- weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · s’core @...
TRANSCRIPT
![Page 1: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/1.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 1
F.M. Test Paper 1
Time: 40 Min Total marks: 20
Chapter → Vertical Statement (F.M.)
Instructions: All Questions are compulsory.
(Q.1) Concept Testing. (2 concepts of 5 marks each = 10 marks)(a) What is working Capital? (b) Advantage of Vertical Balance Sheet.
Q.2) Mahavir Ltd.
Balance Sheet as on 31.03.09
Liabilities Rs. Assets Rs.Equity share capitalReserves6% debenturesCurrent liabilitiesBank overdraftFixed deposit repayable within one year
6,00,0002,00,0005,00,0002,00,000 50,000
50,000
Fixed AssetsStockMarketable investmentsDebtorsCash & Bank balancesPreliminary expenses
9,00,0003,00,0001,00,0001,50,0001,00,000 50,000
16,00,000 16,00,000
Prepare Vertical Balance Sheet. (10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 2: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/2.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 2
F.M. Test Paper 2
Time: 30 Min Total marks: 15
Chapter → Vertical Statement (F.M.)
Instructions: All Questions are compulsory.
(Q.1) Concept Testing. (1 concepts of 5 marks)(a) Debt vs Equity Q.2) The following is the balance sheet of X Ltd.
As at 31.3.2009(Rs.)
12,00,0003,20,00050,00010,000
7,00,0004,00,0002,00,0001,20,000
LiabilitiesShare CapitalProfit & loss accountSecured loansUnclaimed dividendBank overdraftSundry creditorsProvision for taxesProposed dividend
30,00,000
18,60,000 7,00,000
AssetsFixed AssetsLess: Provision for depreciation
11,60,00050,000
6,00,0008,60,000 30,0003,00,000
Investment in L&T Ltd. StockSundry debtorsPrepaid expensesCash & Bank balance
30,00,000
Prepare Vertical Balance Sheet & comment on financial position.(10 Marks)
S’COrE CAT-CET Features-
150 hours of Training. 15 Full Length practice test with analysis. Actual CAT-CET questions discussion in class. Special workshop for speed building. Extra attention on CET preparation & practice paper. Best faculty from the industry.
![Page 3: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/3.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 3
F.M. Test Paper 3
Time: 60 Min. Total marks: 30Instructions: All Questions are compulsory.
(Q.1) Concept Testing. (1 concepts of 5 marks)(a) Window dressing of financial statement.
(Q.2) From the following trail Balance of Jyoti Ltd. As on 31st March, 2004, prepare Vertical Revenue statement for the year ended 31st March, 2004 and vertical Balance Sheet as on that date after making the necessary adjustments:
(10 marks)Particulars Debit Rs. Credit Rs.
12,00,000
17,00,000 9,00,000
3,50,000 1,20,000 1,80,000 75,000 35,000 2,00,000 5,00,000
20,000 60,000
50,000
3,20,000 2,00,000
11,00,000
37,00,000
8,50,000 20,00030,00,000
40,000
1,20,000
1,00,000
(1) Equity Share Capital(2) Plant and Machinery(3) Sales(4) Purchases(5) Sundry Debtors(6) Sundry Creditors(7) Wages(8) Opening Stock(9) Salaries(10) Advertisement(11) Telephone Charges(12) Furniture(13) Investment (Long Term)(14) Interest Received(15) Loss on Sale of Furniture(16) Commission(17) Profit and Loss A/c(18) Interim dividend(19) General Reserve(20) Cash at Bank(21) Bill Receivable
TOTAL 59,10,000 59,10,000
Adjustment :i) Stock on 31st March, 2004 was valued at Rs. 3,00,000.ii) Make provision of Rs. 3,00,000 for Income Tax.iii) Depreciate plant and machinery @ 20% and furniture @ 10%.
(Q.3) Operating Leverage Vs Financial Leverages. (5 Marks)
(Q.4) Sales Rs.20,000, Variable cost 50% fixed cost Rs.2,000 & 10% term loan of Rs. 10,000. Calculate Leverage Ratios. (10 Marks)
![Page 4: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/4.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 4
F.M. Test Paper 4
Time: 20 Min. Total marks: 10
Instructions: All Questions are compulsory.
