectivity 8/360 Patina 17 - - 3.50 3.26 4.21 7.47 2160 Nov Dec

791 01 Nayagram 8 Rural Connectivity 8/361 Patina Rukhni Rukhni 16 - - 3.00 2.85 5.06 7.91 1890 Nov Dec

Repair of Rd from Chakusai PMGSY to SingdhuiRepair of rd from Singdhu chawk to Forest office Pratappur with mooruRepair of Pratappur Gramin Road with water drainageRepair of Rd fro Pratappur to Upar Patin Bank

Upar Patina

Repair of rd from Chakkuchai chawk to Daharkenduboni

Repai of Rd from BSNL tower to Ghoga Hut with moorum boulder and three culvertRoad repair of from Ghaga Hut to Rajpahari Kalimuhi pukur with moorum boulder and culvert hium pipeRepair of Rd from Ghaga chawk to Damodar pur Ranjit Manna House with moorum boulder

Damodarpur

Damodarpur

Repair of rd from Goutam Jana house to Kumar para with moorum boulder and culvert at Damodarpur

Damodarpur

Damodarpur

Repair of Rd from Tetuldanga to Fulboni with moorum boulder and 4 culvert

Repair of rd from Fulboni Sitala Mandir to SSKRepair of rd from Fulboni bartala chawk to Ghaga ChawkRepair of Rd from Chakuchai Bartala to Fulboni Repair of Rd from Kusbonia chawk to Dakshin Sai Forest bundh with morum boulder

Repair of Rd from Chamarbundh PMGSY to Jamrugutu PWD with moorum boulder

Chamarbund

Chamarbund

Repair of Rd from Dakshin Sai Forest to Rukhni village with moorum boulder

Page 41: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

41/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

792 01 Nayagram 8 Rural Connectivity 8/362 Patina 17 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

793 01 Nayagram 8 Rural Connectivity 8/363 Patina Barpat Barpat 18 - - 2.50 3.26 3.35 6.61 2160 Nov Dec

794 01 Nayagram 8 Rural Connectivity 8/364 Const. of Rd from Barpat PWD to Jahira Patina Barpat Barpat 18 - - 1.25 2.04 3.68 5.71 1350 Nov Dec

795 01 Nayagram 8 Rural Connectivity 8/365 Patina Nichupatina Dompara 2 - - 2.00 3.17 3.34 6.51 2099 Nov Dec

796 01 Nayagram 8 Rural Connectivity 8/366 Patina Nichupatina 7 - - 2.00 3.17 5.52 8.69 2099 Nov Dec

797 01 Nayagram 8 Rural Connectivity 8/367 Patina Rangamatia 9 - - 3.00 2.85 4.18 7.03 1890 Nov Dec

798 01 Nayagram 8 Rural Connectivity 8/368 Patina Rangiam Nakbindhi 9 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

799 01 Nayagram 8 Rural Connectivity 8/369 Patina Patina Patina 7 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

800 01 Nayagram 8 Rural Connectivity 8/370 Patina Patina Basiabhole 13 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

801 01 Nayagram 8 Rural Connectivity 8/371 Patina Fulbani Purnapani 4 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

802 01 Nayagram 8 Rural Connectivity 8/372 Repair of Rd from Danga to Damodarpur Patina 2 - - 1.50 3.14 4.20 7.34 2079 Nov Dec

803 01 Nayagram 8 Rural Connectivity 8/373 Patina 17 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

804 01 Nayagram 8 Rural Connectivity 8/374 Patina Bihankuria 5 - - 1.50 2.54 4.16 6.70 1685 Nov Dec

805 01 Nayagram 8 Rural Connectivity 8/375 Patina Patina Patina 7 - - 2.00 3.17 4.22 7.39 2099 Nov Dec

- - - 1105.44 1626.12 2731.56 732076

806 01 Nayagram 14 Rural Drinking 14/1 Chandabila Kasia Kasia 20 0.30 - - 0.53 0.92 1.45 351 Nov Dec

807 01 Nayagram 14 Rural Drinking 14/2 Digging of drinking well at Katash Chandabila Kasia Kasia 20 - - - 0.53 0.92 1.45 351 Sep-Oct

808 01 Nayagram 14 Rural Drinking 14/3 Digging of drinking well at Pairabhar Chandabila Kasia Kasia 20 - - - 0.53 0.92 1.45 351 Sep-Oct

809 01 Nayagram 14 Rural Drinking 14/4 Digging of drinking well at Kasia Chandabila Kasia Kasia 20 - - - 0.53 0.92 1.45 351 Sep-Oct

810 01 Nayagram 14 Rural Drinking 14/5 Digging of Drinking well at Kuji Kuji Kuji 131 - - - 0.53 0.92 1.45 351 Sep-Oct

811 01 Nayagram 14 Rural Drinking 14/6 Chandabila Raisole Raisole 52 - - - 0.53 0.92 1.45 351 Sep-Oct

812 01 Nayagram 14 Rural Drinking 14/7 Chandabila Raisole Raisole 52 - - - 0.53 0.92 1.45 351 Sep-Oct

Repair of Rd from Chamarbundh chawk to Jana Para Chawk with moorum

Chamarbund

Chamarbund

Construction of Rd from Barpat to Dakshin sai village

Repair of Rd from Nichupatina to Dompara with moorum boulderRepair of Rd from Nichpatina Munda para to Upar Patina High school with moorum boulder and guardwall

Nichupatina

Repair of Rd from Nakbindi PMGSY to Rangamatia with moorum boulder

Rangamatia

Repair of Rd from Nakbindi PMGSY to Jamsola with moorum boulderRepair of Rd from Patina High School to NadighatRepair of Rd from Thakursai PMGSY to BasiabholeRepair of Rd from Purnapani bundh to Danga

Damodarpur

Damodarpur

Repair of Rd from Chamarbandh PMGSY to Ugalsanda

Chamarbundh

Chamarbund

Repair of Rd from Bihankuria to Damodarpur with morrum boulder

Damodarpur

Repair of Rd from Mudraburi to PMGSY with morrum boulder

Rural Connectivity Total

Excavation of drinking well at Kasia pl No. 187

Kharikamathani

Digging of Driking well at Raisole (narendra Mahata)Digging of Drinking well at Purnapani(Uttam Singha)

Page 42: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

42/248

_________________________________________________________________________________________________________________________________________________________________________________MGNREGS/Paschim Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Panchayat Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Nayagram Panchayat Samity Sl. No.

PS_cd

Panchayat Samiti

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL / IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

813 01 Nayagram 14 Rural Drinking 14/8 Digging of Drinking well at Dihikhelar Dokra Dihikhelar 155 0.14 - - 0.45 0.70 1.15 300 Sep-Oct

814 01 Nayagram 14 Rural Drinking 14/9 Digging of 2 drinking well at Gamaria Berajal Gobindapur Gamaria 291 0.14 - - 0.45 0.70 1.15 300 Sep-Oct

815 01 Nayagram 14 Rural Drinking 14/10 Berajal Nekrasole Harimaity 304 135 0.14 - - 0.45 0.70 1.15 300 Sep-Oct

816 01 Nayagram 14 Rural Drinking 14/11 Baligeria Kustikara Bhaluktara 320 140 0.14 - - 0.45 0.70 1.15 300 Sep-Oct

817 01 Nayagram 14 Rural Drinking 14/12 Ghoratoria Ghoratoria 112 0.14 - - 0.45 0.70 1.15 300 Sep-Oct

- - - 5.97 9.93 15.91 3956

Grand Total - - - 2820.68 2745.70 5566.38 1868002

Kharikamathani

257,445

Digging of Drinking well near Harimaity Tusu Mela Digging of Drinking well at Bhaluktara Pry. SchoolDigging of Drinking well at Ghoratoria Berapara(Nich) near chandramohan Bera's House

Kharikamathani

Rural Drinking Total

Page 43: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

43/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 241 01 Arrah 1 1/1 Excavation of Barial Tudu Pond Arrah Dumuria 322 205 Private - 0.50 - 2.27 0.25 2.52 1503 2.55 Jun

2 01 Arrah 1 1/2 Arrah Salgeria Dhiral 329 259 Private - 0.50 - 0.93 0.10 1.04 619 1.05 Jun

3 01 Arrah 1 1/3 Excavation of Mangal Hansda Pond Arrah Salgeria Dhiral 329 306 Private - 0.50 - 1.38 0.15 1.53 914 1.55 Jun

4 01 Arrah 1 1/4 Excavation of Salbani desh Pukur Arrah Paika Salbani 335 1.8 Plibeck - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

5 01 Arrah 1 1/5 Arrah Balimundi 172 204 Private - 5.00 - 8.95 0.99 9.94 5925 10.05 Jun

6 01 Arrah 1 1/6 Excavation of Mantu Sing Pond Arrah Panchami 177 213 Private - 0.50 - 0.93 0.10 1.04 619 1.05 Jun

7 01 Arrah 1 1/7 Excavation of Laxmindra Sahoo Pond Arrah 176 501 Private - 0.50 - 1.38 0.15 1.53 914 1.55 Jun

8 01 Arrah 1 1/8 Excavation of Santosh Dhal Pond Arrah 176 605 Private - 0.50 - 1.38 0.15 1.53 914 1.55 Jun

9 01 Arrah 1 1/9 Exacavation of Laxmikanta Pond Arrah 317 405 Private - 0.50 - 0.93 0.10 1.04 619 1.05 Jun

10 01 Arrah 1 1/10 Excavation of Kangalicharan Pond Arrah Kuldiha Kuldiha 320 708 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

11 01 Arrah 1 1/11 Excavation of Bipin Mahata Pond Arrah 317 802 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

12 01 Arrah 1 1/12 Excavation of Kandani Tudu Pond Arrah Jambani 325 907 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

13 01 Arrah 1 1/13 Excavation of Bisu Hansda Pond Arrah 332 304 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

14 01 Arrah 1 1/14 Exacavation of Indramani Sing Pond Arrah Jarighati 324 501 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

15 01 Arrah 1 1/15 Excavation of Sukulal sing Pond Arrah Jarighati 324 809 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

Water Conservation & Water Harvesting

Dumuria 2nd Feb'14

Water Conservation & Water Harvesting

Excavation of Chandra sekhar hansda Pond

2nd Feb'14

Water Conservation & Water Harvesting

2nd Feb'14

Water Conservation & Water Harvesting

2nd Feb'14

Water Conservation & Water Harvesting

Excavation of Ten Huppa Balimundi Sansad

Balimundi

2nd Feb'14

Water Conservation & Water Harvesting

Nagripada

2nd Feb'14

Water Conservation & Water Harvesting

Ramkrishnapur

Ramkrishnapur

2nd Feb'14

Water Conservation & Water Harvesting

Ramkrishnapur

Ramkrishnapur

2nd Feb'14

Water Conservation & Water Harvesting

Jamdahara

Kundalbani 2nd Feb'14

Water Conservation & Water Harvesting

2nd Feb'14

Water Conservation & Water Harvesting

Jamdahara

Kundalbani 2nd Feb'14

Water Conservation & Water Harvesting

Baramara

2nd Feb'14

Water Conservation & Water Harvesting

Baramara

Bhalukchuya

2nd Feb'14

Water Conservation & Water Harvesting

Baramara

2nd Feb'14

Water Conservation & Water Harvesting

Baramara

2nd Feb'14

Page 44: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

44/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

16 01 Arrah 1 1/16 Exacavation of Sunaram Murmu Pond Arrah Baramara 334 407 Private - 1.00 - 2.72 0.30 3.02 1798 3.05 Jun

17 01 Arrah 1 1/17 Exacavation Of Santi Sing Pond Arrah Jarighati 324 802 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

18 01 Arrah 1 1/18 Exacavation Of Jayanti Sing Pond Arrah Baksa 175 145 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

19 01 Arrah 1 1/19 Excavation of Suka Sing Pond Arrah Balimundi 172 427 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

20 01 Arrah 1 1/20 Excavation of Satish mahata Pond Arrah Dhumsai 323 556 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

21 01 Arrah 1 1/21 Excavation of Laxmindra Mahata Pond Arrah Dhumsai 323 612 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

22 01 Arrah 1 1/22 Excavation of Chitan Mahata Pond Arrah dhumsai 323 445 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

23 01 Arrah 1 1/23 Arrah Dhumsai 323 587 Private - 0.50 - 2.27 0.25 2.52 1503 2.55 Jun

24 01 Arrah 1 1/24 Excavation of Jiten Mahata Pond Arrah Dhumsai 323 512 Private - 0.50 - 1.82 0.20 2.03 1209 2.05 Jun

25 01 Arrah 1 1/25 Excavation of Manaranjan Mahata Pond Arrah Kuldiha Kuldiha 320 708 Private - 0.50 - 2.27 0.25 2.52 1503 2.55 Jun

26 01 Arrah 1 1/26 Excavation of Profullya Mahata Pond Arrah Kuldiha Kuldiha 320 789 Private - 1.00 - 2.72 0.30 3.02 1798 3.05 Jun

27 01 Arrah 1 1/27 Excavation of Uday Murmu Pond Arrah 178 623 Private - 0.50 - 0.93 0.10 1.04 619 1.05 Jun

28 01 Arrah 1 1/28 Excavation of Surendra Raj Pond Arrah Nagripada 178 124 Private - 0.50 - 0.93 0.10 1.04 619 1.05 Jun

29 01 Arrah 1 1/29 Excavation of Shuvomay Rout Pond Arrah Arrah 321 807 Private - 0.50 - 2.72 0.30 3.02 1798 3.05 Jun

30 01 Arrah 1 1/30 Arrah Jamdahara 318 - 5.00 - 8.95 0.99 9.94 5925 10.05 Jun

Water Conservation & Water Harvesting

Baramara

2nd Feb'14

Water Conservation & Water Harvesting

Baramara

2nd Feb'14

Water Conservation & Water Harvesting

Balimundi

2nd Feb'14

Water Conservation & Water Harvesting

Balimundi

2nd Feb'14

Water Conservation & Water Harvesting

Dhumsai

2nd Feb'14

Water Conservation & Water Harvesting

Dhumsai

2nd Feb'14

Water Conservation & Water Harvesting

Dhumsai

2nd Feb'14

Water Conservation & Water Harvesting

Excavation of Purnachandra Mahata Pond

Dhumsai

2nd Feb'14

Water Conservation & Water Harvesting

Dhumnsi

2nd Feb'14

Water Conservation & Water Harvesting

2nd Feb'14

Water Conservation & Water Harvesting

2nd Feb'14

Water Conservation & Water Harvesting

Nagripada

Name of Revenue Mouza

2nd Feb'14

Water Conservation & Water Harvesting

Nagripada

2nd Feb'14

Water Conservation & Water Harvesting

Dumuria 2nd Feb'14

Water Conservation & Water Harvesting

Excavation of Huppa Jamdahara Sansad 15 Nos

Jamdahara

2nd Feb'14

Page 45: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

45/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 67.21 7.47 74.68 44512

31 01 Arrah 2 Drought Proofing 2/1 Plantation of Kaju Orchard at Jarighati Arrah Jarighati 324 366 - 40.00 - 8.95 0.99 9.94 5925 10.05 Aug

32 01 Arrah 2 Drought Proofing 2/2 Plantation of Kaju Orchard at Dhumsai Arrah Dhumsai 323 550 - 30.00 - 8.95 0.99 9.94 5925 10.05 Aug

33 01 Arrah 2 Drought Proofing 2/3 Arrah Dhumsai 323 653 - 30.00 - 13.40 1.49 14.89 8873 15.05 Aug

34 01 Arrah 2 Drought Proofing 2/4 Arrah dhumsai 323 458 - 10.00 - 9.84 1.09 10.93 6515 11.05 Aug

35 01 Arrah 2 Drought Proofing 2/5 Plantation of Kuldiha Sansad Arrah Kuldiha Kuldiha 320 805 - 20.00 - 13.40 1.49 14.89 8873 15.05 Sep

36 01 Arrah 2 Drought Proofing 2/6 Arrah Kuldiha 277 652 - 1.00 - 2.72 0.30 3.02 1798 3.05 Sep

37 01 Arrah 2 Drought Proofing 2/7 Arrah Naripada 178 887 - 0.50 - 1.82 0.20 2.03 1209 2.05 Sep

38 01 Arrah 2 Drought Proofing 2/8 Plantation of uday murmu Arrah Naripada 178 556 - 0.50 - 1.82 0.20 2.03 1209 2.05 Sep

39 01 Arrah 2 Drought Proofing 2/9 Arrah Nagripada 178 596 - 10.00 - 26.75 2.97 29.72 17716 30.05 Sep

40 01 Arrah 2 Drought Proofing 2/10 Arrah - - 2.00 5.93 3.96 9.89 3930 10 Sep

41 01 Arrah 2 Drought Proofing 2/11 Arrah - - 3.00 5.93 3.96 9.89 3930 10 Sep

42 01 Arrah 2 Drought Proofing 2/12 Plantation of Arrah Sansad Arrah Arrah 321 495 - 10.00 - 17.85 1.98 19.83 11821 20.05 Sep

43 01 Arrah 2 Drought Proofing 2/13 Nursery under Arrah GP Arrah Arrah Arrah - 0.01 - 1.99 2.46 4.45 1317

- - - 119.35 22.10 141.45 79041

Water Conservation & Water Harvesting Total

Baramara

2nd Feb'14

Dhumsai

2nd Feb'14

Plantation of Mango Orchard At Dhumsai

Dhumsai

2nd Feb'14

Plantation of Akashmoni Bagan at Dhumsai

Dhumsai

2nd Feb'14

2nd Feb'14

Plantation of Dhobaniosole football field

Dhobanisole

2nd Feb'14

Plantation of south nagripada football math

Nagripada

2nd Feb'14

Nagripada

2nd Feb'14

Plantation of Nagripada Sansad 26 Person

Nagripada

2nd Feb'14

Plantation from Tasarbani to Dhumsai pailot Road

jamdaharaDhumsai

jamdaharaDhumsai

318319323

2nd Feb'14

Kuldiha To Dhumsai Road PWD Plantation

KuldihaDhumsai

KuldihaDhumsai

320323

2nd Feb'14

Dumuria 2nd Feb'14

2nd Feb'14

Drought Proofing Total

Page 46: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

46/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

44 01 Arrah 3 3/1 Salgeria Haribandh Eracation Canal Arrah Salgeria Salgeria 329 875 - - 1.00 1.38 0.15 1.53 914 1.55 July

45 01 Arrah 3 3/2 Barabandh to Batash Babur Pond Canal Arrah Kuldiha Kuldiha 320 984 - - 1.00 1.38 0.15 1.53 914 1.55 July

46 01 Arrah 3 3/3 Arrah Kuldiha Kuldiha 320 365 - - 1.00 1.38 0.15 1.53 914 1.55 July

47 01 Arrah 3 3/4 Arrah Kuldiha Kuldiha 320 587 - - 1.00 1.38 0.15 1.53 914 1.55 July

48 01 Arrah 3 3/5 Arrah Paika Jhunarisole 336 107 - - 1.00 1.82 0.20 2.03 1209 2.05 July

49 01 Arrah 3 3/6 Arrah Dhiral 328 285 - - 1.00 1.82 0.20 2.03 1209 2.05 July

50 01 Arrah 3 3/7 North Balimundi to West Canal Arrah Balimundi 172 689 - - 1.00 1.82 0.20 2.03 1209 2.05 July

51 01 Arrah 3 3/8 Buldihi to Dhumsai Village Canal Arrah Dhumsai 323 457 - - 2.00 2.72 0.30 3.02 1798 3.05 July

52 01 Arrah 3 3/9 Arrah Dhumsai 323 654 - - 1.00 1.82 0.20 2.03 1209 2.05 July

53 01 Arrah 3 3/10 Reexcavation of Dhobanisole Canal Arrah Kuldiha 320 387 - - 1.00 1.82 0.20 2.03 1209 2.05 July

54 01 Arrah 3 3/11 Arrah Nagripada 178 689 - - 1.00 1.82 0.20 2.03 1209 2.05 July

55 01 Arrah 3 3/12 South Nagripada Canal Reexcavation Arrah Nagripada 178 451 - - 1.00 1.82 0.20 2.03 1209 2.05 July

56 01 Arrah 3 3/13 Arrah Paika 336 320 - - 1.00 1.82 0.20 2.03 1209 2.05 July

57 01 Arrah 3 3/14 Arrah Paika Jhunarisole 336 345 - - 1.00 1.82 0.20 2.03 1209 2.05 July

58 01 Arrah 3 3/15 Durgaprasad para to dakhinsole canal Arrah dumuria Arrah 321 741 - - 2.00 2.72 0.30 3.02 1798 3.05 July

59 01 Arrah 3 3/16 Arrah Arrah 321 857 - - 2.00 2.72 0.30 3.02 1798 3.05 July

Micro Irrigation Works

2nd Feb'14

Micro Irrigation Works

2nd Feb'14

Micro Irrigation Works

Kuldiha North Para to ICDS PWD Road Canal

2nd Feb'14

Micro Irrigation Works

Hatibura House to Laxman Mahata house Canal

2nd Feb'14

Micro Irrigation Works

Re-Excavation of Jhaunarisole Paschim para Canal

2nd Feb'14

Micro Irrigation Works

Pindrachui to Dhiralbaligeria Vari Bandh

Jamdahara

2nd Feb'14

Micro Irrigation Works

Balimundi

2nd Feb'14

Micro Irrigation Works

Dhumsai

2nd Feb'14

Micro Irrigation Works

Reexcavation of Dhumsai hattala Canal rep

Dhgumsai

2nd Feb'14

Micro Irrigation Works

Dhobanisole

2nd Feb'14

Micro Irrigation Works

Nagripada School Grond to north ICDS Canal

Nagripada

2nd Feb'14

Micro Irrigation Works

Nagripada

2nd Feb'14

Micro Irrigation Works

Reexcavation of Jhaunarisole Paschim Para

Jhunarisole 2nd Feb'14

Micro Irrigation Works

Reexcavation of canal from deshpukur to janpal

2nd Feb'14

Micro Irrigation Works

2nd Feb'14

Micro Irrigation Works

Gramer Purba para t Kurchibani to Banskhali Canal

Dumuria 2nd Feb'14

Page 47: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

47/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

60 01 Arrah 3 3/17 Arati Sing Canal & Calvat Arrah Arrah 321 675 - - 1.00 1.82 0.20 2.03 1209 2.05 July

61 01 Arrah 3 3/18 Reexcavation Arrah Canal Arrah Arrah 321 108 - - 2.00 2.72 0.30 3.02 1798 3.05 July

62 01 Arrah 3 3/19 Dakhinsole to satya maity land canal Arrah Arrah 321 874 - - 2.00 2.72 0.30 3.02 1798 3.05 july

- - - 37.35 4.15 41.50 24732

63 01 Arrah 5 5/1 Re-Excavation of Uttam Mandal Pond Arrah Salgeria Salgeria 329 478 - 0.50 - 1.82 0.20 2.03 1209 2.05 May

64 01 Arrah 5 5/2 Re-Excavation of Paresh Das Pond Arrah Salgeria 329 784 - 0.50 - 1.82 0.20 2.03 1209 2.05 May

65 01 Arrah 5 5/3 Arrah Jarighati 324 548 - 0.50 - 1.82 0.20 2.03 1209 2.05 May

66 01 Arrah 5 5/4 Re-Excavation Of Bhaghari Sing Pond Arrah Jarighati 324 638 - 0.50 - 1.82 0.20 2.03 1209 2.05 May

67 01 Arrah 5 5/5 Re-Excavation of Sawana Hansda Pond Arrah 332 885 - 0.50 - 1.82 0.20 2.03 1209 2.05 May

68 01 Arrah 5 5/6 Arrah Dhumsai 323 967 - 5.00 - 27.15 3.02 30.17 17982 30.5 May

69 01 Arrah 5 5/7 Arrah Kuldiha Kuldiha 320 572 - 5.00 - 18.16 2.02 20.18 12027 20.4 May

70 01 Arrah 5 5/8 Arrah Nagripada 178 547 - 10.00 - 37.39 4.15 41.54 24762 42 May

71 01 Arrah 5 5/9 Arrah Paika Paika 330 581 - 5.00 - 9.17 1.02 10.19 6072 10.3 May

72 01 Arrah 5 5/10 Arrah Arrah 321 650 - 5.00 - 9.17 1.02 10.19 6072 10.3 May

73 01 Arrah 5 5/11 Arrah Balimundi 172 251 - 5.00 - 9.17 1.02 10.19 6072 10.3 May

- - - 119.34 13.26 132.60 79031

Micro Irrigation Works

Dumuria 2nd Feb'14

Micro Irrigation Works

Dumuria 2nd Feb'14

Micro Irrigation Works

Dumuria 2nd Feb'14

Micro Irrigation Works TotalRenovation of Traditional Water Bodies

2nd Feb'14

Renovation of Traditional Water Bodies

Ssalgeria

2nd Feb'14

Renovation of Traditional Water Bodies

Re-Excavation of Dinobandhu Sing Pond

Baramara

2nd Feb'14

Renovation of Traditional Water Bodies

Baramara

2nd Feb'14

Renovation of Traditional Water Bodies

Baramara

Bhalukchuya

2nd Feb'14

Renovation of Traditional Water Bodies

Re-Excavation of Dhumsai Sansad -10 Nos Pond

Dhumsai

2nd Feb'14

Renovation of Traditional Water Bodies

Re-Excavation of Kuldiha Sansad -9 Nos Pond

2nd Feb'14

Renovation of Traditional Water Bodies

Re-Excavation of Nagripada Sansad - 20 Nos Pond

Nagripada

2nd Feb'14

Renovation of Traditional Water Bodies

Re-Excavation of Paika Sansad - 5 Nos Pond

2nd Feb'14

Renovation of Traditional Water Bodies

Re-Excavation of Arrah Sansad -4 Noas Pons

Dumuria 2nd Feb'14

Renovation of Traditional Water Bodies

Re-Excavation of Balimundi Sansad- 10 Nos Pond

Balimundi

2nd Feb'14

Renovation of Traditional Water Bodies Total

Page 48: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

48/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

74 01 Arrah 6 Land Development 6/1 Arrah Arrah 321 487 - 1.00 - 2.72 0.30 3.02 1798 3.05 Feb

75 01 Arrah 6 Land Development 6/2 Arrah Football Math Levelling Arrah Arrah 321 109 - 1.00 - 2.27 0.25 2.52 1503 2.55 Feb

76 01 Arrah 6 Land Development 6/3 Land Levelling Bhalukchuya Arrah 332 754 - 1.40 - 4.50 0.50 5.00 2977 5.05 Feb

77 01 Arrah 6 Land Development 6/4 Jarighati Land Levelling Arrah Jarighti 324 748 - 0.84 - 2.72 0.30 3.02 1798 3.05 Feb

78 01 Arrah 6 Land Development 6/5 Balimundi Sansad Land Levelling Arrah Balimundi 172 698 - 2.80 - 8.95 0.99 9.94 5925 10.05 Feb

79 01 Arrah 6 Land Development 6/6 Land Levelling balimundi ICDS Arrah Balimundi 172 548 - 1.00 - 1.82 0.20 2.03 1209 2.05 Feb

80 01 Arrah 6 Land Development 6/7 Kuldiha Sansad Land Levelling Arrah Kuldiha Kuldiha 320 472 - 4.20 - 13.40 1.49 14.89 8873 15.05 Feb

81 01 Arrah 6 Land Development 6/8 Dhumsai Sansad Arrah Dhumsai 323 587 - 4.20 - 13.40 1.49 14.89 8873 15.05 Feb

82 01 Arrah 6 Land Development 6/9 Nagripada Sansad Land Levelling Arrah Nagripada 178 457 - 4.20 - 13.40 1.49 14.89 8873 15.05 Feb

83 01 Arrah 6 Land Development 6/10 Baramara Sanasad Arrah Baramara 336 651 - 4.20 - 13.40 1.49 14.89 8873 15.05 Feb

84 01 Arrah 6 Land Development 6/11 Jamdahara Sansad Arrah Jamdahara 318 427 - 4.20 - 13.40 1.49 14.89 8873 15.05 Feb

85 01 Arrah 6 Land Development 6/12 Paika Sansad Arrah Paika Paika 330 865 - 4.20 - 13.40 1.49 14.89 8873 15.05 Feb

- - - 103.36 11.48 114.84 68448

86 01 Arrah 7 7/1 Arrah Mini RLI Near guard wall Arrah Arrah 321 472 - - 0.30 1.49 1.97 3.46 988 3.5 Feb

87 01 Arrah 7 7/2 Arati Sing Guard wall Arrah Arrah 321 573 - - 0.20 1.49 0.98 2.47 988 2.5 Feb

- - - 2.98 2.95 5.93 1975

88 01 Arrah 8 Rural Connectivity 8/1 Arrah Grameen Road Rep Arrah Arrah 321 684 - - 3.00 1.49 1.97 3.46 988 3.5 January

Arrah Gram Panchayet Near Field Levelling

Dumuria 2nd Feb'14

Dumuria 2nd Feb'14

Baramara

Bhalukchuya

2nd Feb'14

Baramara

2nd Feb'14

Balimundi

2nd Feb'14

Balimundi

2nd Feb'14

2nd Feb'14

Dhumsai

2nd Feb'14

Nagripada

2nd Feb'14

Baramara

2nd Feb'14

Jamdahara

2nd Feb'14

2nd Feb'14

Land Development TotalFlood Control & Protecation

Dumuria 2nd Feb'14

Flood Control & Protecation

Dumuria 2nd Feb'14

Flood Control & Protecation Total

Dumuria 2nd Feb'14

Page 49: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

49/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

89 01 Arrah 8 Rural Connectivity 8/2 Dumuria Grameen Road Rep Arrah Dumuria 322 648 - - 3.00 1.49 1.97 3.46 988 3.5 January

90 01 Arrah 8 Rural Connectivity 8/3 Dhumsai Grameen Road Rep Arrah Dhumsai 323 654 - - 3.00 1.49 1.97 3.46 988 3.5 January

91 01 Arrah 8 Rural Connectivity 8/4 Arrah Salgeria Dhiral 327 - - 1.00 1.49 1.97 3.46 988 3.5 January

92 01 Arrah 8 Rural Connectivity 8/5 Arrah Salgeria Salgeria 329 - - 1.50 1.49 1.97 3.46 988 3.5 January

93 01 Arrah 8 Rural Connectivity 8/6 Arrah Salgeria Salgeria 329 - - 1.00 1.49 1.97 3.46 988 3.5 January

94 01 Arrah 8 Rural Connectivity 8/7 Arrah Salgeria Salgeria 329 - - 1.00 1.49 1.97 3.46 988 3.5 January

95 01 Arrah 8 Rural Connectivity 8/8 Arrah Salgeria Salgeria 329 - - 1.00 1.49 1.97 3.46 988 3.5 January

96 01 Arrah 8 Rural Connectivity 8/9 Arrah Salgeria Salgeria 329 - - 1.00 1.49 1.97 3.46 988 3.5 January

97 01 Arrah 8 Rural Connectivity 8/10 Arrah Salgeria Salgeria 329 - - 1.00 1.49 1.97 3.46 988 3.5 January

98 01 Arrah 8 Rural Connectivity 8/11 Arrah Salgeria Salgeria 329 - - 1.00 1.49 1.97 3.46 988 3.5 January

99 01 Arrah 8 Rural Connectivity 8/12 Arrah Salgeria Salgeria 329 - - 1.50 1.49 1.97 3.46 988 3.5 January

100 01 Arrah 8 Rural Connectivity 8/13 Arrah Baramara 334 - - 2.00 1.49 1.97 3.46 988 3.5 January

101 01 Arrah 8 Rural Connectivity 8/14 Arrah Baramara 334 - - 1.00 1.49 1.97 3.46 988 3.5 January

102 01 Arrah 8 Rural Connectivity 8/15 Jarighati Road Para Calvat With Road Arrah Jarighati 324 - - 1.00 1.49 1.97 3.46 988 3.5 January

103 01 Arrah 8 Rural Connectivity 8/16 Arrah Jarighati 324 - - 1.00 1.49 1.97 3.46 988 3.5 January

104 01 Arrah 8 Rural Connectivity 8/17 Arrah Jarighati 324 - - 1.00 1.49 1.97 3.46 988 3.5 January

Dumuria 2nd Feb'14

Dhumsai

2nd Feb'14

Pairep Road Pailot to Banskhali Earthen Road

2nd Feb'14

Laxman Chalk to Jatra Para Erathen Road

2nd Feb'14

Tarun Mandal House to Kanai Saren house Road

2nd Feb'14

Improvement of Shaheb Kudhi Erathen Road

2nd Feb'14

Bijan Chalk To Drrisa Suna Erathen Road

2nd Feb'14

Pupan Mandal house to Harijan Chalk Murram Road

2nd Feb'14

School Chalk to Girija Chalk Erathen Road

2nd Feb'14

Pailot Road to Rengamatiya Erathen Road

2nd Feb'14

Jatra Para To Dhiralbaligeria Road Murram

2nd Feb'14

Improvement of Baramara to Paika Road

Baramara

2nd Feb'14

Baramara To Salbani New Erathen Road Baramara

2nd Feb'14

Baramara

2nd Feb'14

Harish Sing house to Khash Jangal New Erathen Road

Baramara

2nd Feb'14

Rabindra Sing House to Routh Para Erathen Road

Baramara

2nd Feb'14

Page 50: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

50/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

105 01 Arrah 8 Rural Connectivity 8/18 Jarighati to Bhaduyasole Erathen Road Arrah Jarighati 324 - - 1.00 1.49 1.97 3.46 988 3.5 January

106 01 Arrah 8 Rural Connectivity 8/19 Arrah Jambani 325 - - 0.50 1.49 1.97 3.46 988 3.5 January

107 01 Arrah 8 Rural Connectivity 8/20 Rakhalban to Nagripada Murram Road Arrah Rakhalban 170 - - 1.00 1.49 1.97 3.46 988 3.5 January

108 01 Arrah 8 Rural Connectivity 8/21 Arrah Baksa 175 - - 1.00 1.49 1.97 3.46 988 3.5 January

109 01 Arrah 8 Rural Connectivity 8/22 Arrah Baksa 175 - - 1.00 1.49 1.97 3.46 988 3.5 January

110 01 Arrah 8 Rural Connectivity 8/23 Arrah Balimundi 172 - - 1.00 1.49 1.97 3.46 988 3.5 January

111 01 Arrah 8 Rural Connectivity 8/24 MSK to Bhalukbasa Murram Road Arrah Balksa 175 - - 1.00 1.49 1.97 3.46 988 3.5 January

112 01 Arrah 8 Rural Connectivity 8/25 Arrah Rakhalban 170 - - 1.00 1.49 1.97 3.46 988 3.5 January

113 01 Arrah 8 Rural Connectivity 8/26 Arrah Baksa 175 - - 1.00 1.49 1.97 3.46 988 3.5 January

114 01 Arrah 8 Rural Connectivity 8/27 Arrah Balimundi 172 - - 1.00 1.49 1.97 3.46 988 3.5 January

115 01 Arrah 8 Rural Connectivity 8/28 New RoadNadipara To Orrisa Sima Arrah 174 - - 1.00 1.49 1.97 3.46 988 3.5 January

116 01 Arrah 8 Rural Connectivity 8/29 Buldihi to Dhumsai Village Road Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 January

117 01 Arrah 8 Rural Connectivity 8/30 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 January

118 01 Arrah 8 Rural Connectivity 8/31 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 January

119 01 Arrah 8 Rural Connectivity 8/32 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 January

120 01 Arrah 8 Rural Connectivity 8/33 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 January

Baramara

2nd Feb'14

Jambani Kunyar Tudu House to Jangal Murram Road

Baramara

2nd Feb'14

Balimundi

2nd Feb'14

Baksa MSK to Barsole Sima Murram Road

Balimundi

2nd Feb'14

Purba Baksa Village Road Murram Road

Balimundi

2nd Feb'14

South Balimundi Village Road Murram Road

Balimundi

2nd Feb'14

Balimundi

2nd Feb'14

Rakhalban to Nagripada Murram Road With Calvat

Balimundi

2nd Feb'14

Baksa Mahata Para Deben Sing House Erathen Road

Balimundi

2nd Feb'14

South Balimundi to Balimundi Khal Murram Road

Balimundi

2nd Feb'14

Balimundi

Bhalukbasa 2nd Feb'14

Dhumsai

2nd Feb'14

Improvement of Road Chunaram Mahali House Murroom Road

Dhumsai

2nd Feb'14

PWD road tom Gobinda Mahata House Murroom Road

Dhumsai

2nd Feb'14

Nisikanta house to Chittaranjan house murram Road

Dhumsai

2nd Feb'14

Ratan Mahata House to Baidanath Mahata House Road Murram road

Dhumsai

2nd Feb'14

Page 51: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

51/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

121 01 Arrah 8 Rural Connectivity 8/34 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 January

122 01 Arrah 8 Rural Connectivity 8/35 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

123 01 Arrah 8 Rural Connectivity 8/36 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

124 01 Arrah 8 Rural Connectivity 8/37 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

125 01 Arrah 8 Rural Connectivity 8/38 Arrah Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

126 01 Arrah 8 Rural Connectivity 8/39 Pailot Pukur to Buldihi Murram Road Arrah dhumsai Dhumsai 323 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

127 01 Arrah 8 Rural Connectivity 8/40 Arrah Kuldiha Kuldiha 320 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

128 01 Arrah 8 Rural Connectivity 8/41 Arrah Kuldiha Kuldiha 320 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

129 01 Arrah 8 Rural Connectivity 8/42 Arrah Kuldiha Kuldiha 320 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

130 01 Arrah 8 Rural Connectivity 8/43 Arrah Kuldiha Kuldiha 320 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

131 01 Arrah 8 Rural Connectivity 8/44 Arrah Kuldiha Kuldiha 320 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

132 01 Arrah 8 Rural Connectivity 8/45 Arrah Kuldiha Kuldiha 320 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

133 01 Arrah 8 Rural Connectivity 8/46 Bamdiha To Nagripada Murram Road Arrah Bamdiha 179 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

134 01 Arrah 8 Rural Connectivity 8/47 Arrah Nagripada 178 - - 1.50 1.49 1.97 3.46 988 3.5 Dec

135 01 Arrah 8 Rural Connectivity 8/48 Arrah Nagripada 178 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

136 01 Arrah 8 Rural Connectivity 8/49 Arrah Nagripada 178 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

UBI Bank To Sailen Mahata House Road

Dhumsai

2nd Feb'14

Ram Ch Mahata House to Kesho Mahata House Murram Road

Dhumsai

2nd Feb'14

PWD road Ramesh Mahata House to Buldihi Murram Road

Dhumsai

2nd Feb'14

Tarapada Mahata House to Orrisa Simana Murram Road

Dhumsai

2nd Feb'14

Hrisikesh Mahata house to Jarighati Semana Murram Road

Dhumsai

2nd Feb'14

2nd Feb'14

Kuldiha Hat tala To Dhobanisole Murram Road

2nd Feb'14

Kulinbabur Chalk to Tasarbani Simana Murram Road

2nd Feb'14

Sushil Mahata House to Arrah Simana Murram Road

2nd Feb'14

Jamini Kalandi House to ICDS Murram Road

2nd Feb'14

PWD road to Apu Mahata House Murram Road

2nd Feb'14

Sadananda Babur Chalk To Bandh Murram Road

2nd Feb'14

Nagripada

2nd Feb'14

North Nagripada ICDS to Balimundi Simana Road

Nagripada

2nd Feb'14

South Nagripada to Rakhalban Murram Road

Nargipada

2nd Feb'14

PMGSY to Udaybabu House Road Murram

Nagripada

2nd Feb'14

Page 52: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

52/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

137 01 Arrah 8 Rural Connectivity 8/50 Arrah Bamdiha 179 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

138 01 Arrah 8 Rural Connectivity 8/51 Arrah Bamdiha 179 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

139 01 Arrah 8 Rural Connectivity 8/52 Bamdiha Grameen Road Murram Arrah Bamdiha 179 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

140 01 Arrah 8 Rural Connectivity 8/53 Uttar Nagripada Village Road Murram Arrah Nagripada 178 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

141 01 Arrah 8 Rural Connectivity 8/54 Arrah Nagripada 178 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

142 01 Arrah 8 Rural Connectivity 8/55 Arrah Panchami 177 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

143 01 Arrah 8 Rural Connectivity 8/56 Arrah Panchami 177 - - 2.00 1.99 2.96 4.95 1317 5 Dec

144 01 Arrah 8 Rural Connectivity 8/57 Arrah Bamdiha 179 - - 1.00 1.87 0.21 2.08 1238 2.1 Dec

145 01 Arrah 8 Rural Connectivity 8/58 Arrah Bamdiha 179 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

146 01 Arrah 8 Rural Connectivity 8/59 Arrah Nagripada 178 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

147 01 Arrah 8 Rural Connectivity 8/60 Nagripada Desh pukur to Balimundi Arrah Nagripada 178 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

148 01 Arrah 8 Rural Connectivity 8/61 Arrah Nagripada 178 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

149 01 Arrah 8 Rural Connectivity 8/62 Pratap Thayal House to PMGSY Arrah Nagripada 178 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

150 01 Arrah 8 Rural Connectivity 8/63 Salbani to Jangal Erathen Road Arrah Paika Salbani 335 - - 1.00 1.87 0.21 2.08 1238 2.1 Dec

151 01 Arrah 8 Rural Connectivity 8/64 Arrah Paika Jhunarisole 336 - - 1.00 1.87 0.21 2.08 1238 2.1 Dec

152 01 Arrah 8 Rural Connectivity 8/65 Arrah Paika Jhunarisole 336 - - 1.00 1.87 0.21 2.08 1238 2.1 Dec

Bamdiha Main Road to Kanchan Khal Murram Road

Nagripada

2nd Feb'14

Bamdiha School Para Murram Bulder Road

Nagripada

2nd Feb'14

Nagripada

2nd Feb'14

Nagripada

2nd Feb'14

Middle Nagripada Village Road Murram

Nagripada

2nd Feb'14

Panchami ICDS to Pailot Pukur Murram Road

Nagripada

2nd Feb'14

Panchami Village Road Murram Boulder

Nagripada

2nd Feb'14

Bamdiha Main Road to Chitta Para Erathen Road

Nagripada

2nd Feb'14

Bamdiha Naran Para to Rani Para Murram Road

Nagripada

2nd Feb'14

Nagripada FootBall Math To Jangal Murram Road

Nagripada

2nd Feb'14

Nagripada

2nd Feb'14

South Nagripada Football Math to Kamal Mahata House

Nagripada

2nd Feb'14

Nagripada

2nd Feb'14

2nd Feb'14

Jhunarisole Gopalpara New Erathen Road

2nd Feb'14

Kamar Para to Balai chalk Erathern Road

2nd Feb'14

Page 53: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

53/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

153 01 Arrah 8 Rural Connectivity 8/66 Paika Grameen Road Murram Road Arrah Paika Paika 330 - - 2.00 1.99 2.96 4.95 1317 5 Dec

154 01 Arrah 8 Rural Connectivity 8/67 Salbani Village road Murram Arrah Paika Salbani 335 - - 2.00 1.99 2.96 4.95 1317 5 Dec

155 01 Arrah 8 Rural Connectivity 8/68 Jhunarisole Village Road Murram Arrah Paika Jhunarisole 336 - - 2.00 1.99 2.96 4.95 1317 5 Dec

156 01 Arrah 8 Rural Connectivity 8/69 Salkhan para to Erathen Road Arrah 332 - - 1.00 1.87 0.21 2.08 1238 2.1 Dec

157 01 Arrah 8 Rural Connectivity 8/70 Ram Ch Para To Jangal Erathen Road Arrah 332 - - 1.00 1.87 0.21 2.08 1238 2.1 Dec

158 01 Arrah 8 Rural Connectivity 8/71 Patra Para to Jamini New Erathen Road Arrah 332 - - 1.00 1.87 0.21 2.08 1238 2.1 Dec

159 01 Arrah 8 Rural Connectivity 8/72 Jamdahara Village Road Murram Arrah Jamdahara 318 - - 3.00 2.98 3.94 6.92 1975 7 Dec

160 01 Arrah 8 Rural Connectivity 8/73 Pindrachui Village Road Murram Arrah Pindrachui 328 - - 2.00 2.49 3.45 5.93 1646 6 Dec

161 01 Arrah 8 Rural Connectivity 8/74 Tasarbani Village Road Murram Arrah Tasarbani 319 - - 2.00 2.49 3.45 5.93 1646 6 Dec

162 01 Arrah 8 Rural Connectivity 8/75 Kundalbani Village Road Murram Arrah 317 - - 2.00 2.49 3.45 5.93 1646 6 Dec

163 01 Arrah 8 Rural Connectivity 8/76 Dhobanisole Village Road Murram Arrah Kuldiha 277 - - 2.00 1.99 3.45 5.44 1317 5.5 Dec

164 01 Arrah 8 Rural Connectivity 8/77 Ramkrishnapur Village Road Arrah 176 - - 2.00 1.99 3.45 5.44 1317 5.5 Dec

165 01 Arrah 8 Rural Connectivity 8/78 Arrah 176 - - 2.00 1.99 3.45 5.44 1317 5.5 Dec

166 01 Arrah 8 Rural Connectivity 8/79 Arrah 176 - - 2.00 1.99 3.45 5.44 1317 5.5 Dec

167 01 Arrah 8 Rural Connectivity 8/80 Banskhali Village Road Murram Road Arrah Banskhali 326 - - 2.00 2.49 3.45 5.93 1646 6 Dec

168 01 Arrah 8 Rural Connectivity 8/81 Dumuria Adibasipara Murram Road Arrah Dumuia 322 - - 1.00 1.49 1.97 3.46 988 3.5 Dec

2nd Feb'14

2nd Feb'14

2nd Feb'14

Baramara

Bhalukchuya

2nd Feb'14

Baramara

Bhalukchya

2nd Feb'14

Baramara

Bhalukchuya

2nd Feb'14

Jamdahara

2nd Feb'14

Jamdahara

2nd Feb'14

Jamdahara

2nd Feb'14

Jamdahara

Kundalbani 2nd Feb'14

Dhobanisole

2nd Feb'14

Ramkrishnapur

Ramkrishnapur

2nd Feb'14

Ramkrishnapur Adibasi Para Murram Road

Ramkrishnapur

Ramkrishnapur

2nd Feb'14

Ramkrishnapur Bagal Para Murram Road

Ramkrishnapur

Ramkrishnapur

2nd Feb'14

Dumuria 2nd Feb'14

Dumuria 2nd Feb'14

Page 54: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

54/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 132.89 165.04 297.93 88007

169 01 Arrah 9 9/1 Arrah Arrah Arrah 321 - - - 3.33 6.67 10.00 2208 15

- - - 3.33 6.67 10.00 2208

170 01 Arrah 11 11/1 Arrah Arrah Arrah - - - 0.88 3.52 4.40 583 4.4

171 01 Arrah 11 11/2 Construcation of Goat Shelter - 33 Nos Arrah Arrah Arrah - - - 2.89 8.66 11.55 1912 11.55

172 01 Arrah 11 11/3 Arrah Arrah Arrah - - - 1.16 2.70 3.85 765 3.85

- - - 4.92 14.88 19.80 3260

173 01 Arrah 14 14/1 Construcation of Soakpit -50 Nos Arrah Arrah Arrah - - - 0.50 0.50 1.00 331 1

- - - 0.50 0.50 1.00 331

174 01 Arrah 15 15/1 Arrah Arrah Arrah - - - 6.48 4.32 10.80 4291

- - - 6.48 4.32 10.80 4291

Arrah Total - - - 597.71 252.82 850.53 395837175 02 Baligeria 1 1/1 Excavation of Rajesh Singha's pond 273 67, 69 IL 2.95 - - 2.90 0.32 3.22 1922 Jun

176 02 Baligeria 1 1/2 Dhobasole 285 250 IL 2.84 - - 2.93 0.33 3.25 1940 Jun

177 02 Baligeria 1 1/3 Dhobasole 285 219 J.besra IL 3.01 - - 2.79 0.31 3.10 1845 Jun

178 02 Baligeria 1 1/4 Excavation of Kotal Murmu's Pond Belajhor 268 142 IL 2.62 - - 2.69 0.30 2.99 1780 Jun

179 02 Baligeria 1 1/5 Excavation of Laxman Murmu's Pond Belajhor 268 IL 2.75 - - 2.87 0.32 3.19 1898 Jun

Rural Connectivity TotalConstruction of BNRGSK

Rajibgandhi bharat nirman seva kendra Building

2nd Feb'14

Construction of BNRGSK TotalLivestock related works

Construcation of Poultry Shelter - 11 Nos

2nd Feb'14

Livestock related works

2nd Feb'14

Livestock related works

Construcation of Puccafloor, Urine tank & Fodder trough for cattle- 11 Nos

2nd Feb'14

Livestock related works TotalRural drinking water related works

2nd Feb'14

Rural drinking water related works TotalRural Sanitation related works

Const. of Individual House Hold Latrines for 200 beneficiries

2nd Feb'14

Rural Sanitation related works Total

Water Conservation & Water Harvesting

Baligeria

Bhudrubani

Balichouria R.Singha

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Japo Hembram's Pond at Dakkhin Dhobasole

Baligeria

Dhobasole

J.Hembram

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Jadu Besra's Pond at Dakkhin Dhobasole

Baligeria

Dhobasole

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Baligeria Pry.

K.Murmu

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Baligeria Pry.

L.Murmu

15th Feb'14

Page 55: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

55/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

180 02 Baligeria 1 1/6 Excavation of Amalendu Mahata's Pond 199 28 IL 2.02 - - 1.93 0.21 2.15 1279 Jun

181 02 Baligeria 1 1/7 Belaguri 269 P 2.42 - - 2.89 0.32 3.21 1916 Jun

182 02 Baligeria 1 1/8 Excavation of Nandalal Tudu'ss Pond 312 94 N.Tudu IL 2.95 - - 2.88 0.32 3.20 1910 Jun

183 02 Baligeria 1 1/9 Excavation of Mangal Hembram's Pond 312 234 M.Hem IL 2.84 - - 2.66 0.30 2.96 1763 Jun

184 02 Baligeria 1 1/10 Dhobasole 285 241 IL 3.54 - - 3.41 0.38 3.79 2258 Jun

185 02 Baligeria 1 1/11 Excavation of Rajib Patra's New Pond Neguria Neguria 192 197 R.Patra IL 3.01 - - 1.87 0.21 2.08 1238 Jun

186 02 Baligeria 1 1/12 Neguria Garduara 193 65 IL 2.86 - - 2.66 0.30 2.96 1763 Jun

187 02 Baligeria 1 1/13 Excavation of Fatunath Murmu's Pond Dhobasole 285 96 IL 3.45 - - 3.41 0.38 3.79 2258 Jun

188 02 Baligeria 1 1/14 Excavation of Santosh Mahata's Pond 273 IL 2.01 - - 1.87 0.21 2.08 1238 Jun

189 02 Baligeria 1 1/15 300 164 P.Bera IL 3.88 - - 3.55 0.39 3.95 2352 Jun

190 02 Baligeria 1 1/16 Excavation of Dijen Bera's Pond 300 257 D.Bera IL 3.23 - - 2.66 0.30 2.96 1763 Jun

191 02 Baligeria 1 1/17 Excavation of Karan Hansda's Pond Benachui 271 IL 3.63 - - 2.39 0.27 2.65 1580 Jun

192 02 Baligeria 1 1/18 Excavation of Jiten Tudu's Pond Goursai 286 91 J.Tudu IL 3.21 - - 2.31 0.26 2.56 1527 Jun

193 02 Baligeria 1 1/19 Excavation of Mansing Tudu's Pond Gopalpur 311 146 M.Tudu IL 2.90 - - 2.66 0.30 2.96 1763 Jun

194 02 Baligeria 1 1/20 Excavtion of Anil Nayek's Pond Murakhuta 313 06 IL 2.92 - - 2.66 0.30 2.96 1763 Jun

Water Conservation & Water Harvesting

Baligeria

Baligeria Pry.

Patharbandh

15th Feb'14

Water Conservation & Water Harvesting

Excavation of New Pond At Dakhin Belaguri

Baligeria

Baligeria High

PL

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Haoda Murmu's Pond at Dakkhin Dhobasole

Baligeria

Dhobasole

H.murmu

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Shuklal Hansda's Pond at Paschim Garduara

Baligeria

S.Hansda

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Dhobasole

F.Murmu

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Bhudrubani

Balichouria S.Mahata

15th Feb'14

Water Conservation & Water Harvesting

Excavatition of Paramananda Bera's Pond

Baligeria

Dhobasole

Amladangri

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Dhobasole

Amladangri

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Bhudrubani

K.Hansda

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Dhobasole

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Dhobasole

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Dhobagonindapur

A.Nayek

15th Feb'14

Page 56: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

56/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

195 02 Baligeria 1 1/21 312 86 IL 3.56 - - 3.41 0.38 3.79 2258 Jun

196 02 Baligeria 1 1/22 Excavation of Nandalal Tudu's Pond 312 94 N.Tudu IL 2.60 - - 2.39 0.27 2.65 1580 Jun

197 02 Baligeria 1 1/23 Neguria Garduara 193 62 IL 2.43 - - 2.31 0.26 2.56 1527 Jun

198 02 Baligeria 1 1/24 Excavation of Sita Tudu's Pond Palasia Palasia 281 112 S.Tudu IL 3.01 - - 2.31 0.26 2.56 1527 Jun

199 02 Baligeria 1 1/25 Palasia Chandua 280 117 IL 3.87 - - 3.55 0.39 3.95 2352 Jun

200 02 Baligeria 1 1/26 Palasia 310 183 K.Saren IL 3.22 - - 3.03 0.34 3.36 2005 Jun

201 02 Baligeria 1 1/27 Palasia 310 75 IL 3.10 - - 3.03 0.34 3.36 2005 Jun

202 02 Baligeria 1 1/28 Neguria Garduara 193 IL 2.73 - - 2.66 0.30 2.96 1763 Jun

203 02 Baligeria 1 1/29 Excavation of Durga Murmu's Pond Palasia Rokhni 282 230 IL 3.42 - - 3.55 0.39 3.95 2352 Jun

204 02 Baligeria 1 1/30 Jhagri Jhagri 276 313 K.Sing IL 2.59 - - 2.66 0.30 2.96 1763 89.57 Jun

- - - 82.88 9.21 92.09 54888

205 02 Baligeria 2 Drought Proofing 2/1 Jhagri Jhagri 276 598 K.Satua IL - 0.37 - 0.75 0.34 1.09 497 July

206 02 Baligeria 2 Drought Proofing 2/2 Jhagri Jhagri 276 P PL - 0.32 - 0.70 0.29 0.99 461 July

207 02 Baligeria 2 Drought Proofing 2/3 312 P PL - - 1.50 0.75 0.34 1.09 497 July

208 02 Baligeria 2 Drought Proofing 2/4 Dhobasole 285 231 IL - 0.07 - 0.30 0.10 0.40 198 June

Water Conservation & Water Harvesting

Excavation of Chaitanna Murmu's New Pond

Baligeria

Dhobagonindapur

Panchgachia

C.Murmu

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

Dhobagonindapur

Panchgachia

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Shuklal Hansda's Doba at Paschim Garduara

Baligeria

S.Hansda

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Panomoni Hembram's New Pond

Baligeria

P.Hembr

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Kanchan Saren's New Pond

Baligeria

Pitambarpur

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Chaitanna Murmu's New Pond

Baligeria

Pitambarpur

C.Murmu

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Rakhal Mahata's Pond at Garduara

Baligeria

R.Mahata

15th Feb'14

Water Conservation & Water Harvesting

Baligeria

D.Murmu

15th Feb'14

Water Conservation & Water Harvesting

Excavation of Krisna Chandra Singh's Pond at Jhagri

Baligeria

15th Feb'14

Water Conservation & Water Harvesting Total

Plantation of Kaliprasanna Satua's Land at Jhagri

Baligeria

15th Feb'14

Plantation of Jhagri to Batighora Rd Side at Jhagri

Baligeria

15th Feb'14

Rd Side Plantation of Panchgachia Pry. to Pitambarpur SSk

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Plantation of Japo Hembram 's Land at Dhobasolei

Baligeria

Dhobasole

J,Hembram

15th Feb'14

Page 57: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

57/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

209 02 Baligeria 2 Drought Proofing 2/5 300 P PL - - 1.50 0.75 0.34 1.09 497 July

210 02 Baligeria 2 Drought Proofing 2/6 283 P PL - - 1.50 0.75 0.34 1.09 497 June

211 02 Baligeria 2 Drought Proofing 2/7 Gopalpur 311 379 F.Tudu IL - 0.07 - 0.30 0.10 0.40 198 June

212 02 Baligeria 2 Drought Proofing 2/8 Jhagri Jhagri 276 559, 560 IL - 0.45 - 0.75 0.34 1.09 497 July

213 02 Baligeria 2 Drought Proofing 2/9 Plantation of Kaeshab Mahata's Land Neguria Betjhoria 194 IL - 0.32 - 0.70 0.29 0.99 461 June

214 02 Baligeria 2 Drought Proofing 2/10 Plantation of Sahadeb Mahata's Land Neguria Garduara 193 192, 195 IL - 0.32 - 0.70 0.29 0.99 461 July

215 02 Baligeria 2 Drought Proofing 2/11 283 IL - 2.00 - 2.29 0.68 2.97 1514 June

216 02 Baligeria 2 Drought Proofing 2/12 Plantation of Mantu Mahata's Land Neguria Garduara 193 188 IL - 0.32 - 0.70 0.29 0.99 461 June

217 02 Baligeria 2 Drought Proofing 2/13 Plantation of Santosh Rana's Land Neguria Neguria 192 108 S.Rana IL - 0.30 - 0.70 0.29 0.99 461 July

218 02 Baligeria 2 Drought Proofing 2/14 Palasia Rokhni 282 P PL - - 1.50 0.75 0.34 1.09 497 June

219 02 Baligeria 2 Drought Proofing 2/15 Palasia Rokhni 282 IL - 0.34 - 0.75 0.34 1.09 497 July

220 02 Baligeria 2 Drought Proofing 2/16 Plantation of Gunadhar Mahata's Land 273 283, 364 IL - 0.54 - 0.89 0.39 1.29 593 June

221 02 Baligeria 2 Drought Proofing 2/17 Rd Side Plantation At Belajhor Belajhor 268 P PL - - 1.50 0.75 0.34 1.09 497 June

222 02 Baligeria 2 Drought Proofing 2/18 Plantation of Bada Tudu's Land 283 1 B.Tudu IL - 2.00 - 2.29 0.68 2.97 1514 July

223 02 Baligeria 2 Drought Proofing 2/19 Plantation of Nagen Mahata's Land 273 255 IL - 0.50 - 0.89 0.39 1.29 593 June

224 02 Baligeria 2 Drought Proofing 2/20 Plantation of Rajesh Singha's Land 273 11, 76 IL - 0.25 - 0.68 0.29 0.97 448 July

Plantation of Rd. side From D. Dhobasole to Amladangri

Baligeria

Dhobasole

Amladangri

15th Feb'14

Plantation of PWD to Pry. Sclool at Bhudrubani

Baligeria

Bhudrubani

Bhudrubani

15th Feb'14

Plantation of Fagunath Tudu 's Land at Gopalpur

Baligeria

Dhobasole

15th Feb'14

Plantation of Falguni Hansda 's Land at Jhagri

Baligeria

F.Hansda

15th Feb'14

Baligeria

124, 125, 121

K.Mahata

15th Feb'14

Baligeria

S.Mahata

15th Feb'14

Plantation of Maheswar Kisku's Land at Bhudrubani

Baligeria

Bhudrubani

Bhudrubani

M.Kisku

15th Feb'14

Baligeria

M.Mahata

15th Feb'14

Baligeria

15th Feb'14

Plantation of Rd. side From Rokhni to Batighora

Baligeria

15th Feb'14

Plantation of Meghnath Mandi & Krishnaprasad Mandi's Land

Baligeria

M.Mandi

15th Feb'14

Baligeria

Bhudrubani

Balichouria G.Mahata

15th Feb'14

Baligeria

Baligeria Pry.

15th Feb'14

Baligeria

Bhudrubani

Bhudrubani

15th Feb'14

Baligeria

Bhudrubani

Balichouria N.Mahata

15th Feb'14

Baligeria

Bhudrubani

Balichouria R.Singha

15th Feb'14

Page 58: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

58/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

225 02 Baligeria 2 Drought Proofing 2/21 Plantation of Bhabanisankar Das's Land Banskuthi 159 B.Das IL - 1.73 - 2.29 0.68 2.97 1514 June

226 02 Baligeria 2 Drought Proofing 2/22 Plantation of Subrata Mahata's Land Baligeria 272 IL - 0.54 - 0.89 0.39 1.29 593 June

227 02 Baligeria 2 Drought Proofing 2/23 Plantation of Prabir Mahakul 's Land Banskuthi 159 IL - 0.79 - 1.00 0.39 1.39 665 July

228 02 Baligeria 2 Drought Proofing 2/24 Plantation of Baren Dehuri 's Land Banskuthi 159 IL - 0.32 - 0.70 0.29 0.99 461 June

229 02 Baligeria 2 Drought Proofing 2/25 Plantation of Tapan Pradhan 's Land Kuifulia 290 IL - 0.66 - 0.89 0.39 1.29 593 July

230 02 Baligeria 2 Drought Proofing 2/26 Plantation of Pulin Gong 's Land Kuifulia 290 P.Gong IL - 0.66 - 0.89 0.39 1.29 593 June

231 02 Baligeria 2 Drought Proofing 2/27 Khemasole 287 505 B.Jana IL - 0.11 - 0.45 0.13 0.57 296 June

232 02 Baligeria 2 Drought Proofing 2/28 Plantation of LaxmindraMahata's Land Belaguri 269 IL - 0.07 - 1.34 0.15 1.48 884 June

233 02 Baligeria 2 Drought Proofing 2/29 Plantation of Subhendu Mahata's Land 199 33 IL - 0.05 - 0.30 0.10 0.40 198 July

234 02 Baligeria 2 Drought Proofing 2/30 Plantation of Kumsole SSK Kumshol 270 G PL - - - 0.89 0.39 1.29 593 June

235 02 Baligeria 2 Drought Proofing 2/31 Plantation of Pathar Bandh S.S.K Kumshol 270 G PL - 0.05 - 0.30 0.10 0.40 198 June

236 02 Baligeria 2 Drought Proofing 2/32 314 P PL - - 1.50 0.75 0.34 1.09 497 July

237 02 Baligeria 2 Drought Proofing 2/33 Plantation of Ashidhari Mahata's Land Dudhiasole 272 IL - 0.50 - 0.89 0.39 1.29 593 June

238 02 Baligeria 2 Drought Proofing 2/34 Plantation of Sisir Samanta's Land 314 515, 294 IL - 0.25 - 0.68 0.29 0.97 448 July

239 02 Baligeria 2 Drought Proofing 2/35 314 D,Bera IL - 0.32 - 0.70 0.29 0.99 461 June

Baligeria

Banskuthi

103, 585, 101, 99, 575, 83, 103, 582

15th Feb'14

Baligeria

Baligeria

S.Mahata

15th Feb'14

Baligeria

Banskuthi

95, 96, 92, 99, 574

P.Mahakul

15th Feb'14

Baligeria

Banskuthi

14, 8, 12, 10, 9, 11

B.Dehuri

15th Feb'14

Baligeria

Baligeria

372, 373, 370

T.Pradhan

15th Feb'14

Baligeria

Baligeria

149, 360, 377

15th Feb'14

Plantation of Baikuntha Nath Jana 's Land

Baligeria

Baligeria

15th Feb'14

Baligeria

Baligeria High

L.Mahata

15th Feb'14

Baligeria

Baligeria High

Patharbandh

S.Mahata

15th Feb'14

Baligeria

Baligeria High

15th Feb'14

Baligeria

Baligeria High

15th Feb'14

Rd Side Plantation of Baghajatin Chak to Dhobagobinda Pry. School

Baligeria

Dhobagonindapur

Dhobagobindapur

15th Feb'14

Baligeria

Bhudrubani

A.Mahata

15th Feb'14

Baligeria

Dhobagonindapur

Dhobagobindapur

S.Samanta

15th Feb'14

Plantation of D ebendra Bera's Land Baligeria

Dhobagonindapur

Dhobagobindapur

235, 201, 203

15th Feb'14

Page 59: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

59/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

240 02 Baligeria 2 Drought Proofing 2/36 Jhagri Jhagri 276 559, 560 IL - 0.50 - 0.89 0.39 1.29 593 June

241 02 Baligeria 2 Drought Proofing 2/37 Plantation at Bishu Hembram's Land Kustikra Salboni 289 211 IL - 0.25 - 0.68 0.29 0.97 448 21090 July

242 02 Baligeria 2 Drought Proofing 2/38 Nursery at Baligeria GP Baligeria - 0.01 - 1.99 2.96 4.95 1317

- - - 33.64 15.20 48.84 22280

243 02 Baligeria 3 3/1 Palasia Palasia 281 P PL - - 0.23 0.50 0.06 0.56 333 April

244 02 Baligeria 3 3/2 Neguria Betjhoria 193 P PL - - 3.00 1.44 0.16 1.60 955 May

245 02 Baligeria 3 3/3 Re-excavation of Dinar Bandh's Canal 199 P PL - - 1.00 0.50 0.07 0.56 329 March

246 02 Baligeria 3 3/4 Kustikra Khemasole 287 P PL - - 2.00 1.00 0.11 1.11 660 June

247 02 Baligeria 3 3/5 273 P PL - - 1.00 0.50 0.07 0.56 329 May

248 02 Baligeria 3 3/6 Kustikra Bhaluktara 299 P PL - - 1.00 0.50 0.07 0.56 329 April

249 02 Baligeria 3 3/7 Palasia Palasia 281 P PL - - 1.00 0.50 0.07 0.56 329 May

250 02 Baligeria 3 3/8 Dudhiasole 272 P PL - - 2.00 1.00 0.11 1.11 660 March

251 02 Baligeria 3 3/9 Dudhiasole 272 P PL - - 1.00 0.50 0.07 0.56 329 June

252 02 Baligeria 3 3/10 Neguria Garduara 193 P PL - - 3.00 1.44 0.16 1.60 955 May

253 02 Baligeria 3 3/11 Palasia 310 P PL - - 1.00 0.50 0.07 0.56 329 April

254 02 Baligeria 3 3/12 Banskuthi 159 P PL - - 1.00 0.50 0.07 0.56 329 May

Plantation of Falguni Hansda's Land at Jhagri

Baligeria

F.Hansda

15th Feb'14

Baligeria

B.Hembram

15th Feb'14

Baligeria

Baligeria

15th Feb'14

Drought Proofing TotalMicro Irrigation Works

Excavation of Canal Rupai Mandi's House to Bhuta Hembram's House

Baligeria

15th Feb'14

Micro Irrigation Works

Re-excavation of Canal From Betjhoria to Majhibar

Baligeria

15th Feb'14

Micro Irrigation Works

Baligeria

Baligeria High

Patharbandh

15th Feb'14

Micro Irrigation Works

Const. of Canal From Khemasole Patkunya to Main Rd.

Baligeria

15th Feb'14

Micro Irrigation Works

Re-excavation of Canal From Balichouria Rd. to Neguria Rd.

Baligeria

Bhudrubani

Balichouria 15th Feb'14

Micro Irrigation Works

Const. of Canal From Palasia Bakultala to Gangadhar Rana's House

Baligeria

15th Feb'14

Micro Irrigation Works

Const. of Canal From Rupai Mandi's House to Bhuta Hembram's House

Baligeria

15th Feb'14

Micro Irrigation Works

Const. of Canal From Dudhiasole Rd. to Garduara

Baligeria

Bhudrubani

15th Feb'14

Micro Irrigation Works

Const. of Canal From Dudhiasole to Neguria I.C.D.S.

Baligeria

Bhudrubani

15th Feb'14

Micro Irrigation Works

Re-excavation of Canal of Paschim Garduara

Baligeria

15th Feb'14

Micro Irrigation Works

Const. of Canal From Pitambarpur S.S.K. to Mokra Mandi's House

Baligeria

Pitambarpur

15th Feb'14

Micro Irrigation Works

Re-excavation of Canal From Shib Temple to Suresh Dehuri's field

Baligeria

Banskuthi

15th Feb'14

Page 60: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

60/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

255 02 Baligeria 3 3/13 Banskuthi 159 P PL - - 1.00 0.50 0.07 0.56 329 March

256 02 Baligeria 3 3/14 Banskuthi 159 P PL - - 1.00 0.50 0.07 0.56 329 June

257 02 Baligeria 3 3/15 Kusumkuti 196 P PL - - 1.00 0.50 0.07 0.56 329 20.23 May

- - - 10.35 1.26 11.62 6856

258 02 Baligeria 5 5/1 Re-excavation of Bijan Mahata's Pond 273 IL 1.75 - - 2.47 0.27 2.74 1633 Jan

259 02 Baligeria 5 5/2 273 IL 1.01 - - 1.53 0.17 1.70 1014 Feb

260 02 Baligeria 5 5/3 Re- Excavation of Tikaram Tudu's Doba Khemasole 287 T.Tudu IL 0.95 - - 1.34 0.15 1.48 884 March

261 02 Baligeria 5 5/4 199 109 IL 2.30 - - 2.82 0.31 3.14 1869 Jan

262 02 Baligeria 5 5/5 Khemasole 287 IL 1.00 - - 0.32 0.08 0.40 210 Feb

263 02 Baligeria 5 5/6 Re- Excavation of Khejhur Garia 199 P PL 1.23 - - 1.34 0.15 1.48 884 Jan

264 02 Baligeria 5 5/7 Dudhiasole 272 P PL 1.34 - - 1.34 0.15 1.48 884 Dec

265 02 Baligeria 5 5/8 Re-excavation of Shree Mati Deo Pond Murakhuta 313 44 M.Deo IL 2.08 - - 1.53 0.17 1.70 1014 Jan

266 02 Baligeria 5 5/9 312 225 IL 1.67 - - 0.98 0.13 1.12 652 March

267 02 Baligeria 5 5/10 Jhagri Jhagri 276 227 P PL 2.75 - - 3.55 0.39 3.95 2352 Feb

268 02 Baligeria 5 5/11 Re-excavation of Aso Hembram's Pond 312 230 IL 1.73 - - 1.34 0.15 1.48 884 Jan

Micro Irrigation Works

Const. of Canal From Banskuthi Gramin Rd. to Satyen Mahapatra's Land

Baligeria

Banskuthi

15th Feb'14

Micro Irrigation Works

Const. of Canal From Kalua Shand to Ashok Barik's House

Baligeria

Banskuthi

15th Feb'14

Micro Irrigation Works

Const. of Canal From Murari Pasoan's House to Betjhoria

Baligeria

Banskuthi

15th Feb'14

Micro Irrigation Works TotalRenovation of Traditional Water Bodies

Baligeria

Bhudrubani

Balichouria B. Mahata

15th Feb'14

Renovation of Traditional Water Bodies

Re- Excavation of Nirmal Mahata's Pond

Baligeria

Bhudrubani

Balichouria N.Mahata

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Baligeria High

15th Feb'14

Renovation of Traditional Water Bodies

Re- Excavation of Dhiren Mahata's Pond

Baligeria

Baligeria High

Patharbandh

D.Mahata

15th Feb'14

Renovation of Traditional Water Bodies

Re- Excavation of Swapan Mahata's Doba

Baligeria

Baligeria High

s.Mahata

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Baligeria High

Patharbandh

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Dudhiasole Desh Pukur

Baligeria

Bhudrubani

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Dhobagonindapur

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavattion of Pradhan Hembram's Pond at Panchgachia Purba Para

Baligeria

Dhobagonindapur

Panchgachia

P.Hemram

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavattion of Jhagri Thakur Than Pond at Jhagri

Baligeria

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Dhobagonindapur

Panchgachia

A.Hembram

15th Feb'14

Page 61: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

61/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

269 02 Baligeria 5 5/12 Murakhuta 313 140 P PL 2.49 - - 2.47 0.27 2.74 1633 April

270 02 Baligeria 5 5/13 Re-excavation of Manindra Tudu's Pond Palasia Palasia 281 122 M.Tudu IL 2.01 - - 1.53 0.17 1.70 1014 Jan

271 02 Baligeria 5 5/14 Neguria 191 249 IL 2.34 - - 1.53 0.17 1.70 1014 Feb

272 02 Baligeria 5 5/15 Re-excavation of Shankar Patra's Pond Neguria Neguria 192 240 S.Patra IL 2.12 - - 1.89 0.21 2.10 1250 March

273 02 Baligeria 5 5/16 Re-excavation of Ajit Mahata's Pond Neguria Garduara 193 249 IL 1.16 - - 1.34 0.15 1.48 884 Feb

274 02 Baligeria 5 5/17 Kustikra Khemasole 287 312 IL 1.36 - - 1.34 0.15 1.48 884 April

275 02 Baligeria 5 5/18 Kustikra Khemasole 287 540 IL 1.01 - - 0.59 0.08 0.66 388 Jan

276 02 Baligeria 5 5/19 Re-excavation of Sidanath Tudu's Pond Baramchati 267 S.Tudu IL 1.27 - - 1.34 0.15 1.48 884 Feb

277 02 Baligeria 5 5/20 Baramchati 267 P PL 2.12 - - 1.89 0.21 2.10 1250 Nov

278 02 Baligeria 5 5/21 Baramchati 267 T.Sing IL 2.67 - - 2.82 0.31 3.14 1869 Dec

279 02 Baligeria 5 5/22 312 126 IL 2.01 - - 1.53 0.17 1.70 1014 Feb

280 02 Baligeria 5 5/23 312 86 IL 1.01 - - 0.59 0.08 0.66 388 April

281 02 Baligeria 5 5/24 Re-excavation of Sundgi Baske's Pond 312 159 S.Baske IL 1.06 - - 0.59 0.08 0.66 388 Jan

282 02 Baligeria 5 5/25 Re-excavation of Anil Nayek's Pond Murakhuta 313 6 IL 2.13 - - 2.47 0.27 2.74 1633 March

283 02 Baligeria 5 5/26 Re-excavation of Sri Mati Deo Pond Murakhuta 313 M.Deo IL 1.04 - - 0.59 0.08 0.66 388 Nov

Renovation of Traditional Water Bodies

Re-excavation of Murakhuta Desh Pukur

Baligeria

Dhobagonindapur

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Shuklal Chopeyar's Pond

Baligeria

Sahasralinga

S.Chapeyar

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

A.Mahata

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Chunaram Hansda's Pond

Baligeria

C.Hansda

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Chandrai Murmu's Pond

Baligeria

C.Murmu

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Baligeria Pry.

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Pond Near the Baramchati Jahira

Baligeria

Baligeria Pry.

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Tarakeswar Singha's Pond

Baligeria

Baligeria Pry.

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Tarachand Hembram's Pond

Baligeria

Panchgachia

Panchgachia

T.Hembram

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Chaitanna Murmu's Pond

Baligeria

Panchgachia

Panchgachia

C.Murmu

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Panchgachia

A.Nayek

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Panchgachia

15th Feb'14

Page 62: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

62/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

284 02 Baligeria 5 5/27 Murakhuta 313 140 P PL 2.24 - - 2.47 0.27 2.74 1633 Feb

285 02 Baligeria 5 5/28 Re-excavation of Deben Hansda'ss Pond Baramchati 267 IL 2.34 - - 2.81 0.31 3.13 1863 March

286 02 Baligeria 5 5/29 Re-excavation of Jamai Saren's Pond Kustikra Khemasole 299 J.Saren IL 2.46 - - 2.47 0.27 2.74 1633 Jan

287 02 Baligeria 5 5/30 Re-excavation of Satya Shee's Pond Kustikra Salboni 289 164,165 S.Shee IL 2.45 - - 2.81 0.31 3.13 1863 Feb

288 02 Baligeria 5 5/31 Re-excavation of Dipak Mahakul's Pond Banskuthi 159 IL 1.67 - - 1.53 0.17 1.70 1014 March

289 02 Baligeria 5 5/32 Kusumkuti 196 19 S.Tudu IL 2.42 - - 2.81 0.31 3.13 1863 Feb

290 02 Baligeria 5 5/33 Banskuthi 159 A.Maity IL 2.01 - - 2.47 0.27 2.74 1633 Jan

291 02 Baligeria 5 5/34 Banskuthi 159 IL 2.01 - - 2.47 0.27 2.74 1633 61.21 April

- - - 60.85 6.87 67.73 40301

292 02 Baligeria 6 Land Development 6/1 Filling Soil of Golok Mahata's Doba Neguria Garduara 193 117 IL - 0.30 - 1.86 0.21 2.07 1232 Jan

293 02 Baligeria 6 Land Development 6/2 Filling Soil of Surendra Dhal's Doba Murakhuta 313 S.Dhal IL - 0.10 - 0.65 0.07 0.72 430 Feb

294 02 Baligeria 6 Land Development 6/3 Filling Soil of Laxmindra Sheet's Doba Murakhuta 313 L.Sheet IL - 0.10 - 0.65 0.07 0.72 430 March

295 02 Baligeria 6 Land Development 6/4 Palasia Rokhni 282 230 P PL - 0.20 - 1.20 0.13 1.34 796 April

296 02 Baligeria 6 Land Development 6/5 Palasia 310 141 P PL - 0.10 - 0.65 0.07 0.72 430 March

297 02 Baligeria 6 Land Development 6/6 Neguria Garduara 193 250 IL - 0.20 - 1.20 0.13 1.34 796 Jan

Renovation of Traditional Water Bodies

Re-excavation of Desh Pukuk at Murakhunta

Baligeria

Panchgachia

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Baligeria Pry.

D.Hansda

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

15th Feb'14

Renovation of Traditional Water Bodies

Baligeria

Banskuthi

D.Mahakul

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Sundar Tudu's Pond at Kusumkuthi

Baligeria

Banskuthi

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavatino of Akeswar Maity's Pond at Banskuthi

Baligeria

Banskuthi

15th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Swapan Mahakul's Pond at Banskuthi

Baligeria

Banskuthi

S.Mahakul

15th Feb'14

Renovation of Traditional Water Bodies Total

Baligeria

G.Mahata

15th Feb'14

Baligeria

Panchgachia

15th Feb'14

Baligeria

Panchgachia

15th Feb'14

Filling Soil of Doba near the Rokhni S.S.K.

Baligeria

15th Feb'14

Filling Soil of Doba near the Pitambarpur S.S.K.

Baligeria

Pitambarpur

15th Feb'14

Filling Soil of Ajit Mahata's Doba at Garduara

Baligeria

A.Mahata

15th Feb'14

Page 63: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

63/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

298 02 Baligeria 6 Land Development 6/7 312 G PL - 0.20 - 1.20 0.13 1.34 796 Feb

299 02 Baligeria 6 Land Development 6/8 Murakhuta 313 G PL - 0.10 - 0.65 0.07 0.72 430 1.3 Jan

- - - 8.07 0.90 8.96 5341

300 02 Baligeria 7 7/1 Repair of Khudgar Kasimar Bandh Jhagri Jhagri 276 P PL - - 0.90 1.04 0.14 1.19 691 March

301 02 Baligeria 7 7/2 Cons. Of Lock gate over the Nekrakhal Murakhuta 313 P PL - - 0.50 0.44 0.50 0.94 290 Jan

302 02 Baligeria 7 7/3 Repair of Dinar Bandh 199 P PL - - 0.30 0.60 0.10 0.69 395 April

303 02 Baligeria 7 7/4 Re-excavation of Bandh Repair 312 P PL - - 1.50 1.48 0.16 1.64 979 Feb

304 02 Baligeria 7 7/5 Kustikra Kuifulia 290 P PL - - 1.50 1.48 0.16 1.64 979 March

305 02 Baligeria 7 7/6 Benachui 271 P PL - - 0.90 2.67 0.30 2.97 1769 April

306 02 Baligeria 7 7/7 Repair of Khudgar Tilka Bandh Jhagri Jhagri 276 P PL - - 0.30 0.60 0.10 0.69 395 5.9 Feb

- - - 8.30 1.46 9.76 5497

307 02 Baligeria 8 Rural Connectivity 8/1 199 P PL - - 1.50 1.31 1.51 2.82 869 All

308 02 Baligeria 8 Rural Connectivity 8/2 Kustikra Khemasole 287 P PL - - 0.80 0.45 0.57 1.02 296 All

309 02 Baligeria 8 Rural Connectivity 8/3 312 P PL - - 0.50 0.44 0.50 0.94 290 All

310 02 Baligeria 8 Rural Connectivity 8/4 Murakhuta 313 P PL - - 1.50 1.31 1.51 2.82 869 All

311 02 Baligeria 8 Rural Connectivity 8/5 312 P PL - - 2.00 1.74 2.01 3.75 1152 All

Land Leveling at Panchgachia Pry. School

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Land Leveling at Murakhunta Pry. School

Baligeria

Panchgachia

15th Feb'14

Land Development TotalFlood Control & Protecation

Baligeria

15th Feb'14

Flood Control & Protecation

Baligeria

Panchgachia

15th Feb'14

Flood Control & Protecation

Baligeria

Baligeria High

Patharbandh

15th Feb'14

Flood Control & Protecation

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Flood Control & Protecation

Re-excavation of canal at kaifulia Village

Baligeria

15th Feb'14

Flood Control & Protecation

Embankment of Bandh From Benachui to Jharabani

Baligeria

Bhudrubani

15th Feb'14

Flood Control & Protecation

Baligeria

15th Feb'14

Flood Control & Protecation Total

Improvement of Rd. From Main Rd. to Patharbandh I.C.D.S. Kendra

Baligeria

Baligeria High

Patharbandh

15th Feb'14

Improvement of Rd. From Ramdhan Para to Bukai Murmu's House

Baligeria

15th Feb'14

Improvement of Rd. From Kirtanath Hembram's House to Panchgachia Purba para Cannucting Rd

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Improvement of Rd.From Murakhunta to Nekra Khal

Baligeria

Panchgachia

15th Feb'14

Improvement of Rd.From Panchgachia purba para to PWD

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Page 64: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

64/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

312 02 Baligeria 8 Rural Connectivity 8/6 312 P PL - - 1.50 1.31 1.51 2.82 869 All

313 02 Baligeria 8 Rural Connectivity 8/7 Belajhor 268 P PL - - 2.00 1.74 2.01 3.75 1152 All

314 02 Baligeria 8 Rural Connectivity 8/8 Baramchati 267 P PL - - 0.50 0.44 0.50 0.94 290 All

315 02 Baligeria 8 Rural Connectivity 8/9 Baramchati 267 P PL - - 1.00 0.87 1.00 1.88 579 All

316 02 Baligeria 8 Rural Connectivity 8/10 Baramchati 267 P PL - - 0.50 0.44 0.50 0.94 290 All

317 02 Baligeria 8 Rural Connectivity 8/11 283 P PL - - 1.50 1.31 1.51 2.82 869 All

318 02 Baligeria 8 Rural Connectivity 8/12 Neguria Garduara 193 P PL - - 2.00 1.74 2.01 3.75 1152 All

319 02 Baligeria 8 Rural Connectivity 8/13 Jhagri Jhagri 276 P PL - - 2.00 1.74 2.01 3.75 1152 All

320 02 Baligeria 8 Rural Connectivity 8/14 Kusumkuti 196 P PL - - 2.00 1.74 2.01 3.75 1152 All

321 02 Baligeria 8 Rural Connectivity 8/15 312 P PL - - 0.50 0.44 0.50 0.94 290 All

322 02 Baligeria 8 Rural Connectivity 8/16 Kustikra Khemasole 287 P PL - - 1.00 0.87 1.00 1.88 579 All

323 02 Baligeria 8 Rural Connectivity 8/17 Belajhor 268 P PL - - 0.50 0.44 0.50 0.94 290 All

324 02 Baligeria 8 Rural Connectivity 8/18 Improvement of Gopalpur Vill. Rd. Gopalpur 311 P PL - - 0.50 0.44 0.50 0.94 290 All

325 02 Baligeria 8 Rural Connectivity 8/19 283 P PL - - 0.50 0.44 0.50 0.94 290 All

326 02 Baligeria 8 Rural Connectivity 8/20 Neguria Betjhoria 194 P PL - - 0.70 0.62 0.70 1.32 408 All

327 02 Baligeria 8 Rural Connectivity 8/21 Neguria 191 P PL - - 1.50 1.31 1.51 2.82 869 All

Improvement of Rd.From Panchgachia Dakkhin para to Pailot chok

Baligeria

Panchgachia

Panchgachia

15th Feb'14

Improvement of Rd. From Bira Rana's House to Ashu Pukur

Baligeria

Baligeria Pry.

15th Feb'14

Improvement of Rd. From Rabi Maity House to Kali Murmu's House

Baligeria

Baligeria Pry.

15th Feb'14

Improvement of Rd. From State Bank to Muslim Para

Baligeria

Baligeria Pry.

15th Feb'14

Improvement of Rd. From Ashok Bera's House to Iswar Murmu's House

Baligeria

Baligeria Pry.

15th Feb'14

Improvement. of Rd. With Soil & Moram From Bhudrubani Pich Rd. to Dhobasole Chak

Baligeria

Bhudrubani

Bhudrubani

15th Feb'14

Improvement of Rd. With Soil & Moram & Const. of Drain From Garduara Khal to Dudhiasole

Baligeria

15th Feb'14

Improvement of Rd. From Jagari & Amdiha's Border to P.W.D. Mission Via Bakultala

Baligeria

15th Feb'14

Improvement of New Rd. From Kusumkuti to Patharbandh

Baligeria

Banskuthi

15th Feb'14

Improvement of Rd.From Panchgachia Uttar Para to Purba Para Connecting Rd.

Baligeria

Dhobagonindapur

Panchgachia

15th Feb'14

Improvement of Rd. From Khemasole S.S.K. to Nimtala Chak

Baligeria

15th Feb'14

Improvement of Earthen & Moram Rd. From Sabarnatha Pond to Bajun Murmu's House

Baligeria

Baligeria Pry.

15th Feb'14

Baligeria

Dhobasole

15th Feb'14

Improvement of Rd. From Bhudrubani Pich Rd. to Pailot Pond

Baligeria

Bhudrubani

Bhudrubani

15th Feb'14

Improvement of Rd. of Betjhoria Gramin Rd.

Baligeria

15th Feb'14

Improvement of Rd. of Sahasralinga Gramin Rd.

Baligeria

Sahasralinga

15th Feb'14

Page 65: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

65/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

328 02 Baligeria 8 Rural Connectivity 8/22 199 P PL - - 1.00 0.87 1.00 1.88 579 All

329 02 Baligeria 8 Rural Connectivity 8/23 Rokhni 282 P PL - - 1.50 1.31 1.51 2.82 869 All

330 02 Baligeria 8 Rural Connectivity 8/24 199 P PL - - 1.50 1.31 1.51 2.82 869 All

331 02 Baligeria 8 Rural Connectivity 8/25 Belaguri 269 P PL - - 0.50 0.44 0.50 0.94 290 All

332 02 Baligeria 8 Rural Connectivity 8/26 199 P PL - - 0.50 0.44 0.50 0.94 290 All

333 02 Baligeria 8 Rural Connectivity 8/27 Palasia Rokhni 282 P PL - - 1.50 1.31 1.51 2.82 869 All

334 02 Baligeria 8 Rural Connectivity 8/28 Jhagri 279 P PL - - 0.50 0.44 0.50 0.94 290 All

335 02 Baligeria 8 Rural Connectivity 8/29 Banskuthi 159 P PL - - 1.50 1.31 1.51 2.82 869 All

336 02 Baligeria 8 Rural Connectivity 8/30 Murakhuta 313 P PL - - 1.00 0.87 1.00 1.88 579 All

337 02 Baligeria 8 Rural Connectivity 8/31 Belaguri 269 P PL - - 1.50 1.31 1.51 2.82 869 All

338 02 Baligeria 8 Rural Connectivity 8/32 Kustikra Kustikra 288 P PL - - 1.50 1.31 1.51 2.82 869 All

339 02 Baligeria 8 Rural Connectivity 8/33 Dhobasole 285 P PL - - 2.00 1.74 2.01 3.75 1152 All

340 02 Baligeria 8 Rural Connectivity 8/34 273 P PL - - 1.00 0.87 1.00 1.88 579 All

341 02 Baligeria 8 Rural Connectivity 8/35 Neguria Garduara 193 P PL - - 1.50 1.31 1.51 2.82 869 All

342 02 Baligeria 8 Rural Connectivity 8/36 Palasia Rokhni 282 P PL - - 1.00 0.87 1.00 1.88 579 All

343 02 Baligeria 8 Rural Connectivity 8/37 Jhagri Jhagri 276 P PL - - 0.50 0.44 0.50 0.94 290 All

Improvement of Earthen RD from Madan Saha House to Nimai Mahata's House

Baligeria

Baligeria High

Patharbandh

15th Feb'14

Improvement of Pradhan Mandi's House to Batighora

Baligeria

Bhudrubani

15th Feb'14

Improvement of Earthen Rd. Dama Murmu's House to Charkona Pukur

Baligeria

Baligeria High

Patharbandh

15th Feb'14

Improvement of Rd From Durga Mandap to Ashu Babu's Pond & Kumsole Gramin Rd

Baligeria

Baligeria High

15th Feb'14

Improvement of Rd From Rai Hotele to Dinar Bandh

Baligeria

Baligeria High

Patharbandh

15th Feb'14

Improvement of Rd. From P.W.D. to Rokhni Mouza

Baligeria

15th Feb'14

Improvement of Rd. From Andharisole Paschim School Para to Ghasipada Jangal

Baligeria

Andharisole

15th Feb'14

Improvement of Rd. From Banskuthi Hat Tala to Tikrapara

Baligeria

Banskuthi

15th Feb'14

Improvement of Rd. From Murakhunta to Nekra Khal (Kumpada)

Baligeria

Dhobagonindapur

15th Feb'14

Improvement of Rd. From Main Rd. to Forest Office

Baligeria

Baligeria High

15th Feb'14

Improvement of Rd. From Nekrasole Main Rd. to Kustikra Temple Compound

Baligeria

15th Feb'14

Improvement of Rd. From D. Dhobasole Rd. to Bela Hansda's Hous Rd. at Amladangri

Baligeria

Dhobasole

15th Feb'14

Improvement of Rd. & Const. of Drain From Balichouria Gramin Rd.

Baligeria

Bhudrubani

Balichouria 15th Feb'14

Improvement of Rd. From Garduara Pry. School to Khal

Baligeria

15th Feb'14

Improvement of Rd. From Rokhni Pich Rd. to Batighora

Baligeria

15th Feb'14

Improvement of Rd. From Jhogri Paschim Para Gramin Rd.

Baligeria

15th Feb'14

Page 66: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

66/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

344 02 Baligeria 8 Rural Connectivity 8/38 Banskuthi 159 P PL - - 1.50 1.31 1.51 2.82 869 All

345 02 Baligeria 8 Rural Connectivity 8/39 312 P PL - - 0.50 0.44 0.50 0.94 290 All

346 02 Baligeria 8 Rural Connectivity 8/40 Benachui 271 P PL - - 0.50 0.44 0.50 0.94 290 All

347 02 Baligeria 8 Rural Connectivity 8/41 Kustikra Khemasole 287 P PL - - 0.80 0.45 0.57 1.02 296 All

348 02 Baligeria 8 Rural Connectivity 8/42 300 P PL - - 1.50 1.31 1.51 2.82 869 All

349 02 Baligeria 8 Rural Connectivity 8/43 Dudhiasole 272 P PL - - 1.50 1.31 1.51 2.82 869 All

350 02 Baligeria 8 Rural Connectivity 8/44 Neguria Garduara 193 P PL - - 1.00 0.87 1.00 1.88 579 All

351 02 Baligeria 8 Rural Connectivity 8/45 Palasia 310 P PL - - 0.80 0.45 0.57 1.02 296 All

352 02 Baligeria 8 Rural Connectivity 8/46 312 P PL - - 0.50 0.44 0.50 0.94 290 All

353 02 Baligeria 8 Rural Connectivity 8/47 Jhagri Jhagri 276 P PL - - 0.50 0.44 0.50 0.94 290 All

354 02 Baligeria 8 Rural Connectivity 8/48 Benachui 271 P PL - - 0.70 0.62 0.70 1.32 408 All

355 02 Baligeria 8 Rural Connectivity 8/49 Improvement of Jhagri Adibasi Para Jhagri Jhagri 276 P PL - - 0.50 0.44 0.50 0.94 290 All

356 02 Baligeria 8 Rural Connectivity 8/50 Palasia Rokhni 282 P PL - - 0.80 0.45 0.57 1.02 296 All

357 02 Baligeria 8 Rural Connectivity 8/51 Dudhiasole 272 P PL - - 0.80 0.70 0.80 1.49 461 All

358 02 Baligeria 8 Rural Connectivity 8/52 Neguria 191 P PL - - 0.70 0.62 0.70 1.32 408 All

359 02 Baligeria 8 Rural Connectivity 8/53 Neguria Betjhoria 194 P PL - - 0.80 0.45 0.57 1.02 296 All

Improvement of Rd. From Banskuthi I.C.D.S. to Pasupati Nayek's House

Baligeria

Banskuthi

15th Feb'14

Improvement of Rd. From Panchgachia Pry. School to P.W.D.Via Gamaria

Baligeria

Dhobagonindapur

Panchgachia

15th Feb'14

Improvement of Rd. From P.W.D. Main Rd. to Benachui

Baligeria

Bhudrubani

15th Feb'14

Improvement of Rd. From Khemasole S.S.K. to Nimtala Chak

Baligeria

15th Feb'14

Improvement of New Rd. From Amladangri to Dolgram SKUS

Baligeria

Dhobasole

Amladangri

15th Feb'14

Improvement of Rd. From Talbandh to Balichouria S.S.K.

Baligeria

Bhudrubani

15th Feb'14

Improvement of Rd. From Garduara Main Rd. to Benthjharia Pry. School

Baligeria

15th Feb'14

Improvement of Rd. From Pitambarpur to P.W.D.

Baligeria

Pitambarpur

15th Feb'14

Improvement of New Rd. From Panchgachia Uttar Para to Purba Para Connecting Rd.

Baligeria

Dhobagonindapur

Panchgachia

15th Feb'14

Improvement of Rd. From Jhagri Shit Para to Gorudahar

Baligeria

15th Feb'14

Improvement of Rd. With Soil & Moram From Benachui P.W.D. to Jahirathan

Baligeria

Bhudrubani

15th Feb'14

Baligeria

15th Feb'14

Improvement of Rd. From P.W.D. to ending border of Rokhni Mouza

Baligeria

15th Feb'14

Improvement of Rd. From P.W.D. to Dudhiasole

Baligeria

Bhudrubani

15th Feb'14

Improvement of Rd. From Sahasralinga to Kusumkuti

Baligeria

Sahasralinga

15th Feb'14

Improvement of Rd. From Bentjhoria to Dudhiasole

Baligeria

15th Feb'14

Page 67: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

67/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

360 02 Baligeria 8 Rural Connectivity 8/54 Palasia Chandua 280 P PL - - 0.80 0.45 0.57 1.02 296 All

361 02 Baligeria 8 Rural Connectivity 8/55 Kustikra Khemasole 287 P PL - - 1.00 0.87 1.00 1.88 579 All

362 02 Baligeria 8 Rural Connectivity 8/56 Kustikra Khemasole 287 P PL - - 1.50 1.31 1.51 2.82 869 All

363 02 Baligeria 8 Rural Connectivity 8/57 Jaraboni 284 P PL - - 0.30 0.26 0.30 0.55 171 All

364 02 Baligeria 8 Rural Connectivity 8/58 Kustikra Bhaluktara 299 P PL - - 0.70 0.62 0.70 1.32 408 All

365 02 Baligeria 8 Rural Connectivity 8/59 Kustikra Bhaluktara 299 P PL - - 0.50 0.44 0.50 0.94 290 All

366 02 Baligeria 8 Rural Connectivity 8/60 Kustikra Bhaluktara 299 P PL - - 1.50 1.31 1.51 2.82 869 All

367 02 Baligeria 8 Rural Connectivity 8/61 Kustikra Bhaluktara 299 P PL - - 1.00 0.87 1.00 1.88 579 All

368 02 Baligeria 8 Rural Connectivity 8/62 Palasia 310 P PL - - 1.50 1.31 1.51 2.82 869 All

369 02 Baligeria 8 Rural Connectivity 8/63 Palasia Palasia 281 P PL - - 0.70 0.62 0.70 1.32 408 All

370 02 Baligeria 8 Rural Connectivity 8/64 Baramchati 267 P PL - - 1.00 0.87 1.00 1.88 579 All

371 02 Baligeria 8 Rural Connectivity 8/65 Kustikra Salboni 289 P PL - - 1.50 1.31 1.51 2.82 869 All

372 02 Baligeria 8 Rural Connectivity 8/66 300 P PL - - 1.50 1.31 1.51 2.82 869 All

373 02 Baligeria 8 Rural Connectivity 8/67 Goursai 286 P PL - - 1.50 1.31 1.51 2.82 869 All

374 02 Baligeria 8 Rural Connectivity 8/68 273 P PL - - 2.00 1.74 2.01 3.75 1152 All

375 02 Baligeria 8 Rural Connectivity 8/69 Kustikra Khemasole 287 P PL - - 4.00 3.49 4.02 7.51 2311 All

Improvement of Rd. With Soil & Moram From Chandua I.C.D.S. Kendra to Batighora

Baligeria

15th Feb'14

Improvement of Rd. From Khemasole to Kustikra Dakkhin Para

Baligeria

15th Feb'14

Improvement of New Rd. From Nityananda Dam's House to Debendra Dam's House

Baligeria

15th Feb'14

Improvement of Rd. From Tamas Babu's Pond to Benachui Rd.

Baligeria

Bhudrubani

15th Feb'14

Improvement of Rd. of Bhaluktara Paschim Para

Baligeria

15th Feb'14

Improvement of Rd. From Bhaluktara Purba Para to Main Rd.

Baligeria

15th Feb'14

Improvement of Rd. From Ruiha Tudu's House to Main Rd.

Baligeria

15th Feb'14

Improvement of Rd. From Bhaluktara Battala Chak to Waterfall

Baligeria

15th Feb'14

Improvement of Rd. From Pitambarpur S.S.K. to Mangal Mandi's House

Baligeria

Pitambarpur

15th Feb'14

Improvement of Rd. From Palasia P.W.D. to Banabihari Tudu's House

Baligeria

15th Feb'14

Improvement of Rd.From Deben Hansda's House to Nanigopal Murmu's House

Baligeria

Baligeria Pry.

15th Feb'14

Improvement of Rd. From Bisu Hembram's House to Rabindra Hembram's House

Baligeria

15th Feb'14

Improvement of New Rd. From Sudam Hansda's House to Dolgram

Baligeria

Dhobasole

Amladangri

15th Feb'14

Improvement of Rd. From Bhagmat Babu's House to Satyeswar Maity's House

Baligeria

Dhobasole

15th Feb'14

Improvement of Rd. From Balichouria to Batighora Forest

Baligeria

Bhudrubani

Balichouria 15th Feb'14

Improvement of Rd From Khemasole to Goursai

Baligeria

15th Feb'14

Page 68: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

68/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

376 02 Baligeria 8 Rural Connectivity 8/70 283 P PL - - 0.70 0.62 0.70 1.32 408 78.1 All

- - - 66.75 77.02 143.77 44207

377 02 Baligeria 15 15/1 Baligeri Baligeria - - - 6.48 4.32 10.80 4291

- - - 6.48 4.32 10.80 4291

- - - 277.33 116.24 393.57 183662

378 03 Barakhankri 1 1/1 Excavation of Dabendra nath pond 56 225 0.15 - - 1.34 0.15 1.48 884 1.5 Jun

379 03 Barakhankri 1 1/2 62 57,58 0.50 - - 1.78 0.20 1.98 1179 2 Jun

380 03 Barakhankri 1 1/3 Excavation of Guruprasad Bera pond Bhaliaghati 57 630 0.63 - - 1.74 0.19 1.93 1150 1.95 Jun

381 03 Barakhankri 1 1/4 Bhaliaghati 57 728 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

382 03 Barakhankri 1 1/5 Bhaliaghati 57 730 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

383 03 Barakhankri 1 1/6 Bhaliaghati 57 689 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

384 03 Barakhankri 1 1/7 Bhaliaghati 57 691 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

385 03 Barakhankri 1 1/8 Bhaliaghati 57 818 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

386 03 Barakhankri 1 1/9 Bhaliaghati 57 81 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

387 03 Barakhankri 1 1/10 Bhaliaghati 57 109 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

388 03 Barakhankri 1 1/11 Bhaliaghati 57 103 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

Improvement of Rd. From Pradhan Mandi's House to Balichouria Pond

Baligeria

Bhudrubani

Bhudrubani

15th Feb'14

Rural Connectivity TotalRural Sanitation related works

Individual House hold Latrines for 200 Nos. beneficiries

Baligeria

15th Feb'14

Rural Sanitation related works Total

Baligeria Total

Water Conservation & Water Harvesting

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Krishna prasad Mahata pond

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell near Lebachand Saren house

Barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell near Biren house Barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Excavation Dugwell near Abani sing house

Barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell near Kanchan rout house

Barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell near Ganesh sing house

Barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell near Saktipada Bera house

barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell near Ratan kisku

Barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell near Singray murmu house

Barakhankri

Bhaliaghati

25th Jan'14

Page 69: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

69/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

389 03 Barakhankri 1 1/12 Bhaliaghati 57 818 0.02 - - 0.50 0.20 0.69 329 0.7 Jun

390 03 Barakhankri 1 1/13 Excavation pof Satyaban Patra's pond Biriberia 33 520 1.20 - - 1.51 0.17 1.68 1002 1.7 Jun

391 03 Barakhankri 1 1/14 Excavation Mrityunjay Mandal pond Tiyakati 10 190 3.40 - - 2.05 0.23 2.28 1356 2.3 Jun

392 03 Barakhankri 1 1/15 Biriberia 33 79 0.22 - - 1.49 0.49 1.98 988 2 Jun

393 03 Barakhankri 1 1/16 Excavation of pond at Pradhan para Deulbarh 8 191 1.54 - - 1.78 0.20 1.98 1179 2 Jun

394 03 Barakhankri 1 1/17 Deulbarh 8 180 - - - 1.49 0.49 1.98 988 2 Jun

395 03 Barakhankri 1 1/18 Biriberia 33 86 0.20 - - 0.50 0.39 0.89 329 0.9 Jun

396 03 Barakhankri 1 1/19 Digging dugwell at Tiyakati upar para Tiyakati 10 85 0.20 - - 0.50 0.39 0.89 329 0.9 Jun

397 03 Barakhankri 1 1/20 Totasai Totasai 59 3.00 - - 2.94 0.33 3.26 1946 3.3 Jun

398 03 Barakhankri 1 1/21 Excavation of Totasai Tentul bandh Totasai Totasai 61 2.00 - - 2.67 0.30 2.97 1769 3 Jun

399 03 Barakhankri 1 1/22 Excavation of Barajhria bali bundh Totasai Barajharia 61 2.00 - - 2.67 0.30 2.97 1769 3 Jun

400 03 Barakhankri 1 1/23 Excavation of Biplab Dandapat pond Nuyasai 38 487488 2.00 - - 2.67 0.30 2.97 1769 3 Jun

401 03 Barakhankri 1 1/24 Excavation of Dugwell of Prabir giri Nuyasai 38 749 1.00 - - 0.71 0.08 0.79 472 0.8 Jun

402 03 Barakhankri 1 1/25 38 2.00 - - 2.94 0.33 3.26 1946 3.3 Jun

403 03 Barakhankri 1 1/26 Excavation of pond at Kiyajharia mouza 38 2.00 - - 2.85 0.32 3.17 1887 3.2 Jun

Water Conservation & Water Harvesting

Excavation of Dugwell near Ganesh sing house

Barakhankri

Bhaliaghati

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Deulbarh

Satyaban

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Deulbarh

Mrityunjay Mandal

25th Jan'14

Water Conservation & Water Harvesting

Diggging dugwell at Biriberia kisku para

Barakhankri

Deulbarh

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Deulbarh

25th Jan'14

Water Conservation & Water Harvesting

Excavation of dugwell at Deulbarh hattal

Barakhankri

Deulbarh

25th Jan'14

Water Conservation & Water Harvesting

Digging dugwell at Biriberia football ground

Barakhankri

Deulbarh

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Deulbarh

25th Jan'14

Water Conservation & Water Harvesting

Excavation of pond at Barajharia south para

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Baradanga

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Baradanga

25th Jan'14

Water Conservation & Water Harvesting

Excavation of pond Bachhurkhoard village

Barakhankri

Bachhurkhoard

Bachhurkhoard

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bachhurkhoard

Bachhurkhoard

25th Jan'14

Page 70: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

70/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

404 03 Barakhankri 1 1/27 38 2.00 - - 2.94 0.33 3.26 1946 3.3 Jun

405 03 Barakhankri 1 1/28 Excavation of kiyajharia Maity bundh 38 2.00 - - 3.20 0.36 3.56 2122 3.6 Jun

406 03 Barakhankri 1 1/29 Excavation of Sudhir Mahata pond 78 582 self 0.35 - - 1.74 0.19 1.94 1156 1.96 Jun

407 03 Barakhankri 1 1/30 Excavation of Hirak Mahata pond kadamdiha 78 255 self 0.60 - - 2.49 0.28 2.77 1646 2.8 Jun

408 03 Barakhankri 1 1/31 Excavation of Laxman Mahata pond 79 403 self 0.55 - - 1.77 0.20 1.97 1173 1.99 Jun

409 03 Barakhankri 1 1/32 78 353 - - - 0.50 0.20 0.69 329 0.7 Jun

410 03 Barakhankri 1 1/33 79 31 - - - 0.50 0.20 0.69 329 0.7 Jun

411 03 Barakhankri 1 1/34 78 53 - - - 0.50 0.20 0.69 329 0.7 Jun

412 03 Barakhankri 1 1/35 79 360 - - - 0.50 0.20 0.69 329 0.7 Jun

413 03 Barakhankri 1 1/36 78 175 - - - 0.50 0.20 0.69 329 0.7 Jun

414 03 Barakhankri 1 1/37 78 455 - - - 0.50 0.20 0.69 329 0.7 Jun

415 03 Barakhankri 1 1/38 78 48 - - - 0.50 0.20 0.69 329 0.7 Jun

416 03 Barakhankri 1 1/39 78 8 - - - 0.50 0.20 0.69 329 0.7 Jun

417 03 Barakhankri 1 1/40 78 120 - - - 0.50 0.20 0.69 329 0.7 Jun

418 03 Barakhankri 1 1/41 Excavation of Sudhir Mahata Pond 78 582 - 0.20 - 1.69 0.19 1.88 1119 1.9 Jun

Water Conservation & Water Harvesting

Excavation of pond at kiyajharia purba para

Barakhankri

Bachhurkhoard

Bachhurkhoard

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bachhurkhoard

Bachhurkhoard

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

chotokhakri

25th Jan'14

Water Conservation & Water Harvesting

Excavation Dugwell near Rajkumar mahata house

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation Dugwell nera Tapash Mahata house

Barakhankri

Barakhankri

chotokhakri

25th Jan'14

Water Conservation & Water Harvesting

Excavation dugwell near Raja Hansda house

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation dugwell near Barsha Mandi house

Barakhankri

Barakhankri

chotokhakri

25th Jan'14

Water Conservation & Water Harvesting

Excavation dugwell near Gobinda Murmu house

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation dugwell near Pratap Ruidas house

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation Dugwell near Duli Kisku house

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation Dugwell near Lasa Hembram house

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation Dugwell near Samir Mahata house

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bara Khanri

Bara Khanri

25th Jan'14

Page 71: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

71/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

419 03 Barakhankri 1 1/42 Excavation of Hirak Mahata Pond 78 225 - 0.40 - 2.76 0.31 3.07 1828 3.1 Jun

420 03 Barakhankri 1 1/43 Excavation of Silu Hemram Pond 78 2/467 - 0.20 - 1.78 0.20 1.98 1179 2 Jun

421 03 Barakhankri 1 1/44 Excavation of Duku Hemram Pond 78 57 - 0.20 - 1.78 0.20 1.98 1179 2 Jun

422 03 Barakhankri 1 1/45 Excavation of Laxman Mahata Pond 79 403 - 0.20 - 1.78 0.20 1.98 1179 2 Jun

423 03 Barakhankri 1 1/46 78 353 - - - 0.40 0.20 0.59 263 0.6 Jun

424 03 Barakhankri 1 1/47 Excavation of Dugwell Tapas Mahata 79 31 - - - 0.40 0.20 0.59 263 0.6 Jun

425 03 Barakhankri 1 1/48 Excavation of Dugwell Raja hansda 78 53 - - - 0.40 0.20 0.59 263 0.6 Jun

426 03 Barakhankri 1 1/49 Excavation of Dugwell Barsa mandi 79 360 - - - 0.40 0.20 0.59 263 0.6 Jun

427 03 Barakhankri 1 1/50 79 54 - - - 0.40 0.20 0.59 263 0.6 Jun

428 03 Barakhankri 1 1/51 78 455 - - - 0.40 0.20 0.59 263 0.6 Jun

429 03 Barakhankri 1 1/52 Excavation of Dugwell Dukhi kisku 78 48 - - - 0.40 0.20 0.59 263 0.6 Rainy

430 03 Barakhankri 1 1/53 Excavation of Dugwell Chita Kisku 79 228 - - - 0.40 0.20 0.59 263 0.6 Rainy

431 03 Barakhankri 1 1/54 Excavation of Dugwell rasbihari Murmu 78 220 - - - 0.40 0.20 0.59 263 0.6 Rainy

432 03 Barakhankri 1 1/55 Excavation of Dugwell Lasa hembram 78 222 - - - 0.40 0.20 0.59 263 0.6 Rainy

433 03 Barakhankri 1 1/56 Excavation of Bhabatosh Mahata pond 77 185 - 0.20 - 1.34 0.15 1.48 884 1.5 January

Water Conservation & Water Harvesting

Barakhankri

Bara Khanri

Bara Khanri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bara Khanri

Bara Khanri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bara Khanri

Bara Khanri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bara Khanri

Chhoto Khankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell Rajkumar Mahata

Barakhankri

Bara Khanri

Bara Khanri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bara Khanri

Chhoto Khankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

Chhoto Khankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell Bidyadhar Mahata

Barakhankri

Barakhankri

Chhoto Khankri

25th Jan'14

Water Conservation & Water Harvesting

Excavation of Dugwell Pratap chandra Ruidas

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

Chhoto Khankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Water Conservation & Water Harvesting

Barakhankri

Bara khankri

Bara khankri

25th Jan'14

Page 72: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

72/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 67.82 12.90 80.72 44911

434 03 Barakhankri 2 Drought Proofing 2/1 Bhaliaghati 57 286/489 - 0.48 - 1.49 0.59 2.08 988 2.1 Rainy

435 03 Barakhankri 2 Drought Proofing 2/2 bhaliaghati 57 824826287 - 0.50 - 0.99 0.59 1.58 658 1.6 Rainy

436 03 barakhankri 2 Drought Proofing 2/3 Plantation of Ratikanta sing land bhaliaghati 59 813 - 0.48 - 0.70 0.29 0.99 461 1

437 03 Barakhankri 2 Drought Proofing 2/4 Plantation of Laxman kisku land bhaliaghati 56 426 - 0.55 - 0.70 0.29 0.99 461 1 Rainy

438 03 Barakhankri 2 Drought Proofing 2/5 Plantation of dhirighutu math land bhaliaghati 57 103 - 0.56 - 1.39 0.24 1.63 922 1.65

439 03 Barakhankri 2 Drought Proofing 2/6 Plantation at Biriberia Mouza Biriberia 32 86,42 - 4.00 - 1.49 0.49 1.98 988 2 Rainy

440 03 Barakhankri 2 Drought Proofing 2/7 Plantation at Deulbarg river side Deulbarh 8 8,9,12,13 - - - 1.49 0.59 2.08 988 2.1

441 03 Barakhankri 2 Drought Proofing 2/8 Plantation of Samay Hembram Tiyakati 10 62 - 1.50 - 0.70 0.29 0.99 461 1 Rainy

442 03 Barakhankri 2 Drought Proofing 2/9 Plantation of Sudhangsu ghosh Tiyakati 33 42 - 0.50 - 1.19 0.52 1.71 790 1.73 Rainy

443 03 Barakhankri 2 Drought Proofing 2/10 Plantation of Ashok Patra Biriberia 33 45 - 0.50 - 0.70 0.29 0.99 461 1 Rainy

444 03 Barakhankri 2 Drought Proofing 2/11 Nurssaryat Biriberia(Pratibadi SHG) Biriberia 33 - - - 1.49 0.78 2.28 988 2.3 Rainy

445 03 Barakhankri 2 Drought Proofing 2/12 Tiyakati 10 60 - 1.00 - 1.44 1.38 2.82 955 2.85 Rainy

446 03 Barakhankri 2 Drought Proofing 2/13 Biriberia 8 147 - 0.50 - 1.50 0.39 1.89 994 1.91 Rainy

447 03 Barakhankri 2 Drought Proofing 2/14 Plantation at Deulbarh pry. School Deulbarh 8 143147136 - 1.00 - 1.89 0.78 2.67 1251 2.7 Rainy

448 03 Barakhankri 2 Drought Proofing 2/15 Deulbarh 33 79 - 1.00 - 1.49 0.59 2.08 988 2.1 Rainy

449 03 Barakhankri 2 Drought Proofing 2/16 Plantation at baradanga Pry. School Baradanga 38 592 - 0.50 - 1.49 0.59 2.08 988 2.1 Rainy

450 03 Barakhankri 2 Drought Proofing 2/17 38 - 1.00 - 1.49 0.59 2.08 988 2.1 Rainy

451 03 Barakhankri 2 Drought Proofing 2/18 Plantation at jahirathan Nuyasai 38 - 0.80 - 1.49 0.59 2.08 988 2.1 Rainy

452 03 Barakhankri 2 Drought Proofing 2/19 Baradanga 38 - 0.60 - 1.39 0.49 1.88 922 1.9 Rainy

453 03 Barakhankri 2 Drought Proofing 2/20 Nuyasai 38 - 0.80 - 1.49 0.68 2.18 988 2.2 Rainy

454 03 Barakhankri 2 Drought Proofing 2/21 Plantation at Nuyasai football ground Nuyasai 38 - 0.90 - 1.49 0.78 2.28 988 2.3 Rainy

Water Conservation & Water Harvesting Total

Plantation of Bhalia ghati chalk to Bhulasini chalk rd side

Barakhankri

Bhaliaghati

25th Jan'14

Plantation of nandalal+bholanath sing land

Barakhankri

bhaliaghati

25th Jan'14

Barakhankri

bhaliaghati

25th Jan'14

barakhankri

bhaliaghati

25th Jan'14

Barakhankri

bhaliaghati

25th Jan'14

Summer+Rainy

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Plantation on Tiyakati junior high school

Barakhankri

Deulbarh

25th Jan'14

Plantation & Nurssery on Biriberia pry. School

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Plantation & Nurssery at Rameswar dahi

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Plantation on road side from Ramchandrapur to ferigha

Barakhankri

Baradanga

Ramchandrapur

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Plantation from Bardanga chak to kusumtala rd side

Barakhankri

Baradanga

25th Jan'14

Plantation from Sadananda ojha house to Nuyasai hattala

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Page 73: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

73/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

455 03 Barakhankri 2 Drought Proofing 2/22 38 749 - 0.80 - 1.44 0.78 2.23 955 2.25 Rainy

456 03 Barakhankri 2 Drought Proofing 2/23 Nurssary at Ramchandrapur 38 749 - 1.00 - 1.59 0.78 2.37 1053 2.4 Rainy

457 03 Barakhankri 2 Drought Proofing 2/24 Plantation of Amal Dutta Baradanga 38 334 - 0.90 - 0.70 0.29 0.99 461 1 Rainy

458 03 Barakhankri 2 Drought Proofing 2/25 Plantation of Sudhanshu Bisui Baradanga 38 512 - 0.56 - 1.49 0.49 1.98 988 2 Rainy

459 03 Barakhankri 2 Drought Proofing 2/26 Plantation of Parameswar Bera Baradanga 38 749/1059 - 0.56 - 0.70 0.29 0.99 461 1 Rainy

460 03 Barakhankri 2 Drought Proofing 2/27 Plantation of Himanshu Bisui Baradanga 38 749/1068 - 0.56 - 0.70 0.29 0.99 461 1 Rainy

461 03 Barakhankri 2 Drought Proofing 2/28 Plantation of Sudhir Bisui Baradanga 38 749/1059 - 0.56 - 0.70 0.29 0.99 461 1 Rainy

462 03 Barakhankri 2 Drought Proofing 2/29 Plantation of Achinta Barik Nuyasai 38 749/1057 - 0.56 - 0.70 0.29 0.99 461 1 Rainy

463 03 Barakhankri 2 Drought Proofing 2/30 Plantation of Sasadhar Patra Nuyasai 38 749/1057 - 0.56 - 0.70 0.29 0.99 461 1 Rainy

464 03 Barakhankri 2 Drought Proofing 2/31 Plantation at Barajharia Football ground Baradanga 38 749/1068 - 0.56 - 0.70 0.29 0.99 461 1 Rainy

465 03 Barakhankri 2 Drought Proofing 2/32 Plantation at Kanthi football ground Totasai Barajharia 61 - 0.56 - 1.49 0.49 1.98 988 2 Rainy

466 03 Barakhankri 2 Drought Proofing 2/33 Plantation at Totasai football ground Totasai Kanthi 64 - 0.56 - 1.49 0.49 1.98 988 2 Rainy

467 03 Barakhankri 2 Drought Proofing 2/34 Plantation at Sitakhal Bheri Totasai Kanthi 64 - 0.50 - 1.49 0.49 1.98 988 2 Rainy

468 03 Barakhankri 2 Drought Proofing 2/35 Plantation at Bachurkhoard desh bundh 38 - 0.50 - 1.49 0.49 1.98 988 2 Rainy

469 03 Barakhankri 2 Drought Proofing 2/36 Plantation of Nandalal jana 38 - 0.50 - 1.49 0.49 1.98 988 2 Rainy

470 03 Barakhankri 2 Drought Proofing 2/37 Plantation at Kiyajharia club ground Kiyajharia 39 - 0.50 - 1.49 0.49 1.98 988 2 Rainy

471 03 Barakhankri 2 Drought Proofing 2/38 Kiyajharia 39 - 0.50 - 1.49 0.49 1.98 988 2 Rainy

472 03 Barakhankri 2 Drought Proofing 2/39 Kiyajharia 39 - 0.50 - 1.49 0.49 1.98 988 2 Rainy

473 03 Barakhankri 2 Drought Proofing 2/40 Plantation of gorachand Kisku Land Murakati 56 - 0.50 - 1.49 0.49 1.98 988 2 Rainy

474 03 Barakhankri 2 Drought Proofing 2/41 Plantation of Ashok Mahata Land Murakati 56 - 0.25 - 0.99 0.69 1.68 658 1.7 Rainy

475 03 Barakhankri 2 Drought Proofing 2/42 Plantation of Shekar Mahata Land Murakati 56 - 0.50 - 1.49 0.49 1.98 988 2 Rainy

476 03 Barakhankri 2 Drought Proofing 2/43 Murakati 56 - 0.75 - 1.69 0.78 2.47 1119 2.5 Rainy

477 03 Barakhankri 2 Drought Proofing 2/44 Murakati 56 - - - 1.24 0.49 1.73 823 1.75 Rainy

Plantation at Ramchandrapur football ground

Barakhankri

Baradanga

Ramchandrapur

25th Jan'14

Barakhankri

Baradanga

Ramchandrapur

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

25th Jan'14

Barakhankri

25th Jan'14

Barakhankri

25th Jan'14

Barakhankri

Bachurkhoartd

Bachurkhoartd

25th Jan'14

Barakhankri

Bachurkhoartd

Bachurkhoartd

25th Jan'14

Barakhankri

Bachurkhoartd

25th Jan'14

Plantation from Kiyajharia club to PMGSY

Barakhankri

Bachurkhoartd

25th Jan'14

Plantation from Football ground to Battala

Barakhankri

Bachurkhoartd

25th Jan'14

Barakhankri

Rukhnimara

641,422,420/647

25th Jan'14

Barakhankri

Rukhnimara

525,527, 530

25th Jan'14

Barakhankri

Rukhnimara

426,427, 430

25th Jan'14

Plantation both side from Digbijay Dokan to Bhalighati road

Barakhankri

Rukhnimara

220,222, 227

25th Jan'14

plantation both side from Ashutosh dokan to Khankri

Barakhankri

Rukhnimara

624,625, 626

25th Jan'14

Page 74: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

74/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

478 03 Barakhankri 2 Drought Proofing 2/45 Murakati 56 - 2.75 6km 1.99 0.98 2.97 1317 3 Rainy

479 03 Barakhankri 2 Drought Proofing 2/46 Plantation of Rameshwar Rauth land Murakati 40 - 0.50 - 0.70 0.29 0.99 461 1 Rainy

480 03 Barakhankri 2 Drought Proofing 2/47 Plantation at padrapukur Land Kadamdiha 77 86 - 0.30 - 1.49 0.49 1.98 988 2 Rainy

481 03 Barakhankri 2 Drought Proofing 2/48 Plantation of Ratan&Naren Mandi Kadamdiha 77 - 0.30 - 0.99 0.98 1.98 658 2 Rainy

482 03 Barakhankri 2 Drought Proofing 2/49 Plantation of Uma&Kusum Mahata Kadamdiha 77 - 2.00 - 0.99 0.98 1.98 658 2 Rainy

483 03 Barakhankri 2 Drought Proofing 2/50 Kadamdiha 77 - 1.00 - 1.49 1.48 2.97 988 3 Rainy

484 03 Barakhankri 2 Drought Proofing 2/51 Kadamdiha 77 - 1.00 - 1.59 0.29 1.88 1053 1.9 Rainy

485 03 Barakhankri 2 Drought Proofing 2/52 Platation at Kadamdiha Club Ground Kadamdiha 77 157158 - 2.00 - 0.80 0.19 0.99 527 1 Rainy

486 03 Barakhankri 2 Drought Proofing 2/53 Platation at Sutartear Ground Kadamdiha 77 565 - 2.00 - 1.49 0.39 1.88 988 1.9 Rainy

487 03 Barakhankri 2 Drought Proofing 2/54 Plantation at Thuria pry. Pry. School Kadamdiha 77 360 - 4.00 - 1.49 0.49 1.98 988 2 Rainy

488 03 Barakhankri 2 Drought Proofing 2/55 Thuria Thuria 58 - 1.00 - 0.99 0.49 1.48 658 1.5 Rainy

489 03 Barakhankri 2 Drought Proofing 2/56 Plantation of Sukumar Mahata 55 89,91,73 - 0.10 - 1.49 0.19 1.68 988 1.7 Rainy

490 03 Barakhankri 2 Drought Proofing 2/57 Plantation of Bimala Mahata 79 540 - 0.10 - 1.49 0.19 1.68 988 1.7 Rainy

491 03 Barakhankri 2 Drought Proofing 2/58 Plantation of Baya Murmu 79 541 - 0.20 - 1.59 0.19 1.78 1053 1.8 Rainy

492 03 Barakhankri 2 Drought Proofing 2/59 Plantation of Murali Hembram 79 542 - 0.10 - 1.49 0.19 1.68 988 1.7 Rainy

493 03 Barakhankri 2 Drought Proofing 2/60 Plantation of Nimai Hembram 79 541 - 0.10 - 1.49 0.19 1.68 988 1.7 Rainy

494 03 Barakhankri 2 Drought Proofing 2/61 Plantation at Chhoto Khankri MSK 55 260234 - 0.10 - 1.49 0.19 1.68 988 1.7 Rainy

495 03 Barakhankri 2 Drought Proofing 2/62 Plantation at Dasband Canal Pard 78 579510 - 0.30 - 1.79 0.68 2.47 1185 2.5 Rainy

496 03 Barakhankri 2 Drought Proofing 2/63 Plantation at Bara Khankri Khas Pukur 79 24 - - 1.00 0.70 0.29 0.99 461 1

497 03 Barakhankri 2 Drought Proofing 2/64 Plantation at Bara Khankri Pry.School 78 354 - - - 0.70 0.29 0.99 461 1 january

498 03 Barakhankri 2 Drought Proofing 2/65 Plantation at Aam Band 78 250 - - - 0.70 0.29 0.99 461 1 Winter

499 03 Barakhankri 2 Drought Proofing 2/66 Plantation at Dol Band 79 11,61,12, - - 1.00 0.70 0.29 0.99 461 1 Winter

500 03 Barakhankri 2 Drought Proofing 2/67 Nursery under Barakhankri GP - 0.01 - 1.99 2.46 4.45 1317 Winter

Plantation both side from Murakati to Rangamatia

Barakhankri

Rukhnimara

25th Jan'14

Barakhankri

Rukhnimara

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Plantation at Ananda Bhakta&others 3 Person

Barakhankri

Kadamdiha

25th Jan'14

Platation at Khagan Mallik&others 2 Person

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Plantation from Totasai yo chitravanu khal

Barakhankri

25th Jan'14

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Page 75: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

75/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 85.36 35.25 120.62 56533

501 03 Barakhankri 3 3/1 Murakati 56 - - 1.50 1.99 0.98 2.97 1317 3 Winter

502 03 Barakhankri 3 3/2 Bhaliaghati - - 0.50 1.99 0.48 2.47 1317 2.5 Winter

503 03 Barakhankri 3 3/3 Bhaliaghati - - 0.49 2.19 0.58 2.77 1449 2.8 Winter

504 03 Barakhankri 3 3/4 Bhaliaghati - - 1.20 1.99 0.29 2.28 1317 2.3 Winter

505 03 Barakhankri 3 3/5 ReExavation of Chitravanu khal (canel) Bhaliaghati - - 0.98 2.05 0.23 2.28 1356 2.3 Summer

506 03 Barakhankri 3 3/6 Tiyakati 38 318 - 0.60 - 2.39 1.57 3.96 1580 4 October

507 03 Barakhankri 3 3/7 Tiyakati 10 75,78 - 0.60 - 2.09 1.47 3.56 1383 3.6

508 03 Barakhankri 3 3/8 Deulbarh 8 34 - 0.60 - 1.09 0.53 1.62 724 1.64

509 03 Barakhankri 3 3/9 Renovation of Nuyasai irrigation canel Baradanga 38 - 0.60 - 2.78 1.17 3.96 1844 4

510 03 Barakhankri 3 3/10 Const. of chek dam at Dhopa dhur 38 - 0.60 - 1.99 1.77 3.76 1317 3.8

511 03 Barakhankri 3 3/11 38 - 0.60 - 2.58 0.52 3.11 1712 3.14

512 03 Barakhankri 3 3/12 Const.of Cross Band of Ganesh Mahata Kadamdiha 77 - - - 1.49 1.48 2.97 988 3

513 03 Barakhankri 3 3/13 Const.at canal Chhoto khankri Jatiasat 79 - - 1.00 1.96 0.22 2.18 1297 2.2

514 03 Barakhankri 3 3/14 78 - - - 2.49 0.78 3.26 1646 3.3

515 03 Barakhankri 3 3/15 79 - - - 2.49 0.78 3.26 1646 3.3 april

516 03 Barakhankri 3 3/16 Const, side embankmen at Chatni Band 78 - - - 2.49 0.78 3.26 1646 3.3 feb

517 03 Barakhankri 3 3/17 78 - - 1.00 2.49 0.78 3.26 1646 3.3 dece

518 03 Barakhankri 3 3/18 Renovation at Aumtua Band&canal 78 - - 2.00 2.39 0.78 3.17 1580 3.2 dece

- - - 38.90 15.18 54.09 25764

519 03 Barakhankri 5 5/1 Murakati 56 291 - 0.28 - 1.31 0.33 1.63 865 1.65 jan

520 03 Barakhankri 5 5/2 Re Exavation of pond at Rangamatia Murakati 62 168,169, - 0.35 - 2.49 0.48 2.97 1646 3 dece

Drought Proofing TotalMicro Irrigation Works

Renovation of Canel From Bhabesh Mahata land to Jamini Mahata land

Barakhankri

Rukhnimara

25th Jan'14

Micro Irrigation Works

Construction of cross bundh at Brindar sol

Barakhankri

Bhaliaghati

25th Jan'14

Micro Irrigation Works

Construction of chack dam and canel at bhaliaghati forest bundh

Barakhankri

Bhaliaghati

25th Jan'14

Micro Irrigation Works

Re Exavation of dhiri ghutu toBhulasini garam than

Barakhankri

Bhaliaghati

25th Jan'14

Micro Irrigation Works

Barakhankri

Bhaliaghati

25th Jan'14

Micro Irrigation Works

Const of Chek dam on Tiyakati mahulia khal

Barakhankri

Deulbarh

25th Jan'14

Micro Irrigation Works

Const. of Chek dam on Tiyakati mahulia khal cultivated land

Barakhankri

Deulbarh

25th Jan'14

December

Micro Irrigation Works

Const. of cross bundh at Deulbarh Dolighatra mouza

Barakhankri

Deulbarh

25th Jan'14

December

Micro Irrigation Works

Barakhankri

Baradanga

25th Jan'14

December

Micro Irrigation Works

Barakhankri

Bachurkhoard

Bachurkhoard

25th Jan'14

December

Micro Irrigation Works

Renovation of canel from Harihar Jana house to Sitakhal

Barakhankri

Bachurkhoard

Bachurkhoard

25th Jan'14

December

Micro Irrigation Works

Barakhankri

Kadamdiha

25th Jan'14

December

Micro Irrigation Works

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

December

Micro Irrigation Works

Const.of side embankment at Gangasagar Band

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

December

Micro Irrigation Works

Const.side embankmen at Chhoto khankri Dasband

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

Micro Irrigation Works

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Micro Irrigation Works

Const.side embankmen at Chhoto Khankri Sankar Band&canal

Barakhankri

Bara Khankri

Chhoto Khankri

25th Jan'14

Micro Irrigation Works

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Micro Irrigation Works TotalRenovation of Traditional Water Bodies

Re Exavation of Pond of Durjodhan Routh

Barakhankri

Rukhnimara

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Rukhnimara

25th Jan'14

Page 76: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

76/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

521 03 Barakhankri 5 5/3 Renovation of Vajar bandh Murakati 56 - 0.50 - 2.22 0.55 2.77 1467 2.8 dece

522 03 Barakhankri 5 5/4 Renovation of Tentul bandh Murakati 56 - - 3.00 1.98 0.49 2.47 1310 2.5 March

523 03 Barakhankri 5 5/5 Renovation of Darkhuli bandh Murakati 41 3.23 - - 1.58 0.40 1.98 1048 2 Winter

524 03 Barakhankri 5 5/6 Re Excavation Atul chandra sing pond Bhaliaghati 57 60 3.23 0.35 - 1.19 0.30 1.48 786 1.5 Winter

525 03 Barakhankri 5 5/7 Bhaliaghati 57 3.23 0.50 - 1.19 0.30 1.48 786 1.5 April

526 03 Barakhankri 5 5/8 Tiyakati 10 3.00 - - 0.50 0.49 0.99 329 1 April

527 03 Barakhankri 5 5/9 Re-excavation of Deulbarh desh bandh Deulbarh 8 176 2.46 - - 2.22 0.55 2.77 1467 2.8 April

528 03 Barakhankri 5 5/10 Deulbarh 8 196 2.50 - - 1.49 0.20 1.69 988 1.71 April

529 03 Barakhankri 5 5/11 Re-excavation of forest bandh Deulbarh 8 180 2.46 - - 2.22 0.55 2.77 1467 2.8 April

530 03 Barakhankri 5 5/12 Deulbarh 8 196 1.46 - - 0.80 0.19 0.99 527 1 March

531 03 Barakhankri 5 5/13 Deulbarh 8 193 1.67 - - 0.95 0.24 1.19 629 1.2 April

532 03 Barakhankri 5 5/14 Re-excavation of pond at Bera para Deulbarh 8 616 1.23 - - 1.03 0.26 1.29 681 1.3 April

533 03 Barakhankri 5 5/15 Re-excavation of pond at Dehuri para Deulbarh 8 373 2.46 - - 1.58 0.40 1.98 1048 2 May

534 03 Barakhankri 5 5/16 Re-excavation of Rameswar pond Deulbarh 8 360 2.46 - - 1.61 0.40 2.02 1069 2.04 May

535 03 Barakhankri 5 5/17 Deulbarh 8 892 1.85 - - 1.58 0.40 1.98 1048 2 July

Renovation of Traditional Water Bodies

Barakhankri

Rukhnimara

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Rukhnimara

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Rukhnimara

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Bhaliaghati

25th Jan'14

Renovation of Traditional Water Bodies

Re Excavation Guruprasad sing house pond

Barakhankri

Bhaliaghati

25th Jan'14

Renovation of Traditional Water Bodies

Renovation of dug well at Tiyakatimouza

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Re-excavation of Deulbarh jana para pond

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Re-excavation of prdahan para(Abinash) pond

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Re-excavation of prdahan para(Saktipada) pond

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Deulbarh

25th Jan'14

Renovation of Traditional Water Bodies

Re-excavation pond atb pradhan para(sankar)

Barakhankri

Deulbarh

25th Jan'14

Page 77: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

77/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

536 03 Barakhankri 5 5/18 Re-excavation of Jahirathan Jharna Baradanga 38 3.08 - - 2.77 0.69 3.46 1834 3.5 April

537 03 Barakhankri 5 5/19 Renovation of chitravanu khal pond Baradanga 38 2.77 - - 2.61 0.65 3.26 1729 3.3 May

538 03 Barakhankri 5 5/20 Re excavation of Puirna Bera pond Baradanga 38 1.23 - - 1.58 0.40 1.98 1048 2 May

539 03 Barakhankri 5 5/21 Re excavation of Jogesh Bera pond Baradanga 38 1.85 - - 1.74 0.44 2.18 1153 2.2 June

540 03 Barakhankri 5 5/22 Re excavation of Sudhansu Bera Baradanga 38 1.85 - - 1.58 0.40 1.98 1048 2

541 03 Barakhankri 5 5/23 Re excavation of Totasai nichpara pond Totasai Totasai 40 1.85 - - 2.61 0.65 3.26 1729 3.3 October

542 03 Barakhankri 5 5/24 Re excavation of kanthi desh pukur Totasai Kanthi 59 1.85 - - 2.61 0.65 3.26 1729 3.3

543 03 Barakhankri 5 5/25 Re-excavation Barajharia Desh bundh Totasai 10 1.85 - - 2.61 0.65 3.26 1729 3.3 Winter

544 03 Barakhankri 5 5/26 Totasai Kanthi 10 1.85 - - 2.61 0.65 3.26 1729 3.3 Winter

545 03 Barakhankri 5 5/27 Totasai Totasai 59 1.85 - - 2.61 0.65 3.26 1729 3.3 Winter

546 03 Barakhankri 5 5/28 Totasai Totasai 59 1.50 - - 2.49 0.48 2.97 1646 3 Winter

547 03 Barakhankri 5 5/29 Re excavation of Arup jana pond Kiyajharia 39 2.00 - - 2.61 0.65 3.26 1729 3.3 Winter

548 03 Barakhankri 5 5/30 Re excavation of Anil Ranjan Bera pond 38 3.00 - - 2.53 0.63 3.17 1677 3.2 Winter

549 03 Barakhankri 5 5/31 Re-excavation at Padrapukur Pond Kadamdiha 77 224 3.00 - - 2.29 0.57 2.87 1520 2.9 Winter

550 03 Barakhankri 5 5/32 Re-excavation at Pahanagaria Pond Kadamdiha 77 194 2.70 - - 1.58 0.40 1.98 1048 2 Winter

Renovation of Traditional Water Bodies

Barakhankri

Baradanga

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Baradanga

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Baradanga

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Baradanga

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Baradanga

25th Jan'14

November

Renovation of Traditional Water Bodies

Barakhankri

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

25th Jan'14

December

Renovation of Traditional Water Bodies

Barakhankri

Barajgharia 25th Jan'14

Renovation of Traditional Water Bodies

Re excavation of Totasasai Janakalyan Bidyalay pond

Barakhankri

25th Jan'14

Renovation of Traditional Water Bodies

Re excavation of kanthi nich para desh pond

Barakhankri

25th Jan'14

Renovation of Traditional Water Bodies

Re-excavation of paschim totasai desh pond

Barakhankri

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Bachurkhoard

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Bachurkhoard

Bachurkhoard

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Kadamdiha

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Kadamdiha

25th Jan'14

Page 78: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

78/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

551 03 Barakhankri 5 5/33 Re-excavation at Salkandahi Pond Kadamdiha 77 3.00 - - 1.58 0.40 1.98 1048 2 Winter

552 03 Barakhankri 5 5/34 Re-excavation of Adhar Mahata Pond Kadamdiha 77 10,12,13 2.50 - - 1.49 0.39 1.88 988 1.9 Winter

553 03 Barakhankri 5 5/35 Re-excavation at Barapukur Pond Kadamdiha 77 184 7.50 - - 3.56 0.89 4.45 2358 4.5 Winter

554 03 Barakhankri 5 5/36 Re-excavation of Uma Mahata Pond Kadamdiha 77 5.00 - - 2.22 0.55 2.77 1467 2.8 Winter

555 03 Barakhankri 5 5/37 Kadamdiha 77 242 3.00 - - 2.22 0.55 2.77 1467 2.8 Winter

556 03 Barakhankri 5 5/38 Kadamdiha 77 12,13,14 2.50 - - 2.22 0.55 2.77 1467 2.8 Winter

557 03 Barakhankri 5 5/39 Kadamdiha 77 182 3.00 - - 2.22 0.55 2.77 1467 2.8 Winter

558 03 Barakhankri 5 5/40 Re excavation of Thuria purba para Thuria Thuria 59 1.20 - - 2.22 0.55 2.77 1467 2.8 Winter

559 03 Barakhankri 5 5/41 Re excavation at Thuria Pry. School Thuria Thuria 58 1.20 - - 2.22 0.55 2.77 1467 2.8 Winter

560 03 Barakhankri 5 5/42 Re-excavation of Sukumar Mahata pond 78 406 - 0.30 - 1.19 0.30 1.48 786 1.5

561 03 Barakhankri 5 5/43 79 250184 - 0.20 - 1.19 0.30 1.48 786 1.5

562 03 Barakhankri 5 5/44 78 265 - 0.30 - 2.29 0.57 2.87 1520 2.9 March

- - - 85.36 21.27 106.63 56532

563 03 Barakhankri 6 Land Development 6/1 Land leveling of Debendra nath Mahata Murakati 56 436 - 0.25 - 0.89 0.10 0.99 590 1 March

564 03 Barakhankri 6 Land Development 6/2 Land leveling of Mantu Mahata Murakati 56 532 - 0.15 - 0.45 0.05 0.49 295 0.5 mMarch

565 03 Barakhankri 6 Land Development 6/3 Land leveling of Sajal Mahata 62 60 - 0.12 - 0.74 0.25 0.99 491 1 mMarch

Renovation of Traditional Water Bodies

Barakhankri

Kadamdiha

491/658,491/660

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Kadamdiha

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Kadamdiha

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Kadamdiha

25th Jan'14

Renovation of Traditional Water Bodies

Re-excavation of Mahaswar Mallik Pond

Barakhankri

Kadamdiha

25th Jan'14

Renovation of Traditional Water Bodies

Re-excavation of Gangadhar Mahata Pond

Barakhankri

Kadamdiha

25th Jan'14

Renovation of Traditional Water Bodies

Re-excavation of Bhabatosh Mahata pond

Barakhankri

Kadamdiha

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

25th Jan'14

Renovation of Traditional Water Bodies

Barakhankri

Bara khankri

Bara khankri

25th Jan'14

February

Renovation of Traditional Water Bodies

Re-excavation of Sankar Mahata pond

Barakhankri

Bara khankri

Chhoto khankri

25th Jan'14

February

Renovation of Traditional Water Bodies

Re-excavation of kusum Mahata Pond

Barakhankri

Bara khankri

Chhoto khankri

25th Jan'14

Renovation of Traditional Water Bodies Total

Barakhankri

Rukhnimara

25th Jan'14

Barakhankri

Rukhnimara

25th Jan'14

Barakhankri

Rukhnimara

Rangamatia

25th Jan'14

Page 79: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

79/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

566 03 Barakhankri 6 Land Development 6/4 Land leveling of Krishnaprasad Mahata Murakati 62 55 - 0.14 - 1.11 0.37 1.48 737 1.5 mMarch

567 03 Barakhankri 6 Land Development 6/5 Land leveling of Gostha bihari Mahata 62 42 - 0.11 - 1.11 0.37 1.48 737 1.5 Winter

568 03 Barakhankri 6 Land Development 6/6 Land leveling of Mangal Mahata 62 112 - 0.11 - 1.11 0.37 1.48 737 1.5 Winter

569 03 Barakhankri 6 Land Development 6/7 Land leveling of Purusottam Mahata 62 110 - 0.14 - 1.11 0.37 1.48 737 1.5 Winter

570 03 Barakhankri 6 Land Development 6/8 Land leveling of Mahendra nath Mahata Murakati 56 332 2.00 - - 0.75 0.24 0.99 494 1 Winter

571 03 Barakhankri 6 Land Development 6/9 Land leveling of Ramesh Mahata Murakati 56 214,707, own 1.00 - - 0.45 0.05 0.49 295 0.5 Winter

572 03 Barakhankri 6 Land Development 6/10 Land leveling of Bhaliaghati Hat tala Bhaliaghati 57 486 - 0.23 - 1.30 0.43 1.73 860 1.75 Winter

573 03 Barakhankri 6 Land Development 6/11 Bhaliaghati 57 486 - 0.50 - 1.74 0.56 2.30 1152 2.33 Winter

574 03 Barakhankri 6 Land Development 6/12 Land leveling of Raban para jahirathan Bhaliaghati 57 761 - 0.56 - 2.05 0.23 2.28 1356 2.3 Winter

575 03 Barakhankri 6 Land Development 6/13 Land leveling of Bhulasini football math Bhaliaghati 57 489 - 0.58 - 1.79 0.60 2.38 1184 2.41 Winter

576 03 Barakhankri 6 Land Development 6/14 Landleveling of Mohan sing dahi Bhaliaghati 59 218 - 0.25 - 1.11 0.37 1.48 737 1.5 Winter

577 03 Barakhankri 6 Land Development 6/15 Dolighatra 11 110 - 1.30 - 1.49 0.49 1.98 988 2 Winter

578 03 Barakhankri 6 Land Development 6/16 Tiyakati 10 72 - 1.20 - 1.87 0.21 2.08 1238 2.1 Winter

579 03 Barakhankri 6 Land Development 6/17 Biriberia 33 58 - 0.45 - 1.78 0.20 1.98 1179 2 Winter

580 03 Barakhankri 6 Land Development 6/18 Tiyakati 33 57 - 0.45 - 1.78 0.20 1.98 1179 2 Winter

581 03 Barakhankri 6 Land Development 6/19 Sand removing from Daman kisku land Birtiberia 33 106 - 0.45 - 1.78 0.20 1.98 1179 2 Winter

582 03 Barakhankri 6 Land Development 6/20 Land levelling Deulbarh hattala Deulbarh 8 180 - - - 1.85 0.62 2.47 1228 2.5 Winter

583 03 Barakhankri 6 Land Development 6/21 Deulbarh 8 614 - 0.70 - 2.76 0.31 3.07 1828 3.1 Winter

584 03 Barakhankri 6 Land Development 6/22 Land levelling at Ramesware danga Deulbarh 34 142123125 - 0.45 - 1.78 0.20 1.98 1179 2 Winter

585 03 Barakhankri 6 Land Development 6/23 Landf levelling of Deulbarh pry. School Deulbarh 8 1076 - 0.45 - 1.78 0.20 1.98 1179 2 Winter

586 03 Barakhankri 6 Land Development 6/24 Deulbarh 8 180 own - 0.45 - 1.78 0.20 1.98 1179 2 Winter

587 03 Barakhankri 6 Land Development 6/25 Land levelling of Ranjit Bera Deulbarh 8 707 - 0.45 - 1.78 0.20 1.98 1179 2 Winter

588 03 Barakhankri 6 Land Development 6/26 Land levelling of timir Dandapat Baradanga 38 4.12.8. - 0.45 - 1.78 0.20 1.98 1179 2 Winter

Barakhankri

Rukhnimara

25th Jan'14

Barakhankri

Rukhnimara

Rangamatia

25th Jan'14

Barakhankri

Rukhnimara

Rangamatia

25th Jan'14

Barakhankri

Rukhnimara

Rangamatia

25th Jan'14

Barakhankri

Rukhnimara

25th Jan'14

Barakhankri

Rukhnimara

25th Jan'14

Barakhankri

Bhaliaghati

25th Jan'14

Landa leveling of Bhaliaghati shibmandir chalk

Barakhankri

Bhaliaghati

25th Jan'14

Barakhankri

Bhaliaghati

25th Jan'14

Barakhankri

Bhaliaghati

25th Jan'14

Barakhankri

Bhaliaghati

25th Jan'14

Cultivated land levelling of Dolighatra mouza

Barakhankri

Deulbarh

25th Jan'14

Land levelling of Tiyakati junior high school

Barakhankri

Deulbarh

25th Jan'14

Sand removing from Surendra Rana's Cultivatted land

Barakhankri

Deulbarh

25th Jan'14

Sand removing from Abani ghosh"s land

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Land levelling at Tarun sangha football ground

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Land levelling at Deulbarh football ground

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Deulbarh

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Page 80: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

80/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

589 03 Barakhankri 6 Land Development 6/27 land levelling of Banabihari Bera Baradanga 228,223, - 0.42 - 1.69 0.19 1.88 1120 1.9 Winter

590 03 Barakhankri 6 Land Development 6/28 Land levelling of Bankim Badhuk Baradanga 35 950,908, - 0.42 - 1.69 0.19 1.88 1120 1.9 Winter

591 03 Barakhankri 6 Land Development 6/29 land levelling of Nirmal patra Baradanga 36 308.309 - 0.56 - 1.69 0.19 1.88 1120 1.9 Winter

592 03 Barakhankri 6 Land Development 6/30 Land levelling of Gobardhan Duyari Baradanga 38 217,86, - 0.80 - 2.23 0.74 2.97 1474 3 Winter

593 03 Barakhankri 6 Land Development 6/31 Land levelling of Sudhir Duyari Baradanga 38 749 - 0.50 - 2.23 0.74 2.97 1474 3 Winter

594 03 Barakhankri 6 Land Development 6/32 Nuyasai 38 331 - 0.07 - 1.78 0.20 1.98 1179 2 Winter

595 03 Barakhankri 6 Land Development 6/33 Baradanga 38 917 - 0.11 - 1.78 0.20 1.98 1179 2 Winter

596 03 Barakhankri 6 Land Development 6/34 Land levelling of Nagen Bisui land Baradanga 38 339 - 0.80 - 1.78 0.20 1.98 1179 2 Winter

597 03 Barakhankri 6 Land Development 6/35 Land levelling of Kamal Badhuk land Nuyasai 38 338 - 0.70 - 1.78 0.20 1.98 1179 2 Winter

598 03 Barakhankri 6 Land Development 6/36 Land levelling of Saktipada Dandapat Baradanga 38 499 - 0.48 - 1.78 0.20 1.98 1179 2 Winter

599 03 Barakhankri 6 Land Development 6/37 Land levelling of Tapas Patra Baradanga 37 499 - 0.48 - 1.78 0.20 1.98 1179 2 Winter

600 03 Barakhankri 6 Land Development 6/38 Sand removing of Lambodar Patra land Baradanga 37 330 - 0.48 - 1.78 0.20 1.98 1179 2 Winter

601 03 Barakhankri 6 Land Development 6/39 Sand removing of Lambodar Patra land Baradanga 37 605 - 0.48 - 1.78 0.20 1.98 1179 2 Autumn

602 03 Barakhankri 6 Land Development 6/40 sand removing of Samir Dandapat land Baradanga 37 339 - 0.48 - 1.78 0.20 1.98 1179 2 Autumn

603 03 Barakhankri 6 Land Development 6/41 Sand removing of Nibaran Boisui land Baradanga 37 213 - 0.48 - 1.78 0.20 1.98 1179 2 Winter

604 03 Barakhankri 6 Land Development 6/42 Sand removing of Nilangsu Bisui land Baradanga 37 214 - 0.48 - 1.78 0.20 1.98 1179 2 Winter

605 03 Barakhankri 6 Land Development 6/43 Baradanga 37 589 - 0.57 - 1.78 0.20 1.98 1179 2 Winter

606 03 Barakhankri 6 Land Development 6/44 Sand removing of Pratap Bera land Baradanga 37 591 - 0.57 - 1.78 0.20 1.98 1179 2 Winter

607 03 Barakhankri 6 Land Development 6/45 Sand removing of Pratap Bera land Baradanga 37 592 - 0.57 - 2.94 0.33 3.26 1946 3.3 Winter

608 03 Barakhankri 6 Land Development 6/46 Totasai Barajharia 61 - 1.00 - 2.94 0.33 3.26 1946 3.3 Winter

609 03 Barakhankri 6 Land Development 6/47 Totasai Kanthi 64 - 1.00 - 2.94 0.33 3.26 1946 3.3 Winter

610 03 Barakhankri 6 Land Development 6/48 Totasai Totasai 59 - 1.00 - 2.94 0.33 3.26 1946 3.3 Winter

611 03 Barakhankri 6 Land Development 6/49 Totasai Totasai 59 - 0.40 - 1.49 0.49 1.98 988 2 Winter

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Land levelling of Nuyasai football ground

Barakhankri

Baradanga

25th Jan'14

Land levelling of Ramchandrapur football grond

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Sand removing of Ramchandra bisui land

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Barakhankri

Baradanga

25th Jan'14

Land levelling of Barajhria Hurihargar football ground

Barakhankri

25th Jan'14

Land levelling of Birsa Munda ST club football ground

Barakhankri

25th Jan'14

Land levelling of Totasai karam suba ST football ground

Barakhankri

25th Jan'14

Land levelling of Totasai karam suba ST Club ground

Barakhankri

25th Jan'14

Page 81: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

81/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

612 03 Barakhankri 6 Land Development 6/50 Land levellingKanthi ICDS ground Totasai Kanthi 59 - 0.40 - 1.49 0.49 1.98 988 2 Winter

613 03 Barakhankri 6 Land Development 6/51 Land levelling of Totasai ICDS ground Totasai Totasai 64 - 0.40 - 1.49 0.49 1.98 988 2 Winter

614 03 Barakhankri 6 Land Development 6/52 Totasai 59 - 0.40 - 1.49 0.49 1.98 988 2 Winter

615 03 Barakhankri 6 Land Development 6/53 Land levelling of Totasai SSK ground Totasai Totasai 63 - 0.40 - 1.49 0.49 1.98 988 2 Winter

616 03 Barakhankri 6 Land Development 6/54 38 - 1.50 - 2.67 0.30 2.97 1769 3 Winter

617 03 Barakhankri 6 Land Development 6/55 38 - 1.20 - 2.67 0.30 2.97 1769 3

618 03 Barakhankri 6 Land Development 6/56 Kiyajharia 39 - 1.00 - 2.67 0.30 2.97 1769 3

619 03 Barakhankri 6 Land Development 6/57 Kiyajharia 39 - 0.42 - 1.49 0.49 1.98 988 2

620 03 Barakhankri 6 Land Development 6/58 Land levelling of Nandalal Jana land Kiyajharia 39 - 1.40 - 1.49 0.49 1.98 988 2 January

621 03 Barakhankri 6 Land Development 6/59 Land Levelling of Indrajit Mahata Kadamdiha 77 399/579 - 0.26 - 1.49 0.49 1.98 988 2 January

622 03 Barakhankri 6 Land Development 6/60 Land Levelling of Dhiren Mahata Kadamdiha 77 224 - 0.10 - 1.49 0.49 1.98 988 2

623 03 Barakhankri 6 Land Development 6/61 Land Levelling of Horish Mahata Kadamdiha 77 392 - 0.40 - 2.60 0.87 3.46 1720 3.5 March

624 03 Barakhankri 6 Land Development 6/62 Land Levelling of Gangadhar Mahata Kadamdiha 77 - 0.50 - 1.11 0.37 1.48 737 1.5 March

625 03 Barakhankri 6 Land Development 6/63 Land Levelling of Sristidhar Mahata Kadamdiha 77 - 0.50 - 1.11 0.37 1.48 737 1.5 March

626 03 Barakhankri 6 Land Development 6/64 Kadamdiha 77 - 0.50 - 2.00 0.67 2.67 1327 2.7 April

627 03 Barakhankri 6 Land Development 6/65 Land Levelling of Adhar Mahata Kadamdiha 77 399 - 0.20 - 1.49 0.49 1.98 988 2

628 03 Barakhankri 6 Land Development 6/66 Land Levelling of Sital Mahata Kadamdiha 77 229230 - 0.30 - 1.49 0.49 1.98 988 2 March

629 03 Barakhankri 6 Land Development 6/67 Land Levelling at Kadarbhurbhuri Kadamdiha 77 662 - 0.50 - 1.49 0.49 1.98 988 2 March

630 03 Barakhankri 6 Land Development 6/68 Land Levelling of Gangadhar Mahata Kadamdiha 77 492493 - 0.80 - 1.49 0.49 1.98 988 2 March

631 03 Barakhankri 6 Land Development 6/69 Land Levelling of Dipali Mahata 79 275 - 0.20 - 1.49 0.49 1.98 988 2 March

632 03 Barakhankri 6 Land Development 6/70 Land Levelling of Anam Mahata 79 230231 - 0.20 - 1.49 0.49 1.98 988 2 May

633 03 Barakhankri 6 Land Development 6/71 Land Levelling of Bholanath Mahata 79 247 - 0.20 - 1.49 0.49 1.98 988 2 April

634 03 Barakhankri 6 Land Development 6/72 Land Levelling of Madan Mahata 79 25 - 0.20 - 1.49 0.49 1.98 988 2 Summer

Barakhankri

25th Jan'14

Barakhankri

25th Jan'14

Land Levelling of Bhalukghora ICDS ground

Barakhankri

Bhalukghora

25th Jan'14

Barakhankri

25th Jan'14

Land levelling of Bachurkhoard SSK ground

Barakhankri

Bachurkhoard

Bachurkhoard

25th Jan'14

Land levvelling of Bachurkhoard school ground

Barakhankri

Bachurkhoard

Bachurkhoard

25th Jan'14

November

Land levelling of Bachurkhoard football ground

Barakhankri

Bachurkhoard

25th Jan'14

Decembar

Land levelling of kiyajharia club Ground

Barakhankri

Bachurkhoard

25th Jan'14

Decembar

Barakhankri

Bachurkhoard

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

February

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

399,399/568

25th Jan'14

Barakhankri

Kadamdiha

399,399/588

25th Jan'14

Land Levelling of Kadamdiha football ground

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

February

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Kadamdiha

25th Jan'14

Barakhankri

Bara khankri

Chhoto khankri

25th Jan'14

Barakhankri

Bara khankri

Chhoto khankri

25th Jan'14

Barakhankri

Bara khankri

Chhoto khankri

25th Jan'14

Barakhankri

Bara khankri

Chhoto khankri

25th Jan'14

Page 82: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

82/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

635 03 Barakhankri 6 Land Development 6/73 Land Levelling of Nandalal Mahata 78 315 - 0.20 - 1.49 0.49 1.98 988 2 Summer

636 03 Barakhankri 6 Land Development 6/74 Land Levelling of Mahakul Mahata 78 182 - 0.20 - 1.49 0.49 1.98 988 2 Summer

637 03 Barakhankri 6 Land Development 6/75 79 24 - 0.40 - 1.49 0.49 1.98 988 2 Summer

- - - 127.01 26.40 153.41 84114

638 03 Barakhankri 7 7/1 Tiyakati 10 79,78 - 0.60 - 1.99 1.47 3.46 1317 3.5

639 03 Barakhankri 7 7/2 62 14 1.00 - - 1.79 0.49 2.28 1185 Winter

640 03 Barakhankri 7 7/3 rangamatia 62 3.00 - - 1.79 1.47 3.26 1185 Winter

641 03 Barakhankri 7 7/4 Bhaliaghati 57 431 1.00 - - 1.79 0.98 2.77 1185 Summer

642 03 Barakhankri 7 7/5 Const. of culvert on Tiyakati gramin rd Tiyakati 10 - - 0.58 1.49 2.47 3.96 988 4 Winter

643 03 Barakhankri 7 7/6 Tiyakati 10 - - 0.20 1.49 2.47 3.96 988 4 Winter

644 03 Barakhankri 7 7/7 Const.of Guardwall at mahulia khal Biriberia 33 - - 0.09 1.49 0.55 2.04 988 2.06 Winter

645 03 Barakhankri 7 7/8 Biriberia 38 - - 0.09 1.49 2.47 3.96 988 4 Winter

646 03 Barakhankri 7 7/9 Biriberia 33 155 - - 0.02 1.49 0.55 2.04 988 2.06 Winter

647 03 Barakhankri 7 7/10 Biriberia 33 141 - - 0.08 0.99 2.47 3.46 658 3.5 Winter

648 03 Barakhankri 7 7/11 Const. of Guard wall at jana para pond Biriberia 33 157 - - 0.08 1.99 0.98 2.97 1317 3 Winter

649 03 Barakhankri 7 7/12 Totasai Barajharia 61 - - 0.08 1.49 2.47 3.96 988 4 Winter

650 03 Barakhankri 7 7/13 Totasai Barajharia 61 - - 0.08 1.29 2.47 3.76 856 3.8 Winter

651 03 Barakhankri 7 7/14 Totasai Totasai - - 1.00 2.49 0.48 2.97 1646 3 Winter

652 03 Barakhankri 7 7/15 Totasai Totasai - - 1.00 2.49 0.48 2.97 1646 3 Winter

653 03 Barakhankri 7 7/16 Baradanga 38 849 - - 0.08 2.49 1.47 3.96 1646 4 Winter

654 03 Barakhankri 7 7/17 Const. of culvert at chitravanu khal Baradanga 38 845 - - 0.80 1.49 3.45 4.95 988 5 March

655 03 Barakhankri 7 7/18 Const. of Guardwall over Sitakhal 38 - - 0.40 1.99 1.47 3.46 1317 3.5 June

656 03 Barakhankri 7 7/19 38 - - 1.00 2.49 0.98 3.46 1646 3.5 April

Barakhankri

Bara khankri

Bara khankri

25th Jan'14

Barakhankri

Bara khankri

Bara khankri

25th Jan'14

Land Levelling at Chhoto Khankri Foot Ball Ground

Barakhankri

Bara khankri

Chhoto khankri

25th Jan'14

Land Development TotalFlood Control & Protecation

const. of Drain both side on Tiyakati gramin rd

Barakhankri

Deulbarh

25th Jan'14

December

Flood Control & Protecation

Constroction of Gudwall of Anadi Mahata land

Barakhankri

Rukhnimara

Rangamatia

25th Jan'14

Flood Control & Protecation

Constrocktion of Gudwall of Mangal Mahata land

Barakhankri

Rukhnimara

25th Jan'14

Flood Control & Protecation

Construction of Gudwall and canal Bholanath sing land

Barakhankri

Bhaliaghati

25th Jan'14

Flood Control & Protecation

Barakhankri

Deulbarh

25th Jan'14

Flood Control & Protecation

Const.of Guardwall at Tiyakati Desh pukur

Barakhankri

Deulbarh

25th Jan'14

Flood Control & Protecation

Barakhankri

Deulbarh

25th Jan'14

Flood Control & Protecation

Const. of wooden bridge over pacha khal

Barakhankri

Deulbarh

25th Jan'14

Flood Control & Protecation

Const. of slab cause way over Dolighatra pacha khal

Barakhankri

Deulbarh

25th Jan'14

Flood Control & Protecation

Const. of Guardwall at Sambhunath pond

Barakhankri

Deulbarh

25th Jan'14

Flood Control & Protecation

Barakhankri

Deulbarh

25th Jan'14

Flood Control & Protecation

Const. of culvert from Barajharia to kanthi road

Barakhankri

25th Jan'14

Flood Control & Protecation

Const. of culvert from Barajharia to Ferighat road

Barakhankri

25th Jan'14

Flood Control & Protecation

Const. of canel from Pradip ghosh para to kiran Sinng house

Barakhankri

25th Jan'14

Flood Control & Protecation

Const. of canel ferom Totasai SSK to Harimandir

Barakhankri

25th Jan'14

Flood Control & Protecation

Const. of Guard wall at Baradanga Ferighat

Barakhankri

Baradanga

25th Jan'14

Flood Control & Protecation

Barakhankri

Baradanga

25th Jan'14

Flood Control & Protecation

Barakhankri

Bachhurkhoard

Bachurkhoard

25th Jan'14

Flood Control & Protecation

Const. of irrigation canel from Dembor sole to Ganga bundh

Barakhankri

Bachhurkhoard

Bachurkhoard

25th Jan'14

Page 83: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

83/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

657 03 Barakhankri 7 7/20 38 - - 1.00 2.49 1.17 3.66 1646 3.7 April

658 03 Barakhankri 7 7/21 Kadamdiha 77 - - - 1.49 2.47 3.96 988 4 October

659 03 Barakhankri 7 7/22 Thuria Thuria 59 - - - 1.49 2.96 4.45 988 4.5

660 03 Barakhankri 7 7/23 Murakati 78 - 0.50 - 2.49 2.46 4.95 1646 5 June

- - - 41.96 38.68 80.64 27786

661 03 Barakhankri 8 Rural Connectivity 8/1 40 - - 2.00 1.49 0.64 2.13 988 2.15 January

662 03 Barakhankri 8 Rural Connectivity 8/2 Const.of Road Darkhuli ToDamdasoal 41 - - 5.00 1.49 0.64 2.13 988 2.15 January

663 03 Barakhankri 8 Rural Connectivity 8/3 40 - - 3.00 1.49 0.64 2.13 988 2.15 Winter

664 03 Barakhankri 8 Rural Connectivity 8/4 40 - - 3.00 1.49 1.97 3.46 988 3.5 Winter

665 03 Barakhankri 8 Rural Connectivity 8/5 56 - - 2.00 1.49 1.97 3.46 988 3.5 Winter

666 03 Barakhankri 8 Rural Connectivity 8/6 56 - - 1.00 1.49 0.64 2.13 988 2.15 Winter

667 03 Barakhankri 8 Rural Connectivity 8/7 62 - - 1.00 1.49 0.49 1.98 988 2 Winter

668 03 Barakhankri 8 Rural Connectivity 8/8 Cnst. Of road Jahirathan to Namasole Bhaliaghati - - 1.00 1.99 0.98 2.97 1317 3 Winter

669 03 Barakhankri 8 Rural Connectivity 8/9 Bhaliaghati - - 1.00 2.19 0.73 2.92 1449 2.95 Winter

670 03 Barakhankri 8 Rural Connectivity 8/10 Bhaliaghati - - 1.12 1.74 1.97 3.71 1152 3.75 Winter

671 03 Barakhankri 8 Rural Connectivity 8/11 Bhaliaghati - - 1.11 1.44 1.92 3.36 955 3.4 Winter

672 03 Barakhankri 8 Rural Connectivity 8/12 Bhaliaghati - - 0.99 1.74 1.92 3.66 1152 3.7 Winter

673 03 Barakhankri 8 Rural Connectivity 8/13 Bhaliaghati - - 0.99 1.74 1.92 3.66 1152 3.7 Winter

674 03 Barakhankri 8 Rural Connectivity 8/14 Bhaliaghati - - 0.95 1.74 0.49 2.23 1152 2.25 January

675 03 Barakhankri 8 Rural Connectivity 8/15 Bhaliaghati - - 1.00 1.49 1.97 3.46 988 3.5 January

676 03 Barakhankri 8 Rural Connectivity 8/16 Bhaliaghati - - 1.13 1.29 1.72 3.02 856 3.05

677 03 Barakhankri 8 Rural Connectivity 8/17 Deulbarh 8 - - 1.20 1.39 1.97 3.36 922 3.4

Flood Control & Protecation

Const. of irrigation canel from Gam bundh to Bachurkhoard desh bundh

Barakhankri

Bachhurkhoard

Bachurkhoard

25th Jan'14

Flood Control & Protecation

Const. of weir at Kadamdiha Kanali khal

Barakhankri

Kadamdiha

25th Jan'14

Flood Control & Protecation

Const. of guardwall from satish kapri land to Manna De

Barakhankri

25th Jan'14

Septembar

Flood Control & Protecation

Const of protection wall at Gram Panchayat Office

Barakhankri

Murakati

25th Jan'14

Flood Control & Protecation Total

Const.of Road Mulukchand House to Laxman Mandi House

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Const.of Road Ruknimara club chok To Kayardahi

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Road Repear from Bakultala to Kutipukur

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Road Repear from Digbijay Chok to Drighutu

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Const.of Road Mulukchand House to Harish Mahata House

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Construction of new road at Dilleswar Mahata house to assta gach

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Barakhankri

Bhaliaghati

25th Jan'14

Cnons. Of road Bhulasini kamar ghar to Bholanath sing house

Barakhankri

Bhaliaghati

25th Jan'14

Cons; of road Bhulasini bat tala chalk toGhandheswary dandapat house

Barakhankri

Bhaliaghati

25th Jan'14

Construction of road Kamar ghar to ashasta tala

Barakhankri

Bhaliaghati

25th Jan'14

Construction of road pmgy to Kunjamohan sing mohua gach

Barakhankri

Bhaliaghati

25th Jan'14

Construction of road Gobinda sing house toSaraswati sing house

Barakhankri

Bhaliaghati

25th Jan'14

Construction of road Rout para to Sing para

Barakhankri

Bhaliaghati

25th Jan'14

Construction of road Bhaliaghati pry; school to Dhirighutu chalk

Barakhankri

Bhaliaghati

25th Jan'14

Construction of road Bhaliaghati shib mandir chalk to Subodh routh house

Barakhankri

Bhaliaghati

25th Jan'14

December

Earthen rd from Rameswar to dukhashini

Barakhankri

Deulbarh

25th Jan'14

November

Page 84: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

84/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

678 03 Barakhankri 8 Rural Connectivity 8/18 Road repair from Biriberia to Topoban Biriberia 32 - - 3.00 1.39 2.76 4.15 922 4.2 January

679 03 Barakhankri 8 Rural Connectivity 8/19 Baradanga 38 - - 1.00 1.39 1.48 2.87 922 2.9

680 03 Barakhankri 8 Rural Connectivity 8/20 Baradanga 38 - - 0.89 1.49 0.98 2.47 988 2.5

681 03 Barakhankri 8 Rural Connectivity 8/21 Baradanga 38 - - 1.00 1.49 2.17 3.66 988 3.7 January

682 03 Barakhankri 8 Rural Connectivity 8/22 Baradanga 38 - - 1.20 1.49 1.97 3.46 988 3.5

683 03 Barakhankri 8 Rural Connectivity 8/23 Baradanga 38 - - 1.00 1.49 1.97 3.46 988 3.5

684 03 Barakhankri 8 Rural Connectivity 8/24 Baradanga 38 - - 1.00 1.49 1.48 2.97 988 3 October

685 03 Barakhankri 8 Rural Connectivity 8/25 Baradanga 38 - - 1.00 1.49 1.77 3.26 988 3.3

686 03 Barakhankri 8 Rural Connectivity 8/26 Totasai 63 - - 3.00 1.49 2.47 3.96 988 4

687 03 Barakhankri 8 Rural Connectivity 8/27 38 - - 1.50 1.49 2.47 3.96 988 4 March

688 03 Barakhankri 8 Rural Connectivity 8/28 38 - - 1.00 1.49 1.97 3.46 988 3.5 March

689 03 Barakhankri 8 Rural Connectivity 8/29 38 - - 1.00 1.49 1.97 3.46 988 3.5 March

690 03 Barakhankri 8 Rural Connectivity 8/30 Kiyajharia 39 - - 1.00 1.49 1.97 3.46 988 3.5 April

691 03 Barakhankri 8 Rural Connectivity 8/31 Road repair from Kiyajharia to Biriberia Kiyajharia 39 - - 2.00 1.49 2.27 3.76 988 3.8 April

692 03 Barakhankri 8 Rural Connectivity 8/32 Kiyajharia 39 - - 1.50 1.29 2.17 3.46 856 3.5 April

693 03 Barakhankri 8 Rural Connectivity 8/33 38 - - 2.00 1.39 2.27 3.66 922 3.7 March

694 03 Barakhankri 8 Rural Connectivity 8/34 38 - - 1.50 1.39 2.17 3.56 922 3.6 April

695 03 Barakhankri 8 Rural Connectivity 8/35 Kadamdiha 77 - - 2.00 1.69 1.97 3.66 1119 3.7 March

696 03 Barakhankri 8 Rural Connectivity 8/36 Kadamdiha 77 - - 1.00 1.49 1.97 3.46 988 3.5 April

697 03 Barakhankri 8 Rural Connectivity 8/37 Kadamdiha 77 - - 1.00 1.49 1.97 3.46 988 3.5 March

698 03 Barakhankri 8 Rural Connectivity 8/38 Kadamdiha 77 - - 2.00 0.99 1.97 2.97 658 3 April

699 03 Barakhankri 8 Rural Connectivity 8/39 Thuria Thuria 58 - - 2.00 0.99 1.97 2.97 658 3 March

700 03 Barakhankri 8 Rural Connectivity 8/40 Thuria Thuria 58 - - 1.50 0.99 1.97 2.97 658 3 April

Barakhankri

Deulbarh

25th Jan'14

Road repair from Baradanga chak to kusumtala

Barakhankri

Baradanga

25th Jan'14

November

Road repair from Baradanga pry. To Nibaran kundu house

Barakhankri

Baradanga

25th Jan'14

February

Road repair from Bomkesh Bera house to Aniruddha house

Barakhankri

Baradanga

25th Jan'14

Road repair Nuyasai PMGSY to kusumtala

Barakhankri

Baradanga

25th Jan'14

December

Road repair from Nuyasai PMGSY to Dhirighutu

Barakhankri

Baradanga

25th Jan'14

November

Road repair from Bradanga chak to Ferighat

Barakhankri

Baradanga

25th Jan'14

Road repair from Harihar Bera house Aswini Badhuk

Barakhankri

Baradanga

25th Jan'14

November

Const. of road from Bhalukghora to Beldahi

Barakhankri

Bhalukghora

25th Jan'14

November

Road repair from Bachurkhoard culture centre to kuthisai

Barakhankri

Bachurkoard

Bachurkoard

25th Jan'14

Road repair from Purba bachurkhoard PMGSY to Barik

Barakhankri

Bachurkoard

Bachurkoard

25th Jan'14

Road repair from Bachurkhoard desh bundh to Barik chak

Barakhankri

Bachurkoard

Bachurkoard

25th Jan'14

Road repair from Bachurkhoard High school to Kiyajharia Battala

Barakhankri

Bachurkoard

25th Jan'14

Barakhankri

Bachurkoard

25th Jan'14

Road repair from Kiyajharia to PMGSY road

Barakhankri

Bachurkoard

25th Jan'14

Road repair from Bachurkhoard football ground to forest pukur

Barakhankri

Bachurkoard

Bachurkoard

25th Jan'14

Road repair from Purba Bachurkhoard to Nuyasai SSK

Barakhankri

Bachurkoard

Bachurkoard

25th Jan'14

Const.of earthen road from Bhulukgora to Gangasagar

Barakhankri

Kadamdiha

25th Jan'14

Rd.repear from Mantu mallik House to Chhoto khankri

Barakhankri

Kadamdiha

25th Jan'14

Rd.repear from Kadamdiha Polghat to Kapi Mandi house

Barakhankri

Kadamdiha

25th Jan'14

Const.of earthen road from Puratan hattala to gaigardahe

Barakhankri

Kadamdiha

25th Jan'14

Road repair from Thuria purba para to laodaha ferighat

Barakhankri

25th Jan'14

Earthen rd from Sudhansu Pati house to satish land

Barakhankri

25th Jan'14

Page 85: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

85/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

701 03 Barakhankri 8 Rural Connectivity 8/41 Thuria Thuria 58 - - 1.00 0.99 1.38 2.37 658 2.4 March

702 03 Barakhankri 8 Rural Connectivity 8/42 Thuria Thuria 58 - - 1.00 0.99 0.79 1.78 658 1.8 April

703 03 Barakhankri 8 Rural Connectivity 8/43 78 - - 1.00 1.79 0.68 2.47 1185 2.5 March

704 03 Barakhankri 8 Rural Connectivity 8/44 78 - - 1.00 1.29 1.77 3.07 856 3.1 April

705 03 Barakhankri 8 Rural Connectivity 8/45 78 - - 1.00 0.99 1.78 2.77 658 2.8 April

706 03 Barakhankri 8 Rural Connectivity 8/46 78 - - 1.00 0.99 1.48 2.47 658 2.5 May

707 03 Barakhankri 8 Rural Connectivity 8/47 78 - - 1.00 0.99 1.48 2.47 658 2.5 June

708 03 Barakhankri 8 Rural Connectivity 8/48 78 - - 1.00 1.79 0.29 2.08 1185 2.1 May

- - - 69.45 78.33 147.78 45991

709 03 Barakhankri 9 9/1 Murakati 78 - 0.02 - 2.50 7.50 10.00 1656 10 Jun

- - - 2.50 7.50 10.00 1656

710 03 Barakhankri 14 14/1 Digging Dugwell of Kandra Hembram Kadamdiha 77 568 - - - 0.50 0.20 0.70 331 0.7 Jun

711 03 Barakhankri 14 14/2 Digging Dugwell of Sanjay Bhakta Kadamdiha 77 551 - - - 0.50 0.20 0.70 331 0.7 Jun

712 03 Barakhankri 14 14/3 Digging Dugwell of Sailan Mahata Kadamdiha 77 32 - - - 0.50 0.20 0.70 331 0.7 Jun

713 03 Barakhankri 14 14/4 Digging Dugwell At Puratan Hattala Kadamdiha 77 197 - - - 0.50 0.20 0.70 331 0.7 Jun

- - - 2.00 0.80 2.80 1325

714 03 Barakhankri 15 15/1 Deulbarh - - - 6.48 4.32 10.80 4291 2.42 May

715 03 Barakhankri 15 15/2 - - - 6.48 4.32 10.80 4291 2.42 June

716 03 Barakhankri 15 15/3 Baradanga - - - 4.86 3.24 8.10 3219 1.82 May

717 03 Barakhankri 15 15/4 Bhaliaghati - - - 4.86 3.24 8.10 3219 1.82 June

718 03 Barakhankri 15 15/5 - - - 6.48 4.32 10.80 4291 2.42 January

719 03 Barakhankri 15 15/6 Thuria Thuria - - - 4.86 3.24 8.10 3219 1.82 April

Road repair from Thuriapaschim para to totasai

Barakhankri

25th Jan'14

Earthen rd from sadan pira house to Gobardhan Mandal

Barakhankri

25th Jan'14

Earthen Road from Barsa mandi House to Ramjit Kisku

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Rd Repair from Sunaram Kisku House to Jharaswar Soren

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Rd Repair from Laxmindra Kotal House to Sarbeswar mallik

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Rd Repair from Damdasoal ICDS to Silu Kisku

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Rd repair from Duli Kisku toShibani kisku

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Earthen road from Rasbihari House to Tatultala Band

Barakhankri

Bara Khankri

Bara Khankri

25th Jan'14

Rural Connectivity TotalConstruction of BNRGSK

Construction of M.G.N.R.E.G.S. building at Gram Panchayat

Barakhankri

Murakati

25th Jan'14

Construction of BNRGSK TotalRural drinking water related works

Barakhankri

Kadamdiha

25th Jan'14

Rural drinking water related works

Barakhankri

Kadamdiha

25th Jan'14

Rural drinking water related works

Barakhankri

Kadamdiha

25th Jan'14

Rural drinking water related works

Barakhankri

Kadamdiha

25th Jan'14

Rural drinking water related works TotalRural Sanitation related works

Const of senitation at Deulbarh Sansad 200 nos

Barakhankri

Deulbarh

25th Jan'14

Rural Sanitation related works

Const of senitation at Bchurkhoard Sansad 200 nos

Barakhankri

Bachurkoard

Bachurkoard

25th Jan'14

Rural Sanitation related works

Const of senitation at Baradanga Sansad 150 nos

Barakhankri

Baradanga

25th Jan'14

Rural Sanitation related works

Const of senitation at Bhaliaghati Sansad 150 nos

Barakhankri

Bhaliaghati

25th Jan'14

Rural Sanitation related works

Const of senitation at Rukhnimara Sansad 200 nos

Barakhankri

Rukhnimara

Rukhnimara

25th Jan'14

Rural Sanitation related works

Const of senitation at Thuria Sansad 150 nos

Barakhankri

25th Jan'14

Page 86: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

86/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

720 03 Barakhankri 15 15/7 - - - 4.86 3.24 8.10 3219 1.82 Jun

721 03 Barakhankri 15 15/8 Kadamdiha - - - 4.86 3.24 8.10 3219 1.82 Jun

722 03 Barakhankri 15 15/9 Totasai Totasai - - - 6.48 4.32 10.80 4291 2.42 Jun

- - - 50.22 33.48 83.70 33258

- - - 570.58 269.79 840.37 377869

723 04 Baranegui 1 1/1 Baranegui 52 3.78 - - 2.67 0.30 2.97 1769 Jun

724 04 Baranegui 1 1/2 Baranegui 52 171 3.78 - - 2.67 0.30 2.97 1769 Jun

725 04 Baranegui 1 1/3 Morchi 83 519 3.78 - - 2.67 0.30 2.97 1769 Jun

726 04 Baranegui 1 1/4 Bonisole Astia 87 65 3.78 - - 2.67 0.30 2.97 1769 Jun

727 04 Baranegui 1 1/5 Bonisole Astia 87 68 3.78 - - 2.67 0.30 2.97 1769 Jun

728 04 Baranegui 1 1/6 Tikrapara 158 3.78 - - 2.67 0.30 2.97 1769 Jun

729 04 Baranegui 1 1/7 Srirampur 157 140 3.78 - - 2.67 0.30 2.97 1769 Jun

730 04 Baranegui 1 1/8 101 84,85 3.78 - - 2.67 0.30 2.97 1769 Jun

731 04 Baranegui 1 1/9 101 21,22, 3.78 - - 2.67 0.30 2.97 1769 Jun

732 04 Baranegui 1 1/10 101 90,91 3.78 - - 2.67 0.30 2.97 1769 Jun

733 04 Baranegui 1 1/11 Haripura 97 61 3.78 - - 2.67 0.30 2.97 1769 Jun

Rural Sanitation related works

Const of senitation at Barakhankri Sansad 150 nos

Barakhankri

Barakhankri

Barakhankri

25th Jan'14

Rural Sanitation related works

Const of senitation at Kadamdiha Sansad 150 nos

Barakhankri

Kadamdiha

25th Jan'14

Rural Sanitation related works

Const of senitation at Totasai Sansad 200 nos

Barakhankri

25th Jan'14

Rural Sanitation related works Total

Barakhankri Total

Water Conservation & Water Harvesting

Excavation of Dungri Pond At- Baranegui.

Baranegui

Baranegui

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond (Niyati Manna) At- Baranegui.

Baranegui

Baranegui

Niyati Manna

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond (Harendranath Mahata) At- Baradhansola.

Baranegui

Baradhansola

Harendra nath Mahata

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond (Seral Saren) At- Astia.

Baranegui

Seral Saren

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond (Tora Saren) At- Astia.

Baranegui

Tora Saren

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond At- Tikrapara (Shit Para)

Baranegui

Garkhelar

111,112,113,

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond(Narayan Mahali) At- srirampur

Baranegui

Garkhelar

Narayan Mahali

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond(Ruiha Maurmu) At- Ramchandrapur

Baranegui

Ramchandrapur

Ramchandrapur

(Ruiha Maurmu

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond (Piru Maurmu) At- Ramchandrapur

Baranegui

Ramchandrapur

Ramchandrapur

Piru Maurmu

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond (Dasha Hemram) At- Ramchandrapur

Baranegui

Ramchandrapur

Ramchandrapur

Dasha Hemram

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond (Kalipada Saren) At- Haripura

Baranegui

Rangamatia

Kalipada Saren

17th Feb'14

Page 87: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

87/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

734 04 Baranegui 1 1/12 94 1/297 3.78 - - 2.67 0.30 2.97 1769 Jun

735 04 Baranegui 1 1/13 Excavation of new pond At- Hatitop. Hatitop 100 49 3.78 - - 2.67 0.30 2.97 1769 Jun

736 04 Baranegui 1 1/14 Baranegui 52 3.78 - - 2.67 0.30 2.97 1769 Jun

737 04 Baranegui 1 1/15 Baranegui 52 171 3.78 - - 2.67 0.30 2.97 1769 March

738 04 Baranegui 1 1/16 Barsole Parasia 106 3.78 - - 2.67 0.30 2.97 1769 March

- - - 42.73 4.75 47.48 28299

739 04 Baranegui 2 Drought Proofing 2/1 Barsole Barsole 105 11/569,80 - 2.00 - 2.10 0.38 2.47 1389 March

740 04 Baranegui 2 Drought Proofing 2/2 Morchi Bheliadiha 99 - 2.00 - 2.10 0.38 2.47 1389 March

741 04 Baranegui 2 Drought Proofing 2/3 Morchi Morchi 98 - 2.00 - 2.10 0.38 2.47 1389 March

742 04 Baranegui 2 Drought Proofing 2/4 Bonisole Bonisole 88 171 - 2.00 - 2.10 0.38 2.47 1389 March

743 04 Baranegui 2 Drought Proofing 2/5 Afforestation at - Garkhelar. Garkhelar 102 - 2.00 - 2.10 0.38 2.47 1389 April

744 04 Baranegui 2 Drought Proofing 2/6 Afforestation at - Tikrapara. Tikrapara 158 - 2.00 - 2.10 0.38 2.47 1389 April

745 04 Baranegui 2 Drought Proofing 2/7 Afforestation at - Srirampur. Srirampur 157 - 2.00 - 2.10 0.38 2.47 1389 April

746 04 Baranegui 2 Drought Proofing 2/8 Nursery under Baranegui GP Baranegui - 0.01 - 2.49 2.95 5.44 1646 April

- - - 17.17 5.58 22.75 11371

747 04 Baranegui 3 3/1 Baranegui 52 - 4.60 - 2.21 0.48 2.69 1462 April

748 04 Baranegui 3 3/2 Morchi Morchi 98 - 4.60 - 0.99 2.19 3.19 658 April

Water Conservation & Water Harvesting

Excavation of new pond (Parameswar Mahata) At- Rangamatia.

Baranegui

Rangamatia

Chhotodhansola

Parameswar Mahata

17th Feb'14

Water Conservation & Water Harvesting

Baranegui

Rangamatia

17th Feb'14

Water Conservation & Water Harvesting

Excavation of new pond (Isha Hossain) At- Baranegui.

Baranegui

Baranegui

(Isha Hossain

17th Feb'14

Water Conservation & Water Harvesting

Excavation of New Pond, Of (Ananda Manna)at- Baranegui

Baranegui

Baranegui

Ananda Manna

17th Feb'14

Water Conservation & Water Harvesting

Excavation of New Pond, at- Parasia Paschim Para.

Baranegui

17th Feb'14

Water Conservation & Water Harvesting Total

Afforestation at Barsole(Girish Chandra shit).

Baranegui

Girish Chandra shit

17th Feb'14

Afforestation at Bheliadiha(Hemendramohan Singha).

Baranegui

17th Feb'14

Afforestation at Side of Morchi Football Ground.

Baranegui

17th Feb'14

Afforestation at Bonisole (Madhusudan Saren).

Baranegui

Madhusudan Saren

17th Feb'14

Baranegui

Garkhelar

17th Feb'14

Baranegui

Garkhelar

17th Feb'14

Baranegui

Garkhelar

17th Feb'14

Baranegui

Baranegui

17th Feb'14

Drought Proofing TotalMicro Irrigation Works

Construction of canel f rom Baranegui Pitch Road to PMGSY Road .

Baranegui

Baranegui

17th Feb'14

Micro Irrigation Works

Construction of Concrete Canel From Morchi high school to Jogendra Mahata`s house.

Baranegui

17th Feb'14

Page 88: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

88/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

749 04 Baranegui 3 3/3 Morchi Morchi 98 - 4.60 - 2.21 0.98 3.19 1462 April

750 04 Baranegui 3 3/4 Morchi 83 - 4.60 - 2.21 0.98 3.19 1462 April

751 04 Baranegui 3 3/5 101 - 4.60 - 2.21 0.98 3.19 1462 April

752 04 Baranegui 3 3/6 Garkhelar 102 - 4.60 - 2.21 0.98 3.19 1462 April

753 04 Baranegui 3 3/7 Excavation of Canel at hatitop Hatitop 100 - 4.60 - 2.21 0.98 3.19 1462 April

754 04 Baranegui 3 3/8 Tentulmuri 92 - 4.60 - 2.21 0.98 3.19 1462 April

755 04 Baranegui 3 3/9 Haripura 97 - 4.60 - 2.21 0.98 3.19 1462 April

756 04 Baranegui 3 3/10 101 - 4.60 - 2.21 0.98 3.19 1462 April

757 04 Baranegui 3 3/11 Re-excavation of Raja Bandh`s Canel. Barsole Barsole 105 - 4.60 - 2.21 0.98 3.19 1462 April

- - - 23.07 11.48 34.54 15276

758 04 Baranegui 5 5/1 Baranegui 52 2.52 - - 2.67 0.30 2.97 1769 April

759 04 Baranegui 5 5/2 Bonisole Bonisole 88 2.52 - - 2.67 0.30 2.97 1769 April

760 04 Baranegui 5 5/3 Bonisole Bonisole 88 21 2.52 - - 2.67 0.30 2.97 1769 April

761 04 Baranegui 5 5/4 Bonisole 89 42 2.52 - - 2.67 0.30 2.97 1769 April

762 04 Baranegui 5 5/5 101 2.52 - - 2.67 0.30 2.97 1769 April

763 04 Baranegui 5 5/6 94 112 2.52 - - 2.67 0.30 2.97 1769 April

764 04 Baranegui 5 5/7 93 119 2.52 - - 2.67 0.30 2.97 1769 April

765 04 Baranegui 5 5/8 Re-excavation of pond at- Hatitop. Hatitop 100 51 2.52 - - 2.67 0.30 2.97 1769 April

Micro Irrigation Works

Re-Excavation of Canel and Gard wall of Morchi Bandh .