(Q.1) You are given the following Information of MR Ltd. Prepare Vertical Statement.
Trail Balance As on 31-12-07 (10 marks)
Particulars Debit Rs. Credit Rs.
25,50,000 8,00,000 3,00,000 5,00,000 1,00,000
15,00,000 3,00,000 3,70,000
1,10,000
3,00,000 20,00030,00,000
7,44,000
20,00,000 4,66,000
(1) Land & Building(2) Machinery(3) Furniture(4) Debtor(5) Cash and Bank Balance(6) Creditor(7) Outstanding Expenses(8) Sales(9) Purchases(10) Opening Stock(11) Administrative Expenses(12) General Reserve(13) Selling Expenses(14) Share Capital(15) Unsecured Loan
TOTAL 65,30,000 65,30,000
Additional Information :Closing Stock as on 31-12-2007 was Rs. 4,00,000.
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 5: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/5.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 5
F.M. Test Paper 5Time: 20 Min. Total marks: 10
Instructions: All Questions are compulsory.
(Q.1) Why are common size Statements, so called ? (5 Marks)
(Q.2) Prepare a common size Balance Sheet of M/s. Ram Ltd. in vertical form from following information.
Balance As at 31-03-2003 (10 marks)Rs.
Land & Building 6,00,000Plant & Machinery 5,00,000Equity Capital 5,00,000Preference Capital 2,00,000Stock 2,40,000Debtors 2,00,000Cash & Bank 55,000Miscellaneous Current Assets 5,000Profit & Loss A/C (Cr. Bal.) 2,00,000General Reserve 1,00,000Sundry Creditors 80,000Bills Payable 60,000Miscellaneous Current Liabilities 60,000Debentures 4,00,000
Results for MBA-CAT & CET
Congratulations!!!
Ojas Doshi (MDI Gurgaon)Shrijit Pillai (MDI Gurgaon)Shreya Premkumar (TISS-Best MBA College for HR)Anupam Ghadekar (TISS-Best MBA College for HR)Arun Kaimal (TISS-Best MBA College for HR)Dhruv Sanghvi (JBIMS)Sagar Shah (JBIMS)Vinay Nair (JBIMS)Chirag Ghada (JBIMS)Ankit Dhadda (NMIMS and Call from IIM - A)Rashank Lalan(PUMBA)
![Page 6: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/6.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 6
F.M. Test Paper 6Time: 30 Min. Total marks: 15
Instructions: All Questions are compulsory.
(Q.1) Advantages of Common size Statements (5 Marks)(Q.2) From the following Profit and Loss Account information for year ending 2008 and 2009, prepare Common Size Statement. Arrange information in Vertical Form suitable for analysis:
(10 marks)
Particulars 2008 Rs. 2009 Rs.SalesClosing StockOpening StockPurchasesWagesManufacturing ExpensesAdministrative ExpensesSelling & Distribution ExpensesLoss on Sale of FurnitureInterest on DebenturesProfit on Sale of Shares
10,00,0002,50,0001,50,0003,00,0002,00,0001,00,000
50,00050,00025,00010,00050,000
15,00,0003,00,0002,50,0004,50,0003,00,0001,50,000
50,00075,000
-10,000
-
Results for MBA-CAT & CET
Congratulations!!!
Ojas Doshi (MDI Gurgaon)Shrijit Pillai (MDI Gurgaon)Shreya Premkumar (TISS-Best MBA College for HR)Anupam Ghadekar (TISS-Best MBA College for HR)Arun Kaimal (TISS-Best MBA College for HR)Dhruv Sanghvi (JBIMS)Sagar Shah (JBIMS)Vinay Nair (JBIMS)Chirag Ghada (JBIMS)Ankit Dhadda (NMIMS and Call from IIM - A)Rashank Lalan(PUMBA)
![Page 7: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/7.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 7
F.M. Test Paper 7Time: 30 Min. Total marks: 15
Instructions: All Questions are compulsory.
(Q.1) Common Size V/S Comparative Statements ? (5 Marks)
(Q.2) Complete the following Comparative of DT Ltd. by ascertaining the missing balances and comment. (10 Marks)
Particulars 2008 Rs. 2009 Rs.Absolute
Increase or Decrease
% Increase
or Decrease
? ? (+) 4,00,000 + 25.00%
80,000 1,20,000 ? ?? ? (+) 2,00,000 + 20.00%
2,40,000 4,40,000 ? ?