Baranegui

17th Feb'14

Micro Irrigation Works

Constrution of Chathal At- Kunwar Bandh.

Baranegui

Baradhansola

17th Feb'14

Micro Irrigation Works

Re-excavation of kanjiam Bandh and canel.

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Micro Irrigation Works

Const. of New canel At- Garkgelar ( Giri Para)

Baranegui

Garkhelar

17th Feb'14

Micro Irrigation Works

Baranegui

Rangamatia

17th Feb'14

Micro Irrigation Works

RE-excavation of Tentulmuri Bandh & Canel

Baranegui

Rangamatia

17th Feb'14

Micro Irrigation Works

Const. of New Canel From Chetan Bandh to Haripura

Baranegui

Rangamatia

17th Feb'14

Micro Irrigation Works

Re-excavation of Bandh & Canel at- Ram Chandrapur Madhyapara(Padum Babus Para)

Baranegui

Garkhelar

Ramchandrapur

17th Feb'14

Micro Irrigation Works

Baranegui

17th Feb'14

Micro Irrigation Works TotalRenovation of Traditional Water Bodies

Re- excavation of pond At- Baranigui (Ratikanta Mahata)

Baranegui

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Pond At- Bonisole (jahira than)

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of pond.At- Bonisole (Nabin Saren)

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re Excavation Of Pond, At-chhototalpada.(Suren kisku)

Baranegui

Chhototalpada

17th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Ramchandra pur Pond (Padum Babu)

Baranegui

Garkhelar

Ram Ch. Pur

17th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of pond at-Chhotodhansola.

Baranegui

Rangamatia

Chhotodhansola

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of pond at- Rangamatia.(Babaji pukur.)

Baranegui

Rangamatia

Rangamatia

17th Feb'14

Renovation of Traditional Water Bodies

Baranegui

Rangamatia

17th Feb'14

Page 89: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

89/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

766 04 Baranegui 5 5/9 93 109 2.52 - - 2.67 0.30 2.97 1769 April

767 04 Baranegui 5 5/10 94 250 2.52 - - 2.67 0.30 2.97 1769 April

768 04 Baranegui 5 5/11 101 2.52 - - 2.67 0.30 2.97 1769 May

769 04 Baranegui 5 5/12 101 2.52 - - 2.67 0.30 2.97 1769 May

770 04 Baranegui 5 5/13 101 2.52 - - 2.67 0.30 2.97 1769 May

771 04 Baranegui 5 5/14 Barsole Parasia 106 2.52 - - 2.67 0.30 2.97 1769 May

772 04 Baranegui 5 5/15 Morchi Morchi 98 58/461 2.52 - - 2.67 0.30 2.97 1769 May

773 04 Baranegui 5 5/16 Re- excavation of pond at-Parasia Barasole Parasia 106 2.52 - - 2.67 0.30 2.97 1769 May

774 04 Baranegui 5 5/17 94 2.52 - - 2.67 0.30 2.97 1769 May

775 04 Baranegui 5 5/18 Barsole Jamboni 104 47 2.52 - - 2.67 0.30 2.97 1769 May

776 04 Baranegui 5 5/19 Barsole Khairasole 103 22,23 2.52 - - 2.67 0.30 2.97 1769 May

777 04 Baranegui 5 5/20 Barsole Barsole 105 659 2.52 - - 2.67 0.30 2.97 1769 May

778 04 Baranegui 5 5/21 Barsole Barsole 105 141 2.52 - - 2.67 0.30 2.97 1769 June

779 04 Baranegui 5 5/22 94 2.52 - - 2.67 0.30 2.97 1769 June

- - - 58.76 6.53 65.28 38911

Renovation of Traditional Water Bodies

Re-excavation pond at - Rangamatia.(Bhim kisku)

Baranegui

Rangamatia

Rangamatia

17th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Pond at - Chhotodhansola.(Thakurpukur)

Baranegui

Rangamatia

Chhotodhansola

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of pond at- Ramchandrapur(Padum Babu)

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of pond at- Ramchandrapur(Makar Tudu)

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of pond at- Ramchandrapur(Arjun Kisku)

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of pond (Biswanth Hemram) At: Parasia

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of pond (Sailendra mohan Singha) At: Morchi.

Baranegui

Sailendramohan singha

17th Feb'14

Renovation of Traditional Water Bodies

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of pond at-Chhotdhansola (Manoranjan Mahata)

Baranegui

Rangamatia

Chhotodhansola

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of Kuthi Pukur.At- Jamboni.

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re-excavation of Desua Pond at- Khairasole.

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re Excavation Of Pond, At-Barsole (Ratikanta and Bikramaditya Mahata)

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re Excavation Of Pond, At-Barsole (Bisan Hansda)

Baranegui

17th Feb'14

Renovation of Traditional Water Bodies

Re- excavation of pond at-Chhotdhansola (Makar Tudu)

Baranegui

Rangamatia

Chhotodhansola

17th Feb'14

Renovation of Traditional Water Bodies Total

Page 90: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

90/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

780 04 Baranegui 6 Land Development 6/1 Filling Soil at- Baranegui (Shib Mandir) Baranegui 52 - 0.88 - 2.94 0.33 3.26 1946 June

781 04 Baranegui 6 Land Development 6/2 Bonisole Bonisole 88 - 0.90 - 2.94 0.33 3.26 1946 June

782 04 Baranegui 6 Land Development 6/3 Filling soil at- Rangamatia pry. School. 93 - 0.90 - 2.94 0.33 3.26 1946 June

783 04 Baranegui 6 Land Development 6/4 Filling soil at- Bonisole pry. School. Bonisole Bonisole 88 - 0.90 - 2.94 0.33 3.26 1946 June

784 04 Baranegui 6 Land Development 6/5 Garkhelar 102 - 0.90 - 2.94 0.33 3.26 1946 June

785 04 Baranegui 6 Land Development 6/6 Morchi Morchi 98 - 0.90 - 2.94 0.33 3.26 1946 June

786 04 Baranegui 6 Land Development 6/7 Filling soil At- Parasia Football ground. Barsole Parasia 106 - 0.90 - 2.94 0.33 3.26 1946 June

787 04 Baranegui 6 Land Development 6/8 Barsole Jamboni 104 - 0.90 - 2.94 0.33 3.26 1946 June

- - - 23.50 2.61 26.11 15564

788 04 Baranegui 7 7/1 Morchi Morchi 98 - - 0.50 2.60 0.87 3.46 1720 June

789 04 Baranegui 7 7/2 Morchi Morchi 98 - - 0.50 2.60 0.87 3.46 1720 June

790 04 Baranegui 7 7/3 Morchi Morchi 98 - - 0.50 2.60 0.87 3.46 1720 June

- - - 7.79 2.60 10.39 5159

791 04 Baranegui 8 Rural Connectivity 8/1 Baranigui 52 - - 1.00 0.99 1.48 2.47 658 June

792 04 Baranegui 8 Rural Connectivity 8/2 Baranigui 52 - - 1.00 0.99 1.73 2.72 658 June

793 04 Baranegui 8 Rural Connectivity 8/3 Baranigui 52 - - 1.00 1.99 1.47 3.46 1317 June

794 04 Baranegui 8 Rural Connectivity 8/4 Morchi Morchi 98 - - 1.00 1.99 1.47 3.46 1317 June

795 04 Baranegui 8 Rural Connectivity 8/5 Morchi 83 - - 1.00 2.49 0.48 2.97 1646 June

796 04 Baranegui 8 Rural Connectivity 8/6 Morchi Bheliadiha 99 - - 1.00 2.49 0.48 2.97 1646 June

797 04 Baranegui 8 Rural Connectivity 8/7 Morchi Jamsola 82 - - 1.00 2.49 0.48 2.97 1646 June

798 04 Baranegui 8 Rural Connectivity 8/8 Morchi Morchi 98 - - 1.00 1.99 1.47 3.46 1317 June

Baranegui

Baranegui

17th Feb'14

Filling soil at- Bonisole Football ground.

Baranegui

17th Feb'14

Baranegui

Rangamatia

Rangamatia

17th Feb'14

Baranegui

17th Feb'14

Filling soil at- Garkhelar junior high School.

Baranegui

Garkhelar

17th Feb'14

Filling soil & moorum at-Baranegui Gram Panchayat office Campus.

Baranegui

17th Feb'14

Baranegui

17th Feb'14

Filling soil At- Jamboni Football Ground.

Baranegui

17th Feb'14

Land Development TotalFlood Control & Protecation

Const. of New Canel From Jamsola main road to Morchi high School.

Baranegui

17th Feb'14

Flood Control & Protecation

Const. of New Canel From Morchi High School to Baranigui GP Office.

Baranegui

17th Feb'14

Flood Control & Protecation

Const. of New Canel From Baranigui GP Office to Sarbeswar mahapatra`s house.

Baranegui

17th Feb'14

Flood Control & Protecation Total

Repair of Road from Baranigui pitch Rd.to PMGSY Road.

Baranegui

Baranigui

17th Feb'14

Repair of Road at Baranegui (valuktara) Baranegui

Baranigui

17th Feb'14

Repair of Road from Baranegui Marashasan to PMGSY Road.

Baranegui

Baranigui

17th Feb'14

Repair of Road from Morchi PMGSY road to Bagan Pukur.

Baranegui

17th Feb'14

Const. of New Road from Shambhu Mahata`s house to High School,At- Baradhansola.

Baranegui

Baradhansola

17th Feb'14

Const.road Mangal See`s house to Hattala.At- Bheliadiha.

Baranegui

17th Feb'14

Const. of Road from Jamsola Aswastha Tree to Parasia.

Baranegui

17th Feb'14

Repair of Road From Morchi to Tentulia.

Baranegui

17th Feb'14

Page 91: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

91/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

799 04 Baranegui 8 Rural Connectivity 8/9 Morchi Amlakara 84 - - 1.00 1.99 1.47 3.46 1317 June

800 04 Baranegui 8 Rural Connectivity 8/10 Morchi Amlakara 84 - - 1.00 1.99 1.47 3.46 1317 June

801 04 Baranegui 8 Rural Connectivity 8/11 Repair of Bheliadiha Gramin Road. Morchi Bheliadiha 99 - - 1.00 1.99 1.47 3.46 1317 June

802 04 Baranegui 8 Rural Connectivity 8/12 Morchi 83 - - 1.00 1.99 1.47 3.46 1317 June

803 04 Baranegui 8 Rural Connectivity 8/13 Bonisole Astia 87 - - 1.50 2.49 0.48 2.97 1646 June

804 04 Baranegui 8 Rural Connectivity 8/14 Bonisole Astia 87 - - 1.50 2.49 0.48 2.97 1646 June

805 04 Baranegui 8 Rural Connectivity 8/15 Bonisole Bonisole 88 - - 2.50 1.99 2.46 4.45 1317 June

806 04 Baranegui 8 Rural Connectivity 8/16 Bonisole Bonisole 88 - - 1.50 2.49 0.48 2.97 1646 June

807 04 Baranegui 8 Rural Connectivity 8/17 Bonisole 89 - - 1.00 1.49 0.49 1.98 988 June

808 04 Baranegui 8 Rural Connectivity 8/18 Bonisole 89 - - 1.00 2.49 0.48 2.97 1646 June

809 04 Baranegui 8 Rural Connectivity 8/19 Bonisole 89 - - 0.50 0.99 0.49 1.48 658 June

810 04 Baranegui 8 Rural Connectivity 8/20 Hatitop 100 - - 2.00 1.99 1.47 3.46 1317 June

811 04 Baranegui 8 Rural Connectivity 8/21 Hatitop 100 - - 1.00 1.99 0.48 2.47 1317 July

812 04 Baranegui 8 Rural Connectivity 8/22 Hatitop 100 - - 1.00 1.49 1.48 2.97 988 Jun

813 04 Baranegui 8 Rural Connectivity 8/23 93 - - 1.50 2.49 0.48 2.97 1646 Jun

814 04 Baranegui 8 Rural Connectivity 8/24 101 - - 1.50 1.99 1.47 3.46 1317 Jun

815 04 Baranegui 8 Rural Connectivity 8/25 101 - - 1.50 2.49 0.48 2.97 1646 Jun

816 04 Baranegui 8 Rural Connectivity 8/26 101 - - 1.50 2.49 0.48 2.97 1646 Jun

817 04 Baranegui 8 Rural Connectivity 8/27 101 - - 2.00 2.49 1.97 4.45 1646 Jun

818 04 Baranegui 8 Rural Connectivity 8/28 101 - - 1.00 1.49 1.48 2.97 988 Jun

819 04 Baranegui 8 Rural Connectivity 8/29 Garkhelar 102 - - 1.00 2.49 0.48 2.97 1646 Jun

820 04 Baranegui 8 Rural Connectivity 8/30 Garkhelar 102 - - 1.00 2.49 0.48 2.97 1646 Jun

Repair of Road from Amlakara Rameswar Murmu`s house to PMGSY Road.

Baranegui

17th Feb'14

Repair of Road From PMGSY Road to Goramthan. At- Amlakara.

Baranegui

17th Feb'14

Baranegui

17th Feb'14

Repair of Road from Jamsola main Road to Baradhansola SSK.

Baranegui

Baradhansola

17th Feb'14

Const. of Road From PMGSY Road to Orissa Border At- Astia.

Baranegui

17th Feb'14

Const. of Road from astia ICDS to Sagar Babu`s Para.

Baranegui

17th Feb'14

Repair of road from Bonisole Pry. School to Orissa Border.

Baranegui

17th Feb'14

Const. of Road From Bonisole Pitch road to jungle.

Baranegui

17th Feb'14

Repair of Road At- chhototalpada ( Biram babu`s para)

Baranegui

Chhototalpada

17th Feb'14

Repair of road from Chhtoto talpada junior high school to Football ground.

Baranegui

Chhototalpada

17th Feb'14

Const. of Road from Chhototalpada Pitch road to Daitary Patra`s house.

Baranegui

Chhototalpada

17th Feb'14

Repair of road from Hatitop Chawk to Ramchandrapur.

Baranegui

Rangamatia

17th Feb'14

Const. Of New road From Khas Jungle to Khal.

Baranegui

Rangamatia

17th Feb'14

Repair of Road from hatitop Chawk to khal.

Baranegui

Rangamatia

17th Feb'14

Const. of road from Rangamatia Main road to Goramthan.

Baranegui

Rangamatia

Rangamatia

17th Feb'14

Repair of road from Ramchandrapur Main Road to khal.

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Const. of Road from Nanda Murmu`s house to Jahirathan.

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Const. of New road from Ramchandrapur Shasan to Khan.

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Repair of Road from Ramchandrapur to Garkhelar.

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Repair of road from Suklal Babu`s house to Jamin.

Baranegui

Ramchandrapur

Ramchandrapur

17th Feb'14

Const. of Road from Kased Ali`s house to Baghmarasole.

Baranegui

Garkhelar

17th Feb'14

Const. of New Road Ranjan Patar`s house to Thakurthan.

Baranegui

Garkhelar

17th Feb'14

Page 92: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

92/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

821 04 Baranegui 8 Rural Connectivity 8/31 Garkhelar 102 - - 1.50 2.49 1.47 3.96 1646 Jun

822 04 Baranegui 8 Rural Connectivity 8/32 Garkhelar 102 - - 1.50 2.49 1.47 3.96 1646 April

823 04 Baranegui 8 Rural Connectivity 8/33 Garkhelar 102 - - 1.50 1.99 1.47 3.46 1317 April

824 04 Baranegui 8 Rural Connectivity 8/34 Tikrapara 158 - - 0.50 1.99 5.92 7.91 1317 April

825 04 Baranegui 8 Rural Connectivity 8/35 Tikrapara 158 - - 1.00 1.99 0.48 2.47 1317 April

826 04 Baranegui 8 Rural Connectivity 8/36 Srirampur 157 - - 1.00 1.99 0.48 2.47 1317 April

827 04 Baranegui 8 Rural Connectivity 8/37 Srirampur 157 - - 1.00 1.99 0.48 2.47 1317 April

828 04 Baranegui 8 Rural Connectivity 8/38 Barsole Barsole 105 - - 1.50 1.99 0.98 2.97 1317 April

829 04 Baranegui 8 Rural Connectivity 8/39 Barsole Parasia 106 - - 0.50 1.96 0.22 2.18 1297 April

830 04 Baranegui 8 Rural Connectivity 8/40 Barsole Parasia 106 - - 1.00 1.99 0.48 2.47 1317 April

831 04 Baranegui 8 Rural Connectivity 8/41 Barsole Barsole 105 - - 1.00 1.99 0.48 2.47 1317 April

832 04 Baranegui 8 Rural Connectivity 8/42 Bonisole 89 - - 1.00 1.99 0.48 2.47 1317 April

833 04 Baranegui 8 Rural Connectivity 8/43 Baranegui 52 - - 1.50 1.99 0.48 2.47 1317 April

834 04 Baranegui 8 Rural Connectivity 8/44 Garkhelar 106 - - 1.00 1.99 0.48 2.47 1317 April

- - - 90.44 46.50 136.95 59897

835 04 Baranegui 14 14/1 Morchi 83 138/466 0.10 - - 0.30 0.60 0.90 199

836 04 Baranegui 14 14/2 Morchi 83 319 0.10 - - 0.30 0.60 0.90 199

837 04 Baranegui 14 14/3 Morchi Bheliadiha 99 17 0.10 - - 0.30 0.60 0.90 199

838 04 Baranegui 14 14/4 Bonisole Bonisole 88 46 0.10 - - 0.30 0.60 0.90 199

Repair of Road from Garkhelar to Dakhin Srirampur.

Baranegui

Garkhelar

17th Feb'14

Repair of road from Dakhhin Srirampur to Banskuthi.

Baranegui

Garkhelar

17th Feb'14

Repir of road from Garkhelar football ground to puratan Pukur.

Baranegui

Garkhelar

17th Feb'14

Const. of Concret road from Shit Para to Paka Rasta. At- Tikrapara.

Baranegui

Garkhelar

17th Feb'14

Const. of New Road From Shit para to Jungle. At- Tikrapara.

Baranegui

Garkhelar

17th Feb'14

Const. of New Road from Dakhin Sriram pur (Lakshman Tudu`s house) to Tikrapara Bagan.

Baranegui

Garkhelar

17th Feb'14

Const. of New Road from Dakhin Sriram pur (Dasa Tudu`s house) Jungle.

Baranegui

Garkhelar

17th Feb'14

Repair of Road from Bhagabani`s house to Kasafal Bandh.

Baranegui

17th Feb'14

Construction of New Road from Parasia Nichu para to Baradhansola.

Baranegui

17th Feb'14

Repair of Road at- Parasia Purba para (Bansahi)

Baranegui

17th Feb'14

Construction of road from Raja Bandh to Barsole ICDS.

Baranegui

17th Feb'14

Construction of New Road From Chhototalpada Pitch Road to Dibakar Patra`s house.

Baranegui

Chhototalpada

17th Feb'14

Construction of rd from Baranegui Pitch road to Tentultala

Baranegui

Baranegui

17th Feb'14

Const. of New road From Ismaile`s house to Main Road At- Garkhelar Dakhin Para.

Baranegui

Garkhelar

17th Feb'14

Rural Connectivity TotalRural drinking water related works

Digging Well Of (Dhirendranath Mahata) at- Baradhansola.

Baranegui

Baradhansola

Dhirendranath Mahata

17th Feb'14

February

Rural drinking water related works

Digging Well Of (Shambhu Mahata) at- Baradhansola.

Baranegui

Baradhansola

Shambhu Mahata

17th Feb'14

February

Rural drinking water related works

Digging Well Of (Shankar Mahata) at- Bheliadiha.

Baranegui

Shankar Mahata

17th Feb'14

Jun to July

Rural drinking water related works

Digging Well Of (Lasha Murmu) at- Bonisole.

Baranegui

Lasha Murmu

17th Feb'14

Jun to July

Page 93: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

93/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

839 04 Baranegui 14 14/5 Bonisole Bonisole 88 50,51 0.10 - - 0.30 0.60 0.90 199

840 04 Baranegui 14 14/6 Bonisole Astia 87 34 0.10 - - 0.30 0.60 0.90 199

841 04 Baranegui 14 14/7 Bonisole 89 63 0.10 - - 0.30 0.60 0.90 199

842 04 Baranegui 14 14/8 Bonisole 89 102 0.10 - - 0.30 0.60 0.90 199

843 04 Baranegui 14 14/9 101 41 0.10 - - 0.30 0.60 0.90 199

844 04 Baranegui 14 14/10 101 63 0.10 - - 0.30 0.60 0.90 199

845 04 Baranegui 14 14/11 101 234 0.10 - - 0.30 0.60 0.90 199 March

846 04 Baranegui 14 14/12 101 27 0.10 - - 0.30 0.60 0.90 199 March

847 04 Baranegui 14 14/13 101 284 0.10 - - 0.30 0.60 0.90 199 March

848 04 Baranegui 14 14/14 Garkhelar 102 0.10 - - 0.30 0.60 0.90 199 March

849 04 Baranegui 14 14/15 Garkhelar 102 0.10 - - 0.30 0.60 0.90 199 March

850 04 Baranegui 14 14/16 Tikrapara 158 0.10 - - 0.30 0.60 0.90 199 March

851 04 Baranegui 14 14/17 Tikrapara 158 0.10 - - 0.30 0.60 0.90 199 March

852 04 Baranegui 14 14/18 Digging Well , at- Rangamatia 93 207 0.10 - - 0.30 0.60 0.90 199 March

853 04 Baranegui 14 14/19 Digging Well , at- Rangamat 93 180 0.10 - - 0.30 0.60 0.90 199 March

854 04 Baranegui 14 14/20 Digging Well , at- Tentulmuri Tentulmuri 92 87/174 0.10 - - 0.30 0.60 0.90 199 March

855 04 Baranegui 14 14/21 Digging Well , at- Hatitop Hatitop 100 0.10 - - 0.30 0.60 0.90 199 March

856 04 Baranegui 14 14/22 Digging Well , at- Barsole Shib Mandir. Barsole Barsole 105 28/575 0.10 - - 0.30 0.60 0.90 199 March

857 04 Baranegui 14 14/23 Digging Well , At- Jamboni SSK. Barsole Jamboni 104 156 0.10 - - 0.30 0.60 0.90 199 March

- - - 6.90 13.80 20.70 4570

Rural drinking water related works

Digging Well Of (Subodh Saren) at- Bonisole.

Baranegui

(Subodh Saren

17th Feb'14

Jun to July

Rural drinking water related works

Digging Well Of (Nabin Babu) at- Astia.

Baranegui

Nabin Babu

17th Feb'14

Jun to July

Rural drinking water related works

Digging Well Of (Pahar Saren) at- Chhototalpada.

Baranegui

Chhototalpada

Pahar Saren

17th Feb'14

Jun to July

Rural drinking water related works

Digging Well Of (Thakuram Saren) at- Chhototalpada.

Baranegui

Chhototalpada

Thakuram Saren

17th Feb'14

Jun to July

Rural drinking water related works

Digging Well Of (Pare Hansda) at- Ramchandrapur.

Baranegui

Ramchandrapur

Ramchandrapur

Pare Hansda

17th Feb'14

Jun to July

Rural drinking water related works

Digging Well Of (Piru Murmu) at- Ramchandrapur.

Baranegui

Ramchandrapur

Ramchandrapur

Piru Murmu

17th Feb'14

Rural drinking water related works

Digging Well Of (Purnachandra Mandi) at- Ramchandrapur.

Baranegui

Ramchandrapur

Ramchandrapur

Purnachandra Mandi

17th Feb'14

Rural drinking water related works

Digging Well Of (Makar Tudu) at- Ramchandrapur.

Baranegui

Ramchandrapur

Ramchandrapur

Makar Tudu

17th Feb'14

Rural drinking water related works

Digging Well Of (Madhu Hansda) at- Ramchandrapur.

Baranegui

Ramchandrapur

Ramchandrapur

Madhu Hansda

17th Feb'14

Rural drinking water related works

Digging Well Of (Sanatan Baramajhi) at- Garkhelar.

Baranegui

Garkhelar

Sanatan Baramajhi

17th Feb'14

Rural drinking water related works

Digging Well Of (Duryodhan Giri) at- Garkhelar.

Baranegui

Garkhelar

Duryodhan Giri

17th Feb'14

Rural drinking water related works

Digging Well Of (Shakti Rana ) at- Tikrapara.

Baranegui

Garkhelar

Shakti Rana

17th Feb'14

Rural drinking water related works

Digging Well Of (Shit Para ) at- Tikrapara.

Baranegui

Garkhelar

17th Feb'14

Rural drinking water related works

Baranegui

Rangamatia

Rangamatia

17th Feb'14

Rural drinking water related works

Baranegui

Rangamatia

Rangamatia

17th Feb'14

Rural drinking water related works

Baranegui

Rangamatia

17th Feb'14

Rural drinking water related works

Baranegui

Rangamatia

17th Feb'14

Rural drinking water related works

Baranegui

17th Feb'14

Rural drinking water related works

Baranegui

17th Feb'14

Rural drinking water related works Total

Page 94: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

94/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 270.36 93.84 364.20 179047

858 05 Berajal 1 1/1 Dug well at Umesh Mahato House Berajal Nekrasole 295 207 - - - 0.48 0.31 0.79 316

859 05 Berajal 1 1/2 Excavation of Sridam Mahato Pond Berajal Nekrasole 295 - - - 1.67 1.10 2.77 1106

860 05 Berajal 1 1/3 Berajal Nekrasole 295 139 - - - 0.48 0.31 0.79 316

861 05 Berajal 1 1/4 Excavation of Khirod Mahata Pond Berajal Sathatia 294 274 - 0.81 - 2.49 0.28 2.77 1651

862 05 Berajal 1 1/5 Excavation of Bankim Tudu Pond Berajal Sathatia 294 140 - 0.60 - 2.23 0.25 2.47 1474

863 05 Berajal 1 1/6 Excavation of Gopal Mahata Pond Berajal Sathatia 294 297298 - 1.41 - 2.67 0.30 2.97 1769

864 05 Berajal 1 1/7 Excavation of Chandan Mahata Pond Berajal Sathatia 294 293294 - 0.40 - 2.67 0.30 2.97 1769

865 05 Berajal 1 1/8 Dug well at Ashok Patra House Berajal Jugisole jugisole 260 628/260 - - - 0.48 0.31 0.79 316

866 05 Berajal 1 1/9 Dug well at Ram Chandra Saren House Berajal Jugisole jugisole 260 254 - - - 0.48 0.31 0.79 316

867 05 Berajal 1 1/10 Dug well at Mangal Saren Saren House Berajal Jugisole jugisole 260 211 - - - 0.48 0.31 0.79 316

868 05 Berajal 1 1/11 Dug well at Naresh Patra House Berajal Jugisole jugisole 260 668/697 - - - 0.48 0.31 0.79 316

869 05 Berajal 1 1/12 Dug well at Purna Chandra Das House Berajal Jugisole jugisole 260 427 - - - 0.47 0.30 0.77 309

870 05 Berajal 1 1/13 Berajal Jugisole jugisole 260 31 - - - 0.48 0.31 0.79 316

871 05 Berajal 1 1/14 Dug well at Tapan Maity House Berajal Jugisole jugisole 260 71 - - - 0.48 0.31 0.79 316

Baranegui Total

Water Conservation & Water Harvesting

Asurhata

Umesh Mahata

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Asurhata

220 /336 ,201 /

220

Sridam Mahato

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Dug well at Nekrasole near Sanaka Mahato house house

Asurhata

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Asurhata

Khirod Mahata

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Asurhata

Bankim Tudu

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Asurhata

Gopal Mahata

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Asurhata

Chandan Mahata

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Ashok Patra

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Ram Chandra Saren

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Mangal Saren

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Naresh Patra

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Purna Chandra Das

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Dug well at Bimalendu Shymal House (Near Shiv Mandir)

Bimalendu Shymal

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Tapan Maity

25th Jan'14

Dec to Jan

Page 95: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

95/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

872 05 Berajal 1 1/15 Dug well at Sukumar sau House Berajal Jugisole jugisole 260 447 - - - 0.48 0.31 0.79 316

873 05 Berajal 1 1/16 Dug well at Jugisole Party Office Berajal Jugisole jugisole 260 133 - - - 0.48 0.31 0.79 316

874 05 Berajal 1 1/17 Dug well at Kanu Shit House Berajal Jugisole Berajal 258 283/752 - - - 0.48 0.31 0.79 316

875 05 Berajal 1 1/18 Dug well at Bimal Rout House Berajal Jugisole Berajal 258 32/33 - - - 0.48 0.31 0.79 316

876 05 Berajal 1 1/19 Dug well at Berajal swashan Berajal Jugisole Berajal 258 84/85/86 - - - 0.48 0.31 0.79 316

877 05 Berajal 1 1/20 Dug well at Biren Dey House Berajal Jugisole Berajal 258 54 - - - 0.48 0.31 0.79 316

- - - 18.88 6.92 25.80 12502

878 05 Berajal 2 Drought Proofing 2/1 Berajal Dolgram 301 125 /15 - - - 0.89 0.59 1.48 593

879 05 Berajal 2 Drought Proofing 2/2 Berajal Dolgram 301 534 - - - 0.89 0.59 1.48 593

880 05 Berajal 2 Drought Proofing 2/3 Plantation of tree at Pakabandh Berajal Dolgram 301 732 - - - 0.89 0.59 1.48 593

881 05 Berajal 2 Drought Proofing 2/4 Plantation of tree at GuriPukur Math Berajal Dolgram 301 727 - - - 0.89 0.59 1.48 593

882 05 Berajal 2 Drought Proofing 2/5 Berajal Dolgram 301 35 - - - 0.89 0.59 1.48 593

883 05 Berajal 2 Drought Proofing 2/6 Plantation of tree arround the New Pond Berajal Dolgram 301 1032 - - - 0.89 0.59 1.48 593

884 05 Berajal 2 Drought Proofing 2/7 Berajal Dolgram 301 27 - - - 0.89 0.59 1.48 593

885 05 Berajal 2 Drought Proofing 2/8 Plantation at High School Land Berajal Dolgram 301 532 - - - 0.89 0.59 1.48 593

886 05 Berajal 2 Drought Proofing 2/9 Berajal Dolgram 301 25 /1022 - - - 0.89 0.59 1.48 593

887 05 Berajal 2 Drought Proofing 2/10 Plantation of tree arround Bourani Pond Berajal Dolgram 301 325 - - - 1.19 0.79 1.98 790

888 05 Berajal 2 Drought Proofing 2/11 Plantation of tree at Charakmath Berajal Dolgram 301 1022 - - - 0.89 0.59 1.48 593

889 05 Berajal 2 Drought Proofing 2/12 Berajal Dolgram 301 - - - 0.89 0.59 1.48 593

Water Conservation & Water Harvesting

Sukumar Sau

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Kanu Shit

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Bimal Rout

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting

Biren Dey

25th Jan'14

Dec to Jan

Water Conservation & Water Harvesting Total

Plantation of tree on both side road from Ulda to Jaykhunta

Dolgram (N)

25th Jan'14

June to July

Plantation of tree arround The Padmapukur

Dolgram (N)

25th Jan'14

June to July

Dolgram (N)

25th Jan'14

June to July

Dolgram (N)

25th Jan'14

June to July

Plantation of tree at Dolgram Uttar SSK Land

Dolgram (N)

25th Jan'14

June to July

Dolgram (N)

25th Jan'14

June to July

Plantation of tree at Sitarampur SSK Land

Dolgram (N)

25th Jan'14

June to July

Dolgram (N)

25th Jan'14

June to July

Plantation of tree from Pirep road to Charakmath road

Dolgram (N)

25th Jan'14

June to July

Dolgram (N)

25th Jan'14

June to July

Dolgram(S)

25th Jan'14

June to July

Plantation of tree at road side from Charakmath to Orisha Border

Dolgram(S)

25th Jan'14

June to July

Page 96: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

96/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

890 05 Berajal 2 Drought Proofing 2/13 Plantation of Nursury at Dolgram Berajal Dolgram 301 - - - 1.19 0.79 1.98 790

891 05 Berajal 2 Drought Proofing 2/14 Plantation of tree at Nekrasole Berajal Nekrasole 295 179 - 181 - 0.42 - 0.89 0.59 1.48 593

892 05 Berajal 2 Drought Proofing 2/15 Plantation of tree at Bara Pukurpar Berajal Nekrasole 295 287288 - - - 0.89 0.59 1.48 593

893 05 Berajal 2 Drought Proofing 2/16 Plantation of Nursury at Nekrasole Berajal Nekrasole 295 28,29 - - - 0.89 0.59 1.48 593

894 05 Berajal 2 Drought Proofing 2/17 Plantation of tree at Baya Murmu Land Berajal Sathatia 294 70/326 - 1.01 - 0.89 0.59 1.48 593

895 05 Berajal 2 Drought Proofing 2/18 Plantation of Nursury at Harimaity Berajal Harimaity 304 248 - - - 1.19 0.79 1.98 790

896 05 Berajal 2 Drought Proofing 2/19 Plantation of tree at Anil Mahata Land Berajal Jugisole jugisole 260 772 - - - 0.89 0.59 1.48 593

897 05 Berajal 2 Drought Proofing 2/20 Berajal Jugisole jugisole 260 2 - - - 0.89 0.59 1.48 593

898 05 Berajal 2 Drought Proofing 2/21 Plantation of tree at Gopal sau Land Berajal Jugisole jugisole 260 140 - - - 0.89 0.59 1.48 593

899 05 Berajal 2 Drought Proofing 2/22 Plantation of tree at Narottam Das Land Berajal Jugisole jugisole 260 138 - - - 0.89 0.59 1.48 593

900 05 Berajal 2 Drought Proofing 2/23 Plantation of tree at chepli Saren Land Berajal Jugisole jugisole 260 236 - - - 0.89 0.59 1.48 593

901 05 Berajal 2 Drought Proofing 2/24 Berajal Jugisole jugisole 260 447448 - - - 0.89 0.59 1.48 593

902 05 Berajal 2 Drought Proofing 2/25 Berajal Jugisole jugisole 260 181 - - - 0.89 0.59 1.48 593

903 05 Berajal 2 Drought Proofing 2/26 Berajal Jugisole jugisole 260 39 - - - 0.89 0.59 1.48 593

904 05 Berajal 2 Drought Proofing 2/27 Berajal Jugisole Kenduboni 259 218 - - - 0.60 0.39 0.99 395

905 05 Berajal 2 Drought Proofing 2/28 Berajal Jugisole Kenduboni 259 - - - 0.60 0.39 0.99 395

906 05 Berajal 2 Drought Proofing 2/29 Berajal Jugisole Kenduboni - - - 1.01 0.67 1.68 672

907 05 Berajal 2 Drought Proofing 2/30 Plantation of tree at sanatan Das Land Berajal Jugisole jugisole 260 9 - 0.16 - 0.89 0.59 1.48 593

908 05 Berajal 2 Drought Proofing 2/31 Berajal Jugisole jugisole 260 126 - 0.40 - 0.89 0.59 1.48 593

909 05 Berajal 2 Drought Proofing 2/32 Plantation of Nursury at Jugisole Berajal Jugisole jugisole 260 9 - - - 0.89 0.59 1.48 593

Dolgram(S)

25th Jan'14

June to July

Asurhata

25th Jan'14

June to July

Asurhata

25th Jan'14

June to July

Asurhata

25th Jan'14

June to July

Asurhata

Baya Murmu

25th Jan'14

June to July

Harimaity

25th Jan'14

June to July

Anil Mahata

25th Jan'14

June to July

Plantation of tree at Manoranjan Mahata Land

Manoranjan Mahata

25th Jan'14

June to July

Gopal Sau

25th Jan'14

June to July

Narottam Das

25th Jan'14

June to July

Chepli Saren

25th Jan'14

June to July

Plantation of tree at Subhas Ch.Sau Land

Subhas ch.sau

25th Jan'14

June to July

Plantation of tree at Bhutnath saren Land

Bhutnath Saren

25th Jan'14

June to July

Plantation of Nursury at Bimalendu Shymal Land

Bimalendu Shymal

25th Jan'14

June to July

Plantation of tree at Shankar Mahata Land

Shankar Mahata

25th Jan'14

June to July

Plantation of tree at Sudhir Ch. Mahata Land

Sudhir Ch. Mahata

25th Jan'14

June to July

Plantation of tree from Amtala to Kenduboni Road

25th Jan'14

June to July

Sanatan Das

25th Jan'14

June to July

Plantation of tree at Srijib Sundar Das Land

Srijib Sundar Das

25th Jan'14

June to July

25th Jan'14

June to July

Page 97: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

97/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

910 05 Berajal 2 Drought Proofing 2/33 Berajal 292 454 - 0.23 - 0.78 0.51 1.29 514

911 05 Berajal 2 Drought Proofing 2/34 Berajal 292 529 - 0.50 - 0.60 0.39 0.99 395

912 05 Berajal 2 Drought Proofing 2/35 Berajal 292 953 - 1.01 - 0.60 0.39 0.99 395

913 05 Berajal 2 Drought Proofing 2/36 Plantation of tree at Bijay Das Land Berajal Jharaboni 293 - 0.20 - 0.78 0.51 1.29 514

914 05 Berajal 2 Drought Proofing 2/37 Berajal Jharaboni 293 581 - 0.30 - 0.78 0.51 1.29 514

915 05 Berajal 2 Drought Proofing 2/38 Plantation at Raja Bandh Par Berajal Jharaboni 293 540 - 2.02 - 0.89 0.59 1.48 593

916 05 Berajal 2 Drought Proofing 2/39 plantation of Nursury at Gobindapur Berajal 292 240 - - - 0.89 0.59 1.48 593

917 05 Berajal 2 Drought Proofing 2/40 Nursery under Berajal GP Berajal Berajal Berajal - 0.01 - 2.49 2.46 4.95 1646

- - - 36.85 25.08 61.92 24401

918 05 Berajal 3 3/1 Berajal Nekrasole 295 82 ,213 - - 1.50 1.49 0.98 2.47 988

919 05 Berajal 3 3/2 Berajal Sathatia 294 - - 2.00 2.68 1.77 4.45 1778

920 05 Berajal 3 3/3 Berajal Sathatia 294 - - 2.00 2.98 1.96 4.95 1975

921 05 Berajal 3 3/4 Berajal 292 248 ,237 - - 0.10 2.09 1.37 3.46 1383

922 05 Berajal 3 3/5 Berajal 292 758 - 0.42 - 0.72 0.47 1.19 474

923 05 Berajal 3 3/6 Berajal 292 - - 1.50 0.60 0.39 0.99 395

924 05 Berajal 3 3/7 Berajal 292 268 - 435 - - 0.70 3.28 2.16 5.44 2173

925 05 Berajal 3 3/8 Berajal Jharaboni 293 142-517 - - - 0.72 0.47 1.19 474

926 05 Berajal 3 3/9 Berajal Jharaboni 293 108 - - 1.00 0.89 0.59 1.48 593

- - - 15.45 10.17 25.62 10232

927 05 Berajal 5 5/1 Re-excavation of Dolgram Padmapukur Berajal Dolgram 301 537 - 1.61 - 4.90 0.54 5.44 3243

Plantation of tree at Kangali Nayek Land

Gobindapur

Gobindapur

Kangali Nayek

25th Jan'14

June to July

Plantation of tree at Kamalakanta Pattyanayek Land

Gobindapur

Gobindapur

Kamalakanta Pattyanayek

25th Jan'14

June to July

Plantation of tree at Nandakisore Khatua Land

Gobindapur

Gobindapur

Nandakisore Khatua

25th Jan'14

June to July

Gobindapur

Bijay Das

25th Jan'14

June to July

Plantation of tree at Shib Kinkar Dutta Land

Gobindapur

Shib Kinkar Dutta

25th Jan'14

June to July

Gobindapur

25th Jan'14

June to July

Gobindapur

Gobindapur

25th Jan'14

June to July

25th Jan'14

Drought Proofing TotalMicro Irrigation Works

Cons't of canel from Barapukur to Gyan ranjan mahata

Asurhata

25th Jan'14

Dec to Jan

Micro Irrigation Works

Cons't of canel from Asurhata main road to Nildahi Jahira Than

Asurhata

25th Jan'14

Dec to Jan

Micro Irrigation Works

Cons't of canel from Play ground to Nildahi Jahira Than

Asurhata

25th Jan'14

Dec to Jan

Micro Irrigation Works

Cons't of concrete canel from Rabindra Dehuri house to Bijay Mallik house at Gobindapur

Gobindapur

Gobindapur

25th Jan'14

Dec to Jan

Micro Irrigation Works

Cons't of Spillway at Janmenjay Mallik Field

Gobindapur

Gobindapur

25th Jan'14

Dec to Jan

Micro Irrigation Works

Rep.of canel from Babuidanga to Sathatia jungle border

Gobindapur

Gobindapur

25th Jan'14

Dec to Jan

Micro Irrigation Works

Cons't of spillway from Bagamber Nayek field to Janmenjay Mallik field

Gobindapur

Gobindapur

25th Jan'14

Dec to Jan

Micro Irrigation Works

Cons't of spillway from Arrbandh to Shole Ara

Gobindapur

25th Jan'14

Dec to Jan

Micro Irrigation Works

Cons't of canel from Kenduboni Ukarmathani to Tapan Dutta field

Gobindapur

25th Jan'14

Dec to Jan

Micro Irrigation Works TotalRenovation of Traditional Water Bodies

Dolgram (N)

25th Jan'14

apr to June

Page 98: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

98/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

928 05 Berajal 5 5/2 Re-excavation of Bourani Pond Berajal Dolgram 301 432 - 1.00 - 5.79 0.64 6.43 3832

929 05 Berajal 5 5/3 Re-excavation of Raidiha Pond Berajal Dolgram 301 132 - 1.29 - 8.90 0.99 9.89 5896

930 05 Berajal 5 5/4 Re-excavation of Guripukur Pond Berajal Dolgram 301 713 - 2.00 - 8.90 0.99 9.89 5896

931 05 Berajal 5 5/5 Re-excavation of New Pond Berajal Dolgram 301 112 - 1.41 - 8.90 0.99 9.89 5896

932 05 Berajal 5 5/6 Re-excavation of Nuniadanga Pond Berajal Dolgram 301 1363 - 1.00 - 8.90 0.99 9.89 5896

933 05 Berajal 5 5/7 Re-excavation of Khas Pond Berajal Dolgram 301 608 / 609 - 0.80 - 8.90 0.99 9.89 5896

934 05 Berajal 5 5/8 Re-excavation of Charakmath Pond Berajal Dolgram 301 1022 - 2.00 - 2.23 0.25 2.47 1474

935 05 Berajal 5 5/9 Re-excavation of Nagen Dey Pond Berajal Dolgram 301 849 - 0.12 - 2.23 0.25 2.47 1474

936 05 Berajal 5 5/10 Re-excavation of Madan Majhi Pond Berajal Dolgram 301 850 - 0.80 - 2.23 0.25 2.47 1474

937 05 Berajal 5 5/11 Re-excavation of Trilochan Bera Pond Berajal Dolgram 301 504 - 0.40 - 2.23 0.25 2.47 1474

938 05 Berajal 5 5/12 Berajal Nekrasole 295 287 ,288 - 0.99 - 8.90 0.99 9.89 5896

939 05 Berajal 5 5/13 Berajal Nekrasole 295 211 ,219 - - - 2.23 0.25 2.47 1474

940 05 Berajal 5 5/14 Re-excavation of Ram Murmu Pond Berajal Sathatia 294 70/325 - 0.40 - 1.07 0.12 1.19 707

941 05 Berajal 5 5/15 Re-excavation of Khas Pond Berajal Sathatia 294 - 1.01 - 2.49 0.28 2.77 1651

942 05 Berajal 5 5/16 Re-excavation of Khas Pond Berajal Sathatia 294 - 1.41 - 2.49 0.28 2.77 1651

Renovation of Traditional Water Bodies

Dolgram (N)

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (N)

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (N)

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (N)

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (N)

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (N)

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (S)

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (S)

Nagen Dey

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (S)

Madan Majhi

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Dolgram (S)

Trilochan Bera

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Re-excavation of Nekrasole Village Pond

Asurhata

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Re-excavation of Purusottam Mahato Pond

Asurhata

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Asurhata

Ram Murmu

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Asurhata

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Asurhata

25th Jan'14

apr to June

Page 99: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

99/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

943 05 Berajal 5 5/17 Re-excavation of Srihari Mahata Pond Berajal Harimaity 307 90 - - - 2.23 0.25 2.47 1474

944 05 Berajal 5 5/18 Berajal Harimaity 303 168 - - - 1.34 0.15 1.48 884

945 05 Berajal 5 5/19 Berajal Harimaity 304 248 - - - 1.34 0.15 1.48 884

946 05 Berajal 5 5/20 Berajal Jugisole jugisole 260 - - - 1.34 0.15 1.48 884

947 05 Berajal 5 5/21 Re-excavation of Chepli Saren Pond Berajal Jugisole jugisole 260 153 - - - 1.34 0.15 1.48 884

948 05 Berajal 5 5/22 Re-excavation of Biren ch. dey Pond Berajal Jugisole jugisole 260 116117 - - - 1.34 0.15 1.48 884

949 05 Berajal 5 5/23 Re-excavation of Ram Bandh Pond Berajal Jugisole jugisole 260 753755 - - - 2.31 0.26 2.57 1533

950 05 Berajal 5 5/24 Re-excavation of Bagan para Pond Berajal Jugisole jugisole 260 105 - - - 2.67 0.30 2.97 1769

951 05 Berajal 5 5/25 Re-excavation of Purna Maity Pond Berajal Jugisole jugisole 260 74 - - - 2.31 0.26 2.57 1533

952 05 Berajal 5 5/26 Re-excavation of Khal Pukur Berajal Jugisole jugisole 260 499 - - - 2.67 0.30 2.97 1769

953 05 Berajal 5 5/27 Re-excavation of Nitai Kuila Pond Berajal Jugisole jugisole 260 34 - - - 2.67 0.30 2.97 1769

954 05 Berajal 5 5/28 Re-excavation of Purna Saren Pond Berajal Jugisole jugisole 258 - - - 1.34 0.15 1.48 884

955 05 Berajal 5 5/29 Re-excavation of Berajal Khas pukur Berajal Jugisole Berajal 258 297 - - - 2.67 0.30 2.97 1769

956 05 Berajal 5 5/30 Re-excavation of Debendra Pal Pond Berajal Jugisole Berajal 258 311 - - - 1.07 0.12 1.19 707

957 05 Berajal 5 5/31 Re-excavation of Berajal swashan Berajal Jugisole Berajal 258 - - - 2.67 0.30 2.97 1769

Renovation of Traditional Water Bodies

Harimaity

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Re-excavation of Jogeawar Mahata Pond

Harimaity

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Re-excavation of Champaki Mahata Pond

Harimaity

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Re-excavation of Rameswar Mishra Pond

Rameswar Mishra

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Chepli Saren

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Biren ch.Dey

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Purna Maity

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Nitai Kuila

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Purna Saren

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Debendra Pal

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

25th Jan'14

apr to June

Page 100: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

100/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

958 05 Berajal 5 5/32 Re-excavation of Ram Ch. Mahata Pond Berajal Jugisole Kenduboni 259 179 - - - 1.34 0.15 1.48 884

959 05 Berajal 5 5/33 Re-excavation of Arun Mahata Pond Berajal Jugisole Kenduboni 259 140 ,142 - - - 1.07 0.12 1.19 707

960 05 Berajal 5 5/34 Berajal Jugisole Kenduboni 259 531 - - - 1.60 0.18 1.78 1061

- - - 114.57 12.73 127.30 75877

961 05 Berajal 6 Land Development 6/1 Berajal Dolgram 301 729 - - - 1.11 0.37 1.48 737

962 05 Berajal 6 Land Development 6/2 Land levelling at H.S Ground Berajal Dolgram 301 534 - - - 0.74 0.25 0.99 491

963 05 Berajal 6 Land Development 6/3 Berajal Dolgram 301 225 - - - 0.37 0.12 0.49 246

964 05 Berajal 6 Land Development 6/4 Land levelling at Nuniadanga SSK Berajal Dolgram 301 415 - - - 1.11 0.37 1.48 737

965 05 Berajal 6 Land Development 6/5 Land levelling at Sitrampur SSK Berajal Dolgram 301 37 - - - 1.85 0.62 2.47 1228

966 05 Berajal 6 Land Development 6/6 Berajal Dolgram 301 112 - - - 1.11 0.37 1.48 737

967 05 Berajal 6 Land Development 6/7 Berajal Dolgram 301 735 - - - 0.74 0.25 0.99 491

968 05 Berajal 6 Land Development 6/8 Berajal Dolgram 301 105 - - - 0.74 0.25 0.99 491

969 05 Berajal 6 Land Development 6/9 Land levelling at Charakmath Land Berajal Dolgram 301 1022 - - - 1.11 0.37 1.48 737

970 05 Berajal 6 Land Development 6/10 Land levelling at Padmapukur Land Berajal Dolgram 301 503 /909 - - - 1.85 0.62 2.47 1228

971 05 Berajal 6 Land Development 6/11 Land Levelling at Anil Mahata Land Berajal Nekrasole 295 - 0.44 - 1.85 0.62 2.47 1228

972 05 Berajal 6 Land Development 6/12 Berajal Nekrasole 295 38 - - - 0.74 0.25 0.99 491

973 05 Berajal 6 Land Development 6/13 Berajal Nekrasole 295 139253 - - - 1.11 0.37 1.48 737

974 05 Berajal 6 Land Development 6/14 Berajal Nekrasole 295 183 - - - 1.11 0.37 1.48 737

975 05 Berajal 6 Land Development 6/15 Berajal Nekrasole 295 - - - 1.11 0.37 1.48 737

976 05 Berajal 6 Land Development 6/16 Land Levelling at Gura Tudu Land Berajal sathatia 294 70/317 - 1.82 - 0.96 0.32 1.29 639

Renovation of Traditional Water Bodies

Ram Ch.Mahata

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Arun Mahata

25th Jan'14

apr to June

Renovation of Traditional Water Bodies

Re-excavation of Chunaram Mahata Pond

Chunaram Mahata

25th Jan'14

apr to June

Renovation of Traditional Water Bodies Total

Land levelling at prymary School Ground

Dolgram (N)

25th Jan'14

Apr to May

Dolgram (N)

25th Jan'14

Apr to May

Land levelling at Purbapara football math

Dolgram(N)

25th Jan'14

Apr to May

Dolgram(N)

25th Jan'14

Apr to May

Dolgram(N)

25th Jan'14

Apr to May

Land levelling at Nuniadanga Cultural center

Dolgram(N)

25th Jan'14

Apr to May

Land levelling at Purbapara wellside ground

Dolgram(N)

25th Jan'14

Apr to May

Land levelling at Biswahari Club ground

Dolgram(N)

25th Jan'14

Apr to May

Dolgram(S)

25th Jan'14

Apr to May

Dolgram(S)

25th Jan'14

Apr to May

Asurhata

131, 186, 195, 205

25th Jan'14

Apr to May

Land Levelling at Nekrasole Paschim para Harimandir Land

Asurhata

25th Jan'14

Apr to May

Land levelling at Nekrasole Shiv Mandir Land

Asurhata

25th Jan'14

Apr to May

Land levelling at Nekrasole Primary School Land

Asurhata

25th Jan'14

Apr to May

Land levelling at Bimal Mahata & 7 others land

Asurhata

27 ,42 ,115 ,176,222,227 ,219

25th Jan'14

Apr to May

Asurhata

Gura Tudu

25th Jan'14

Apr to May

Page 101: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

101/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

977 05 Berajal 6 Land Development 6/17 Land Levelling at Dula Tudu Land Berajal sathatia 294 430 - 1.41 - 0.89 0.30 1.19 590

978 05 Berajal 6 Land Development 6/18 Land Levelling at Babulal Tudu Land Berajal sathatia 294 487 - 1.41 - 0.89 0.30 1.19 590

979 05 Berajal 6 Land Development 6/19 Land Levelling at Sankar Mandi Land Berajal sathatia 294 137 - 0.20 - 0.89 0.30 1.19 590

980 05 Berajal 6 Land Development 6/20 Berajal Harimaity 307 84 - - - 0.89 0.30 1.19 590

981 05 Berajal 6 Land Development 6/21 Berajal Harimaity - - - 1.48 0.49 1.98 983

982 05 Berajal 6 Land Development 6/22 Berajal Harimaity 305 12 - - - 1.48 0.49 1.98 983

983 05 Berajal 6 Land Development 6/23 Land levelling at Jugisole Pry.School Berajal Jugisole jugisole 260 68 - - - 2.23 0.74 2.97 1474

984 05 Berajal 6 Land Development 6/24 Land Levelling at Gopal Das Land Berajal Jugisole jugisole 260 140 - - - 1.19 0.40 1.58 786

985 05 Berajal 6 Land Development 6/25 Land Levelling at Gour Kuila Land Berajal Jugisole jugisole 260 34 - - - 1.85 0.62 2.47 1228

986 05 Berajal 6 Land Development 6/26 Berajal Jugisole jugisole 260 81/82 - - - 1.48 0.49 1.98 983

987 05 Berajal 6 Land Development 6/27 Land Levelling at Suresh Patra Land Berajal Jugisole jugisole 260 91 - - - 1.11 0.37 1.48 737

988 05 Berajal 6 Land Development 6/28 Land Levelling at Sudhir Das Land Berajal Jugisole jugisole 260 91 - - - 1.11 0.37 1.48 737

989 05 Berajal 6 Land Development 6/29 Land Levelling at Ajay Pusti Land Berajal Jugisole jugisole 260 91 - - - 1.11 0.37 1.48 737

990 05 Berajal 6 Land Development 6/30 Berajal Jugisole jugisole 260 12 - - - 1.11 0.37 1.48 737

991 05 Berajal 6 Land Development 6/31 Berajal Jugisole jugisole 260 67 - - - 1.11 0.37 1.48 737

992 05 Berajal 6 Land Development 6/32 Land Levelling at Narottam Das Land Berajal Jugisole jugisole 260 138 - - - 2.08 0.69 2.77 1376

993 05 Berajal 6 Land Development 6/33 Land Levelling at Sukumar Sau Land Berajal Jugisole jugisole 260 499 - - - 2.08 0.69 2.77 1376

994 05 Berajal 6 Land Development 6/34 Land Levelling at Purna Jana Land Berajal Jugisole Berajal 258 313 - - - 0.89 0.30 1.19 590

995 05 Berajal 6 Land Development 6/35 Land Levelling at Shankar Shit Land Berajal Jugisole Berajal 258 284 /752 - - - 0.74 0.25 0.99 491

Asurhata

Dula Tudu

25th Jan'14

Apr to May

Asurhata

Babulal Tudu

25th Jan'14

Apr to May

Asurhata

Sankar Mandi

25th Jan'14

Apr to May

Land levelling at Harish Chandra Mahata Land

Harimaity

25th Jan'14

Apr to May

Land levelling at Damodar Manna & Kunti Tudu Land

Harimaity

1-3,5,6,73,7

4,45

Damodar Manna & Kunti Tudu

25th Jan'14

Apr to May

Land levelling at Dhansola Foot ball ground

Harimaity

25th Jan'14

Apr to May

25th Jan'14

Apr to May

Gopal Das

25th Jan'14

Apr to May

Gour Kuila

25th Jan'14

Apr to May

Land Levelling at Moni Sankar Das Land

Moni Sankar Das

25th Jan'14

Apr to May

Suresh Patra

25th Jan'14

Apr to May

Sudhir Das

25th Jan'14

Apr to May

Ajay Pusti

25th Jan'14

Apr to May

Land Levelling at Sudhanshu Dutta Land

Sudhanshu Dutta

25th Jan'14

Apr to May

Land Levelling at Radharani Karan Land

Radharani Karan

25th Jan'14

Apr to May

Narottam Das

25th Jan'14

Apr to May

Sukumar Sau

25th Jan'14

Apr to May

25th Jan'14

Apr to May

Shankar Shit

25th Jan'14

Apr to May

Page 102: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

102/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

996 05 Berajal 6 Land Development 6/36 Berajal Jugisole Berajal 258 280 - - - 1.04 0.35 1.38 688

997 05 Berajal 6 Land Development 6/37 Land Levelling at Bimal Routh Land Berajal Jugisole Berajal 258 180 /284 - - - 0.74 0.25 0.99 491

998 05 Berajal 6 Land Development 6/38 Land Levelling at Niranjan Bag Land Berajal Jugisole Berajal 258 512 / 513 - - - 1.04 0.35 1.38 688

999 05 Berajal 6 Land Development 6/39 Land Levelling at Tapan Pusti Land Berajal Jugisole Berajal 258 524 / 525 - - - 0.74 0.25 0.99 491

1000 05 Berajal 6 Land Development 6/40 Land Levelling at Shankar Mahata Land Berajal Jugisole Kenduboni 259 181 - - - 0.74 0.25 0.99 491

1001 05 Berajal 6 Land Development 6/41 Land Levelling at Anil Mahata Land Berajal Jugisole Kenduboni 259 141 - - - 0.74 0.25 0.99 491

1002 05 Berajal 6 Land Development 6/42 Land Levelling at Bharat Mahata Land Berajal Jugisole Kenduboni 259 - - - 0.74 0.25 0.99 491

1003 05 Berajal 6 Land Development 6/43 Land Levelling at Srikanta Patra Land Berajal Jugisole Kenduboni 259 9 ,10 - - - 0.74 0.25 0.99 491

1004 05 Berajal 6 Land Development 6/44 Land Levelling at Barsha saren Land Berajal Jugisole jugisole 260 373 - - - 0.89 0.30 1.19 590

1005 05 Berajal 6 Land Development 6/45 Land Levelling at Nimai Das Land Berajal Jugisole jugisole 260 123 - - - 0.89 0.30 1.19 590

1006 05 Berajal 6 Land Development 6/46 Land Levelling at A.S. Vidyapith Berajal Jugisole jugisole 260 8 ,9 - 0.20 - 1.48 0.49 1.98 983

1007 05 Berajal 6 Land Development 6/47 Berajal Jugisole jugisole 260 8,9 - 0.40 - 1.48 0.49 1.98 983

1008 05 Berajal 6 Land Development 6/48 Land Levelling at Kangali Nayek Land Berajal 292 453 - 0.30 - 2.23 0.74 2.97 1474

1009 05 Berajal 6 Land Development 6/49 Land Levelling at Gour Mallik Land Berajal 292 544 - 0.32 - 0.89 0.30 1.19 590

1010 05 Berajal 6 Land Development 6/50 Land Levelling at Jaychandi Than Berajal 292 280 - 0.20 - 0.74 0.25 0.99 491

1011 05 Berajal 6 Land Development 6/51 Land Levelling at Pathar Chati Berajal Jharaboni 293 398 - 0.40 - 0.74 0.25 0.99 491

1012 05 Berajal 6 Land Development 6/52 Land Levelling at Jharaboni Pry School Berajal Jharaboni 293 337 - - 0.40 1.48 0.49 1.98 983

- - - 59.65 19.88 79.53 39501

1013 05 Berajal 7 7/1 Berajal Dolgram 301 - - - 1.49 0.98 2.47 988

1014 05 Berajal 7 7/2 Berajal Dolgram 301 - - 0.50 2.68 1.77 4.45 1778

1015 05 Berajal 7 7/3 Berajal Dolgram 301 - - 0.50 20.88 13.74 34.62 13827

1016 05 Berajal 7 7/4 Berajal Dolgram 301 - - 0.50 1.49 0.98 2.47 988

Land Levelling at Berajal purba SSK Land

25th Jan'14

Apr to May

Bimal Routh

25th Jan'14

Apr to May

Niranjan Bag

25th Jan'14

Apr to May

25th Jan'14

Apr to May

Shankar Mahata

25th Jan'14

Apr to May

Anil Mahata

25th Jan'14

Apr to May

170 , 159 ,199

Bharat Mahata

25th Jan'14

Apr to May

Srikanta Patra

25th Jan'14

Apr to May

Barsha Saren

25th Jan'14

Apr to May

Nimai Das

25th Jan'14

Apr to May

25th Jan'14

Apr to May

Land Levelling at Jugisole Hostel Ground

25th Jan'14

Apr to May

Gobindapur

Gobindapur

Kangali Nayek

25th Jan'14

Apr to May

Gobindapur

Gobindapur

Gour Mallik

25th Jan'14

Apr to May

Gobindapur

Gobindapur

25th Jan'14

Apr to May

Gobindapur

25th Jan'14

Apr to May

Gobindapur

25th Jan'14

Apr to May

Land Development TotalFlood Control & Protecation

Cons't of Box Culvert near Karu Murmu House

Dolgram (N)

25th Jan'14

Dec to Jan

Flood Control & Protecation

Cons't of drain from Rabindra Mangal House to both side of road

Dolgram(S)

25th Jan'14

Dec to Jan

Flood Control & Protecation

Cons't of drain from Adikanta Mahakud house to Anand Bera house both side road

Dolgram(S)

25th Jan'14

Dec to Jan

Flood Control & Protecation

Cons't of drain from Charakmath to Battala both side road

Dolgram(S)

25th Jan'14

Dec to Jan

Page 103: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

103/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1017 05 Berajal 7 7/5 Berajal Dolgram 301 - - 0.50 1.49 0.98 2.47 988

1018 05 Berajal 7 7/6 Berajal Nekrasole 295 197 - - - 2.68 1.77 4.45 1778

1019 05 Berajal 7 7/7 Cons't of Chatal Arround Shiv Mandir Berajal Dolgram 301 - - - 2.09 1.37 3.46 1383

1020 05 Berajal 7 7/8 Berajal Dolgram 301 129 /1021 - - 0.50 2.09 1.37 3.46 1383

1021 05 Berajal 7 7/9 Berajal Dolgram 301 534 /124 - - 0.50 1.79 1.18 2.97 1185

1022 05 Berajal 7 7/10 Berajal Dolgram 301 534 /729 - - 0.50 1.49 0.98 2.47 988

1023 05 Berajal 7 7/11 Berajal Dolgram 301 112 /825 - - 0.50 1.79 1.18 2.97 1185

1024 05 Berajal 7 7/12 Berajal Dolgram 301 139 - - - 2.39 1.57 3.96 1580

1025 05 Berajal 7 7/13 Berajal Dolgram 301 240 - - - 2.39 1.57 3.96 1580

1026 05 Berajal 7 7/14 Berajal Dolgram 301 320 - - - 2.68 1.77 4.45 1778

1027 05 Berajal 7 7/15 Berajal Dolgram 301 719 - - - 1.49 0.98 2.47 988

1028 05 Berajal 7 7/16 Berajal Dolgram 301 515 - - - 2.09 1.37 3.46 1383

1029 05 Berajal 7 7/17 Berajal Dolgram 301 12 - - - 2.39 1.57 3.96 1580

1030 05 Berajal 7 7/18 Berajal Dolgram 301 727 - - - 2.68 1.77 4.45 1778

1031 05 Berajal 7 7/19 Berajal Dolgram 301 847 - - - 3.88 2.55 6.43 2568

1032 05 Berajal 7 7/20 Berajal Dolgram 301 922 - - - 3.88 2.55 6.43 2568

1033 05 Berajal 7 7/21 Berajal Dolgram 301 822 - - - 3.46 2.28 5.74 2291

1034 05 Berajal 7 7/22 Berajal Dolgram 301 824 - - - 20.88 13.74 34.62 13827

1035 05 Berajal 7 7/23 Berajal Dolgram 301 720 - - - 3.46 2.28 5.74 2291

1036 05 Berajal 7 7/24 Berajal Dolgram 301 902 - - 0.50 1.79 1.18 2.97 1185

1037 05 Berajal 7 7/25 Berajal Dolgram 301 829 - - 0.50 1.49 0.98 2.47 988

1038 05 Berajal 7 7/26 Berajal Dolgram 301 785 - - 0.50 0.89 0.59 1.48 593

Flood Control & Protecation

Cons't of drain from Charakmath toBarik para both side road

Dolgram(S)

25th Jan'14

Dec to Jan

Flood Control & Protecation

Cons't of 2 box culvert near Hasu Das house

Asurhata

25th Jan'14

Dec to Jan

Flood Control & Protecation

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Both side drain from Samiti chawk to shiv Mandir Road

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Both side drain from H.S to Primary School Road

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Both side drain from Padma pukur To Guripukur Road

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of drain from Baram than to Karu Murmu House Road

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guardwall on east side of Madhusudan Giri Pond

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guardwall on north side of Nilambar Sau Pond

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guardwall on north side of Pulin Bera Pond

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guardwall on north side of Guripukur Pond

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Purbapara Guardwall near Sanchay Singh House

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guardwall on north side of Bharat Jana Pond

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Swasan Ghat on Guripukur Math

Dolgram (N)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall at South side of Ram ch.Nanda Pond

Dolgram(S)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall at North side of Kanailal Barik Pond beside Road

Dolgram(S)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall at North side of Santosh Bera Pond beside Road

Dolgram(S)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall at west side of Kamal Lochan Bera Pond beside Road

Dolgram(S)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall at North side of Trilochan Bera Pond beside Road

Dolgram(S)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Chatal near Ananda Bera House

Dolgram(S)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Chatal from Rabindra Mangal House to Shiv Mandir

Dolgram(S)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Chatal from Krishna Nanda house to Rabindra Mangal house

Dolgram(S)

25th Jan'14

Sep To Oct

Page 104: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

104/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1039 05 Berajal 7 7/27 Cons't of Swasan Ghat on Charak Math Berajal Dolgram 301 1022 - - - 2.09 1.37 3.46 1383

1040 05 Berajal 7 7/28 Berajal Nekrasole 295 - - - 2.09 1.37 3.46 1383

1041 05 Berajal 7 7/29 Berajal Nekrasole 295 172204 - - 0.30 1.79 1.18 2.97 1185

1042 05 Berajal 7 7/30 Berajal Nekrasole 303 199198 - - 0.50 1.49 0.98 2.47 988

1043 05 Berajal 7 7/31 Berajal Harimaity 304 1202 - - 0.10 2.86 1.88 4.75 1896

1044 05 Berajal 7 7/32 Berajal Harimaity 303 203 - - - 3.46 2.28 5.74 2291

1045 05 Berajal 7 7/33 Berajal Harimaity 304 287 - - - 3.46 2.28 5.74 2291

1046 05 Berajal 7 7/34 Berajal Jugisole jugisole 260 45,44 - - 0.10 4.06 2.67 6.73 2686

1047 05 Berajal 7 7/35 Berajal Jugisole jugisole 260 15,16 - - - 3.88 2.55 6.43 2568

1048 05 Berajal 7 7/36 Berajal Jugisole jugisole 260 519 , 520 - - 0.06 4.47 2.94 7.42 2963

1049 05 Berajal 7 7/37 Berajal Jugisole jugisole 260 441442 - - 0.10 3.46 2.28 5.74 2291

1050 05 Berajal 7 7/38 Berajal Jugisole jugisole 260 467468 - - 0.50 4.06 2.67 6.73 2686

1051 05 Berajal 7 7/39 Berajal Jugisole jugisole 260 133/441 - - - 3.88 2.55 6.43 2568

1052 05 Berajal 7 7/40 Berajal 292 261 -260 - - 0.04 3.88 2.55 6.43 2568

1053 05 Berajal 7 7/41 Berajal 292 - - - 3.88 2.55 6.43 2568

1054 05 Berajal 7 7/42 Berajal 292 - - 0.40 3.46 2.28 5.74 2291

1055 05 Berajal 7 7/43 Berajal Jharaboni 293 401 - 498 - - 0.20 3.22 2.12 5.34 2133

1056 05 Berajal 7 7/44 Berajal Jharaboni 293 376 - - 0.20 4.47 2.94 7.42 2963

- - - 155.76 102.51 258.27 103149

1057 05 Berajal 8 Rural Connectivity 8/1 Berajal Dolgram 301 235 /237 - - - 2.98 1.96 4.95 1975

Flood Control & Protecation

Dolgram(S)

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Canel from Ramanath Mahata house to Primary School with concrit

Asurhata

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall from Aamgali to Sanatan Mahata House

Asurhata

25th Jan'14

Sep To Oct

Flood Control & Protecation

Rep.of Nekrasole Bandh with Cons't of Guard wall

Asurhata

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of guard wall & culvert at Harimaity Bandh

Harimaity

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of culvert near Bhupen Mahata house

Harimaity

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of guard wall near Nanda Mahata road at Harimaity Bandh

Harimaity

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall on Shiv Sankar Shymal Pond

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall from Lakshmi Mandir to Kunja Pusti house on Berajal Road

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of 4 box Culvert with Guard wall at berajal Khal near Amal Pusti House

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall from Kangla Setu to Hari Krishna Sau House

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall from ShanKhali to Tal Betal Setu

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of Guard wall from Party Office to sau Para

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't 0f guard wall arround Kedar Dehuri pond near purbapara Sitala Mandir road

Gobindapur

Gobindapur

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of culvert & rep.of all cannel at the fields of Gobindapur mouza

Gobindapur

Gobindapur

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of culvert & rep.of canel from Nandalal Murmu house to Jahira Than

Gobindapur

Gobindapur

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of road side guardwall from Hari Mandir toTala jami

Gobindapur

25th Jan'14

Sep To Oct

Flood Control & Protecation

Cons't of 2 side guardwall from jharaboni Pakakua to School side culvert

Gobindapur

25th Jan'14

Sep To Oct

Flood Control & Protecation Total

cons't of box culvert on Totasai Main Road

Dolgram (N)

25th Jan'14

Dec to Jan

Page 105: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

105/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1058 05 Berajal 8 Rural Connectivity 8/2 Berajal Dolgram 301 537 - - - 2.09 1.37 3.46 1383

1059 05 Berajal 8 Rural Connectivity 8/3 Berajal Dolgram 301 436 - - - 1.49 0.98 2.47 988

1060 05 Berajal 8 Rural Connectivity 8/4 Berajal Dolgram 301 714 - - - 2.09 1.37 3.46 1383

1061 05 Berajal 8 Rural Connectivity 8/5 Berajal Dolgram 301 652 - - - 2.09 1.37 3.46 1383

1062 05 Berajal 8 Rural Connectivity 8/6 Berajal Dolgram 301 - - - 2.09 1.37 3.46 1383

1063 05 Berajal 8 Rural Connectivity 8/7 Berajal Dolgram 301 1022 - - - 2.68 1.77 4.45 1778

1064 05 Berajal 8 Rural Connectivity 8/8 Berajal Dolgram 301 822 - - - 3.28 2.16 5.44 2173

1065 05 Berajal 8 Rural Connectivity 8/9 Berajal Dolgram 301 503 - - - 3.28 2.16 5.44 2173

1066 05 Berajal 8 Rural Connectivity 8/10 Berajal Dolgram 301 845 - - - 3.88 2.55 6.43 2568

1067 05 Berajal 8 Rural Connectivity 8/11 Berajal Nekrasole 295 129 - - - 1.49 0.98 2.47 988

1068 05 Berajal 8 Rural Connectivity 8/12 Berajal Nekrasole 295 28 - - - 2.68 1.77 4.45 1778

1069 05 Berajal 8 Rural Connectivity 8/13 Berajal Nekrasole 303 293 - - - 3.88 2.55 6.43 2568

1070 05 Berajal 8 Rural Connectivity 8/14 Berajal Dolgram 301 329 /129 - - 1.00 1.49 0.98 2.47 988

1071 05 Berajal 8 Rural Connectivity 8/15 Berajal Dolgram 301 75 /152 - - 1.00 1.79 1.18 2.97 1185

1072 05 Berajal 8 Rural Connectivity 8/16 Berajal Dolgram 301 116 /235 - - 0.50 1.49 0.98 2.47 988

1073 05 Berajal 8 Rural Connectivity 8/17 Berajal Dolgram 301 75 /129 - - 0.50 2.09 1.37 3.46 1383

1074 05 Berajal 8 Rural Connectivity 8/18 Berajal Dolgram 301 352 /145 - - 0.50 1.49 0.98 2.47 988

1075 05 Berajal 8 Rural Connectivity 8/19 Berajal Dolgram 301 177 /275 - - 0.50 1.49 0.98 2.47 988

1076 05 Berajal 8 Rural Connectivity 8/20 Berajal Dolgram 301 25 /535 - - 0.50 1.49 0.98 2.47 988

1077 05 Berajal 8 Rural Connectivity 8/21 Berajal Dolgram 301 1017 /535 - - 0.50 1.49 0.98 2.47 988

1078 05 Berajal 8 Rural Connectivity 8/22 Berajal Dolgram 301 117 /535 - - 0.50 1.49 0.98 2.47 988

1079 05 Berajal 8 Rural Connectivity 8/23 Berajal Dolgram 301 119 /325 - - 0.50 1.49 0.98 2.47 988

1080 05 Berajal 8 Rural Connectivity 8/24 Berajal Dolgram 301 35 /135 - - 0.50 1.49 0.98 2.47 988

Cons't of Box Culvert on Padmapukur Road

Dolgram (N)

25th Jan'14

Dec to Jan

Cons't of Box Culvert on High School Road

Dolgram (N)

25th Jan'14

Dec to Jan

Cons't of Box Culvert on Primary School Road

Dolgram (N)

25th Jan'14

Dec to Jan

Cons't of Box Culvert on Kumir Doba Road

Dolgram (N)

25th Jan'14

Dec to Jan

Cons't of Box Culvert near Bishahari Than Road

Dolgram (N)

25th Jan'14

Dec to Jan

Cons't of Box Culvert at Charakmath Road

Dolgram(S)

25th Jan'14

Dec to Jan

Cons't of Box Culvert at Shiv Mandir Road

Dolgram(S)

25th Jan'14

Dec to Jan

Cons't of Box Culvert at South side of Padmapukur Road

Dolgram(S)

25th Jan'14

Dec to Jan

Cons't of Box Culvert at South side of Guripukur Road

Dolgram(S)

25th Jan'14

Dec to Jan

Cons't of Box Culvert at Nekrasole village Road

Asurhata

25th Jan'14

Dec to Jan

Cons't of Box Culvert at Nekrasole Post Office Road

Asurhata

25th Jan'14

Dec to Jan

Cons't of 4 box culvert in the jungle at Nekrasole Pirep road

Asurhata

25th Jan'14

Dec to Jan

New Earthen Road from Samiti Chawk to Amladangri

Dolgram (N)

25th Jan'14

April to May

New Earthen road from Uttar SSK to Amladangri

Dolgram (N)

25th Jan'14

April to May

Rep.of road from Samiti Chawk to Shiv Mandir with moorum & Boulder

Dolgram (N)

25th Jan'14

April to May

Rep.of road from Ulda to Ajay Bera Shop with moorum & Boulder

Dolgram (N)

25th Jan'14

April to May

Rep.of road from Sunil Bera House to H.S School with Moorum & Boulder

Dolgram (N)

25th Jan'14

April to May

Rep.of road from ajay Bera Shop to Jaykhunta

Dolgram (N)

25th Jan'14

April to May

rep.of road from Sital Dehuri House to Pry.School

Dolgram (N)

25th Jan'14

April to May

Rep. of road from football Ground to Satyaranjan Singha House

Dolgram (N)

25th Jan'14

April to May

Rep.of road from Ajay Bera Shop to Goutam barik House

Dolgram (N)

25th Jan'14

April to May

Rep.of road from Uttar SSK to Barial Hansda House

Dolgram (N)

25th Jan'14

April to May

Rep.of road from Baramthan to Karu Murmu House

Dolgram (N)

25th Jan'14

April to May

Page 106: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

106/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1081 05 Berajal 8 Rural Connectivity 8/25 Berajal Dolgram 301 205 /375 - - 0.50 1.49 0.98 2.47 988

1082 05 Berajal 8 Rural Connectivity 8/26 Rep.of Dolgram Village Road Berajal Dolgram 301 115 /535 - - 0.50 1.49 0.98 2.47 988

1083 05 Berajal 8 Rural Connectivity 8/27 Berajal Dolgram 301 117 /235 - - 0.50 1.64 1.08 2.72 1086

1084 05 Berajal 8 Rural Connectivity 8/28 Berajal Dolgram 301 - - 0.50 2.09 1.37 3.46 1383

1085 05 Berajal 8 Rural Connectivity 8/29 Berajal Dolgram 301 - - 0.50 0.89 0.59 1.48 593

1086 05 Berajal 8 Rural Connectivity 8/30 Berajal Dolgram 301 - - 0.50 0.89 0.59 1.48 593

1087 05 Berajal 8 Rural Connectivity 8/31 Berajal Dolgram 301 - - 0.50 0.89 0.59 1.48 593

1088 05 Berajal 8 Rural Connectivity 8/32 Berajal Dolgram 301 - - 0.50 0.94 0.62 1.56 626

1089 05 Berajal 8 Rural Connectivity 8/33 Berajal Dolgram 301 - - 0.50 0.89 0.59 1.48 593

1090 05 Berajal 8 Rural Connectivity 8/34 Berajal Dolgram 301 - - 0.50 0.89 0.59 1.48 593

1091 05 Berajal 8 Rural Connectivity 8/35 Berajal Dolgram 301 - - 0.50 0.89 0.59 1.48 593

1092 05 Berajal 8 Rural Connectivity 8/36 Berajal Dolgram 301 - - 0.50 0.89 0.59 1.48 593

1093 05 Berajal 8 Rural Connectivity 8/37 Rep.of road at Dolgram Village Berajal Dolgram 301 - - 0.50 0.89 0.59 1.48 593

1094 05 Berajal 8 Rural Connectivity 8/38 Berajal Dolgram 301 - - 0.50 1.49 0.98 2.47 988

1095 05 Berajal 8 Rural Connectivity 8/39 Rep.of road at Nekrasole village Berajal Nekrasole 295 24 ,213 - - 1.50 1.49 0.98 2.47 988

1096 05 Berajal 8 Rural Connectivity 8/40 Berajal Nekrasole 295 139 , 253 - - - 1.49 0.98 2.47 988

1097 05 Berajal 8 Rural Connectivity 8/41 Berajal Nekrasole 295 139 , 253 - - - 1.49 0.98 2.47 988

1098 05 Berajal 8 Rural Connectivity 8/42 Berajal Sathatia 294 - - 2.00 1.49 0.98 2.47 988

1099 05 Berajal 8 Rural Connectivity 8/43 Berajal Sathatia 294 - - 1.50 2.68 1.77 4.45 1778

rep.of road from Sitarampur SSK to Village road

Dolgram (N)

25th Jan'14

April to May

Dolgram (N)

25th Jan'14

April to May

Cons't of concrit Road from Tapan Bera Shop to Shiv Mandir

Dolgram (N)

25th Jan'14

April to May

New earthen road from Dey Para to Rabindra Mangal House with Guard wall

Dolgram (S)

25th Jan'14

April to May

New earthen road from Adikanda Mahakud House to Battala with Guard wall

Dolgram (S)

25th Jan'14

April to May

Rep.of road from Shiv Mandir to Orisha Border with moorum &boulder

Dolgram(S)

25th Jan'14

April to May

Rep.of road from Guripukur to Charakmath with moorum &boulder

Dolgram(S)

25th Jan'14

April to May

Rep.of road from Saipara to Padmapukur with moorum &boulder

Dolgram(S)

25th Jan'14

April to May

Rep.of road from Santosh Bera house to Paresh Majhi house with moorum &boulder

Dolgram(S)

25th Jan'14

April to May

Rep.of road from Barikpara to Charak math with moorum &boulder

Dolgram(S)

25th Jan'14

April to May

Rep.of road from Majhipara to Main road with moorum &boulder

Dolgram(S)

25th Jan'14

April to May

Rep.of road Sitarampur Village with moorum &boulder

Dolgram(S)

25th Jan'14

April to May

Dolgram(S)

25th Jan'14

April to May

Cons't of concrit Road from Trilochan Bera house to Rabindra Majhi house

Dolgram(S)

25th Jan'14

April to May

Asurhata

25th Jan'14

April to May

Rep.of road from Sanaka Mahata house to Murari Mahata house with moorum

Asurhata

25th Jan'14

April to May

Cons't of Concrete road from Nekrasole Shiv Mandir to Post office

Asurhata

25th Jan'14

April to May

New earthen road from Raghua Saren house to Main road of Gobindapur Jungle with Moorum

Asurhata

25th Jan'14

April to May

New earthen road from Jharaboni to Asurhata with Moorum

Asurhata

25th Jan'14

April to May

Page 107: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

107/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1100 05 Berajal 8 Rural Connectivity 8/44 Berajal Sathatia 294 - - 1.50 2.39 1.57 3.96 1580

1101 05 Berajal 8 Rural Connectivity 8/45 Berajal Sathatia 294 - - 2.00 2.39 1.57 3.96 1580

1102 05 Berajal 8 Rural Connectivity 8/46 Berajal Sathatia 294 - - 1.50 2.68 1.77 4.45 1778

1103 05 Berajal 8 Rural Connectivity 8/47 Berajal Sathatia 294 - - 1.50 2.68 1.77 4.45 1778

1104 05 Berajal 8 Rural Connectivity 8/48 Berajal Sathatia 294 - - 1.00 1.79 1.18 2.97 1185

1105 05 Berajal 8 Rural Connectivity 8/49 Berajal Harimaity 303 - - - 2.09 1.37 3.46 1383

1106 05 Berajal 8 Rural Connectivity 8/50 Berajal Harimaity 303 108 - - - 1.79 1.18 2.97 1185

1107 05 Berajal 8 Rural Connectivity 8/51 Berajal Harimaity 302 - - - 1.79 1.18 2.97 1185

1108 05 Berajal 8 Rural Connectivity 8/52 Berajal Harimaity 304 - - - 1.79 1.18 2.97 1185

1109 05 Berajal 8 Rural Connectivity 8/53 Berajal Harimaity 304 - - - 1.79 1.18 2.97 1185

1110 05 Berajal 8 Rural Connectivity 8/54 Berajal Harimaity 304 - - - 1.79 1.18 2.97 1185

1111 05 Berajal 8 Rural Connectivity 8/55 Berajal Harimaity 305 12 - - - 1.49 0.98 2.47 988

1112 05 Berajal 8 Rural Connectivity 8/56 Berajal Harimaity 305 - - - 1.79 1.18 2.97 1185

1113 05 Berajal 8 Rural Connectivity 8/57 Berajal Harimaity 304 - - 0.50 2.68 1.77 4.45 1778

1114 05 Berajal 8 Rural Connectivity 8/58 Rep.of Jugisole Villege road Berajal Jugisole Jugisole 260 - - 3.00 4.77 3.14 7.91 3160

1115 05 Berajal 8 Rural Connectivity 8/59 Rep.of Berajal Villege road Berajal Jugisole Berajal 258 - - 2.00 3.58 2.36 5.93 2370

1116 05 Berajal 8 Rural Connectivity 8/60 Rep.of Purba Berajal Villege Road Berajal Jugisole Berajal 258 - - 1.00 1.79 1.18 2.97 1185

1117 05 Berajal 8 Rural Connectivity 8/61 Berajal Jugisole Jugisole 260 - - 1.00 1.79 1.18 2.97 1185

1118 05 Berajal 8 Rural Connectivity 8/62 Berajal Jugisole Berajal 258 - - 0.50 1.79 1.18 2.97 1185

1119 05 Berajal 8 Rural Connectivity 8/63 Berajal Jugisole Berajal 258 521 /522 - - 0.50 1.79 1.18 2.97 1185

1120 05 Berajal 8 Rural Connectivity 8/64 Berajal Jugisole Jugisole 260 - - 0.50 1.79 1.18 2.97 1185

New earthen road from Khas Pond Main road of Asurhata with Moorum

Asurhata

25th Jan'14

April to May

New earthen road from Bankim Tudu house to Jungle canel with Moorum

Asurhata

25th Jan'14

April to May

Rep.of road from Uttarpara SSK to Play ground with earth & moorum

Asurhata

25th Jan'14

April to May

Rep.of road from Uttarpara Play ground to Paresh Mahata House with earth & moorum

Asurhata

25th Jan'14

April to May

Rep.of road from Minakhal Canel to Khas pond

Asurhata

25th Jan'14

April to May

Rep.of road from Asit Mahata Shop to field

Harimaity

25th Jan'14

April to May

Rep.of road from Jogeswar Mahata Shop to Shiv Mandir with earth & moorum & a culvert

Harimaity

25th Jan'14

April to May

Rep.of road from garden to Ram Tudu house with moorum

Harimaity

25th Jan'14

April to May

Rep.of road from Harimaity villege to Pirep road with earth & moorum

Harimaity

25th Jan'14

April to May

Rep.of road from Harimaity Bandh to Chittya Mahata Pond side road with earth & moorum

Harimaity

25th Jan'14

April to May

Rep.of road from Deben Mahata house to Kamal Mahata house

Harimaity

25th Jan'14

April to May

Rep.of road from Nabin Mahata house to east side field with culvert

Harimaity

25th Jan'14

April to May

Rep.of road from Dhansola South para chwak to Murgapahari Battala Chwak with earth & moorum

Harimaity

25th Jan'14

April to May

Const't of concrete road from Tusumela to Orissha border

Harimaity

25th Jan'14

April to May

25th Jan'14

April to May

25th Jan'14

April to May

25th Jan'14

April to May

New Earthen road from Amtala to Kuifullia

25th Jan'14

April to May

New Earthen road from Adal Das house to Khal

25th Jan'14

April to May

New Earthen road from Shib Sankar Sen house to Khal

25th Jan'14

April to May

New earthen road from Kangla Setu to Khal pond

25th Jan'14

April to May

Page 108: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

108/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1121 05 Berajal 8 Rural Connectivity 8/65 Berajal Jugisole Jugisole 260 - - 0.50 4.77 3.14 7.91 3160

1122 05 Berajal 8 Rural Connectivity 8/66 Berajal Jugisole Berajal 258 - - 0.50 5.37 3.53 8.90 3556

1123 05 Berajal 8 Rural Connectivity 8/67 Berajal Asurhata 295 - - 0.30 2.49 4.44 6.92 1646

1124 05 Berajal 8 Rural Connectivity 8/68 Berajal 292 589 - 533 - - 0.50 3.58 2.36 5.93 2370

1125 05 Berajal 8 Rural Connectivity 8/69 Berajal 292 261 - 307 - - 0.20 2.98 1.96 4.95 1975

1126 05 Berajal 8 Rural Connectivity 8/70 Berajal 292 423 - 275 - - 0.30 2.39 1.57 3.96 1580

1127 05 Berajal 8 Rural Connectivity 8/71 Berajal 292 220 - 690 - - 0.40 2.68 1.77 4.45 1778

1128 05 Berajal 8 Rural Connectivity 8/72 Berajal 292 261 - 325 - - 0.20 2.68 1.77 4.45 1778

1129 05 Berajal 8 Rural Connectivity 8/73 Berajal 292 - - 0.20 2.09 1.37 3.46 1383

1130 05 Berajal 8 Rural Connectivity 8/74 Berajal 292 - - 0.30 1.79 1.18 2.97 1185

1131 05 Berajal 8 Rural Connectivity 8/75 Berajal Gamaria 291 292 - 314 - - 0.20 1.79 1.18 2.97 1185

1132 05 Berajal 8 Rural Connectivity 8/76 Berajal Gamaria 291 302- 294 - - 0.20 1.79 1.18 2.97 1185

1133 05 Berajal 8 Rural Connectivity 8/77 Berajal Gamaria 291 447 - 456 - - 0.20 2.09 1.37 3.46 1383

1134 05 Berajal 8 Rural Connectivity 8/78 Berajal Gamaria 291 440 - 458 - - 0.25 1.79 1.18 2.97 1185

1135 05 Berajal 8 Rural Connectivity 8/79 Berajal Jharaboni 293 28-45 - - 0.50 0.72 0.47 1.19 474

1136 05 Berajal 8 Rural Connectivity 8/80 Berajal Jharaboni 293 565 - - - 1.49 0.98 2.47 988

1137 05 Berajal 8 Rural Connectivity 8/81 Berajal Gamaria 291 - - 0.80 5.97 3.93 9.89 3951

- - - 168.94 113.99 282.93 111880

Cons't of concrete road from Party Office to Sau

25th Jan'14

April to May

Cons't of Concrete road from Berajal Laxmi Mandir to Dom Para

25th Jan'14

April to May

Cons't of Concrete road at Berajal G.P.office Compound

Asurhata

25th Jan'14

April to May

New Earthen road from Gobindapur Jhareswar Maity house to Adibasi para Jahira Than

Gobindapur

Gobindapur

25th Jan'14

April to May

New Earthen road from Gobindapur purbaparaSitala Mandir to Rasobabur Pond

Gobindapur

Gobindapur

25th Jan'14

April to May

New Earthen road from Bipin Sau house to Pond side canel

Gobindapur

Gobindapur

25th Jan'14

April to May

New Earthen road from Gobindapur Purbapara Land to Mahadev Mandir with 4 culvert

Gobindapur

Gobindapur

25th Jan'14

April to May

New Earthen road from Gobindapur purbapara to canel

Gobindapur

Gobindapur

25th Jan'14

April to May

New Earthen road from Gobindapur Nandalal Murmu house to Sukul Hembram house

Gobindapur

Gobindapur

25th Jan'14

April to May

New Earthen road from Lakhan Murmu house to Sakar Hansda house

Gobindapur

Gobindapur

25th Jan'14

April to May

New Earthen road from Gamaria Sukumar Nayek house to Tapan Patra house

Gobindapur

25th Jan'14

April to May

New Earthen road from Gamaria Pulin Dehuri house to Gopinath Saren house

Gobindapur

25th Jan'14

April to May

New Earthen road from Bagambar Rana house to Ramanath Hembram house

Gobindapur

25th Jan'14

April to May

New Earthen road from Chaitnya Hembram house to Santra Bandh

Gobindapur

25th Jan'14

April to May

New Earthen road from Minakhal to Bajudiha villege

Gobindapur

25th Jan'14

April to May

New Earthen road at Anchal para with 2 box culvert

Gobindapur

25th Jan'14

April to May

Cons't of concret road from Gamaria Pathar Chatia to Gobindapur Janmenjay Mallik house

Gobindapur

25th Jan'14

April to May

Rural Connectivity Total

Page 109: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

109/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1138 05 Berajal 15 15/1 Berajal Berajal Berajal - - - 6.48 4.32 10.80 4291

- - - 6.48 4.32 10.80 4291

Berajal Total - - - 576.57 295.60 872.17 3818341139 06 Chandabila 1 1/1 Chandabila 27 315 IL 1.80 - - 1.36 0.15 1.51 901

1140 06 Chandabila 1 1/2 Chandabila 27 - IL 1.91 - - 1.44 0.16 1.60 955

1141 06 Chandabila 1 1/3 Tapaban 31 336 P PL 1.76 - - 1.33 0.15 1.48 881

1142 06 Chandabila 1 1/4 Excavation of New pond at Tapaban. Tapaban 31 1,2 G PL 3.13 - - 2.37 0.26 2.63 1567

1143 06 Chandabila 1 1/5 Telia Gorurghata 45 120 IL 1.81 - - 1.37 0.15 1.52 906

1144 06 Chandabila 1 1/6 Telia Dulki 25 281 IL 1.96 - - 1.48 0.16 1.64 979

1145 06 Chandabila 1 1/7 Excavation of New pond at Dulki Telia Dulki 25 260 IL 1.71 - - 1.29 0.14 1.44 857

1146 06 Chandabila 1 1/8 Telia Kuldiha 24 389 IL 1.96 - - 1.48 0.16 1.64 979

1147 06 Chandabila 1 1/9 Telia Kuldiha 24 310 IL 1.83 - - 1.38 0.15 1.54 916

1148 06 Chandabila 1 1/10 Telia Telia 23 158 IL 1.74 - - 1.32 0.15 1.46 871

1149 06 Chandabila 1 1/11 Excavation of Dabsahi New pond Gokhurpal 50 46753 P PL 1.81 - - 1.37 0.15 1.52 909

Rural Sanitation related works

Const. of Individual House Hold Latrines for 200 beneficiries

25th Jan'14

April to May

Rural Sanitation related works Total

Water Conservation & Water Harvesting

Excavation of pond at Kalipada Mana's Land at Chandabila

Chandabila

Chandabila

Kalipada Mana'

1799.32 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of pond at Rajani Mana's Land at Chandabila

Chandabila

Chandabila

Rajani Mana's

1906.89 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Tapaban Mandipara New pond.