(A) SalesCost of Goods SoldOpening StockPurchasesWagesLess: Closing Stock ? 1,60,000 ? ?
(B) Cost of Goods Sold ? ? ? ?? ? ? ?
? ? (+) 20,000 + 20.00%50,000 60,000 ? ?
(C) Gross Profit (A-B)Less : Operating expenses(a) Administrator(b) Selling(c) Finance ? ? (+) 4,500 + 22.50%
? ? ? ?? ? ? ?
20,000 1,00,000 ? ?? ? ? ?? ? ? ?
(D) Total Operating Expenses Net Operating Profit (C-D) Add: Non-Operating Income Net Profit Before Tax Less: Provision Tax Net Profit After Tax 2,10,000 2,35,500 ? ?
S’COrE Team for CAT-CET.
Pradip Mehta is a 1979 graduate of IIT Mumbai who has taught CAT and CET (formerly CWT) to IIM and JBIMS aspirants, GRE, GMAT & SAT to students wishing to study abroad, since 1992. He has worked for more than a decade in the US bringing first hand international experience.
Nikunj Doshi (Founder) is, an MBA (Finance), and a M.Com. He is, a UGC certified Faculty member at national Level. He has been associated, with various classes since 2004. He has taught more than 15,000 students
Nilesh Vaghani, has a masters in Analytical Chemistry from University of Mumbai and a Diploma in Business Management from Xaviers Institute of management. He has over 6 years of experience improving English Communication Skills of BBA and BCA students. In addition he has helped students improve their English scores in International competitive Examinations.
![Page 8: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/8.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 8
F.M. Test Paper 8
Time: 30 Min. Total marks: 15
Instructions: All Questions are compulsory.
(Q.1) What are Comparative, Common size and Trend Analysis Statements?
(5 Marks)
(Q.3) Calculate Trend Percentage from the following information extracted from the financial Statements of a limited Company. Give your appropriate comments:
(10 marks)
Particulars 2009 Rs. 2008 Rs. 2007 Rs. 2006 Rs.SalesCost of SalesExpensesInterestProfit before taxTaxProfit after taxFixed Assets (Net)Working CapitalLoansNet Worth
16,40114,978 89 503 831 394 437 5,489 5,085
? 6,691
13,64512,491 134 379 641 198 443 5,111 4,887
? 6,017
9,8848,813 58 206 807 455 3524,7773,298
?5,857
9,1127,432 45 101 1,534 820 714 4,486 2,773
? 5,954
The Economic Miracle, that is India, continues even while enduring the adverse Economic conditions around the Globe. The Miracle is sustained by the efforts of a highly competitive enterprise. We help our ambitious students sharpen their skills, and increase their knowledge base so as to achieve success at CAT, SNAP, NMAT, FMS, CET, XAT and enter the portals of reputed institutes like the I IM’s, XLRI, JBIMS, NMIMS, I IFT and many others.
![Page 9: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/9.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 9
F.M. Test Paper 9
Time: 30 Min. Total marks: 15
Instructions: All Questions are compulsory.
(Q.1) Liquidity Ratios (5 Marks)
(Q.2) X Ltd. and Y Ltd. are in the same line of business. Following are their Balance Sheets as on 31st December, 2003:
Balance Sheets as on 31st December, 2003 (10 marks)
Liabilities X Ltd. Rs.
Y Ltd. Rs.
Assets X Ltd. Rs.
Y Ltd. Rs.
7,00,0001,00,000 2,00,0001,20,000
40,000 20,000 35,000
2,00,0001,00,0005,00,000
70,00020,00020,00020,000
1,00,0002,50,000 5,00,0002,10,000
1,00,00 55,000
80,0002,00,000 3,00,000 1,10,0002,00,000
40,000
Equity Share CapitalReserve & Surplus12% DebenturesCreditorsBills PayableProposed DividendProvision for Tax
2,15,000 9,30,000
LandBuildingPlant & MachineryDebtorsStockCash and Bank
12,15,000 9,30,000
You are required to rearrange the Balance Sheets (in Vertical form) and calculate the following ratios for both the companies and comment thereon (any three)(a) Proprietory ratio, (b) Capital-Gearing ratio,(c) Current ratio, (d) Stock Working Capital ratio
(April. 03)
S’COrE Education is a professional coaching institute to coach for new generation courses.S’COrE has highly experienced faculty with enormous experience and achievement in teaching and industry. We teach each subject in such a manner that even complicated subject feels simple. This helps student to S’COrE-the-Max. Since 1998 S’COrE had university toppers accross courses and subjects. Once you are our student you will also believe S’COrE - the – Best !!
![Page 10: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/10.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 10
F.M. Test Paper 10
Time: 30 Min. Total marks: 15
Instructions: All Questions are compulsory.
(Q.1) Short term financial management ratios. (5 Marks)
(Q.2) Following financial statements are of XYZ Ltd. for 2004.
Trading and Profit and Loss A/c for the year ended 31st March, 2004. (10 marks)
Particulars Rs. Particulars Rs.70,000
15,00,000 2,50,000
16,60,0001,60,000
18,20,000 18,20,00036,00074,00040,00016,00094,000
2,50,000 10,000
To Opening StockTo PurchasesTo Gross Profit
To DepreciationTo Other ExpensesTo Tax ProvisionTo Proposed DividendTo Net Profit
2,60,000
By SalesBy Closing Stock
By Gross ProfitBy Commission
2,60,000
Balance Sheets as on 31st December, 2004
Particulars Rs. Particulars Rs.3,00,000
38,000 34,000
54,00040,00016,000
1,80,000
48,0001,60,0001,38,400
92,0001,28,600 20,000
60,00015,000
Share CapitalBank OverdraftCreditorsProvision of DepreciationProvision of TaxProposed DividendProfit & Loss A/c
6,62,000
CashStockDebtors Land and buildingMachineryGoodwillLoan and AdvancePreliminary Expenses
6,62,000
Re-arrange the above in a vertical form and also calculate:(a) Stock turnover ratio.(b) Debtors turnover ratio.(c) Creditors turnover ratio. (Oct. 04)
![Page 11: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/11.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 11
F.M. Test Paper 11
Time: 30 Min. Total marks: 15Instructions: All Questions are compulsory.
(Q.1) ‘Ratio Analysis is only tool of Analysis and not final decision’ Elucidate the statement . (5 Marks)(Q.2) Complete the following Balance Sheet from the information given below.Balance Sheets as on 31st December, 2004 (10 marks)
Liabilities Rs. Assets Rs.?
?4,00,000
?2,00,000
?
???
Equity Share Capital(of Rs.100 each)Reserve and Surplus10% DebenturesCurrent LiabilitiesSundry CreditorsOther Current Liabilities
?
Fixed AssetsCurrent AssetsStockDebtorsOther Current Assets
?
Following information is available:1) Sales for the year Rs. 48 lakhs.2) Gross Profit Ratio 25%3) Net Profit after tax Rs. 2,00,000.4) Purchases and sales on credit basis.5) Debtors Turnover Ratio 12 times (Sales / Debtors)6) Creditors Turnover Ratio 12 times (Cost of Sales / Creditors).7) E.P.S. Rs. 20 per share.8) Stock Turnover Ratio 10 times.9) Debt Equity Ratio 0.25: 1.10) Current Ratio 1.6: 1. (Apr. 04)
Ridhi Daftry
1stin University (07-08)1st in NM CollegeSEM 5 → 83%SEM 6 → 86%
Ritu Javeri (08-09)
NM CollegeF.M 95 / 100 (Ext. 57)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 12: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/12.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 12
F.M. Test Paper 12
Time: 30 Min. Total marks: 15
Chapter: Fund Flow Statement.
Instructions: All Questions are compulsory.