Chandabila

Pathardahara

1760.2 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Pathardahara

3129.25 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of New pond of kalipada Routh at Gorurghata

Chandabila

kalipada Routh

1809.10 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of New pond of Samay Murmu at Dulki

Chandabila

Samay Murmu

1955.78 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Kanai Murmu and Khenka Murmu

1711.31 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of pond at Kanai Murmu and Khenka Murmu At Kuldiha

Chandabila

Kanai Murmu and Khenka Murmu

1955.78 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Dasarath Mahata's pond at Kuldiha

Chandabila

Dasarath Mahata

1828.66 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of New pond at Srikanta Mahata's Land.

Chandabila

Srikanta Mahata

1740.65 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Gokhurpal

1814.97 Cu.m

21st Feb'14

Oct - May

Page 110: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

110/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1150 06 Chandabila 1 1/12 Narda 42 390 IL 1.86 - - 1.41 0.16 1.56 931

1151 06 Chandabila 1 1/13 44 125 IL 1.96 - - 1.48 0.16 1.64 979

1152 06 Chandabila 1 1/14 Excavation of Gan mahata's New pond Narda 42 1017 IL 1.82 - - 1.37 0.15 1.53 910

1153 06 Chandabila 1 1/15 Excavation of Sunil mahata's New pond Gokhurpal 50 471 IL 1.70 - - 1.29 0.14 1.43 852

1154 06 Chandabila 1 1/16 Gokhurpal 50 592 IL 1.77 - - 1.34 0.15 1.49 888

1155 06 Chandabila 1 1/17 Gokhurpal 50 172 IL 1.79 - - 1.35 0.15 1.50 896

1156 06 Chandabila 1 1/18 Sananegui 49 95 IL 1.88 - - 1.42 0.16 1.58 940

1157 06 Chandabila 1 1/19 Sananegui 49 1015 IL 1.89 - - 1.43 0.16 1.59 945

1158 06 Chandabila 1 1/20 Sananegui 49 907 IL 1.93 - - 1.46 0.16 1.62 965

1159 06 Chandabila 1 1/21 Pukhuria 46 523, 322 IL 1.96 - - 1.48 0.16 1.64 979

1160 06 Chandabila 1 1/22 47 143 IL 1.94 - - 1.46 0.16 1.63 970

1161 06 Chandabila 1 1/23 Pukhuria 46 122 IL 1.75 - - 1.32 0.15 1.47 876

1162 06 Chandabila 1 1/24 Excavation of Dhiren shit's New pond Pukhuria 46 263 IL 1.83 - - 1.38 0.15 1.54 916

1163 06 Chandabila 1 1/25 Raisole Raisole 86 94 IL 1.75 - - 1.33 0.15 1.47 879

1164 06 Chandabila 1 1/26 Raisole Raisole 86 75 IL 1.93 - - 1.46 0.16 1.62 967

Water Conservation & Water Harvesting

Excavation of Amrit mahata's New pond Chandabila

Gokhurpal

Amrit mahata

1857.99 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Brindaban Das's New pond

Chandabila

Gokhurpal

Bhalukgajari

Brindaban Das

1955.78 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Gokhurpal

Gan mahata

1818.88 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Gokhurpal

Sunil mahata

1701.53 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Gopinath Mahata's New pond

Chandabila

Gokhurpal

Gopinath Mahata

1773.90 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Gayaprasad Mahata's New pond

Chandabila

Gokhurpal

Gayaprasad Mahata

1789.54 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Ruhia murmu's New pond

Chandabila

Gokhurpal

Ruhia murmu

1877.55 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Jitendra Mahata's New pond

Chandabila

Gokhurpal

Jitendra Mahata

1887.33 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Dipankar Mahata's New pond

Chandabila

Gokhurpal

Dipankar Mahata

1926.45 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Bharat Mahata's New pond

Chandabila

Pukhuria

Bharat Mahata

1955.78 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Dhireswar Mahata's New pond

Chandabila

Pukhuria

Upparbankinala

Dhireswar Mahata

1936.22 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of Paltu Mahata's New pond

Chandabila

Pukhuria

Paltu Mahata

1750.43 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Pukhuria

Dhiren shit's

1828.66 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavaton of new pond at Himangshu Mahata's land

Chandabila

Himangshu Mahata

1754.34 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavaton of new pond at Janmenjay Mahata's land

Chandabila

Janmenjay Mahata

1932.31 Cu.m

21st Feb'14

Oct - May

Page 111: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

111/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1165 06 Chandabila 1 1/27 Raisole 48 292 IL 1.93 - - 1.46 0.16 1.62 967

1166 06 Chandabila 1 1/28 Raisole 48 284 IL 1.78 - - 1.35 0.15 1.49 891

1167 06 Chandabila 1 1/29 Excavation of Ananta Mahata pond Tungadhua 54 61, 62, 64 IL 1.72 - - 1.30 0.14 1.45 862

1168 06 Chandabila 1 1/30 Excavation of Gunadhar Mahata pond Tungadhua 54 123/222 IL 1.81 - - 1.37 0.15 1.52 908

1169 06 Chandabila 1 1/31 Excavation of Kanu Sing pond Tungadhua 54 40/41 IL 1.83 - - 1.39 0.15 1.54 918

1170 06 Chandabila 1 1/32 Excavation of Nagen pond at tungadhua Tungadhua 54 28 Nagen IL 1.93 - - 1.46 0.16 1.62 966

1171 06 Chandabila 1 1/33 Tungadhua 54 6 IL 1.91 - - 1.45 0.16 1.61 957

1172 06 Chandabila 1 1/34 Excavation of pond of Ramchandra Tungadhua 54 5/3 IL 1.92 - - 1.45 0.16 1.61 962

1173 06 Chandabila 1 1/35 Excavation of new pond of Asit Mahata Tungadhua 54 2 IL 1.83 - - 1.38 0.15 1.53 915

1174 06 Chandabila 1 1/36 Excavation of new pond of Debendra Tungadhua 54 6 IL 1.87 - - 1.41 0.16 1.57 935

1175 06 Chandabila 1 1/37 Kashia Kashia 15 376 IL 1.89 - - 1.43 0.16 1.59 945

1176 06 Chandabila 1 1/38 Kashia Kashia 15 398 IL 1.90 - - 1.44 0.16 1.60 951

1177 06 Chandabila 1 1/39 Kashia Kashia 15 309 IL 1.88 - - 1.42 0.16 1.58 941

1178 06 Chandabila 1 1/40 Kashia Kashia 15 157 IL 1.88 - - 1.42 0.16 1.58 939

Water Conservation & Water Harvesting

Excavaton of new pond at Manisankar Mahata's land

Chandabila

Nicjubankinala

Manisankar Mahata'

1930.36 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavaton of new pond at Bhabesh Mahata's land

Chandabila

Nichubankinala

Bhabesh Mahata'

1779.76 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Tungadhua

Ananta Mahata

1721.09 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Tungadhua

Gunadhar Mahata

1813.01 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Tungadhua

Kanu Sing

1832.57 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Tungadhua

1928.40Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of pond of Tapan Kumar at tungadhua

Chandabila

Tungadhua

Tapan Kumar

1928.40 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Tungadhua

Ramchandra

1922.53 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Tungadhua

Asit Mahata

1826.70 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Chandabila

Tungadhua

Debendra

1867.77 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Tapan Mahata

Chandabila

Tapan Mahata

1887.33 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Bimal Mahata

Chandabila

Bimal Mahata

1899.07 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Biplab Mahata

Chandabila

Biplab Mahata

1879.51 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Mrityunjoy Mahata

Chandabila

Mrityunjoy Mahata

1875.60 Cu.m

21st Feb'14

Oct - May

Page 112: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

112/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1179 06 Chandabila 1 1/41 Kashia Kashia 15 436 IL 1.86 - - 1.41 0.16 1.56 932

1180 06 Chandabila 1 1/42 Kashia Kashia 15 221 IL 1.90 - - 1.43 0.16 1.59 949

1181 06 Chandabila 1 1/43 Kashia Kashia 15 147 IL 1.90 - - 1.44 0.16 1.60 952

1182 06 Chandabila 1 1/44 Kashia Kashia 15 - IL 1.78 - - 1.35 0.15 1.50 892

1183 06 Chandabila 1 1/45 Kashia Kashia 15 23 IL 1.80 - - 1.36 0.15 1.51 903

1184 06 Chandabila 1 1/46 Kashia Kashia 15 126 IL 1.80 - - 1.36 0.15 1.51 899

1185 06 Chandabila 1 1/47 Kashia Kashia 15 36 IL 1.78 - - 1.34 0.15 1.49 890

1186 06 Chandabila 1 1/48 Kashia Pairabhari 22 17 18 IL 1.93 - - 1.46 0.16 1.62 967

1187 06 Chandabila 1 1/49 Kashia Gulfa 21 205 IL 1.74 - - 1.32 0.15 1.46 871

1188 06 Chandabila 1 1/50 Kashia Katash 20 317/372 IL 1.95 - - 1.48 0.16 1.64 978

1189 06 Chandabila 1 1/51 Kashia Kashia 15 454 IL 1.87 - - 1.41 0.16 1.57 936

1190 06 Chandabila 1 1/52 Kashia Pairabhari 22 47 46 IL 1.86 - - 1.41 0.16 1.57 933

1191 06 Chandabila 1 1/53 Kashia Pairabhari 22 137 IL 1.90 - - 1.44 0.16 1.60 953

1192 06 Chandabila 1 1/54 Kashia Pairabhari 22 136 IL 1.85 - - 1.40 0.16 1.56 927

Water Conservation & Water Harvesting

Excavation of new pond of Bankim ahata

Chandabila

Bankim Mahata

1859.95 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Prufalla Mahata

Chandabila

Prufalla Mahata

1895.15 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Nalini Mahata

Chandabila

Nalini Mahata

1901.02 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Gobinda Mahata

Chandabila

Gobinda Mahata

1781.72 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Hiren Mahata

Chandabila

Hiren Mahata

1803.23 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Prasanta Mahata

Chandabila

Prasanta Mahata

1795.41 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Bhabatash Mahata

Chandabila

Bhabatash Mahata

1777.81 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Netai Mahata

Chandabila

Netai Mahata

1930.36 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Banshi dhar Mahata

Chandabila

Banshi dhar Mahata

1740.65 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Ananda Mahata

Chandabila

Ananda Mahata

1953.83 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Digambar Mahata

Chandabila

Digambar Mahata

1869.73 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Basanta Mahata

Chandabila

Basanta Mahata

1863.86 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Bimal Mahata

Chandabila

Bimal Mahata

1902.98 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting

Excavation of new pond of Harish chandra Mahata

Chandabila

Harish chandra Mahata

1852.13 Cu.m

21st Feb'14

Oct - May

Page 113: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

113/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1193 06 Chandabila 1 1/55 Kashia Katash 20 51 54 IL 1.83 - - 1.39 0.15 1.54 919

- - - 77.87 8.65 86.53 51572

1194 06 Chandabila 2 Drought Proofing 2/1 Plantation at Kuldiha football ground Telia Kuldiha 24 - G PL - 0.75 - 0.68 0.27 0.94 447

1195 06 Chandabila 2 Drought Proofing 2/2 Plantation at Telia Upper Pry. School Telia telia 23 - G PL - 0.85 - 0.75 0.29 1.05 497

1196 06 Chandabila 2 Drought Proofing 2/3 Plantation at Gorurghatafootball ground Telia Gorurghata 45 - G PL - 0.97 - 0.79 0.31 1.10 522

1197 06 Chandabila 2 Drought Proofing 2/4 Plantation at Dulki football ground Telia Dulki 25 - G PL - 0.89 - 0.74 0.29 1.02 487

1198 06 Chandabila 2 Drought Proofing 2/5 Plantation at Telia football ground Telia telia 23 - G PL - 1.01 - 0.83 0.32 1.15 547

1199 06 Chandabila 2 Drought Proofing 2/6 Plantation at Ajay Patra's land Gokhurpal 50 536 , 537 IL - 1.00 - 0.80 0.32 1.12 532

1200 06 Chandabila 2 Drought Proofing 2/7 Plantation at Sunil Mahata's land Gokhurpal 50 100 , 15 IL - 1.65 - 0.90 0.35 1.25 597

1201 06 Chandabila 2 Drought Proofing 2/8 Plantation at Sibcharan Mahata's land Sananegui 49 13 ,14 , 15 IL - 0.80 - 0.74 0.29 1.02 487

1202 06 Chandabila 2 Drought Proofing 2/9 Plantation at Lalmohan Mahata's land Sananegui 49 236 , 237 IL - 0.83 - 0.75 0.29 1.05 497

1203 06 Chandabila 2 Drought Proofing 2/10 Plantation at Tapaban land Tapaban 31 1,2 G PL - 1.75 - 1.20 0.47 1.67 795 4000

1204 06 Chandabila 2 Drought Proofing 2/11 Plantation at Ksitish Das's land sananegui 49 1013 IL - 0.82 - 0.71 0.28 0.98 467

1205 06 Chandabila 2 Drought Proofing 2/12 Plantation at Dungri Dahi Pukhuria 46 182 IL - 0.80 - 0.75 0.29 1.05 497

1206 06 Chandabila 2 Drought Proofing 2/13 Plantation at Bera pond Pukhuria 46 523 P PL - 0.98 - 0.91 0.36 1.27 605

1207 06 Chandabila 2 Drought Proofing 2/14 Plantation at Daharasole 47 13 P PL - 1.35 - 1.05 0.41 1.46 696

1208 06 Chandabila 2 Drought Proofing 2/15 Plantation at Pukhuria Pukhuria 46 182 P PL - 1.45 - 1.20 0.47 1.67 795

1209 06 Chandabila 2 Drought Proofing 2/16 Plantation at Kadokatha Pry. School Kashia Kadokatha 19 - G PL - 0.77 - 0.75 0.29 1.05 497

1210 06 Chandabila 2 Drought Proofing 2/17 Plantation at Kadokatha Panchayat Pond Kashia Kadokatha 19 - G PL - 0.75 - 0.72 0.28 1.00 477

Water Conservation & Water Harvesting

Excavation of new pond of Biswjit Mahata

Chandabila

Biswjit Mahata

1834.52 Cu.m

21st Feb'14

Oct - May

Water Conservation & Water Harvesting Total

Chandabila

2000 nos

21st Feb'14

June- August

Chandabila

2200 nos

21st Feb'14

June- August

Chandabila

2335 nos

21st Feb'14

June- August

Chandabila

2150 nos

21st Feb'14

June- August

Chandabila

2400 nos

21st Feb'14

June- August

Chandabila

Gokhurpal

Ajay Patra

2375 nos

21st Feb'14

June- August

Chandabila

Gokhurpal

Sunil Mahata

2500 nos

21st Feb'14

June- August

Chandabila

Gokhurpal

Sibcharan Mahata'

2190 nos

21st Feb'14

June- August

Chandabila

Gokhurpal

Lalmohan Mahata

2210 nos

21st Feb'14

June- August

Chandabila

Pathardahara

21st Feb'14

June- August

Chandabila

Gokhurpal

Ksitish Das

2210 nos

21st Feb'14

June- August

Chandabila

Pukhuria

Dungri Dahi

2220 nos

21st Feb'14

June- August

Chandabila

Pukhuria

2700 nos

21st Feb'14

June- August

Chandabila

Pukhuria

Upparbankinala

3500 nos

21st Feb'14

June- August

Chandabila

Pukhuria

4010 nos

21st Feb'14

June- August

Chandabila

2015 nos

21st Feb'14

June- August

Chandabila

2116 nos

21st Feb'14

June- August

Page 114: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

114/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1211 06 Chandabila 2 Drought Proofing 2/18 Kashia Kashia 15 231/588 P PL - 0.71 - 0.68 0.27 0.94 447

1212 06 Chandabila 2 Drought Proofing 2/19 Kashia Kashia 15 - G PL - 1.87 - 1.05 0.41 1.46 696

1213 06 Chandabila 2 Drought Proofing 2/20 Plantation at Katash Pry. School Kashia Katahs 20 - G PL - 0.91 - 0.68 0.27 0.94 447

1214 06 Chandabila 2 Drought Proofing 2/21 Plantation at Gulfa Pry. School Kashia Gulfa 21 - G PL - 1.05 - 0.74 0.29 1.02 487

1215 06 Chandabila 2 Drought Proofing 2/22 Plantation at Pairabhari SSK Kashia Pairabhari 22 141 142 G PL - 0.87 - 0.75 0.29 1.05 497

1216 06 Chandabila 2 Drought Proofing 2/23 Plantation at Kashia Forest Pond Kashia Kashia 15 - G PL - 0.93 - 0.83 0.32 1.15 547

1217 06 Chandabila 2 Drought Proofing 2/24 Chandabila 27 - G PL - 1.35 - 1.05 0.41 1.46 696

1218 06 Chandabila 2 Drought Proofing 2/25 Chandabila 27 - G PL - 1.38 - 1.13 0.44 1.57 746

1219 06 Chandabila 2 Drought Proofing 2/26 Chandabila 27 - G PL - 1.48 - 1.20 0.47 1.67 795

1220 06 Chandabila 2 Drought Proofing 2/27 Chandabila 27 - G PL - 1.68 - 1.35 0.53 1.88 895

1221 06 Chandabila 2 Drought Proofing 2/28 Chandabila 27 - G PL - 1.97 - 1.28 0.50 1.78 845

1222 06 Chandabila 2 Drought Proofing 2/29 Tapaban 31 - G PL - 1.88 - 1.34 0.53 1.87 890

1223 06 Chandabila 2 Drought Proofing 2/30 Tapaban 31 - G PL - 1.99 - 1.37 0.54 1.90 905

1224 06 Chandabila 2 Drought Proofing 2/31 Tapaban 31 - G PL - 3.09 - 1.26 0.50 1.76 835

1225 06 Chandabila 2 Drought Proofing 2/32 Telia Dulki 25 - G PL - 2.75 - 1.27 0.50 1.77 840

1226 06 Chandabila 2 Drought Proofing 2/33 Telia Kuldiha 24 - G PL - 2.88 - 1.20 0.47 1.67 795

1227 06 Chandabila 2 Drought Proofing 2/34 Telia Dulki 24 - G PL - 2.90 - 1.25 0.49 1.74 825

1228 06 Chandabila 2 Drought Proofing 2/35 Telia Gorurghata 45 - G PL - 2.89 - 1.24 0.49 1.72 820

1229 06 Chandabila 2 Drought Proofing 2/36 Telia Dulki 24 - G PL - 3.09 - 1.31 0.52 1.83 870

1230 06 Chandabila 2 Drought Proofing 2/37 Telia Kuldiha 24 - G PL - 3.10 - 1.25 0.49 1.75 830

1231 06 Chandabila 2 Drought Proofing 2/38 Telia Dulki 25 - G PL - 2.84 - 1.27 0.50 1.77 840

1232 06 Chandabila 2 Drought Proofing 2/39 Telia Dulki 25 - G PL - 2.95 - 1.23 0.48 1.71 815

Plantation at Kashia Bidyasagar Vidya Mandir

Chandabila

2017 nos

21st Feb'14

June- August

Plantation at Kashia Pry.&M.S.K. School

Chandabila

3018 nos

21st Feb'14

June- August

Chandabila

2019 nos

21st Feb'14

June- August

Chandabila

2220 nos

21st Feb'14

June- August

Chandabila

2170 nos

21st Feb'14

June- August

Chandabila

2222 nos

21st Feb'14

June- August

Both side plantation at Chandabila Dahar road

Chandabila

Chandabila

3723 nos

21st Feb'14

June- August

Both side plantation at Chandabila to Barsole

Chandabila

Chandabila

3780 nos

21st Feb'14

June- August

Both side plantation of road from shop of Shakti to Rana Para

Chandabila

Chandabila

4125 nos

21st Feb'14

June- August

Road side plantationof road from Chandabila Paschim Para to Chilimda Pitch road

Chandabila

Chandabila

5136 nos

21st Feb'14

June- August

Road side plantationof road at Chandabila .

Chandabila

Chandabila

3577 nos

21st Feb'14

June- August

Road side plantation of road from Chandabila Hospital to Tapaban Barsoloe .

Chandabila

Pathardahara

4480 nos

21st Feb'14

June- August

Road side plantation of Tapaban Barsole road

Chandabila

Pathardahara

5210 nos

21st Feb'14

June- August

Road side plantationof road from cultivation field to Tapaban village.

Chandabila

Pathardahara

4880 nos

21st Feb'14

June- August

Road side plantation of Dulki village road

Chandabila

4780 nos

21st Feb'14

June- August

Road side plantation of Kuldiha to Dulki road

Chandabila

4090 nos

21st Feb'14

June- August

Road side plantationof Dulki to Orissaborder road

Chandabila

4033 nos

21st Feb'14

June- August

Road side plantation of Gorurghata to Orissaborder road.

Chandabila

4134 nos

21st Feb'14

June- August

Road side plantation of Orissaborder to Dulki road.

Chandabila

4235 nos

21st Feb'14

June- August

Road side plantation of road from Talakuldiha to Orissa border

Chandabila

4336 nos

21st Feb'14

June- August

Road side plantation of Dulki Paschim Para village road

Chandabila

4237 nos

21st Feb'14

June- August

Road side plantationof road from Negui Hut to Dulki Paschim para

Chandabila

4138 nos

21st Feb'14

June- August

Page 115: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

115/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1233 06 Chandabila 2 Drought Proofing 2/40 Telia Kuldiha 24 - G PL - 2.75 - 1.22 0.48 1.69 805

1234 06 Chandabila 2 Drought Proofing 2/41 Telia Dulki 25 - G PL - 2.88 - 1.31 0.51 1.82 865

1235 06 Chandabila 2 Drought Proofing 2/42 Telia Dulki 25 - G PL - 2.90 - 1.27 0.50 1.77 840

1236 06 Chandabila 2 Drought Proofing 2/43 Telia Telia 23 - G PL - 2.89 - 1.25 0.49 1.75 830

1237 06 Chandabila 2 Drought Proofing 2/44 Telia Telia 23 - G PL - 3.09 - 1.31 0.52 1.83 870

1238 06 Chandabila 2 Drought Proofing 2/45 Telia Telia 23 - G PL - 3.10 - 1.22 0.48 1.70 810

1239 06 Chandabila 2 Drought Proofing 2/46 Telia Telia 23 - G PL - 2.84 - 1.35 0.53 1.88 895

1240 06 Chandabila 2 Drought Proofing 2/47 Narda 42 - G PL - 2.95 - 1.28 0.50 1.79 850

1241 06 Chandabila 2 Drought Proofing 2/48 Gokhurpal 50 - G PL - 1.88 - 1.28 0.50 1.78 845

1242 06 Chandabila 2 Drought Proofing 2/49 Road side plantationof bamunpara road Gokhurpal 50 - G PL - 1.99 - 1.30 0.51 1.81 860

1243 06 Chandabila 2 Drought Proofing 2/50 Sananegui 49 - G PL - 3.09 - 1.36 0.54 1.90 904

1244 06 Chandabila 2 Drought Proofing 2/51 Sananegui 49 - G PL - 2.75 - 1.32 0.52 1.83 871

1245 06 Chandabila 2 Drought Proofing 2/52 Sananegui 49 - G PL - 2.88 - 1.25 0.49 1.74 828

1246 06 Chandabila 2 Drought Proofing 2/53 Gokhurpal 50 - G PL - 2.90 - 1.25 0.49 1.74 829

1247 06 Chandabila 2 Drought Proofing 2/54 Gokhurpal 50 - G PL - 2.89 - 1.29 0.51 1.79 852

1248 06 Chandabila 2 Drought Proofing 2/55 Narda 42 - G PL - 3.09 - 1.23 0.48 1.71 815

1249 06 Chandabila 2 Drought Proofing 2/56 Narda 42 - G PL - 2.75 - 1.27 0.50 1.77 840

1250 06 Chandabila 2 Drought Proofing 2/57 Sananegui 49 - G PL - 2.88 - 1.30 0.51 1.81 862

1251 06 Chandabila 2 Drought Proofing 2/58 44 - G PL - 2.90 - 1.31 0.51 1.82 866

1252 06 Chandabila 2 Drought Proofing 2/59 - G PL - 2.89 - 1.35 0.53 1.88 896

1253 06 Chandabila 2 Drought Proofing 2/60 - G PL - 3.09 - 1.34 0.53 1.87 890

Road side plantationof Kuldiha Purba Para road

Chandabila

4039 nos

21st Feb'14

June- August

Road side plantation of Telia to Dulki road

Chandabila

4440 nos

21st Feb'14

June- August

Road side plantation of Kuldiha to Dulki Paschim Para road

Chandabila

4241 nos

21st Feb'14

June- August

Road side plantation of Telia village road

Chandabila

4142 nos

21st Feb'14

June- August

Road side plantationof road from Telia village rooad to old pond

Chandabila

4643 nos

21st Feb'14

June- August

Road side plantation of road from Telia to Kuldiha

Chandabila

4144 nos

21st Feb'14

June- August

Road side plantationof road from Jahar Manna's house to Pairavari.

Chandabila

5245 nos

21st Feb'14

June- August

Road side plantation of road from Jarkuna to Narda Bankata

Chandabila

Gokhurpal

4146 nos

21st Feb'14

June- August

Road side plantation of road from gokhurpal Pry. School to Sananegui Kadamtala.

Chandabila

Gokhurpal

4247 nos

21st Feb'14

June- August

Chandabila

Gokhurpal

4848 nos

21st Feb'14

June- August

Road side plantation of Sananegui Mukhi Para road

Chandabila

Gokhurpal

5235 nos

21st Feb'14

June- August

Road side plantation of Sananegui Adibasi para road

Chandabila

Gokhurpal

5136 nos

21st Feb'14

June- August

of road from Sananegui pitch road to Bailasole road

Chandabila

Gokhurpal

3577 nos

21st Feb'14

June- August

Road side plantation of gokhurpal village road

Chandabila

Gokhurpal

4480 nos

21st Feb'14

June- August

Road side plantation of Gokhurpal Dubkupara road

Chandabila

Gokhurpal

5210 nos

21st Feb'14

June- August

Road side plantation of road from Narda village to Bhangat pond

Chandabila

Gokhurpal

4880 nos

21st Feb'14

June- August

Road side plantationof Narda to Tapaban road

Chandabila

Gokhurpal

4780 nos

21st Feb'14

June- August

Road side plantation of Bankata to Sananegui road

Chandabila

Gokhurpal

4090 nos

21st Feb'14

June- August

Road side plantation of Bhalukgajari village road

Chandabila

Gokhurpal

Bhalukgajari

4033 nos

21st Feb'14

June- August

Road side plantation of road from Sadarghat to Orissa Border

Chandabila

Pukhuria

Pukhuria , Upparbankinala

46, 47

4134 nos

21st Feb'14

June- August

Road side plantation of road from Upparbankinalato Nichubankinala

Chandabila

Pukhuria

Pukhuria , Upparbankinala

46, 47

4235 nos

21st Feb'14

June- August

Page 116: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

116/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1254 06 Chandabila 2 Drought Proofing 2/61 46,47 - G PL - 3.10 - 1.33 0.52 1.85 880

1255 06 Chandabila 2 Drought Proofing 2/62 Road side plantation of Mahulbani road Pukhuria 46 - G PL - 2.84 - 1.25 0.49 1.74 825

1256 06 Chandabila 2 Drought Proofing 2/63 Pukhuria 46 - G PL - 2.95 - 1.23 0.48 1.71 815

1257 06 Chandabila 2 Drought Proofing 2/64 Pukhuria 46 - G PL - 1.88 - 1.25 0.49 1.74 825

1258 06 Chandabila 2 Drought Proofing 2/65 Pukhuria 46 - G PL - 1.99 - 1.28 0.50 1.79 850

1259 06 Chandabila 2 Drought Proofing 2/66 pukhuria 46 - G PL - 3.09 - 1.32 0.52 1.84 874

1260 06 Chandabila 2 Drought Proofing 2/67 Raisole Raisole 86 - G PL - 1.88 - 1.27 0.50 1.77 840

1261 06 Chandabila 2 Drought Proofing 2/68 Raisole Raisole 86 - G PL - 1.99 - 1.23 0.48 1.72 817

1262 06 Chandabila 2 Drought Proofing 2/69 Raisole Raisole 86 - G PL - 3.09 - 1.30 0.51 1.81 859

1263 06 Chandabila 2 Drought Proofing 2/70 Raisole 87 - G PL - 2.75 - 1.35 0.53 1.88 892

1264 06 Chandabila 2 Drought Proofing 2/71 Raisole 87 - G PL - 2.88 - 1.30 0.51 1.81 863

1265 06 Chandabila 2 Drought Proofing 2/72 Raisole Purnapani 87 - G PL - 2.90 - 1.23 0.48 1.71 814

1266 06 Chandabila 2 Drought Proofing 2/73 Raisole Purnapani 87 - G PL - 2.89 - 1.25 0.49 1.75 830

1267 06 Chandabila 2 Drought Proofing 2/74 Raisole Raisole 86 - G PL - 3.09 - 1.24 0.49 1.73 822

1268 06 Chandabila 2 Drought Proofing 2/75 Tungadhua 54 - G PL - 2.84 - 1.39 0.55 1.93 920

1269 06 Chandabila 2 Drought Proofing 2/76 Pachakhali 51 - G PL - 2.95 - 1.25 0.49 1.74 825

1270 06 Chandabila 2 Drought Proofing 2/77 Pachakhali 51 - G PL - 1.88 - 1.29 0.51 1.79 853

1271 06 Chandabila 2 Drought Proofing 2/78 Tungadhua 54 - G PL - 1.99 - 1.25 0.49 1.74 828

1272 06 Chandabila 2 Drought Proofing 2/79 Tungadhua 54 - G PL - 3.09 - 1.23 0.48 1.71 815

1273 06 Chandabila 2 Drought Proofing 2/80 Nursery under Chandabila GP Chilimda - 0.01 - 2.49 2.95 5.44 1646

- - - 92.76 38.41 131.17 61429

Road side plantation of road from Sadarghat to Upparbankinala

Chandabila

Pukhuria

Pukhuria , Upparbankinala

4336 nos

21st Feb'14

June- August

Chandabila

Pukhuria

4237 nos

21st Feb'14

June- August

Road side plantation of road from Pukhuria muralikhal to gorurghata

Chandabila

Pukhuria

4138 nos

21st Feb'14

June- August

Road side plantationof road from matilal patra's house to Pukhuria sib mandir

Chandabila

Pukhuria

4039 nos

21st Feb'14

June- August

Road side plantation of Berapara village road

Chandabila

Pukhuria

4440 nos

21st Feb'14

June- August

Road side plantation of Pariapara village road

Chandabila

Pukhuria

4241 nos

21st Feb'14

June- August

Road side plantation of road from Raisole sitala Mandir to Muralikhal

Chandabila

4142 nos

21st Feb'14

June- August

Road side plantation of road at Raisole Daskhinpara

Chandabila

4643 nos

21st Feb'14

June- August

Road side plantation of road at Raisole Paschimpara

Chandabila

4144 nos

21st Feb'14

June- August

Road side plantation of road at Nichubankinala

Chandabila

Nichubankinala

5245 nos

21st Feb'14

June- August

Road side plantation of road at Nichubankinala paschim para

Chandabila

Nichubankinala

4146 nos

21st Feb'14

June- August

Road side plantationfro Purnapani to Muralikhal

Chandabila

4247 nos

21st Feb'14

June- August

Road side plantation fro Purnapani to house of Tarapada Singha.

Chandabila

4848 nos

21st Feb'14

June- August

Road side plantation fro Purnapani to Raisole

Chandabila

4235 nos

21st Feb'14

June- August

Road side plantationTungadhua to Pachakhali village road

Chandabila

Tungadhua

5136 nos

21st Feb'14

June- August

Road side plantation from Pachakhali to Bailasole

Chandabila

Tungadhua

4039 nos

21st Feb'14

June- August

Road side plantation from Pachakhali to Damda sole

Chandabila

Tungadhua

4440 nos

21st Feb'14

June- August

Road side plantation from Tungadhua to Kharia sole.

Chandabila

Tungadhua

4241 nos

21st Feb'14

June- August

Road side plantation from Pachakhali Tentultala to Tungadhua sukna pond

Chandabila

Tungadhua

4142 nos

21st Feb'14

June- August

Chandabila

Chandabila

21st Feb'14

June- August

Drought Proofing Total

Page 117: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

117/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1274 06 Chandabila 3 3/1 Murakati 28 - P PL - 1.88 - 1.50 0.44 1.94 994

1275 06 Chandabila 3 3/2 Chilimda 29 - P PL - 2.14 - 1.68 0.39 2.07 1114

1276 06 Chandabila 3 3/3 30 - P PL - 2.45 - 1.50 0.64 2.14 994

1277 06 Chandabila 3 3/4 Renovation of Patnigachhiya Bandh. Tapaban 31 - G PL - 1.97 - 1.47 0.44 1.91 974

1278 06 Chandabila 3 3/5 Renavation of Barsole Bandh Tapaban 31 - G PL - 2.30 - 1.68 0.45 2.13 1114

1279 06 Chandabila 3 3/6 Renovation of Kalajhuri Canel Tapaban 31 - P PL - 2.45 - 1.20 0.44 1.64 795

1280 06 Chandabila 3 3/7 Telia Gorurghata 45 - G PL - 1.99 - 1.28 1.23 2.51 845

1281 06 Chandabila 3 3/8 Telia Gorurghata 45 - G PL - 3.45 - 1.37 1.43 2.79 905

1282 06 Chandabila 3 3/9 Renovation of Dulki Dahar Cannal Telia Dulki 25 - P PL - 2.25 - 1.13 0.37 1.50 746

1283 06 Chandabila 3 3/10 Telia kuldiha 24 - P PL - 2.15 - 1.19 0.74 1.92 785

1284 06 Chandabila 3 3/11 Telia Dulki 25 - P PL - 2.10 - 1.22 0.44 1.65 805

1285 06 Chandabila 3 3/12 Telia Telia 23 - P PL - 2.98 - 1.49 0.47 1.95 984

1286 06 Chandabila 3 3/13 Telia Telia 23 - P PL - 3.08 - 1.42 0.43 1.85 940

1287 06 Chandabila 3 3/14 Gokhurpal 50 - G PL - 3.33 - 1.50 0.39 1.89 994

1288 06 Chandabila 3 3/15 Renovation of Daharasole cannal 47 - P PL - 2.87 - 1.34 0.37 1.71 885

1289 06 Chandabila 3 3/16 Raisole 48 - G PL - 2.67 - 1.37 0.83 2.20 905

1290 06 Chandabila 3 3/17 pachakhali 51 - P PL - 2.76 - 1.42 0.93 2.35 940

1291 06 Chandabila 3 3/18 Tungadhua 54 - P PL - 3.87 - 1.80 0.63 2.44 1193

1292 06 Chandabila 3 3/19 Renovation of Bailasole Bandh pachakhali 51 2 G PL - 2.96 - 1.68 0.37 2.05 1114

1293 06 Chandabila 3 3/20 Renovation of Kusal Bandh with gate Tungadhua 54 - G PL - 2.95 - 1.64 0.83 2.47 1084

1294 06 Chandabila 3 3/21 Damdasole 55 2 P PL - 1.97 - 1.22 0.76 1.98 810

1295 06 Chandabila 3 3/22 Khasjangle 53 74 G PL - 2.93 - 1.39 0.76 2.15 920

Micro Irrigation Works

Renovation of Cannal at the East side of Babur Bandh and 5 nos. Hume pipe

Chandabila

Chandabila

1.876 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Chilimda Bandh Canal with 10 Nos Hume pipe.

Chandabila

Chandabila

2.14 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Pathardahara Bandh. Canel Chatal.

Chandabila

Pathardahara

Pathardahara

2.45 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Pathardahara

1.97 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Pathardahara

2.3 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Pathardahara

2.45 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Check Dam at Gorurghata Adibasi Para

Chandabila

1.99 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Check Dam at Gorurghata Madhya Para

Chandabila

3.45 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

2.25 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of canal from pairavari to Talakuldiha

Chandabila

2.15 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Talbandh cannal from Telia Taltala Bandh to Dulki Paschim Para Near Orissaborder.

Chandabila

2.1 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Gurur Dahar cannal and Bandh at Telia

Chandabila

2.98 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Bara Khet cannal and Bandh at Telia

Chandabila

3.08 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Baliasole Arr Bandh and 3 Nos culvert

Chandabila

Gokhurpal

3.33 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Pukhuria

Upparbankinala

2.87 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Bara Bandh at Murali Khal

Chandabila

Nichubankinala

2.67 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of cannal at Bailasole to Damdasole with pipe and culvert

Chandabila

Tungadhua

2.76 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of cannal at 26 No land to Bandh

Chandabila

Tungadhua

3.87 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Tungadhua

2.96 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Tungadhua

2.95 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of cannal from Baliasole to Damdasole

Chandabila

Tungadhua

1.97 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of cannal from pathar Bandh to Rajendra Bandh

Chandabila

Tungadhua

2.93 Hect

21st Feb'14

Oct - May

Page 118: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

118/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1296 06 Chandabila 3 3/23 Renovation of Rajendra Bandh Tungadhua 54 - G PL - 2.99 - 1.54 0.46 2.00 1019

1297 06 Chandabila 3 3/24 Tungadhua 54 - G PL - 3.25 - 1.20 0.50 1.70 795

1298 06 Chandabila 3 3/25 Kashia Katash 20 - P PL - 2.78 - 1.34 0.88 2.22 885

1299 06 Chandabila 3 3/26 Kashia Katash 20 - P PL - 2.77 - 1.25 0.96 2.21 825

1300 06 Chandabila 3 3/27 Renovation of Fagur Bandh with gate Tungadhua 54 160/161 G PL - 2.98 - 1.49 1.23 2.72 984

1301 06 Chandabila 3 3/28 Renovation of Kusar Bandh and culvert Tungadhua 54 117 G PL - 3.08 - 1.42 1.33 2.75 940

1302 06 Chandabila 3 3/29 Renovation of Kusar Bandh Tungadhua 54 175 to 177 G PL - 3.33 - 1.50 0.39 1.89 994

1303 06 Chandabila 3 3/30 Renovation of Ranjit Bandh Pachakhali 51 46 G PL - 2.87 - 1.34 0.44 1.77 885

1304 06 Chandabila 3 3/31 Renovation of Guruchara Bandh Pachakhali 51 44 G PL - 2.67 - 1.37 0.83 2.20 905

1305 06 Chandabila 3 3/32 Renovation of Upar solePanchyat bandh Kashia kashia 15 - G PL - 2.76 - 1.42 0.93 2.35 940

1306 06 Chandabila 3 3/33 Renovation of Gulfa bara bandh Kashia Gulfa 21 - G PL - 3.87 - 1.56 0.63 2.20 1034

1307 06 Chandabila 3 3/34 Renovation of katash bara bandh Kashia Katash 20 - G PL - 2.96 - 1.64 0.47 2.10 1084

1308 06 Chandabila 3 3/35 Pachakhali 51 52 G PL - 2.95 - 1.61 0.83 2.45 1069

1309 06 Chandabila 3 3/36 Renovation of Fagur Bandh with gate Tungadhua 54 G PL - 1.97 - 1.54 1.24 2.78 1019

1310 06 Chandabila 3 3/37 Khasjangle 53 65 G PL - 2.93 - 1.39 0.76 2.15 920

1311 06 Chandabila 3 3/38 Pukhuria 46 - G PL - 2.99 - 1.54 0.46 2.00 1019

1312 06 Chandabila 3 3/39 Pukhuria 46 - G PL - 1.88 - 1.50 0.54 2.04 994

1313 06 Chandabila 3 3/40 Pukhuria 46 G PL - 2.14 - 1.68 0.48 2.16 1114

1314 06 Chandabila 3 3/41 Gokhurpal 50 - G PL - 2.45 - 1.50 1.13 2.63 994

1315 06 Chandabila 3 3/42 Narda 42 - G PL - 1.97 - 1.47 0.98 2.45 974

1316 06 Chandabila 3 3/43 Renovation of Jarkuna Bandh Gokhurpal 50 - G PL - 2.30 - 1.53 0.57 2.10 1014

1317 06 Chandabila 3 3/44 Renovation of Dulki Check Dam Telia Dulki 25 - G PL - 2.45 - 1.35 1.23 2.58 895

Micro Irrigation Works

Chandabila

Tungadhua

2.99 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Mahata Bandh with culvert and boulder pitching

Chandabila

Tungadhua

3.25 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of cannal from Bahadur Bhakta Land to Nagen Mahata land at Katash

Chandabila

2.78 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of cannal from Jalahari Kisku land to Nabin Babu land

Chandabila

2.77 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Tungadhua

2.98 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Tungadhua

3.08 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Tungadhua

3.33 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Tungadhua

2.87 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Tungadhua

2.67 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

2.76 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

3.87 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

2.96 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Mahata's Bandh and boulder pitching

Chandabila

Tungadhua

2.95 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Tungadhua

160, 161, 218

1.97 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Ghagrasole bandh and 4 Nos pipe

Chandabila

Tungadhua

2.93 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Conture Bandh at Jaral Danga

Chandabila

Pukhuria

2.99 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Conture Bandh at Daharasole

Chandabila

Pukhuria

1.876 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Check Bandh at Barapukur

Chandabila

Pukhuria

344, 345, 346, 347

2.14 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Jarkuna Bandh cannal and 2 Nos culvert

Chandabila

Gokhurpal

2.45 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Narda Bandh cannal and 2 Nos culvert

Chandabila

Gokhurpal

1.97 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

Gokhurpal

2.3 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

2.45 Hect

21st Feb'14

Oct - May

Page 119: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

119/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1318 06 Chandabila 3 3/45 Renovation of Tapaban Barsole Bandh Tapoban 31 - G PL - 1.99 - 1.28 0.74 2.01 845

1319 06 Chandabila 3 3/46 Renovation of Kulmudu cannal Telia Telia 23 - P PL - 2.45 - 1.20 0.47 1.67 795

1320 06 Chandabila 3 3/47 Telia Dulki 25 - P PL - 1.99 - 1.28 0.57 1.84 845

1321 06 Chandabila 3 3/48 Renovation of Kulmudu Bandh cannal. Telia Telia 23 - P PL - 3.45 - 1.37 0.54 1.90 905

1322 06 Chandabila 3 3/49 Repair of Barakshet cannel Telia Telia 23 300 P PL - 2.25 - 1.13 0.47 1.60 746

1323 06 Chandabila 3 3/50 Repair of Talbandh cannel Telia Telia 23 - P PL - 2.15 - 1.19 0.74 1.92 785

1324 06 Chandabila 3 3/51 Repair of Saluk bandh cannel Telia Telia 23 116 P PL - 2.10 - 1.22 0.44 1.65 805

1325 06 Chandabila 3 3/52 Narda 42 - G PL - 2.98 - 1.49 1.46 2.94 984

1326 06 Chandabila 3 3/53 Gokhurpal 50 - P PL - 1.99 - 1.28 0.74 2.01 845

1327 06 Chandabila 3 3/54 Gokhurpal 50 - P PL - 2.45 - 1.20 0.47 1.67 795

- - - 76.24 37.64 113.88 50492

1328 06 Chandabila 4 4/1 Renovation of Tapaban Barsole Canal. Tapaban 31 - p PL - 2.45 - 1.48 0.55 2.03 982

1329 06 Chandabila 4 4/2 Telia Gorurghata 45 - p PL - 2.45 - 1.43 0.47 1.89 945

1330 06 Chandabila 4 4/3 Telia Dulki 25 - p PL - 1.99 - 1.28 0.64 1.91 845

1331 06 Chandabila 4 4/4 Telia Dulki 25 - p PL - 1.90 - 1.31 1.48 2.78 865

1332 06 Chandabila 4 4/5 Telia Telia 23 - p PL - 2.25 - 1.63 0.54 2.17 1078

1333 06 Chandabila 4 4/6 Gokhurpal 50 - p PL - 2.15 - 1.25 1.23 2.48 825

1334 06 Chandabila 4 4/7 Renovation of cannal at Muralikhal Pukhuria 46 - p PL - 2.10 - 1.29 0.44 1.73 853

1335 06 Chandabila 4 4/8 Const. of irrigation dam at Muralikhal Raisole Purnapani 87 - G PL - 2.98 - 2.10 0.70 2.80 1390

Micro Irrigation Works

Chandabila

Pathardahara

1.99 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

2.45 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of cannal from Dulki Bandh to Orissa Border

Chandabila

1.99 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

3.45 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

2.25 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

2.15 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Chandabila

2.1 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Renovation of Narda Bandh cannal with hume pipe and loc gate

Chandabila

Gokhurpal

2.98 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Repair of cannal from Uparsole to Asan Danga

Chandabila

Gokhurpal

1.99 Hect

21st Feb'14

Oct - May

Micro Irrigation Works

Repair of cannal from Uparsole to Behechi Danga

Chandabila

Gokhurpal

2.45 Hect

21st Feb'14

Oct - May

Micro Irrigation Works TotalIrrigation facilities to land owned by SC/ST bene.

Chandabila

Pathardahara

2.45 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Renovation of Canal from Tilajuria to gorurghata Uttar para.

Chandabila

2.45 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Const. of Canal from Tilajuria to Dulki road.

Chandabila

1.99 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Renovation of Dulki Bandh cannal and guard wall

Chandabila

1.9 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Const. of Canal from Talbandh to Orissa border

Chandabila

2.25 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Renovation of Jarkuna Bandh cannal pipe and guard wall

Chandabila

Gokhurpal

2.15 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Chandabila

Pukhuria

2.1 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Chandabila

2.98 Hect

21st Feb'14

Oct - May

Page 120: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

120/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1336 06 Chandabila 4 4/9 Const. of check dam at Muralikhal Raisole Raisole 86 - G PL - 3.08 - 2.01 0.67 2.68 1331

1337 06 Chandabila 4 4/10 Renovation of Ghagrasole Bandh cannal Khasjangle 53 65 p PL - 2.65 - 1.35 0.47 1.81 892

1338 06 Chandabila 4 4/11 Renovation of Lauhatal bandh Tungadhua 54 202 G PL - 2.87 - 1.47 0.41 1.88 974

1339 06 Chandabila 4 4/12 Tungadhua 54 197 G PL - 2.67 - 1.25 0.49 1.73 825

1340 06 Chandabila 4 4/13 Khasjangle 53 77 G PL - 2.76 - 1.47 0.50 1.97 972

1341 06 Chandabila 4 4/14 Kashia Kashia 15 - P PL - 3.08 - 1.50 0.66 2.17 994

1342 06 Chandabila 4 4/15 Re-excavation of Arr bandh at Kashia Kashia Kashia 15 142 P PL - 2.65 - 1.90 0.63 2.53 1255

1343 06 Chandabila 4 4/16 Kashia Gulfa 21 - P PL - 2.87 - 1.47 0.41 1.88 974

1344 06 Chandabila 4 4/17 Kashia Kashia 15 - P PL - 2.67 - 1.34 0.49 1.82 885

- - - 25.50 10.76 36.26 16887

1345 06 Chandabila 5 5/1 Chandabila 27 - P PL 2.54 - - 2.01 0.22 2.23 1331

1346 06 Chandabila 5 5/2 Renovation of Chandabila Mahata Pond. Chandabila 27 - IL 1.76 - - 1.39 0.15 1.55 921

1347 06 Chandabila 5 5/3 Renovation of Mara Pond Chandabila 27 - P PL 1.72 - - 1.36 0.15 1.51 901

1348 06 Chandabila 5 5/4 Chandabila 27 - G PL 1.86 - - 1.47 0.16 1.63 972

1349 06 Chandabila 5 5/5 Murakati 28 - P PL 1.80 - - 1.42 0.16 1.58 942

Irrigation facilities to land owned by SC/ST bene.

Chandabila

3.08 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Chandabila

Tungadhua

2.65 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Chandabila

Tungadhua

2.87 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Renovation of Sukumar Mahata's Bandh and pipe setting

Chandabila

Tungadhua

2.67 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

renovation of Kailash Bandh and 1 nos pipe

Chandabila

Tungadhua

2.76 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Re-excavation of Kashia irrigation bandh and cannel

Chandabila

3.08 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Chandabila

2.65 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Re-excavation of cannel at Gulfa to Katash

Chandabila

2.87 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene.

Re-excavation of cannel Kashia to gulfa Chandabila

2.67 Hect

21st Feb'14

Oct - May

Irrigation facilities to land owned by SC/ST bene. TotalRenovation of Traditional Water Bodies

Renovation of Chandabila Village pond .( 2 Nos)

Chandabila

Chandabila

2542.517 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Chandabila

Chandabila Mahata

1760.204 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Chandabila

1721.088 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Forest pond at Chandabila Paschim Para

Chandabila

Chandabila

1857.993 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Renovation of Babur Bandh with 2 Nos. pipe and Chatal

Chandabila

Chandabila

1799.320 CU.M

21st Feb'14

Oct - May

Page 121: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

121/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1350 06 Chandabila 5 5/6 Murakati 28 - P PL 1.79 - - 1.41 0.16 1.57 937

1351 06 Chandabila 5 5/7 Chandabila 27 317 IL 1.96 - - 1.50 0.39 1.89 994

1352 06 Chandabila 5 5/8 Re-excavation of Tapaban 4 Nos. pond. Tapaban 31 - G PL 3.13 - - 2.47 0.27 2.75 1638

1353 06 Chandabila 5 5/9 Tapaban 31 488 IL 1.66 - - 1.31 0.15 1.46 870

1354 06 Chandabila 5 5/10 Re-excavation of Priyanath routh Pond. Telia Gorurghata 45 263 , 265 IL 1.63 - - 1.29 0.14 1.43 855

1355 06 Chandabila 5 5/11 Re-excavation of Santosh Routh Pond. Telia Gorurghata 45 268 IL 1.74 - - 1.38 0.15 1.53 911

1356 06 Chandabila 5 5/12 Telia Gorurghata 45 152 IL 1.76 - - 1.39 0.15 1.55 921

1357 06 Chandabila 5 5/13 Re-excavation of Jagen Mandi's Pond. Telia Gorurghata 45 83 IL 1.70 - - 1.34 0.15 1.49 891

1358 06 Chandabila 5 5/14 Re-excavation of Dulki Pond. Telia Dulki 25 293 P PL 1.68 - - 1.33 0.15 1.48 881

1359 06 Chandabila 5 5/15 Re-excavation of Gudra Murmu's Pond. Telia Dulki 25 46 IL 1.71 - - 1.35 0.15 1.50 896

1360 06 Chandabila 5 5/16 Telia Kuldiha 24 157/481 IL 1.73 - - 1.37 0.15 1.52 906

1361 06 Chandabila 5 5/17 Re-excavation of Dhiren Mahata's pond Telia Kuldiha 24 121/470 IL 1.72 - - 1.36 0.15 1.51 900

1362 06 Chandabila 5 5/18 Re-cxcavation of Naresh Mahata's pond Telia Telia 23 - IL 1.69 - - 1.34 0.15 1.49 886

1363 06 Chandabila 5 5/19 Reexcavation of Talakuldiha pond Telia Kuldiha 24 101 P PL 1.67 - - 1.32 0.15 1.47 876

Renovation of Traditional Water Bodies

Renovation of Patra pond with 2 Nos. pipe and Chatal

Chandabila

Chandabila

1789.541 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Mantu Mahata's pond at Chandabila

Chandabila

Chandabila

Mantu Mahata

1701.531 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pathardahara

3129.252 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Renovation of Pond of Purnachandra Mandi

Chandabila

Pathardahara

Purnachandra Mandi

1662.415 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Priyanath routh

1633.078 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Santosh Routh

1740.646 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Manikchand Mandi's Pond.

Chandabila

Manikchand Mandi

1760.204 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Jagen Mandi

1701.531 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1681.973 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Gudra Murmu

1711.310 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Balaram Mahata's pond

Chandabila

Balaram Mahata's

1730.867 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Dhiren Mahata's

1719.133 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Naresh Mahata's

1691.752 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1672.194 CU.M

21st Feb'14

Oct - May

Page 122: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

122/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1364 06 Chandabila 5 5/20 Telia Kuldiha 24 312 IL 1.75 - - 1.38 0.15 1.54 916

1365 06 Chandabila 5 5/21 Telia Telia 23 121 IL 1.81 - - 1.43 0.16 1.59 947

1366 06 Chandabila 5 5/22 Sananegui 49 306 IL 1.76 - - 1.39 0.15 1.54 919

1367 06 Chandabila 5 5/23 Re-excavation of Sunil Mahata's pond Gokhurpal 50 - IL 1.69 - - 1.34 0.15 1.49 887

1368 06 Chandabila 5 5/24 Rrexcavation of Bhulagara pond Sananegui 49 119 P PL 1.67 - - 1.32 0.15 1.47 876

1369 06 Chandabila 5 5/25 Gokhurpal 50 87 IL 1.68 - - 1.33 0.15 1.48 880

1370 06 Chandabila 5 5/26 Gokhurpal 50 273 , 274 IL 1.71 - - 1.35 0.15 1.50 894

1371 06 Chandabila 5 5/27 Re-excavation of Amtuasole pond Sananegui 49 579 P PL 1.66 - - 1.31 0.15 1.46 869

1372 06 Chandabila 5 5/28 Re-excavation of Naren Mahata's pond Sananegui 49 305 IL 1.83 - - 1.45 0.16 1.61 957

1373 06 Chandabila 5 5/29 Re-excavation of Dari Bura's pond Narda 42 1038 P PL 1.77 - - 1.40 0.16 1.56 929

1374 06 Chandabila 5 5/30 Re-excavation ofDari Bura''s pond Narda 42 770 IL 1.72 - - 1.36 0.15 1.51 902

1375 06 Chandabila 5 5/31 Narda 42 940 IL 1.74 - - 1.38 0.15 1.53 911

1376 06 Chandabila 5 5/32 Renovation of Lal Pond Pukhuria 46 P PL 1.76 - - 1.39 0.15 1.55 921

Renovation of Traditional Water Bodies

Re-excavation of Kalicharan Mahata's pond

Chandabila

Kalicharan Mahata'

1750.425 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Ram Chandra Mahata's Tal Pukur

Chandabila

Ram Chandra Mahata'

1809.099 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Mangal Mandi'g pond at Sananegui

Chandabila

Gokhurpal

Mangal Mandi

1756.293 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Gokhurpal

Sunil Mahata

1693.707 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Gokhurpal

1672.194 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Premchand Mahata's pond

Chandabila

Gokhurpal

Premchand Mahata'

1680.017 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Tarani Mahata's Tal pond

Chandabila

Gokhurpal

Tarani Mahata'

1707.398 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Gokhurpal

1660.459 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Gokhurpal

Naren Mahata'

1828.656 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Gokhurpal

1773.895 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Gokhurpal

Dari Bura'

1723.044 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Khegendra Mahata's pond

Chandabila

Gokhurpal

Khegendra Mahata

1740.646 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pukhuria

923, 925, 917, 98

1760.204 CU.M

21st Feb'14

Oct - May

Page 123: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

123/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1377 06 Chandabila 5 5/33 Pukhuria 46 686 IL 1.70 - - 1.34 0.15 1.49 891

1378 06 Chandabila 5 5/34 Renovation of Bara Pond Pukhuria 46 523 P PL 1.68 - - 1.33 0.15 1.48 881

1379 06 Chandabila 5 5/35 Renovation of Chhatto Pond Pukhuria 46 519 P PL 1.71 - - 1.35 0.15 1.50 896

1380 06 Chandabila 5 5/36 Re-excavation of kshitish Mahata's pond Pukhuria 46 63 IL 1.73 - - 1.37 0.15 1.52 906

1381 06 Chandabila 5 5/37 Re-excavation of Tapash Mahata's pond Pukhuria 46 150 IL 1.72 - - 1.36 0.15 1.51 900

1382 06 Chandabila 5 5/38 Re-excavation of Sudhir Mahata's pond Pukhuria 46 65 IL 1.69 - - 1.34 0.15 1.49 886

1383 06 Chandabila 5 5/39 Re-excavation of Jharna Mahata's pond Pukhuria 46 923 IL 1.67 - - 1.32 0.15 1.47 876

1384 06 Chandabila 5 5/40 47 274 IL 1.75 - - 1.38 0.15 1.54 916

1385 06 Chandabila 5 5/41 Re-excavation of Daharasole pond 47 13 P PL 1.81 - - 1.43 0.16 1.59 947

1386 06 Chandabila 5 5/42 Re-excavation of Calta pond Raisole Purnapani 87 - P PL 1.76 - - 1.39 0.15 1.54 919

1387 06 Chandabila 5 5/43 Re-excavation of sitala Pond Raisole Purnapani 87 - P PL 1.69 - - 1.34 0.15 1.49 887

1388 06 Chandabila 5 5/44 Re-excavation of Bhutahar pond Raisole Purnapani 87 - P PL 1.67 - - 1.32 0.15 1.47 876

1389 06 Chandabila 5 5/45 Re-excavation of Srihari Mahata's pond. Raisole Raisole 86 64 IL 1.68 - - 1.33 0.15 1.48 880

1390 06 Chandabila 5 5/46 Raisole Raisole 86 205 P PL 1.71 - - 1.35 0.15 1.50 894

Renovation of Traditional Water Bodies

Re-excavation of Dilleswar Mahata's pond

Chandabila

Pukhuria

Dilleswar Mahata

1701.531 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pukhuria

1681.973 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pukhuria

1711.310 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pukhuria

kshitish Mahata'

1730.867 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pukhuria

Tapash Mahata

1719.133 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pukhuria

Sudhir Mahata

1691.752 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pukhuria

Jharna Mahata

1672.194 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of ramchandra Mahata's pond

Chandabila

Gokhurpal

Upparbankinala

ramchandra Mahata

1750.425 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Gokhurpal

Upparbankinala

1809.099 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1756.293 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1693.707 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1672.194 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Srihari Mahata

1680.017 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Raisole moorum pond.

Chandabila

1707.398 CU.M

21st Feb'14

Oct - May

Page 124: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

124/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1391 06 Chandabila 5 5/47 Re-excavation of Khenati pond pond. Raisole 48 406 P PL 1.66 - - 1.31 0.15 1.46 869

1392 06 Chandabila 5 5/48 Raisole 48 97 IL 1.83 - - 1.45 0.16 1.61 957

1393 06 Chandabila 5 5/49 Re-excavation of Uttam Mahata's pond. Raisole 48 81 IL 1.77 - - 1.40 0.16 1.56 929

1394 06 Chandabila 5 5/50 Re-excavation of Chalta pond pond. Raisole purnapani 87 88 P PL 1.72 - - 1.36 0.15 1.51 902

1395 06 Chandabila 5 5/51 Re-excavation of Sitala pond pond. Raisole Purnapani 87 227 P PL 1.69 - - 1.34 0.15 1.49 887

1396 06 Chandabila 5 5/52 Re-excavation of Mrinal Mahata's pond Pachakhali 51 48 IL 1.67 - - 1.32 0.15 1.47 876

1397 06 Chandabila 5 5/53 Khasjangle 53 49 IL 1.68 - - 1.33 0.15 1.48 880

1398 06 Chandabila 5 5/54 Re-excavation of Ananta Mahata's pond Tungadhua 54 147 IL 1.71 - - 1.35 0.15 1.50 894

1399 06 Chandabila 5 5/55 Re-excavation of surendra pond Khasjangle 53 49 IL 1.66 - - 1.31 0.15 1.46 869

1400 06 Chandabila 5 5/56 Re-excavation of abani and Mrinal pond Pachakhali 51 48 IL 1.83 - - 1.45 0.16 1.61 957

1401 06 Chandabila 5 5/57 Re-excavation of Surendra sukna pond Khasjangle 53 49 IL 1.77 - - 1.40 0.16 1.56 929

1402 06 Chandabila 5 5/58 Kashia Kashia 15 - IL 1.72 - - 1.36 0.15 1.51 902

1403 06 Chandabila 5 5/59 Kashia Kashia 15 - IL 1.74 - - 1.38 0.15 1.53 911

1404 06 Chandabila 5 5/60 Kashia Kashia 15 76 IL 1.76 - - 1.39 0.15 1.55 921

Renovation of Traditional Water Bodies

Chandabila

Nichubankinala

1660.459 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Susankar Mahata's pond.

Chandabila

Nichubankinala

Susankar Mahata

1828.656 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Nichubankinala

Uttam Mahata'

1773.895 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1723.044 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1693.707 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Tungadhua

Mrinal Mahata'

1672.194 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of Surendra Mahata's pond

Chandabila

Tungadhua

Surendra Mahata'

1680.017 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Tungadhua

Ananta Mahata

1707.398 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Tungadhua

surendra

1660.459 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Tungadhua

abani and Mrinal

1828.656 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Tungadhua

Surendra

1773.895 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Subhash Mahata

Chandabila

Subhash Mahata

1723.044 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Bhutunath Mahata

Chandabila

Bhutunath Mahata

1740.646 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Ramanath Mahata

Chandabila

Ramanath Mahata

1760.204 CU.M

21st Feb'14

Oct - May

Page 125: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

125/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1405 06 Chandabila 5 5/61 Kashia Kashia 15 - IL 1.83 - - 1.45 0.16 1.61 957

1406 06 Chandabila 5 5/62 Kashia Kashia 15 - IL 1.77 - - 1.40 0.16 1.56 929

1407 06 Chandabila 5 5/63 Re-excavation of Forest pond Kashia Kashia 15 - G PL 1.72 - - 1.36 0.15 1.51 902

1408 06 Chandabila 5 5/64 Kashia Gulfa 21 243 IL 1.69 - - 1.34 0.15 1.49 887

1409 06 Chandabila 5 5/65 Kashia Gulfa 21 108 IL 1.67 - - 1.32 0.15 1.47 876

1410 06 Chandabila 5 5/66 Kashia Gulfa 21 - IL 1.68 - - 1.33 0.15 1.48 880

1411 06 Chandabila 5 5/67 Kashia Katash 132 IL 1.71 - - 1.35 0.15 1.50 894

1412 06 Chandabila 5 5/68 Kashia Katash 50 IL 1.66 - - 1.31 0.15 1.46 869

1413 06 Chandabila 5 5/69 Kashia Katash 20 141 IL 1.83 - - 1.45 0.16 1.61 957

1414 06 Chandabila 5 5/70 Kashia Kashia - IL 1.77 - - 1.40 0.16 1.56 929

1415 06 Chandabila 5 5/71 Re-excavation of pond of Pratap Mahata Kashia Katash 20 - IL 1.76 - - 1.39 0.15 1.55 921

1416 06 Chandabila 5 5/72 Kashia Kashia - IL 1.83 - - 1.45 0.16 1.61 957

1417 06 Chandabila 5 5/73 Kashia Kashia 15 30 IL 1.77 - - 1.40 0.16 1.56 929

1418 06 Chandabila 5 5/74 Re-excavation of Panchyat pond Kashia Katash 20 101 G PL 1.72 - - 1.36 0.15 1.51 902

Renovation of Traditional Water Bodies

Re-excavation of pond of Dhiren Mahata

Chandabila

Dhiren Mahata

1828.656 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Debendra nath Mahata

Chandabila

Debendra nath Mahata

1773.895 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1723.044 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Chaityana Sing

Chandabila

Chaityana Sing

1693.707 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Satrughana Sing

Chandabila

Satrughana Sing

1672.194 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Jagannath Sing

Chandabila

Jagannath Sing

1680.017 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Subodh Murmu

Chandabila

Subodh Murmu

1707.398 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Paresh ch Mahata

Chandabila

Paresh ch Mahata

1660.459 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Madan Murmu

Chandabila

Madan Murmu

1828.656 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Santash Mahata

Chandabila

Santash Mahata

1773.895 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

Pratap Mahata

1760.204 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Gurucharan Mahata

Chandabila

Gurucharan Mahata

1828.656 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Re-excavation of pond of Biman Mahata

Chandabila

Biman Mahata

1773.895 CU.M

21st Feb'14

Oct - May

Renovation of Traditional Water Bodies

Chandabila

1723.044 CU.M

21st Feb'14

Oct - May

Page 126: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

126/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 103.08 11.67 114.75 68262

1419 06 Chandabila 6 Land Development 6/1 Land development at Pairavari Kashia Pairavari 22 P PL - 0.56 - 2.05 0.23 2.28 1356

1420 06 Chandabila 6 Land Development 6/2 Land levelling at Chandabila Bankata Chandabila 27 - P PL - 0.47 - 1.70 0.19 1.89 1126

1421 06 Chandabila 6 Land Development 6/3 Land levelling at Chandabila Hurhuri Chandabila 27 - P PL - 0.54 - 1.97 0.22 2.19 1305

1422 06 Chandabila 6 Land Development 6/4 Chandabila 27 - P PL - 0.68 - 2.47 0.27 2.75 1638

1423 06 Chandabila 6 Land Development 6/5 Chandabila 27 - G PL - 0.55 - 2.01 0.22 2.23 1331

1424 06 Chandabila 6 Land Development 6/6 Chandabila 27 - IL - 0.39 - 1.44 0.16 1.60 952

1425 06 Chandabila 6 Land Development 6/7 Chandabila 27 - IL - 0.41 - 1.50 0.17 1.67 993

1426 06 Chandabila 6 Land Development 6/8 Chandabila 27 - IL - 0.41 - 1.52 0.17 1.68 1003

1427 06 Chandabila 6 Land Development 6/9 Chandabila 27 - IL - 0.40 - 1.47 0.16 1.63 972

1428 06 Chandabila 6 Land Development 6/10 Chandabila 27 - IL - 0.41 - 1.49 0.17 1.66 988

1429 06 Chandabila 6 Land Development 6/11 Chandabila 27 - P PL - 0.43 - 1.58 0.18 1.75 1044

1430 06 Chandabila 6 Land Development 6/12 Murakati 28 - P PL - 0.59 - 2.16 0.24 2.40 1433

1431 06 Chandabila 6 Land Development 6/13 Land development at atheldiha Village Atheldiha 43 - P PL - 0.47 - 1.70 0.19 1.89 1126

Renovation of Traditional Water Bodies Total

Chandabila

1, 2, 3, 4, 6, 7, 8, 10, 131, 132, 63, 69, 72, 74, 75, 38, 43, 52, 11,

5, 116, 112, 106, 105, 102, 91, 162, 166, 83

10.65 Hect

21st Feb'14

Oct - May

Chandabila

Chandabila

5.45 Hect

21st Feb'14

Oct - May

Chandabila

Chandabila

4.87 Hect

21st Feb'14

Oct - May

Land levelling of Chandabila Bhanga Bandh

Chandabila

Chandabila

10.25 Hect

21st Feb'14

Oct - May

Land levelling of Upper side of Chandabila Pry. School

Chandabila

Chandabila

7.89 Hect

21st Feb'14

Oct - May

Earth filling of Bholanath Khilari's House land at Chandabila

Chandabila

Chandabila

Bholanath Khilari

5.25 Hect

21st Feb'14

Oct - May

Earth filling of Paresh Rana's House land at Chandabila

Chandabila

Chandabila

Paresh Rana

5.35 Hect

21st Feb'14

Oct - May

Earth filling of Amrit Mahata's House land at Chandabila

Chandabila

Chandabila

Amrit Mahata

5.23 Hect

21st Feb'14

Oct - May

Earth filling of Deben Mahata's House land at Chandabila

Chandabila

Chandabila

Deben Mahata'

5.75 Hect

21st Feb'14

Oct - May

Earth filling of Subimal Mahata's House land at Chandabila

Chandabila

Chandabila

Subimal Mahata'

5.45 Hect

21st Feb'14

Oct - May

Earth filling of Low land at Chandabila Rana Para

Chandabila

Chandabila

8.7 Hect

21st Feb'14

Oct - May

Land levelling at murakati and Chilimda mouja with 15 Nos. hume pipe

Chandabila

Chandabila

11.25 Hect

21st Feb'14

Oct - May

Chandabila

Chandabila

10.15 Hect

21st Feb'14

Oct - May

Page 127: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

127/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1432 06 Chandabila 6 Land Development 6/14 Land development at Neradihi Tapoban 31 P PL - 0.70 - 2.55 0.28 2.83 1689

1433 06 Chandabila 6 Land Development 6/15 Land development at Nedamahul Tapoban 31 P PL - 0.52 - 1.90 0.21 2.11 1259

1434 06 Chandabila 6 Land Development 6/16 Land development at Duegisole Tapoban 31 P PL - 0.55 - 2.01 0.22 2.23 1331

1435 06 Chandabila 6 Land Development 6/17 Land development at Patnigachhiya 30 P PL - 0.54 - 1.96 0.22 2.18 1300

1436 06 Chandabila 6 Land Development 6/18 Land development at Daskhinsat Tapoban 31 P PL - 0.56 - 2.05 0.23 2.28 1356

1437 06 Chandabila 6 Land Development 6/19 30 380, 384 G PL - 0.42 - 1.55 0.17 1.72 1024

1438 06 Chandabila 6 Land Development 6/20 Tapoban 31 488 IL - 0.41 - 1.48 0.16 1.65 983

1439 06 Chandabila 6 Land Development 6/21 Tapaban 31 488 IL - 0.40 - 1.47 0.16 1.63 972

1440 06 Chandabila 6 Land Development 6/22 Tapaban 31 488 IL - 0.39 - 1.44 0.16 1.60 952

Chandabila

Pathardahara

315/396,315/18,315/384,69,14,63,234,36,46,194,21,220,77,223,57,86,376,229,257,18,48,111,375,194,146,219,50,

484

15 Hect

21st Feb'14

Oct - May

Chandabila

Pathardahara

47 , 20, 75, 49,

129, 219,24,

240, 181, 204, 107, 217, 154, 165, 103, 194, 148

13 Hect

21st Feb'14

Oct - May

Chandabila

Pathardahara

315/489,315,490,315/370,315/384,484,3

15/348

12.35 Hect

21st Feb'14

Oct - May

Chandabila

Pathardahara

Pathardahara

7,15,36,130,120,77,23,22,249,76,75,24,19,20,58,59,63,21,27,2

8

11.55 Hect

21st Feb'14

Oct - May

Chandabila

Pathardahara

220, 221, 205, 280, 315/493, 228, 218, 219, 426, 485, 484,

293,

10.65 Hect

21st Feb'14

Oct - May

Earth Filling of I.C.J.C.K. Pry. School at Pathardahara

Chandabila

Pathardahara

Pathardahara

6.78 Hect

21st Feb'14

Oct - May

Land Development of Ledhra Mandi at Tapaban.

Chandabila

Pathardahara

Ledhra Mandi

5.75 Hect

21st Feb'14

Oct - May

Land Development of Mangal Mandi at Tapaban.

Chandabila

Pathardahara

Mangal Mandi

6.77 Hect

21st Feb'14

Oct - May

Land Development of Gurva Mandi at Tapaban.

Chandabila

Pathardahara

Gurva Mandi

7.35 Hect

21st Feb'14

Oct - May

Page 128: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

128/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1441 06 Chandabila 6 Land Development 6/23 Tapaban 31 488 IL - 0.39 - 1.43 0.16 1.59 949

1442 06 Chandabila 6 Land Development 6/24 Tapaban 31 386387 G PL - 0.48 - 1.75 0.19 1.94 1157

1443 06 Chandabila 6 Land Development 6/25 Land levelling of Balmiki asram parking Tapaban 31 147 G PL - 0.51 - 1.86 0.21 2.06 1229

1444 06 Chandabila 6 Land Development 6/26 Tapaban 31 - G PL - 0.41 - 1.51 0.17 1.67 998

1445 06 Chandabila 6 Land Development 6/27 Land Development ICJCK at Tapaban. Tapaban 31 380 G PL - 0.42 - 1.55 0.17 1.72 1024

1446 06 Chandabila 6 Land Development 6/28 Tapaban 31 G PL - 0.41 - 1.49 0.17 1.66 988

1447 06 Chandabila 6 Land Development 6/29 Tapaban 31 84/85 IL - 0.39 - 1.44 0.16 1.60 952

1448 06 Chandabila 6 Land Development 6/30 Tapaban 31 1 G PL - 0.68 - 2.47 0.27 2.74 1636

1449 06 Chandabila 6 Land Development 6/31 Telia Gorurghta 45 IL - 0.38 - 1.38 0.15 1.53 911

1450 06 Chandabila 6 Land Development 6/32 Telia Gorurghta 45 IL - 0.40 - 1.46 0.16 1.62 967

1451 06 Chandabila 6 Land Development 6/33 Telia Gorurghta 45 IL - 0.40 - 1.47 0.16 1.63 971

1452 06 Chandabila 6 Land Development 6/34 Telia Gorurghta 45 IL - 0.59 - 2.16 0.24 2.40 1433

1453 06 Chandabila 6 Land Development 6/35 Telia Gorurghta 45 IL - 0.41 - 1.51 0.17 1.67 998

1454 06 Chandabila 6 Land Development 6/36 Telia Gorurghta 45 - G PL - 0.45 - 1.65 0.18 1.84 1095

1455 06 Chandabila 6 Land Development 6/37 Telia Dulki 25 1 G PL - 0.39 - 1.43 0.16 1.59 947

1456 06 Chandabila 6 Land Development 6/38 Telia Dulki 25 - G PL - 0.38 - 1.39 0.15 1.55 921

1457 06 Chandabila 6 Land Development 6/39 Telia Telia 23 - G PL - 0.38 - 1.38 0.15 1.53 911

1458 06 Chandabila 6 Land Development 6/40 Land development of Sudhir Mahata Telia Telia 23 IL - 0.38 - 1.41 0.16 1.56 931

1459 06 Chandabila 6 Land Development 6/41 Telia Telia 23 IL - 0.37 - 1.34 0.15 1.49 891

Land Development of Mangal Mandi at Tapaban.

Chandabila

Pathardahara

Mangal Mandi

6.25 Hect

21st Feb'14

Oct - May

Land Development of Pathardahara pry. School ground

Chandabila

Pathardahara

5.44 Hect

21st Feb'14

Oct - May

Chandabila

Pathardahara

7.8 Hect

21st Feb'14

Oct - May

Land Development of Tapaban foot ball ground

Chandabila

Pathardahara

3.25 Hect

21st Feb'14

Oct - May

Chandabila

Pathardahara

5.21 Hect

21st Feb'14

Oct - May

Land development of Tapaban Football ground

Chandabila

Pathardahara

426, 323, 423,

4.87 Hect

21st Feb'14

Oct - May

Land Development of Rajen Mallick at Tapaban.

Chandabila

Pathardahara

Rajen Mallick

5.09 Hect

21st Feb'14

Oct - May

Earth filling of Balmiki Asram at Tapaban

Chandabila

Pathardahara

3.93 Hect

21st Feb'14

Oct - May

Land development of Jagen Mandi at Gorurghata

Chandabila

142, 122 , 112, 167,

Jagen Mandi

4.77 Hect

21st Feb'14

Oct - May

Land development of Lalo Mandi at Gorurghata

Chandabila

132 , 213, 127, 122,

111

Lalo Mandi

5.11 Hect

21st Feb'14

Oct - May

Land development of Nimai Mandi at Gorurghata

Chandabila

201 , 199, 76, 113,

119

Nimai Mandi

5.08 Hect

21st Feb'14

Oct - May

Land development of Nagen Mandi and 20 others at Gorurghata

Chandabila

84 , 85, 99, 204, 120, 77, 151 , 206

Nagen Mandi

7.87 Hect

21st Feb'14

Oct - May

Land development of Daman Saren at Gorurghata

Chandabila

185 , 124 ,148 , 160 , 175 ,

178

Daman Saren

4.33 Hect

21st Feb'14

Oct - May

Land development at Gorurghata Uttar Para I.C.D.S centre.

Chandabila

4.55 Hect

21st Feb'14

Oct - May

Land development of Dulki Football ground

Chandabila

5.12 Hect

21st Feb'14

Oct - May

Land Development of Dulki Paschim Para Football ground

Chandabila

4.97 Hect

21st Feb'14

Oct - May

Land development of telia football Ground

Chandabila

4.67 Hect

21st Feb'14

Oct - May

Chandabila

21 ,22 ,45 ,200

Sudhir Mahata

5.19 Hect

21st Feb'14

Oct - May

Land development of amchandra Mahata

Chandabila

78 ,.119 ,76

Amchandra Mahata

4.33 Hect

21st Feb'14

Oct - May

Page 129: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

129/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1460 06 Chandabila 6 Land Development 6/42 Land development of Dasarath Mahata Telia Kuldiha 24 IL - 0.40 - 1.46 0.16 1.62 967

1461 06 Chandabila 6 Land Development 6/43 Land development of Prafulla Mahata Telia Kuldiha 24 IL - 0.40 - 1.47 0.16 1.63 972

1462 06 Chandabila 6 Land Development 6/44 Land development of Sukul Murmu Telia Dulki 25 IL - 0.39 - 1.41 0.16 1.56 932

1463 06 Chandabila 6 Land Development 6/45 Telia Kuldiha 24 101 G PL - 0.39 - 1.43 0.16 1.59 947

1464 06 Chandabila 6 Land Development 6/46 Land development of Kunjamohan Sing Telia Kuldiha 24 IL - 0.38 - 1.39 0.15 1.55 921

1465 06 Chandabila 6 Land Development 6/47 Land development of Samay Murmu Telia Dulki 25 340 ,360 IL - 0.38 - 1.38 0.15 1.53 911

1466 06 Chandabila 6 Land Development 6/48 Gokhurpal 50 IL - 0.47 - 1.70 0.19 1.89 1126

1467 06 Chandabila 6 Land Development 6/49 Gokhurpal 50 151 to 377 IL - 0.54 - 1.97 0.22 2.19 1305

1468 06 Chandabila 6 Land Development 6/50 Gokhurpal 50 591 to 595 IL - 0.42 - 1.55 0.17 1.72 1024

1469 06 Chandabila 6 Land Development 6/51 Sananegui 49 208 to 219 IL - 0.47 - 1.70 0.19 1.89 1126

1470 06 Chandabila 6 Land Development 6/52 Sananegui 49 273 to 280 IL - 0.54 - 1.97 0.22 2.19 1305

1471 06 Chandabila 6 Land Development 6/53 Gokhurpal 50 171 to 180 IL - 0.42 - 1.55 0.17 1.72 1024

1472 06 Chandabila 6 Land Development 6/54 Gokhurpal 50 171 to 182 IL - 0.47 - 1.70 0.19 1.89 1126

1473 06 Chandabila 6 Land Development 6/55 Sananegui 49 IL - 0.54 - 1.97 0.22 2.19 1305

1474 06 Chandabila 6 Land Development 6/56 Sananegui 49 322 to 332 IL - 0.42 - 1.55 0.17 1.72 1024

1475 06 Chandabila 6 Land Development 6/57 Gokhurpal 50 378 to 400 IL - 0.47 - 1.70 0.19 1.89 1126

Chandabila

122 ,200 ,189 ,180

Dasarath Mahata

4.29 Hect

21st Feb'14

Oct - May

Chandabila

125 ,122 ,28

Prafulla Mahata

5.01 Hect

21st Feb'14

Oct - May

Chandabila

300 ,322 ,325

Sukul Murmu

5.41 Hect

21st Feb'14

Oct - May

Land development of talakuldiha Football Ground

Chandabila

5.12 Hect

21st Feb'14

Oct - May

Chandabila

320 ,322 ,323

Kunjamohan Sing

4.97 Hect

21st Feb'14

Oct - May

Chandabila

Samay Murmu

4.67 Hect

21st Feb'14

Oct - May

Land development of Tarani Mahata and 12 others

Chandabila

Gokhurpal

180 , 181 , 182, 183 , 184, 185 , 186 , 187 , 188, 189 , 190 , 191

to 229

Tarani Mahata

5.45 Hect

21st Feb'14

Oct - May

Land development of Satyaranjan Mahata and 12 others

Chandabila

Gokhurpal

Satyaranjan Mahata

4.87 Hect

21st Feb'14

Oct - May

Land development of Gopinath Mahata and 10 others

Chandabila

Gokhurpal

Gopinath Mahata

6.78 Hect

21st Feb'14

Oct - May

Land development of Ajit Khatua and 9 others

Chandabila

Gokhurpal

Ajit Khatua

7.45 Hect

21st Feb'14

Oct - May

Land development of Pulin Saren and 9 others

Chandabila

Gokhurpal

Pulin Saren

6.87 Hect

21st Feb'14

Oct - May

Land development of Banamali Mahata and 10 others

Chandabila

Gokhurpal

Banamali Mahata

6.78 Hect

21st Feb'14

Oct - May

Land development of Sadhu charan Mahata and 15 others

Chandabila

Gokhurpal

Sadhu charan Mahata

5.45 Hect

21st Feb'14

Oct - May

Land development of Naren Mahata and 5 others

Chandabila

Gokhurpal

1100 to 1104

Naren Mahata

4.87 Hect

21st Feb'14

Oct - May

Land development of Sibcharan Mahata and 5 others

Chandabila

Gokhurpal

Sibcharan Mahata

6.78 Hect

21st Feb'14

Oct - May

Land development of Murari Mahata and 15 others

Chandabila

Gokhurpal

Murari Mahata

7.45 Hect

21st Feb'14

Oct - May

Page 130: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

130/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1476 06 Chandabila 6 Land Development 6/58 Sananegui 49 306 to 318 IL - 0.54 - 1.97 0.22 2.19 1305

1477 06 Chandabila 6 Land Development 6/59 Gokhurpal 50 - G PL - 0.39 - 1.43 0.16 1.59 947

1478 06 Chandabila 6 Land Development 6/60 Gokhurpal 50 IL - 0.38 - 1.39 0.15 1.55 921

1479 06 Chandabila 6 Land Development 6/61 Land development of Samanta Saren 47 170 to 175 IL - 0.38 - 1.38 0.15 1.53 911

1480 06 Chandabila 6 Land Development 6/62 Land development of Kandru Hansda 47 147 to 156 IL - 0.38 - 1.41 0.16 1.56 931

1481 06 Chandabila 6 Land Development 6/63 Land development of Jaral Danga 47 IL - 0.37 - 1.34 0.15 1.49 891

1482 06 Chandabila 6 Land Development 6/64 47 45 G PL - 0.40 - 1.46 0.16 1.62 967

1483 06 Chandabila 6 Land Development 6/65 Pukhuria 46 180 G PL - 0.47 - 1.70 0.19 1.89 1126

1484 06 Chandabila 6 Land Development 6/66 Pukhuria 46 180 G PL - 0.54 - 1.97 0.22 2.19 1305

1485 06 Chandabila 6 Land Development 6/67 Pukhuria 46 822 IL - 0.41 - 1.48 0.16 1.65 983

1486 06 Chandabila 6 Land Development 6/68 Land development of Buri Ahar Pukhuria 46 192 P PL - 0.40 - 1.47 0.16 1.63 972

1487 06 Chandabila 6 Land Development 6/69 47 45 G PL - 0.39 - 1.44 0.16 1.60 952

1488 06 Chandabila 6 Land Development 6/70 Land development of Sharna Paira Pukhuria 46 345 IL - 0.39 - 1.43 0.16 1.59 949

1489 06 Chandabila 6 Land Development 6/71 Raisole 48 246 IL - 0.39 - 1.41 0.16 1.56 932

1490 06 Chandabila 6 Land Development 6/72 Raisole 48 273 G PL - 0.39 - 1.43 0.16 1.59 947

1491 06 Chandabila 6 Land Development 6/73 Land development of Kangali Mahata Pachakhali 51 IL - 0.38 - 1.39 0.15 1.55 921

1492 06 Chandabila 6 Land Development 6/74 Pachakhali 51 IL - 0.38 - 1.38 0.15 1.53 911

1493 06 Chandabila 6 Land Development 6/75 Land development of Nitai Mahata Pachakhali 51 8 to 12 IL - 0.39 - 1.43 0.16 1.59 947

Land development of Paresh mukhi and 5 others

Chandabila

Gokhurpal

Paresh mukhi

6.87 Hect

21st Feb'14

Oct - May

Land development of Gokhurpal foot Ground

Chandabila

Gokhurpal

5.12 Hect

21st Feb'14

Oct - May

Land development of Jhareswar Mahata and 3 others

Chandabila

Gokhurpal

403 to 410 , 282 to 286 ,

516 to 520

Jhareswar Mahata

4.97 Hect

21st Feb'14

Oct - May

Chandabila

Pukhuria

Upparbankinala

Samanta Saren

4.67 Hect

21st Feb'14

Oct - May

Chandabila

Pukhuria

Upparbankinala

Kandru Hansda

5.19 Hect

21st Feb'14

Oct - May

Chandabila

Pukhuria

Upparbankinala

40 to 43 , 53 to 56

Jaral Danga

4.33 Hect

21st Feb'14

Oct - May

Land development of Upparbankinala SSK

Chandabila

Pukhuria

Upparbankinala

4.29 Hect

21st Feb'14

Oct - May

Land development of Pukhuria pry. School

Chandabila

Pukhuria

7.45 Hect

21st Feb'14

Oct - May

Land development of Pukhuria Upper pry. School

Chandabila

Pukhuria

6.87 Hect

21st Feb'14

Oct - May

Land development of Ramchandra Mahata

Chandabila

Pukhuria

Ramchandra Mahata

5.75 Hect

21st Feb'14

Oct - May

Chandabila

Pukhuria

6.77 Hect

21st Feb'14

Oct - May

Land development of female football ground

Chandabila

Pukhuria

Upparbankinala

7.35 Hect

21st Feb'14

Oct - May

Chandabila

Pukhuria

Sharna Paira

6.25 Hect

21st Feb'14

Oct - May

Land development at Balaram Mahata's land

Chandabila

Nichubankinala

Balaram Mahata

5.41 Hect

21st Feb'14

Oct - May

Land development at Nichubankinala SSK

Chandabila

Nichubankinala

5.12 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

23 to 26, 30

Kangali Mahata

4.97 Hect

21st Feb'14

Oct - May

Land development of satyaranjan Mahata

Chandabila

Tungadhua

23 to 26, 30

satyaranjan Mahata

4.67 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Nitai Mahata

5.12 Hect

21st Feb'14

Oct - May

Page 131: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

131/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1494 06 Chandabila 6 Land Development 6/76 Pachakhali 51 8 to 12 IL - 0.38 - 1.39 0.15 1.55 921

1495 06 Chandabila 6 Land Development 6/77 Pachakhali 51 IL - 0.38 - 1.38 0.15 1.53 911

1496 06 Chandabila 6 Land Development 6/78 Land development of Kangali Mahata Pachakhali 51 - IL - 0.38 - 1.41 0.16 1.56 931

1497 06 Chandabila 6 Land Development 6/79 Land development of Abani Mahata Pachakhali 51 48, 49, 57 IL - 0.37 - 1.34 0.15 1.49 891

1498 06 Chandabila 6 Land Development 6/80 Land development of Mrinal Mahata Pachakhali 51 48, 49, 57 IL - 0.40 - 1.46 0.16 1.62 967

1499 06 Chandabila 6 Land Development 6/81 Land development of Bikash Sing Khasjangle 53 IL - 0.39 - 1.43 0.16 1.59 947

1500 06 Chandabila 6 Land Development 6/82 Land development of Gurucharan Sing Khasjangle 53 IL - 0.20 - 1.39 0.15 1.55 921

1501 06 Chandabila 6 Land Development 6/83 Pachakhali 51 51, 71, 69 IL - 0.20 - 1.38 0.15 1.53 911

1502 06 Chandabila 6 Land Development 6/84 Pachakhali 51 75, 71, 69 IL - 0.21 - 1.41 0.16 1.56 931

1503 06 Chandabila 6 Land Development 6/85 Land development of Anil Mahata Pachakhali 51 3, 44, 45 IL - 0.20 - 1.34 0.15 1.49 891

1504 06 Chandabila 6 Land Development 6/86 Land development of Gouranga Mahata Pachakhali 51 3, 44, 45 IL - 0.21 - 1.46 0.16 1.62 967

1505 06 Chandabila 6 Land Development 6/87 Land development of Mangal Mahata Pachakhali 51 IL - 0.41 - 1.48 0.16 1.65 983

1506 06 Chandabila 6 Land Development 6/88 Land development of Danardan Mahata Pachakhali 51 3,44, 45, 5 IL - 0.40 - 1.47 0.16 1.63 972

1507 06 Chandabila 6 Land Development 6/89 Land development of Kailash Mahata Pachakhali 51 3, 44, 47 IL - 0.39 - 1.44 0.16 1.60 952

1508 06 Chandabila 6 Land Development 6/90 Land development of Kedar Mahata Pachakhali 51 3, 44, 47 IL - 0.39 - 1.43 0.16 1.59 949

1509 06 Chandabila 6 Land Development 6/91 Khasjangle 53 46 G PL - 0.20 - 1.39 0.15 1.55 921

1510 06 Chandabila 6 Land Development 6/92 Land development of Asit Mahata Tungadhua 54 IL - 0.20 - 1.38 0.15 1.53 911

Land development of Gouranga mohan Mahata

Chandabila

Tungadhua

Gouranga mohan Mahata

4.97 Hect

21st Feb'14

Oct - May

Land development of Mrityunjay Mahata

Chandabila

Tungadhua

16, 17, 18, 13

Mrityunjay Mahata

4.67 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Kangali Mahata

5.19 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Abani Mahata

4.33 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Mrinal Mahata

4.29 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

63, 64, 65, 70

Bikash Sing

5.12 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

63, 64, 65, 70

Gurucharan Sing

4.97 Hect

21st Feb'14

Oct - May

Land development of Kalicharan Mahata

Chandabila

Tungadhua

Kalicharan Mahata

4.67 Hect

21st Feb'14

Oct - May

Land development of Hemchandra Mahata

Chandabila

Tungadhua

Hemchandra Mahata

5.19 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Anil Mahata

4.33 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Gouranga Mahata

4.29 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

3, 44, 45, 5

Mangal Mahata

5.75 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Danardan Mahata

6.77 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Kailash Mahata

7.35 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Kedar Mahata

6.25 Hect

21st Feb'14

Oct - May

Land development of football ground at Khasjangle

Chandabila

Tungadhua

4.97 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

6,33,34, 55, 54, 35

Asit Mahata

4.67 Hect

21st Feb'14

Oct - May

Page 132: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

132/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1511 06 Chandabila 6 Land Development 6/93 Land development of Kanu sing Tungadhua 54 49, 50 IL - 0.21 - 1.41 0.16 1.56 931

1512 06 Chandabila 6 Land Development 6/94 Land development of Naren Mahata Tungadhua 54 IL - 0.20 - 1.34 0.15 1.49 891

1513 06 Chandabila 6 Land Development 6/95 Land development of Parikshit Mahata Tungadhua 54 IL - 0.21 - 1.46 0.16 1.62 967

1514 06 Chandabila 6 Land Development 6/96 Land development of Kangali Mahata Tungadhua 54 129 to 134 IL - 0.39 - 1.43 0.16 1.59 947

1515 06 Chandabila 6 Land Development 6/97 Land development of Bulu Mahata Tungadhua 54 129 to 133 IL - 0.38 - 1.39 0.15 1.55 921

1516 06 Chandabila 6 Land Development 6/98 Land development of Surendra Mahata Tungadhua 54 129 to 135 IL - 0.38 - 1.38 0.15 1.53 911

1517 06 Chandabila 6 Land Development 6/99 Land development of asit Mahata Khasjangle 5.3 66 IL - 0.38 - 1.41 0.16 1.56 931

1518 06 Chandabila 6 Land Development 6/100 Khasjangle 53 60 to 63 IL - 0.37 - 1.34 0.15 1.49 891

1519 06 Chandabila 6 Land Development 6/101 Land development of Abani and Mrinal Pachakhali 51 48 IL - 0.40 - 1.46 0.16 1.62 967

1520 06 Chandabila 6 Land Development 6/102 Khasjangle 53 IL - 0.47 - 1.70 0.19 1.89 1126

1521 06 Chandabila 6 Land Development 6/103 Khasjangle 53 77 IL - 0.38 - 1.38 0.15 1.53 911

1522 06 Chandabila 6 Land Development 6/104 Khasjangle 53 33/28 IL - 0.38 - 1.41 0.16 1.56 931

1523 06 Chandabila 6 Land Development 6/105 Tungadhua 54 IL - 0.43 - 1.57 0.17 1.75 1042

1524 06 Chandabila 6 Land Development 6/106 Tungadhua 54 6, 28/196 IL - 0.40 - 1.46 0.16 1.62 967

1525 06 Chandabila 6 Land Development 6/107 Land development of Ananda Mahata Tungadhua 54 30/31 IL - 0.41 - 1.54 0.17 1.71 1019

1526 06 Chandabila 6 Land Development 6/108 Land development at Tungadhua Tungadhua 54 P PL - 0.47 - 1.70 0.19 1.89 1126

Chandabila

Tungadhua

Kanu sing

5.19 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

129 to 133, 135

Naren Mahata

4.33 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

129 to 133, 135

Parikshit Mahata

4.29 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Kangali Mahata

5.12 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Bulu Mahata

4.97 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Surendra Mahata

4.67 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Asit Mahata

5.19 Hect

21st Feb'14

Oct - May

Land development of Ananta Mahata and 6 others

Chandabila

Tungadhua

Ananta Mahata

4.33 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Abani and Mrinal

4.29 Hect

21st Feb'14

Oct - May

Land development of Dukhuram Mahata and Bikas Sing

Chandabila

Tungadhua

71, 72, 73, 75, 61, 79

Dukhuram Mahata and Bikas Sing

7.45 Hect

21st Feb'14

Oct - May

Land development of sankar Mahta and 3 others

Chandabila

Tungadhua

sankar Mahta

4.67 Hect

21st Feb'14

Oct - May

Land development of Hemchandra Mahata and 2 others

Chandabila

Tungadhua

Hemchandra Mahata

5.19 Hect

21st Feb'14

Oct - May

Land development of Khagen Mahta and 3 others

Chandabila

Tungadhua

17, 21, 22, 24, 26, 32,

33, 34

Khagen Mahta

4.33 Hect

21st Feb'14

Oct - May

Land development of Tapan Mahata and 2 others

Chandabila

Tungadhua

Tapan Mahata

4.29 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

Ananda Mahata

7.45 Hect

21st Feb'14

Oct - May

Chandabila

Tungadhua

96, 94, 192, 193, 195, 198, 190, 185

7.45 Hect

21st Feb'14

Oct - May

Page 133: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

133/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1527 06 Chandabila 6 Land Development 6/109 Kashia Gulfa 21 367 G PL - 0.41 - 1.48 0.16 1.65 983

1528 06 Chandabila 6 Land Development 6/110 Kashia Katash 20 213 G PL - 0.40 - 1.47 0.16 1.63 972

1529 06 Chandabila 6 Land Development 6/111 Kashia Kadokotha 19 436 G PL - 0.39 - 1.44 0.16 1.60 952

1530 06 Chandabila 6 Land Development 6/112 Kashia Kashia 15 272 G PL - 0.39 - 1.43 0.16 1.59 949

1531 06 Chandabila 6 Land Development 6/113 Kashia Kadokotha 19 227 G PL - 0.20 - 1.39 0.15 1.55 921

1532 06 Chandabila 6 Land Development 6/114 Earth fillinh of pry. School at Katash Kashia Katash 20 71 G PL - 0.20 - 1.38 0.15 1.53 911

1533 06 Chandabila 6 Land Development 6/115 Land development at Kadokotha Kashia Kadokotha 19 P PL - 0.52 - 1.90 0.21 2.11 1259

1534 06 Chandabila 6 Land Development 6/116 Land development at Katash Kashia Katash 20 P PL - 0.55 - 2.01 0.22 2.23 1331

Land development of foot ball ground at Gulfa

Chandabila

5.75 Hect

21st Feb'14

Oct - May

Land development of foot ball ground at Katash

Chandabila

6.77 Hect

21st Feb'14

Oct - May

Land development of foot ballground at Kadokhata

Chandabila

7.35 Hect

21st Feb'14

Oct - May

Land development of foot ballground at Kashia

Chandabila

6.25 Hect

21st Feb'14

Oct - May

Earth fillinh of pry. School at Kadokhata

Chandabila

4.97 Hect

21st Feb'14

Oct - May

Chandabila

4.67 Hect

21st Feb'14

Oct - May

Chandabila

45, 50, 43, 129, 35, 54, 62,

225, 340, 256,

270/392, 257, 305,

272

13 Hect

21st Feb'14

Oct - May

Chandabila

320, 325, 213, 220, 227/226, 5, 7, 141, 142, 145,

1/489, 347, 276, 213/354, 123, 124, 125, 126, 127, 159, 160, 161, 162, 44,

45, 46, 47, 48, 49, 50, 180, 181, 182, 184, 213, 302,

154

12.35 Hect

21st Feb'14

Oct - May

Page 134: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

134/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1535 06 Chandabila 6 Land Development 6/117 Land development at Kashia Kashia Kashia 15 P PL - 0.54 - 1.96 0.22 2.18 1300

1536 06 Chandabila 6 Land Development 6/118 Kashia Kashia 15 IL - 0.52 - 2.03 0.23 2.25 1343

1537 06 Chandabila 6 Land Development 6/119 Chilimda 29 204, 205, IL - 0.55 - 2.12 0.24 2.36 1405

1538 06 Chandabila 6 Land Development 6/120 Ground filling at Swapan Mahata Chandabila 27 298 IL - 0.38 - 2.06 0.69 2.75 1365

- - - 190.37 21.61 211.98 126070

1539 06 Chandabila 7 7/1 Chandabila 27 172 to 190 G PL - - 0.90 3.64 1.21 4.85 2408

1540 06 Chandabila 7 7/2 Murakati 28 - P PL - - 0.33 0.90 1.67 2.57 595

Chandabila

15, 172, 335, 255, 231, 157, 251, 454, 330, 251, 351, 315, 28, 29, 70, 10, 256, 490, 16, 5/496,

262, 236, 11/498,

210, 238, 384, 329, 374, 431, 506, 62, 126, 162,

163, 92/435, 17, 28,5, 15, 266, 435/426, 65, 66,

189/476, 240, 279, 375, 376, 377, 378, 1, 2, 3, 4,

5

11.55 Hect

21st Feb'14

Oct - May

Land development at Hiren Mahata ( Gandhi Mahata )

Chandabila

27, 28, 164, 166, 170, 173, 174, 174,

177, 162,160,

Hiren Mahata ( Gandhi Mahata )

13 Hect

21st Feb'14

Oct - May

Land development at Janmenjoy Mahata Chandabila

Chandabila

Janmenjoy Mahata

12.35 Hect

21st Feb'14

Oct - May

Chandabila

Chandabila

Swapan Mahata

4.97 Hect

21st Feb'14

Oct - May

Land Development TotalFlood Control & Protecation

Const. of drain at the East side of Chandabila pitch road

Chandabila

Chandabila

0.9 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of guard wall at upper place of Murakati Village

Chandabila

Chandabila

0.33 k.m

21st Feb'14

Dec - April

Page 135: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

135/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1541 06 Chandabila 7 7/3 Atheldiha 43 - P PL - - 0.45 1.05 2.23 3.28 696

1542 06 Chandabila 7 7/4 30 149 G PL - - 0.29 0.98 2.47 3.44 646

1543 06 Chandabila 7 7/5 Const. of guard wall at Nimbandh 30 147 G PL - - 2.85 0.90 2.07 2.97 597

1544 06 Chandabila 7 7/6 Const.of gurd wall at Mahabandh 30 129 ,130 G PL - - 0.32 0.64 1.97 2.60 423

1545 06 Chandabila 7 7/7 Tapoban 31 291 P IL - - 0.45 1.07 2.23 3.29 706

1546 06 Chandabila 7 7/8 Tapoban 31 257 , 289 P IL - - 0.31 0.98 2.47 3.45 651

1547 06 Chandabila 7 7/9 Tapoban 31 - P PL - - 0.56 1.50 4.05 5.55 994

1548 06 Chandabila 7 7/10 Gokhurpal 50 - P PL - - 0.50 0.90 2.47 3.37 597

1549 06 Chandabila 7 7/11 Const. of drain at Bera para Pukhuria 46 - P PL - - 0.28 0.87 1.87 2.75 577

1550 06 Chandabila 7 7/12 Const. of drain at Pukhuria Club Pukhuria 46 180 to 182 P PL - - 0.30 0.86 2.07 2.94 572

1551 06 Chandabila 7 7/13 Const. of drain at Paria Pukhuria 46 P PL - - 0.25 1.93 0.64 2.57 1278

1552 06 Chandabila 7 7/14 Const. of culvert at Murali Khal Pukhuria 46 - P PL - - 0.01 0.90 2.27 3.17 597

1553 06 Chandabila 7 7/15 Const. of culvert at Daharasole 47 - P PL - - 0.01 0.80 2.17 2.97 527

1554 06 Chandabila 7 7/16 Const. of culvert at Upparbankinala 47 - P PL - - 0.01 0.81 2.17 2.98 537

1555 06 Chandabila 7 7/17 Const. of Guard wall at Sadarghat Pukhuria 46 63 P PL - - 0.30 0.89 2.07 2.97 592

1556 06 Chandabila 7 7/18 Pukhuria 46 345 P PL - - 0.32 0.92 2.22 3.14 606

1557 06 Chandabila 7 7/19 Pukhuria 46 - P PL - - 0.11 0.94 1.48 2.42 621

1558 06 Chandabila 7 7/20 Repair of Sluich gate at Pukhuria Pukhuria 46 - P PL - - 0.25 0.87 1.73 2.60 577

1559 06 Chandabila 7 7/21 Const. of Drain at Raisole Daskhin Para. Raisole Raisole 86 - P PL - - 1.00 2.23 0.74 2.97 1477 1 k.m

1560 06 Chandabila 7 7/22 Raisole 48 - P PL - - 1.20 0.95 2.22 3.17 626

1561 06 Chandabila 7 7/23 Tungadhua 54 41 P PL - - 0.01 0.89 1.97 2.87 592

1562 06 Chandabila 7 7/24 Kashia Kashia 15 - G PL - - 1.20 1.01 2.52 3.52 666

1563 06 Chandabila 7 7/25 Kashia pairabhari 22 - G PL - - 0.35 1.50 1.87 3.37 994

Flood Control & Protecation

Const. of guard wall at Atheldiha village road with hume pipe

Chandabila

Chandabila

0.45 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of Culvert & guard wall at Kumbandh

Chandabila

Pathardahara

Pathardahara

0.29 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pathardahara

Pathardahara

2.85 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pathardahara

Pathardahara

0.32 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of guard wall atTapoban(Barat Sing)

Chandabila

Pathardahara

0.453 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of guard wall& culvert at Tapoban(Satyen Sing)

Chandabila

Pathardahara

0.31 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of Guard wall at Tapaban Balmiki Asram

Chandabila

Pathardahara

0.560 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of concreat drain at Both side of Gokhurpal and Sananegui road

Chandabila

Gokhurpal

0.5 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pukhuria

0.275 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pukhuria

0.3 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pukhuria

313 to canal

0.25 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pukhuria

0.013 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pukhuria

Upparbankinala

0.01 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pukhuria

Upparbankinala

0.01 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pukhuria

0.3 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of Guard wall at Pukhuria ( Sarna Paria's land)

Chandabila

Pukhuria

0.32 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of Sluich gate on Muralikhal at Nimaiburi

Chandabila

Pukhuria

0.11 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

Pukhuria

0.25 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Chandabila

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of Drain from Sujit Mahata's house to Matilal Mahata's house.