(Q.1) Process of determination of flow of funds. (5 Marks)
(Q.2) The following are the balance sheets of M/s, X Ltd. As on 31st March 2008 and 2009:
2008 Rs. 2009 Rs.
4,00,0001,00,000
79,3801,19,020
79,00067,56080,000
5,20,0001,00,000
82,440
82,27033,050
1,00,0009,24,960 9,17,760
2,97,0002,25,9002,22,0801,74,980
5,000
2,88,5002,32,4001,94,7401,46,720
5,40050,000
Liabilities:Share CapitalReservesProfit & Loss AccountBank OverdraftSundry CreditorsBill PayablesProvision for Taxation
TotalAssets:BuildingsMachineryStockSundry DebtorsCashGoodwill
Total 9,24,960 9,17,760The following additional information is given:
a. During 2009 an interim dividend of Rs.82,000 was paid.b. Assets of another company were purchased for a consideration of Rs.1,30,000
payable in fully paid shares of X Ltd. The following assets were purchased: Stock Rs.44,000; Machinery Rs.36,000.
c. Machinery was further purchased for Rs.11,200d. Income tax paid during the year amounted to Rs.60,000e. The net profit for the year before tax was Rs.2,25,060.
Prepare a Statement of Sources and Application of Funds for the year 2009 and a Schedule setting out the changes in working capital. (10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 13: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/13.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 13
F.M. Test Paper 13
Time: 30 Min. Total marks: 15
Chapter: Cash Flow Statement.
Instructions: All Questions are compulsory.
(Q.1) Distinguish Fund Flow Statement & Cash Flow Statement. (5 Marks)
(Q.2) The following are summarized balance sheets of Kevin India Ltd. As on 31 March, 2008 and 2009.
Particulars 2008 2009Liabilities (in Rs.) (in Rs.)
2,00,00050,00030,50070,000
1,50,00030,000
2,50,00060,00030,600
-1,35,200
35,000
Share CapitalGeneral reserveProfit and lossBank loan (Long term)Sundry creditorsProvision for taxation
5,30,500 5,10,800Assets 2008 2009
2,00,0001,50,0001,00,000
80,000500
--
1,90,0001,69,000
74,00064,200
8007,8005,000
Land and buildingsMachineryStockSundry debtorsCashBankGoodwill
5,30,500 5,10,800
Additional Information:During the year ended 31st March, 2009.i) Dividend of Rs.33,000 was paid.ii) Assets of another company were purchased for a consideration of Rs.50,000
payable in shares. The following assets were purchased: Stock – Rs.20,000 and Machinery – Rs.25,000.
iii) Machinery was further purchased for Rs.8,000.iv) Depreciation written off on machinery Rs.12,000v) Income-tax provided during the year was Rs.38,000.vi) Loss on sale of machinery Rs.200 was written off to general reserve.You are required to prepare a Cash Statement. (10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 14: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/14.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 14
F.M. Test Paper 14
Time: 30 Min. Total marks: 15
Chapter: Estimated of Working Capital.
Instructions: All Questions are compulsory.
(Q.1) Operating Cycle. (5 Marks)
(Q.2) Tasty Ltd. is presently operating at 50% level producing 30,000 packets of snacks foods and proposes to increase capacity utilization in the coming year to 75% level. The following data has been supplied:
i. Unit cost structure of the product at current level:Rs.
Raw Material 5Wages (Variable) 2Overheads (Variable) 2Fixed Overhead 1Profit 3Selling Price 13
ii. Raw materials will remain in stores for 1 month before being issued for production. Material will remain in process for further 1 month. Suppliers grant 3 months credit to the company.
iii. Finished goods remain in godown for 2 month.iv. Debtors are allowed credit for 3 months.v. Lag in wages and overhead payments is 1 month and these expenses accrue
evenly throughout the production cycle.vi. No increase either in cost of inputs or selling price is envisaged.
Prepare an estimate of working capital requirement at the new level, assuming that a minimum cash balance of Rs.80,000 has to be maintained.
(10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 15: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/15.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 15
F.M. Test Paper 15Time: 30 Min. Total marks: 15
Chapter: Capital StructureInstructions: All Questions are compulsory.
(Q.1) Optimum Capital Structure. (5 Marks)(Q.2) In considering the most desirable capital structure for a company, the following estimates of the cost of debt and equity capital (both after tax) have been made at various levels of financial leverage:
Debt as a percentage of total capital employed
Cost of Debt
Cost of equity
0 10 20 30 40 50 60
5% 5% 5% 5.5% 6% 6.5% 7%
12% 12% 12.50% 13% 14% 16% 20%
Advise the company of the optimal Debt Equity Mix on the basis of the Composite cost of capital. (5 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 16: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/16.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 16
F.M. Test Paper 16
Time: 30 Min. Total marks: 15
Chapter: Cash Budget.