Chandabila

Nichubankinala

1.2 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of culvert at Tungadhua (Gurucharan Sing land)

Chandabila

Tungadhua

0.012 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of road side drain of Kashia to Pairabhari

Chandabila

1.2 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of guard wall and filling at pairabhari ( irrigation bandh)

Chandabila

0.35 k.m

21st Feb'14

Dec - April

Page 136: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

136/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1564 06 Chandabila 7 7/26 Kashia Kashia 15 - G PL - - 0.10 1.02 2.47 3.49 676

1565 06 Chandabila 7 7/27 Chandabila 27 172 to 190 G PL - - 1.50 2.04 4.44 6.48 1348

- - - 31.97 57.76 89.73 21174

1566 06 Chandabila 8 Rural Connectivity 8/1 Chandabila 27 - P PL - - 0.50 1.32 1.23 2.55 877

1567 06 Chandabila 8 Rural Connectivity 8/2 Repair of Chandabila Dahar road Chandabila 27 - P PL - - 4.00 1.31 1.48 2.78 865 4 K.M

1568 06 Chandabila 8 Rural Connectivity 8/3 Chandabila 27 - P PL - - 1.00 3.02 12.09 15.12 2002 1 K.M

1569 06 Chandabila 8 Rural Connectivity 8/4 Chandabila 27 - P PL - - 6.00 2.74 3.35 6.10 1816 6 K.M

1570 06 Chandabila 8 Rural Connectivity 8/5 Chandabila 27 - P PL - - 1.50 1.41 2.07 3.48 931

1571 06 Chandabila 8 Rural Connectivity 8/6 Chandabila 27 - P PL - - 1.25 1.31 1.18 2.49 865

1572 06 Chandabila 8 Rural Connectivity 8/7 Chandabila 27 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1573 06 Chandabila 8 Rural Connectivity 8/8 Murakati 28 - P PL - - 0.80 2.82 11.30 14.12 1870

1574 06 Chandabila 8 Rural Connectivity 8/9 Murakati 28 - P PL - - 1.00 1.30 1.72 3.02 860 1 K.M

1575 06 Chandabila 8 Rural Connectivity 8/10 Murakati 28 - P PL - - 1.20 1.31 1.63 2.93 865

1576 06 Chandabila 8 Rural Connectivity 8/11 Atheldiha 43 - P PL - - 0.70 2.70 10.81 13.51 1790

1577 06 Chandabila 8 Rural Connectivity 8/12 Chandabila 27 - P PL - - 0.50 1.25 2.22 3.47 825

1578 06 Chandabila 8 Rural Connectivity 8/13 30 - P PL - - 1.50 1.41 2.07 3.48 931

1579 06 Chandabila 8 Rural Connectivity 8/14 Const. of Tapaban Lodhapara road Tapaban 31 - P PL - - 1.25 1.31 1.18 2.49 865

1580 06 Chandabila 8 Rural Connectivity 8/15 30 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1581 06 Chandabila 8 Rural Connectivity 8/16 30 - P PL - - 0.90 1.25 2.22 3.47 825

Flood Control & Protecation

Exction. of road side culvert of Kashia ( irrigation bandh)

Chandabila

0.1 k.m

21st Feb'14

Dec - April

Flood Control & Protecation

Const. of drain from Chandabila to Athaldiha

Chandabila

Chandabila

1.5 k.m

21st Feb'14

Dec - April

Flood Control & Protecation Total

Const. o f road from Chandabila Nichupara village road to Pond.

Chandabila

Chandabila

0.5 K.M

21st Feb'14

April - March

Chandabila

Chandabila

21st Feb'14

April - March

Const. o f Chandabila village road with concreat cannal and culvert

Chandabila

Chandabila

21st Feb'14

April - March

Repair of road from Chandabila to Barsole with moorum

Chandabila

Chandabila

21st Feb'14

April - March

Const. of road from pitch road to New pond at Chandabila Manapara with earth work moorum and culvert

Chandabila

Chandabila

1.5 K.M

21st Feb'14

April - March

Repair of road from shop of Shakti to Rana Para

Chandabila

Chandabila

1.25 K.M

21st Feb'14

April - March

Repair of road from Chandabila Paschim Para to Chilimda Pitch road with culvert and guide Bandh

Chandabila

Chandabila

21st Feb'14

April - March

Const. of road from Santosh Mahata's house to Lalmohan Mahata's house with concreat Palaster.

Chandabila

Chandabila

0.8 K.M

21st Feb'14

April - March

Const. of road from Santosh Mahata's house to Forest pond with moorum and culvert.

Chandabila

Chandabila

21st Feb'14

April - March

Const. of road from Murakati Chhak to Lalmohan Mahata's house with moorum and culvert

Chandabila

Chandabila

1.2 K.M

21st Feb'14

April - March

Const of road from Atheldiha Club to Pitch rpoad with concreat plaster and both side drain

Chandabila

Chandabila

0.7 K.M

21st Feb'14

April - March

Repair of road at Chandabila Das para with moorum culvert and Drain.

Chandabila

Chandabila

0.5 K.M

21st Feb'14

April - March

Const. of road from amtala to Pathardahara Bandh

Chandabila

Pathardahara

Pathardahara

1.5 K.M

21st Feb'14

April - March

Chandabila

Pathardahara

1.25 K.M

21st Feb'14

April - March

Const. of road from Hari Mandir to Katasot Pathardhara

Chandabila

Pathardahara

Pathardahara

21st Feb'14

April - March

Const. of road fro Jugnichhara to Neradihi

Chandabila

Pathardahara

Pathardahara

0.9 K.M

21st Feb'14

April - March

Page 137: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

137/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1582 06 Chandabila 8 Rural Connectivity 8/17 Const. of road from Kashighasia to Mat 30 - P PL - - 1.50 1.41 2.07 3.48 931

1583 06 Chandabila 8 Rural Connectivity 8/18 Tapaban 31 - P PL - - 1.25 1.31 1.18 2.49 865

1584 06 Chandabila 8 Rural Connectivity 8/19 Tapaban 31 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1585 06 Chandabila 8 Rural Connectivity 8/20 Const. of Gaidahar Culvert Tapaban 31 - P PL - - 1.50 1.41 2.07 3.48 931

1586 06 Chandabila 8 Rural Connectivity 8/21 30 - P PL - - 1.25 1.31 1.18 2.49 865

1587 06 Chandabila 8 Rural Connectivity 8/22 Tapaban 31 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1588 06 Chandabila 8 Rural Connectivity 8/23 Tapaban 31 - P PL - - 1.00 1.25 2.22 3.47 825 1 K.M

1589 06 Chandabila 8 Rural Connectivity 8/24 Tapaban 31 - P PL - - 1.50 1.41 2.07 3.48 931

1590 06 Chandabila 8 Rural Connectivity 8/25 Tapaban 31 - P PL - - 1.25 1.31 1.18 2.49 865

1591 06 Chandabila 8 Rural Connectivity 8/26 Tapaban 31 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1592 06 Chandabila 8 Rural Connectivity 8/27 Telia Dulki 25 - P PL - - 0.80 1.25 2.22 3.47 825

1593 06 Chandabila 8 Rural Connectivity 8/28 Telia Kuldiha 24 - P PL - - 1.50 1.41 2.07 3.48 931

1594 06 Chandabila 8 Rural Connectivity 8/29 Telia Dulki 24 - P PL - - 1.25 1.31 1.18 2.49 865

1595 06 Chandabila 8 Rural Connectivity 8/30 Telia Gorurghata 45 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1596 06 Chandabila 8 Rural Connectivity 8/31 Telia Kuldiha 24 - P PL - - 1.50 1.41 2.07 3.48 931

1597 06 Chandabila 8 Rural Connectivity 8/32 Telia Kuldiha 24 - P PL - - 1.25 2.25 1.18 3.43 1491

1598 06 Chandabila 8 Rural Connectivity 8/33 Telia Kuldiha 24 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1599 06 Chandabila 8 Rural Connectivity 8/34 Telia Kuldiha 24 - P PL - - 1.00 1.25 2.22 3.47 825 1 K.M

1600 06 Chandabila 8 Rural Connectivity 8/35 Telia Dulki 25 - P PL - - 1.50 1.41 2.07 3.48 931

1601 06 Chandabila 8 Rural Connectivity 8/36 Telia Dulki 25 - P PL - - 0.50 1.25 2.22 3.47 825

1602 06 Chandabila 8 Rural Connectivity 8/37 Telia Dulki 25 - P PL - - 1.50 1.41 2.07 3.48 931

1603 06 Chandabila 8 Rural Connectivity 8/38 Repair of Telia village road with culvert Telia Telia 23 - P PL - - 1.25 1.31 1.18 2.49 865

Chandabila

Pathardahara

Pathardahara

1.5 K.M

21st Feb'14

April - March

Const. of road from Tapaban Chak to Balmiki Temple

Chandabila

Pathardahara

1.25 K.M

21st Feb'14

April - March

Const. of road from Challata Tala to Pokachab with culvert

Chandabila

Pathardahara

21st Feb'14

April - March

Chandabila

Pathardahara

1.5 K.M

21st Feb'14

April - March

Const. of road from Upper land to Durgisole

Chandabila

Pathardahara

Pathardahara

1.25 K.M

21st Feb'14

April - March

Repair of road from Chandabila Hospital to Tapaban Barsoloe .

Chandabila

Pathardahara

21st Feb'14

April - March

Repair of Tapaban Barsole road with 3 Nos culvert.

Chandabila

Pathardahara

21st Feb'14

April - March

Repair of road from cultivation field to Tapaban village.

Chandabila

Pathardahara

1.5 K.M

21st Feb'14

April - March

Const. of road from Mandi para to Lodha para.

Chandabila

Pathardahara

1.25 K.M

21st Feb'14

April - March

Const .of road from Mandi Para to Tapaban Mandir

Chandabila

Pathardahara

21st Feb'14

April - March

Repair of Dulki village road with culvert Chandabila

0.8 K.M

21st Feb'14

April - March

Repair of Kuldiha to Dulki road with culvert

Chandabila

1.5 K.M

21st Feb'14

April - March

Repair of Dulki to Orissaborder road with culvert

Chandabila

1.25 K.M

21st Feb'14

April - March

Repair of Gorurghata to Orissaborder road. with culvert

Chandabila

21st Feb'14

April - March

Const. of road from orissa Border to Talakuldiha with culvert

Chandabila

1.5 K.M

21st Feb'14

April - March

Const. of road from Kuldiha to Sadharghat with culvert

Chandabila

1.25 K.M

21st Feb'14

April - March

Repair of road from Talakuldiha to Orissa border with culvert

Chandabila

21st Feb'14

April - March

Const. of road from Talakuldiha to Gulfa with culvert

Chandabila

21st Feb'14

April - March

Repair of Dulki Paschim Para village road with culvert

Chandabila

1.5 K.M

21st Feb'14

April - March

Repair of Telia to Dulki road with earth work and moorum

Chandabila

0.5 K.M

21st Feb'14

April - March

Repair of Kuldiha to Dulki Paschim Para road with earth work and moorum

Chandabila

1.5 K.M

21st Feb'14

April - March

Chandabila

1.25 K.M

21st Feb'14

April - March

Page 138: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

138/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1604 06 Chandabila 8 Rural Connectivity 8/39 Telia Telia 23 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1605 06 Chandabila 8 Rural Connectivity 8/40 Telia Telia 23 - P PL - - 2.00 1.25 2.22 3.47 825 2 K.M

1606 06 Chandabila 8 Rural Connectivity 8/41 Narda 42 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1607 06 Chandabila 8 Rural Connectivity 8/42 Gokhurpal 50 - P PL - - 0.90 1.25 2.22 3.47 825

1608 06 Chandabila 8 Rural Connectivity 8/43 Gokhurpal 50 - P PL - - 1.50 1.41 2.07 3.48 931

1609 06 Chandabila 8 Rural Connectivity 8/44 Sananegui 49 - P PL - - 1.25 1.31 1.18 2.49 865

1610 06 Chandabila 8 Rural Connectivity 8/45 Sananegui 49 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1611 06 Chandabila 8 Rural Connectivity 8/46 Sananegui 49 - P PL - - 1.10 1.25 2.22 3.47 825

1612 06 Chandabila 8 Rural Connectivity 8/47 Gokhurpal 50 - P PL - - 1.50 1.41 2.07 3.48 931

1613 06 Chandabila 8 Rural Connectivity 8/48 Gokhurpal 50 - P PL - - 1.25 1.31 1.18 2.49 865

1614 06 Chandabila 8 Rural Connectivity 8/49 Narda 42 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1615 06 Chandabila 8 Rural Connectivity 8/50 Narda 42 - P PL - - 3.00 1.50 2.22 3.72 994 3 K.M

1616 06 Chandabila 8 Rural Connectivity 8/51 Narda 42 - P PL - - 1.50 1.41 2.07 3.48 931

1617 06 Chandabila 8 Rural Connectivity 8/52 Sananegui 49 - P PL - - 1.25 1.31 1.18 2.49 865

1618 06 Chandabila 8 Rural Connectivity 8/53 44 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1619 06 Chandabila 8 Rural Connectivity 8/54 44 - P PL - - 1.00 1.25 2.22 3.47 825

1620 06 Chandabila 8 Rural Connectivity 8/55 Pukhuria 46 - P PL - - 1.50 1.41 2.07 3.48 931

1621 06 Chandabila 8 Rural Connectivity 8/56 47 - P PL - - 1.25 1.31 1.18 2.49 865

1622 06 Chandabila 8 Rural Connectivity 8/57 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

Repair of road from Telia village rooad to Shib Mandir with culvert

Chandabila

21st Feb'14

April - March

Repair of road from Telia to Kuldiha with culvert

Chandabila

21st Feb'14

April - March

.Repair of road from Jarkuna to Narda Bankata with earth work moorum and 3 Nos culvert

Chandabila

Gokhurpal

21st Feb'14

April - March

.Repair of road from gokhurpal Pry. School to Sananegui Kadamtala with earth work moorum.

Chandabila

Gokhurpal

0.9 K.M

21st Feb'14

April - March

Repair of bamunpara road earth wark moorum and guard wall

Chandabila

Gokhurpal

1.5 K.M

21st Feb'14

April - March

Repair of Sananegui Mukhi Para road earth work moorum and culvert

Chandabila

Gokhurpal

1.25 K.M

21st Feb'14

April - March

Repair of Sananegui Adibasi para road earth work moorum .

Chandabila

Gokhurpal

21st Feb'14

April - March

Repair of road from Sananegui pitch road to Bailasole road earth work and moorum.

Chandabila

Gokhurpal

1.10 K.M

21st Feb'14

April - March

Repair of gokhurpal village road earth work and concreat plaster with drain

Chandabila

Gokhurpal

1.5 K.M

21st Feb'14

April - March

Repair of Gokhurpal Dubkupara road Earth work and moorum

Chandabila

Gokhurpal

1.25 K.M

21st Feb'14

April - March

Repair of road from Narda village to Bhangat pond earth work moorum and 2 Nos culvert

Chandabila

Gokhurpal

21st Feb'14

April - March

Repair of Narda to Tapaban roafd with earth work and moorum

Chandabila

Gokhurpal

21st Feb'14

April - March

Const. of Narda village road with concreat plaster.

Chandabila

Gokhurpal

1.5 K.M

21st Feb'14

April - March

Repair of Bankata to Sananegui road with moorum

Chandabila

Gokhurpal

1.25 K.M

21st Feb'14

April - March

Repair of Bhalukgajari village road earth work and moorum

Chandabila

Gokhurpal

Bhalukgajari

21st Feb'14

April - March

Const. of Bhalukgajari cannal par road earth work and moorum.

Chandabila

Gokhurpal

Bhalukgajari

1.00 K.M

21st Feb'14

April - March

Const. of road from Pukhuria to Mahulbani Via Dungri

Chandabila

Pukhuria

1.5 K.M

21st Feb'14

April - March

Const. of New road from Daharasole to Agar.

Chandabila

Pukhuria

Upparbankinala

1.25 K.M

21st Feb'14

April - March

Const. of road from Pukhuria cannal to Nichubankinala

Chandabila

Pukhuria

Pukhuria, Upparbankinala, Nichubankinala

46, 47, 48

21st Feb'14

April - March

Page 139: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

139/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1623 06 Chandabila 8 Rural Connectivity 8/58 - P PL - - 1.00 1.25 2.22 3.47 825

1624 06 Chandabila 8 Rural Connectivity 8/59 - P PL - - 1.50 1.41 2.07 3.48 931

1625 06 Chandabila 8 Rural Connectivity 8/60 46,47 - P PL - - 1.25 1.31 1.18 2.49 865

1626 06 Chandabila 8 Rural Connectivity 8/61 Repair of Mahulbani road Pukhuria 46 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1627 06 Chandabila 8 Rural Connectivity 8/62 Pukhuria 46 - P PL - - 1.00 1.25 2.22 3.47 825

1628 06 Chandabila 8 Rural Connectivity 8/63 Pukhuria 46 - P PL - - 3.00 1.50 2.22 3.72 994

1629 06 Chandabila 8 Rural Connectivity 8/64 46,47 - P PL - - 5.00 2.23 2.73 4.96 1477

1630 06 Chandabila 8 Rural Connectivity 8/65 Pukhuria 46 - P PL - - 1.50 1.41 2.07 3.48 931

1631 06 Chandabila 8 Rural Connectivity 8/66 Pukhuria 46 - P PL - - 0.70 2.83 11.33 14.16 1875

1632 06 Chandabila 8 Rural Connectivity 8/67 Repair of Pariapara village road pukhuria 46 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1633 06 Chandabila 8 Rural Connectivity 8/68 Repair of Berapara Madhya para road Pukhuria 46 - P PL - - 0.90 1.25 2.22 3.47 825

1634 06 Chandabila 8 Rural Connectivity 8/69 Raisole Raisole 86 - P PL - - 1.50 1.41 2.07 3.48 931

1635 06 Chandabila 8 Rural Connectivity 8/70 Raisole Raisole 86 - P PL - - 1.25 1.31 1.18 2.49 865

1636 06 Chandabila 8 Rural Connectivity 8/71 Raisole Raisole 86 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1637 06 Chandabila 8 Rural Connectivity 8/72 Raisole Raisole 86 - P PL - - 1.25 1.31 1.33 2.63 865

1638 06 Chandabila 8 Rural Connectivity 8/73 Raisole Raisole 86 - P PL - - 1.00 1.34 2.22 3.56 890 1 K.M

1639 06 Chandabila 8 Rural Connectivity 8/74 Raisole 87 - P PL - - 1.00 1.25 2.07 3.32 825

1640 06 Chandabila 8 Rural Connectivity 8/75 Raisole 87 - P PL - - 1.50 1.41 1.18 2.59 931

1641 06 Chandabila 8 Rural Connectivity 8/76 Raisole 87 - P PL - - 1.25 1.31 1.33 2.63 865

Repair of road from Sadarghat to Orissa Border

Chandabila

Pukhuria

Pukhuria , Upparbankinala

46, 47

1.00 K.M

21st Feb'14

April - March

Repair of road from Upparbankinalato Nichubankinala

Chandabila

Pukhuria

Pukhuria , Upparbankinala

46, 47

1.5 K.M

21st Feb'14

April - March

Repair of road from Sadarghat to Upparbankinala

Chandabila

Pukhuria

Pukhuria , Upparbankinala

1.25 K.M

21st Feb'14

April - March

Chandabila

Pukhuria

21st Feb'14

April - March

Repair of road from Pukhuria muralikhal to gorurghata

Chandabila

Pukhuria

1.00 K.M

21st Feb'14

April - March

Repair of road from Jarldanga to dadrasole

Chandabila

Pukhuria

3.00 K.M

21st Feb'14

April - March

Repair of road from ager to uppar bankinala

Chandabila

Pukhuria

Pukhuria,Upparbankinala

5.00 K.M

21st Feb'14

April - March

Repair of road from matilal patra's house to Pukhuria sib mandir

Chandabila

Pukhuria

1.5 K.M

21st Feb'14

April - March

Repair of with concreat (Berapara village) road

Chandabila

Pukhuria

0.7 K.M

21st Feb'14

April - March

Chandabila

Pukhuria

21st Feb'14

April - March

Chandabila

Pukhuria

0.9 K.M

21st Feb'14

April - March

Repair of road from Raisole sitala Mandir to Muralikhal

Chandabila

1.5 K.M

21st Feb'14

April - March

Repair of road at Raisole Daskhinpara earth work and moorum

Chandabila

1.25 K.M

21st Feb'14

April - March

Repair of road at Raisole Paschimpara earth work and moorum

Chandabila

21st Feb'14

April - March

Const. of road from Sanjit Sing's soap to Murali Khal

Chandabila

1.25 K.M

21st Feb'14

April - March

Const. of road from Ananda Mahata House to Orissa border with earth work and moorum.

Chandabila

21st Feb'14

April - March

Repair of road at Nichubankinala with earth work and moorum

Chandabila

Nichubankinala

1.00 K.M

21st Feb'14

April - March

Repair of road at Nichubankinala paschim para with earth work and moorum

Chandabila

Nichubankinala

1.5 K.M

21st Feb'14

April - March

Const. of road from moorum pond to Futur dungri with earth work and moorum.

Chandabila

Nichubankinala

1.25 K.M

21st Feb'14

April - March

Page 140: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

140/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1642 06 Chandabila 8 Rural Connectivity 8/77 Raisole Purnapani 87 - P PL - - 1.00 1.34 2.22 3.56 890 1 K.M

1643 06 Chandabila 8 Rural Connectivity 8/78 Raisole Purnapani 87 - P PL - - 1.00 1.25 2.07 3.32 825

1644 06 Chandabila 8 Rural Connectivity 8/79 Raisole Raisole 86 - P PL - - 1.50 1.41 1.18 2.59 931

1645 06 Chandabila 8 Rural Connectivity 8/80 Const. of culvert at Muralikhal road Raisole Purnapani 87 - P PL - - 1.25 1.31 1.33 2.63 865

1646 06 Chandabila 8 Rural Connectivity 8/81 Tungadhua 54 - P PL - - 1.00 2.64 10.57 13.21 1749 0.8

1647 06 Chandabila 8 Rural Connectivity 8/82 Pachakhali 51 - P PL - - 0.50 1.25 2.22 3.47 825

1648 06 Chandabila 8 Rural Connectivity 8/83 Pachakhali 51 - P PL - - 1.50 1.41 2.07 3.48 931

1649 06 Chandabila 8 Rural Connectivity 8/84 Tungadhua 54 - P PL - - 1.25 1.31 1.18 2.49 865

1650 06 Chandabila 8 Rural Connectivity 8/85 Tungadhua 54 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1651 06 Chandabila 8 Rural Connectivity 8/86 Kashia Kashia 15 - P PL - - 0.50 1.25 2.47 3.71 825

1652 06 Chandabila 8 Rural Connectivity 8/87 Kashia Kashia 15 - P PL - - 1.50 1.41 2.22 3.62 931

1653 06 Chandabila 8 Rural Connectivity 8/88 Kashia Kashia 15 - P PL - - 1.25 1.31 3.46 4.76 865

1654 06 Chandabila 8 Rural Connectivity 8/89 Kashia 20 21 - P PL - - 1.00 1.34 1.18 2.52 890 1 K.M

1655 06 Chandabila 8 Rural Connectivity 8/90 Kashia Katash 20 - P PL - - 1.00 1.34 1.33 2.67 890 1 K.M

1656 06 Chandabila 8 Rural Connectivity 8/91 Kashia Katash 20 - P PL - - 2.00 1.25 2.22 3.47 825 2 K.M

1657 06 Chandabila 8 Rural Connectivity 8/92 Kashia Kadokatha 19 - P PL - - 1.50 1.41 2.07 3.48 931

1658 06 Chandabila 8 Rural Connectivity 8/93 Kashia Katash 20 - P PL - - 1.25 1.31 1.18 2.49 865

1659 06 Chandabila 8 Rural Connectivity 8/94 Kashia Pairabhari 22 - P PL - - 1.00 2.75 11.01 13.76 1823 1 K.M

1660 06 Chandabila 8 Rural Connectivity 8/95 Kashia Pairabhari 22 - P PL - - 1.50 1.25 2.22 3.47 825

1661 06 Chandabila 8 Rural Connectivity 8/96 Kashia Gulfa 21 - P PL - - 1.50 1.41 2.07 3.48 931

1662 06 Chandabila 8 Rural Connectivity 8/97 Kashia Katash 20 - P PL - - 1.25 1.31 1.18 2.49 865

Repair of road fro Purnapani to Muralikhal

Chandabila

21st Feb'14

April - March

Repair of road fro Purnapani to house of Tarapada Singha.

Chandabila

1.00 K.M

21st Feb'14

April - March

Repair of road fro Purnapani to Raisole earth work and moorum

Chandabila

1.5 K.M

21st Feb'14

April - March

Chandabila

1.25 K.M

21st Feb'14

April - March

Tungadhua to Pachakhali village with concreat road

Chandabila

Tungadhua

21st Feb'14

April - March

Const. of rooad from Negui pitch road to Pachakhali earth work moorum and 2 nos hume pipe

Chandabila

Tungadhua

0.5 K.M

21st Feb'14

April - March

Const. of new road from Pachakhali to Damda sole with eart work moorum hume pipe and culvert.

Chandabila

Tungadhua

1.5 K.M

21st Feb'14

April - March

Const. of road from Tungadhua to Baliya sole.

Chandabila

Tungadhua

1.25 K.M

21st Feb'14

April - March

Const. of concreat road from Pachakhali Tentultala to Tungadhua sukna pond

Chandabila

Tungadhua

21st Feb'14

April - March

Const. of new road from Kashia Lodhapara to Pitch road

Chandabila

0.5 K.M

21st Feb'14

April - March

Const. of new road from Pitch road to Mihir Mahata house

Chandabila

1.5 K.M

21st Feb'14

April - March

Const. of new road from Kashia Paschim Para to Pitch road

Chandabila

1.25 K.M

21st Feb'14

April - March

Const. of new road from Gulffa to Katash Road

Chandabila

Gulfa Katash

21st Feb'14

April - March

Const. of new road from Baredihi to Orissa

Chandabila

21st Feb'14

April - March

Const. of new road from Katash Ananda Mahata house to Gopi bouder

Chandabila

21st Feb'14

April - March

Const. of new road from Kadokatha to Harihar Sing land

Chandabila

1.5 K.M

21st Feb'14

April - March

Const. of new road from Katash Paschim Para to Bishusole

Chandabila

1.25 K.M

21st Feb'14

April - March

Const. of Pairabhari village with concreat road

Chandabila

21st Feb'14

April - March

Const. of new road from Pairabhari cas way to Ramch Mahata land

Chandabila

1.5 K.M

21st Feb'14

April - March

Repair of road fro Gulfa to Orissa Border

Chandabila

1.5 K.M

21st Feb'14

April - March

Repair of road fro Katash bara bandh to Hapna babu house

Chandabila

1.25 K.M

21st Feb'14

April - March

Page 141: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

141/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1663 06 Chandabila 8 Rural Connectivity 8/98 Kashia Kadakotha 19 - P PL - - 5.00 1.34 1.33 2.67 890 5 K.M

1664 06 Chandabila 8 Rural Connectivity 8/99 Kashia Kashia 15 - P PL - - 5.00 1.25 2.22 3.47 825 5 K.M

1665 06 Chandabila 8 Rural Connectivity 8/100 Kashia Kashia 15 - P PL - - 3.00 1.41 2.07 3.48 931 3 K.M

1666 06 Chandabila 8 Rural Connectivity 8/101 Kashia Pairabhari 22 - P PL - - 1.25 1.31 1.18 2.49 865

1667 06 Chandabila 8 Rural Connectivity 8/102 Kashia Pairabhari 22 - P PL - - 1.50 1.34 1.33 2.67 890

1668 06 Chandabila 8 Rural Connectivity 8/103 Telia Gorurghata 45 - P PL - - 1.25 1.31 1.18 2.49 865

1669 06 Chandabila 8 Rural Connectivity 8/104 Telia Telia 23 - P PL - - 4.00 2.25 1.32 3.58 1491 4 K.M

1670 06 Chandabila 8 Rural Connectivity 8/105 Telia Telia 23 - P PL - - 3.00 1.25 2.22 3.47 825 3 K.M

- - - 152.62 239.58 392.20 101071

- - - 750.40 426.09 1176.49 496957

1671 07 Chandrarekha 1 1/1 Amdiha 275 - 0.50 - 2.67 0.30 2.97 1769 April

1672 07 Chandrarekha 1 1/2 Excavation of Pond atBiswanathpur 183 - 0.50 - 2.67 0.30 2.97 1769 April

1673 07 Chandrarekha 1 1/3 Excavation of Tank atSatppoutia Satpoutia 190 - 0.50 - 2.67 0.30 2.97 1769 April

1674 07 Chandrarekha 1 1/4 Excavation of Tank atBhola Bhola Bhola 161 - 0.50 - 2.67 0.30 2.97 1769 April

1675 07 Chandrarekha 1 1/5 Lohaberia 189 - 1.00 - 5.34 0.59 5.93 3537 April

1676 07 Chandrarekha 1 1/6 Naradi 180 563 - 0.50 - 2.67 0.30 2.97 1769 Dec

1677 07 Chandrarekha 1 1/7 Naradi 180 - 0.50 - 2.67 0.30 2.97 1769 Dec

1678 07 Chandrarekha 1 1/8 Naradi 180 - 0.50 - 2.67 0.30 2.97 1769 Dec

Repair of road fro Kada kotha pitch road to Chamarbandh school

Chandabila

21st Feb'14

April - March

Repair of road fro kashia bustand to Rukhni

Chandabila

21st Feb'14

April - March

Repair of road fro Kashia pitch road to Talakuldhia

Chandabila

21st Feb'14

April - March

Const. of new road from Pairabhari cosway to Forest land

Chandabila

1.25 K.M

21st Feb'14

April - March

Const. of new road from kashia pitch road to pairabhari

Chandabila

1.5K.M

21st Feb'14

April - March

Repair of road at Gorurghata Das para, Adibasi Para, Routh Para.

Chandabila

1.25 K.M

21st Feb'14

April - March

Const. of new road fro Telia to Sadarghat via uttarpara

Chandabila

21st Feb'14

April - March

Const. of new road from Telia to Dulki main road.

Chandabila

21st Feb'14

April - March

Rural Connectivity Total

Chandabila Total

Water Conservation & Water Harvesting

Excavation of pond atAmdiha Bhutunath para

Chandrarekha

Satpoutis

28th Feb'14

Water Conservation & Water Harvesting

Chandrarekha

Biswanathpur

BiswanathPur

28th Feb'14

Water Conservation & Water Harvesting

Chandrarekha

Satpoutia

28th Feb'14

Water Conservation & Water Harvesting

Chandrarekha

28th Feb'14

Water Conservation & Water Harvesting

Excavation of pond of Suren Mandi at Lohaberia

Chandrarekha

Satopoutia

28th Feb'14

Water Conservation & Water Harvesting

Excavation of pond of Dipak Bhunia at Naradi

Chandrarekha

Mohanpur

28th Feb'14

Water Conservation & Water Harvesting

Excavation of Pond of Gangadhar Mahata at Naradi

Chandrarekha

Mohanpur

28th Feb'14

Water Conservation & Water Harvesting

Excavatiion of pond of Debendra Mahata at Naradi

Chandrarekha

Mohanpur

28th Feb'14

Page 142: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

142/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1679 07 Chandrarekha 1 1/9 Kuilisuta 184 - 0.50 - 2.67 0.30 2.97 1769 Dec

1680 07 Chandrarekha 1 1/10 Patharasole 164 66 - 0.50 - 2.67 0.30 2.97 1769 Dec

1681 07 Chandrarekha 1 1/11 Const of Dug Well at Telia Plantation Bhola Telia 162 - - - 0.30 0.49 0.79 198 April

- - - 29.68 3.76 33.43 19653

1682 07 Chandrarekha 2 Drought Proofing 2/1 Bhola Raipal 160 - 4.00 - 2.53 1.73 4.25 1672 May

1683 07 Chandrarekha 2 Drought Proofing 2/2 Plantation at Bhola Bhola Bhola 161 - 5.00 - 3.16 2.16 5.32 2091 May

1684 07 Chandrarekha 2 Drought Proofing 2/3 Plantation at Chilkipada (Purba) Chilkipada 185 - 3.00 - 1.89 1.30 3.19 1251 May

1685 07 Chandrarekha 2 Drought Proofing 2/4 Plantation at Chilkipada (Paschim) 182 - 2.00 - 1.26 0.86 2.13 836 May

1686 07 Chandrarekha 2 Drought Proofing 2/5 Plantation at Satpoutia Football Ground Satpoutia 190 - 2.00 - 1.26 0.86 2.13 836 May

1687 07 Chandrarekha 2 Drought Proofing 2/6 Plantation at Monhanpur Mohanpur 181 - 10.00 - 6.31 4.32 10.63 4181 May

1688 07 Chandrarekha 2 Drought Proofing 2/7 Plantation at Bamunda Bamunda 169 - 10.00 - 6.31 4.32 10.63 4181 May

1689 07 Chandrarekha 2 Drought Proofing 2/8 Plantation at Biswanathpur 183 - 10.00 - 6.31 4.32 10.63 4181 May

1690 07 Chandrarekha 2 Drought Proofing 2/9 Plantation at telia Bhola Telia 162 - 10.00 - 6.31 4.32 10.63 4181 May

1691 07 Chandrarekha 2 Drought Proofing 2/10 Plantation at Kuiliauta Kuilisuta 184 - 5.00 - 3.16 2.16 5.32 2091 May

1692 07 Chandrarekha 2 Drought Proofing 2/11 Mohanpur 181 - 5.00 - 3.16 2.16 5.32 2091 May

1693 07 Chandrarekha 2 Drought Proofing 2/12 Bamunda 169 - 7.50 - 5.10 2.02 7.12 3378 May

1694 07 Chandrarekha 2 Drought Proofing 2/13 187 - 3.00 - 1.89 1.30 3.19 1251 May

1696 07 Chandrarekha 2 Drought Proofing 2/14 Nursery under Chandrarekha GP - 0.01 - 2.49 2.95 5.44 1646

- - - 51.14 34.78 85.92 33866

1697 07 Chandrarekha 3 3/1 Mohanpur 181 - - 1.00 1.50 0.23 1.73 994 April

Water Conservation & Water Harvesting

Excavation of Pond of Kendra Mandi at Kuilisuta

Chandrarekha

Kuilisuta

28th Feb'14

Water Conservation & Water Harvesting

Excavation of Pond of Gobinda Chopeyer at Patharasole.

Chandrarekha

Kuilisuta

28th Feb'14

Water Conservation & Water Harvesting

Chandrarekha

28th Feb'14

Water Conservation & Water Harvesting Total

Plantatioin of Dakshim Raipal (Kaju Garden)

Chandrarekha

28th Feb'14

Chandrarekha

28th Feb'14

Chandrarekha

Kuilisuta

28th Feb'14

Chandrarekha

Biswanathpur

Kesharrekha

28th Feb'14

Chandrarekha

Satpoutia

28th Feb'14

Chandrarekha

Monanpur

28th Feb'14

Chandrarekha

Monanpur

28th Feb'14

Chandrarekha

Biswanathpur

BiswanathPur

28th Feb'14

Chandrarekha

28th Feb'14

Chandrarekha

Kuilisuta

28th Feb'14

Maintanance of kaju Orchardat Mohanpur

Chandrarekha

Mohanpur

28th Feb'14

Maintanance of kaju Orchardat Bamunda

Chandrarekha

Mohanpur

28th Feb'14

Maintanance of Mango/ kaju Orchard at Chandrarekha

Chandrarekha

Biswanahpur

Chandrarekha

28th Feb'14

Chandrarekha

Kesharrekha

Kesharrekha

28th Feb'14

Drought Proofing TotalMicro Irrigation Works

Excavation of cannal from Kesherrekha Pirep Tank toMohanpur

Chandrarekha

Mohanpur

28th Feb'14

Page 143: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

143/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1698 07 Chandrarekha 3 3/2 Naradi 180 - - 1.00 1.50 0.23 1.73 994 April

1699 07 Chandrarekha 3 3/3 Kuilisuta 184 - - 1.50 2.26 0.31 2.57 1495 April

1700 07 Chandrarekha 3 3/4 Madhupura 167 - - 1.50 2.26 0.31 2.57 1495 April

- - - 7.52 1.09 8.61 4978

1701 07 Chandrarekha 5 5/1 Bamanda 169 - 0.45 - 2.23 0.25 2.47 1474 April

1702 07 Chandrarekha 5 5/2 Satpoutia 190 - 0.50 - 2.67 0.30 2.97 1769 Dec

1703 07 Chandrarekha 5 5/3 Bamanda 169 - 0.45 - 2.23 0.25 2.47 1474 April

1704 07 Chandrarekha 5 5/4 Bamanda 169 - 0.45 - 2.23 0.25 2.47 1474 Dec

1705 07 Chandrarekha 5 5/5 185 - 0.25 - 1.47 0.16 1.63 973 April

1706 07 Chandrarekha 5 5/6 Chilkipada 185 - 0.25 - 1.47 0.16 1.63 973 Dec

1707 07 Chandrarekha 5 5/7 Kuilisuta 184 - 0.50 - 2.67 0.30 2.97 1769 April

1708 07 Chandrarekha 5 5/8 Re Excavation of Khas Pond atTelia. Bhola Telia 162 - 0.45 - 2.23 0.25 2.47 1474 Dec

1709 07 Chandrarekha 5 5/9 Re Excavatio of Pirep Pond at Hatitop. Hatitop 168 - 0.50 - 2.67 0.30 2.97 1769 April

1710 07 Chandrarekha 5 5/10 Chilkipada 185 - 0.45 - 2.23 0.25 2.47 1474 Dec

1711 07 Chandrarekha 5 5/11 Lohaberia 189 - 0.50 - 2.67 0.30 2.97 1769 April

1712 07 Chandrarekha 5 5/12 Satpoutia 190 - 0.45 - 2.23 0.25 2.47 1474 Dec

Micro Irrigation Works

Excavation of cannal from Bamunda to Naradi

Chandrarekha

Mohanpur

28th Feb'14

Micro Irrigation Works

Re Excavation of Cannal fromPatharasole to Kuilisuta

Chandrarekha

Kuilisuta

28th Feb'14

Micro Irrigation Works

Excavation of Cannal from Madhupura to Ghanghana

Chandrarekha

Kuilisuta

28th Feb'14

Micro Irrigation Works TotalRenovation of Traditional Water Bodies

Re Excavation of Pond of Santosh Jana at Bamanda

Chandrarekha

Mohanpur

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pirep Pond at Satpoutia.

Chandrarekha

Satpoutia

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Khas Pond at Kesharrekha

Chandrarekha

Biswanathpur

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Rahim Mandi at Bamanda

Chandrarekha

Mohanpur

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond ofIswar Mahata at Chilkipada

Chandrarekha

Kuilisuta

Chilkipada

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond ofBhuban Mandi at Chilkipada

Chandrarekha

Kuilisuta

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Khas Pond at Kuilisuta .

Chandrarekha

Kuilisuta

28th Feb'14

Renovation of Traditional Water Bodies

Chandrarekha

28th Feb'14

Renovation of Traditional Water Bodies

Chandrarekha

Mohanpur

28th Feb'14

Renovation of Traditional Water Bodies

Re excavatio of Pond of Nagendra Mahata at chilkipada.

Chandrarekha

Kuilisuta

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Village Pond at Lohaberia.

Chandrarekha

Satpoutia

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Chitreswar Patra at Satpoutia.

Chandrarekha

Satpoutia

28th Feb'14

Page 144: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

144/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1713 07 Chandrarekha 5 5/13 Naradi 180 - 0.25 - 1.47 0.16 1.63 973 April

1714 07 Chandrarekha 5 5/14 Hatitop 168 18 - 0.45 - 2.23 0.25 2.47 1474 Dec

1715 07 Chandrarekha 5 5/15 Amdiha 190 - 0.50 - 2.67 0.30 2.97 1769 April

1716 07 Chandrarekha 5 5/16 Kuilisuta 184 - 0.45 - 2.23 0.25 2.47 1474 Dec

1717 07 Chandrarekha 5 5/17 Bamanda 169 - 0.45 - 2.23 0.25 2.47 1474 April

1718 07 Chandrarekha 5 5/18 Kuilisuta 184 - 0.50 - 2.67 0.30 2.97 1769 Dec

1719 07 Chandrarekha 5 5/19 Kuilisuta 164 - 0.45 - 2.23 0.25 2.47 1474 April

1720 07 Chandrarekha 5 5/20 Kuilisuta 184 - 0.45 - 2.23 0.25 2.47 1474 Dec

1721 07 Chandrarekha 5 5/21 Bhola Telia 161 252 - 0.25 - 1.47 0.16 1.63 973 April

1722 07 Chandrarekha 5 5/22 Bhola Raipal 160 181 - 0.45 - 2.23 0.25 2.47 1474 Dec

1723 07 Chandrarekha 5 5/23 Bhola Raipal 160 85 - 0.25 - 1.47 0.16 1.63 973 April

1724 07 Chandrarekha 5 5/24 183 - 0.45 - 2.23 0.25 2.47 1474 Dec

1725 07 Chandrarekha 5 5/25 lohaberia 189 - 0.50 - 2.67 0.30 2.97 1769 April

1726 07 Chandrarekha 5 5/26 Lohaberia 189 - 0.45 - 2.23 0.25 2.47 1474 Dec

1727 07 Chandrarekha 5 5/27 Re Excavation ofTelia Bara Pond Bhola Telila 161 - 0.50 - 2.23 0.25 2.47 1474 Dec

Renovation of Traditional Water Bodies

Re Excavation of pond of laxmindra Murmu at Naradi.

Chandrarekha

Mohanpur

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Thaya Hansda at Hatitop.

Chandrarekha

Mohanpur

28th Feb'14

Renovation of Traditional Water Bodies

Re excavation of Pond of Ashok Roul at Amdiha

Chandrarekha

Satpoutia

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavaation of Pond of Shyam charan Mandi at Kuilisuta

Chandrarekha

Kuilisuta

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of pond of Gajna Mandi at Bamanda

Chandrarekha

Mohanpur

395452

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Khas Pond near PMGY road at Kuilisuta

Chandrarekha

Kuilisuta

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Gopal Mandi at Patharasole

Chandrarekha

Kuilisuta

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Prahallad Murmu at Kuilisuta

Chandrarekha

Kuilisuta

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Ampa Mandi at Telia

Chandrarekha

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Akeswar Maity at Raipal

Chandrarekha

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Salama Soren at Raipal

Chandrarekha

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Swapan Manna at Biswanathpur

Chandrarekha

Biswanathpur

BiswanathPur

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of pond of Laxmiram Mandi at Lohaberria

Chandrarekha

Satpoutia

28th Feb'14

Renovation of Traditional Water Bodies

Re Excavation of Pond of Sita Mandi at Lohaberia

Chandrarekha

Satpoutia

28th Feb'14

Renovation of Traditional Water Bodies

Chandrarekha

237264

28th Feb'14

Page 145: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

145/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1728 07 Chandrarekha 5 5/28 Well at Chandrarekha Gurd Purban 187 - - - 0.30 0.49 0.79 198 April

- - - 59.72 7.10 66.82 39551

1729 07 Chandrarekha 6 Land Development 6/1 Chilkipada 185 - 0.25 - 1.78 0.20 1.97 1176 Oct.

1730 07 Chandrarekha 6 Land Development 6/2 Hatitop 168 - 0.25 - 1.78 0.20 1.97 1176 Oct.

1731 07 Chandrarekha 6 Land Development 6/3 182 - 0.25 - 1.52 0.17 1.69 1008 Oct.

1732 07 Chandrarekha 6 Land Development 6/4 Lohaberia 189 - 0.25 - 1.78 0.20 1.97 1176

1733 07 Chandrarekha 6 Land Development 6/5 Land Levelling of telia SSk Ground. Bhola Te;lia 160 - 0.25 - 1.78 0.20 1.97 1176

1734 07 Chandrarekha 6 Land Development 6/6 Bhola Telia 161 41 - 0.75 - 1.78 0.20 1.97 1176 Oct.

- - - 10.40 1.16 11.56 6889

1735 07 Chandrarekha 7 7/1 Flood Control(gurd Wall) at Raipal Bhola Raipal 160 - - 0.20 1.50 1.61 3.12 994 January

1736 07 Chandrarekha 7 7/2 Bhola Raipal 160 - - 0.20 1.50 1.61 3.12 994 January

1737 07 Chandrarekha 7 7/3 Kuilisuta 184 - - 0.01 0.60 1.88 2.47 395 January

1738 07 Chandrarekha 7 7/4 Chatal at Rhim Mnadi Land Bamanda 169 - - 0.01 0.60 1.88 2.47 395 January

- - - 4.20 6.98 11.18 2779

1739 07 Chandrarekha 8 Rural Connectivity 8/1 Kuilisuta 184 - - 0.75 0.89 0.10 0.99 590 Oct.

1740 07 Chandrarekha 8 Rural Connectivity 8/2 Kuilisuta 184 - - 1.00 1.74 0.19 1.93 1150 Nov.

1741 07 Chandrarekha 8 Rural Connectivity 8/3 Bhola Raipal 160 - - 1.00 1.74 0.19 1.93 1150 Dec

1742 07 Chandrarekha 8 Rural Connectivity 8/4 Bhola Raipal 160 - - 1.50 2.09 1.77 3.86 1383 Oct.

1743 07 Chandrarekha 8 Rural Connectivity 8/5 Bhola Bhola 161 - - 1.00 1.74 0.19 1.93 1150 Nov.

1744 07 Chandrarekha 8 Rural Connectivity 8/6 Bhola Raipal 160 - - 1.00 1.74 0.19 1.93 1150 Dec

Renovation of Traditional Water Bodies

Chandrarekha

Biswanathpur

Chandrarekha

28th Feb'14

Renovation of Traditional Water Bodies Total

Land Devlopment of Chilkipada MSK Ground

Chandrarekha

Kuilisuta

28th Feb'14

Land Devlopment of Hatitop SSK Ground

Chandrarekha

Mohanpur

28th Feb'14

Land Development of G P Office Ground

Chandrarekha

Biswanathpur

Kesharrekha

28th Feb'14

Land Levelling of Lohaberia ssk Ground.

Chandrarekha

Satpoutia

28th Feb'14

Chandrarekha

28th Feb'14

Land Levelling of Telia Football Ground

Chandrarekha

28th Feb'14

Land Development TotalFlood Control & Protecation

Chandrarekha

28th Feb'14

Flood Control & Protecation

Flood Control(gurd Wall) at Raipal(Telia Khal)

Chandrarekha

28th Feb'14

Flood Control & Protecation

Construction of Chhtal of Buddheswar Murmu Land at Kuilisuta

Chandrarekha

Kuilisuta

28th Feb'14

Flood Control & Protecation

Chandrarekha

Mohanpur

28th Feb'14

Flood Control & Protecation Total

Const. of Earthen Road at kuilisut PMGY road to Kuilisuta Paschim para

Chandrarekha

Kuilisuta

28th Feb'14

Const. of eaarthen road from Bagra road to Kuilisuta D. Murmus house

Chandrarekha

Kuilisuta

28th Feb'14

Const of earthen road from raipal Mini dip tubwell to Bhaja hari Mndis house

Chandrarekha

28th Feb'14

Const of earthen road from Raipal ssk to Bhola road

Chandrarekha

28th Feb'14

Const of earthen road from PMGY road to Bhola Nichu para

Chandrarekha

28th Feb'14

Const of earthen Road from Raipal main road to Telia Khal

Chandrarekha

28th Feb'14

Page 146: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

146/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1745 07 Chandrarekha 8 Rural Connectivity 8/7 Kuilisuta 184 - - 1.00 1.74 0.19 1.93 1150 Oct.

1746 07 Chandrarekha 8 Rural Connectivity 8/8 Const of of Lohaberia Village road Lohaberia 189 - - 1.00 1.74 0.19 1.93 1150 Nov.

1747 07 Chandrarekha 8 Rural Connectivity 8/9 Jaradahi 166 - - 1.50 0.89 1.78 2.67 593 Dec

1748 07 Chandrarekha 8 Rural Connectivity 8/10 Bhola to Telia Road Moram & Bolder Bhola Bhola 161 - - 1.50 0.89 1.78 2.67 593 April

1749 07 Chandrarekha 8 Rural Connectivity 8/11 183 - - 1.00 0.75 1.23 1.98 494 Dec

1750 07 Chandrarekha 8 Rural Connectivity 8/12 Purbatelia Gramin road repair & moram Bhola Telia 161 - - - 0.75 1.23 1.98 494 Nov.

1751 07 Chandrarekha 8 Rural Connectivity 8/13 Saw-mill to Jamin road atSatpoutia Satpoutia 190 - - - 0.75 1.23 1.98 494 January

1752 07 Chandrarekha 8 Rural Connectivity 8/14 Tulsiboni 186 - - 1.50 0.89 1.78 2.67 593 Dec

1753 07 Chandrarekha 8 Rural Connectivity 8/15 Ghanghana 167 - - 1.00 0.75 1.23 1.98 494 Nov.

1754 07 Chandrarekha 8 Rural Connectivity 8/16 Patharasole 164 - - 1.00 1.74 0.19 1.93 1150 January

1755 07 Chandrarekha 8 Rural Connectivity 8/17 Const of Purba Telia Gramin Roads Bhola Telia 161 - - 1.50 0.89 1.78 2.67 593 Dec

1756 07 Chandrarekha 8 Rural Connectivity 8/18 Bamunda 169 - - 0.01 0.42 1.26 1.68 278 May

1757 07 Chandrarekha 8 Rural Connectivity 8/19 Hatitop 168 - - 0.01 0.42 1.26 1.68 278 june

1758 07 Chandrarekha 8 Rural Connectivity 8/20 183 - - 0.01 0.84 2.52 3.36 557 Aug

1759 07 Chandrarekha 8 Rural Connectivity 8/21 Patharasole 164 - - 0.01 0.84 2.52 3.36 557 Sept

1760 07 Chandrarekha 8 Rural Connectivity 8/22 Tulsiboni 186 - - 0.01 0.42 1.26 1.68 278 May

1761 07 Chandrarekha 8 Rural Connectivity 8/23 Chilkipada 185 - - 0.01 0.42 1.26 1.68 278 june

1762 07 Chandrarekha 8 Rural Connectivity 8/24 187 - - 0.01 0.42 1.26 1.68 278 Aug

1763 07 Chandrarekha 8 Rural Connectivity 8/25 Satpoutia 190 - - 0.01 0.42 1.26 1.68 278 Sept

1764 07 Chandrarekha 8 Rural Connectivity 8/26 Kuilisuta 184 - - 0.01 0.42 1.26 1.68 278 May

1765 07 Chandrarekha 8 Rural Connectivity 8/27 183 - - 1.00 0.75 1.23 1.98 494 Nov.

1766 07 Chandrarekha 8 Rural Connectivity 8/28 Mohanpur 181 - - 1.50 0.89 1.78 2.67 593 Dec

Cionst. of earthen road Kuilisuta PMGY to Chilkipada gramin road

Chandrarekha

Kuilisuta

28th Feb'14

Chandrarekha

Satpoutia

28th Feb'14

Const. of earthen road & Morrum form Jaradahi to Bamanda

Chandrarekha

Mohanpur

28th Feb'14

Chandrarekha

28th Feb'14

Const of Biswanathpur Grmn Rd. rep.with muram (Uttar Para)

Chandrarekha

Biswanathpur

BiswanathPur

28th Feb'14

Chandrarekha

28th Feb'14

Chandrarekha

Satpoutia

28th Feb'14

Const of Tulsiboni PMGY to raipal grmn.Rd. with muram

Chandrarekha

Kuilisuta

28th Feb'14

Const of Ghanghana to Madhupura grmn road rep. with Muram

Chandrarekha

Kuilisuta

28th Feb'14

Const. of Patharasole Pry to Domasole Road

Chandrarekha

Kuilisuta

28th Feb'14

Chandrarekha

28th Feb'14

Repair of road &Culvart on Bamunda gramin Road

Chandrarekha

Mohanpur

28th Feb'14

Repair of Road &Culvart on Hatitop gramin Road

Chandrarekha

Mohanpur

28th Feb'14

Repair of Road & 2 nos Culvart onBiswanathpur gramin Road

Chandrarekha

Biswanathpur

BiswanathPur

28th Feb'14

Repair of Road & 2 Nos Culvart on Patharasole Gramin Road.

Chandrarekha

Kuilisuta

28th Feb'14

Repair of Road & Culvart on Tulsiboni gramin Road

Chandrarekha

Kuilisuta

28th Feb'14

Repair of Road & Culvart on Chilkipada Gramin road

Chandrarekha

Kuilisuta

28th Feb'14

Repair of Road & Culvart on Chandrarekha to Raipal Road(near M Garden)

Chandrarekha

Biswanathpur

Chandrarekha

28th Feb'14

Repair of Road & Culvart on Satpoutia Gramin road

Chandrarekha

Satpoutia

28th Feb'14

Repair of Road & Culvart on Kuilisuta gramin Road

Chandrarekha

Kuilisuta

28th Feb'14

Biswanathpur ( South) Gramin road Morram

Chandrarekha

Biswanaathpur

BiswanathPur

28th Feb'14

Mohanpur Pairep Pond to Pmgsy Road repair with Morram.

Chandrarekha

Mohanpur

28th Feb'14

Page 147: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

147/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1767 07 Chandrarekha 8 Rural Connectivity 8/29 Patharasole 164 - - 1.50 0.89 1.78 2.67 593 April

- - - 28.85 33.91 62.76 19107

1768 07 Chandrarekha 10 10/1 G P Area 3E+06 - - - 1.13 3.38 4.50 745 May

- - - 1.13 3.38 4.50 745

- - - 192.63 92.15 284.78 127567

1769 08 Jamirapal 1 1/1 Excavation of Dojala Pond Bhuasai Dojola 252 4,5 PL 0.80 _ _ 2.23 0.25 2.47 1474

1770 08 Jamirapal 1 1/2 Excavation of Angergeria Pond Bhuasai Angergeria 248 PL 0.80 _ _ 2.23 0.25 2.47 1474

1771 08 Jamirapal 1 1/3 Excavation of Jadukata Pond Banspat Jadhukotha 218 PL 1.20 _ _ 2.23 0.25 2.47 1474

1772 08 Jamirapal 1 1/4 Excavation of Sirisbani Pond Banspat Sirishboni 209 PL 0.80 _ _ 2.23 0.25 2.47 1474

1773 08 Jamirapal 1 1/5 Jamirapal 235 PL 0.90 _ _ 3.12 0.35 3.46 2063

1774 08 Jamirapal 1 1/6 Jamirapal 235 37 PL 1.00 _ _ 3.29 0.37 3.66 2181

1775 08 Jamirapal 1 1/7 Excavation of Jamirapal Pond Jamirapal 235 PL 0.90 _ _ 2.23 0.25 2.47 1474

1776 08 Jamirapal 1 1/8 Excavation of Gentabani Pond Atmajia Gentaboni 244 PL 0.90 _ _ 2.23 0.25 2.47 1474

1777 08 Jamirapal 1 1/9 Atmajia Atmajia 240 PL 0.60 _ _ 2.23 0.25 2.47 1474

1778 08 Jamirapal 1 1/10 Excavation of Jambani Pond Jamboni 238 PL 0.50 _ _ 2.40 0.27 2.67 1592

1779 08 Jamirapal 1 1/11 Excavation of Darkhuli Pond 234 PL 0.50 _ _ 3.12 0.35 3.46 2063

Patharasole Paschim & purba gramin road repair & morram

Chandrarekha

Kuilisuta

28th Feb'14

Rural Connectivity TotalAgriculture related works

50 Nos Varmi Compost pith at G P Area

Chandrarekha

G P Area

28th Feb'14

Agriculture related works Total

Chandrarekha Total

Water Conservation & Water Harvesting

Jamirapal

4th Mar'14

Dec to Feb

Water Conservation & Water Harvesting

Jamirapal

4th Mar'14

Dec to Feb

Water Conservation & Water Harvesting

Jamirapal

4th Mar'14

Dec to Feb

Water Conservation & Water Harvesting

Jamirapal

4th Mar'14

Dec to Feb

Water Conservation & Water Harvesting

Excavation of Jamirapal Garh pukur Pond

Jamirapal

Jamirapal

4th Mar'14

Dec to Feb

Water Conservation & Water Harvesting

Excavation of Jamirapal Jhapa Khal Pond

Jamirapal

Jamirapal

4th Mar'14

Dec to Feb

Water Conservation & Water Harvesting

Jamirapal

Jamirapal

4th Mar'14

Dec to Feb

Water Conservation & Water Harvesting

Jamirapal

4th Mar'14

Dec to Feb

Water Conservation & Water Harvesting

Excavation of Atmajhia Bautia khal Pond

Jamirapal

4th Mar'14

June to July

Water Conservation & Water Harvesting

Jamirapal

Kandaghasa

4th Mar'14

June to July

Water Conservation & Water Harvesting

Jamirapal

Kandaghasa

Kandaghasa

4th Mar'14

June to July

Page 148: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

148/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1780 08 Jamirapal 1 1/12 Khudmorai 232 5 PL 1.20 _ _ 2.23 0.25 2.47 1474

1781 08 Jamirapal 1 1/13 Khudmorai 232 PL 0.80 _ _ 2.23 0.25 2.47 1474

1782 08 Jamirapal 1 1/14 Excavation of Pathuria Pond Pathuria 233 PL 0.50 _ _ 2.23 0.25 2.47 1474

1783 08 Jamirapal 1 1/15 Excavation of Jagannathpur Pond 237 PL 0.50 _ _ 2.58 0.29 2.87 1710

1784 08 Jamirapal 1 1/16 Excavation of Junboni Pond Junboni 236 PL 0.50 _ _ 2.23 0.25 2.47 1474

1785 08 Jamirapal 1 1/17 Excavation of Bagmacha Bagmacha 224 PL 0.50 _ _ 2.23 0.25 2.47 1474

- - - 41.22 4.58 45.80 27297

1786 08 Jamirapal 2 Drought Proofing 2/1 Bhuasai Bhuasai 249 PL - 0.50 _ 0.59 0.40 0.99 393

1787 08 Jamirapal 2 Drought Proofing 2/2 Plantation at Bhuasai mouza Bhuasai Bhuasai 249 PL - - _ 0.59 0.40 0.99 393

1788 08 Jamirapal 2 Drought Proofing 2/3 Plantation at Methia Mouza Methia 220 PL - - _ 0.59 0.40 0.99 393

1789 08 Jamirapal 2 Drought Proofing 2/4 Plantation at Kusumkuria Banspat 217 PL - - _ 0.59 0.40 0.99 393

1790 08 Jamirapal 2 Drought Proofing 2/5 Plantation at Sirisbani mouza Banspat Sirishboni 209 PL - - _ 0.59 0.40 0.99 393

1791 08 Jamirapal 2 Drought Proofing 2/6 Jamirapal 235 PL - 0.80 _ 0.59 0.40 0.99 393

1792 08 Jamirapal 2 Drought Proofing 2/7 Plantation at Jamirapal garh pukur. Jamirapal 235 PL - 0.70 _ 0.59 0.40 0.99 393

1793 08 Jamirapal 2 Drought Proofing 2/8 Plantation at Fuldaha Pry School. Fuldaha 225 PL - 4.00 _ 0.59 0.40 0.99 393

1794 08 Jamirapal 2 Drought Proofing 2/9 Plantation at Fuldaha uttar para Ground Fuldaha 225 PL - 3.00 _ 0.59 0.40 0.99 393

Water Conservation & Water Harvesting

Excavation of Khudmorai Jhapa khal Pond

Jamirapal

Khudmorai

4th Mar'14

June to July

Water Conservation & Water Harvesting

Excavation of Khudmorai High School Pond

Jamirapal

Khudmorai

4th Mar'14

June to July

Water Conservation & Water Harvesting

Jamirapal

Khudmorai

4th Mar'14

June to July

Water Conservation & Water Harvesting

Jamirapal

Khudmorai

Jagannathpur

4th Mar'14

June to July

Water Conservation & Water Harvesting

Jamirapal

Khudmorai

4th Mar'14

June to July

Water Conservation & Water Harvesting

Jamirapal

Dwarikapally

4th Mar'14

June to July

Water Conservation & Water Harvesting Total

Plantation of Bhuasai Pry School Ground.

Jamirapal

4th Mar'14

June to July

Jamirapal

4th Mar'14

Dec to March

Jamirapal

Dwarikapally

4th Mar'14

Dec to March

Jamirapal

Kusumkuria

4th Mar'14

Dec to March

Jamirapal

4th Mar'14

Dec to March

Plantation at Jamirapal Sitala Mandir Ground

Jamirapal

Jamirapal

4th Mar'14

Dec to March

Jamirapal

Jamirapal

4th Mar'14

Dec to March

Jamirapal

Dwarikapally

4th Mar'14

Nov to March

Jamirapal

Dwarikapally

4th Mar'14

Nov to March

Page 149: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

149/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1795 08 Jamirapal 2 Drought Proofing 2/10 Khudmorai 232 PL - 3.50 _ 0.80 0.49 1.29 527

1796 08 Jamirapal 2 Drought Proofing 2/11 Khudmorai 219 PL - 3.00 _ 0.59 0.40 0.99 393

1797 08 Jamirapal 2 Drought Proofing 2/12 Plantation at Jagannathpur SSK ground. 237 PL - 3.50 _ 0.59 0.40 0.99 393

1798 08 Jamirapal 2 Drought Proofing 2/13 Nursery under Jamirapal GP Jamirapal - 0.01 - 2.49 2.95 5.44 1646

- - - 9.81 7.80 17.61 6496

1799 08 Jamirapal 3 3/1 Banspat Sirishboni 209 PL - _ 1.00 1.69 0.19 1.88 1119

1800 08 Jamirapal 3 3/2 Jamirapal 235 PL - _ 1.00 1.60 0.18 1.78 1061

1801 08 Jamirapal 3 3/3 Jamirapal 235 PL - _ 1.00 1.96 0.22 2.18 1297

1802 08 Jamirapal 3 3/4 Jamirapal 235 PL - _ 1.00 1.96 0.22 2.18 1297

1803 08 Jamirapal 3 3/5 Fuldaha 225 PL - _ 1.00 2.23 0.74 2.97 1474

1804 08 Jamirapal 3 3/6 Re-Exavation of Bhangabandh Canal. Atmajia 243 PL - _ 1.00 0.89 0.59 1.48 593

1805 08 Jamirapal 3 3/7 Atmajia 243 PL - _ 1.00 0.89 0.59 1.48 593

1806 08 Jamirapal 3 3/8 Atmajia 243 PL - _ 1.00 1.11 0.37 1.48 737

1807 08 Jamirapal 3 3/9 Atmajia Gentaboni 244 PL - _ 1.00 0.89 0.59 1.48 593

1808 08 Jamirapal 3 3/10 Khudmorai 232 PL - _ 1.00 0.89 0.59 1.48 593

1809 08 Jamirapal 3 3/11 237 PL - _ 1.00 1.39 1.58 2.97 922

1810 08 Jamirapal 3 3/12 Khudmorai 232 PL - - 1.00 1.48 0.49 1.98 983

Plantation at Khudmorai Shiv Mandir Grpund.

Jamirapal

Khudmorai

4th Mar'14

Nov to March

Plantation at Khudmorai High School ground.

Jamirapal

Khudmorai

4th Mar'14

Nov to March

Jamirapal

Khudmorai

Jagannathpur

4th Mar'14

Nov to March

Jamirapal

Jamirapal

4th Mar'14

Drought Proofing TotalMicro Irrigation Works

Const of Canal From Sirisbani to Jadukata.

Jamirapal

4th Mar'14

Nov to March

Micro Irrigation Works

Const of Canal From Jamirapal to Jagannathpur.

Jamirapal

Jamirapal

4th Mar'14

Nov to March

Micro Irrigation Works

Const of Canal From Jamirapal School to GP Office.

Jamirapal

Jamirapal

4th Mar'14

Nov to March

Micro Irrigation Works

Const of Canal From Laxmindra Patra house to Ananata Patra House.

Jamirapal

Jamirapal

4th Mar'14

Nov to March

Micro Irrigation Works

Const of Canal From Fuldaha Fulaswar Mandir to Fuldaha Causay.

Jamirapal

Dwariakapally

4th Mar'14

Oct to March

Micro Irrigation Works

Jamirapal

Bhaghabandh

4th Mar'14

Oct to March

Micro Irrigation Works

Const of Canal From Balia Khal to Bhaandabandh Mouza Via Paihapal Land of Pradip Patra & Jadav Kuila

Jamirapal

Bhaghabandh

4th Mar'14

Oct to March

Micro Irrigation Works

Const of Canal From Kitajhari to Bhangabandh Near Subhas Rana House

Jamirapal

Bhaghabandh

4th Mar'14

Oct to March

Micro Irrigation Works

Const of Canal From Bajipukur to Gengtabani Football Ground

Jamirapal

4th Mar'14

Oct to March

Micro Irrigation Works

Const of Canal From Khudmorai Shiv Mandir to Jaidev Sahoo House

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Micro Irrigation Works

Const of Canal From Jagannathpur Pirep to Bagmacha

Jamirapal

Khudmorai

Jagannathpur

4th Mar'14

Oct to March

Micro Irrigation Works

Const of Canal From Khudmorai Subhandu Pradhan House to Jhapa Khal

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Page 150: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

150/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 17.00 6.34 23.34 11260

1811 08 Jamirapal 6 Land Development 6/1 Land Lavelling of Muraboni Harimandir Bhuasai Muraboni 251 PL - 0.20 _ 2.23 0.25 2.47 1474

1812 08 Jamirapal 6 Land Development 6/2 Land Lavelling of Bhuasai pry school Bhuasai Bhuasai 249 PL - 0.20 _ 2.23 0.25 2.47 1474

1813 08 Jamirapal 6 Land Development 6/3 Land Lavelling of Jadukata SSK Banspat Jadhukotha 218 PL - 0.20 _ 2.23 0.74 2.97 1474

1814 08 Jamirapal 6 Land Development 6/4 Banspat 217 PL - 0.20 _ 2.23 0.25 2.47 1474

1815 08 Jamirapal 6 Land Development 6/5 Land Lavelling of Banspat Pry School Banspat Banspat 223 PL - 0.20 _ 2.23 0.25 2.47 1474

1816 08 Jamirapal 6 Land Development 6/6 Land Lavelling of Knwar Saheb Than Birkada 223 PL - 0.20 _ 2.23 0.25 2.47 1474

1817 08 Jamirapal 6 Land Development 6/7 Land Lavelling of Dwarikapally Hut. Birkada 223 PL - 0.20 _ 2.23 0.25 2.47 1474

1818 08 Jamirapal 6 Land Development 6/8 Land Lavelling of Krishna Jew Ground Birkada 223 PL - 0.20 _ 2.23 0.25 2.47 1474

1819 08 Jamirapal 6 Land Development 6/9 Jamirapal 235 PL - 0.20 _ 2.23 0.25 2.47 1474

1820 08 Jamirapal 6 Land Development 6/10 Jamirapal 235 PL - 0.20 _ 2.23 0.25 2.47 1474

1821 08 Jamirapal 6 Land Development 6/11 Jamirapal 235 PL - 0.20 _ 2.23 0.25 2.47 1474

1822 08 Jamirapal 6 Land Development 6/12 Jamirapal 235 PL - 0.20 _ 2.23 0.25 2.47 1474

1823 08 Jamirapal 6 Land Development 6/13 Fuldaha 225 PL - 0.20 _ 2.23 0.25 2.47 1474

1824 08 Jamirapal 6 Land Development 6/14 Fuldaha 225 PL - 0.20 _ 2.23 0.25 2.47 1474

1825 08 Jamirapal 6 Land Development 6/15 Fuldaha 225 PL - 0.20 _ 2.23 0.25 2.47 1474

1826 08 Jamirapal 6 Land Development 6/16 Atmajia Atmajia 240 PL - 0.20 _ 2.23 0.25 2.47 1474

Micro Irrigation Works Total

Jamirapal

4th Mar'14

Oct to March

Jamirapal

4th Mar'14

Oct to March

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Kusumkuria Pry School

Jamirapal

Kusumkuria

4th Mar'14

Oct to March

Jamirapal

4th Mar'14

Oct to March

Jamirapal

Dwariakapally

4th Mar'14

Oct to March

Jamirapal

Dwariakapally

4th Mar'14

Oct to March

Jamirapal

Dwariakapally

4th Mar'14

Oct to March

Land Lavelling of Jamirapal Football Groud

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Jamirapal Sita Mandir Ground

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Jamirapal Tushar Santi Sangha

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Jamirapal Uttar para ICDS Centre

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Fuldaha Shiv Mandir Ground

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Fuldaha ICDS & Pry School Ground

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Fuldaha Uttar Para Ground

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Atmajhia Pry school ground

Jamirapal

4th Mar'14

Oct to March

Page 151: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

151/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1827 08 Jamirapal 6 Land Development 6/17 Atmajia Pachageria 246 PL - 0.20 _ 2.23 0.25 2.47 1474

1828 08 Jamirapal 6 Land Development 6/18 Atmajia Atmajia 240 PL - 0.20 _ 2.40 0.27 2.67 1592

1829 08 Jamirapal 6 Land Development 6/19 234 PL - 0.20 _ 2.23 0.25 2.47 1474

1830 08 Jamirapal 6 Land Development 6/20 Land Lavelling ofRaisole SSK ground Raisole 239 PL - 0.20 _ 2.40 0.27 2.67 1592

1831 08 Jamirapal 6 Land Development 6/21 Khudmorai 232 PL - 0.20 _ 2.23 0.25 2.47 1474

1832 08 Jamirapal 6 Land Development 6/22 237 PL - 0.20 _ 2.23 0.25 2.47 1474

- - - 49.32 5.97 55.29 32662

1833 08 Jamirapal 8 Rural Connectivity 8/1 Bhuasai Dojola 252 PL - - 1.00 1.79 0.68 2.47 1185

1834 08 Jamirapal 8 Rural Connectivity 8/2 Soil &Morum Work Dojala Vill . Rd Bhuasai Dojola 252 PL - - 1.00 1.79 0.68 2.47 1185

1835 08 Jamirapal 8 Rural Connectivity 8/3 Bhuasai Bhuasai 249 PL - - 0.50 1.49 0.68 2.18 988

1836 08 Jamirapal 8 Rural Connectivity 8/4 Bhuasai Bhuasai 249 PL - - 0.50 1.49 0.68 2.18 988

1837 08 Jamirapal 8 Rural Connectivity 8/5 Bhuasai Bhuasai 249 PL - - 0.50 1.49 0.68 2.18 988

1838 08 Jamirapal 8 Rural Connectivity 8/6 Bhuasai Bhuasai 249 PL - - 0.50 1.49 0.49 1.98 988

1839 08 Jamirapal 8 Rural Connectivity 8/7 Bhuasai Bhuasai 249 PL - - 1.50 1.99 0.98 2.97 1317

1840 08 Jamirapal 8 Rural Connectivity 8/8 Banspat Banspat 219 PL - - 1.50 2.98 0.48 3.46 1975

1841 08 Jamirapal 8 Rural Connectivity 8/9 Banspat 219 PL - - 0.50 1.49 0.68 2.18 988

1842 08 Jamirapal 8 Rural Connectivity 8/10 Banspat Banspat 219 PL - - 0.50 1.49 0.49 1.98 988

Land Lavelling of Pachageri Harimancha

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Atmajhia SSK Groind

Jamirapal

4th Mar'14

Oct to March

Land Lavelling of Kandaghasa Mandir Ground

Jamirapal

Kandaghasa

Kandaghasa

4th Mar'14

Oct to March

Jamirapal

Kandaghasa

4th Mar'14

Oct to March

Land Lavelling of Khudmorai Shiv Mandir Ground

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Land Lavelling of Jajannathpur ICDS Centre

Jamirapal

Khudmorai

Jagannathpur

4th Mar'14

Oct to March

Land Development Total

Soil &Morum Work Dojala Ambagan to Bhajai Murmu House Rd

Jamirapal

4th Mar'14

Oct to March

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Binod Sing to Rabindra Mahata House .

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Kuyar Hansda House to Jayram Mahata House .

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Kadu Soren House to PMG . Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Kapu Soren House to Makar Hansda House . Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work PMG Road to Odisha Border. Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Muchak Chak to Banspat Pry School. Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Banspat MSK to Dukhu Dandapat House"s. Rd

Jamirapal

Banspat, Karasai

4th Mar'14

Oct to March

Soil &Morum Work Salil Mahata House to Hari Mandir. Rd

Jamirapal

4th Mar'14

Oct to March

Page 152: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

152/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1843 08 Jamirapal 8 Rural Connectivity 8/11 Banspat Sirishboni 209 PL - - 1.00 2.19 0.48 2.67 1449

1844 08 Jamirapal 8 Rural Connectivity 8/12 Banspat Sirishboni 209 PL - - 0.50 1.49 0.49 1.98 988

1845 08 Jamirapal 8 Rural Connectivity 8/13 Banspat Banspat 219 PL - - 0.50 1.49 0.49 1.98 988

1846 08 Jamirapal 8 Rural Connectivity 8/14 Banspat Atmajia 240 PL - - 2.00 2.49 0.98 3.46 1646

1847 08 Jamirapal 8 Rural Connectivity 8/15 Banspat Banspat 219 PL - - 0.50 1.49 0.49 1.98 988

1848 08 Jamirapal 8 Rural Connectivity 8/16 Banspat 217 PL - - 0.50 1.49 0.49 1.98 988

1849 08 Jamirapal 8 Rural Connectivity 8/17 Banspat 218 PL - - 1.00 1.99 0.48 2.47 1317

1850 08 Jamirapal 8 Rural Connectivity 8/18 Soil &Morum Work Banspat Vill. Rd Banspat Banspat 219 PL - - 1.00 1.99 0.48 2.47 1317

1851 08 Jamirapal 8 Rural Connectivity 8/19 Birkada 223 PL - - 0.50 1.49 0.49 1.98 988

1852 08 Jamirapal 8 Rural Connectivity 8/20 Birkada 223 PL - - 0.50 1.99 0.48 2.47 1317

1853 08 Jamirapal 8 Rural Connectivity 8/21 Birkada 223 PL - - 0.30 0.76 0.92 1.68 501

1854 08 Jamirapal 8 Rural Connectivity 8/22 Birkada 223 PL - - 0.50 1.49 0.68 2.18 988

1855 08 Jamirapal 8 Rural Connectivity 8/23 Birkada 223 PL - - 0.80 1.99 0.68 2.67 1317

1856 08 Jamirapal 8 Rural Connectivity 8/24 Birkada 254 PL - - 0.30 1.99 1.37 3.36 1317

1857 08 Jamirapal 8 Rural Connectivity 8/25 Bagmacha 224 PL - - 0.30 0.76 0.92 1.68 501

1858 08 Jamirapal 8 Rural Connectivity 8/26 Tikrapara 215 PL - - 0.50 1.29 0.98 2.28 856

Soil &Morum Work Sirisbani Hari Mandir to Anam Mahata House. Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Sirisbani Harimandir to Banthu Tudus House . Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Kalyan Mahata house to Kunyar Hembram House. Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Baghdekha to Narayan Murmu House. Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Jadukata Ramdas Tudus House to Sitaram Murmus House. Rd

Jamirapal

4th Mar'14

Oct to March

Soil &Morum Work Kusumkuria Pirep rd to Haripada Beshra House . Rd

Jamirapal

Kusumkuria

4th Mar'14

Oct to March

Soil &Morum Work Kusumkuria Vill . Rd

Jamirapal

Kusumkuria

4th Mar'14

Oct to March

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Birkada Adhar Paira"s House to Sahoo Para road.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Birkada Tulsi Kotal"s to Tikrapara more rd.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Birkada Baneswer Dandapats House to Amar Mahapatra"s House rd.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Bikada Brajendra patra"s House to Nilkanta DAs House rd.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Birkada Debendra palui House to Kalipada Mishra house Rd.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Birkada Bhupati Sahoo House to Jatindra Sahoo House Rd.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Bagmacha Indu Hemram House to Nilkanta House Rd.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Tikrapara Chak to Dhananjay"s Rd.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Page 153: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

153/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1859 08 Jamirapal 8 Rural Connectivity 8/27 Tikrapara 215 PL - - 0.50 1.99 1.37 3.36 1317

1860 08 Jamirapal 8 Rural Connectivity 8/28 Tikrapara 215 PL - - 0.50 1.99 1.37 3.36 1317

1861 08 Jamirapal 8 Rural Connectivity 8/29 Tikrapara 215 PL - - 1.00 1.99 1.37 3.36 1317

1862 08 Jamirapal 8 Rural Connectivity 8/30 Tikrapara 215 PL - - 1.00 1.99 1.37 3.36 1317

1863 08 Jamirapal 8 Rural Connectivity 8/31 Tikrapara 215 PL - - 0.50 1.49 0.49 1.98 988

1864 08 Jamirapal 8 Rural Connectivity 8/32 Kumarpur 222 PL - - 0.50 1.49 0.49 1.98 988

1865 08 Jamirapal 8 Rural Connectivity 8/33 Kumarpur 222 PL - - 0.50 1.49 0.49 1.98 988

1866 08 Jamirapal 8 Rural Connectivity 8/34 Banspat 218 PL - - 0.50 1.49 0.49 1.98 988

1867 08 Jamirapal 8 Rural Connectivity 8/35 Khudmorai 232 PL - - 0.50 1.49 0.68 2.18 988

1868 08 Jamirapal 8 Rural Connectivity 8/36 Khudmorai 232 PL - - 1.50 1.99 1.37 3.36 1317

1869 08 Jamirapal 8 Rural Connectivity 8/37 Methia 220 PL - - 0.50 1.19 1.18 2.37 790

1870 08 Jamirapal 8 Rural Connectivity 8/38 Sirisboni 209 PL - - 0.30 0.76 0.92 1.68 501

1871 08 Jamirapal 8 Rural Connectivity 8/39 Kumarpur 222 PL - - 0.30 0.50 0.59 1.09 329

1872 08 Jamirapal 8 Rural Connectivity 8/40 Birkada 223 PL - - 0.30 0.50 0.59 1.09 329

1873 08 Jamirapal 8 Rural Connectivity 8/41 Fuldaha 225 PL - - 0.30 0.50 0.59 1.09 329

1874 08 Jamirapal 8 Rural Connectivity 8/42 225 PL - - 0.30 0.50 0.59 1.09 329

Soil and morrum work Dhananjay Shit House to Sonamoy Bridge Rd.