Instructions: All Questions are compulsory.
(Q.1) Motives for Holding Cash. (5 Marks)
(Q.2) Prepare monthly forecast of cash for Raja Ltd. for the quarter ended 31st
December 2007 from the following information.
1. Opening balance as on 1st October 2008 Rs.52,000.2. The Budgeted and actual sales were Rs.1,00,000 each for August & September,
October Rs.1,20,000, November Rs.1,35,000 and December, Rs.1,40,000, 30% sales were for cash and out of the balance, 50% in subsequent month of sale and 50% in the second subsequent to the month of the sale.
3. Dividend on investments is being declared on 20th December 2007 amounting to Rs.800
4. Machinery sale in month of December 2007 Rs.25,0005. Materials worth Rs.40,000 each is being purchased in August and September,
50% of which is payable on 1st October 2008 and proposed purchases for Quarter October to December evenly spread-out is Rs.1,50,000. Vendors offer 5% discount for cash payments. It is decided to maintain cash balance at Rs.10,000 each month and the balance to be utilized for payment to vendors.
6. Wages are expected to be Rs.11,000 per month payable a month in arrear.7. Manufacturing expenses payable in the month incurred Rs.9,000 per month.8. General Selling expenses are expected to be Rs.5,000 per month.9. Machine costing Rs.40,000 is proposed to be purchased for cash in December.
(10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 17: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/17.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 17
F.M. Test Paper 17Time: 30 Min. Total marks: 15
Chapter: Receivable Management.Instructions: All Questions are compulsory.
(Q.1) 5 C’s in Credit Analysis. (5 Marks)
(Q.2) M / s. Bharat Industries Ltd. has annual credit sales of Rs. 24 lacs. Mr. Patil, the newly appointed Sales Manager has ambitious plans to increase the Sales and also the profitability of the Company.At present the sales price per unit is Rs. 30 and present age of accounts receivable is one month and variable cost is @50% and net profit is @20%.Mr. Patil has put forward the following two proposals before the management.Proposal I: Increase the credit period to debtors from one month to 3 months. The expected Sales would be Rs. 30 lacs. Chances of bad debt @ 2% of Credit sale.Proposal II: Reduce the Selling Price by 5% per unit. Expected Sales would be Rs.28.50 lacs. All cash sales no credit sale. Assuming that the cost of funds is 15% p.a., and other condition remaining same, which would you recommend? (10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 18: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/18.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 18
F.M. Test Paper 18
Time: 30 Min. Total marks: 15
Chapter: Leverage.
Instructions: All Questions are compulsory.
(Q.1) Concept Testing. (2 concepts of 3 mark each).a) Operating Leverage.b) Business Risk.
(Q.2) Mr. SRK has business opportunity to invest upto Rs.10 Lakhs, probable return is 30% on investment. If he borrows, he can invest Rs. 10 Lakhs but if he has to invest only his own money, he can invest Rs. 4 Lakhs only. Explain him the risk return mechanism in his options, based on Leverages.
[Case Study → 7 Marks]
(Q.3) Annual Production 5000 Units. Selling Price Rs 20 per Unit Variable cost Rs 10 per Unit
Situation A Situation BFixed Cost
Rs. 15,000 Rs.20,000
Capital Structure will have two Options
Option I Option II
Equity Rs. 2,00,000 Rs.1,50,000
10% Debt Rs. 1,00,000 Rs.1,50,000
Calculate DOL, DFL & DCL for:(i) Situation A – Option I(ii) Situation A – Option II(iii)Situation B – Option I (7 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 19: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/19.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 19
F.M. Test Paper 19
Time: 30 Min. Total marks: 15
Chapter: Leverage.
Instructions: All Questions are compulsory.
(Q.1) Types of Working Capital (5 Marks).