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Dhananjay Sahoo House to Tikrapara Sonamoye pool Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Tikrapara Tarun Sahoo House to Paresh SahooHouse Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Sonamaye pool toKamlapur Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Adaitya Sahoo House to Dorkhuli pond Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Dorkhuli Pond to Knwarsaheb Temple up to Matilal Aguan House Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Matilal Aguan House to side of Kumarpur Uttarpara Up to Kusumkuria Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Paban Bera Shop to Karji House Rd

Jamirapal

Kusumkuria

4th Mar'14

Oct to March

Soil and morrum work Jamirapal Club to khudmorai sanibar hut tala Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Khudmorai shiv mandir to jinaipal Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Jamirapal Foot ball ground to Nadi ghat Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Khudmorai High School Gate to Ananta Shyamal house Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Sukumar Ghosh House to Bipad Bhunia HouseRd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Khudmorai Shiv mandir Rakhal ch Ghosh house Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Khudmorsi Himangshu Ghosh House Bipad bhunia Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Jhareswar Ghosh House to Srimanta Bag House Rd

Jamirapal

Khudmorai

Fuldaha, Tikrapara

4th Mar'14

Oct to March

Page 154: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

154/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1875 08 Jamirapal 8 Rural Connectivity 8/43 Fuldaha 225 PL - - 0.50 1.99 0.78 2.77 1317

1876 08 Jamirapal 8 Rural Connectivity 8/44 Fuldaha 225 PL - - 0.50 1.99 0.78 2.77 1317

1877 08 Jamirapal 8 Rural Connectivity 8/45 Fuldaha 225 PL - - 0.30 0.50 0.49 0.99 329

1878 08 Jamirapal 8 Rural Connectivity 8/46 Fuldaha 225 PL - - 0.30 0.50 0.49 0.99 329

1879 08 Jamirapal 8 Rural Connectivity 8/47 Fuldaha 225 PL - - 0.30 0.50 0.49 0.99 329

1880 08 Jamirapal 8 Rural Connectivity 8/48 Bagmacha 224 PL - - 1.00 1.99 0.78 2.77 1317

1881 08 Jamirapal 8 Rural Connectivity 8/49 Atmajia Atmajia 224 PL - - 1.00 1.99 0.78 2.77 1317

1882 08 Jamirapal 8 Rural Connectivity 8/50 Atmajia Pachageria 246 PL - - 1.00 1.99 0.78 2.77 1317

1883 08 Jamirapal 8 Rural Connectivity 8/51 Atmajia Gentaboni 244 PL - - 0.50 1.99 0.78 2.77 1317

1884 08 Jamirapal 8 Rural Connectivity 8/52 Atmajia Atmajia 240 PL - - 0.50 1.99 0.78 2.77 1317

1885 08 Jamirapal 8 Rural Connectivity 8/53 Atmajia Atmajia 240 PL - - 0.50 1.99 0.78 2.77 1317

1886 08 Jamirapal 8 Rural Connectivity 8/54 Atmajia Gentaboni 244 PL - - 1.00 1.99 0.78 2.77 1317

1887 08 Jamirapal 8 Rural Connectivity 8/55 Atmajia Atmajia 240 PL - - 0.50 1.99 0.78 2.77 1317

1888 08 Jamirapal 8 Rural Connectivity 8/56 Atmajia Atmajia 240 PL - - 1.00 1.99 0.78 2.77 1317

1889 08 Jamirapal 8 Rural Connectivity 8/57 Atmajia Tikrapara 215 PL - - 1.00 1.99 0.78 2.77 1317

1890 08 Jamirapal 8 Rural Connectivity 8/58 Atmajia Atmajia 240 PL - - 0.50 1.99 0.78 2.77 1317

Soil and morrum work priyari pukur to Sanibar hut tala Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Sanibar Hut Tala to Jagannathpur Rabindra Bera House Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Laxminarayan Pariary House Swapan Karan House Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Sanibar Hut tala to Nakul Dandapat House Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Satyaranjan Bhunia House to Agasti charan ghodh Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Jagannathpur pirep to Jamipal Hospital Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Atmajhia Pradip Patra House to Nadi ghat Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Pachageria Pirep Samir jana Shop to Buddha Sing House Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Gengtabani foot ball North West corner to Mojesh Hembram House Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Atmajhia Sudhir Ghosh House More to Pankeswar House Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Atmajhia Uttar Para Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Gengtabani football Ground south corner to Bhangabandh Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Ananda Juila Chak to Jadav kuila Pukur Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Atmajhia pry School to khudmorai Pariyari pukur Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Gopinathpur Vill Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work sonatan House to Deben Mandi House Rd

Jamirapal

4th Mar'14

Oct to March

Page 155: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

155/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1891 08 Jamirapal 8 Rural Connectivity 8/59 Atmajia Gentaboni 244 PL - - 1.00 2.09 0.78 2.87 1383

1892 08 Jamirapal 8 Rural Connectivity 8/60 Atmajia 245 PL - - 1.00 2.49 0.78 3.26 1646

1893 08 Jamirapal 8 Rural Connectivity 8/61 Atmajia Atmajia 240 PL - - 1.00 2.49 0.78 3.26 1646

1894 08 Jamirapal 8 Rural Connectivity 8/62 Jamirapal 235 PL - - 0.50 1.49 0.49 1.98 988

1895 08 Jamirapal 8 Rural Connectivity 8/63 Jamirapal 235 PL - - 0.50 1.49 0.68 2.18 988

1896 08 Jamirapal 8 Rural Connectivity 8/64 Jamirapal 235 PL - - 0.50 1.49 0.49 1.98 988

1897 08 Jamirapal 8 Rural Connectivity 8/65 Jamirapal 235 PL - - 0.50 1.49 1.18 2.67 988

1898 08 Jamirapal 8 Rural Connectivity 8/66 Jamirapal 235 PL - - 1.00 1.99 0.78 2.77 1317

1899 08 Jamirapal 8 Rural Connectivity 8/67 Jamirapal 235 PL - - 1.00 1.99 1.18 3.17 1317

1900 08 Jamirapal 8 Rural Connectivity 8/68 Jamirapal 235 PL - - 1.00 1.99 1.18 3.17 1317

1901 08 Jamirapal 8 Rural Connectivity 8/69 Jamirapal 215 PL - - 0.50 1.99 1.18 3.17 1317

1902 08 Jamirapal 8 Rural Connectivity 8/70 Jamirapal 235 PL - - 1.00 1.99 1.18 3.17 1317

1903 08 Jamirapal 8 Rural Connectivity 8/71 Jamirapal 235 PL - - 1.00 1.99 1.18 3.17 1317

1904 08 Jamirapal 8 Rural Connectivity 8/72 Jamirapal 235 PL - - 1.00 1.99 1.18 3.17 1317

1905 08 Jamirapal 8 Rural Connectivity 8/73 Jamirapal 235 PL - - 1.00 1.99 1.18 3.17 1317

1906 08 Jamirapal 8 Rural Connectivity 8/74 Fuldaha 235 PL - - 1.00 1.99 1.18 3.17 1317

Soil and morrum work Gengtabani Nakfuri Rana House to Pachageria Sontosh Jana House Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Gopinathpur SSK Western Side to Budhu Sing House Rd

Jamirapal

Gopinathpur

4th Mar'14

Oct to March

Soil and morrum work Atmajhia Pradip patra house to Bhanu Kotal House Rd

Jamirapal

4th Mar'14

Oct to March

Soil and morrum Jamirapal Sitala Mandir to Prabhat Sing House work Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work jamirapal GP Office to Ajit Mishra House Via Garh Pukur Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum Radhakanta House to Jhapa Khal Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Jamirapal Bakul Tala to Nadi Ghat Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Sachindra Pathagar to Hospital Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Shaktipada Pattyanayak Shop to Dipu pattanayak pukur Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Jamirapal ananta Patra house to aam Tala Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work munnar Dokan to Fuldaha Cosway Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Munnar dokan to kedri Dandapat house Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Jamirapal Baneswar Patra house to Nadi ghat Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Jamirapal pry School to amtalia Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Fuldaha Casay to Natun Sai Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work Fuldaha Harimancha to Nadi ghat Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Page 156: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

156/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1907 08 Jamirapal 8 Rural Connectivity 8/75 Fuldaha 235 PL - - 1.00 1.99 1.18 3.17 1317

1908 08 Jamirapal 8 Rural Connectivity 8/76 Fuldaha 225 PL - - 1.00 1.99 1.18 3.17 1317

1909 08 Jamirapal 8 Rural Connectivity 8/77 Fuldaha 225 PL - - 0.50 1.49 0.49 1.98 988

1910 08 Jamirapal 8 Rural Connectivity 8/78 Tikrapara 215 PL - - 0.50 1.19 0.79 1.98 790

1911 08 Jamirapal 8 Rural Connectivity 8/79 Fuldaha 215 PL - - 0.50 0.70 1.18 1.88 461

1912 08 Jamirapal 8 Rural Connectivity 8/80 Fuldaha 225 PL - - 0.50 0.70 0.79 1.48 461

1913 08 Jamirapal 8 Rural Connectivity 8/81 Khudmorai 232 PL - - 0.50 1.19 0.79 1.98 790

1914 08 Jamirapal 8 Rural Connectivity 8/82 215 PL - - 0.50 1.19 0.79 1.98 790

1915 08 Jamirapal 8 Rural Connectivity 8/83 Soil and morrum work Raisole Vill Rd Raisole 215 PL - - 0.70 1.19 0.79 1.98 790

1916 08 Jamirapal 8 Rural Connectivity 8/84 Raisole 239 PL - - 0.70 1.19 0.79 1.98 790

1917 08 Jamirapal 8 Rural Connectivity 8/85 234 PL - - 0.50 0.99 0.79 1.78 658

1918 08 Jamirapal 8 Rural Connectivity 8/86 234 PL - - 0.50 1.19 0.79 1.98 790

1919 08 Jamirapal 8 Rural Connectivity 8/87 Raisole 239 PL - - 0.50 1.19 0.79 1.98 790

- - - 139.67 69.53 209.21 92498

1920 08 Jamirapal 15 15/1 750 Nos Sanitatioin at G P area. - - - 24.30 16.20 40.50 16093 June

- - - 24.30 16.20 40.50 16093

- - - 281.32 110.43 391.75 186306

Soil and morrum work Fuldaha Shiv mandir to Kenaram Dhal"s house Rd

Jamirapal

Jamirapal

4th Mar'14

Oct to March

Soil and morrum work fuldaha Kritibas Patra house to Golap Kuila house Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Suern Barik House to Bhutia sai Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Basanta Patra house to Tikrapara more Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Shiv Mandir to Ghosh pukur Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work Fuldaha uttar Para to Nadi ghat Rd

Jamirapal

Dwarikapally

4th Mar'14

Oct to March

Soil and morrum work khudmorai Sudhir Ghosh house to Biplab Rout House Rd

Jamirapal

Khudmorai

4th Mar'14

Oct to March

Soil and morrum work Kandaghasa Uttar sai Rd

Jamirapal

Kandaghasa

Kandaghasa

4th Mar'14

Oct to March

Jamirapal

Kandoghasa

4th Mar'14

Oct to March

Soil and morrum work Raisole Jagen Rana house to Naran Hembram house Rd

Jamirapal

Kandoghasa

4th Mar'14

Oct to March

Soil and morrum work Kandaghasa Gopal Bautia house to Badal Digar house Rd

Jamirapal

Kandoghasa

Kandoghasa

4th Mar'14

Oct to March

Soil and morrum work Kandaghasa Dakshin Sai Rd

Jamirapal

Kandoghasa

Kandoghasa

4th Mar'14

Oct to March

Soil and morrum work Raisole Mugli murmu house to Nagen Rana house Rd

Jamirapal

Kandoghasa

4th Mar'14

Oct to March

Rural Connectivity TotalRural Sanitation related works

Jamirapal

Jamirapal

2nd Feb'14

Rural Sanitation related works Total

Jamirapal Total

Page 157: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

157/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1921 09 1 1/1 Rangium 108 Lusku IL 2.60 - - 2.54 0.28 2.82 1683

1922 09 1 1/2 Rangium 108 IL 2.60 - - 2.54 0.28 2.82 1683

1923 09 1 1/3 Excav of Pond at the land of Rani Tudu Rangium 108 IL 2.60 - - 2.54 0.28 2.82 1683

1924 09 1 1/4 Rangium 108 IL 2.60 - - 2.54 0.28 2.82 1683

1925 09 1 1/5 Rangium 108 IL 2.60 - - 2.54 0.28 2.82 1683

1926 09 1 1/6 Rangium 108 182/527 IL 2.60 - - 2.54 0.28 2.82 1683

1927 09 1 1/7 Excav of Pond at the land of Haren Sing Marapada 132 218 IL 1.70 - - 2.40 0.27 2.67 1591

1928 09 1 1/8 Marapada 132 56 own IL 1.40 - - 1.86 0.21 2.07 1232

1929 09 1 1/9 Kuji Kuji 131 82 IL 1.40 - - 2.33 0.26 2.59 1542

1930 09 1 1/10 Excav Of Pond At Bartalpada Mouza Dokra 197 357 1.50 - - 2.33 0.26 2.59 1542

1931 09 1 1/11 Excav Of Pond At Saripura Mouza Dokra Saripura 197 196 1.60 - - 2.54 0.28 2.82 1683

1932 09 1 1/12 Exca. Of Prakash Barik Pond Dokra Salbani 156 302 IL 1.40 - - 2.46 0.27 2.74 1631

1934 09 1 1/13 203 IL 1.40 - - 2.33 0.28 2.61 1541

1935 09 1 1/14 203 Dhiren IL 1.40 - - 2.17 0.24 2.41 1435

1936 09 1 1/15 Kenduboni 193 IL 1.40 - - 2.62 0.29 2.92 1737

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Lusku Hembram

Kharikamathani

Panchkahania

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Gouri Saren

Kharikamathani

Panchkahania

Gouri Saren

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Panchkahania

Rani Tudu

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Sagar Mahata

Kharikamathani

Panchkahania

Sagar Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Pulin Mahata

Kharikamathani

Panchkahania

Pulin Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Harekrishna Mahata

Kharikamathani

Panchkahania

Harekrishna

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Marapada

Haren Sing

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Nirananda Mahata

Kharikamathani

Marapada

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of pond at the land of Brindaban Senapati

Kharikamathani

Brindaban

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Baratalpada

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Prakash Barik

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Rup Chand Mahali at Chowka

Kharikamathani

Ghugrisole

Chowkapathra

Rupchand

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Dhiren Mahali at Chowkapathra

Kharikamathani

Ghugrisole

Chowkapathra

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Lakshman Mandi at Kenduboni

Kharikamathani

Ghugrisole

Lakshman

21st Feb'14

April to May

Page 158: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

158/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1937 09 1 1/16 Kenduboni 193 Dandu IL 1.40 - - 2.08 0.23 2.31 1379

1938 09 1 1/17 Kenduboni 193 IL 1.40 - - 2.33 0.26 2.59 1542

1939 09 1 1/18 Excav of Ghugrisole Churka Pukur Ghugrisole 191 PL 1.40 - - 2.54 0.28 2.82 1681

1940 09 1 1/19 Exca. Of Shib Charan Mahata Pond Ghoratoria 112 365 IL 1.40 - - 2.55 0.30 2.86 1690

1941 09 1 1/20 Exca. Of Mahendra Mahata Pond Ghoratoria 112 488 IL 1.40 - - 2.23 0.25 2.48 1480

1942 09 1 1/21 Exca. Of Anil Mahata Pond Ghoratoria 112 280 IL 1.40 - - 2.33 0.26 2.59 1542

1943 09 1 1/22 Exca. Of Baren Mahata Pond Ghoratoria 112 IL 1.40 - - 2.33 0.26 2.59 1542

1944 09 1 1/23 Exca. Of Ajit Mahata Pond Ghoratoria 112 IL 1.40 - - 2.33 0.26 2.59 1542

1945 09 1 1/24 Exca. Of Mirza Mandi Pond Banksole 71, 67 IL 1.40 - - 2.48 0.28 2.76 1643

1946 09 1 1/25 Exca. Of Bijay Bera Pond Dihikhelar 70 IL 1.40 - - 2.40 0.27 2.67 1592

1947 09 1 1/26 Dihikhelar 178 IL 1.40 - - 2.48 0.28 2.76 1643

1948 09 1 1/27 Exca. Of Chittaranjan Mahata Pond 202 19 IL 1.40 - - 2.48 0.28 2.76 1643

1949 09 1 1/28 Exca. Of Atul Chandra Mahata Pond 202 84,83 IL 1.40 - - 2.62 0.29 2.92 1737

1950 09 1 1/29 Exca. Of Naran Hansda Pond Charpada 200 65 IL 1.40 - - 2.62 0.29 2.92 1737

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Dandu Mandi at Kenduboni

Kharikamathani

Ghugrisole

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav of Pond at the land of Dhananjay Hembram at Keduboni

Kharikamathani

Ghugrisole

Dhananjay

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Ghugrisole

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Ghoratoria

Shibcharan Mahara

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Ghoratoria

Mahendra Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Ghoratoria

Anil Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Ghoratoria

Baren Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Ghoratoria

Ajit Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Ghoratoria

Mirza Mandi

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Ghoratoria

Bijay Bera

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Exca. Of Manmatha Bera & Others Pond

Kharikamathani

Ghoratoria

Manmatha Bera & Others

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Kurmipathra

Kurmipathra

Chittaranjan Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Kurmipathra

Kurmipathra

Atul Chandra Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Kurmipathra

Naran Hansda

21st Feb'14

April to May

Page 159: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

159/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1951 09 1 1/30 Exca. Of Badal Besra Pond Charpada 200 IL 1.40 - - 2.40 0.27 2.67 1592

1952 09 1 1/31 Exca. Of Bijay Mahata Pond Charpada 200 266 IL 1.40 - - 2.40 0.27 2.67 1592

1953 09 1 1/32 Exca. Of Tridib Mahata Pond Barakati 201 IL 1.40 - - 2.47 0.27 2.75 1637

1954 09 1 1/33 Exca. Of Dayal chandra Mahata Pond Barakati 201 91 IL 1.40 - - 2.78 0.31 3.08 1838

1955 09 1 1/34 Exca. Of Sudhir Mahata Pond Barakati 201 100, 101 IL 1.40 - - 2.17 0.24 2.41 1435

1956 09 1 1/35 Exca. Of Lagu Soren Pond Jharia Jharia 262 726 IL 1.40 - - 2.47 0.27 2.75 1637

1957 09 1 1/36 Exca. Of Rabindra Shit Pond Jharia Jharia 262 263 IL - - - 2.47 0.27 2.75 1637

1958 09 1 1/37 Exca. Of Madan Hembram Pond Jharia Kadokotha 205 46 IL - - - 2.47 0.27 2.75 1637

1959 09 1 1/38 Amjam 208 IL 1.70 - - 1.89 0.21 2.10 1255

1960 09 1 1/39 Excav Pond at the land of Nagen Tudu Amjam 208 IL 1.70 - - 1.91 0.21 2.12 1266

1961 09 1 1/40 Excav Of Pond At Khanamuri Mouza Khanamuri 147 PL 1.60 - - 1.92 0.21 2.13 1269

1962 09 1 1/41 Khanamuri 147 PL 1.60 - - 1.92 0.21 2.13 1269

1963 09 1 1/42 Kuji Kuji 135 152 IL 1.00 - - 1.70 0.19 1.88 1123

- - - 99.07 11.06 110.13 65610

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Kurmipathra

Badal Besra

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Kurmipathra

Bijay Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Kurmipathra

Tridib Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Kurmipathra

Dayal chandra Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Kurmipathra

Sudhir Mahata

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Lagu Soren

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Rabindra Shit

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Madan Hembram

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav Pond at the land of Sahahadev Tudu

Kharikamathani

Baradhansola

Ajay Maity

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Baradhansola

Hrishikesh Jana

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Kharikamathani

Khanamuri

21st Feb'14

April to May

Kharikamathani

Water Conservation & Water Harvesting

Excav Of Pond At Khanamuri Adibasi para

Kharikamathani

Khanamuri

21st Feb'14

June to Sept

Kharikamathani

Water Conservation & Water Harvesting

Excav of pond at the land of Rajendra Dehuri

Kharikamathani

Rajendra

Reno.wat

21st Feb'14

Jan to Mar

Water Conservation & Water Harvesting Total

Page 160: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

160/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1964 09 2 Drought Proofing 2/1 Rangium 108 185 IL - 1.00 - 1.05 0.29 1.34 696

1965 09 2 Drought Proofing 2/2 107 IL - 3.00 - 1.80 0.49 2.29 1193

1966 09 2 Drought Proofing 2/3 107 School PL - 0.50 - 1.05 0.79 1.84 696

1967 09 2 Drought Proofing 2/4 Nurshery Firm At Panchkahania 107 - 0.50 - 0.75 0.69 1.44 497

1968 09 2 Drought Proofing 2/5 Nurshery Firm At Ambisole Ambisole 115 - 0.20 - 0.60 0.59 1.19 398

1969 09 2 Drought Proofing 2/6 Marapada 132 St/SC IL - 2.00 - 0.60 0.29 0.89 398

1970 09 2 Drought Proofing 2/7 Horticulture at Marapada Sansad IL - 4.00 - 1.20 1.84 3.04 795

1971 09 2 Drought Proofing 2/8 Gohaldiha 133 IL - 4.00 - 1.65 0.49 2.14 1094

1972 09 2 Drought Proofing 2/9 Gohaldiha 133 452, 453 IL - 0.50 - 0.90 0.29 1.19 597

1973 09 2 Drought Proofing 2/10 Gohaldiha 133 PL - 2.00 - 1.35 1.48 2.83 895

1974 09 2 Drought Proofing 2/11 Kuji Kuji 131 IL - 4.00 - 1.65 0.49 2.14 1094

1975 09 2 Drought Proofing 2/12 Kuji Kuji 131 84 IL - 1.00 - 1.20 1.18 2.38 795

1976 09 2 Drought Proofing 2/13 Kuji Kuji 131 PL - 1.00 - 1.43 0.95 2.38 946

1977 09 2 Drought Proofing 2/14 Dihikhelar 1 IL - - - 1.20 0.59 1.79 795

Kharikamathani

Afforstation at the Land of Manoranjan Mahata & others land

Kharikamathani

Panchkahania

Manoranjan Mahata

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at the Land of Ampa Tudu, Mantri Saren & Others

Kharikamathani

Panchkahania

Panchkahania

236 & others

Ampa & others

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Horticulture at Panchkahania Pry School (New)Land

Kharikamathani

Panchkahania

Panchkahania

182/735,750

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Kharikamathani

Panchkahania

Panchkahania

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Kharikamathani

Panchkahania

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Maintenance of afforstation at Marapada Sansad

Kharikamathani

Marapada

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Kharikamathani

Marapada

Mara,sia,bara

132, 113, 114

St/SC/Bpl

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at the Jayanta Singha,Mriganka Singha,Harish Raut & others' land

Kharikamathani

Gohaldiha

2,95,96,124

Jayanta Singha & Others

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at the side of Ramnarayan Singha's Pond

Kharikamathani

Gohaldiha

Ramnarayan

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Horticulture behind the Babukati Aribundh

Kharikamathani

Gohaldiha

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at the Land of Hemanta Senapati & others

Kharikamathani

156 & oths

Hemanta & othrs

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Horticulture(Mango Garden)at the Land of Kashinath Nayek

Kharikamathani

Kashinath Nayek

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at the both side of Kuji Natun pukur to Sarat House rd

Kharikamathani

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of Madhusudan Bera & Others Land

Kharikamathani

Ghoratoria

Madhusudan Bera & Others

Drou. Proof

21st Feb'14

June to Sept

Page 161: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

161/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1978 09 2 Drought Proofing 2/15 Ghoratoria 112 - 0.25 - 0.75 1.53 2.28 497

1979 09 2 Drought Proofing 2/16 Dokra Dokra 198 306 PL - - - 1.20 0.59 1.79 795

1980 09 2 Drought Proofing 2/17 Dokra 197 249 IL - - - 1.20 0.59 1.79 795

1981 09 2 Drought Proofing 2/18 Dokra 197 291, 402 IL - - - 1.05 0.64 1.69 696

1982 09 2 Drought Proofing 2/19 Afforstation at Gurianisole Mouza PL - - - 1.81 1.21 3.02 1202

1983 09 2 Drought Proofing 2/20 Afforstation at Kenduboni Mouza Kenduboni PL - - - 1.05 0.64 1.69 696

1984 09 2 Drought Proofing 2/21 Afforstation at Chowkapathra Mouza Chowka 203 PL - - - 1.05 0.64 1.69 696

1985 09 2 Drought Proofing 2/22 202 113, 114 IL - - - 1.81 1.21 3.02 1202

1986 09 2 Drought Proofing 2/23 202 52 IL - - - 1.05 0.49 1.54 696

1987 09 2 Drought Proofing 2/24 202 151 IL - - - 1.05 0.49 1.54 696

1988 09 2 Drought Proofing 2/25 charpada 200 9 IL - - - 1.05 0.49 1.54 696

1989 09 2 Drought Proofing 2/26 charpada 200 IL - - - 1.05 0.49 1.54 696

Kharikamathani

Nurshary Firm At Ghorateria By Sathi Sangha SHG

Kharikamathani

Ghoratoria

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at Gramin Padma Pukur at Dokra

Kharikamathani

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at the Land of Matilal Hansda & Suren Hembram Land

Kharikamathani

Baratalpada

Matilal Hansda & Othera

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at the land of Ramchandra Soren & Others

Kharikamathani

Baratalpada

Ramchandra Soren & Others

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Kharikamathani

Ghugrisole

Gurianisole Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Kharikamathani

Ghugrisole

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Kharikamathani

Ghugrisole

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of Gita Mahata & Others Land

Kharikamathani

Kurmipathra

Kurmipathra

Gita Mahata & Others

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of Anil Mahata & Others Land

Kharikamathani

Kurmipathra

Kurmipathra

Anil Mahata & Others

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of chinmoy Mahata & Others

Kharikamathani

Kurmipathra

Kurmipathra

Chinmoy Mahata & others

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of Bariyal Hansda & Others Land

Kharikamathani

Kurmipathra

Bariyal Hansda & others

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of Musu Mandi & Others Land

Kharikamathani

Kurmipathra

Musu Mandi & Others

Drou. Proof

21st Feb'14

June to Sept

Page 162: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

162/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

1990 09 2 Drought Proofing 2/27 Afforstation of Arjun Murmu Land Barakati 201 9 IL - - - 1.05 0.49 1.54 696

1991 09 2 Drought Proofing 2/28 Barakati 201 IL - - - 1.05 0.49 1.54 696

1992 09 2 Drought Proofing 2/29 Afforstation at Jharia Khash Plot Jharia Jharia 262 242 PL - - - 1.65 0.49 2.14 1094

1993 09 2 Drought Proofing 2/30 Jharia Jharia 262 222 IL - - - 1.65 0.49 2.14 1094

1994 09 2 Drought Proofing 2/31 Afforstation at Kartik Ghosh Land Jharia 263 184 IL - - - 1.05 0.49 1.54 696

1995 09 2 Drought Proofing 2/32 Jharia 263 263 IL - - - 1.05 0.49 1.54 696

1996 09 2 Drought Proofing 2/33 Jharia Jharia 262 242 PL - - - 1.65 0.49 2.14 1094

1997 09 2 Drought Proofing 2/34 Kukrasole 206 - 0.26 - 1.05 0.79 1.84 696

1998 09 2 Drought Proofing 2/35 Khanamuri 147 IL - - - 0.95 0.29 1.24 627

1999 09 2 Drought Proofing 2/36 207 IL - 4.00 - 1.49 0.49 1.98 985

2000 09 2 Drought Proofing 2/37 Nursery under Kharikamathani - 0.05 - 2.98 2.95 5.93 1975

- - - 46.21 27.38 73.58 30600

2001 09 3 3/1 107 IL - 0.05 - 0.34 0.41 0.75 225

2002 09 3 3/2 Rangium 108 56 PL - 0.05 - 0.34 0.41 0.75 225

2003 09 3 3/3 Rangium 108 35 Arjun PL - 0.05 - 0.34 0.41 0.75 225

Kharikamathani

Kharikamathani

Kurmipathra

Arjun Murmu

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of Satrughana Mahata & Others Land

Kharikamathani

Kurmipathra

Satrughana Maha

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Kharikamathani

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of Kamal Mahta & Dhiren Mahata Land

Kharikamathani

Kamal Mahata & Others

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Kharikamathani

Baburampathra

Kartik Ghosh

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation of Atul chandra Mahata Land

Kharikamathani

Baburampathra

Atul Chandra Mahata

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation at Jharia Desh Pukur Par & Both Side of Road

Kharikamathani

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Nurshary Firm At Kukrasole By Ma Gouri SHG

Kharikamathani

Kukrasole

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstation At The Rd Side Of Khanamuri Pry School To Kadabundh

Kharikamathani

Khanamuri

Drou. Proof

21st Feb'14

June to Sept

Kharikamathani

Afforstatiion at Baradhansola Dakshin Mandi & four beneficiaries

Kharikamathani

Baradhansola

Baradhansola

Dak Mandi

Drou. Proof

21st Feb'14

Kharikamathani

Kharikamathani

Kharikamathani

Kharikamathani

21st Feb'14

Jan to Mar

Drought Proofing Total

Kharikamathani

Micro Irrigation Works

Digging of Dug well near the house of Danial Saren

Kharikamathani

Panchkahania

Panchkahania

Daniel Saren

Micr Irr

21st Feb'14

Jan to Mar

Kharikamathani

Micro Irrigation Works

Digging of Dug well near the house of Ananta Rana

Kharikamathani

Panchkahania

Ananta Rana

Micr Irr

21st Feb'14

Jan to Mar

Kharikamathani

Micro Irrigation Works

Digging of Dug well near the house of Arjun Soren

Kharikamathani

Panchkahania

Micr Irr

21st Feb'14

Jan to Mar

Page 163: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

163/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2004 09 3 3/4 Ambisole 115 109 IL - 0.05 - 0.34 0.41 0.75 225

2005 09 3 3/5 Narsingpur 204 - - 1.50 1.80 0.29 2.09 1193

2006 09 3 3/6 - - 1.00 1.65 0.29 1.94 1094

2007 09 3 3/7 Narsingpur 204 - - 2.00 2.40 0.29 2.69 1591

2008 09 3 3/8 Khanamuri 147 - - 1.00 1.65 0.29 1.94 1094

2009 09 3 3/9 207 - - 1.00 1.65 0.29 1.94 1094

- - - 10.52 3.11 13.62 6964

2010 09 4 4/1 107 St/SC IL - 6.00 - 2.85 0.32 3.17 1889

2011 09 4 4/2 Kenduboni 193 st IL - 6.00 - 2.85 0.32 3.17 1889

- - - 5.70 0.64 6.34 3778

2012 09 5 5/1 Rangium 108 IL 1.70 - - 1.95 0.22 2.17 1292

2013 09 5 5/2 Re-excav of Desh Bundh Pond Hadhadi 109 PL 2.60 - - 2.24 0.25 2.49 1483

2014 09 5 5/3 Re-excav of Sitaram Tudu's pond Sialia 113 226 IL 2.60 - - 2.54 0.28 2.82 1683

2015 09 5 5/4 Re-excav of Yudhisthir Sing's pond Marapada 132 272 IL 1.70 - - 2.49 0.28 2.77 1650

2016 09 5 5/5 Re-excav of Bhupen Majhi's pond Marapada 132 478 PL 1.70 - - 1.95 0.22 2.17 1292

Kharikamathani

Micro Irrigation Works

Digging of dugg well near the house of Panchanan Digar

Kharikamathani

Panchkahania

Panchanan Digar

Micr Irr

21st Feb'14

Jun to Dec

Kharikamathani

Micro Irrigation Works

Re-exca. Of Csnal from Narasingpur to Kadokatha

Kharikamathani

Kukrasole

21st Feb'14

Jan to Mar

Kharikamathani

Micro Irrigation Works

Re-exca. Of Canal from Bhatbhanga Club to Pry. School

Kharikamathani

Kukrasole

Bhatbhanga

Micr Irr

21st Feb'14

Jan to Mar

Kharikamathani

Micro Irrigation Works

Re-exca. Of canal from Chowkapathra to East side of Bhatbhanga

Kharikamathani

Kukrasole

Micr Irr

21st Feb'14

Jan to Mar

Kharikamathani

Micro Irrigation Works

Re-excav Of Canal From Kadabundh To Lupa Dihi

Kharikamathani

Khanamuri

Micr Irr

21st Feb'14

Jan to Mar

Kharikamathani

Micro Irrigation Works

Excav of canal from Sahadev Hembram's House To Footbal Ground

Kharikamathani

Baradhansola

Baradhansola

Micr Irr

21st Feb'14

Jan to Mar

Micro Irrigation Works Total

Kharikamathani

Irrigation facilities to land owned by SC/ST bene.

Land Development of Panchkahania ST Villagers

Kharikamathani

Panchkahania

Panchkahania

Land dev

21st Feb'14

Jan to Mar

Kharikamathani

Irrigation facilities to land owned by SC/ST bene.

Land Development ST Villagers at Kenduboni

Kharikamathani

Ghugrisole

Land dev

21st Feb'14

Jan to Mar

Irrigation facilities to land owned by SC/ST bene. Total

Kharikamathani

Renovation of Traditional Water Bodies

Re-excav of pond at the land of Premchand Mahata

Kharikamathani

Panchkahania

Premchand

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Panchkahania

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Marapada

Sitaram Tudu

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Marapada

Yudhisthir Sing

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Marapada

Bhupen Majhi

Reno.wat

21st Feb'14

Jan to Mar

Page 164: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

164/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2017 09 5 5/6 Re-excav of Kamala Kanta's pond Sialia 113 364 Pl 3.40 - - 2.10 0.23 2.33 1390

2018 09 5 5/7 Re-excav of Pravat Mahata's pond Sialia 113 279 IL 1.70 - - 1.95 0.22 2.17 1292

2019 09 5 5/8 Re-excav of Amiya Sau's pond Gohaldiha 133 265 IL 1.00 - - 1.56 0.17 1.73 1034

2020 09 5 5/9 Re-excav of Samir Mahapatra's pond Gohaldiha 133 626 IL 0.90 - - 1.35 0.15 1.50 893

2021 09 5 5/10 Re-excav of Gopal Bag's Pond Gohaldiha 133 325 IL 1.00 - - 1.42 0.16 1.57 938

2022 09 5 5/11 Re-excav of Dasharathi Singh's pond Gohaldiha 133 9 IL 1.00 - - 1.42 0.16 1.57 938

2023 09 5 5/12 Re-excav of Biren Raut's pond Gohaldiha 133 469 IL 0.90 - - 1.28 0.14 1.42 849

2024 09 5 5/13 Re-excav of Pachageria pond Gohaldiha 133 302 PL 1.00 - - 1.42 0.16 1.57 938

2025 09 5 5/14 Re-excav of Jogen Raut's Doba Gohaldiha 133 474 IL 1.00 - - 1.48 0.16 1.65 983

2026 09 5 5/15 Re-excav of Gayaprasad Das's Pond Gohaldiha 133 330 PL 1.00 - - 1.50 0.38 1.88 994

2027 09 5 5/16 Re-excav of Sarat Singh pond Kuji Kuji 131 124, 125 IL 1.20 - - 1.96 0.22 2.18 1301

2028 09 5 5/17 Re-excav of Satyaban Singh's pond Kuji Kuji 133 202 IL 1.00 - - 1.50 0.38 1.88 994

2029 09 5 5/18 Re-excav of Natu Pukur Kuji Kuji 131 PL 1.10 - - 1.83 0.20 2.03 1212

2030 09 5 5/19 Re-exca. Of Magal Patra Pond Kukrasole 206 IL 1.10 - - 1.83 0.20 2.03 1212

2031 09 5 5/20 Re-exca. Of Manik Giri Pond Kukrasole 206 IL 1.10 - - 1.83 0.20 2.03 1212

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Marapada

Kamalakanta

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Marapada

Pravat Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Gohaldiha

Amiya Sau

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Gohaldiha

Samir Mahapatra

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Gohaldiha

Gopal Bag

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Gohaldiha

Dasharathi

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Gohaldiha

Biren Raut

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Gohaldiha

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Gohaldiha

Jogen Raut

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Gohaldiha

Gayaprasad

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Sarat Sing

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Satyaban

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kukrasole

Mangal Patra

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kukrasole

Manik Giri

Reno.wat

21st Feb'14

Jan to Mar

Page 165: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

165/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2032 09 5 5/21 Re-exca. Of Kamalakanta Giri Pond Kukrasole 206 1.00 - - 1.48 0.16 1.65 983

2033 09 5 5/22 Re-exca. Of Ratikanta Giri Pond Kukrasole 206 - - - 1.48 0.16 1.65 983

2034 09 5 5/23 149 - - - 1.48 0.16 1.65 983

2035 09 5 5/24 Re-exca. Of Biswanath Routh Pond 149 1.00 - - 1.50 0.38 1.88 994

2036 09 5 5/25 Re-exca. Of Shyamcharan Das Pond 149 1.00 - - 1.50 0.38 1.88 994

2037 09 5 5/26 Re-exca. Of Subrata Mahakul Pond Dokra Dokra 198 753 1.00 - - 1.42 0.16 1.57 938

2038 09 5 5/27 Re-exca. Of Ramai Tudu Pond Dokra Saripura 154 42 1.00 - - 1.42 0.16 1.57 938

2039 09 5 5/28 Re-excav of Doba of Subhash Mahali Choka 203 IL 1.00 - - 1.83 0.20 2.03 1212

2040 09 5 5/29 Re-excav of Doba of Ananda Mahali Choka 203 IL 1.00 - - 1.83 0.20 2.03 1212

2041 09 5 5/30 Re-excav of Doba of Purna Ch Mahali Choka 203 IL 1.00 - - 1.83 0.20 2.03 1212

2042 09 5 5/31 Re-excav of Doba of Doctor Mahali Choka 203 IL 1.00 - - 1.07 0.12 1.19 707

2043 09 5 5/32 Re-excav of Pond of Akhil Mahali Choka 203 IL 1.70 - - 2.14 0.24 2.38 1420

2044 09 5 5/33 Re-excav of Pond of Tentul Pukur Kenduboni 193 PL 1.00 - - 1.07 0.12 1.19 707

2045 09 5 5/34 Re-excav of Pond of Parao Hembram Kenduboni 193 IL 1.70 - - 1.95 0.22 2.17 1292

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kukrasole

Kamalakanta Giri

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kukrasole

Ratikanta Giri

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Rw-exca. Of Bibekananda Achariya Pond

Kharikamathani

Kukrasole

Bhatbhanga

Bibekananda Achariya

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kukrasole

Bhatbhanga

Biswanath Routh

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kukrasole

Bhatbhanga

Shyamcharan Routh

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Subrata Mahakul

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ramai Tudu

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ghugrisole

K.Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ghugrisole

Ananda Mahali

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ghugrisole

Purna chandra Mahali

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ghugrisole

Doctor Mahali

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ghugrisole

Akhil Mahali

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ghugrisole

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ghugrisole

Parao Hembram

Reno.wat

21st Feb'14

Jan to Mar

Page 166: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

166/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2046 09 5 5/35 Re-excav of Pond of Jitarai Mandi Kenduboni 193 IL 1.10 - - 1.50 0.38 1.88 994

2047 09 5 5/36 Rw-exca. Of Old Pond at Kurmipathra 202 198 PL 3.00 - - 2.90 0.32 3.22 1917

2048 09 5 5/37 Re-exca. Of Susankar Mahata Pond 202 161, 162 IL 1.00 - - 1.50 0.38 1.88 994

2049 09 5 5/38 Re-exca. Of Saktipada Mahata Pond 202 136 IL 1.00 - - 1.50 0.38 1.88 994

2050 09 5 5/39 Re-exca. Of Guhiram Mahata Pond 202 92 IL 1.00 - - 1.83 0.20 2.03 1212

2051 09 5 5/40 Re-exca. Of Sandip Mahata Pond 202 17 IL 1.00 - - 1.83 0.20 2.03 1212

2052 09 5 5/41 Re-exca. Of Jageswar Mahata Pond 202 219 IL 1.00 - - 1.83 0.20 2.03 1212

2053 09 5 5/42 Re-exca. Of Dhananjay Mahata Pond 202 159 IL 1.00 - - 1.42 0.16 1.57 938

2054 09 5 5/43 Re-exca. Of Kachi chandra Manna Pond 202 89 IL 1.00 - - 1.42 0.16 1.57 938

2055 09 5 5/44 Re-exca. Of Ramesh tudu Pond Charpada 200 100 IL 1.00 - - 1.42 0.16 1.57 938

2056 09 5 5/45 Re-exca. Of Biswajit Das Pond Jharia Jharia 262 169 IL 1.00 - - 1.83 0.20 2.03 1212

2057 09 5 5/46 Re-exca. Of Rajashree Das Pond Jharia Jharia 262 194 IL 1.00 - - 1.83 0.20 2.03 1212

2058 09 5 5/47 Re-exca. Of Santi Mahata Pond Jharia Jharia 262 236 IL 1.00 - - 1.83 0.20 2.03 1212

2059 09 5 5/48 Re-exca. Of Tusar Mahata Pond Jharia Jharia 262 855 IL 1.00 - - 1.50 0.38 1.88 994

2060 09 5 5/49 Re-exca. Of Kaliram Murmu Pond Jharia Kadokotha 205 152 IL 1.00 - - 1.50 0.38 1.88 994

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Ghugrisole

Jitarai Mandi

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Kurmipathra

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Kurmipathra

Susankar Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Kurmipathra

Saktipada Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Kurmipathra

Guhiram Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Kurmipathra

Sandip Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Kurmipathra

Jageswar Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Kurmipathra

Dhananjay Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Kurmipathra

Kachichandra Manna

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kurmipathra

Ramesh Tudu

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Biswajit Das

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Rajashree Das

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Santi Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Tusar Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Kaliram Murmu

Reno.wat

21st Feb'14

Jan to Mar

Page 167: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

167/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2061 09 5 5/50 Re-exca. Of Ananda Mahata Pond Jharia 263 324 IL 1.00 - - 1.50 0.38 1.88 994

2062 09 5 5/51 Re-excav Of Tentuldanga Pond Khanamuri 147 302 PL 1.00 - - 3.04 0.34 3.38 2013

2063 09 5 5/52 Re-excav of Khanamuri Badam Pukur Khanamuri 147 PL 3.40 - - 2.89 0.32 3.21 1916

2064 09 5 5/53 Re-excav of Pond Of Even Santal Club Amjam 208 PL 3.40 - - 2.89 0.32 3.21 1916

- - - 93.57 12.56 106.12 61964

2065 09 6 Land Development 6/1 Ambisole 115 IL - - - 2.70 0.30 3.01 1791 Cultiv

2066 09 6 Land Development 6/2 Marapada 132 st IL - 0.76 - 2.70 0.30 3.01 1791 Cultiv

2067 09 6 Land Development 6/3 Sialia 113 IL - 0.76 - 2.70 0.30 3.01 1791 Cultiv

2068 09 6 Land Development 6/4 Gohaldiha 133 52,53 IL - 0.47 - 1.83 0.20 2.03 1212 L.D.

2069 09 6 Land Development 6/5 Gohaldiha 133 IL - 0.47 - 1.83 0.20 2.03 1212 L.D.

2070 09 6 Land Development 6/6 Gohaldiha 133 IL - 0.47 - 1.76 0.20 1.96 1166 Cultiv

2071 09 6 Land Development 6/7 Land Levelling of Harihar Mahata Land Ghoratoria 112 IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2072 09 6 Land Development 6/8 Ghoratoria 112 IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2073 09 6 Land Development 6/9 Ghoratoria 112 IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Baburampathra

Ananda Mahata

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Khanamuri

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Baradhansola

Reno.wat

21st Feb'14

Jan to Mar

Kharikamathani

Renovation of Traditional Water Bodies

Kharikamathani

Baradhansola

Reno.wat

21st Feb'14

Jan to Mar

Renovation of Traditional Water Bodies Total

Kharikamathani

Land Development of Nilkanta Digar & Others

Kharikamathani

Panchkahania

Nilkanta Digar & Others

21st Feb'14

Jan to Mar

Kharikamathani

Land Levelling of ST Villagers at Marapada Mouza

Kharikamathani

Marapada

21st Feb'14

Jan to Mar

Kharikamathani

Land Levelling of BPL Villagers at Sialia Mouza

Kharikamathani

Marapada

st/SC/bpl

21st Feb'14

Jan to Mar

Kharikamathani

Land Development at Prasanta Sau & Others

Kharikamathani

Gohaldiha

Prasanta & Others

21st Feb'14

Jan to Mar

Kharikamathani

Land development of Jayanta Singha, Pinaki Singha & others

Kharikamathani

Gohaldiha

389, 150, 443

Jayanta & others

21st Feb'14

Jan to Mar

Kharikamathani

Ile binding of Gour Gopal Singha & others at Gohaldiha Mouza

Kharikamathani

Gohaldiha

411 & othrs

Gour & others

21st Feb'14

Jan to Mar

Kharikamathani

Kharikamathani

Ghoratoria

Harihar Mahata

21st Feb'14

Jan to Mar

Kharikamathani

Land Levelling of Judhithir Bera & Others Land

Kharikamathani

Ghoratoria

Judhithir Bera & Other

21st Feb'14

Jan to Mar

Kharikamathani

ILE Binding of Utpal Bera & Others Land

Kharikamathani

Ghoratoria

Utpal Bera & Others

21st Feb'14

Jan to Mar

Page 168: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

168/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2074 09 6 Land Development 6/10 Banksole IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2075 09 6 Land Development 6/11 Banksole IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2076 09 6 Land Development 6/12 Dihikheler 41 IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2077 09 6 Land Development 6/13 Dihikhelar 39 PL - 0.47 - 1.83 0.20 2.03 1212 L.D.

2078 09 6 Land Development 6/14 Dokra Saripura 154 152 - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2079 09 6 Land Development 6/15 Dokra Saripura 154 222 IL - 0.80 - 2.89 0.32 3.21 1916 Cultiv

2080 09 6 Land Development 6/16 Dokra Dokra 198 IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2081 09 6 Land Development 6/17 Land Dev Of Dokra Mouza Dokra Dokra 198 172 PL - 0.80 - 2.89 0.32 3.21 1916 Cultiv

2082 09 6 Land Development 6/18 Dokra Dokra 198 93, 94 IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2083 09 6 Land Development 6/19 Dokra Dokra 198 - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2084 09 6 Land Development 6/20 Dokra 197 338 IL - 0.47 - 1.83 0.20 2.03 1212 Cultiv

2085 09 6 Land Development 6/21 Land Dev. Of Salbani Football Groun Dokra Salbani 156 387 PL - 0.47 - 1.83 0.20 2.03 1212 L.D.

2086 09 6 Land Development 6/22 202 83 PL - 0.80 - 2.89 0.32 3.21 1916 L.D.

Kharikamathani

Land Levelling of Bramhananda & Others

Kharikamathani

Ghoratoria

Bramhananda & Others

21st Feb'14

Jan to Mar

Kharikamathani

Land Levelling of Sambhu Mandi & Others

Kharikamathani

Ghoratoria

Sambhu Mandi & Others

21st Feb'14

Jan to Mar

Kharikamathani

ILE binding of Alok kanti Sou & Other Land

Kharikamathani

Ghoratoria

Alok kanti Sou & Others

21st Feb'14

Jan to Mar

Kharikamathani

Land Dev. Of Dihikhelar Nich Para I.C.D.S Center`

Kharikamathani

Ghoratoria

Dihikhelar

21st Feb'14

Jan to Mar

Kharikamathani

Land Levelling of Chunaram Tudu & Subal Tudu Land

Kharikamathani

21st Feb'14

Jan to Mar

Kharikamathani

Land levelling of Lakshman Mandi, Arjun Mandi & Others

Kharikamathani

L.Mandi & Oth

21st Feb'14

Jan to Mar

Kharikamathani

Land Levelling of Kalisankar Patra Land

Kharikamathani

159, 141, 200

Kalisankar Patra

21st Feb'14

Jan to Mar

Kharikamathani

Kharikamathani

21st Feb'14

Apr to May

Kharikamathani

ILE Bunding At Dokra Of Swades Sing ,Nirmal Dey & Others Land

Kharikamathani

21st Feb'14

Apr to May

Kharikamathani

Land Dev Of Dokra Junior High School Land

Kharikamathani

School

21st Feb'14

Apr to May

Kharikamathani

Land Levelling & ILE Binding of Sukumar Mandi & Others

Kharikamathani

Baratalpada

Sukumar Mandi & Others

21st Feb'14

Apr to May

Kharikamathani

Kharikamathani

Salbani Football Ground

21st Feb'14

Apr to May

Kharikamathani

Land Dev. Of Dipayan Club at Kurmipathra

Kharikamathani

Kurmipathra

Kurmipathra

21st Feb'14

Apr to May

Page 169: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

169/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2087 09 6 Land Development 6/23 202 46 PL - 0.80 - 2.89 0.32 3.21 1916 L.D.

2088 09 6 Land Development 6/24 Land Dev. Of Jharia Mouza Jharia Jharia 262 PL - 0.80 - 2.89 0.32 3.21 1916 L.D.

2089 09 6 Land Development 6/25 Land Dev. Of Baburampathra Jharia 263 PL - 0.80 - 2.89 0.32 3.21 1916 L.D.

2090 09 6 Land Development 6/26 Land developnent of Kharika Pry school Kharika Kharika(N) 148 IL - 0.20 - 1.83 0.20 2.03 1212 L.D.

2091 09 6 Land Development 6/27 Land development of Netaji Club Kharika Kharika(N) 148 N.Club IL - 0.20 - 1.83 0.20 2.03 1212 L.D.

2092 09 6 Land Development 6/28 Kharika Kharika(N) 148 PL - 0.20 - 1.83 0.20 2.03 1212 L.D.

2093 09 6 Land Development 6/29 Kharika Kharika(N) 148 IL - 0.20 - 1.02 0.11 1.14 678 L.D.

2094 09 6 Land Development 6/30 Baradh Amjm 208 IL - 0.80 - 2.89 0.32 3.21 1916 L.D.

2095 09 6 Land Development 6/31 207 IL - 0.20 - 1.78 0.20 1.98 1179 L.D.

2096 09 6 Land Development 6/32 Land Dev Of Khanamuri Natunsai Khanamuri 147 274 PL - 0.80 - 2.89 0.32 3.21 1916 L.D.

2097 09 6 Land Development 6/33 Khanamuri 147 PL - 0.80 - 2.89 0.32 3.21 1916 L.D.

2098 09 6 Land Development 6/34 Khanamuri 147 IL - 0.80 - 2.89 0.32 3.21 1916 Cultiv

- - - 74.54 8.28 82.82 49365

2099 09 7 7/1 Choka 203 PL - - 1.00 1.80 0.29 2.09 1193

2100 09 7 7/2 Kharika 148 PL - - 1.00 1.80 0.29 2.09 1193

Kharikamathani

Land Dev. Of Kurmipathra Football Ground

Kharikamathani

Kurmipathra

Kurmipathra

21st Feb'14

Apr to May

Kharikamathani

Kharikamathani

21st Feb'14

Apr to May

Kharikamathani

Kharikamathani

Baburampathra

21st Feb'14

Apr to May

Kharikamathani

Kharikamathani

Pry School

21st Feb'14

Apr to May

Kharikamathani

Kharikamathani

21st Feb'14

Apr to May

Kharikamathani

Land development of Land near Sitala Mandir

Kharikamathani

21st Feb'14

Apr to May

Kharikamathani

Land development Khitish Ch Mhakul house

Kharikamathani

Khitish ch Mahakul

21st Feb'14

Apr to May

Kharikamathani

Land development at Amjam Footbal Grond

Kharikamathani

st/SC/bpl

21st Feb'14

Apr to May

Kharikamathani

Land development at Baradhansola Paschim para near club

Kharikamathani

Baradhansola

Baradhansola

st/SC/bpl

21st Feb'14

Apr to May

Kharikamathani

Kharikamathani

Khanamuri

21st Feb'14

Apr to May

Kharikamathani

Land Dev Of the Behind Of Khanamuri Pry School

Kharikamathani

Khanamuri

21st Feb'14

Jun to Dec

Kharikamathani

ILE Bunding of Khanamuri ST/SC/BPL villagers

Kharikamathani

Khanamuri

445 & Othrs

st/SC/bpl

21st Feb'14

Jun to Dec

Land Development Total

Kharikamathani

Flood Control & Protecation

Re-excav of drain from Gunadhar Mhali house to Mission School

Kharikamathani

Ghugrisole

Commu.

21st Feb'14

Jan to Mar

Kharikamathani

Flood Control & Protecation

Re-excav of drain at Khamathani Adibasi para near Kharikamathani Hat

Kharikamathani

Kharika(N)

Commu.

21st Feb'14

Jan to Mar

Page 170: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

170/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2101 09 7 7/3 Rangium 108 PL - - 1.00 1.65 0.98 2.63 1094 F.C.

2102 09 7 7/4 Barabundh 114 PL - - 2.00 2.40 0.98 3.38 1591 F.C.

2103 09 7 7/5 Gohaldiha 133 347-447 PL - - 1.00 1.65 0.29 1.94 1094 F.C.

2104 09 7 7/6 Gohaldiha 133 313-347 PL - - 1.00 1.65 0.29 1.94 1094 F.C.

2105 09 7 7/7 Gohaldiha 133 302-356 PL - - 1.00 1.65 0.29 1.94 1094 F.C.

2106 09 7 7/8 Dokra Saripura 154 59, 132 PL - - 3.00 2.40 0.98 3.38 1591 F.C.

2107 09 7 7/9 Kenduboni 193 PL - - 1.50 2.85 0.36 3.21 1889 F.C.

2108 09 7 7/10 Jharia Jharia 262 - - 1.00 3.37 1.12 4.49 2232 F.C.

2109 09 7 7/11 Kharika Kharika(N) 148 PL - - 1.50 2.85 0.36 3.21 1889 F.C.

2110 09 7 7/12 Kharika Kharika(S) 148 PL - - 1.00 1.65 0.29 1.94 1094 F.C.

2111 09 7 7/13 Kharika Kharika(S) 148 PL - - 1.00 1.65 0.29 1.94 1094 F.C.

2112 09 7 7/14 Kharika Kharika(S) 148 PL - - 1.00 1.65 0.29 1.94 1094 F.C.

2113 09 7 7/15 Kharika Kharika(S) 148 PL - - 1.00 1.65 0.29 1.94 1094 F.C.

2114 09 7 7/16 Kharika Kharika(S) 148 PL - - 1.00 1.65 0.29 1.94 1094 F.C.

2115 09 7 7/17 207 PL - - 3.00 2.85 0.36 3.21 1889 F.C.

Kharikamathani

Flood Control & Protecation

Excav of Canal from Pitch Rd Chto pole to Khal pole with chatal

Kharikamathani

Panchkahania

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-exca. Of Canal from Barabundh to Ambisole

Kharikamathani

Marapada

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of drain from Sukumar Singh's house to sitala mandir

Kharikamathani

Gohaldiha

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of drain from Amaresh Singh's house to sitala mandir

Kharikamathani

Gohaldiha

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of drain from Ananda Singh's house to Sadhan Powel' house

Kharikamathani

Gohaldiha

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-exca. Of Canal from Saripura Bundh to South Sariura

Kharikamathani

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of Canal Both side of Bara Kenduboni Village Rd

Kharikamathani

Ghugrisole

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav Canal From Jharia PMGSY To Bibhuti msahata House

Kharikamathani

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of Canal from Bakultala pitch Rd to Ananta Giri shop via Lalmohan Mann's house

Kharikamathani

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of Drain from Adhir Giri house to Brajendra Mahakul's house

Kharikamathani

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of Drain from BokulGiri house to Chaitannya Barik's Machine Ghar

Kharikamathani

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of Drain from Pranabananda Mahakul's house to Sanatan Raut's house

Kharikamathani

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of Drain from Asit Barik house to Bokul Giri house

Kharikamathani

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav of Drain from Arabinda Pania house to Danga Borum

Kharikamathani

21st Feb'14

Jun to Dec

Kharikamathani

Flood Control & Protecation

Re-excav Of Drain From Sudhir Soren 's House To Rasik Hembram House

Kharikamathani

Baradhansola

Bharadhansola

21st Feb'14

Jun to Dec

Page 171: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

171/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2116 09 7 7/18 207 PL - - 3.00 2.85 0.36 3.21 1889 F.C.

- - - 38.05 8.39 46.44 25199

2117 09 8 Rural Connectivity 8/1 Rangium 108 PL - - 1.00 0.90 1.97 2.87 597

2118 09 8 Rural Connectivity 8/2 Rangium 108 PL - - 1.00 0.90 1.97 2.87 597

2119 09 8 Rural Connectivity 8/3 Rangium 108 PL - - 1.30 1.13 1.97 3.10 746

2120 09 8 Rural Connectivity 8/4 Marapada 132 179-68 - - 1.50 1.13 1.97 3.10 746

2121 09 8 Rural Connectivity 8/5 Marapada 132 338-373 - - 0.90 0.90 1.73 2.63 597

2122 09 8 Rural Connectivity 8/6 Khusjungle 110 PL - - 1.50 2.69 0.30 2.99 1780

2123 09 8 Rural Connectivity 8/7 Sialia 113 PL - - 2.00 3.09 0.34 3.44 2048

2124 09 8 Rural Connectivity 8/8 Sialia 113 PL - - 0.80 0.90 1.68 2.58 597

2125 09 8 Rural Connectivity 8/9 Sialia 113 200-62 PL - - 1.00 1.20 0.29 1.49 795

2126 09 8 Rural Connectivity 8/10 New Rd from Amtala to Pacca well Gohaldiha 133 203-347 PL - - 1.00 1.20 0.29 1.49 795

2127 09 8 Rural Connectivity 8/11 Gohaldiha 133 233-633 PL - - 0.80 0.90 1.68 2.58 597

2128 09 8 Rural Connectivity 8/12 Gohaldiha 133 424 PL - - 0.80 0.90 1.68 2.58 597

2129 09 8 Rural Connectivity 8/13 Gohaldiha 133 447 PL - - 0.30 1.05 3.80 4.85 696

Kharikamathani

Flood Control & Protecation

Re-excav Of Drain From Satyen Mahata House To Nischinta Mahata House

Kharikamathani

Baradhansola

Baradhansola

21st Feb'14

Jun to Dec

Flood Control & Protecation Total

Kharikamathani

Repair of Rd from Dakshin Rangium Tapan Hembram house to Sabuj Sangha club

Kharikamathani

Panchkahania

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Sabuj Sangha Club to Jaradihi

Kharikamathani

Panchkahania

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Sarbeswar Mahata house to Basiasole khal

Kharikamathani

Panchkahania

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Marapada Pry School to Bankuli Bakultala

Kharikamathani

Marapada

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Rakhal Saren house to Sitala Mandir(with Boulder & Morrum)

Kharikamathani

Marapada

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from khus jungle 110 to sarasgeria

Kharikamathani

Marapada

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Sialia football ground to Ghugrisole

Kharikamathani

Marapada

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from the house of Shyamal Majhi to ICDS(with Boulder & Morrum)

Kharikamathani

Marapada

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Bankuli Harimandir to Ledergaria

Kharikamathani

Marapada

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Kharikamathani

Gohaldiha

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Puspita Sau's house to Buddhadeb Raut's house via Madhya para to Battala

Kharikamathani

Gohaldiha

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Paban Singha's house to Barum

Kharikamathani

Gohaldiha

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Concret Rd from Battala to Duck bungla under firm net

Kharikamathani

Gohaldiha

Commu.

21st Feb'14

Jun to Dec

Page 172: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

172/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2130 09 8 Rural Connectivity 8/14 Kuji Kuji 131 1/367 PL - - 1.50 1.80 0.29 2.09 1193

2131 09 8 Rural Connectivity 8/15 Kuji Taldiha 135 120 PL - - 1.00 1.20 0.29 1.49 795

2132 09 8 Rural Connectivity 8/16 Kuji Kuji 131 82 PL - - 1.00 1.20 0.29 1.49 795

2133 09 8 Rural Connectivity 8/17 Kuji Kuji 131 103 PL - - 0.80 0.90 1.68 2.58 597

2134 09 8 Rural Connectivity 8/18 Kuji Kuji 131 PL - - 0.80 0.90 1.68 2.58 597

2135 09 8 Rural Connectivity 8/19 Ghoratoria 112 PL - - 1.50 2.10 0.34 2.44 1392

2136 09 8 Rural Connectivity 8/20 Ghoratoria 112 PL - - 1.50 2.10 0.34 2.44 1392

2137 09 8 Rural Connectivity 8/21 Ghoratoria 112 - - 0.80 1.13 1.68 2.81 751

2138 09 8 Rural Connectivity 8/22 Dokra Salboni 156 348 - - 0.80 1.13 1.68 2.81 751

2139 09 8 Rural Connectivity 8/23 Dokra 198 - - 0.80 1.13 1.68 2.81 751

2140 09 8 Rural Connectivity 8/24 Dokra 197 411, 249 - - 1.00 1.80 0.34 2.14 1193

2141 09 8 Rural Connectivity 8/25 Dokra Saripura 154 49, 111 - - 1.00 1.20 1.91 3.11 795

2142 09 8 Rural Connectivity 8/26 Chowka 203 - - 0.50 0.68 1.68 2.35 447

2143 09 8 Rural Connectivity 8/27 Guriani - - 1.00 1.35 0.37 1.72 895

2144 09 8 Rural Connectivity 8/28 Chowka 203 - - 0.50 0.68 1.68 2.35 447

Kharikamathani

New Rd from Kuji Natun pukur to Marapada Machine house

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Chunaram House to Adibasi Club

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Harimandir to Prafullya Singha's house

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Madhusankar Giri house to Jharna well

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Rajib Sinhg's house to Sudhir Singha'(B) house

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Dihikhelar Battala to Bikalgadhuya Bundh

Kharikamathani

Ghoratoria

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Churamuni Mahata House to Bimal Hansda House

Kharikamathani

Ghoratoria

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair Of Rd From Jagadish Mahata House To Aribundh

Kharikamathani

Ghoratoria

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Road from Salbani Mangal Soren to South Side Via Bhagirath Barik House

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Bakultala chhawk to Rakhal Nayek & Niranjan Mahapatra House

Kharikamathani

Baratalpada

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Road from Baratalpada East side to Dina Bundh

Kharikamathani

Baratalpada

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of road from North Side Saripura Chawk to Jangal

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Shaona Mahali house to Mangal Mahali house

Kharikamathani

Ghugrisole

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Bharat Mahali house to Ghugrisole pitch Rd

Kharikamathani

Ghugrisole

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Chowkapathra pitch Rd to Akhil Mahali house

Kharikamathani

Ghugrisole

Commu.

21st Feb'14

Jun to Dec

Page 173: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

173/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2145 09 8 Rural Connectivity 8/29 Ghugrisole 191 PL - - 1.00 0.90 1.68 2.58 597

2146 09 8 Rural Connectivity 8/30 Kenduboni 193 PL - - 1.00 0.90 1.68 2.58 597

2147 09 8 Rural Connectivity 8/31 Jharia Mahuli 261 - - 1.00 1.20 1.91 3.11 795

2148 09 8 Rural Connectivity 8/32 Jharia Jharia 262 - - 1.00 1.20 1.91 3.11 795

2149 09 8 Rural Connectivity 8/33 Jharia Jharia 262 - - 1.00 1.20 1.91 3.11 795

2150 09 8 Rural Connectivity 8/34 Jharia Jharia 262 - - 0.30 1.05 3.80 4.85 696

2151 09 8 Rural Connectivity 8/35 Kukrasole 206 - - 1.00 1.20 1.91 3.11 795

2152 09 8 Rural Connectivity 8/36 202 - - 0.80 1.65 0.31 1.96 1094

2153 09 8 Rural Connectivity 8/37 New Rd from Pailot Pukur Par 202 46 - - 0.80 1.65 0.31 1.96 1094

2154 09 8 Rural Connectivity 8/38 202 - - 1.50 2.10 0.34 2.44 1392

2155 09 8 Rural Connectivity 8/39 Barakati 201 - - 1.00 1.20 1.91 3.11 795

2156 09 8 Rural Connectivity 8/40 Barakati 201 - - 1.00 1.20 1.91 3.11 795

2157 09 8 Rural Connectivity 8/41 Barakati 201 - - 1.00 1.20 1.91 3.11 795

2158 09 8 Rural Connectivity 8/42 Barakati 201 - - 1.00 1.20 1.91 3.11 795

2159 09 8 Rural Connectivity 8/43 202 - - 0.30 1.05 3.80 4.85 696

Kharikamathani

Repair of Rd from Ghugrisole ICDS to Chowkapathra Pitch Rd with Codgeway

Kharikamathani

Ghugrisole

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Barakenduboni Culvert chawk to Charpada

Kharikamathani

Ghugrisole

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Tantubai Samittee to Mahuli I.C.D.S

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Road from Anadi Mahata to Anup Das Land

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Ankur Manna House to Rameswar Manna House

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Concret Rd from Jharia PMGSY To Jagadish Mahata House

Kharikamathani

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Kukrasole Harimandir to Baradhansola chathal

Kharikamathani

Kukrasole

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Kurmipathra Football Ground to Pich Road

Kharikamathani

Kurmipathra

Kurmipathra

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Kharikamathani

Kurmipathra

Kurmipathra

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Kurmipathra Uttar para to Madhya Para

Kharikamathani

Kurmipathra

Kurmipathra

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Road from Kendubani Mouza to Dubai Tudu House

Kharikamathani

Kurmipathra

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Barakati Mahata Para to Charpada Pitch Road

Kharikamathani

Kurmipathra

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from charpada Pitch Road to callege Muroom& Bulder

Kharikamathani

Kurmipathra

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Barakati Mahata Para Battala to Patharchakri Moroom & Boulder

Kharikamathani

Kurmipathra

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Concret Rd from Kurmipathra Pry School To Mrinmoy Mahata House

Kharikamathani

Kurmipathra

Kurmipathra

Commu.

21st Feb'14

Jun to Dec

Page 174: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

174/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2160 09 8 Rural Connectivity 8/44 Kukrasole 206 529 - - 1.00 1.20 1.91 3.11 795

2161 09 8 Rural Connectivity 8/45 Kukrasole 206 149 - - 0.70 1.05 1.18 2.23 696

2162 09 8 Rural Connectivity 8/46 149 594, 596 - - 0.70 1.05 1.18 2.23 696

2163 09 8 Rural Connectivity 8/47 149 594, 596 - - 1.00 1.20 1.91 3.11 795

2164 09 8 Rural Connectivity 8/48 149 594, 596 - - 1.00 1.20 1.63 2.83 795

2165 09 8 Rural Connectivity 8/49 Karika 148 PL - - 1.00 0.90 1.68 2.58 597

2166 09 8 Rural Connectivity 8/50 Kharika 148 PL - - 1.00 1.50 0.37 1.87 994

2167 09 8 Rural Connectivity 8/51 Kharika 148 PL - - 0.50 0.68 1.68 2.35 447

2168 09 8 Rural Connectivity 8/52 Kharika 148 PL - - 0.50 0.68 1.68 2.35 447

2169 09 8 Rural Connectivity 8/53 Kharika 148 PL - - 0.50 0.68 1.68 2.35 447

2170 09 8 Rural Connectivity 8/54 Kharika 148 PL - - 0.50 0.68 1.68 2.35 447

2171 09 8 Rural Connectivity 8/55 Kharika 148 PL - - 1.00 1.80 0.37 2.17 1193

2172 09 8 Rural Connectivity 8/56 Khanamuri 147 - - 1.50 1.20 2.22 3.42 795

2173 09 8 Rural Connectivity 8/57 Khanamuri 147 - - 1.50 1.20 2.22 3.42 795

2174 09 8 Rural Connectivity 8/58 - - 1.00 1.20 2.22 3.42 795

Kharikamathani

Repair of Rd Kukrasole Harimandir Via Narasinghapur,Bhatbhanga Pitch Road

Kharikamathani

Kukrasole

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Sukumar Giri House to Iswar Chandra Janachetana Kendra

Kharikamathani

Kukrasole

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Bhatbhanga Iswar chandra Janachetana Kendra to Gangadhar Khilari

Kharikamathani

Kukrasole

Bhatbhanga

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Sarbeswar House to Sasanka Achariya House

Kharikamathani

Kukrasole

Bhatbhanga

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair Rd from Iswar chandra Janachetana Kendra to Bhatbhanga Pry. School

Kharikamathani

Kukrasole

Bhatbhanga

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Bakultala pitch Rd to Ananta Giri shop via Lalmohan Mann's house

Kharikamathani

Kharika(N)

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

New Rd from Anil Patra Shop to Pitch Rd via Talpukur

Kharikamathani

Kharika(N)

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Baren Patra shop to Nirmal Ghosh house

Kharikamathani

Kharika(S)

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Ranjit Giri house to Ananda Nayek 's house

Kharikamathani

Kharika(S)

Commu.

21st Feb'14

Jun to Dec

Kharikamathani

Repair of Rd from Sanatan Raut house to Datwan Rd

Kharikamathani

Kharika(S)

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair of Rd from Danga Borum to Dipank Patra's shop

Kharikamathani

Kharika(S)

Commu.

6th Mar'14

Dry Season

Kharikamathani

New Rd from Sachindra Mhakul pan shop to Puraton shop

Kharikamathani

Kharika(S)

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair Of Rd From Tentuldanga To Moynadihi With Chatal

Kharikamathani

Khanamuri

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair Of Rd From Baradhansdola To Khanamuri Pry School

Kharikamathani

Khanamuri

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair of Rd from Ranta Kisku House to Football Ground via Rana Para with Culvert

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Page 175: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

175/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2175 09 8 Rural Connectivity 8/59 - - 0.80 1.65 0.31 1.96 1094

2176 09 8 Rural Connectivity 8/60 - - 1.00 1.35 1.67 3.03 895

2177 09 8 Rural Connectivity 8/61 - - 0.80 1.65 0.31 1.96 1094

2178 09 8 Rural Connectivity 8/62 - - 1.00 1.20 1.68 2.88 795

2179 09 8 Rural Connectivity 8/63 - - 0.80 1.65 0.31 1.96 1094

2180 09 8 Rural Connectivity 8/64 - - 1.50 1.20 2.22 3.42 795

2181 09 8 Rural Connectivity 8/65 - - 1.00 1.20 1.68 2.88 795

2182 09 8 Rural Connectivity 8/66 - - 0.80 1.65 0.31 1.96 1094

2183 09 8 Rural Connectivity 8/67 baradhsola - - 1.00 1.20 1.68 2.88 795

2184 09 8 Rural Connectivity 8/68 - - 1.50 1.20 1.77 2.98 795

2185 09 8 Rural Connectivity 8/69 baradhsola - - 1.00 1.20 1.68 2.88 795

- - - 86.50 100.01 186.51 57283

2186 09 15 15/1 - - - 6.48 4.32 10.80 4291

- - - 6.48 4.32 10.80 4291

- - - 460.63 175.74 636.37 305054

Kharikamathani

New Rd from Suresh Soren House to Thakur Than

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair of Rd from Sanjay Manna House to Dakhin Kharika -Jamirapal Road

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

New Rd from Baradhansola Bakultala to Ambaresh Paira House to

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair of Rd fro Gour Mahata House to Mritunjay Mahata House

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

New Rd from Baradhansola Gora Tudu House to Main Road

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair of Rd from Baradhansola football Ground to Berajal chawak with morroom, Boulder with culvert

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair of Mritunjay Mahata House to Sashil Mahata House

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

New Budhdeb Mahata House to Ratnakar Mahata House

Kharikamathani

Baradhansola

baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair of Rd from Bhanu Mahata House to Khishori Mahata Pond

Kharikamathani

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair of Kukrasole Bundh to Baradhasola via Amjam Shirish

Kharikamathani

Baradhansola

Baradhansola

Commu.

6th Mar'14

Dry Season

Kharikamathani

Repair Of Rd from Baradhansola Paira Para

Kharikamathani

Baradhansola

Commu.

6th Mar'14

Dry Season

Rural Connectivity Total

Kharikamathani

Rural Sanitation related works

Const. of Individual House Hold latrine for 200 Nos. Beneficiries

Kharikamathani

Kharikamatani

Kharikamathani

6th Mar'14

Dry Season

Rural Sanitation related works Total

Kharikamathani Total

Page 176: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

176/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2187 10 Malam 1 1/1 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2188 10 Malam 1 1/2 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2189 10 Malam 1 1/3 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2190 10 Malam 1 1/4 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2191 10 Malam 1 1/5 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2192 10 Malam 1 1/6 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2193 10 Malam 1 1/7 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2194 10 Malam 1 1/8 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2195 10 Malam 1 1/9 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2196 10 Malam 1 1/10 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2197 10 Malam 1 1/11 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2198 10 Malam 1 1/12 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2199 10 Malam 1 1/13 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

Water Conservation & Water Harvesting

Excavation of Mangal Murmu (f-Jughu)pond, (100X80X12)

Kalmapukhuria paschim

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Kalipada saren pond, (100X80X12)

Kalmapukhuria paschim

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Srimanta saren pond, (100X80X12)

Kalmapukhuria paschim

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Mangal Murmu poind, (100X80X12)

Kalmapukhuria paschim

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Sham Hembram pond (100X80X12)

Kalmapukhuria paschim

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Mihir Shit pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Srikanta Sahu pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Biren Sahupond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Haren Shit pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Naren Shit pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Kalachand Ghosh pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Bhathu Saren pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Biren Sahu pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Page 177: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

177/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2200 10 Malam 1 1/14 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2201 10 Malam 1 1/15 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2202 10 Malam 1 1/16 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2203 10 Malam 1 1/17 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2204 10 Malam 1 1/18 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2205 10 Malam 1 1/19 Malam 74 IL 1.89 - - 1.13 0.13 1.25 747

2206 10 Malam 1 1/20 Malam 74 IL 1.89 - - 1.13 0.13 1.25 747

2207 10 Malam 1 1/21 Malam 74 IL 1.89 - - 1.13 0.13 1.25 747

2208 10 Malam 1 1/22 Malam 74 IL 1.89 - - 1.13 0.13 1.25 747

2209 10 Malam 1 1/23 Malam 74 IL 1.89 - - 1.13 0.13 1.25 747

2210 10 Malam 1 1/24 Malam Khasjangal 74 IL 1.89 - - 1.13 0.13 1.25 747

2211 10 Malam 1 1/25 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2212 10 Malam 1 1/26 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2213 10 Malam 1 1/27 Malam 75 IL 1.89 - - 1.13 0.13 1.25 747

2214 10 Malam 1 1/28 Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

Water Conservation & Water Harvesting

Excavation of Tapas Singha pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Pratap Ghosh pond (100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Dibakar Palui pond(100X80X12)

Kalmapukhuria paschim

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Rames Sahoo pond(100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Khagendra nath pond(100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Bhim Sing pond(100X80X12)

Chhotojharia

Chhotojharia

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of SAMBHU AHARI pond(100X80X12)

Chhotojharia

Chhotojharia

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Kasinath Kuila pond(100X80X12)

Chhotojharia

Chhotojharia

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Bancha Nidhi Kuila pond(100X80X12)

Chhotojharia

Chhotojharia

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Purno Kuila pond(100X80X12)

Chhotojharia

Chhotojharia

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Purna chandra mahata pond(100X80X12)

Chhotojharia

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Ananda Mahapatra pond(100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Baidanath Saw pond(100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Dhiren Saw pond(100X80X12)

Kalmapukhuria purba

kalmapukhuria

Ownership of Land

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of gorachand Saw pond(100X80X12)

Kalmapukhuria purba

kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Page 178: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

178/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2215 10 Malam 1 1/29 Malam 72 own IL 1.89 - - 1.13 0.13 1.25 747

2216 10 Malam 1 1/30 Malam 72 own IL 1.89 - - 1.13 0.13 1.25 747

2217 10 Malam 1 1/31 Malam 72 own IL 1.89 - - 1.13 0.13 1.25 747

2218 10 Malam 1 1/32 Malam 72 own IL 1.89 - - 1.13 0.13 1.25 747

2219 10 Malam 1 1/33 Malam 72 own IL 1.89 - - 1.13 0.13 1.25 747

2220 10 Malam 1 1/34 Malam 72 own IL 1.89 - - 1.13 0.13 1.25 747

2221 10 Malam 1 1/35 Malam Chirpiti 120 own IL 1.89 - - 1.13 0.13 1.25 747

2222 10 Malam 1 1/36 Malam basiasole 120 own IL 1.89 - - 1.13 0.13 1.25 747

2223 10 Malam 1 1/37 Malam basiasole 120 own IL 1.89 - - 1.13 0.13 1.25 747

2224 10 Malam 1 1/38 Malam basiasole 120 own IL 1.89 - - 1.13 0.13 1.25 747

2225 10 Malam 1 1/39 Malam Kaptibhole 120 own IL 1.89 - - 1.13 0.13 1.25 747

2226 10 Malam 1 1/40 Malam Kaptibhole 120 own IL 1.89 - - 1.13 0.13 1.25 747

2227 10 Malam 1 1/41 Malam Kaptibhole 120 own IL 1.89 - - 1.13 0.13 1.25 747

2228 10 Malam 1 1/42 Malam Kaptibhole 120 own IL 1.89 - - 1.13 0.13 1.25 747

2229 10 Malam 1 1/43 Malam Kharsola 120 own IL 1.89 - - 1.13 0.13 1.25 747

Water Conservation & Water Harvesting

Excavation of Khandu Ojha pond(100X80X12)

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Tapas Mahapatra pond(100X80X12)

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of SaktiPada Kotal pond(100X80X12)

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Sasanka Mahapatra pond(100X80X12)

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Chaitanya Palui pond(100X80X12)

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of sapan ghose pond(100X80X12)

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Raghunath murmu pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Mangal Mahata pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of subodh mahata pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Chandra Saren pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of kunaram Hansda pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Muchiram hansda pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Haladhar Mahata pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of Arsu Murmu pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Excavation of laxman Hansda pond(100X80X12)

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Page 179: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

179/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2230 10 Malam 1 1/44 Excavation of Prafulla Sahoo Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2231 10 Malam 1 1/45 Excavation of Khagan Sahoo Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2232 10 Malam 1 1/46 Excavation of Srimath Soren Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2233 10 Malam 1 1/47 Excavation of Subal Hembram Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2234 10 Malam 1 1/48 Excavation of Sanatan Soren Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2235 10 Malam 1 1/49 Excavation of Mohon Soren Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2236 10 Malam 1 1/50 Excavation of Sukulal Soren Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2237 10 Malam 1 1/51 Excavation of pond Bankim Sahoo Malam 75 282 own IL 1.89 - - 1.13 0.13 1.25 747

2238 10 Malam 1 1/52 Excavation of pond Baydyanat Sahoo Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2239 10 Malam 1 1/53 Excavation of pond Depankar Shit Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2240 10 Malam 1 1/54 Excavation of pond Chandrashaker Shit Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2241 10 Malam 1 1/55 Excavation of pond Gandishaker Shit Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2242 10 Malam 1 1/56 Excavation of pond Horen Shit Malam 75 525 own IL 1.89 - - 1.13 0.13 1.25 747

2243 10 Malam 1 1/57 Excavation of pond Rabikanta Duary Malam 75 229 own IL 1.89 - - 1.13 0.13 1.25 747

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Page 180: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

180/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2244 10 Malam 1 1/58 Excavation of pond alini Kuila Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2245 10 Malam 1 1/59 Excavation of pond Nittananda Kuila Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2246 10 Malam 1 1/60 Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2247 10 Malam 1 1/61 Excavation of pond Baydyanat Singha Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2248 10 Malam 1 1/62 Excavation of pond Horen Sahoo Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2249 10 Malam 1 1/63 Excavation of pond Gorachand Sahoo Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2250 10 Malam 1 1/64 Excavation of pond Jotindra Mahapatra Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2251 10 Malam 1 1/65 Excavation of pond kumar Hansda Malam 75 own IL 1.89 - - 1.13 0.13 1.25 747

2252 10 Malam 1 1/66 Malam Bagdoba 69 IL 1.89 - - 1.13 0.13 1.25 747

2253 10 Malam 1 1/67 Excavation of Biswanath Saren Pond Malam Bagdoba 69 48 IL 1.89 - - 1.13 0.13 1.25 747

2254 10 Malam 1 1/68 Excavation of Gobinda Sing Pond Malam Chaltabera 67 IL 1.89 - - 1.13 0.13 1.25 747

2255 10 Malam 1 1/69 Excavation of Bhagirath Sing Pond Malam Chaltabera 67 IL 1.89 - - 1.13 0.13 1.25 747

2256 10 Malam 1 1/70 Excavation of Gyan Dandapat's Pond Malam Ichhapura 60 7 IL 1.89 - - 1.13 0.13 1.25 747

2257 10 Malam 1 1/71 Excavation of Rabindra Sing Pond Malam Chaltabera 78 34 IL 1.89 - - 1.13 0.13 1.25 747

2258 10 Malam 1 1/72 Excavation of pond Binod Soren Malam Bagdoba 69 own IL 1.89 - - 1.13 0.13 1.25 747

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Excavation of pond Ramesh Chandra Shoo

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Excavation of Bhaliachati Adibasi Para Pond

Chaltabera

Ownership of Land

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Chaltabera

Ownership of Land

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Chaltabera

Ownership of Land

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Chaltabera

Ownership of Land

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Chaltabera

Ownership of Land

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Chaltabera

Ownership of Land

Fishary/Irrigation

6th Mar'14

Rainy Season

Water Conservation & Water Harvesting

Chaltabera

Fishary/Irrigation

6th Mar'14

Rainy Season

Page 181: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

181/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 81.19 9.02 90.21 53766

2259 10 Malam 2 Drought Proofing 2/1 Plantaion of Timir Kuila's land Malam 74 Own IL - 0.69 - 0.22 0.15 0.37 146

2260 10 Malam 2 Drought Proofing 2/2 Plantaion of Manjula Ghosh's land Malam 74 Own IL - 0.69 - 0.22 0.15 0.37 146

2261 10 Malam 2 Drought Proofing 2/3 Plantaion of Sanat Kuila's land Malam 74 Own IL - 0.69 - 0.22 0.15 0.37 146

2262 10 Malam 2 Drought Proofing 2/4 Plantaion of chotojharia B.s club's land Malam 74 Own IL - 0.69 - 0.22 0.15 0.37 146

2263 10 Malam 2 Drought Proofing 2/5 Plantaion of chotojharia jahira than Malam 74 Own IL - 0.69 - 0.22 0.15 0.37 146

2264 10 Malam 2 Drought Proofing 2/6 Plantaion of chotojharia manasa than Malam 74 Own IL - 0.69 - 0.22 0.15 0.37 146

2265 10 Malam 2 Drought Proofing 2/7 Plantaion of chotojharia football ground Malam 74 Own IL - 0.69 - 0.22 0.15 0.37 146

2266 10 Malam 2 Drought Proofing 2/8 Plantaion of Pramotha Dandapat land Malam kukrakhupi 74 Own IL - 0.69 - 0.22 0.15 0.37 146

2267 10 Malam 2 Drought Proofing 2/9 Malam 72 Own IL - 0.69 - 0.22 0.15 0.37 146

2268 10 Malam 2 Drought Proofing 2/10 Plantaion of Pramotha Dandapat land Malam 72 Own IL - 0.69 - 0.22 0.15 0.37 146

2269 10 Malam 2 Drought Proofing 2/11 Plantaion of Bimal Kotal land Malam 72 Own IL - 0.69 - 0.22 0.15 0.37 146

2270 10 Malam 2 Drought Proofing 2/12 Plantaion of Santosh Dandapat land Malam 72 Own IL - 0.69 - 0.22 0.15 0.37 146

2271 10 Malam 2 Drought Proofing 2/13 Plantaion of Harekrishna Bera land Malam 72 Own IL - 0.69 - 0.22 0.15 0.37 146

2272 10 Malam 2 Drought Proofing 2/14 Plantaion of Tapas Mahapatra land Malam 72 Own IL - 0.69 - 0.22 0.15 0.37 146

Water Conservation & Water Harvesting Total

Chhotojharia

Chhotojharia

Social Forestry

6th Mar'14

Rainy Season

Chhotojharia

Chhotojharia

Social Forestry

6th Mar'14

Rainy Season

Chhotojharia

Chhotojharia

Social Forestry

6th Mar'14

Rainy Season

Chhotojharia

Chhotojharia

Social Forestry

6th Mar'14

Rainy Season

Chhotojharia

Chhotojharia

Social Forestry

6th Mar'14

Rainy Season

Chhotojharia

Chhotojharia

Social Forestry

6th Mar'14

Rainy Season

Chhotojharia

Chhotojharia

Social Forestry

6th Mar'14

Rainy Season

Chhotojharia

Social Forestry

6th Mar'14

Rainy Season

Plantaion Both Side on Kalmapukhuria toNarsinghapurFerighat

Narasinghapur

Narasinghapur

Social Forestry

6th Mar'14

Rainy Season

Narasinghapur

Narasinghapur

Social Forestry

6th Mar'14

Rainy Season

Narasinghapur

Narasinghapur

Social Forestry

6th Mar'14

Rainy Season

Narasinghapur

Narasinghapur

Social Forestry

6th Mar'14

Rainy Season

Narasinghapur

Narasinghapur

Social Forestry

6th Mar'14

Rainy Season

Narasinghapur

Narasinghapur

Social Forestry

6th Mar'14

Page 182: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

182/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2273 10 Malam 2 Drought Proofing 2/15 Plantaion of Sumati Tarai land Malam 72 Own IL - 0.69 - 0.22 0.15 0.37 146

2274 10 Malam 2 Drought Proofing 2/16 Plantaion of Haripada Sing's land Malam Chaltabera 67 Own IL - 1.28 - 0.41 0.15 0.56 270

2275 10 Malam 2 Drought Proofing 2/17 Plantaion of Susanta Murmu's land Malam Chaltabera 67 Own IL - 1.28 - 0.41 0.15 0.56 270

2276 10 Malam 2 Drought Proofing 2/18 Plantaion of Baya Bhakta land Malam Chaltabera 71 Own IL - 1.28 - 0.41 0.15 0.56 270

2277 10 Malam 2 Drought Proofing 2/19 Plantaion of Bimal Senapati land Malam Chaltabera 67 Own IL - 1.28 - 0.41 0.15 0.56 270

2278 10 Malam 2 Drought Proofing 2/20 Plantaion of Chaitanya Karan land Malam Malam Malam 125 Own IL - 3.32 - 1.06 0.59 1.65 702

2279 10 Malam 2 Drought Proofing 2/21 Plantaion of Keder Duary land Malam Malam Malam 125 Own IL - 3.32 - 1.06 0.59 1.65 702

2280 10 Malam 2 Drought Proofing 2/22 Plantaion of Chaitanya Paira land Malam Malam Malam 125 Own IL - 3.32 - 1.06 0.59 1.65 702

2281 10 Malam 2 Drought Proofing 2/23 Plantaion of Rathikanta Duari land Malam Malam Malam 125 Own IL - 3.32 - 1.06 0.59 1.65 702

2282 10 Malam 2 Drought Proofing 2/24 Plantaion of Birendra Ghose land Malam Malam Malam 125 Own IL - 3.32 - 1.06 0.59 1.65 702

2283 10 Malam 2 Drought Proofing 2/25 Plantaion of Matilal Pramanik land Malam Malam Malam 75 Own IL - 1.42 - 0.45 0.25 0.70 300

2284 10 Malam 2 Drought Proofing 2/26 Plantaion of Gobinda bera land Malam Malam Malam 75 Own IL - 1.42 - 0.45 0.25 0.70 300

2285 10 Malam 2 Drought Proofing 2/27 Plantaion of Sanatan Soren Malam 75 Own IL - 3.32 - 1.06 0.59 1.65 702

2286 10 Malam 2 Drought Proofing 2/28 Plantaion of Kuli Murmu Malam 75 Own IL - 1.42 - 0.45 0.25 0.70 300

2287 10 Malam 2 Drought Proofing 2/29 Plantation of Khagan Sahoo Malam 75 Own IL - 3.32 - 1.06 0.59 1.65 702

Narasinghapur

Narasinghapur

Social Forestry

6th Mar'14

Rainy Season

Chaltabera

Social Forestry

6th Mar'14

Rainy Season

Chaltabera

Social Forestry

6th Mar'14

Rainy Season

Chaltabera

134,94/224

Social Forestry

6th Mar'14

Chaltabera

Social Forestry

6th Mar'14

Dry Season

Social Forestry

6th Mar'14

Dry Season

Social Forestry

6th Mar'14

Dry Season

Social Forestry

6th Mar'14

Dry Season

Social Forestry

6th Mar'14

Dry Season

Social Forestry

6th Mar'14

Dry Season

Social Forestry

6th Mar'14

Dry Season

Social Forestry

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Social Forestry

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Social Forestry

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Social Forestry

6th Mar'14

Dry Season

Page 183: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

183/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2288 10 Malam 2 Drought Proofing 2/30 Plantation of Ranjit Bera Malam 75 Own IL - 1.42 - 0.45 0.25 0.70 300

2289 10 Malam 2 Drought Proofing 2/31 Plantation of Srimath Soren Malam 75 Own IL - 3.32 - 1.06 0.59 1.65 702

2290 10 Malam 2 Drought Proofing 2/32 Plantaion of Bimal Senapati's land Malam Chaltabera 67 Own IL - 0.97 - 0.31 0.15 0.46 205

2291 10 Malam 2 Drought Proofing 2/33 Plantation of Krishna pada Dandapat Malam Ichhapura 60 Own IL - 1.42 - 0.45 0.25 0.70 300

2292 10 Malam 2 Drought Proofing 2/34 Plantation of Jayanta Dandapat Malam Ichhapura 60 Own IL - 1.42 - 0.45 0.25 0.70 300

2293 10 Malam 2 Drought Proofing 2/35 Plantation of Dhiren Dendapat Malam Ichhapura 60 Own IL - 1.42 - 0.45 0.25 0.70 300

2294 10 Malam 2 Drought Proofing 2/36 Nursery under Malam GP Malam Malam Malam - 0.05 - 2.49 2.46 4.95 1646

- - - 19.39 11.92 31.31 12838

2295 10 Malam 3 3/1 Const. of Canal from Khalpad to Abri Malam Malam Malam 125 Gov PL - 0.37 - 1.79 0.91 2.70 1184

2296 10 Malam 3 3/2 Const. of Malam Khalpar Sech Bandh Malam Malam Malam 125 Gov PL - 0.37 - 1.79 0.91 2.70 1184

2297 10 Malam 3 3/3 Const. of Banspat cannal Malam Chaltabera 69 Gov PL - 0.38 - 1.81 0.66 2.47 1199

2298 10 Malam 3 3/4 Malam 75 Gov PL - 0.47 - 2.22 0.25 2.46 1467

2299 10 Malam 3 3/5 Const. of Bagdoba cannal Malam Bagdoba 67 Gov PL - 0.48 - 2.32 0.26 2.58 1535

Kalmapukhuria purba

Kalmapukhuria

Social Forestry

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Social Forestry

6th Mar'14

Dry Season

Chaltabera

Social Forestry

6th Mar'14

Dry Season

Chaltabera

Social Forestry

6th Mar'14

Dry Season

Chaltabera

Social Forestry

6th Mar'14

Dry Season

Chaltabera

Social Forestry

6th Mar'14

Dry Season

6th Mar'14

Dry Season

Drought Proofing TotalMicro Irrigation Works

Water Conservation

6th Mar'14

Dry Season

Micro Irrigation Works

Water Conservation

6th Mar'14

Dry Season

Micro Irrigation Works

Chaltabera

Water Conservation

6th Mar'14

Dry Season

Micro Irrigation Works

Const. of Cannal at Chaitanna tudu Pond to jharna

Kalmapukhuria paschim

Kalmapukhuria

Water Conservation

6th Mar'14

Dry Season

Micro Irrigation Works

Chaltabera

Water Conservation

6th Mar'14

Dry Season

Page 184: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

184/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2300 10 Malam 3 3/6 Malam Bhaliachati Gov PL - 0.37 - 1.79 0.91 2.70 1184

2301 10 Malam 3 3/7 Const. of kalma Daha pond Malam 75 Gov PL - 0.52 - 2.48 0.84 3.33 1645

- - - 14.19 4.75 18.94 9399

2302 10 Malam 5 5/1 Re- excavation of Jagdish Bera pond Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2303 10 Malam 5 5/2 Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2304 10 Malam 5 5/3 Re- excavation of Karma Rout pond Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2305 10 Malam 5 5/4 Re- excavation of Salil Giri pond Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2306 10 Malam 5 5/5 Re- excavation of Nirmal Bera pond Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2307 10 Malam 5 5/6 Re- excavation of Sasanka Giri pond Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2308 10 Malam 5 5/7 Re- excavation of Gour Nayek pond Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2309 10 Malam 5 5/8 Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2310 10 Malam 5 5/9 Re- excavation of Pulin Ghosh pond Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2311 10 Malam 5 5/10 Re- excavation of Ramani Tarai pond Malam 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2312 10 Malam 5 5/11 Re- excavation of Khagen Tarai pond Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

Micro Irrigation Works

Repair of Bhaliyachati to Narasinghapur khal Cannal

Chaltabera

Water Conservation

6th Mar'14

Dry Season

Micro Irrigation Works

Kalmapukhuria paschim

Kalmapukhuria

Water Conservation

6th Mar'14

Dry Season

Micro Irrigation Works TotalRenovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Madan Mohan Ghosh pond

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Hrishikesh Ghosh pond

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Page 185: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

185/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2313 10 Malam 5 5/12 Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2314 10 Malam 5 5/13 Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2315 10 Malam 5 5/14 Re- excavation of Srihari Kotal pond Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2316 10 Malam 5 5/15 Re- excavation of rajendra Ojha pond Malam Banspat 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2317 10 Malam 5 5/16 Re- excavation of Pradip Bala pond Malam Banspat 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2318 10 Malam 5 5/17 Re- excavation of Gobinda Routh pond Malam Banspat 70 Own IL 1.75 - - 1.30 0.14 1.44 858

2319 10 Malam 5 5/18 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2320 10 Malam 5 5/19 Re- excavation of Gobinda Bera pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2321 10 Malam 5 5/20 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2322 10 Malam 5 5/21 Re- excavation of Swapan Sahu pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2323 10 Malam 5 5/22 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

Renovation of Traditional Water Bodies

Re- excavation of Mritunjoy Ghosh pond

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Panchanan Ghose pond

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Shiv Prashad Bera pond

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Purushottam Bera pond

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of ChityaRanjan Saren pond

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Page 186: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

186/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2324 10 Malam 5 5/23 Re- excavation of Kalipada Saren pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2325 10 Malam 5 5/24 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2326 10 Malam 5 5/25 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2327 10 Malam 5 5/26 Re- excavation Gour paik pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2328 10 Malam 5 5/27 Re- excavation Dibakar Palui pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2329 10 Malam 5 5/28 Re- excavation Dasarath Bera pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2330 10 Malam 5 5/29 Re- excavation Chityana Tudu pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2331 10 Malam 5 5/30 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2332 10 Malam 5 5/31 Re- excavation of Kalira Daha pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Lakhindra Tudu pond Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Kalmapukuria High School pond

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Radha shyam Bera pond

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Page 187: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

187/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2333 10 Malam 5 5/32 Re- excavation of Jala Ghati pond Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2334 10 Malam 5 5/33 Re- excavation of Gajendra Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2335 10 Malam 5 5/34 Re- excavation of Bhanupada Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2336 10 Malam 5 5/35 Re- excavation of Badal Bhakta pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2337 10 Malam 5 5/36 Re- excavation of Santosh Ghose pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2338 10 Malam 5 5/37 Re- excavation of Ajit Mahata pond Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2339 10 Malam 5 5/38 Re- excavation of Mantu Mahata pond Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2340 10 Malam 5 5/39 Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2341 10 Malam 5 5/40 Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2342 10 Malam 5 5/41 Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2343 10 Malam 5 5/42 Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2344 10 Malam 5 5/43 Re- excavation of Laxman Saren pond Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

Renovation of Traditional Water Bodies

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Guna Ram Saren pond

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Jageswar Hansda pond

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Rameswar Saren pond Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Basab Hembram pond Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Page 188: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

188/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2345 10 Malam 5 5/44 Re- excavation of Goura Mandi pond Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2346 10 Malam 5 5/45 Malam Kaptibhole 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2347 10 Malam 5 5/46 Re- excavation of Mangal Saren pond Malam Chunpara Own IL 1.75 - - 1.30 0.14 1.44 858

2348 10 Malam 5 5/47 Re- excavation of Bhaliachati pond Malam Bhaliachati 71 Own IL 1.75 - - 1.30 0.14 1.44 858

2349 10 Malam 5 5/48 Re- excavation of Bagdipada pond Malam Bhaliachati 71 Own IL 1.75 - - 1.30 0.14 1.44 858

2350 10 Malam 5 5/49 Re- excavation of Ichhapura pond Malam Ichhapura 60 Own IL 1.75 - - 1.30 0.14 1.44 858

2351 10 Malam 5 5/50 Re- excavation of Matilal Khatua pond Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2352 10 Malam 5 5/51 Re- excavation of Malam Ghose pond Malam Malam Malam 125 Own IL 1.75 - - 1.30 0.14 1.44 858

2353 10 Malam 5 5/52 Re- excavation of Pritosh Nayek pond Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2354 10 Malam 5 5/53 Re- excavation of Srikanta Kotal pond Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2355 10 Malam 5 5/54 Re- excavation of Kartik Bera pond Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2356 10 Malam 5 5/55 Re- excavation of Harish Bera pond Malam Banspat 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2357 10 Malam 5 5/56 Re- excavation of Nirmal Bera pond Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2358 10 Malam 5 5/57 Re- excavation of Sumati Tarai pond Malam 72 Own IL 1.75 - - 1.30 0.14 1.44 858

2359 10 Malam 5 5/58 Re- excavation of Haguri Mangal pond Malam Banspat 72 Own IL 1.75 - - 1.30 0.14 1.44 858

Renovation of Traditional Water Bodies

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Koptibhole Gramin pond

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chaltabera

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chaltabera

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chaltabera

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Narasinghapur

Fishary/Irrigation

6th Mar'14

Dry Season

Page 189: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

189/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2360 10 Malam 5 5/59 Re- excavation of Dibakar Palai pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2361 10 Malam 5 5/60 Re- excavation of Mohan Saren pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2362 10 Malam 5 5/61 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2363 10 Malam 5 5/62 Re- excavation of Srimat Saren pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2364 10 Malam 5 5/63 Re- excavation of Siman Kisku pond Malam Kharsola 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2365 10 Malam 5 5/64 Re- excavation of Maghat Murmu pond Malam Chirpiti 120 Own IL 1.75 - - 1.30 0.14 1.44 858

2366 10 Malam 5 5/65 Re- excavation of Shyamlal Baskey Malam Ichhapura 60 Own IL 1.75 - - 1.30 0.14 1.44 858

2367 10 Malam 5 5/66 Re- excavation of Rajkumar Tarai pond Malam Bagdoba 67 8/169 Own IL 1.75 - - 1.30 0.14 1.44 858

2368 10 Malam 5 5/67 Re- excavation of biswanath Saren pond Malam Bagdoba 67 Own IL 1.75 - - 1.30 0.14 1.44 858

2369 10 Malam 5 5/68 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2370 10 Malam 5 5/69 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2371 10 Malam 5 5/70 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Kalachand Sahoo pond

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chaltabera

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chaltabera

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chaltabera

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Mahananda Kuila's pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Aswani Ghosh's pond Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Gaya Prashad Ghosh 's pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Page 190: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

190/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2372 10 Malam 5 5/71 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2373 10 Malam 5 5/72 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2374 10 Malam 5 5/73 Re- excavation of Sadesh Kuila 's pond Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2375 10 Malam 5 5/74 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2376 10 Malam 5 5/75 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2377 10 Malam 5 5/76 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2378 10 Malam 5 5/77 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2379 10 Malam 5 5/78 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2380 10 Malam 5 5/79 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2381 10 Malam 5 5/80 Re- excavation of Dipak Kuila's pond Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2382 10 Malam 5 5/81 Re- excavation of laxman Murmu pond Malam kukrakhupi 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2383 10 Malam 5 5/82 Re- excavation of Sapan Kuila pond Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2384 10 Malam 5 5/83 Re- excavation of Prabir Kuila pond Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2385 10 Malam 5 5/84 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2386 10 Malam 5 5/85 Re- excavation of Purna Ghose pond Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

Renovation of Traditional Water Bodies

Re- excavation of Haradhan Ghosh 's pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Banchanidhi Kuila 's pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Kasinath Kuila 's pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Samar Kr. Kuila's pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Gunadhar Mahapatra's pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Gaya Prasad Ghosh's pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Santosh Kuila(Bara)'s pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Santosh Kuila(Bara)'s pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Baikuntha Ghose pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Page 191: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

191/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2387 10 Malam 5 5/86 Re- excavation of Gunadhar Kuila pond Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2388 10 Malam 5 5/87 Re- excavation of Biplab Kuila pond Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2389 10 Malam 5 5/88 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2390 10 Malam 5 5/89 Re- excavation of Bhanupada Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2391 10 Malam 5 5/90 Re- excavation of Haricharan Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2392 10 Malam 5 5/91 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2393 10 Malam 5 5/92 Re- excavation of Goutam Ghosh pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2394 10 Malam 5 5/93 Re- excavation of Gajendra Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2395 10 Malam 5 5/94 Re- excavation of AnantaHatui pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2396 10 Malam 5 5/95 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2397 10 Malam 5 5/96 Re- excavation of Umesh Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2398 10 Malam 5 5/97 Re- excavation of Haricharan Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2399 10 Malam 5 5/98 Re- excavation of Rajballab Barik pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2400 10 Malam 5 5/99 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2401 10 Malam 5 5/100 Re- excavation of CharaPara pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

Renovation of Traditional Water Bodies

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Radhakanta Kuila pond

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Baidhyanath Singha pond

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Kalachand Ghosh pond

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Daisai Adivasi /para pond

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Page 192: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

192/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2402 10 Malam 5 5/101 Re- excavation of Surendra Tudu pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2403 10 Malam 5 5/102 Re- excavation of Bhanupada Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2404 10 Malam 5 5/103 Re- excavation of Gajendra Shit pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2405 10 Malam 5 5/104 Re- excavation of saw pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2406 10 Malam 5 5/105 Re- excavation of Mihir Saw pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2407 10 Malam 5 5/106 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2408 10 Malam 5 5/107 Re- excavation of Subhas ghose pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2409 10 Malam 5 5/108 Re- excavation of Babu der khas pond Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2410 10 Malam 5 5/109 Malam Malam Malam 125 Own IL 1.75 - - 1.30 0.14 1.44 858

2411 10 Malam 5 5/110 Malam Malam Malam 125 Own IL 1.75 - - 1.30 0.14 1.44 858

2412 10 Malam 5 5/111 Re- excavation of Mala Ghose pond Malam Malam Malam 125 Own IL 1.75 - - 1.30 0.14 1.44 858

2413 10 Malam 5 5/112 Malam Malam Malam 125 Own IL 1.75 - - 1.30 0.14 1.44 858

2414 10 Malam 5 5/113 Re- excavation of Supai Murmu Pond Malam Chirpiti Own IL 1.75 - - 1.30 0.14 1.44 858

2415 10 Malam 5 5/114 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2416 10 Malam 5 5/115 Re- excavation of Baliya Khal Uppar Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of nitayananda Kuila pond

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Manmatha Pariary pond

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Manmatha Duary pond

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Chitta Ranjan Duary pond

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kaptibhole

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Aitu pukhur to Manganl Bera

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Page 193: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

193/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2417 10 Malam 5 5/116 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2418 10 Malam 5 5/117 Re- excavation of Baliya Khal nech Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2419 10 Malam 5 5/118 Re- excavation of Sagar Bera Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2420 10 Malam 5 5/119 Re- excavation of Sam Hembram Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2421 10 Malam 5 5/120 Re- excavation of Kapara Hembram Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2422 10 Malam 5 5/121 Re- excavation of Jadu Murmu Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2423 10 Malam 5 5/122 Malam 74 260 Own IL 1.75 - - 1.30 0.14 1.44 858

2424 10 Malam 5 5/123 Malam 74 Own IL 1.75 - - 1.30 0.14 1.44 858

2425 10 Malam 5 5/124 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2426 10 Malam 5 5/125 Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

2427 10 Malam 5 5/126 Re- excavation of Pond Kamala Daha Malam 75 Own IL 1.75 - - 1.30 0.14 1.44 858

- - - 163.26 18.14 181.40 108121

2428 10 Malam 6 Land Development 6/1 Land Devlopment of Mahendra Singha Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2429 10 Malam 6 Land Development 6/2 Land Devlopment of Iswar Senapati Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

Renovation of Traditional Water Bodies

Re- excavation of Forest Chook to Kumed pulai

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria paschim

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Pond At Chhotojharia Adibasi para

Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Pond Banthun murmu Chhotojharia

Chhotojharia

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Pond Tarachand Sahoo & other

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Re- excavation of Pond Pulin Ghosh & other

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies

Kalmapukhuria purba

Kalmapukhuria

Fishary/Irrigation

6th Mar'14

Dry Season

Renovation of Traditional Water Bodies Total

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Page 194: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

194/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2430 10 Malam 6 Land Development 6/3 Land Devlopment of Sushanta Duyari Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2431 10 Malam 6 Land Development 6/4 Land Devlopment of Abani Duyari Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2432 10 Malam 6 Land Development 6/5 Land Devlopment of Bijoy Duyari Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2433 10 Malam 6 Land Development 6/6 Land Devlopment of Birendra Ghose Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2434 10 Malam 6 Land Development 6/7 Land Devlopment of Bankim Karan Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2435 10 Malam 6 Land Development 6/8 Land Devlopment of Manaranjan Ghosh Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2436 10 Malam 6 Land Development 6/9 Land Devlopment of Alok Ghose Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2437 10 Malam 6 Land Development 6/10 Land Devlopment of Khitish Patra Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2438 10 Malam 6 Land Development 6/11 Land Devlopment of Jahanara SSk Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2439 10 Malam 6 Land Development 6/12 Land Devlopment of Gour Ghose Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2440 10 Malam 6 Land Development 6/13 Land Devlopment of Ananda Singha Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2441 10 Malam 6 Land Development 6/14 Land Devlopment of Joinarayan Patra Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2442 10 Malam 6 Land Development 6/15 Land Devlopment of Guru Prasad Bera Malam Malam Malam 125 Own IL - 0.34 - 1.10 0.12 1.22 727

2443 10 Malam 6 Land Development 6/16 Land Devlopment of Daktar Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2444 10 Malam 6 Land Development 6/17 Land Devlopment of Mangal Bera Malam 75 Own IL - 0.27 - 0.89 0.10 0.99 589

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Page 195: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

195/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2445 10 Malam 6 Land Development 6/18 Land Devlopment of Ludu Murmu Malam 75 Own IL - 0.27 - 0.89 0.10 0.99 589

2446 10 Malam 6 Land Development 6/19 Land Devlopment of Cittaranjan Saren Malam 75 Own IL - 0.27 - 0.89 0.10 0.99 589

2447 10 Malam 6 Land Development 6/20 Malam 75 Own IL - 0.27 - 0.89 0.10 0.99 589

2448 10 Malam 6 Land Development 6/21 Land Devlopment of Bimal Senapati Malam Chaltabera 67 Own IL - 1.27 - 0.89 0.10 0.99 589

2449 10 Malam 6 Land Development 6/22 Land Devlopment of Santosh Ghosh Malam Chaltabera 67 Own IL - 1.27 - 0.89 0.10 0.99 589

2450 10 Malam 6 Land Development 6/23 Land Devlopment of Kalachand Ghosh Malam Chaltabera 67 Own IL - 1.27 - 0.89 0.10 0.99 589

2451 10 Malam 6 Land Development 6/24 Land Devlopment of Icchapura SSK Malam Icchapura 60 Own IL - 1.27 - 0.89 0.10 0.99 589

2452 10 Malam 6 Land Development 6/25 Malam Chaltabera 67 Own IL - 0.26 - 0.89 0.10 0.99 589

2453 10 Malam 6 Land Development 6/26 Malam Bhaliachati 71 Own IL - 0.33 - 1.11 0.12 1.23 734

2454 10 Malam 6 Land Development 6/27 Land Devlopment of Diren Dandapat Malam Ichhapura 60 108 Own IL - 0.27 - 1.11 0.12 1.23 734

2455 10 Malam 6 Land Development 6/28 Land Devlopment of Arjun Dandapat Malam Ichhapura 60 178 Own IL - 0.27 - 1.11 0.12 1.23 734

2456 10 Malam 6 Land Development 6/29 Malam Ichhapura 60 8 Own IL - 0.27 - 1.11 0.12 1.23 734

2457 10 Malam 6 Land Development 6/30 Land Devlopment of Sunil Senapati Malam Chaltabera 67 Own IL - 0.27 - 1.11 0.12 1.23 734

2458 10 Malam 6 Land Development 6/31 Malam Chaltabera 67 Own IL - 0.27 - 1.11 0.12 1.23 734

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Guruprasad Hembram

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Chaltabera Primary School

Chaltabera

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Bhaliachati Jaher Sthan

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Gobardhan Dandapat

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Chida Nanda Senapai

Chaltabera

Agricultre

6th Mar'14

Dry Season

Page 196: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

196/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2459 10 Malam 6 Land Development 6/32 Malam Chaltabera 67 Own IL - 0.27 - 1.11 0.12 1.23 734

2460 10 Malam 6 Land Development 6/33 Malam Ichhapura 60 Own IL - 0.27 - 1.11 0.12 1.23 734

2461 10 Malam 6 Land Development 6/34 Land Devlopment of Shymal Sing Malam Chaltabera 64 195 Own IL - 0.27 - 1.11 0.12 1.23 734

2462 10 Malam 6 Land Development 6/35 Land Devlopment of Haripada Sing Malam Bagdoba 67 Own IL - 0.27 - 1.11 0.12 1.23 734

2463 10 Malam 6 Land Development 6/36 Malam Sonadhua 66 82 Own IL - 0.27 - 1.11 0.12 1.23 734

2464 10 Malam 6 Land Development 6/37 Land Devlopment of Surendranath Sing Malam Bagdoba 67 Own IL - 0.27 - 1.11 0.12 1.23 734

2465 10 Malam 6 Land Development 6/38 Land Devlopment of Biswanath Saren Malam Bagdoba 67 48 Own IL - 0.27 - 1.11 0.12 1.23 734

2466 10 Malam 6 Land Development 6/39 Malam Bhaliachati 67 Public IL - 0.27 - 0.89 0.10 0.99 589 Play

2467 10 Malam 6 Land Development 6/40 Land Devlopment of Anil bhakta Malam Bhaliachati 67 Own IL - 0.27 - 0.89 0.10 0.99 589

2468 10 Malam 6 Land Development 6/41 Land Devlopment of rajen bhakta Malam Bhaliachati 67 Own IL - 0.27 - 0.89 0.10 0.99 589

2469 10 Malam 6 Land Development 6/42 Land Devlopment of fakir Kotal Malam Bhaliachati 67 Own IL - 0.27 - 0.89 0.10 0.99 589

2470 10 Malam 6 Land Development 6/43 Land Devlopment of Chunaram Baskey Malam chaltabera 67 Own IL - 0.27 - 0.89 0.10 0.99 589

2471 10 Malam 6 Land Development 6/44 Land Devlopment of Raghunath Rout Malam Sonadhua 66 196 Own IL - 0.27 - 0.89 0.10 0.99 589

2472 10 Malam 6 Land Development 6/45 Land Devlopment of Gurupada Sing Malam Sonadhua 66 196 Own IL - 0.27 - 0.89 0.10 0.99 589

2473 10 Malam 6 Land Development 6/46 Sand Removal of Nandalal Sing Malam Sonadhua 66 196 Own IL - 0.27 - 0.89 0.10 0.99 589

2474 10 Malam 6 Land Development 6/47 Land Devlopment of Gayn Rout Malam chaltabera 67 352 Own IL - 0.27 - 0.89 0.10 0.99 589

2475 10 Malam 6 Land Development 6/48 Land Devlopment of Arjun Sing Malam Bagdoba 67 Own IL - 0.27 - 0.89 0.10 0.99 589

Land Devlopment of Chaltabera Football Ground

Chaltabera

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Haradhan Dandapat

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Rabindra nath Rout

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Land Devlopment of bhaliachati Footbal play ground

Chaltabera

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Page 197: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

197/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2476 10 Malam 6 Land Development 6/49 Land Devlopment of Sapan Sing Malam Bagdoba 67 Own IL - 0.27 - 0.89 0.10 0.99 589

2477 10 Malam 6 Land Development 6/50 Land Devlopment of Haradhan karan Malam Malam Malam 125 Own IL - 0.27 - 0.89 0.10 0.99 589

2478 10 Malam 6 Land Development 6/51 Kalipada karan Land Malam Malam Malam Own IL - 0.27 - 0.89 0.10 0.99 589

2479 10 Malam 6 Land Development 6/52 Balipal SSK Malam Malam Malam Own IL - 0.27 - 0.89 0.10 0.99 589

2480 10 Malam 6 Land Development 6/53 Brindaban Kara land Malam Malam Malam 125 Own IL - 0.27 - 0.89 0.10 0.99 589

2481 10 Malam 6 Land Development 6/54 Manmatha Pariaty Land Malam Malam Malam 125 Own IL - 0.27 - 0.89 0.10 0.99 589

2482 10 Malam 6 Land Development 6/55 Piush Pal Land Malam Malam Malam 125 Own IL - 0.27 - 0.89 0.10 0.99 589

2483 10 Malam 6 Land Development 6/56 Malam Malam Malam 125 Own IL - 0.27 - 0.89 0.10 0.99 589

2484 10 Malam 6 Land Development 6/57 Land Devlopment of satyaban kuila Malam Malam Malam 125 Own IL - 0.50 - 1.63 0.18 1.81 1081

2485 10 Malam 6 Land Development 6/58 Land Devlopment of Debasis karan Malam Malam Malam 125 Own IL - 0.50 - 1.63 0.18 1.81 1081

2486 10 Malam 6 Land Development 6/59 Land Devlopment of Haradhan Paida Malam Malam Malam 125 Own IL - 0.50 - 1.63 0.18 1.81 1081

2487 10 Malam 6 Land Development 6/60 Land Devlopment of Nilkuthi Tala Malam Malam Malam 125 Own IL - 0.50 - 1.63 0.18 1.81 1081

2488 10 Malam 6 Land Development 6/61 Malam 72 Own IL - 1.50 - 1.63 0.18 1.81 1081

2489 10 Malam 6 Land Development 6/62 Land Devlopment of Banspat SSK Malam Banspat 70 Own IL - 1.50 - 1.63 0.18 1.81 1081

2490 10 Malam 6 Land Development 6/63 Land Devlopment of Sukhdevpur SSK Malam 72 Own IL - 1.50 - 1.63 0.18 1.81 1081

2491 10 Malam 6 Land Development 6/64 Land Devlopment of Bijoy Nayek Malam 72 Own IL - 1.50 - 1.63 0.18 1.81 1081

2492 10 Malam 6 Land Development 6/65 Malam 72 Own IL - 1.50 - 1.63 0.18 1.81 1081

Chaltabera

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Land Devlopment at Balipal Shib Mandir

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Narsingpur Primary School

Narasinghapur

Narasinghapur

Agricultre

6th Mar'14

Dry Season

Narasinghapur

Agricultre

6th Mar'14

Dry Season

Narasinghapur

Sukhdevpur

Agricultre

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Narsingpur Play ground

Narasinghapur

Narasinghapur

Agricultre

6th Mar'14

Dry Season

Page 198: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

198/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2493 10 Malam 6 Land Development 6/66 Land Devlopment of Japan Nayek Malam Naldam 118 1 Own IL - 0.50 - 1.63 0.18 1.81 1081

2494 10 Malam 6 Land Development 6/67 Land Devlopment of Kuwar Saren Malam Ciripiti 117 Own IL - 0.50 - 1.63 0.18 1.81 1081

2495 10 Malam 6 Land Development 6/68 Land Devlopment of Anil Nayek Malam Naldam 118 1 Own IL - 0.50 - 1.63 0.18 1.81 1081

2496 10 Malam 6 Land Development 6/69 Land Devlopment of Maheswar Saren Malam Ciripiti 117 Own IL - 0.50 - 1.63 0.18 1.81 1081

2497 10 Malam 6 Land Development 6/70 Land Devlopment of Jharu Saren Malam Ciripiti 117 Own IL - 0.50 - 1.63 0.18 1.81 1081

2498 10 Malam 6 Land Development 6/71 Malam Khasjangal 117 Own IL - 0.50 - 1.63 0.18 1.81 1081

2499 10 Malam 6 Land Development 6/72 Land Devlopment of Bhudhu Saren Malam Ciripiti 117 Own IL - 0.50 - 1.63 0.18 1.81 1081

2500 10 Malam 6 Land Development 6/73 Land Devlopment of Madan Nayek Malam Ciripiti 117 18/107 Own IL - 0.50 - 0.97 0.11 1.08 643

2501 10 Malam 6 Land Development 6/74 Land Devlopment of Maheswar Bhuia Malam Naldam 118 24,44,39 IL - 0.50 - 0.97 0.11 1.08 643

2502 10 Malam 6 Land Development 6/75 Land Devlopment of Bhanu Nayek Malam Naldam 118 20,17 IL - 0.50 - 0.97 0.11 1.08 643

2503 10 Malam 6 Land Development 6/76 Land Devlopment of Lipa Saren Malam Ciripiti 117 26,40 Own IL - 0.50 - 0.97 0.11 1.08 643

2504 10 Malam 6 Land Development 6/77 Land Devlopment of Jhapal Tudu Malam 123 30 Own IL - 0.50 - 0.97 0.11 1.08 643

2505 10 Malam 6 Land Development 6/78 Land Devlopment of Manu Saren Malam 123 2 Own IL - 0.50 - 0.97 0.11 1.08 643

2506 10 Malam 6 Land Development 6/79 Land Devlopment of Laxman Murmu Malam 123 116 Own IL - 0.50 - 0.97 0.11 1.08 643

2507 10 Malam 6 Land Development 6/80 Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2508 10 Malam 6 Land Development 6/81 Land Devlopment of Prasanta Hembram Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2509 10 Malam 6 Land Development 6/82 Malam 74 Own IL - 0.50 - 2.66 0.30 2.96 1763

Khasjangal

Agricultre

6th Mar'14

Dry Season

Khasjangal

2,1,8,12,78,21

Agricultre

6th Mar'14

Dry Season

Khasjangal

Agricultre

6th Mar'14

Dry Season

Khasjangal

1,8,77,78,79,55

Agricultre

6th Mar'14

Dry Season

Khasjangal

3,5,1,70.93

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Khasjangal Football Ground

Khasjangal

3,26,40,54,83,85,55

Agricultre

6th Mar'14

Dry Season

Khasjangal

3,26,40,54,83,85,55

Agricultre

6th Mar'14

Dry Season

Khasjangal

Agricultre

6th Mar'14

Dry Season

Khasjangal

Agricultre

6th Mar'14

Dry Season

Khasjangal

Agricultre

6th Mar'14

Dry Season

Khasjangal

Agricultre

6th Mar'14

Dry Season

Khasjangal

Khuprakhupi

Agricultre

6th Mar'14

Dry Season

Khasjangal

Khuprakhupi

Agricultre

6th Mar'14

Dry Season

Khasjangal

Khuprakhupi

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Satyaranjan Kuila( Bara)

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Chotojharia Football ground

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Page 199: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

199/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2510 10 Malam 6 Land Development 6/83 Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2511 10 Malam 6 Land Development 6/84 Malam 74 Own IL - - 0.20 1.63 0.18 1.81 1081

2512 10 Malam 6 Land Development 6/85 Malam 74 Own IL - - 0.20 1.63 0.18 1.81 1081

2513 10 Malam 6 Land Development 6/86 Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2514 10 Malam 6 Land Development 6/87 Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2515 10 Malam 6 Land Development 6/88 Land Devlopment of Sanat Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2516 10 Malam 6 Land Development 6/89 Land Devlopment of Baikuntha Ghosh Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2517 10 Malam 6 Land Development 6/90 Land Devlopment of Aswini Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2518 10 Malam 6 Land Development 6/91 Land Devlopment of Tiimir Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2519 10 Malam 6 Land Development 6/92 Land Devlopment of Manjula Ghosh Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2520 10 Malam 6 Land Development 6/93 Land Devlopment of Kashinath Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2521 10 Malam 6 Land Development 6/94 Land Devlopment of Badal Ghosh Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2522 10 Malam 6 Land Development 6/95 Land Devlopment of Sambhu Ahari Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2523 10 Malam 6 Land Development 6/96 Land Devlopment of Dhanu Saren Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2524 10 Malam 6 Land Development 6/97 Land Devlopment of Timir Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2525 10 Malam 6 Land Development 6/98 Land Devlopment of Santi Ranjan Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2526 10 Malam 6 Land Development 6/99 Land Devlopment of Sukesh Ghosh Malam Jadavpur 73 Own IL - 0.50 - 1.63 0.18 1.81 1081

Land Devlopment of Chotojharia Manasathan ground

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Pathanr Chiyan to Brindaban's Land repair of Aile

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Pradhan para to Rabindra's land Repair of Aile

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Chotojharia Jahirathan ground

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Chotojharia B.S. Club ground

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Page 200: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

200/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2527 10 Malam 6 Land Development 6/100 Land Devlopment of Rabindra Ghosh Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2528 10 Malam 6 Land Development 6/101 Land Devlopment of Manoj Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2529 10 Malam 6 Land Development 6/102 Land Devlopment of Praloy Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2530 10 Malam 6 Land Development 6/103 Land Devlopment of Prabodh Ghosh Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2531 10 Malam 6 Land Development 6/104 Land Devlopment of Nagen Ahari Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2532 10 Malam 6 Land Development 6/105 Land Devlopment of Bhagirath Karan Malam Jadavpur 73 Own IL - 0.50 - 1.63 0.18 1.81 1081

2533 10 Malam 6 Land Development 6/106 Malam Jadavpur 73 Own IL - 0.50 - 1.63 0.18 1.81 1081

2534 10 Malam 6 Land Development 6/107 Land Devlopment of Saroj Kuila Malam 74 Own IL - 0.50 - 1.63 0.18 1.81 1081

2535 10 Malam 6 Land Development 6/108 Land Devlopment of Laxman Murmu Malam Kukrakupi 123 116 Own IL - 0.50 - 1.63 0.18 1.81 1081

2536 10 Malam 6 Land Development 6/109 Land Devlopment of Manu Saren Malam Kukrakupi 123 2 Own IL - 0.50 - 1.63 0.18 1.81 1081

2537 10 Malam 6 Land Development 6/110 Land Devlopment of Japal Tudu Malam Kukrakupi 123 30 Own IL - 0.50 - 1.63 0.18 1.81 1081

2538 10 Malam 6 Land Development 6/111 Ratan Murmu Malam Chirpiti 117 Own IL - 0.50 - 1.63 0.18 1.81 1081

2539 10 Malam 6 Land Development 6/112 Laxmon Soren Malam Chirpiti 118 Own IL - 0.50 - 1.63 0.18 1.81 1081

2540 10 Malam 6 Land Development 6/113 Jagat Soren Malam Chirpiti 118 Own IL - 0.50 - 1.63 0.18 1.81 1081

2541 10 Malam 6 Land Development 6/114 Panchanan Saren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2542 10 Malam 6 Land Development 6/115 Khandu Mahata Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2543 10 Malam 6 Land Development 6/116 Chandra Saren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Land Devlopment of Bhabatosh Mahapatra

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Chhotojharia

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Page 201: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

201/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2544 10 Malam 6 Land Development 6/117 Makar Hansda Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2545 10 Malam 6 Land Development 6/118 Gunaram Saren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2546 10 Malam 6 Land Development 6/119 Sunaram Saren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2547 10 Malam 6 Land Development 6/120 Rameswer Saren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2548 10 Malam 6 Land Development 6/121 Bablu Hansda Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2549 10 Malam 6 Land Development 6/122 Gobardhan Saren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2550 10 Malam 6 Land Development 6/123 Samsar Soren Malam Chirpiti 118 Own IL - 0.50 - 1.63 0.18 1.81 1081

2551 10 Malam 6 Land Development 6/124 Basab Hembram Malam Harimari 121 Own IL - 0.50 - 1.63 0.18 1.81 1081

2552 10 Malam 6 Land Development 6/125 Mahan Murmu Malam Harimari 121 Own IL - 0.50 - 1.63 0.18 1.81 1081

2553 10 Malam 6 Land Development 6/126 Bimal Hansda Malam Harimari 121 Own IL - 0.50 - 1.63 0.18 1.81 1081

2554 10 Malam 6 Land Development 6/127 Santosh Murmu Malam Harimari 121 Own IL - 0.50 - 1.63 0.18 1.81 1081

2555 10 Malam 6 Land Development 6/128 Bhim Hambram Malam Harimari 121 Own IL - 0.50 - 1.63 0.18 1.81 1081

2556 10 Malam 6 Land Development 6/129 Dangi Soren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2557 10 Malam 6 Land Development 6/130 Laxmon Soren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2558 10 Malam 6 Land Development 6/131 Sasadhar Mahata Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2559 10 Malam 6 Land Development 6/132 Pradhan Hansda Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2560 10 Malam 6 Land Development 6/133 Chitan Murmu Malam Kharsola 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Page 202: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

202/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2561 10 Malam 6 Land Development 6/134 Chunaram Hansda Malam Kharsola 130 Own IL - 0.50 - 1.63 0.18 1.81 1081

2562 10 Malam 6 Land Development 6/135 Rutha Soren Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2563 10 Malam 6 Land Development 6/136 Pungi Soren Malam Khasjangal 130 Own IL - 0.50 - 1.63 0.18 1.81 1081

2564 10 Malam 6 Land Development 6/137 Club Ground Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2565 10 Malam 6 Land Development 6/138 Foot Ball Ground Malam Kaptibhole 120 Own IL - 0.50 - 1.63 0.18 1.81 1081

2566 10 Malam 6 Land Development 6/139 Rabi Bera Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2567 10 Malam 6 Land Development 6/140 Srimanta soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2568 10 Malam 6 Land Development 6/141 Land Levelling of Bablu Hatui Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2569 10 Malam 6 Land Development 6/142 Land Levelling of Bimal Hatui Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2570 10 Malam 6 Land Development 6/143 Land Levelling of Parimal Hatui Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2571 10 Malam 6 Land Development 6/144 Land Levelling of Ananta Dolai Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2572 10 Malam 6 Land Development 6/145 Land Levelling of Tapas Singha Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2573 10 Malam 6 Land Development 6/146 Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2574 10 Malam 6 Land Development 6/147 Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2575 10 Malam 6 Land Development 6/148 Sam Charan Soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kaptibhole

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Land Levelling of Charapara ICDS Ground

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Land Levelling of Kalmapukhuria Purbo SSK Ground

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Page 203: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

203/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2576 10 Malam 6 Land Development 6/149 Sanatan soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2577 10 Malam 6 Land Development 6/150 Mohon Soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2578 10 Malam 6 Land Development 6/151 Sam Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2579 10 Malam 6 Land Development 6/152 Sambhu Soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2580 10 Malam 6 Land Development 6/153 Dakther Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2581 10 Malam 6 Land Development 6/154 Kapura Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2582 10 Malam 6 Land Development 6/155 Goya rana Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2583 10 Malam 6 Land Development 6/156 Sam Soren Boro Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2584 10 Malam 6 Land Development 6/157 Lakhindra Tudu Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2585 10 Malam 6 Land Development 6/158 Lakhindra Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2586 10 Malam 6 Land Development 6/159 Rabi Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2587 10 Malam 6 Land Development 6/160 Bhim Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria purba

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Page 204: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

204/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2588 10 Malam 6 Land Development 6/161 Nabin Soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2589 10 Malam 6 Land Development 6/162 Nagua Soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2590 10 Malam 6 Land Development 6/163 Mongal Soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2591 10 Malam 6 Land Development 6/164 Sukulal Soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2592 10 Malam 6 Land Development 6/165 Daktar Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2593 10 Malam 6 Land Development 6/166 Rengta Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2594 10 Malam 6 Land Development 6/167 Sukul Murmu Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2595 10 Malam 6 Land Development 6/168 Niranjan Pramanik Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2596 10 Malam 6 Land Development 6/169 Mangal Murmu Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2597 10 Malam 6 Land Development 6/170 Chitya Saren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2598 10 Malam 6 Land Development 6/171 Laxman saren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Page 205: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

205/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2599 10 Malam 6 Land Development 6/172 Jhareswar Pramanik Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2600 10 Malam 6 Land Development 6/173 Jhareswar Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2601 10 Malam 6 Land Development 6/174 Ladu Murmu Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2602 10 Malam 6 Land Development 6/175 Guruprasad Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2603 10 Malam 6 Land Development 6/176 Laxman Hembram Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2604 10 Malam 6 Land Development 6/177 Dhuma Soren Malam 75 Own IL - 0.50 - 1.63 0.18 1.81 1081

2605 10 Malam 6 Land Development 6/178 Chalta bera Pry School Ground Malam Chaltabera Own IL - 0.27 - 0.89 0.10 0.99 589

2606 10 Malam 6 Land Development 6/179 Land Devlopment of Somay Hansda Malam Bagdoba 67 Gov PL - 0.27 - 0.89 0.10 0.99 589

2607 10 Malam 6 Land Development 6/180 Land Devlopment of Icchapura SSK Malam Ichhapura 60 Gov PL - 0.27 - 0.89 0.10 0.99 589

2608 10 Malam 6 Land Development 6/181 Land Devlopment of Badal kar Malam Malam Malam 125 Own IL - 0.50 - 1.63 0.18 1.81 1081

- - - 254.71 28.30 283.01 168681

2609 10 Malam 7 7/1 Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2610 10 Malam 7 7/2 Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2611 10 Malam 7 7/3 Const. of Gurd wall at Kala Mahajan Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Chaltabera

Agricultre

6th Mar'14

Dry Season

Agricultre

6th Mar'14

Dry Season

Land Development TotalFlood Control & Protecation

Const. of Guard Wall Near Gopal bera 's house

Kalmapukhuria purba

kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Const. of drinage from Gopal bera to Kalachand sahoo house

Kalmapukhuria purba

kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Kalmapukhuria purba

kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Page 206: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

206/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2612 10 Malam 7 7/4 Malam Kharsola 122 Gov PL - - 0.05 1.16 0.89 2.05 768

2613 10 Malam 7 7/5 Malam Kharsola 122 Gov PL - - 0.06 1.16 0.89 2.05 768

2614 10 Malam 7 7/6 Malam Harimari 122 Gov PL - - 0.05 1.16 0.89 2.05 768

2615 10 Malam 7 7/7 Repair of koptibhole jharna Malam Kaptibhole 122 Gov PL - - 0.37 1.16 0.89 2.05 768

2616 10 Malam 7 7/8 Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2617 10 Malam 7 7/9 Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2618 10 Malam 7 7/10 Malam Bagdoba Gov PL - - 0.37 1.16 0.89 2.05 768

2619 10 Malam 7 7/11 Icchapura SSK to Thuria Guard Wall Malam Ichhapura 60 Gov PL - - 0.37 1.16 0.89 2.05 768

2620 10 Malam 7 7/12 Repair of Chaltabera jharna& bandh Malam chaltabera 67 Gov PL - - 0.37 1.16 0.89 2.05 768

2621 10 Malam 7 7/13 Repair of Chaltabera jharna Malam chaltabera 67 Gov PL - - 0.37 1.16 0.89 2.05 768

2622 10 Malam 7 7/14 Malam 74 Gov PL - - 0.37 1.16 0.89 2.05 768

2623 10 Malam 7 7/15 Repair of Nala at primary school Malam 74 Gov PL - - 0.37 1.16 0.89 2.05 768

2624 10 Malam 7 7/16 Repair of Nala from mandir to jharna Malam 74 Gov PL - - 0.37 1.16 0.89 2.05 768

2625 10 Malam 7 7/17 Malam 74 Gov PL - - 0.37 1.16 0.89 2.05 768

Flood Control & Protecation

Const. of culvert under koptibhole to purba koptibhole II

Kaptibhole

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Const. of culvert under koptibhole to purba koptibhole I

Kaptibhole

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Const. of culvert under Harimari to Khasjangal

Kaptibhole

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Kaptibhole

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Const. of drinage from Digamber shit House to Amulya bera house

Kalmapukhuria paschim

Kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Const. of Gurd wall at Gunadhar Shit Pond

Kalmapukhuria paschim

Kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Const. of Culvert with Gard Wall of Bagdoba Bandh

Chaltabera

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Chaltabera

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Chaltabera

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Chaltabera

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Repair of Nala frompich road to duary land

Chhotojharia

Chhotojharia

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Chhotojharia

Chhotojharia

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Chhotojharia

Chhotojharia

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Repair of Nala from chotojharia kamar pada to magra muhu

Chhotojharia

Chhotojharia

Flod Control

6th Mar'14

Dry Season

Page 207: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

207/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2626 10 Malam 7 7/18 Repair of Nala Bera Pada Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2627 10 Malam 7 7/19 Repair of Chadra Nala Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2628 10 Malam 7 7/20 Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2629 10 Malam 7 7/21 Const. of culvert at Kalma Nala Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2630 10 Malam 7 7/22 const. of guard wall at Saw pond Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2631 10 Malam 7 7/23 Const. of Guard wall at malam khal pad Malam Malam Malam 125 Gov PL - - 0.37 1.16 0.89 2.05 768

2632 10 Malam 7 7/24 Cons. of Culvertn at Gunaram Soren Malam Kaptibhole Gov PL - - 0.05 1.16 0.89 2.05 768

2633 10 Malam 7 7/25 Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2634 10 Malam 7 7/26 Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2635 10 Malam 7 7/27 Construction of KelmaNala Culvert Malam 72 Gov PL - - 0.37 1.16 0.89 2.05 768

2636 10 Malam 7 7/28 Malam 72 Gov PL - - 0.37 1.16 0.89 2.05 768

2637 10 Malam 7 7/29 Construction of KelmaNala Culvert Malam 72 Gov PL - - 0.37 1.16 0.89 2.05 768

2638 10 Malam 7 7/30 Malam Banspat 72 Gov PL - - 0.37 1.16 0.89 2.05 768

2639 10 Malam 7 7/31 Malam 74 211/138 Gov PL - - 0.37 1.16 0.89 2.05 768

2640 10 Malam 7 7/32 Malam 74 48 Gov PL - - 0.37 1.16 0.89 2.05 768

Flood Control & Protecation

kalmapukhuria Purba

kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

kalmapukhuria Purba

kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Repair of Nala from rana pada culvert to kalmadaha nala

kalmapukhuria Purba

kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

kalmapukhuria Purba

kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

kalmapukhuria Purba

kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Kaptibhole

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Repair of at Bandh Chaitanya Bera House

Kalmapukhuria purba

Kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Repair of at Bandh Dhaysai To Kalmapukhuria

Kalmapukhuria purba

Kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Narasinghapur

Narasinghapur

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Construction of Boulder Pitching From Shit paraTo Shiv Mandir

Narasinghapur

Sukhdevpur

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Narasinghapur

Sukhdevpur

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Repair of Nala from Badam Ghati to Banspat

Narasinghapur

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Const. of From Sitala mondir to pacha gariya

Chhotojharia

Chhotojharia

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Repair of Play Ground Adibasi para At chhotojharia

Chhotojharia

Chhotojharia

Flod Control

6th Mar'14

Dry Season

Page 208: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

208/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2641 10 Malam 7 7/33 Malam 74 Gov PL - - 0.37 1.16 0.89 2.05 768

2642 10 Malam 7 7/34 Repair of Nala Kamala Malam 75 Gov PL - - 0.37 1.16 0.89 2.05 768

2643 10 Malam 7 7/35 Malam Malam Malam 125 Gov PL - - 0.37 1.16 0.89 2.05 768

2644 10 Malam 7 7/36 Malam Malam Malam 125 Gov PL - - 0.37 1.16 0.89 2.05 768

2645 10 Malam 7 7/37 Malam Malam Malam 125 Gov PL - - 0.37 1.16 0.89 2.05 768

2646 10 Malam 7 7/38 Malam Malam Malam 125 Gov PL - - 0.37 1.16 0.89 2.05 768

2647 10 Malam 7 7/39 Malam Malam Malam 125 Gov PL - - 0.37 1.16 0.89 2.05 768

2648 10 Malam 7 7/40 Malam Malam Malam 125 Gov PL - - 0.37 1.16 0.89 2.05 768

2649 10 Malam 7 7/41 Const. of Nala at Adibasi pada Malam 74 Gov PL - - 0.37 1.16 0.89 2.05 768

- - - 47.52 36.54 84.06 31472

2650 10 Malam 8 Rural Connectivity 8/1 Malam Chaltabera 67 Gov PL - - 1.00 1.19 1.28 2.47 790

2651 10 Malam 8 Rural Connectivity 8/2 Malam Bhaliachati 71 Gov PL - - 1.00 1.19 1.28 2.47 790

2652 10 Malam 8 Rural Connectivity 8/3 Malam Bhaliachati 71 Gov PL - - 1.50 1.19 1.28 2.47 790

2653 10 Malam 8 Rural Connectivity 8/4 Malam Bhaliachati 71 Gov PL - - 1.50 1.19 1.28 2.47 790

2654 10 Malam 8 Rural Connectivity 8/5 Malam Bhaliachati 71 Gov PL - - 1.50 1.19 1.28 2.47 790

Flood Control & Protecation

Repair of Play Ground at chhotojharia Priyamari School

Chhotojharia

Chhotojharia

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Kalmapukhuria purba

Kalmapukhuria

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Construction of Gurd wall Kalipada Karan Land Side.

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Construction of Gurd wall Ashok Karan Land Side.

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Construction of Gurd wall Devdarutala Roda to Nilkuthi With Calvert.

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Construction of Gurd wall Shibmandir to Nilkuthi With Calvert.

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Construction of Gurd wall Devdarutala Roda to Nilkuthi With Calvert.

Flod Control

6th Mar'14

Flood Control & Protecation

Construction of Gurd wall Shibmandir to Nilkuthi With Calvert.

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation

Chhotojharia

Chhotojharia

Flod Control

6th Mar'14

Dry Season

Flood Control & Protecation Total

Repair of rd from chaltabera pitch to banspat

Chaltabera

Communication

6th Mar'14

Dry Season

Const. of Rd from Khagen Bhakta's House to Primary School Via Badal Bera's house

Chaltabera

Communication

6th Mar'14

Dry Season

Const. of Rd from Adivasi Para to Badal Bera's house

Chaltabera

Communication

6th Mar'14

Dry Season

Const. of Rd from PMGSY Road to Pukur Ghat

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Rd from Kalmapukhuria High Sc. to Jaleswar Murmu's house

Chaltabera

Communication

6th Mar'14

Dry Season

Page 209: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

209/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2655 10 Malam 8 Rural Connectivity 8/6 Malam Bhaliachati 71 Gov PL - - 1.50 1.19 1.28 2.47 790

2656 10 Malam 8 Rural Connectivity 8/7 Malam Chaltabera 67 Gov PL - - 1.00 1.19 1.28 2.47 790

2657 10 Malam 8 Rural Connectivity 8/8 Repair of Rd from Sing Para to Kanthi Malam Chaltabera 67 Gov PL - - 1.00 1.19 1.28 2.47 790

2658 10 Malam 8 Rural Connectivity 8/9 Malam Chaltabera 67 Gov PL - - 1.50 1.19 1.28 2.47 790

2659 10 Malam 8 Rural Connectivity 8/10 Malam Chaltabera 67 Gov PL - - 1.50 1.19 1.28 2.47 790

2660 10 Malam 8 Rural Connectivity 8/11 Malam Chaltabera 67 Gov PL - - 1.50 1.19 1.28 2.47 790

2661 10 Malam 8 Rural Connectivity 8/12 Malam Chaltabera 67 Gov PL - - 1.50 1.19 1.28 2.47 790

2662 10 Malam 8 Rural Connectivity 8/13 Malam Bhaliachati 71 Gov PL - - 1.50 1.19 1.28 2.47 790

2663 10 Malam 8 Rural Connectivity 8/14 Malam Bhaliachati 71 Gov PL - - 1.50 1.19 1.28 2.47 790

2664 10 Malam 8 Rural Connectivity 8/15 Malam Bhaliachati 71 Gov PL - - 1.00 1.19 1.28 2.47 790

2665 10 Malam 8 Rural Connectivity 8/16 Malam Banspat Ichhapura - - 2.00 2.49 3.45 5.93 1646

2666 10 Malam 8 Rural Connectivity 8/17 Repair. of ichhapura to banspat road Malam Ichhapura 60 Gov PL - - 1.50 1.16 1.48 2.64 768

2667 10 Malam 8 Rural Connectivity 8/18 Malam Ichhapura 60 Gov PL - - 2.00 1.16 1.48 2.64 768

2668 10 Malam 8 Rural Connectivity 8/19 Repair. of ichhapura gramin road Malam Ichhapura 60 Gov PL - - 1.50 1.16 1.48 2.64 768

2669 10 Malam 8 Rural Connectivity 8/20 Const. of ichhapura to feri ghat road Malam Ichhapura 60 Gov PL - - 0.24 1.16 1.48 2.64 768

Repair of Rd from Primary School. to Sanatan Murmu's house

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Rd from Sing Para Pukur to Khal

Chaltabera

Communication

6th Mar'14

Dry Season

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Rd from Pitch rd to Sadarghat

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Rd from Babuichati to Sadarghat

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Rd from Baram Ghati to Marakur

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Rd from Jharna to PMGSY Road

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Rd from Primary School. to PMGSY Road

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Rd from Akal Hansda's House Road to Jaleswar Murmu's hose

Chaltabera

Communication

6th Mar'14

Dry Season

Const. of Rd from Madan's House to Bhaliachati Main Road

Chaltabera

Communication

6th Mar'14

Dry Season

Repair. of Rd. From ichhapura to Banspat

6th Mar'14

Dry Season

Chaltabera

Communication

6th Mar'14

Dry Season

Repair. of ichhapura to Barajharia Jaher Pitch road

Chaltabera

Communication

6th Mar'14

Dry Season

Chaltabera

Communication

6th Mar'14

Dry Season

Chaltabera

Communication

6th Mar'14

Dry Season

Page 210: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

210/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2670 10 Malam 8 Rural Connectivity 8/21 Malam Bhaliachati 71 Gov PL - - 1.50 1.19 1.28 2.47 790

2671 10 Malam 8 Rural Connectivity 8/22 Repair of Adibasi Para Gramin Road Malam Bhaliachati 71 Gov PL - - 1.50 1.19 1.28 2.47 790

2672 10 Malam 8 Rural Connectivity 8/23 Malam Bagdoba 69 Gov PL - - 1.50 1.19 1.28 2.47 790

2673 10 Malam 8 Rural Connectivity 8/24 Malam Bagdoba 69 Gov PL - - 1.50 1.19 1.28 2.47 790

2674 10 Malam 8 Rural Connectivity 8/25 Malam Bagdoba 69 Gov PL - - 2.00 1.19 1.28 2.47 790

2675 10 Malam 8 Rural Connectivity 8/26 Malam Bagdoba 69 Gov PL - - 2.00 1.19 1.28 2.47 790

2676 10 Malam 8 Rural Connectivity 8/27 Malam Bagdoba 69 Gov PL - - 1.50 1.19 1.28 2.47 790

2677 10 Malam 8 Rural Connectivity 8/28 Malam Bagdoba 69 Gov PL - - 1.50 1.19 1.28 2.47 790

2678 10 Malam 8 Rural Connectivity 8/29 Malam Bagdoba 69 Gov PL - - 0.80 0.75 0.99 1.73 494

2679 10 Malam 8 Rural Connectivity 8/30 Malam Bagdoba 69 Gov PL - - 0.80 0.75 0.99 1.73 494

2680 10 Malam 8 Rural Connectivity 8/31 Const, of Ichhapura to berajharia road Malam Ichhapura 60 Gov PL - - 0.24 1.16 1.48 2.64 768

2681 10 Malam 8 Rural Connectivity 8/32 Repair of Bagdodoba Gramin Road Malam Bagdoba 69 Gov PL - - 1.05 1.16 1.48 2.64 768

2682 10 Malam 8 Rural Connectivity 8/33 Repair of Babuichati Gramin Road Malam Bhaliachati 68 Gov PL - - 1.05 1.16 1.48 2.64 768

2683 10 Malam 8 Rural Connectivity 8/34 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2684 10 Malam 8 Rural Connectivity 8/35 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

Const. of Rd. from Bhaliachati Adibasi Para To Jharna

Chaltabera

Communication

6th Mar'14

Dry Season

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Road from Babuichati to School chak

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Road from Bagdoba pubpara to School chak

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Road from Kakranal to baramghati

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Road from maity kotcha to pitch

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Tarai Para to Baramchati Road

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Baskey Para to Senapai Para Gramin Road

Chaltabera

Communication

6th Mar'14

Dry Season

Const. of Bagdoba Paschim Para to Football Ground

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Bagdoba Pukhur to Pacha Ghat Road

Chaltabera

Communication

6th Mar'14

Dry Season

Chaltabera

Communication

6th Mar'14

Dry Season

Chaltabera

Communication

6th Mar'14

Dry Season

Chaltabera

Communication

6th Mar'14

Dry Season

Repair of Road From Ghosh Para to Ranapara

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road From Kuila Para to Jadavpur

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Page 211: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

211/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2685 10 Malam 8 Rural Connectivity 8/36 Repair of Tetul Danga Gramin Road Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2686 10 Malam 8 Rural Connectivity 8/37 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2687 10 Malam 8 Rural Connectivity 8/38 Malam 75 Gov PL - - 1.05 0.95 0.11 1.06 631

2688 10 Malam 8 Rural Connectivity 8/39 Malam 75 Gov PL - - 1.05 0.99 0.49 1.48 658

2689 10 Malam 8 Rural Connectivity 8/40 Repair of Palui Para Road Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2690 10 Malam 8 Rural Connectivity 8/41 Repair of Jharna Gramin Road Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2691 10 Malam 8 Rural Connectivity 8/42 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2692 10 Malam 8 Rural Connectivity 8/43 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2693 10 Malam 8 Rural Connectivity 8/44 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2694 10 Malam 8 Rural Connectivity 8/45 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2695 10 Malam 8 Rural Connectivity 8/46 Malam 74 Gov PL - - 1.50 1.49 1.97 3.46 988

2696 10 Malam 8 Rural Connectivity 8/47 Malam 74 Gov PL - - 1.50 1.49 1.97 3.46 988

2697 10 Malam 8 Rural Connectivity 8/48 Malam 74 Gov PL - - 1.50 1.49 1.97 3.46 988

2698 10 Malam 8 Rural Connectivity 8/49 Malam 74 Gov PL - - 1.50 1.49 1.97 3.46 988

2699 10 Malam 8 Rural Connectivity 8/50 Malam 74 Gov PL - - 1.50 1.49 1.97 3.46 988

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Rd.From Tetul Danga to Chotojharia Baram Sthan

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Rd from Sitala Mandir to Singha Para

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Rd from Surendra Saren's House to Chaandra Saren's House

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road from keder bera house to PIREP

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road form Surendra pike house to Chaitanna bera house

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road of Khasjangal Gramin Road

Khasjangal

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road from Khasjangal to Harimari

Khasjangal

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road from Khasjangal to Chotojharia Tower

Khasjangal

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road from Khasjangal to Rangiyam

Khasjangal

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road from Khuprakhupi Pitch to mini deep tubewell

Khasjangal

Khuprakhupi

Communication

6th Mar'14

Dry Season

Repair of Road from Khuprakhupi SSK Pitch to (Choto)Laxman Murmu's House

Khasjangal

Khuprakhupi

Communication

6th Mar'14

Dry Season

Repair of Road from Khuprakhupi Muciram Saren to mini deep tubewell

Khasjangal

Chhotojharia

Communication

6th Mar'14

Dry Season

Page 212: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

212/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2700 10 Malam 8 Rural Connectivity 8/51 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2701 10 Malam 8 Rural Connectivity 8/52 Malam 74 Gov PL - - 0.60 0.50 0.99 1.48 329

2702 10 Malam 8 Rural Connectivity 8/53 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2703 10 Malam 8 Rural Connectivity 8/54 Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2704 10 Malam 8 Rural Connectivity 8/55 Repair of Goripada road Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2705 10 Malam 8 Rural Connectivity 8/56 Malam Bhaliachati 67 Gov PL - - 0.24 1.16 1.48 2.64 768

2706 10 Malam 8 Rural Connectivity 8/57 Malam chaltabera 67 Gov PL - - 0.24 1.16 1.48 2.64 768

2707 10 Malam 8 Rural Connectivity 8/58 Malam 74 Gov PL - - 1.00 1.16 1.48 2.64 768

2708 10 Malam 8 Rural Connectivity 8/59 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2709 10 Malam 8 Rural Connectivity 8/60 Const. of Rd. from jadavpur to Ausapal Malam 74 Gov PL - - 1.00 1.16 1.48 2.64 768

2710 10 Malam 8 Rural Connectivity 8/61 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2711 10 Malam 8 Rural Connectivity 8/62 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2712 10 Malam 8 Rural Connectivity 8/63 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2713 10 Malam 8 Rural Connectivity 8/64 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2714 10 Malam 8 Rural Connectivity 8/65 Repair of kalmapukuria Village Road Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

Repair of Road from manas chowck to Harimari

Khasjangal

Chhotojharia

Communication

6th Mar'14

Dry Season

Cons. Of Rd from Hatui House to Adibasi Jahirathan Via Gayla para

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road From Chotojharia Sitala Mandir to Jharna

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Rd from Goripada to Khatuapara

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Const. of road from bhaliachati to Kalmapukuria

Chaltabera

Communication

6th Mar'14

Dry Season

Const. of road from Adibasi pada to pirep

Chaltabera

Communication

6th Mar'14

Dry Season

Const. of Rd. from Jadavpur to Sukhdevpur

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road From Chotojharia Sitala Mandir to Jharna

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road from chotojaria adibasi pada to village road

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road from chotojharia to sabar pada

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road from chotojharia pitch road to jadavpur

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road from khasjangal to harimari

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Page 213: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

213/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2715 10 Malam 8 Rural Connectivity 8/66 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2716 10 Malam 8 Rural Connectivity 8/67 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2717 10 Malam 8 Rural Connectivity 8/68 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2718 10 Malam 8 Rural Connectivity 8/69 Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2719 10 Malam 8 Rural Connectivity 8/70 Repair of Road from paik pada to jharna Malam 75 Gov PL - - 1.05 1.16 1.48 2.64 768

2720 10 Malam 8 Rural Connectivity 8/71 Malam 75 Gov PL - - 0.06 1.16 1.48 2.64 768

2721 10 Malam 8 Rural Connectivity 8/72 Malam 75 Gov PL - - 0.06 1.16 1.48 2.64 768

2722 10 Malam 8 Rural Connectivity 8/73 Malam 75 Gov PL - - 0.06 1.16 1.48 2.64 768

2723 10 Malam 8 Rural Connectivity 8/74 Malam 74 Gov PL - - 1.05 1.16 1.48 2.64 768

2724 10 Malam 8 Rural Connectivity 8/75 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2725 10 Malam 8 Rural Connectivity 8/76 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2726 10 Malam 8 Rural Connectivity 8/77 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2727 10 Malam 8 Rural Connectivity 8/78 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2728 10 Malam 8 Rural Connectivity 8/79 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2729 10 Malam 8 Rural Connectivity 8/80 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

Repair of Road from Sitala mandir to Palui Para

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road from Hatui pada to Chotojharia

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road from kalmapukuria to Jadavpur

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road from kalamapukuria to Sukdevpur

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Const. Of concrete Road from k.p.ananda Mahapatra house to ghose pada

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Const. Of concrete Road from ghose pada to sitala more

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Const. Of concrete Road from Sitala more to bakultala

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road from Chotojharia pitch to paschimpada

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Construction of Road Abrida to Shib Mandir.

Communication

6th Mar'14

Dry Season

Construction of Road Nimainagar to Shib Mandir.

Communication

6th Mar'14

Dry Season

Construction of Road Chunpara to Mannapara.

Communication

6th Mar'14

Dry Season

Construction of Road Jahanera Gramin Road

Communication

6th Mar'14

Dry Season

Construction of Road from Haripada Das to Parrimal Dandapat.

Communication

6th Mar'14

Dry Season

Construction of Road from Ranjit Singha to Paresh Sing.

Communication

6th Mar'14

Dry Season

Page 214: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

214/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2730 10 Malam 8 Rural Connectivity 8/81 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2731 10 Malam 8 Rural Connectivity 8/82 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2732 10 Malam 8 Rural Connectivity 8/83 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2733 10 Malam 8 Rural Connectivity 8/84 Repair of Balipal Gramin Road Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2734 10 Malam 8 Rural Connectivity 8/85 Repair of Manapara Gramin Road Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2735 10 Malam 8 Rural Connectivity 8/86 Repair of Nilkuti to Ausapal Road Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2736 10 Malam 8 Rural Connectivity 8/87 Repair of Singhapara to Shib Mandir Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2737 10 Malam 8 Rural Connectivity 8/88 Repair of Chunpura Gramin Road Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2738 10 Malam 8 Rural Connectivity 8/89 Repair of Singhapara to Nilkuthi Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2739 10 Malam 8 Rural Connectivity 8/90 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2740 10 Malam 8 Rural Connectivity 8/91 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2741 10 Malam 8 Rural Connectivity 8/92 Const. of Road from Malam to Ausapal Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2742 10 Malam 8 Rural Connectivity 8/93 Malam Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2743 10 Malam 8 Rural Connectivity 8/94 Malam Malam 125 Gov PL - - 0.24 1.16 1.48 2.64 768

2744 10 Malam 8 Rural Connectivity 8/95 Malam 72 Gov PL - - 0.24 1.16 1.48 2.64 768

Const. of Road from Bagpada to malam shib mandir

Communication

6th Mar'14

Dry Season

Const. of Road from malam Nilkuthi to manna pada

Communication

6th Mar'14

Dry Season

Const. of Road from malam Nilkuthi to Jadavpur

Communication

6th Mar'14

Dry Season

Communication

6th Mar'14

Dry Season

Communication

6th Mar'14

Dry Season

Communication

6th Mar'14

Dry Season

Communication

6th Mar'14

Dry Season

Communication

6th Mar'14

Dry Season

Communication

6th Mar'14

Dry Season

Const. of Road from malam Nilkuthi to Devdarutala

Communication

6th Mar'14

Dry Season

Const. of Road from Balipal to Nimainagar

Communication

6th Mar'14

Dry Season

Communication

6th Mar'14

Dry Season

Const. of Road from malam Nilkuthi to Shib Mandir

Communication

6th Mar'14

Dry Season

Repair of rd. from Sukhdevpur ferighat to Kalmaphukuria

Narasinghapur

Communication

6th Mar'14

Dry Season

Const. of Road from narasinghapur to Sukdebpur

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Page 215: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

215/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2745 10 Malam 8 Rural Connectivity 8/96 Malam 72 Gov PL - - 2.00 1.16 1.48 2.64 768

2746 10 Malam 8 Rural Connectivity 8/97 Malam 72 Gov PL - - 0.24 1.16 1.48 2.64 768

2747 10 Malam 8 Rural Connectivity 8/98 Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2748 10 Malam 8 Rural Connectivity 8/99 Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2749 10 Malam 8 Rural Connectivity 8/100 Repair of Road at Singpada gali Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2750 10 Malam 8 Rural Connectivity 8/101 Repair of Road at ghosepada gali Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2751 10 Malam 8 Rural Connectivity 8/102 Repair of Road at shitpada gali Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2752 10 Malam 8 Rural Connectivity 8/103 Repair of Road at Giripada gali Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2753 10 Malam 8 Rural Connectivity 8/104 Repair of Road at senapati pada gali Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2754 10 Malam 8 Rural Connectivity 8/105 Repair of Road at Kotal pada gali Malam 72 Gov PL - - 0.50 1.16 1.48 2.64 768

2755 10 Malam 8 Rural Connectivity 8/106 Repair of Road at tarai pada gali Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2756 10 Malam 8 Rural Connectivity 8/107 Repair of Road at Khatua pada gali Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2757 10 Malam 8 Rural Connectivity 8/108 Repair of Road from k.p to Sukhdevpur Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2758 10 Malam 8 Rural Connectivity 8/109 Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2759 10 Malam 8 Rural Connectivity 8/110 Repair of Road from k.p to Banspat Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

Const. of Road from Banspat to Icchapura

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Const. of Road from Kalmapukhuria to Narsinghapur ferighat

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Repair of Road from Banspat to Narsinghapur

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Repair of Road from Singpada to Chaltabeda

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Repair of Road from Narsinghpur to Banspat

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Page 216: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

216/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2760 10 Malam 8 Rural Connectivity 8/111 Repair of Road at sukdevpur villaga Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2761 10 Malam 8 Rural Connectivity 8/112 Repair of Road at Narsinghapur village Malam 72 Gov PL - - 1.05 1.16 1.48 2.64 768

2762 10 Malam 8 Rural Connectivity 8/113 Malam 74 Gov PL - - 0.24 1.16 1.48 2.64 768

2763 10 Malam 8 Rural Connectivity 8/114 Malam Kaptibhole 120 Gov PL - - 1.26 1.39 1.48 2.88 921

2764 10 Malam 8 Rural Connectivity 8/115 Malam Kaptibhole 120 Gov PL - - 1.26 1.39 1.48 2.88 921

2765 10 Malam 8 Rural Connectivity 8/116 Malam Kaptibhole 120 Gov PL - - 1.26 1.39 1.48 2.88 921

2766 10 Malam 8 Rural Connectivity 8/117 Malam Basiasole 116 Gov PL - - 1.26 1.39 1.48 2.88 921

2767 10 Malam 8 Rural Connectivity 8/118 Malam Basiasole 116 Gov PL - - 1.26 1.39 1.48 2.88 921

2768 10 Malam 8 Rural Connectivity 8/119 Repair of Road at Basiaole to Ambisole Malam Basiasole 116 Gov PL - - 1.26 1.39 1.48 2.88 921

2769 10 Malam 8 Rural Connectivity 8/120 Repair of Road at Basiaole to Chiripity Malam Chirpiti 120 Gov PL - - 1.26 1.39 1.48 2.88 921

2770 10 Malam 8 Rural Connectivity 8/121 Repair of Koptibhole Village Road Malam Kaptibhole 120 Gov PL - - 1.26 1.39 1.48 2.88 921

2771 10 Malam 8 Rural Connectivity 8/122 Repair of at harimari village Road Malam Harimari 120 Gov PL - - 1.26 1.39 1.48 2.88 921

2772 10 Malam 8 Rural Connectivity 8/123 Repair of at kharsola village Road Malam Kharsola 130 Gov PL - - 1.26 1.39 1.48 2.88 921

2773 10 Malam 8 Rural Connectivity 8/124 Malam 174 Gov PL - - 1.26 1.39 1.48 2.88 921

2774 10 Malam 8 Rural Connectivity 8/125 Repair of Harimari Gramin Road Malam Harimari Gov PL - - 1.26 1.39 1.48 2.88 921

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Narasinghapur

Narasinghapur

Communication

6th Mar'14

Dry Season

Const. of Road from Jadabpur asathatal to Kalladoba

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Road at Koptibhole to Khasjangal Road

Kaptibhole

Communication

6th Mar'14

Dry Season

Repair of Road at Koptibhole modhya Para gramin Road

Kaptibhole

Communication

6th Mar'14

Dry Season

Repair of Road at Purbo Koptibhole gramin Road

Kaptibhole

Communication

6th Mar'14

Dry Season

Repair of Road at Basiaole modhya Para gramin Road

Kaptibhole

Communication

6th Mar'14

Dry Season

Repair of Road at Basiaole Lodha Para gramin Road

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Const. of Road from Adibasipada to dhanu house

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Page 217: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

217/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2775 10 Malam 8 Rural Connectivity 8/126 Malam 75 Gov PL - - 1.05 1.16 0.89 2.05 768

2776 10 Malam 8 Rural Connectivity 8/127 Malam 75 Gov PL - - 1.05 1.16 0.89 2.05 768

2777 10 Malam 8 Rural Connectivity 8/128 Malam 75 Gov PL - - 1.05 1.16 0.89 2.05 768

2778 10 Malam 8 Rural Connectivity 8/129 Malam 75 Gov PL - - 1.05 1.16 0.89 2.05 768

2779 10 Malam 8 Rural Connectivity 8/130 Malam 75 Gov PL - - 1.05 1.16 0.89 2.05 768

2780 10 Malam 8 Rural Connectivity 8/131 Malam 75 Gov PL - - 1.05 1.16 0.89 2.05 768

2781 10 Malam 8 Rural Connectivity 8/132 Malam 75 Gov PL - - 1.05 1.16 0.89 2.05 768

2782 10 Malam 8 Rural Connectivity 8/133 Repair of Road Kedar Bera To Pitch Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

2783 10 Malam 8 Rural Connectivity 8/134 Malam 75 Gov PL - - 1.05 1.16 0.89 2.05 768

2784 10 Malam 8 Rural Connectivity 8/135 Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

2785 10 Malam 8 Rural Connectivity 8/136 Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

Const. of Road From Motilal Pramanik's House to Laba Paramanik's House

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Erthen Road Taldanga To School Chook

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Const. of Road From Kalmapukuria High School Chak to Panchanan Bera's House

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Erthen Road Pitch to School Bazar

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Const. of Road From Surendra Paik's House to Pairep Road

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Erthen Road Sura Paik to Makhan Das

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Kalmapukhuria High School Chak to Taldanga Bhaliachati Primary School

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Erthen Road Chatanya Bera to Pitch Road

Kalmapukhuria purba

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road Pitch Rasta to Madhu Makllik

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road Nandalal Bera to Baliya Khal

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Page 218: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

218/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2786 10 Malam 8 Rural Connectivity 8/137 Malam 75 Gov PL - - 1.00 0.50 0.99 1.48 329

2787 10 Malam 8 Rural Connectivity 8/138 Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

2788 10 Malam 8 Rural Connectivity 8/139 Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

2789 10 Malam 8 Rural Connectivity 8/140 Repair of Chiripiti Gramin Road Malam Chirpiti Gov PL - - 1.26 1.39 1.48 2.88 921

2790 10 Malam 8 Rural Connectivity 8/141 Repair of Basiasole Gramin Road Malam Basiasole Gov PL - - 1.26 1.39 1.48 2.88 921

2791 10 Malam 8 Rural Connectivity 8/142 Repair of Kaptibhole Gramin Road Malam Kaptibhole 120 Gov PL - - 1.26 1.39 1.48 2.88 921

2792 10 Malam 8 Rural Connectivity 8/143 Repair of Kharsula Gramin Road Malam Kharsola Gov PL - - 1.26 1.39 1.48 2.88 921

2793 10 Malam 8 Rural Connectivity 8/144 Repair of Purba Kaptibhole Road Malam Kharsola Gov PL - - 1.26 1.39 1.48 2.88 921

2794 10 Malam 8 Rural Connectivity 8/145 Repair of Chunpura Gramin Road Malam Chunpara Gov PL - - 1.26 1.39 1.48 2.88 921

2795 10 Malam 8 Rural Connectivity 8/146 Malam Kaptibhole 120 Gov PL - - 1.26 1.39 1.48 2.88 921

2796 10 Malam 8 Rural Connectivity 8/147 Malam 74 87/14 Gov PL - - 1.05 1.16 0.89 2.05 768

2797 10 Malam 8 Rural Connectivity 8/148 Repair of Erthen Road Goyalapara Malam Malam Malam 74 270/260 Gov PL - - 1.05 1.16 0.89 2.05 768

2798 10 Malam 8 Rural Connectivity 8/149 Malam 74 Gov PL - - 1.05 1.16 0.89 2.05 768

2799 10 Malam 8 Rural Connectivity 8/150 Malam 74 142/293 Gov PL - - 1.05 1.16 0.89 2.05 768

Repair of Murrum Road to Gaya Prasad Bhakta's House to Bakultala Chak

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road Matilal Paraminik to Baliya Khal

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road Kalachand Sahoo to Nayan Baera

Kalmapukhuria purba

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Kaptibhole

Communication

6th Mar'14

Dry Season

Repair of Kaptibhole to Purba Kaptibhole

Kaptibhole

Communication

6th Mar'14

Dry Season

Repair of Erthen Road from Gour Shit house to Paschim para.

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Communication

6th Mar'14

Dry Season

Repair of Erthen Road from Natunpukur to Pitch road Viya Lodhapara

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Erthen From Adibasi para to saltola

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Page 219: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

219/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2800 10 Malam 8 Rural Connectivity 8/151 Malam 74 84/160 Gov PL - - 1.05 1.16 0.89 2.05 768

2801 10 Malam 8 Rural Connectivity 8/152 Malam 74 Gov PL - - 1.05 1.16 0.89 2.05 768

2802 10 Malam 8 Rural Connectivity 8/153 Malam 74 32/237 Gov PL - - 1.26 1.39 1.48 2.88 921

2803 10 Malam 8 Rural Connectivity 8/154 Malam 74 Gov PL - - 1.26 1.39 1.48 2.88 921

2804 10 Malam 8 Rural Connectivity 8/155 Malam 74 10/260 Gov PL - - 1.26 1.39 1.48 2.88 921

2805 10 Malam 8 Rural Connectivity 8/156 Malam 74 Gov PL - - 1.26 1.39 1.48 2.88 921

2806 10 Malam 8 Rural Connectivity 8/157 Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

2807 10 Malam 8 Rural Connectivity 8/158 Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

2808 10 Malam 8 Rural Connectivity 8/159 Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

2809 10 Malam 8 Rural Connectivity 8/160 Malam 75 Gov PL - - 1.26 1.39 1.48 2.88 921

2810 10 Malam 8 Rural Connectivity 8/161 Malam 75 Gov PL - - 3.00 1.99 1.47 3.46 1317

2811 10 Malam 8 Rural Connectivity 8/162 Malam 75 Gov PL - - 1.26 0.50 0.99 1.48 329

2812 10 Malam 8 Rural Connectivity 8/163 Malam 75 Gov PL - - 1.26 0.50 0.99 1.48 329

2813 10 Malam 8 Rural Connectivity 8/164 Malam 75 Gov PL - - 1.26 0.50 0.99 1.48 329

Repair of Erthen From Natunpukur to Baruden bandh.

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Erthen From Setola mandi to Pacha gariya

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Const. of Muram Road From Kamar chook to Nayak para

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Muram Road From Lead to Pitch road

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Muram Road From Pitch to kamar para

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Muram Road From Tower to Khasgangal

Chhotojharia

Chhotojharia

Communication

6th Mar'14

Dry Season

Repair of Muram Road From Bakul tola to Chhotojharia

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Muram Road From Hatui para to Chhotojharia

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Muram Road FromKalmapukhuria to Jhaddapur

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Muram Road From Kalmapukhuria to sudekpur

Kalmapukhuria purba

kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Murrum Road To Bakultala To Charda Chak

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Murrum Road Kalmaphukhuria High School Chalk to Forest Office

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road From Ashutosh Mahapatra's House to Jharna Ghat

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road From Kalmapukuria High School to tal Danga

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Page 220: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

220/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2814 10 Malam 8 Rural Connectivity 8/165 Malam 75 Gov PL - - 1.26 0.50 0.99 1.48 329

2815 10 Malam 8 Rural Connectivity 8/166 Malam 75 Gov PL - - 1.26 0.50 0.99 1.48 329

2816 10 Malam 8 Rural Connectivity 8/167 Malam 75 819 Gov PL - - 1.05 1.16 0.89 2.05 768

2817 10 Malam 8 Rural Connectivity 8/168 Malam Bagdoba 69 Gov PL - - 1.26 1.39 1.48 2.88 921

2818 10 Malam 8 Rural Connectivity 8/169 Malam Bagdoba 69 Gov PL - - 0.24 1.16 0.89 2.05 768

2819 10 Malam 8 Rural Connectivity 8/170 Malam Bagdoba 69 Gov PL - - 1.26 1.39 1.48 2.88 921

2820 10 Malam 8 Rural Connectivity 8/171 Malam Bagdoba 69 Gov PL - - 1.26 1.39 1.48 2.88 921

2821 10 Malam 8 Rural Connectivity 8/172 Malam Ichhapura 60 Gov PL - - 1.26 1.39 1.48 2.88 921

2822 10 Malam 8 Rural Connectivity 8/173 Malam Bagdoba 69 Gov PL - - 1.26 1.39 1.48 2.88 921

2823 10 Malam 8 Rural Connectivity 8/174 Malam Bagdoba 69 Gov PL - - 1.26 1.39 1.48 2.88 921

2824 10 Malam 8 Rural Connectivity 8/175 Malam Chaltabera 67 Gov PL - - 1.26 1.39 1.48 2.88 921

2825 10 Malam 8 Rural Connectivity 8/176 Malam Chaltabera 67 Gov PL - - 0.29 1.39 1.48 2.88 921

2826 10 Malam 8 Rural Connectivity 8/177 Malam Sonadhua Gov PL - - 1.26 1.39 1.48 2.88 921

2827 10 Malam 8 Rural Connectivity 8/178 Malam Chaltabera 67 Gov PL - - 1.26 1.39 1.48 2.88 921

Repair of Road From Gayaprasad Bhakta to Jharna bakultala

Kalmapukhuria paschim

Kalmapukhuria

Communication

6th Mar'14

Dry Season

Repair of Road From Surendra paik to Paschim pirep Road

Kalmapukhuria paschim

Kalmapukhuria

Communication

20th Feb'14

October-Decemb

er

Repair of Erthen Road Dahisai (Gramin) Kalmapukhuria paschim

kalmapukhuria

Communication

20th Feb'14

October-Decemb

er

Repair of Muram Road Bagdoba Adibasi Para

Chaltabera

Communication

20th Feb'14

October-Decemb

erConst. of Road Bagdoba Natun para to Poran Soren Chawk

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road Bagdobaclub toBaram ghati

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road Chaltabera school to Babuichati

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road Sadarghat to Praymari School

Chaltabera

Communication

20th Feb'14

October-Decemb

er

Repair of Muram Road Pitch road to Kathi khal gat

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road Paschim Bagdoba towards kathi Khalgat

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road Chaltabera to Banspat

Chaltabera

Communication

20th Feb'14

October-Decemb

erConst. of Road Sukulal Basketo Bimal senapati house

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road Sonadhua to Fery gat

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road Monotosh tarai house to Baram Ghati

Chaltabera

Communication

20th Feb'14

October-Decemb

er

Page 221: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

221/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2828 10 Malam 8 Rural Connectivity 8/179 Malam Chaltabera 67 Gov PL - - 1.26 1.39 1.48 2.88 921

2829 10 Malam 8 Rural Connectivity 8/180 Malam Chaltabera 67 Gov PL - - 1.26 1.39 1.48 2.88 921

2830 10 Malam 8 Rural Connectivity 8/181 Malam Chaltabera 67 Gov PL - - 1.26 1.39 1.48 2.88 921

2831 10 Malam 8 Rural Connectivity 8/182 Const. Of concrete Road at baharaghati Malam Gov PL - - 0.29 1.39 5.24 6.63 921

2832 10 Malam 8 Rural Connectivity 8/183 Malam Chaltabera 67 Gov PL - - 0.29 1.39 1.48 2.88 921

- - - 221.77 258.78 480.56 146870

Malam Total - - - 802.03 367.45 1169.48 5311472833 11 Nayagram 1 1/1 Digging Nagen Hatui Pond Kurchiboni 140 Private - - - 2.39 0.28 2.67 1580

2834 11 Nayagram 1 1/2 Digging Mrigen Hatui Pond Kurchiboni 140 212 Private - 0.25 - 2.67 0.30 2.97 1769

2835 11 Nayagram 1 1/3 Digging of Pradip Pani Pond Kurchiboni 140 Private - - - 2.39 0.28 2.67 1580

2836 11 Nayagram 1 1/4 Digging of Rani Baskey Pond Kurchiboni 140 Private - - - 2.39 0.28 2.67 1580

2837 11 Nayagram 1 1/5 Goutam Ghosh Pond Kurchiboni 140 Private - - - 2.39 0.28 2.67 1580

2838 11 Nayagram 1 1/6 Khagen Patra Pond Kurchiboni 140 Private - - - 2.67 0.30 2.97 1769

2839 11 Nayagram 1 1/7 Muktipada Ghosh Pond Kurchiboni 140 212 Private - - - 2.39 0.28 2.67 1580

2840 11 Nayagram 1 1/8 Digging of Durgapada Hemram's pond 129 Private - 1.00 - 3.29 0.37 3.66 2181

2841 11 Nayagram 1 1/9 Digging of Sukhendu Sing Pond Tufuria Tufuria 211 Private - 0.35 - 3.56 0.40 3.96 2358

Repair of Muram Road Chaltabara to Purba Bagdoba

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road From Chaltabera to Jharna

Chaltabera

Communication

20th Feb'14

October-Decemb

erRepair of Muram Road Baram ghati to Srimanta bhakata

Chaltabera

Communication

20th Feb'14

October-Decemb

erkalmapukhuria

kalmapukhuria

Communication

20th Feb'14

October-Decemb

erConst. of Road Bhaliyachati Sabar para to Adibasi para

Chaltabera

Communication

20th Feb'14

October-Decemb

erRural Connectivity Total

Water Conservation & Water Harvesting

Nayagram

Kurchiboni

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Kurchiboni

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Kurchiboni

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Kurchiboni

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Kurchiboni

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Kurchiboni

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Kurchiboni

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Nimainagar

Uthan Nayagram

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Pond

20th Feb'14

October-Decemb

er

Page 222: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

222/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2842 11 Nayagram 1 1/10 Digging of Bhim palui pond Sitalpura 146 Private - 5.00 - 2.49 0.48 2.97 1646

2843 11 Nayagram 1 1/11 Digging of Bhupen pal pond Sitalpura 146 Private - 0.35 - 1.78 0.20 1.98 1179

2844 11 Nayagram 1 1/12 Digging of Gourhari pal pond Sitalpura 146 Private - 0.35 - 1.78 0.20 1.98 1179

2845 11 Nayagram 1 1/13 Digging of sudan pal pond Sitalpura 146 Private - 5.00 - 1.78 0.20 1.98 1179

2846 11 Nayagram 1 1/14 Digging of Sitalpura under the pul Sitalpura 146 Private - 0.50 - 3.48 0.48 3.96 2305

2847 11 Nayagram 1 1/15 Digging of korasole pond Sitalpura 146 Private - 0.35 - 1.78 0.20 1.98 1179

2848 11 Nayagram 1 1/16 Digging of Radhashyam sing pond Nayagram 143 Private - 1.00 - 4.01 0.45 4.45 2653

2849 11 Nayagram 1 1/17 Digging of Gouranga murmu pond Nayagram 143 Private - 1.00 - 3.85 0.45 4.29 2548

2850 11 Nayagram 1 1/18 Digging of badal saren pond Jarka jarka Private - 1.00 - 2.67 0.30 2.97 1769

- - - 47.74 5.72 53.45 31615

2851 11 Nayagram 2 Drought Proofing 2/1 Plantation at Subrata Senapati land 128 Private - - - 1.19 0.59 1.78 790

2852 11 Nayagram 2 Drought Proofing 2/2 128 - - - 1.99 0.98 2.97 1317

2853 11 Nayagram 2 Drought Proofing 2/3 Plantation of Subhas Das's lan Dahi Dahi 142 104/103 Private - 0.44 - 1.49 0.98 2.47 988

2854 11 Nayagram 2 Drought Proofing 2/4 Plantation at Mahamaya Land Kamalapur - 1.00 - 0.99 0.49 1.48 658

2855 11 Nayagram 2 Drought Proofing 2/5 Kamalapur - 0.25 - 0.70 0.29 0.99 461

Water Conservation & Water Harvesting

Nayagram

Sitalpura

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Sitalpura

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Sitalpura

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Sitalpura

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Sitalpura

Pond

20th Feb'14

October-Decemb

erWater Conservation & Water Harvesting

Nayagram

Sitalpura

Pond

20th Feb'14

October-Decemb

er

Water Conservation & Water Harvesting

Nayagram

Nayagram(S)

Pond

20th Feb'14

July-Septemb

er

Water Conservation & Water Harvesting

Nayagram

Nayagram(S)

Pond

20th Feb'14

July-Septemb

erWater Conservation & Water Harvesting

Nayagram

Pond

20th Feb'14

July-Septemb

erWater Conservation & Water Harvesting Total

Nayagram

Nimainagar

Niaminagar

Plantation

20th Feb'14

Plantation surrounding Nimainagar MSK

Nayagram

Nimainagar

Niaminagar

Public Land

Plantation

20th Feb'14

Nayagram

Plant

20th Feb'14

Nayagram

Kamalapur

Public Land

Plant

20th Feb'14

Plantation at Kamalapur Pry. School Ground

Nayagram

Kamalapur

Public Land

Plant

20th Feb'14

April- June

Page 223: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

223/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2856 11 Nayagram 2 Drought Proofing 2/6 Kamalapur - 0.20 - 0.70 0.29 0.99 461

2857 11 Nayagram 2 Drought Proofing 2/7 Making Nursery at Kamalapur Kamalapur - 1.50 - 1.49 1.48 2.97 988

2858 11 Nayagram 2 Drought Proofing 2/8 Kamalapur - - 2.00 2.37 1.58 3.96 1572

2859 11 Nayagram 2 Drought Proofing 2/9 Kurchiboni 140 Private - - - 1.99 0.98 2.97 1317

2860 11 Nayagram 2 Drought Proofing 2/10 Plantation at Banchanidhi Ghosh land Kurchiboni 140 Private - - - 0.99 0.39 1.38 658

2861 11 Nayagram 2 Drought Proofing 2/11 Plantation at Tapas Das Land Kurchiboni 140 Private - - - 0.80 0.39 1.19 527

2862 11 Nayagram 2 Drought Proofing 2/12 Plantation at Nishikanta Maity Kurchiboni 140 Private - - - 0.99 0.39 1.38 658

2863 11 Nayagram 2 Drought Proofing 2/13 Plantation at Abdhut Ghosh Kurchiboni 140 Private - - - 0.99 0.39 1.38 658

2864 11 Nayagram 2 Drought Proofing 2/14 Plantation at Asit Hatui Land Kurchiboni 140 Private - - - 0.99 0.39 1.38 658

2865 11 Nayagram 2 Drought Proofing 2/15 Plantation of Parimal Singha Land Tufuria Tufuria 211 578 Private - 1.50 - 0.70 0.29 0.99 461

2866 11 Nayagram 2 Drought Proofing 2/16 Plantation of Nagen Palui Land Tufuria Tufuria 211 80 Private - 1.50 - 0.60 0.24 0.84 395

2867 11 Nayagram 2 Drought Proofing 2/17 Sitalpura 146 - 1.50 - 1.19 0.79 1.98 786

2868 11 Nayagram 2 Drought Proofing 2/18 Plantation of Gokul nagar mouza - 1.50 - 2.97 1.98 4.95 1965

2869 11 Nayagram 2 Drought Proofing 2/19 Plantation of natunsai SSK Ground Sitalpura 146 - 1.50 - 1.19 0.79 1.98 786

2870 11 Nayagram 2 Drought Proofing 2/20 Nayagram 143 - 1.50 - 0.59 0.40 0.99 393

2871 11 Nayagram 2 Drought Proofing 2/21 Plantation of Radhashyam sing land Nayagram 143 Private - 2.00 - 20.98 13.99 34.97 13894

2872 11 Nayagram 2 Drought Proofing 2/22 Plantation of ground near Dispensary Nayagram 143 - 3.00 - 0.30 0.20 0.49 197

- - - 46.19 28.29 74.48 30589

2873 11 Nayagram 3 3/1 Dahi Dahi 142 - - 2.00 3.34 0.37 3.71 2211

Plantation at Kamalapur S.S.K. Ground .

Nayagram

Kamalapur

Public Land

Plant

20th Feb'14

April- June

Nayagram

Kamalapur

Public Land

Plant

20th Feb'14

April- June

Plantation from Tufuria Bridge to Kamalapur

Nayagram

Kamalapur

Public Land

Plant

20th Feb'14

April- June

Plantation at Kurchiboni Pry. School ground

Nayagram

Kurchiboni

Plant

20th Feb'14

April- June

Nayagram

Kurchiboni

Plant

20th Feb'14

April- June

Nayagram

Kurchiboni

Plant

20th Feb'14

April- June

Nayagram

Kurchiboni

Plant

20th Feb'14

April- June

Nayagram

Kurchiboni

Plant

20th Feb'14

April- June

Nayagram

Kurchiboni

Plant

20th Feb'14

April- June

Nayagram

Plant

20th Feb'14

April- June

Nayagram

Plant

20th Feb'14

April- June

Plantation of sitalpura pry.school ground

Nayagram

Sitalpura

Public Land

Plant

20th Feb'14

April- June

Nayagram

Sitalpura

Gokulnagar

Public Land

Plant

20th Feb'14

July-Septemb

erNayagram

Sitalpura

Public Land

Plant

20th Feb'14

July-Septemb

erPlanstation of Ground near Nayagram bani bisyapith

Nayagram

Nayagram(S)

Public Land

Plant

20th Feb'14

July-Septemb

erNayagram

Nayagram(S)

Plant

20th Feb'14

July-Septemb

erNayagram

Nayagram(S)

Public Land

Plant

20th Feb'14

July-Septemb

erDrought Proofing TotalMicro Irrigation Works

Re excavation of Khal from Baura mouza to Satya Shyamal land

Nayagram

Public Land

Cannel

20th Feb'14

July-Septemb

er

Page 224: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

224/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2874 11 Nayagram 3 3/2 Dahi Dahi 142 - - 2.00 3.34 0.37 3.71 2211

2875 11 Nayagram 3 3/3 Dahi Dahi 142 - - 2.00 3.34 0.37 3.71 2211

2876 11 Nayagram 3 3/4 Tufuria Tufuria - - 1.00 3.29 0.37 3.66 2181

- - - 13.31 1.48 14.79 8814

2877 11 Nayagram 5 5/1 Re excavation of Sitalpura desh pond. Sitalpura 146 Private - 5.00 - 2.67 0.30 2.97 1769

2878 11 Nayagram 5 5/2 Re excavation of Tarun Dhauria pond. Nayagram 143 Private - 0.50 - 3.29 0.37 3.66 2181

2879 11 Nayagram 5 5/3 Re excavation of Ramesh singh pond. Nayagram 143 Private - 0.50 - 3.20 0.36 3.56 2122

2880 11 Nayagram 5 5/4 Re excavation of Mihir singh pond Nayagram 143 Private - 2.00 - 2.67 0.30 2.97 1769

2881 11 Nayagram 5 5/5 Re excavation of Deben Mukhi pond Nayagram 143 Private - 1.00 - 3.03 0.34 3.36 2005

2882 11 Nayagram 5 5/6 Re excavation of kalipada bhunia pond Jarka kamalapur Private - 1.00 - 1.78 0.20 1.98 1179

2883 11 Nayagram 5 5/7 Re excavation of nanigopal patra pond Jarka kamalapur Private - 1.00 - 1.78 0.20 1.98 1179

2884 11 Nayagram 5 5/8 Re excavation of Subal bhunia pond Jarka kamalapur Private - 1.00 - 1.78 0.20 1.98 1179

2885 11 Nayagram 5 5/9 Re excavation of haripada bhunia pond Jarka kamalapur Private - 0.90 - 1.78 0.20 1.98 1179

2886 11 Nayagram 5 5/10 Re excavation of raghunath kuila pond Jarka kamalapur Private - 1.00 - 1.78 0.20 1.98 1179

2887 11 Nayagram 5 5/11 Re excavation of kailash ch. Kuila pond Jarka kamalapur Private - 1.00 - 1.78 0.20 1.98 1179

Micro Irrigation Works

Re excavation of khal from Satya Shyamal land to Jahar Bera land

Nayagram

Public Land

Cannel

20th Feb'14

July-Septemb

erMicro Irrigation Works

Re excavation of khal from Jahar Bera land to Santaiburi mandir

Nayagram

Public Land

Cannel

20th Feb'14

July-Septemb

erMicro Irrigation Works

Canal with culvert from Singrai Hansda Land to Sarbeswar Singha Land.

Nayagram

Public Land

Cannel

20th Feb'14

July-Septemb

erMicro Irrigation Works TotalRenovation of Traditional Water Bodies

Nayagram

Sitalpura

Pond

20th Feb'14

October-Decemb

erRenovation of Traditional Water Bodies

Nayagram

Nayagram(S)

Pond

20th Feb'14

October-Decemb

er

Renovation of Traditional Water Bodies

Nayagram

Nayagram(S)

Pond

20th Feb'14

October-Decemb

erRenovation of Traditional Water Bodies

Nayagram

Nayagram(S)

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Nayagram(S)

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

er

Page 225: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

225/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2888 11 Nayagram 5 5/12 Re excavation of Hrisikesh pal pond Jarka kamalapur Private - 1.00 - 1.78 0.20 1.98 1179

2889 11 Nayagram 5 5/13 Re excavation of siddhyartya hatui pond Jarka kamalapur Private - 0.90 - 1.78 0.20 1.98 1179

2890 11 Nayagram 5 5/14 Re excavation of binoy bhunia pond Jarka kamalapur Private - 1.00 - 1.78 0.20 1.98 1179

2891 11 Nayagram 5 5/15 Re excavation of kalachand saren pond Jarka jarka Private - 1.20 - 2.67 0.30 2.97 1769

2892 11 Nayagram 5 5/16 Re excavation of Jageth mandi pond Jarka jarka Private - 1.30 - 2.67 0.30 2.97 1769

2893 11 Nayagram 5 5/17 Re excavation of Mahasay mandi pond Jarka jarka Private - 1.30 - 2.67 0.30 2.97 1769

2894 11 Nayagram 5 5/18 Re excavation of shyampatra pond Jarka jarka Private - 2.00 - 3.56 0.40 3.96 2358

2895 11 Nayagram 5 5/19 Re-Excavetion of Arabinda Jana's pond Kamalapur 212 Private - 2.00 - 2.23 0.25 2.47 1474

2896 11 Nayagram 5 5/20 Kamalapur 212 Private - 2.00 - 1.78 0.20 1.98 1179

2897 11 Nayagram 5 5/21 Re-Excavetion of Bamdeb Jana's pond Kamalapur 212 Private - 3.00 - 1.78 0.20 1.98 1179

2898 11 Nayagram 5 5/22 Kamalapur 212 - - 1.50 3.56 0.40 3.96 2358

2899 11 Nayagram 5 5/23 Reexcavation of Pond at 212 no. Dag Kurchiboni 140 Private - - - 2.39 0.28 2.67 1580

2900 11 Nayagram 5 5/24 Sukhendu Hatui Pond Kurchiboni 140 212 Private - - - 2.67 0.30 2.97 1769

2901 11 Nayagram 5 5/25 Sukumar Ghosh Pond Kurchiboni 140 Private - - - 2.39 0.28 2.67 1580

2902 11 Nayagram 5 5/26 Tapan Maity Pond Kurchiboni 140 212 Private - - - 2.39 0.28 2.67 1580

Renovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

Renovation of Traditional Water Bodies

Nayagram

Pond

20th Feb'14

Renovation of Traditional Water Bodies

Nayagram

Kamalapur

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Re-Excavetion of Arabinda Singha's pond

Nayagram

Kamalapur

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Nayagram

Kamalapur

Pond

20th Feb'14

July-Septemb

erRenovation of Traditional Water Bodies

Re-Excavetion of canal from Dahagora to Sankamui

Nayagram

Kamalapur

Public Land

Pond

20th Feb'14

April- June

Renovation of Traditional Water Bodies

Nayagram

Kurchiboni

Pond

20th Feb'14

April- June

Renovation of Traditional Water Bodies

Nayagram

Kurchiboni

Pond

20th Feb'14

All Season

Renovation of Traditional Water Bodies

Nayagram

Kurchiboni

Pond

20th Feb'14

All Season

Renovation of Traditional Water Bodies

Nayagram

Kurchiboni

Pond

20th Feb'14

All Season

Page 226: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

226/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2903 11 Nayagram 5 5/27 Re-Excavetion of pungiri pond Nayagram Private - 2.50 - 2.67 0.30 2.97 1769

- - - 64.31 7.20 71.52 42591

2904 11 Nayagram 6 Land Development 6/1 Levelling of Mr. Subhas Das land Dahi Dahi 142 104/103 Private LD - 0.44 - 2.05 0.23 2.28 1356

2905 11 Nayagram 6 Land Development 6/2 Land levelling of Kalipada Das Kurchiboni 140 Private LD - - - 1.34 0.15 1.48 884

2906 11 Nayagram 6 Land Development 6/3 Land levelling of Guina Paria Kurchiboni 140 Private LD - - - 1.34 0.15 1.48 884

2907 11 Nayagram 6 Land Development 6/4 Land levelling of Chittaranjan Ghosh Kurchiboni 140 Private LD - - - 1.34 0.15 1.48 884

2908 11 Nayagram 6 Land Development 6/5 Land levelling of Khitish Dalai Kurchiboni 140 Private LD - - - 1.34 0.15 1.48 884

2909 11 Nayagram 6 Land Development 6/6 129 LD - 1.00 - 3.29 0.37 3.66 2181

2910 11 Nayagram 6 Land Development 6/7 129 LD - 1.00 - 1.51 0.17 1.68 1002

2911 11 Nayagram 6 Land Development 6/8 Tufuria Tufuria LD - 1.50 - 3.12 0.35 3.46 2063

2912 11 Nayagram 6 Land Development 6/9 Land levelling of Gunadhar Bera Tufuria Tufuria 211 612 Private LD - 1.50 - 1.34 0.15 1.48 884

2913 11 Nayagram 6 Land Development 6/10 Land levelling of Nagen Palui Tufuria Tufuria 211 612 Private LD - 0.36 - 1.34 0.15 1.48 884

2914 11 Nayagram 6 Land Development 6/11 Land levelling of Ananta Rana Tufuria Tufuria 211 381 Private LD - 0.98 - 3.56 0.40 3.96 2358

2915 11 Nayagram 6 Land Development 6/12 Land levelling of Jatindra Dhauria Tufuria Tufuria 211 431 Private LD - 0.73 - 2.67 0.30 2.97 1769

2916 11 Nayagram 6 Land Development 6/13 Levelling of Jamini Ghosh land 128 Private LD - - - 0.82 0.27 1.09 540

2917 11 Nayagram 6 Land Development 6/14 Levelling of Brajendra Senapati land 128 131 Private LD - - - 1.69 0.19 1.88 1120

2918 11 Nayagram 6 Land Development 6/15 Leveling of sital pura icds ground Sitalpura 146 Private LD - 0.70 - 2.67 0.30 2.97 1769

2919 11 Nayagram 6 Land Development 6/16 Leveling of Shikari singh land Nayagram 143 Private LD - 0.40 - 1.42 0.16 1.58 943

2920 11 Nayagram 6 Land Development 6/17 Leveling of Bul singh land Nayagram 143 Private LD - 0.50 - 1.78 0.20 1.98 1179

2921 11 Nayagram 6 Land Development 6/18 Leveling of Ramesh singh land Nayagram 143 Private LD - 0.76 - 2.94 0.33 3.26 1946

2922 11 Nayagram 6 Land Development 6/19 Leveling of Sahadev singh land Nayagram 143 Private LD - 0.48 - 1.78 0.20 1.98 1179

2923 11 Nayagram 6 Land Development 6/20 Leveling of kanchan singh land Nayagram 143 Private LD - 0.63 - 2.23 0.25 2.47 1474

Renovation of Traditional Water Bodies

Nayagram

Nayagram (N)

Pond

20th Feb'14

All Season

Renovation of Traditional Water Bodies Total

Nayagram

20th Feb'14

All Season

Nayagram

Kurchiboni

20th Feb'14

All Season

Nayagram

Kurchiboni

20th Feb'14

All Season

Nayagram

Kurchiboni

20th Feb'14

All Season

Nayagram

Kurchiboni

20th Feb'14

All Season

Levelling of Uthan Nayagram Pry. School ground

Nayagram

Nimainagar

Uthan Nayagram

Public Land

20th Feb'14

All Season

Levelling of Uthan Nayagram Football ground

Nayagram

Nimainagar

Uthan Nayagram

Public Land

20th Feb'14

All Season

Land levelling of Dakshin Tufuria ICDS ground

Nayagram

Public Land

20th Feb'14

April- June

Nayagram

20th Feb'14

April- June

Nayagram

20th Feb'14

April- June

Nayagram

20th Feb'14

April- June

Nayagram

20th Feb'14

April- June

Nayagram

Nimainagar

Niaminagar

20th Feb'14

April- June

Nayagram

Nimainagar

Niaminagar

20th Feb'14

April- June

Nayagram

Sitalpura

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Page 227: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

227/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2924 11 Nayagram 6 Land Development 6/21 Leveling of Krishna sing land Nayagram 143 Private LD - 0.40 - 1.42 0.16 1.58 943

2925 11 Nayagram 6 Land Development 6/22 Leveling of Jagannath Dey land Nayagram 143 Private LD - 0.45 - 1.60 0.18 1.78 1061

2926 11 Nayagram 6 Land Development 6/23 Leveling of Jageswar Dhauria land Nayagram 143 Private LD - 1.50 - 2.23 0.25 2.47 1474

2927 11 Nayagram 6 Land Development 6/24 Leveling of Milan Bhakta land Nayagram 143 Private LD - 0.38 - 1.34 0.15 1.48 884

2928 11 Nayagram 6 Land Development 6/25 Leveling of Bablu Bhakta land Nayagram 143 Private LD - 0.40 - 1.42 0.16 1.58 943

- - - 47.55 5.47 53.02 31492

2929 11 Nayagram 7 7/1 Dahi Dahi 142 - - 0.80 2.23 0.74 2.97 1474

2930 11 Nayagram 7 7/2 Dahi Dahi 142 - - 0.60 2.23 0.74 2.97 1474

2931 11 Nayagram 7 7/3 Dahi Dahi 142 - - 0.60 2.23 0.74 2.97 1474

2932 11 Nayagram 7 7/4 Dahi Dahi 142 - - 0.60 2.23 0.74 2.97 1474

2933 11 Nayagram 7 7/5 Dahi Dahi 142 - - 0.60 2.23 0.74 2.97 1474

2934 11 Nayagram 7 7/6 Kamalapur 212 - - 0.50 1.26 0.42 1.68 835

2935 11 Nayagram 7 7/7 Construction of Jana para Drain Kamalapur 212 - - 0.50 0.50 1.28 1.78 329

2936 11 Nayagram 7 7/8 Kamalapur 212 - - 0.70 1.48 0.49 1.98 983

2937 11 Nayagram 7 7/9 Nayagram - - 0.50 2.23 0.74 2.97 1474

2938 11 Nayagram 7 7/10 Nayagram - - 0.50 2.23 0.74 2.97 1474

2939 11 Nayagram 7 7/11 Repair of Pungiri Bandh . Nayagram - - 1.00 2.39 0.58 2.97 1580

2940 11 Nayagram 7 7/12 128 - - 0.50 2.23 0.74 2.97 1474

2941 11 Nayagram 7 7/13 Tufuria Tufuria - - 1.50 3.48 0.48 3.96 2305

2942 11 Nayagram 7 7/14 Nayagram - - 0.50 2.23 0.74 2.97 1474

2943 11 Nayagram 7 7/15 Sitalpura 146 - - 0.50 0.20 0.79 0.99 132

Nayagram

Nayagram(S)

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Nayagram

Nayagram(S)

20th Feb'14

April- June

Land Development TotalFlood Control & Protecation

Construction of cannel from Shitala mandir to Bimal Shit house

Nayagram

Public Land

20th Feb'14

April- June

Flood Control & Protecation

Excavation of drain from Dilip Das house to Shitala mandir

Nayagram

Public Land

20th Feb'14

April- June

Flood Control & Protecation

Construction of drain from Anadi Ghosh house to Badal Ghosh house

Nayagram

Public Land

20th Feb'14

April- June

Flood Control & Protecation

Construction of drain from Gayaprasad Mahapatra land to Santaiburi Mandir

Nayagram

Public Land

20th Feb'14

April- June

Flood Control & Protecation

Construction of drain from Bimal Shit house to Jahar Ghosh house

Nayagram

Public Land

20th Feb'14

April- June

Flood Control & Protecation

Construction of Drain from Anil paria house to ashwani paria house at Kamalapur mouza

Nayagram

Kamalapur

Public Land

20th Feb'14

April- June

Flood Control & Protecation

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Construction of Drain from Main road to Nadi Ghat

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Construction of Drain from Badal Pariary house to Bidhan Bera house

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Construction of Drain from Bidhan Bera house to etheletic Clabe

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Const. of road from Brajendra Senapati house to Main road

Nayagram

Nimainagar

Niaminagar

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Canal from Nagen Palui house to Guruprasad Singha Pond

Nayagram

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Construction of Drain from Bidhan Bera House to Bharati Bera House+

Nayagram

Nayagram

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Const.of drain Raghunath pal house to Madan pal house(with concrite)

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Page 228: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

228/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2944 11 Nayagram 7 7/16 Sitalpura 146 - - 1.00 1.11 0.37 1.48 737

2945 11 Nayagram 7 7/17 Sitalpura 146 - - 0.50 1.11 0.37 1.48 737

2946 11 Nayagram 7 7/18 Sitalpura 146 - - 3.00 2.19 0.78 2.97 1449

2947 11 Nayagram 7 7/19 Sitalpura 145 - - 1.00 1.19 0.79 1.98 790

2948 11 Nayagram 7 7/20 Sitalpura 146 - - 1.00 1.78 0.20 1.98 1179

2949 11 Nayagram 7 7/21 Nayagram 143 - 1.50 - 1.19 0.79 1.98 790

2950 11 Nayagram 7 7/22 Jarka kamalapur 212 - - 0.30 2.67 0.30 2.97 1769

2951 11 Nayagram 7 7/23 Jarka jarka 210 - - 1.00 1.78 0.20 1.98 1179

2952 11 Nayagram 7 7/24 Const. of khal band pukurpara Nayagram 143 - 1.50 - 1.78 1.19 2.97 1179

- - - 44.15 15.70 59.84 29237

2953 11 Nayagram 8 Rural Connectivity 8/1 Dahi Dahi 142 - - 4.00 3.56 0.40 3.96 2358

2954 11 Nayagram 8 Rural Connectivity 8/2 Dahi Dahi 142 - - 1.00 1.99 0.98 2.97 1317

2955 11 Nayagram 8 Rural Connectivity 8/3 Dahi Dahi 142 - - 1.00 2.98 0.48 3.46 1975

2956 11 Nayagram 8 Rural Connectivity 8/4 Dahi Dahi 142 - - 0.30 1.49 0.78 2.28 988

2957 11 Nayagram 8 Rural Connectivity 8/5 Dahi Dahi 142 - - 1.00 2.49 0.98 3.46 1646

2958 11 Nayagram 8 Rural Connectivity 8/6 Dahi Dahi 142 - - 1.00 2.49 0.98 3.46 1646

2959 11 Nayagram 8 Rural Connectivity 8/7 Dahi Dahi 142 - - 1.00 2.49 0.98 3.46 1646

2960 11 Nayagram 8 Rural Connectivity 8/8 Repair of road from dalai para . Kamalapur 212 - - 0.60 0.70 0.29 0.99 461

2961 11 Nayagram 8 Rural Connectivity 8/9 Kamalapur - - 0.60 0.75 0.44 1.19 494

2962 11 Nayagram 8 Rural Connectivity 8/10 Kamalapur - - 1.00 0.70 0.29 0.99 461

Flood Control & Protecation

Const.of Drain from Asoke maity house to pramatha pal house with concrite.

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Cons.of Drain from Subal paria house Ananta Dhauria housewith concrite.

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Const. of Canel from Sitalpura(korasole) to kukrasole band.

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Cons.of Canel from Raibera to dalkisole.

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Const. of Canel from Sitalpura(korasole) to Puria hpuse.

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Const. of drain Bana Ahari to Ahar pukur

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Re excavation of Canel from Tufuria paka pul to Bararia

Nayagram

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Re excavation of Canel fromRamchandra shit house to Sunil tudu

Nayagram

Public Land

20th Feb'14

All Season

Flood Control & Protecation

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Flood Control & Protecation Total

Construction of Bheri bandh from Harish Manna's chak to Begunadahi with road

Nayagram

Public Land

20th Feb'14

All Season

Repair of road from Shaibal Patra house to Shitala mandir

Nayagram

Public Land

20th Feb'14

All Season

Construction of road from Purba pada to Math

Nayagram

Public Land

20th Feb'14

All Season

Repair of road from Bimal Shit house to Badal Ghosh house

Nayagram

Public Land

20th Feb'14

All Season

Repair of road from Shitala mandir to Dhibarpada

Nayagram

Public Land

20th Feb'14

All Season

Repair of road from Ananda Kuila house to Rajani Bera house

Nayagram

Public Land

20th Feb'14

All Season

Repair of road from Gayaprasad Mahapatra house to Guina Bera house

Nayagram

Public Land

20th Feb'14

All Season

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of Amaresh Mahapatra house road .

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of Dibakar Bera house road .

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Page 229: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

229/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2963 11 Nayagram 8 Rural Connectivity 8/11 Construction of Natun para road Kamalapur - - 1.00 1.19 0.49 1.68 790

2964 11 Nayagram 8 Rural Connectivity 8/12 Construction of road at Barik para . Kamalapur - - 1.50 1.24 0.54 1.78 823

2965 11 Nayagram 8 Rural Connectivity 8/13 Kamalapur - - 1.50 1.34 0.64 1.98 889

2966 11 Nayagram 8 Rural Connectivity 8/14 Kamalapur - - 1.50 1.39 0.59 1.98 922

2967 11 Nayagram 8 Rural Connectivity 8/15 Kamalapur - - 1.00 1.19 0.79 1.98 790

2968 11 Nayagram 8 Rural Connectivity 8/16 Kamalapur - - 1.50 1.24 0.74 1.98 823

2969 11 Nayagram 8 Rural Connectivity 8/17 Kamalapur - - 1.50 0.60 0.39 0.99 395

2970 11 Nayagram 8 Rural Connectivity 8/18 Kamalapur 212 - - 1.50 1.09 0.88 1.98 724

2971 11 Nayagram 8 Rural Connectivity 8/19 Kamalapur 212 - - 1.80 1.19 0.79 1.98 790

2972 11 Nayagram 8 Rural Connectivity 8/20 Kurchiboni 140 - - 1.50 0.89 0.59 1.48 593

2973 11 Nayagram 8 Rural Connectivity 8/21 Kurchiboni 140 - - 0.80 0.84 0.55 1.38 553

2974 11 Nayagram 8 Rural Connectivity 8/22 Kurchiboni 140 - - 1.50 1.49 0.98 2.47 988

2975 11 Nayagram 8 Rural Connectivity 8/23 Kurchiboni 140 - - 1.00 1.19 0.79 1.98 790

2976 11 Nayagram 8 Rural Connectivity 8/24 Kurchiboni 140 - - 1.20 0.89 0.59 1.48 593

2977 11 Nayagram 8 Rural Connectivity 8/25 Kurchiboni 140 - - 0.70 0.60 0.39 0.99 395

2978 11 Nayagram 8 Rural Connectivity 8/26 Kurchiboni 140 - - 0.50 0.45 0.29 0.74 296

2979 11 Nayagram 8 Rural Connectivity 8/27 Kurchiboni 140 - - 1.00 1.79 1.18 2.97 1185

2980 11 Nayagram 8 Rural Connectivity 8/28 Kurchiboni 140 - - 0.90 0.45 0.29 0.74 296

2981 11 Nayagram 8 Rural Connectivity 8/29 Kurchiboni 140 - - 2.00 1.49 0.98 2.47 988

2982 11 Nayagram 8 Rural Connectivity 8/30 Nayagram 143 - - 0.50 0.89 0.59 1.48 593

2983 11 Nayagram 8 Rural Connectivity 8/31 Nayagram 143 - - 1.50 1.24 0.74 1.98 823

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of road from Mean road to Jagadish paria's house .

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of road from Bijoy Singha house to Anil paria house .

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of road from Ghosh para to pry. School .

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of road from Pry. School to Maheswar Bera house

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of road from Maheswar Bera house to Ferighat

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of road from Unchu Kamalapur men road to Bivas Singha house

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Construction of road from Men road to Sankamui Ghat

Nayagram

Kamalapur

Public Land

20th Feb'14

All Season

Repair of road from PMGSY to Paresh Das house

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from Paresh Das house to Balaram Das house

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from Balarm Das house to Mritakhal with Culvert

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from Biren Maity house to Tapan Ghosh house

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from PMGSY to Pry. School

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from Sukumar Maity house to Shyamapada Routh

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from Sannyasi Das house to Purna Ghosh house

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from Badal Mandal house to Nimainagar main road with Drain

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from Jagadish Mandal house to Mrigen Hatui Land

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from Kali Dalai Pond to Chekpost

Nayagram

Kurchiboni

Public Land

20th Feb'14

All Season

Repair of road from prithinath Mahapatra house to Hari Sing house .

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Repair of road from Kali mandir to pungiri village

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Page 230: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

230/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

2984 11 Nayagram 8 Rural Connectivity 8/32 Nayagram 143 - - 0.30 1.49 0.98 2.47 988

2985 11 Nayagram 8 Rural Connectivity 8/33 Nayagram 143 - - 0.20 0.30 0.25 0.54 198

2986 11 Nayagram 8 Rural Connectivity 8/34 Nayagram 143 - - 0.40 1.89 1.08 2.97 1251

2987 11 Nayagram 8 Rural Connectivity 8/35 Nayagram 143 - - 0.05 0.99 1.48 2.47 658

2988 11 Nayagram 8 Rural Connectivity 8/36 Nayagram 143 - - 0.05 0.99 1.48 2.47 658

2989 11 Nayagram 8 Rural Connectivity 8/37 Nayagram 143 - - 0.30 1.89 1.08 2.97 1251

2990 11 Nayagram 8 Rural Connectivity 8/38 Nayagram 143 - - 0.20 1.29 0.69 1.98 856

2991 11 Nayagram 8 Rural Connectivity 8/39 Nayagram 143 - - 1.00 1.89 1.08 2.97 1251

2992 11 Nayagram 8 Rural Connectivity 8/40 128 - - 1.00 2.49 0.98 3.46 1646

2993 11 Nayagram 8 Rural Connectivity 8/41 128 - - 0.05 1.21 2.25 3.46 802

2994 11 Nayagram 8 Rural Connectivity 8/42 128 - - 0.80 1.19 0.59 1.78 790

2995 11 Nayagram 8 Rural Connectivity 8/43 128 - - 0.80 1.19 0.59 1.78 790

2996 11 Nayagram 8 Rural Connectivity 8/44 Repair of road from Beltala to Khal pad 128 - - 1.00 2.49 0.98 3.46 1646

2997 11 Nayagram 8 Rural Connectivity 8/45 Petching of Bhunia pada khal ghat 128 - - 0.01 0.99 2.47 3.46 658

2998 11 Nayagram 8 Rural Connectivity 8/46 128 - - 1.00 1.19 0.59 1.78 790

2999 11 Nayagram 8 Rural Connectivity 8/47 129 - - 0.80 1.49 0.68 2.18 988

3000 11 Nayagram 8 Rural Connectivity 8/48 129 - - 1.00 2.49 0.78 3.26 1646

3001 11 Nayagram 8 Rural Connectivity 8/49 129 - - 1.00 0.99 0.69 1.68 658

3002 11 Nayagram 8 Rural Connectivity 8/50 129 - - 1.00 1.49 0.68 2.18 988

3003 11 Nayagram 8 Rural Connectivity 8/51 129 - - 0.30 2.49 0.98 3.46 1646

3004 11 Nayagram 8 Rural Connectivity 8/52 Tufuria Tufuria - - 0.80 3.18 1.27 4.45 2107

3005 11 Nayagram 8 Rural Connectivity 8/53 Guardwall near Bimal Patra Land Tufuria Tufuria 212 470556 - - 0.17 3.98 2.95 6.92 2634

3006 11 Nayagram 8 Rural Connectivity 8/54 Tufuria Tufuria 211 - - 0.30 1.99 0.98 2.97 1317

Repair of road from Nayagram Thana to Rabi Dandapat House .

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Construction of road from Battola chak to Football ground .

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Repair of road from Harish Patra house to Mathpara

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Construction of kankrit chatal at Shitala Mandir .

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Construction of kankrit chatal at near Mantu Acharja Shop .

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Construction of road from Forest Office to Gopi Pattanayak house . .

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Construction of road from Bhupati paira house to Bharat paira House

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Construction of road from Shitala Mandir to Raghunath Pukur

Nayagram

Nayagram (N)

Public Land

20th Feb'14

All Season

Repair of road from Gourhari Nanda house to Primary School

Nayagram

Nimainagar

Niaminagar

Public Land

20th Feb'14

All Season

Construction of Guardwall from Primary school to SSK

Nayagram

Nimainagar

Niaminagar

Public Land

20th Feb'14

All Season

Repair of road from Primary school to Debdarutala

Nayagram

Nimainagar

Niaminagar

Public Land

20th Feb'14

All Season

Repair of road from Himangsu Dutta house to PMGSY road

Nayagram

Nimainagar

Niaminagar

Public Land

20th Feb'14

All Season

Nayagram

Nimainagar

Niaminagar

Public Land

20th Feb'14

All Season

Nayagram

Nimainagar

Niaminagar

Public Land

20th Feb'14

All Season

Repair of road from Asutosh Singha house to Srikanta Nanda house

Nayagram

Nimainagar

Niaminagar

Public Land

20th Feb'14

All Season

Repair of road from Dukharam Murmu house to forest road

Nayagram

Nimainagar

Uthan Nayagram

Public Land

20th Feb'14

All Season

Construction of road from Mangal Hansda house to Khal

Nayagram

Nimainagar

Uthan Nayagram

Public Land

20th Feb'14

All Season

Construction of road from Laxman Hemram house to forest road

Nayagram

Nimainagar

Uthan Nayagram

Public Land

20th Feb'14

All Season

Repair of road from Kanda Murmu house to Smasanghat

Nayagram

Nimainagar

Uthan Nayagram

Public Land

20th Feb'14

All Season

Construction of Bandh near Dukharam Murmu land

Nayagram

Nimainagar

Uthan Nayagram

Public Land

20th Feb'14

All Season

Repair of road from Pintu Patra shop to Jatin Sing House

Nayagram

Public Land

20th Feb'14

All Season

Nayagram

Public Land

20th Feb'14

All Season

Repair of road from Thura Nayek house to Ramesh Baramajhi house

Nayagram

Public Land

20th Feb'14

All Season

Page 231: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

231/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3007 11 Nayagram 8 Rural Connectivity 8/55 Kamlatota 144 - - 0.50 0.89 0.59 1.48 593

3008 11 Nayagram 8 Rural Connectivity 8/56 Kamlatota 144 - - 1.00 0.89 0.59 1.48 593

3009 11 Nayagram 8 Rural Connectivity 8/57 - - 2.00 1.19 0.79 1.98 790

3010 11 Nayagram 8 Rural Connectivity 8/58 Sitalpura 146 - - 1.00 0.89 0.59 1.48 593

3011 11 Nayagram 8 Rural Connectivity 8/59 Sitalpura 146 - - 0.50 0.89 0.59 1.48 593

3012 11 Nayagram 8 Rural Connectivity 8/60 Sitalpura 146 - - 1.00 1.19 0.79 1.98 790

3013 11 Nayagram 8 Rural Connectivity 8/61 Sitalpura 146 - - 0.50 0.89 0.59 1.48 593

3014 11 Nayagram 8 Rural Connectivity 8/62 Sitalpura 146 - - 0.50 0.89 0.59 1.48 593

3015 11 Nayagram 8 Rural Connectivity 8/63 Sitalpura 144 - - 0.50 0.89 0.59 1.48 593

3016 11 Nayagram 8 Rural Connectivity 8/64 Kamlatota 144 - - 0.50 0.89 0.59 1.48 593

3017 11 Nayagram 8 Rural Connectivity 8/65 Sitalpura 146 - - 1.00 0.89 0.59 1.48 593

3018 11 Nayagram 8 Rural Connectivity 8/66 Sitalpura 146 - - 1.00 0.89 0.59 1.48 593

3019 11 Nayagram 8 Rural Connectivity 8/67 Const.of road from natunsai to korasole Sitalpura 146 - - 3.00 2.39 0.58 2.97 1580

3020 11 Nayagram 8 Rural Connectivity 8/68 Kamlatota 144 - - 0.50 0.60 0.39 0.99 395

3021 11 Nayagram 8 Rural Connectivity 8/69 Nayagram 143 - - 0.50 1.16 0.77 1.93 770

3022 11 Nayagram 8 Rural Connectivity 8/70 Nayagram 143 - - 1.00 1.19 0.67 1.86 790

3023 11 Nayagram 8 Rural Connectivity 8/71 Nayagram 143 - - 2.00 1.19 0.79 1.98 790

3024 11 Nayagram 8 Rural Connectivity 8/72 Nayagram 143 - - 2.00 1.39 0.78 2.18 922

3025 11 Nayagram 8 Rural Connectivity 8/73 Repair of road from Nayagram hat road Nayagram 143 - - 1.00 1.07 0.77 1.84 711

3026 11 Nayagram 8 Rural Connectivity 8/74 Nayagram 143 - - 0.50 0.89 0.59 1.48 593

3027 11 Nayagram 8 Rural Connectivity 8/75 Nayagram 143 - - 0.50 1.79 0.66 2.45 1185

Const. of road from Ananta Dhauria house to Chandapara Pairep road

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Repair of road from Sattyaranjan house to Kashinath Dhauria house

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Repair of road from Tetultola to Nadighat to(Gokulnaga

Nayagram

Sitalpura

Gokulnagar

Public Land

20th Feb'14

All Season

Repair of road from Pramatha pal house to Bhim palui house

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Const. of Road from Pairep Road (kuchla)to sitalpura football ground.

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Repair of road from Nittyananda maity house to Gabardhan Paria house

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Repair of road from Gouri patra house to sudhan mallik house

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Repair of road from Jaga mandi house to Bulu Bhakta house(moram&bolder)

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Repair of road from mahi hembram to paban bhakta house(moram&bolder)

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Repair of road from Mrityunjay Rana house to Raghunath Sing house

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Const. of road from Dhurba Bera house to Balichand than

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Const.of road from Sitalpura ssk to pirep road .

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Cons.of road from pitch road to Girja mandir

Nayagram

Sitalpura

Public Land

20th Feb'14

All Season

Repair of road from Dispensari to dev dutta das (morroum)

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Repair of road from Pairep road to Sarath bera house (morroum)

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Repair of road from Pitch road to Sadhucharan patra with moorum

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Repair of road from basab maity house to pukurpar with moorum

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Repair of road from dispensari to buddhadev mukhi house with moorum

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Repair of road from dispensari to football ground

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Page 232: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

232/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3028 11 Nayagram 8 Rural Connectivity 8/76 Nayagram 143 - - 1.00 1.37 0.90 2.28 909

3029 11 Nayagram 8 Rural Connectivity 8/77 Nayagram 143 - 1.50 - 0.69 1.29 1.98 459

3030 11 Nayagram 8 Rural Connectivity 8/78 Nayagram 143 - 1.50 - 0.87 1.61 2.47 573 Jun

3031 11 Nayagram 8 Rural Connectivity 8/79 Jarka kamalapur 112 - - 0.30 0.99 0.49 1.48 658 Jun

3032 11 Nayagram 8 Rural Connectivity 8/80 Jarka jarka 210 - - 1.00 1.49 0.98 2.47 988 Jun

3033 11 Nayagram 8 Rural Connectivity 8/81 Jarka jarka 210 - - 0.50 0.99 0.49 1.48 658 Jun

3034 11 Nayagram 8 Rural Connectivity 8/82 Jarka jarka 210 - - 0.50 0.99 0.49 1.48 658 Jun

3035 11 Nayagram 8 Rural Connectivity 8/83 Jarka kamalapur 212 - - 0.50 1.29 0.69 1.98 856 Jun

3036 11 Nayagram 8 Rural Connectivity 8/84 Jarka kamalapur 212 - - 0.30 0.70 0.49 1.19 461 Jun

3037 11 Nayagram 8 Rural Connectivity 8/85 Jarka kamalapur 212 - - 0.30 0.70 0.49 1.19 461 Jun

3038 11 Nayagram 8 Rural Connectivity 8/86 Kamalapur 212 - - 0.60 0.89 0.39 1.29 593 Jun

- - - 115.91 67.69 183.61 76764

3039 11 Nayagram 15 15/1 Const. of Toilet 110nos. Dahi Dahi 142 Private - - - 3.56 2.38 5.94 2360 Jun

3040 11 Nayagram 15 15/2 Const. of Toilet 110nos. Kurchiboni 140 Private - - - 3.56 2.38 5.94 2360 Jun

3041 11 Nayagram 15 15/3 Const. of Toilet 110nos. Nayagram 211 Private - - - 3.56 2.38 5.94 2360 Jun

3042 11 Nayagram 15 15/4 Const. of Toilet 110nos. 128 Private - - - 3.56 2.38 5.94 2360 Jun

3043 11 Nayagram 15 15/5 Const. of Toilet 110nos. Tufuria Tufuria 211 Private - - - 3.56 2.38 5.94 2360 Jun

3044 11 Nayagram 15 15/6 Const. of Toilet 110nos. Sitalpura 146 Private - - - 3.56 2.38 5.94 2360 Jun

3045 11 Nayagram 15 15/7 Const. of Toilet 110nos. Nayagram 143 Private - - - 3.56 2.38 5.94 2360 Jun

3046 11 Nayagram 15 15/8 Const. of Toilet 110nos. Kamalapur 143 Private - - - 3.56 2.38 5.94 2360 Jun

3047 11 Nayagram 15 15/9 Const. of Toilet 110nos. Jarka Jarka 143 Private - - - 3.56 2.38 5.94 2360 Jun

- - - 32.08 21.38 53.46 21242

Repair of road from Nayagram bazer to Begunadahi

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Const. of Gardwall pitch road to khudiram singh house

Nayagram

Nayagram(S)

Public Land

20th Feb'14

All Season

Const. of Gardwall from Mrityunjay maity to Khandu Mukhi

Nayagram

Nayagram(S)

Public Land

17th Feb'14

Repair of road from kamlapur chatina tala to atul ghoshpond

Nayagram

Public Land

17th Feb'14

Repair of road from jarka ssk to patra para

Nayagram

Public Land

17th Feb'14

Repair of road from laxman saren house to jarka man road

Nayagram

Public Land

17th Feb'14

Repair of road from jahira than to jarka kuya

Nayagram

Public Land

17th Feb'14

Repair of road from kamlapur man road to kadamtala to shit para

Nayagram

Public Land

17th Feb'14

Repair of road from Pukurpar to uddhav bhunia chak

Nayagram

Public Land

17th Feb'14

Const. of road from pal para to hisikesh pal house

Nayagram

Public Land

17th Feb'14

Construction of Purna Tripathy house road .

Nayagram

Kamalapur

Public Land

17th Feb'14

Rural Connectivity TotalRural Sanitation related works

Nayagram

17th Feb'14

Rural Sanitation related works

Nayagram

Kurchiboni

17th Feb'14

Rural Sanitation related works

Nayagram

Nayagram (N)

17th Feb'14

Rural Sanitation related works

Nayagram

Nimainagar

Niaminagar

17th Feb'14

Rural Sanitation related works

Nayagram

17th Feb'14

Rural Sanitation related works

Nayagram

Sitalpura

17th Feb'14

Rural Sanitation related works

Nayagram

Nayagram(S)

17th Feb'14

Rural Sanitation related works

Nayagram

Kamalapur

17th Feb'14

Rural Sanitation related works

Nayagram

17th Feb'14

Rural Sanitation related works Total

Page 233: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

233/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 411.24 152.93 564.17 272345

3048 12 Patina 1 1/1 Excavation of Biren Jana pond Patina 2 3.50 - - 2.07 0.23 2.30 1371 Jun

3049 12 Patina 1 1/2 Excavation of Lakshman Tudu pond. Patina Bihakuria 5 3.45 - - 2.07 0.23 2.30 1371 Jun

3050 12 Patina 1 1/3 Excavation of damodarpur pond Patina 2 3.45 - - 2.07 0.23 2.30 1371 Jun

3051 12 Patina 1 1/4 Patina Rajpahari 3 3.45 - - 2.07 0.23 2.30 1371 Jun

3052 12 Patina 1 1/5 Excavation of Kalipada Maity pond Patina 2 442 3.55 - - 2.07 0.23 2.30 1371 Jun

3053 12 Patina 1 1/6 Excavation of Keshab Ch. Jana pond Patina 17 448 3.56 - - 2.07 0.23 2.30 1371 Jun

3054 12 Patina 1 1/7 Excavation of Sudhasindhu Nayek Pond Patina 17 344 3.50 - - 2.07 0.23 2.30 1371 Jun

3055 12 Patina 1 1/8 Excavation of Mahadev Sing Pond Patina 17 1142 3.50 - - 2.07 0.23 2.30 1371 Jun

3056 12 Patina 1 1/9 Excavation of Gokul ch. Jana Pond Patina 17 447 3.45 - - 2.07 0.23 2.30 1371 Jun

3057 12 Patina 1 1/10 Excavation of Srimanta Routh Pond Patina 17 3.25 - - 2.07 0.23 2.30 1371 Jun

3058 12 Patina 1 1/11 Excavation of Jatindra Mahapatra Pond Patina 17 560 3.60 - - 2.07 0.23 2.30 1371 Jun

3059 12 Patina 1 1/12 Excavation of Ranjit Dey Pond Patina 17 3.40 - - 2.07 0.23 2.30 1371 Jun

3060 12 Patina 1 1/13 Excavation of Murmu Pond Patina 17 3.42 - - 2.07 0.23 2.30 1371 Jun

3061 12 Patina 1 1/14 Excavation of Raghunath Mandir Pond Patina 17 3.42 - - 2.07 0.23 2.30 1371 Jun

Nayagram Total

Water Conservation & Water Harvesting

Damodarpur

Damodarpur

17th Feb'14

Water Conservation & Water Harvesting

Damodarpur

17th Feb'14

Water Conservation & Water Harvesting

Damodarpur

Damodarpur

17th Feb'14

Water Conservation & Water Harvesting

Excavation of Rajpahari Kalipada jana pond.

Damodarpur

17th Feb'14

Water Conservation & Water Harvesting

Damodarpur

Damodarpur

17th Feb'14

Water Conservation & Water Harvesting

Upar patina

Upar patina

17th Feb'14

Water Conservation & Water Harvesting

Upar patina

Upar patina

17th Feb'14

Water Conservation & Water Harvesting

Upar patina

Upar patina

17th Feb'14

Water Conservation & Water Harvesting

Upar patina

Upar patina

17th Feb'14

Water Conservation & Water Harvesting

Upar patina

Upar patina

17th Feb'14

Water Conservation & Water Harvesting

Upar patina

Upar patina

17th Feb'14

Water Conservation & Water Harvesting

Upar patina

Upar patina

17th Feb'14

Water Conservation & Water Harvesting

Upar patina

Upar patina

17th Feb'14

Water Conservation & Water Harvesting

Chamarnamdh

Chamarbandh

17th Feb'14

Page 234: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

234/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3062 12 Patina 1 1/15 Patina 17 552 3.42 - - 2.07 0.23 2.30 1371 Jun

3063 12 Patina 1 1/16 Excavation of Dubai Mandi Pond Patina Jamsola 11 3.45 - - 2.07 0.23 2.30 1371 Jun

3064 12 Patina 1 1/17 Excavation of Angrabhati Pond Patina Jamsola 11 3.50 - - 2.07 0.23 2.30 1371 Jun

3065 12 Patina 1 1/18 Excavation of bhuna Bisram Pond Patina Patina 7 3.45 - - 2.07 0.23 2.30 1371 Jun

3066 12 Patina 1 1/19 Excavation of Surendra Sing Pond Patina Patina 7 3.50 - - 2.07 0.23 2.30 1371 Jun

3067 12 Patina 1 1/20 Excavation of Dhanakrishna Bera Pond Patina Fulbani Fulbani 4 3.46 - - 1.94 0.22 2.15 1282 Jun

3068 12 Patina 1 1/21 Excavation of Surmani Murmu Pond Patina Fulbani Fulbani 4 3.45 - - 1.94 0.22 2.15 1282 Jun

3069 12 Patina 1 1/22 Excavation of Susil Saren Pond Patina Fulbani Fulbani 4 3.44 - - 1.94 0.22 2.15 1282 Jun

3070 12 Patina 1 1/23 Excavation of Rajni Kotal pond. Patina Jamsola 11 3.56 - - 1.94 0.22 2.15 1282 Jun

3071 12 Patina 1 1/24 Excavation of Murmu Pond Patina Singdhui 14 3.56 - - 1.94 0.22 2.15 1282 Jun

3072 12 Patina 1 1/25 Excavation of Murmu Pond Patina Singdhui 14 3.56 - - 1.94 0.22 2.15 1282 Jun

3073 12 Patina 1 1/26 Excavation of Murmu Pond Patina Singdhui 14 3.56 - - 1.94 0.22 2.15 1282 Jun

3074 12 Patina 1 1/27 Excavation of Murmu Pond Patina Singdhui 14 3.50 - - 1.79 0.20 1.99 1187 Jun

3075 12 Patina 1 1/28 Excavation of Murmu Pond Patina Singdhui 14 3.50 - - 1.79 0.20 1.99 1187 Jun

3076 12 Patina 1 1/29 Excavation of Murmu Pond Patina Singdhui 14 3.50 - - 1.79 0.20 1.99 1187 Jun

Water Conservation & Water Harvesting

Excavation of Rabindranath Murmu's Pond

Chamarnamdh

Chamarbandh

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Water Conservation & Water Harvesting

Rangamatia

17th Feb'14

Water Conservation & Water Harvesting

Rangamatia

17th Feb'14

Water Conservation & Water Harvesting

17th Feb'14

Water Conservation & Water Harvesting

17th Feb'14

Water Conservation & Water Harvesting

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Water Conservation & Water Harvesting

Singdhui

17th Feb'14

Page 235: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

235/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

- - - 58.25 6.47 64.72 38576

3077 12 Patina 2 Drought Proofing 2/1 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3078 12 Patina 2 Drought Proofing 2/2 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3079 12 Patina 2 Drought Proofing 2/3 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3080 12 Patina 2 Drought Proofing 2/4 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3081 12 Patina 2 Drought Proofing 2/5 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3082 12 Patina 2 Drought Proofing 2/6 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3083 12 Patina 2 Drought Proofing 2/7 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3084 12 Patina 2 Drought Proofing 2/8 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3085 12 Patina 2 Drought Proofing 2/9 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3086 12 Patina 2 Drought Proofing 2/10 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3087 12 Patina 2 Drought Proofing 2/11 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3088 12 Patina 2 Drought Proofing 2/12 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3089 12 Patina 2 Drought Proofing 2/13 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3090 12 Patina 2 Drought Proofing 2/14 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3091 12 Patina 2 Drought Proofing 2/15 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3092 12 Patina 2 Drought Proofing 2/16 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3093 12 Patina 2 Drought Proofing 2/17 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3094 12 Patina 2 Drought Proofing 2/18 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3095 12 Patina 2 Drought Proofing 2/19 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3096 12 Patina 2 Drought Proofing 2/20 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3097 12 Patina 2 Drought Proofing 2/21 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

Water Conservation & Water Harvesting Total

192, 193, 194, 188

17th Feb'14

192, 193, 194, 188

17th Feb'14

192, 193, 194, 189

17th Feb'14

192, 193, 194, 190

17th Feb'14

192, 193, 194, 191

17th Feb'14

192, 193, 194, 192

17th Feb'14

192, 193, 194, 193

17th Feb'14

192, 193, 194, 194

17th Feb'14

192, 193, 194, 195

17th Feb'14

192, 193, 194, 196

17th Feb'14

192, 193, 194, 197

17th Feb'14

192, 193, 194, 198

17th Feb'14

192, 193, 194, 199

17th Feb'14

192, 193, 194, 200

17th Feb'14

192, 193, 194, 201

17th Feb'14

192, 193, 194, 202

17th Feb'14

192, 193, 194, 203

17th Feb'14

192, 193, 194, 204

17th Feb'14

192, 193, 194, 205

17th Feb'14

192, 193, 194, 206

17th Feb'14

192, 193, 194, 207

17th Feb'14

Page 236: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

236/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3098 12 Patina 2 Drought Proofing 2/22 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3099 12 Patina 2 Drought Proofing 2/23 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3100 12 Patina 2 Drought Proofing 2/24 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3101 12 Patina 2 Drought Proofing 2/25 Arjuna Plantation in Khasjangal Patina Singdui Khasjangal 11 own - 0.83 - 1.50 0.19 1.69 994 Jun

3102 12 Patina 2 Drought Proofing 2/26 Kajubagan of Budhiram Murmu & oth. Patina Khasjangal 6 - 5.00 - 4.50 1.46 5.96 2983 Jun

3103 12 Patina 2 Drought Proofing 2/27 Patina Bansiabhol 13 344 - 2.00 - 2.25 0.98 3.23 1491 Jun

3104 12 Patina 2 Drought Proofing 2/28 Plantation Of Basanta Hemram Patina Bansiabhol 13 116 - 6.00 - 2.25 0.98 3.23 1491 Jun

3105 12 Patina 2 Drought Proofing 2/29 Plantation Of Suklal Murmu Patina Bansiabhol 13 306 - 4.50 - 2.25 0.98 3.23 1491 Jun

3106 12 Patina 2 Drought Proofing 2/30 Plantation Of Raghunath Murmu Patina Bansiabhol 13 344 - 5.00 - 2.25 0.98 3.23 1491 Jun

3107 12 Patina 2 Drought Proofing 2/31 Plantation Of Manik Murmu Patina Singdhui 14 14 - 5.00 - 2.25 0.98 3.23 1491 Jun

3108 12 Patina 2 Drought Proofing 2/32 Plantation Of Guba Mandi Patina Singdhui 14 294 - 5.00 - 2.25 0.98 3.23 1491 Jun

- - - 55.55 12.08 67.63 36786

3109 12 Patina 3 3/1 Patina 17 3.56 - - 2.07 0.23 2.30 1371 Jun

3110 12 Patina 3 3/2 Patina 2 - - 0.90 1.79 0.20 1.99 1187 Jun

3111 12 Patina 3 3/3 Patina 2 - - 0.90 1.79 0.20 1.99 1187 Jun

3112 12 Patina 3 3/4 Re-Excavation of Canal Rajpahari Road Patina Rajpahari 3 - - 0.90 1.79 0.20 1.99 1187 Jun

3113 12 Patina 3 3/5 Patina 2 - - 0.90 1.79 0.20 1.99 1187 Jun

3114 12 Patina 3 3/6 Patina 17 - - 0.50 1.79 0.20 1.99 1187 Jun

3115 12 Patina 3 3/7 Patina 17 - - 0.60 1.79 0.20 1.99 1187 Jun

3116 12 Patina 3 3/8 Patina 17 - - 0.60 2.20 0.24 2.45 1460 Jun

3117 12 Patina 3 3/9 Re-excavation of Bholdaha canal.. Patina 17 - - 0.60 1.79 0.20 1.99 1187 Jun

192, 193, 194, 208

17th Feb'14

192, 193, 194, 209

17th Feb'14

192, 193, 194, 210

17th Feb'14

192, 193, 194, 211

17th Feb'14

Chamarbandh

17th Feb'14

Plantation of Sukul mani Murmu at- Bansiabhal

Singdhui

17th Feb'14

Singdhui

17th Feb'14

Singdhui

17th Feb'14

Singdhui

17th Feb'14

Singdhui

17th Feb'14

Singdhui

17th Feb'14

Drought Proofing TotalMicro Irrigation Works

Excavation of Cannel from Dakshin Chamarbandh to Rukhni Football Ground

Chamarbandh

Chamarbandh

17th Feb'14

Micro Irrigation Works

Re-Excavation of Canal from Suresh Jana's house to Ugalsanda Mandir

Damodarpur

Damodarpur

17th Feb'14

Micro Irrigation Works

Re-Excavation of Canal from Jayanta Jana's house to Anil Pramanik's house

Damodarpur

Damodarpur

17th Feb'14

Micro Irrigation Works

Damodarpur

17th Feb'14

Micro Irrigation Works

Re-Excavation of Canal from Aguanpara Road at Damodarpur

Damodarpur

Damodarpur

17th Feb'14

Micro Irrigation Works

Re-excavation of canal from karma sing house to subarnarekha river.

Upar patina

Upar patina

17th Feb'14

Micro Irrigation Works

Re-excavation of upar patina Sing para canal.

Khasjangal

Upar patina

17th Feb'14

Micro Irrigation Works

Re-excavation of canal near High school foot ball ground on jhariapara.

Upar patina

Upar patina

17th Feb'14

Micro Irrigation Works

Upar patina

Upar patina

17th Feb'14

Page 237: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

237/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3118 12 Patina 3 3/10 Patina 17 - - 0.60 1.79 0.20 1.99 1187 Jun

3119 12 Patina 3 3/11 Patina 17 - - 0.60 1.79 0.20 1.99 1187 Jun

3120 12 Patina 3 3/12 Patina 17 - - 0.60 1.79 0.20 1.99 1187 Jun

3121 12 Patina 3 3/13 Patina 17 - - 1.50 1.79 0.20 1.99 1187 Jun

3122 12 Patina 3 3/14 Patina 17 - - 1.50 1.79 0.20 1.99 1187 Jun

3123 12 Patina 3 3/15 Guid bandh of Bagray Hansda land. Patina 2 - - 0.50 1.79 0.20 1.99 1187 Jun

3124 12 Patina 3 3/16 Patina 2 - - 0.50 1.79 0.20 1.99 1187 Jun

3125 12 Patina 3 3/17 Re-excavation of Amsol Bandh. Patina 2 - - 0.60 1.79 0.20 1.99 1187 Jun

3126 12 Patina 3 3/18 Guid bandh of Baram chati. Patina 2 - - 0.60 1.79 0.20 1.99 1187 Jun

3127 12 Patina 3 3/19 Guid bandh of Dhiri Da. Patina 2 - - 0.60 1.79 0.20 1.99 1187 Jun

3128 12 Patina 3 3/20 Re-excavation of Sirganasha canal. Patina Jamsola 11 - - 0.60 1.79 0.20 1.99 1187 Jun

3129 12 Patina 3 3/21 Patina Jamsola 11 - - 0.60 1.79 0.20 1.99 1187 Jun

3130 12 Patina 3 3/22 Re-excavation of Sadar ghati canal Patina Patina 7 - - 0.60 1.50 0.19 1.69 994 Jun

3131 12 Patina 3 3/23 Patina Patina 7 - - 0.60 1.50 0.19 1.69 994 Jun

3132 12 Patina 3 3/24 Patina Patina 7 - - 0.50 1.50 0.19 1.69 994 Jun

3133 12 Patina 3 3/25 Patina Patina 7 - - 0.60 1.50 0.19 1.69 994 Jun

3134 12 Patina 3 3/26 Patina Patina 7 - - 0.55 1.50 0.19 1.69 994 Jun

3135 12 Patina 3 3/27 Patina Patina 7 - - 0.50 1.50 0.19 1.69 994 Jun

3136 12 Patina 3 3/28 Patina Patina 7 - - 0.50 1.50 0.19 1.69 994 Jun

3137 12 Patina 3 3/29 Re-excavation of canal of Sankar saren . Patina 17 - - 0.50 1.79 0.20 1.99 1187

3138 12 Patina 3 3/30 Re-excavation of canal at- Barpat Patina Barpat 17 - - 1.00 2.20 0.24 2.44 1454

Micro Irrigation Works

Re-excavation of canal from Lakshman Aguan house to Khal.

Upar patina

Upar patina

17th Feb'14

Micro Irrigation Works

Re-excavation of canal near adidtya Mahapatra house.

Upar patina

Upar patina

17th Feb'14

Micro Irrigation Works

Re-excavation of Upar Patina Clab Ground Cannel

Upar patina

Upar patina

17th Feb'14

Micro Irrigation Works

Re-excavation of Upar Patina Shib Mandir Cannel

Upar patina

Upar patina

17th Feb'14

Micro Irrigation Works

Re-excavation of Upar Patina Bera Para Cannel

Upar patina

Upar patina

17th Feb'14

Micro Irrigation Works

Damodarpur

Damodarpur

17th Feb'14

Micro Irrigation Works

Re-excavation of Bagray Hansda Bandh. Damodarpur

Damodarpur

17th Feb'14

Micro Irrigation Works

Damodarpur

Damodarpur

17th Feb'14

Micro Irrigation Works

Damodarpur

Damodarpur

17th Feb'14

Micro Irrigation Works

Damodarpur

Damodarpur

17th Feb'14

Micro Irrigation Works

Singdhui

17th Feb'14

Micro Irrigation Works

Re-excavation of canal from peyra bandh to Dasarathi land.

Singdhui

17th Feb'14

Micro Irrigation Works

Rangamatia

17th Feb'14

Micro Irrigation Works

Re-excavation of Bijan dey ghati. canal . Rangamatia

17th Feb'14

Micro Irrigation Works

Re-excavation of canal fromChakradhar Jana house to Gour hari house..

Rangamatia

17th Feb'14

Micro Irrigation Works

Re-excavation of canal fromChakradhar Jana house to Bablu Chowdhurihouse.

Rangamatia

17th Feb'14

Micro Irrigation Works

Re-excavation of canal froml Madan mahan jana house to Dipak Bera house.

Rangamatia

17th Feb'14

Micro Irrigation Works

Re-excavation of canal froml Madan mahan jana house to Kendudahar.

Rangamatia

17th Feb'14

Micro Irrigation Works

Re-excavation of canal froml Jayanta Chowdhuri house to Kendudahar.

Rangamatia

17th Feb'14

Micro Irrigation Works

Chamarbandh

Chamarbandh

17th Feb'14

Micro Irrigation Works

Chamarbandh

17th Feb'14

Page 238: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

238/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3139 12 Patina 3 3/31 Patina 17 - - 0.80 2.20 0.24 2.45 1460

- - - 55.02 6.28 61.30 36439

3140 12 Patina 4 4/1 Excavation of Debashis Khilari's Pond Patina Fulboni Fulboni 4 - 3.70 - 2.47 0.27 2.75 1638

3141 12 Patina 4 4/2 Excavation of Jahira Than Pond Patina Singdhui 14 - 3.70 - 2.47 0.27 2.75 1638

3142 12 Patina 4 4/3 Excavation of Pukur Para Pond Patina Singdhui 14 - 3.70 - 2.47 0.27 2.75 1638

3143 12 Patina 4 4/4 Excavation of Naran Tudu's Pond Patina Singdhui 14 - 3.70 - 2.47 0.27 2.75 1638

3144 12 Patina 4 4/5 Excavation of Pehara Bandh Patina Singdhui 14 - 3.70 - 2.47 0.27 2.75 1638

3145 12 Patina 4 4/6 Excavation of Bahara Bandh Patina Singdhui 14 - 3.70 - 2.47 0.27 2.75 1638

3146 12 Patina 4 4/7 Excavation of Kama Hembram's Pond Patina Singdhui 14 - 3.60 - 2.34 0.26 2.60 1549

3147 12 Patina 4 4/8 Excavation of Surendra Sing Pond Patina 7 - 3.60 - 2.34 0.26 2.60 1549

3148 12 Patina 4 4/9 Excavation of Bhuna Bishram Pond Patina 7 - 3.60 - 2.34 0.26 2.60 1549

- - - 21.85 2.43 24.28 14473

3149 12 Patina 5 5/1 Patina 17 3.42 - - 2.07 0.23 2.30 1371 Jun

3150 12 Patina 5 5/2 Rexcavation of Doharbandh at Barpat Patina Barpat 17 3.56 - - 2.07 0.23 2.30 1371 Jun

3151 12 Patina 5 5/3 Re-exavation of Dangi Pond Patina 2 - 3.50 - 2.06 0.23 2.29 1365

3152 12 Patina 5 5/4 Patina 2 - 3.50 - 2.06 0.23 2.29 1365

Micro Irrigation Works

Re-excavation of canal at Nichu Adibasa Para

Chamarbandh

Chamarbandh

17th Feb'14

Micro Irrigation Works TotalIrrigation facilities to land owned by SC/ST bene.

17th Feb'14

Irrigation facilities to land owned by SC/ST bene.

Singdhui

17th Feb'14

Irrigation facilities to land owned by SC/ST bene.

Singdhui

17th Feb'14

Irrigation facilities to land owned by SC/ST bene.

Singdhui

17th Feb'14

Irrigation facilities to land owned by SC/ST bene.

Singdhui

17th Feb'14

Irrigation facilities to land owned by SC/ST bene.

Singdhui

17th Feb'14

Irrigation facilities to land owned by SC/ST bene.

Singdhui

17th Feb'14

Irrigation facilities to land owned by SC/ST bene.

Rangamatia

nichu patina

17th Feb'14

Irrigation facilities to land owned by SC/ST bene.

Rangamatia

nichu patina

17th Feb'14

Irrigation facilities to land owned by SC/ST bene. TotalRenovation of Traditional Water Bodies

Rexcavation of Dakshinsai Jangle Bandh

Chamarnamdh

Chamarbandh

17th Feb'14

Renovation of Traditional Water Bodies

Chamarbandh

17th Feb'14

Renovation of Traditional Water Bodies

Damodarpur

Damodarpur

17th Feb'14

Renovation of Traditional Water Bodies

Re-exavation of Muchiram Murmu Pond

Damodarpur

Damodarpur

17th Feb'14

Page 239: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

239/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3153 12 Patina 5 5/5 Patina Rajpahari 4 - 3.50 - 2.06 0.23 2.29 1365

3154 12 Patina 5 5/6 Re-exavation of Amlasole Bandh Patina Amlasole 4 - 3.50 - 2.06 0.23 2.29 1365

3155 12 Patina 5 5/7 Re-exavation of Baghrai Hansda Bandh Patina 2 - 3.50 - 2.06 0.23 2.29 1365

3156 12 Patina 5 5/8 Re-exavation of Kalipada Maity's Pond Patina 7 - 3.50 - 2.06 0.23 2.29 1365

3157 12 Patina 5 5/9 Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3158 12 Patina 5 5/10 Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3159 12 Patina 5 5/11 Re-exavation of Mahadev Sing's Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3160 12 Patina 5 5/12 Re-exavation of Gokul Ch. Jana's Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3161 12 Patina 5 5/13 Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3162 12 Patina 5 5/14 Re-exavation of Binod Sing's Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3163 12 Patina 5 5/15 Patina 7 - 3.50 - 2.06 0.23 2.29 1365

3164 12 Patina 5 5/16 Re-exavation of Ranjit Dey's Pond Patina 7 - 3.50 - 2.06 0.23 2.29 1365

3165 12 Patina 5 5/17 Re-exavation of Murmu Pond Patina 7 - 3.50 - 2.06 0.23 2.29 1365

3166 12 Patina 5 5/18 Re-exavation of Bera Pond Patina 7 - 3.50 - 2.06 0.23 2.29 1365

3167 12 Patina 5 5/19 Re-exavation of Jana Pond Patina 7 - 3.50 - 2.06 0.23 2.29 1365

Renovation of Traditional Water Bodies

Re-exavation of Rajpahari Kalia Mukhi Pond

Damodarpur

17th Feb'14

Renovation of Traditional Water Bodies

Damodarpur

17th Feb'14

Renovation of Traditional Water Bodies

Damodarpur

Damodarpur

17th Feb'14

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

Renovation of Traditional Water Bodies

Re-exavation of Keshab Ch. Jana'ss Pond

Upar patina

Upar patina

17th Feb'14

Renovation of Traditional Water Bodies

Re-exavation of Sudha Sindhu Nayek's Pond

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Re-exavation of Srimanata Routh's Pond

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Re-exavation of Jatindra Mahapatra's Pond

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Page 240: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

240/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3168 12 Patina 5 5/20 Re-exavation of Routh Pond Patina 7 - 3.50 - 2.06 0.23 2.29 1365

3169 12 Patina 5 5/21 Re-exavation of Das Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3170 12 Patina 5 5/22 Re-exavation of Kamal Nayek's Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3171 12 Patina 5 5/23 Re-exavation of Baidyanath Sui 's Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3172 12 Patina 5 5/24 Re-exavation of Taldangra Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3173 12 Patina 5 5/25 Re-exavation of Maheswar Bera 's Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3174 12 Patina 5 5/26 Re-exavation of Jharia Para Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

3175 12 Patina 5 5/27 Re-exavation of Taldangra Khudia Pond Patina 7 - 3.50 - 1.94 0.22 2.15 1282

- - - 54.03 6.00 60.03 35782

3176 12 Patina 6 Land Development 6/1 Land levelling of fulboni jaher than Patina Fulboni Fulboni 4 - 0.90 - 2.47 0.27 2.75 1638

3177 12 Patina 6 Land Development 6/2 Land levelling of Khasjangal I C D S Patina Fulboni Fulboni 4 - 0.90 - 2.47 0.27 2.75 1638

3178 12 Patina 6 Land Development 6/3 Patina Fulboni Fulboni 4 - 0.90 - 2.47 0.27 2.75 1638

3179 12 Patina 6 Land Development 6/4 Land levelling of Hatimada Patina Fulboni Fulboni 4 - 0.90 - 2.47 0.27 2.75 1638

3180 12 Patina 6 Land Development 6/5 Land levelling of Pitam Soren & Others Patina Fulboni Fulboni 4 - 0.90 - 2.47 0.27 2.75 1638

3181 12 Patina 6 Land Development 6/6 Patina Fulboni Fulboni 4 - 0.90 - 2.47 0.27 2.75 1638

3182 12 Patina 6 Land Development 6/7 Patina Fulboni Fulboni 4 - 0.90 - 2.47 0.27 2.75 1638

3183 12 Patina 6 Land Development 6/8 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3184 12 Patina 6 Land Development 6/9 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies

Upar patina

Upar patina

17th Feb'14

All Season

Renovation of Traditional Water Bodies Total

17th Feb'14

All Season

17th Feb'14

All Season

Land levelling of Fulboni Sisu Sikha Kendra

17th Feb'14

All Season

17th Feb'14

All Season

17th Feb'14

All Season

Land levelling of Baduram Soren & Others

17th Feb'14

All Season

Land levelling of Nabin Soren & Others

17th Feb'14

All Season

Land levelling of Rameswar Beshra & Others

17th Feb'14

All Season

Land levelling of Solma Baske & Others

17th Feb'14

All Season

Page 241: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

241/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3185 12 Patina 6 Land Development 6/10 Land levelling of Guba Soren & Others Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3186 12 Patina 6 Land Development 6/11 Land levelling of Sukul Soren & Others Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3187 12 Patina 6 Land Development 6/12 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3188 12 Patina 6 Land Development 6/13 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3189 12 Patina 6 Land Development 6/14 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3190 12 Patina 6 Land Development 6/15 Land levelling of Aditya Bera & Others Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3191 12 Patina 6 Land Development 6/16 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3192 12 Patina 6 Land Development 6/17 Land levelling of Ganes Bera & Others Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3193 12 Patina 6 Land Development 6/18 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3194 12 Patina 6 Land Development 6/19 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3195 12 Patina 6 Land Development 6/20 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3196 12 Patina 6 Land Development 6/21 Patina Fulboni Fulboni 4 - 0.70 - 2.20 0.24 2.44 1454

3197 12 Patina 6 Land Development 6/22 Patina Fulboni Fulboni 4 - 0.70 - 2.06 0.23 2.29 1365

3198 12 Patina 6 Land Development 6/23 Patina Fulboni Fulboni 4 - 0.70 - 2.06 0.23 2.29 1365

3199 12 Patina 6 Land Development 6/24 Patina Fulboni Fulboni 4 - 0.70 - 2.06 0.23 2.29 1365

3200 12 Patina 6 Land Development 6/25 Patina Fulboni Fulboni 4 - 0.70 - 2.06 0.23 2.29 1365

3201 12 Patina 6 Land Development 6/26 Patina Fulboni Fulboni 4 own - 0.80 - 2.34 0.26 2.60 1549

3202 12 Patina 6 Land Development 6/27 Patina Fulboni Fulboni 4 own - 0.80 - 2.34 0.26 2.60 1549

3203 12 Patina 6 Land Development 6/28 Patina Fulboni Fulboni 4 own - 0.90 - 2.34 0.26 2.60 1549

3204 12 Patina 6 Land Development 6/29 Patina Fulboni Fulboni 4 own - 0.90 - 2.34 0.26 2.60 1549

3205 12 Patina 6 Land Development 6/30 Land levelling of Sitala Mandir Patina Fulboni Fulboni 4 - 0.90 - 2.34 0.26 2.60 1549

3206 12 Patina 6 Land Development 6/31 Land levelling of Gram Debatar Than Patina Fulboni Fulboni 4 - 0.90 - 2.34 0.26 2.60 1549

3207 12 Patina 6 Land Development 6/32 Land levelling of Kalua Sanda Mandir Patina Fulboni Fulboni 4 - 0.70 - 2.34 0.26 2.60 1549

17th Feb'14

All Season

17th Feb'14

All Season

Land levelling of Bhabataran Bera & Others

17th Feb'14

All Season

Land levelling of Chitaranjan Bera & Others

17th Feb'14

All Season

Land levelling of Chanrasakhar Bera & Others

17th Feb'14

All Season

17th Feb'14

All Season

Land levelling of Sonatan Bera & Others

17th Feb'14

All Season

17th Feb'14

All Season

Land levelling of Sudhanna Bera & Others

17th Feb'14

All Season

Land levelling of Prabod Bera & Others 17th Feb'14

All Season

Land levelling of Swarup Dey & Others 17th Feb'14

All Season

Land levelling of Chandi Danndapat & Others

17th Feb'14

All Season

Land levelling of Makuram Soren & Others

17th Feb'14

All Season

Land levelling of Ruiha Hembram & Others

17th Feb'14

All Season

Land levelling of Chitan Hembram & Others

17th Feb'14

All Season

Land levelling of Mangal Murmu & Others

17th Feb'14

All Season

Land levelling of Sukul Soren & Others 5nos.

17th Feb'14

All Season

Land levelling of Basu Soren & Others 3 nos.

17th Feb'14

All Season

Land levelling of Debashis Khilari & Others 5 nos.

17th Feb'14

All Season

Land levelling of Ramchandra Bera & Others 2 nos.

17th Feb'14

All Season

17th Feb'14

All Season

17th Feb'14

All Season

17th Feb'14

All Season

Page 242: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

242/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3208 12 Patina 6 Land Development 6/33 Patina Bihakuria 5 own - 0.80 - 2.34 0.26 2.60 1549

3209 12 Patina 6 Land Development 6/34 Patina Bihakuria 5 own - 0.80 - 2.34 0.26 2.60 1549

3210 12 Patina 6 Land Development 6/35 Patina Bihakuria 5 own - 0.80 - 2.34 0.26 2.60 1549

3211 12 Patina 6 Land Development 6/36 Patina Bihakuria 5 own - 0.80 - 2.34 0.26 2.60 1549

3212 12 Patina 6 Land Development 6/37 Patina Bihakuria 5 own - 0.80 - 2.34 0.26 2.60 1549

3213 12 Patina 6 Land Development 6/38 Patina Bihakuria 5 own - 0.20 - 1.79 0.20 1.99 1187

3214 12 Patina 6 Land Development 6/39 Patina 2 own - 0.80 - 1.79 0.20 1.99 1187

3215 12 Patina 6 Land Development 6/40 Patina 2 own - 0.80 - 1.79 0.20 1.99 1187

3216 12 Patina 6 Land Development 6/41 Land levelling of MadanJana & Others Patina 2 own - 0.70 - 1.79 0.20 1.99 1187

3217 12 Patina 6 Land Development 6/42 Land levelling of Tipu & Others Patina 2 own - 0.80 - 1.79 0.20 1.99 1187

3218 12 Patina 6 Land Development 6/43 Land levelling of Bijay Bera, & Others Patina Taldangra 3 own - 0.60 - 1.79 0.20 1.99 1187

3219 12 Patina 6 Land Development 6/44 Patina Taldangra 3 - 0.60 - 1.79 0.20 1.99 1187

3220 12 Patina 6 Land Development 6/45 Land levelling of Mayti Gon & Others Patina Taldangra 3 - 0.60 - 1.79 0.20 1.99 1187

3221 12 Patina 6 Land Development 6/46 Patina Taldangra 3 own - 0.90 - 1.94 0.22 2.15 1282

3222 12 Patina 6 Land Development 6/47 Patina Taldangra 3 own - 0.65 - 1.94 0.22 2.15 1282

3223 12 Patina 6 Land Development 6/48 Land levelling of Jaher Tudu & Others Patina Singdui Bansiyavol 11 own - 0.60 - 1.94 0.22 2.15 1282

3224 12 Patina 6 Land Development 6/49 Patina Singdui Kenduboni 11 own - 0.60 - 1.94 0.22 2.15 1282

3225 12 Patina 6 Land Development 6/50 Patina Singdui banciyavol 11 own - 0.90 - 1.94 0.22 2.15 1282

3226 12 Patina 6 Land Development 6/51 Patina Singdui Singdhui 11 own - 0.90 - 1.94 0.22 2.15 1282

3227 12 Patina 6 Land Development 6/52 Land levelling of Lusu Baske, & Others Patina Rukhni Rukhni 11 own - 0.65 - 1.94 0.22 2.15 1282

3228 12 Patina 6 Land Development 6/53 Land levelling of Manik Besra & Others Patina Singdui Singdhui 11 own - 0.90 - 1.94 0.22 2.15 1282

3229 12 Patina 6 Land Development 6/54 Land levelling of Hira,& Others Patina Singdui Jamsola 11 own - 0.80 - 2.07 0.23 2.30 1371

3230 12 Patina 6 Land Development 6/55 Land levelling of Gosai & Others Patina Singdui Jamsola 11 own - 0.70 - 2.07 0.23 2.30 1371

Land levelling of Ratan, Baske & Others

Damodarpur

17th Feb'14

All Season

Land levelling of Kanai Hembram, & Others

Damodarpur

17th Feb'14

All Season

Land levelling of Fulmoni Baskey, & Others

Damodarpur

17th Feb'14

All Season

Land levelling of DurgaPada Murmu & Others

Damodarpur

17th Feb'14

All Season

Land levelling of Kusu,Murmu & Others

Damodarpur

17th Feb'14

All Season

Land levelling of Bihan kuriya football ground

Damodarpur

17th Feb'14

All Season

Land levelling of SuKlal, Murmu & Others

Damodarpur

Damodarpur

17th Feb'14

All Season

Land levelling of Kusu Hembram ,& Others

Damodarpur

Damodarpur

17th Feb'14

All Season

Damodarpur

Damodarpur

17th Feb'14

All Season

Damodarpur

Damodarpur

17th Feb'14

All Season

Upar Patina

17th Feb'14

All Season

Land levelling of Pabon Nayek & Others

Upar Patina

17th Feb'14

All Season

Upar Patina

17th Feb'14

All Season

Land levelling of Kedharchadra Nayek & Others

Upar Patina

17th Feb'14

All Season

Land levelling of Patina S C high School & Others

Upar Patina

17th Feb'14

All Season

17th Feb'14

All Season

Land levelling of Keduboni Jiyar Jharna Club & Others

17th Feb'14

All Season

Land levelling of Basiyavol Debostan, & Others

17th Feb'14

All Season

Land levelling of Ramdu Tudu & Others 17th Feb'14

All Season

17th Feb'14

All Season

17th Feb'14

All Season

17th Feb'14

All Season

17th Feb'14

All Season

Page 243: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

243/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3231 12 Patina 6 Land Development 6/56 Land levelling of & Others Patina Singdui Jamsola 11 own - 0.70 - 2.07 0.23 2.30 1371

3232 12 Patina 6 Land Development 6/57 Patina Singdui Singdui 11 344 own - 0.80 - 2.07 0.23 2.30 1371

3233 12 Patina 6 Land Development 6/58 Patina Singdui Khasjangal 11 own - 0.90 - 2.07 0.23 2.30 1371

3234 12 Patina 6 Land Development 6/59 Land levelling of Subal nayek & Others Patina Singdui Khasjangal 11 own - 0.80 - 2.07 0.23 2.30 1371

3235 12 Patina 6 Land Development 6/60 Patina Singdui Khasjangal 11 own - 0.70 - 2.07 0.23 2.30 1371

3236 12 Patina 6 Land Development 6/61 Patina Singdui Khasjangal 11 own - 0.80 - 2.07 0.23 2.30 1371

3237 12 Patina 6 Land Development 6/62 Patina Singdui Khasjangal 11 own - 0.70 - 2.07 0.23 2.30 1371

3238 12 Patina 6 Land Development 6/63 Patina 17 own - 0.70 - 2.07 0.23 2.30 1371

3239 12 Patina 6 Land Development 6/64 Land levelling of Sitla Mandir Patina 17 own - 0.60 - 2.07 0.23 2.30 1371

3240 12 Patina 6 Land Development 6/65 Patina 17 own - 0.70 - 2.07 0.23 2.30 1371

3241 12 Patina 6 Land Development 6/66 Patina 17 own - 0.60 - 1.93 0.21 2.14 1276

3242 12 Patina 6 Land Development 6/67 Land levelling of Suru Murmu &Others Patina 17 own - 0.65 - 1.93 0.21 2.14 1276

3243 12 Patina 6 Land Development 6/68 Patina 17 own - 0.65 - 1.93 0.21 2.14 1276

3244 12 Patina 6 Land Development 6/69 Patina 17 own - 0.80 - 1.93 0.21 2.14 1276

3245 12 Patina 6 Land Development 6/70 Land levelling of Mihir Jana &Others Patina 17 own - 0.65 - 1.93 0.21 2.14 1276

3246 12 Patina 6 Land Development 6/71 Patina 17 own - 0.65 - 1.93 0.21 2.14 1276

3247 12 Patina 6 Land Development 6/72 Patina 17 own - 0.65 - 1.93 0.21 2.14 1276

3248 12 Patina 6 Land Development 6/73 Land levelling of at Upar Para Patina 17 - 1.00 - 2.34 0.26 2.60 1549

3249 12 Patina 6 Land Development 6/74 Land levelling of Nichupara Patina 17 - 1.00 - 2.34 0.26 2.60 1549

3250 12 Patina 6 Land Development 6/75 Patina 17 - 0.70 - 2.34 0.26 2.60 1549

3251 12 Patina 6 Land Development 6/76 Patina 9 - 0.80 - 2.34 0.26 2.60 1549

3252 12 Patina 6 Land Development 6/77 Patina 9 - 0.80 - 2.34 0.26 2.60 1549

3253 12 Patina 6 Land Development 6/78 Patina 7 - 0.80 - 2.34 0.26 2.60 1549

17th Feb'14

All Season

Land levelling of Jahergutu Club Ground & Others

17th Feb'14

All Season

Land levelling of Swapan Murmu & Others

17th Feb'14

All Season

17th Feb'14

All Season

Land levelling of Sukra nayek & Others

17th Feb'14

All Season

Land levelling of Khakan nayek & Others

17th Feb'14

All Season

Land levelling of Binda Bhata & Others

17th Feb'14

All Season

Land levelling of Shrihori Jana & Others

Chamarbandh

Chamarbandh

17th Feb'14

All Season

Chamarbandh

Chamarbandh

17th Feb'14

All Season

Land levelling of Sisir kumar Giri & Others

Chamarbandh

Chamarbandh

17th Feb'14

All Season

Land levelling of Badpat Futball Graund &Pry.School

Chamarbandh

Chamarbandh

17th Feb'14

All Season

Chamarbandh

Chamarbandh

17th Feb'14

April May

Land levelling of Surendranath Murmu &Others

Chamarbandh

Chamarbandh

17th Feb'14

April May

Land levelling of Snatan Besra &Others Chamarbandh

Chamarbandh

17th Feb'14

April May

Chamarbandh

Chamarbandh

17th Feb'14

April May

Land levelling of Chamar Band Futball Graund

Chamarbandh

Chamarbandh

17th Feb'14

April May

Land levelling of Chamar Band Ragunath Zew Adibasi Club Graund

Chamarbandh

Chamarbandh

17th Feb'14

April May

Chamarbandh

Chamarbandh

17th Feb'14

April May

Chamarbandh

Chamarbandh

17th Feb'14

April May

Land levelling from Manik Beshra's land to Muchiram Beshra's Land

Chamarbandh

Chamarbandh

17th Feb'14

April May

Land levelling of Jagat Choudary & Others

Rangamatia

Rangamatia

17th Feb'14

April May

Land levelling of Monoranjan Dutta& Others

Rangamatia

Rangamatia

17th Feb'14

April May

Land levelling of Bimal Choudhari & Others

Rangamatia

Nichu patina

17th Feb'14

April May

Page 244: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

244/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3254 12 Patina 6 Land Development 6/79 Patina 7 - 0.60 - 1.79 0.20 1.99 1187

3255 12 Patina 6 Land Development 6/80 Patina 7 - 0.70 - 1.79 0.20 1.99 1187

3256 12 Patina 6 Land Development 6/81 Patina 7 - 0.60 - 1.79 0.20 1.99 1187

3257 12 Patina 6 Land Development 6/82 Patina 7 - 0.60 - 1.79 0.20 1.99 1187

3258 12 Patina 6 Land Development 6/83 Patina 7 - 0.70 - 1.79 0.20 1.99 1187

3259 12 Patina 6 Land Development 6/84 Patina 7 - 0.70 - 1.79 0.20 1.99 1187

- - - 177.28 19.70 196.98 117404

3260 12 Patina 7 7/1 Patina 17 3.56 - - 2.07 0.23 2.30 1371 Jun

3261 12 Patina 7 7/2 Patina 17 3.56 - - 2.07 0.23 2.30 1371 Jun

3262 12 Patina 7 7/3 Guard wall of Mahulia Bridze. Patina Bansiabhol 13 - - 0.40 1.67 0.19 1.85 1104 Jun

3263 12 Patina 7 7/4 Guid bandh of Renta Mandi Land. Patina Jamsola 11 - - 0.40 1.67 0.19 1.85 1104 Jun

3264 12 Patina 7 7/5 Guid bandh of Pitu Mandi land Patina Jamsola 11 - - 0.40 1.67 0.19 1.85 1104 Jun

3265 12 Patina 7 7/6 Patina Jamsola 11 - - 0.40 1.67 0.19 1.85 1104 Jun

3266 12 Patina 7 7/7 Patina 7 - - - 1.79 0.20 1.99 1187

3267 12 Patina 7 7/8 Re-excavation of Bimal Choudhari pond Patina 7 - - - 1.79 0.20 1.99 1187

3268 12 Patina 7 7/9 Patina 7 - - - 1.79 0.20 1.99 1187

3269 12 Patina 7 7/10 Re-excavation of Benu Bishram pond Patina 7 - - - 1.93 0.21 2.14 1276

3270 12 Patina 7 7/11 Patina 7 - - - 1.93 0.21 2.14 1276

3271 12 Patina 7 7/12 Patina 7 - - - 1.93 0.21 2.14 1276

3272 12 Patina 7 7/13 Patina 7 - - - 1.93 0.21 2.14 1276

3273 12 Patina 7 7/14 Patina 7 - - - 2.07 0.23 2.30 1371

Land levelling of Niranjan Choudary & Others

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Land levelling of Kalachand Dutta & Others

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Land levelling of Kalachand Dutta & Others

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Land levelling of Kalachand Dutta & Others

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Land levelling of Kalachand Dutta & Others

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Land levelling of Kalachand Dutta & Others

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Land Development TotalFlood Control & Protecation

Rxcavation of Sukupai Guide Bandh with Cannel

Chamarbandh

Chamarbandh

17th Feb'14

Flood Control & Protecation

Excavation of Drain at Rukhni Gramin Road.

Chamarbandh

Chamarbandh

17th Feb'14

Flood Control & Protecation

Singdhui

17th Feb'14

Flood Control & Protecation

Singdhui

17th Feb'14

Flood Control & Protecation

Singdhui

17th Feb'14

Flood Control & Protecation

Guid bandh of Ram, Laxman, & Rasu Hansda land.

Singdhui

17th Feb'14

Flood Control & Protecation

Re-excavation of Purusottom Choudhari pond

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Re-excavation of Sudhir Choudhari pond

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Re-excavation of Canel with Gard wall at Khoka sing house to Hari Sing

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Re-excavation of Cannel From Nichu patina Dompara to Sitlamandir

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Re-excavation of Cannel From Nichu patina 2 Nos Ghati

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Re-excavation of Cannel From Chakradhar Jana house to Gourhari Bera house

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Page 245: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

245/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3274 12 Patina 7 7/15 Patina 7 - - - 2.07 0.23 2.30 1371

3275 12 Patina 7 7/16 Patina 7 - - - 2.07 0.23 2.30 1371

3276 12 Patina 7 7/17 Patina 7 - - - 2.07 0.23 2.30 1371

3277 12 Patina 7 7/18 Patina 7 - - - 2.07 0.23 2.30 1371

- - - 34.24 3.80 38.04 22673

3278 12 Patina 8 Rural Connectivity 8/1 Patina 7 - - 0.76 0.75 0.99 1.74 497

3279 12 Patina 8 Rural Connectivity 8/2 Patina 17 - - 1.00 0.75 0.99 1.74 497

3280 12 Patina 8 Rural Connectivity 8/3 Patina 17 - - 0.75 0.75 0.99 1.74 497

3281 12 Patina 8 Rural Connectivity 8/4 Patina 17 - - 0.50 0.75 0.99 1.74 497

3282 12 Patina 8 Rural Connectivity 8/5 Patina 17 - - 1.00 0.75 0.99 1.74 497

3283 12 Patina 8 Rural Connectivity 8/6 Patina 17 - - 1.50 0.90 0.98 1.89 597

3284 12 Patina 8 Rural Connectivity 8/7 Patina 17 - - 1.00 0.90 0.98 1.89 597

3285 12 Patina 8 Rural Connectivity 8/8 Patina 17 - - 1.30 0.90 0.98 1.89 597

3286 12 Patina 8 Rural Connectivity 8/9 Patina Singdui Jamsola 11 - - 5.00 0.90 0.98 1.89 597

3287 12 Patina 8 Rural Connectivity 8/10 Patina Singdui Jamsola 11 - - 1.20 0.90 0.98 1.89 597

3288 12 Patina 8 Rural Connectivity 8/11 Patina Singdui Jamsola 11 - - 1.20 0.98 1.08 2.06 646

3289 12 Patina 8 Rural Connectivity 8/12 Patina Singdui Jamsola 11 - - 1.20 0.98 1.08 2.06 646

3290 12 Patina 8 Rural Connectivity 8/13 Patina Singdui Jamsola 11 - - 1.20 0.98 1.08 2.06 646

3291 12 Patina 8 Rural Connectivity 8/14 Patina Singdui Jamsola 11 - - 1.20 0.98 1.08 2.06 646

3292 12 Patina 8 Rural Connectivity 8/15 Patina Singdui Jamsola 11 - - 1.20 0.98 1.08 2.06 646

3293 12 Patina 8 Rural Connectivity 8/16 Patina 2 - - 1.20 0.98 1.08 2.06 646

Flood Control & Protecation

Re-excavation of Cannel From Chakradhar Jana house to Bablu Choudhary house

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Re-excavation of Cannel From Madan Jana house to Dipak Bera house

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Re-excavation of Cannel From Madan Jana house to Kendudahar

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation

Re-excavation of Cannel From Jayanta Choudhari house to Kendudahar

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Flood Control & Protecation Total

Connectivity road from Satrughan Ghosh house to Football Ground

Upar Patina

Upar Patina

17th Feb'14

Nov Dec

Connectivity road from Bera Para to Football Ground

Upar Patina

Upar Patina

17th Feb'14

Nov Dec

Connectivity road from Baidanath Sui House to Amdali Road

Upar Patina

Upar Patina

17th Feb'14

Nov Dec

Repair of Road from Upar Patina Gramin Road

Upar Patina

Upar Patina

17th Feb'14

Nov Dec

Repair of Road from PMGSY to Upar patina Bank

Upar Patina

Upar Patina

17th Feb'14

Nov Dec

Repair of Road from Patina High School to Munda para

Upar Patina

Upar Patina

17th Feb'14

Nov Dec

Repair of Road from Taldangra Gramin Road

Upar Patina

Upar Patina

17th Feb'14

Nov Dec

Repair of Road from Taldangra to Upar patina Bank

Upar Patina

Upar Patina

17th Feb'14

Nov Dec

Connectivity road from Jamsola Football Ground to Jahira than

17th Feb'14

Nov Dec

Connectivity road from Gosai Murmu house to Jahira than

17th Feb'14

Nov Dec

Connectivity road from Bira Hansda house to Mahuliya khal

17th Feb'14

Nov Dec

Connectivity road from Sankar Nayek house to Sirga nasa

17th Feb'14

Nov Dec

Connectivity road from Mana Mallik house to Pathar dahara puratan road

17th Feb'14

Nov Dec

Repair of Road from Jamsola Battala to Pukurpara

17th Feb'14

Nov Dec

Repair of Road from Jamsola Batdihi to Mahuliya khal

17th Feb'14

Nov Dec

Connectivity Road from Baram to Amsol band

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Page 246: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

246/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3294 12 Patina 8 Rural Connectivity 8/17 Patina 2 - - 1.20 0.98 1.08 2.06 646

3295 12 Patina 8 Rural Connectivity 8/18 Patina 2 - - 0.60 0.75 0.99 1.74 497

3296 12 Patina 8 Rural Connectivity 8/19 Patina 2 - - 0.60 0.75 0.99 1.74 497

3297 12 Patina 8 Rural Connectivity 8/20 Patina 2 - - 0.60 0.75 0.99 1.74 497

3298 12 Patina 8 Rural Connectivity 8/21 Patina 2 - - 0.50 0.75 0.99 1.74 497

3299 12 Patina 8 Rural Connectivity 8/22 Patina 2 - - 1.06 1.05 0.88 1.94 696

3300 12 Patina 8 Rural Connectivity 8/23 Patina 2 - - 1.00 1.05 0.88 1.94 696

3301 12 Patina 8 Rural Connectivity 8/24 Repair of Road from Anup Janar Gali Patina 2 - - 1.00 1.05 0.88 1.94 696

3302 12 Patina 8 Rural Connectivity 8/25 Repair of Road from Jayanta Jana Gali Patina 2 - - 1.20 1.05 0.88 1.94 696

3303 12 Patina 8 Rural Connectivity 8/26 Repair of Road from Shit Para Gali Patina 2 - - 1.30 1.05 0.88 1.94 696

3304 12 Patina 8 Rural Connectivity 8/27 Repair of Road from Matilal Jana Gali Patina 2 - - 1.40 1.05 0.88 1.94 696

3305 12 Patina 8 Rural Connectivity 8/28 Patina 2 - - 1.20 1.05 0.88 1.94 696

3306 12 Patina 8 Rural Connectivity 8/29 Patina 2 - - 0.80 0.98 1.08 2.06 646

3307 12 Patina 8 Rural Connectivity 8/30 Patina 2 - - 1.00 0.98 1.08 2.06 646

3308 12 Patina 8 Rural Connectivity 8/31 Repair of Road Ghaga hat to Rajpahari Patina 2 - - 1.00 0.98 1.08 2.06 646

3309 12 Patina 8 Rural Connectivity 8/32 Patina 2 - - 1.50 1.35 0.78 2.14 895

3310 12 Patina 8 Rural Connectivity 8/33 Patina 2 - - 1.00 0.98 1.08 2.06 646

3311 12 Patina 8 Rural Connectivity 8/34 Patina 2 - - 1.00 0.98 1.08 2.06 646

3312 12 Patina 8 Rural Connectivity 8/35 Patina Fulboni Fulboni 4 - - 2.00 1.35 0.78 2.14 895

3313 12 Patina 8 Rural Connectivity 8/36 Patina Fulboni Fulboni 4 - - 2.00 1.35 0.78 2.14 895

3314 12 Patina 8 Rural Connectivity 8/37 Patina Fulboni Fulboni 4 - - 2.00 1.35 0.78 2.14 895

3315 12 Patina 8 Rural Connectivity 8/38 Repair of Road Fulboni Danga Patina Fulboni Fulboni 4 - - 1.00 0.98 1.08 2.06 646

3316 12 Patina 8 Rural Connectivity 8/39 Repair of Road Nichu Adibasi para Patina 17 - - 1.00 0.98 1.08 2.06 646

Connectivity Road from Baraghati to Fulardihi

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Connectivity Road from Chamarband PMGSY to Bipra prasad dahi

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Connectivity Road from Tantidanga to Dompara

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Connectivity Road from Pahar Baskey house to Damodarpur pukur

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Connectivity Road from Ghaga paschim para

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Connectivity Road from Ghaga SSK to NabaRana house

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Connectivity Road from Bihankuriya Jharthan to Majna danga

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Repair of Road from Harihar Gharmajhi Gali

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Repair of Road Ghaga hattala to Gopalband

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Repair of Road Chamarband Tower to Ghaga hat

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Repair of Road Ghaga hat to Damodarpur Dabati

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Repair of Road Kaliyadanga chak to Damodarpur Madhab murmu chak

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Repair of Road Damodarpur Dabati to Kumbhakar para

Damodarpur

Damodarpur

17th Feb'14

Nov Dec

Connectivity Road from Fulboni sitla mandir to Farest office

17th Feb'14

Nov Dec

Connectivity Road from Taldangra to fulboni battala chak

17th Feb'14

Nov Dec

Connectivity Road from Fulboni sitla mandir to Mrityunjoy Khilari house

17th Feb'14

Nov Dec

17th Feb'14

Nov Dec

Chamarband

Chamarband

17th Feb'14

Nov Dec

Page 247: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

247/248

____________________________________________________________________________________________________________________________________________________________________________MGNREGS/Pa.Medinipur

MGNREGA Annual Action Plan of Paschim Medinipur District for the year 2014-15

(Rs. In lakh) Name of Block : NayagramSector name Scheme name Location Details Unit Estimated Cost Date of

Plot No. Hect KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Programme Implementing Agency : Gram Panchayats as follows under col.3Sl. No.

GP_cd

Gram Panchayat

Sect_cd

Sch_sl

Person days to be generated

Estimated

outcome

Panchayat

Sansad name

Name of Revenue Mouza

J.L. No.

Ownership of Land

PL /

IL

000 cu.m.

Unskilled wage

Other cost

Total cost

Proposal

Work Start

3317 12 Patina 8 Rural Connectivity 8/40 Patina 17 - - 1.00 0.98 1.08 2.06 646

3318 12 Patina 8 Rural Connectivity 8/41 Patina 17 - - 1.00 0.98 1.08 2.06 646

3319 12 Patina 8 Rural Connectivity 8/42 Patina 17 - - 1.00 0.98 1.08 2.06 646

3320 12 Patina 8 Rural Connectivity 8/43 Patina 17 - - 1.00 0.98 1.08 2.06 646

3321 12 Patina 8 Rural Connectivity 8/44 Patina 7 - - 0.50 1.35 0.78 2.14 895

3322 12 Patina 8 Rural Connectivity 8/45 Patina 9 - - 1.20 1.05 0.88 1.94 696

3323 12 Patina 8 Rural Connectivity 8/46 Patina 9 - - 1.20 1.05 0.88 1.94 696

3324 12 Patina 8 Rural Connectivity 8/47 Patina 9 - - 1.20 1.05 0.88 1.94 696

3325 12 Patina 8 Rural Connectivity 8/48 Patina 9 - - 1.20 1.05 0.88 1.94 696

3326 12 Patina 8 Rural Connectivity 8/49 Patina Singdui Bansiyavol 11 - - 1.20 1.05 0.88 1.94 696

3327 12 Patina 8 Rural Connectivity 8/50 Patina Fulboni Fulboni 4 - - 1.20 1.05 0.88 1.94 696

3328 12 Patina 8 Rural Connectivity 8/51 Patina Fulboni Fulboni 4 - - 1.20 1.05 0.88 1.94 696

- - - 50.29 49.60 99.89 33307

3329 12 Patina 9 9/1 Bharat Nirman Sebha Kendra Patina Patina Patina 6 - - - 4.53 5.47 10.00 3000

- - - 4.53 5.47 10.00 3000

Patina Total - - - 511.05 111.83 622.88 338441Grand Total - - - 5701.86 2464.91 8166.77 3776066

Repair of Road fromChamar band Mahadeb mandir

Chamarband

Chamarband

17th Feb'14

Nov Dec

Repair of Road from Mohan Tudu house to Rukhni football Ground

Chamarband

Chamarband

17th Feb'14

Nov Dec

Repair of Road from PMGSY to Tuniya buri

Rangamatia

Rangamatia

17th Feb'14

Nov Dec

Repair of Road from Rangamatiya gramin road

Rangamatia

Rangamatia

17th Feb'14

Nov Dec

Repair of Road from Nichu patina 2 nos Ghati

Rangamatia

Nichu patina

17th Feb'14

Nov Dec

Repair of Road from Jelepara to Tilok matiya

Rangamatia

Rangamatia

17th Feb'14

Nov Dec

Repair of Road from Chakradhar Jana house to Kaluya sanda

Rangamatia

Rangamatia

17th Feb'14

Nov Dec

Repair of Road from Subarnarekha nadipar

Rangamatia

Rangamatia

17th Feb'14

Nov Dec

Repair of Road from Kendudhar to Subarnarekha

Rangamatia

Rangamatia

17th Feb'14

Nov Dec

Repair of Road from Bansiyavol to Darimara

17th Feb'14

Nov Dec

Repair of Road from Fulboni Chak to Ghaga chok

17th Feb'14

Nov Dec

Repair of Road from Temathani Near Mohuliya Briz

17th Feb'14

Nov Dec

Rural Connectivity TotalConstruction of BNRGSK

17th Feb'14

Nov Dec

Construction of BNRGSK Total

Page 248: €¦ · XLS file · Web view2014-06-10 · Excavation of Pehara Bandh 4/6 Excavation of Bahara Bandh 4/7 Excavation of Kama Hembram's Pond 4/8 nichu patina 4/9 Excavation of Bhuna

MGNEGS/Pa.Medinipur

MGNREGA Annual Action Plan of Panchayat Samiti & Gram Panchayats of Nayagram Block for the Year 2014-15

(Sectoral Outlay)(Rs.in lakh)

Num

ber

of S

chem

es

Dro

ught

Pro

ofin

g

Mic

ro Ir

riga

tion

Wor

ks

Lan

d D

evel

opm

ent

Floo

d C

ontr

ol &

Pro

tect

ion

Con

stru

ctio

n of

BN

RG

SK

Agr

icul

ture

rel

ated

wor

ks

Liv

esto

ck r

elat

ed w

orks

Rur

al S

anita

tion

rela

ted

wor

ks Total Estimated Cost

No.

of J

ob C

ard

Issu

ed

Total cost

Gram Panchayat

01 Arrah 174 74.68 141.45 41.50 - 132.60 114.84 5.93 297.93 10.00 - 19.80 1.00 10.80 597.71 252.82 850.53 3.96 3007

02 Baligeria 203 92.09 48.84 11.62 - 67.73 8.96 9.76 143.77 - - - - 10.80 277.33 116.24 393.57 1.84 2983

03 Barakhankri 345 80.72 120.62 54.09 - 106.63 153.41 80.64 147.78 10.00 - - 2.80 83.70 570.58 269.79 840.37 3.78 2464

04 Baranigui 135 47.48 22.75 34.54 - 65.28 26.11 10.39 136.95 - - - 20.70 - 270.36 93.84 364.20 1.79 1987

05 Berajal 281 25.80 61.92 25.62 - 127.30 79.53 258.27 282.93 - - - - 10.80 576.57 295.60 872.17 3.82 2049

06 Chandabila 532 86.53 131.17 113.88 36.26 114.75 211.98 89.73 392.20 - - - - - 750.40 426.09 1176.49 4.97 2518

07 Chandrarekha 97 33.43 85.92 8.61 - 66.82 11.56 11.18 62.76 - 4.50 - - - 192.63 92.15 284.78 1.28 1606

08 Jamirapal 152 45.80 17.61 23.34 - - 55.29 - 209.21 - - - - 40.50 281.32 110.43 391.75 1.86 1879

09 Kharikamathani 265 110.13 73.58 13.62 6.34 106.12 82.82 46.44 186.51 - - - - 10.80 460.63 175.74 636.37 3.05 3937

10 Malam 646 90.21 31.31 18.94 - 181.40 283.01 84.06 480.56 - - - - - 802.03 367.45 1169.48 5.31 2107

11 Nayagram 215 53.45 74.48 14.79 - 71.52 53.02 59.84 183.61 - - - - 53.46 411.24 152.93 564.17 2.72 2640

12 Patina 282 64.72 67.63 61.30 24.28 60.03 196.98 38.04 99.89 10.00 - - - - 511.05 111.83 622.88 3.38 1924

GP_Total 3327 805.03 877.28 421.84 66.88 1100.19 1277.51 694.28 2624.09 30.00 4.50 19.80 24.50 220.86 5701.86 2464.91 8166.77 37.76 29101

27 PS 817 282.84 1124.12 302.29 - 688.07 110.86 310.75 2731.56 - - - 15.91 - 2820.68 2745.70 5566.38 18.68 -

Block 4144 1087.87 2001.40 724.13 66.88 1788.25 1388.37 1005.03 5355.64 30.00 4.50 19.80 40.41 220.86 8522.54 5210.61 13733.15 56.44 29101

Annual Action Plan, 2014-15 is prepared as per Unskilled wage rate Rs.151/-

GP/

PS_cd

Panchayat Samiti/Gram

Panchayat

Wat

er c

onse

rvat

ion

& W

ater

ha

rves

ting

Irri

gatio

n fa

cilit

ies t

o la

nd

owne

d by

SC

/ST

, ben

efic

iari

es,

etc.

Ren

ovat

ion

of T

radi

tiona

l Wat

er

Bod

ies

Rur

al C

onne

ctiv

ity  

Rur

al d

rink

ing

wat

er r

elat

ed

wor

ks

Pers

onda

ys to

be

gene

rate

d (la

kh)

Unskilled wage

Other cost