(Q.2) A Factory produces 96,000 units during the year and sells them for Rs. 50 per unit. Cost structure of a product is as follows:
Raw materials 60%Labour 15%Overheads 10%
85%Profit 15%Selling Price 100%
The following additional information is available.1. The activities of purchasing, producing and selling occur evenly throughout the
year.2. Raw materials equivalent to 1 month’s supply is stored in godown.3. The producing process takes 1 month.4. Finished goods equal to three month production are carried in stock.5. Debtors get 2 month’s credit.6. Creditors allow 1½ months credit.7. Time lag in payment of wages and overheads in ½ month.8. Cash and Bank Balance is to be maintained at 10% of the working capital.9. 10% of the sales are made at 10% above the normal selling price.
Draw a forecast of working capital requirements of the factory.(10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 20: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/20.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 20
F.M. Test Paper 20
Time: 30 Min. Total marks: 15
Chapter: Cash Flow Statement.
Instructions: All Questions are compulsory.
(Q.1) “Cash flow help to study liquidity / Cash management of Company” Comment.(5 Marks)
(Q.2) Following are the Balance Sheets of Young India Ltd.:
Liabilities 2002Rs. 2001Rs. Assets 2002Rs. 2001Rs.Share CapitalGeneral ReserveProfit & Loss A/c14% Debentures issued for purchase of fixed AssetsProposed Dividend
7,00,0002,00,0002,00,000
2,00,00080,000
6,00,0001,50,0001,00,000
NIL70,000
Fixed AssetsDebtorsStockCashUnderwriting Commission
6,50,0003,50,0002,50,0001,30,000
NIL
4,00,0002,00,0001,50,0001,00,000
70,000
13,80,000 9,20,000 13,80,000 9,20,000
Assuming the depreciation for the year to be Rs.50,000 and interim dividend paid during the year to be 20,000. Prepare Cash Flow Statement. (10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 21: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/21.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 21
F.M. Test Paper 21
Time: 30 Min. Total marks: 15
Chapter: Cash Flow Statement.
Instructions: All Questions are compulsory.
(Q.1) “Comparative Statement are more useful than commonsize statement” Comment. (5 Marks)
(Q.2) Complete the following trend statement. (10 Marks)
M/s. Tail Ltd.
Profit & Loss Accounts For the Year Ended 31st March.
Years2003 2002 2001
Base Year 2000No Particulars
Rs.(000) % Rs.(000) % Rs.(000) % Rs.(000) %2,0001,500
100?
?1.280
80100
??
120110
??
??
??
16
?50
?
?135
8
?90
?
???
?6040
??
10
???
?60
??
?120
?600
?40
??
??
??
??
??
??
??
??
??
??
??
?3
?30
??
?90
??
??
??
??
1. Sales.2. Cost of Goods Sold3. Trading Profit.4. Non-operating Income.5. Non-operating Expenses.6. Profit Before Interest &Tax(PBIT)7. Interest8. Profit Before Tax (PBT)9. Tax at 50% of PBT10. Profit After Tax (PAT)11. Dividend12. Net Earning ? ? ? ? 410 ? ? ?
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 22: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/22.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 22
F.M. Test Paper 22
Time: 30 Min. Total marks: 15
Chapter: Ratio Analysis.
Instructions: All Questions are compulsory.
(Q.1) Important ratios from investors point of view. (5 Marks)
(Q.2) From the following information, you are required to prepare a Balance – Sheet in Horizontal form:Current Ratio 1.75Liquid Ratio 1.25Stock Turnover Ratio 9times (Based on Closing Stock)Gross Profit Ratio 25%Debtor Collection Period 1.5 monthsReserves and surplus to share Capital 0.2Cost of Goods Sold to Fixed Assets 1.2Capital Gearing (Long term Loans to Share Capital) 0.6Fixed Assets to Shareholders Funds 1.25Sales for the year Rs. 12,00,000(All are on credit basis)
Current Assets consisted of Cash, Stock & Debtors only. The company has not issued pref. Shares. There are no Bank overdraft and Fictitious Assets.
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 23: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/23.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 23
F.M. Test Paper 23
Time: 30 Min. Total marks: 15
Chapter: Working Capital.
Instructions: All Questions are compulsory.
(Q.1) Risk return trade off in working capital Management. (5 Marks)
(Q.2) Chinmag is carrying on trading business in India and gives the following information.
1. Estimated Sales in a year Rs. 12,00,0002. His Administrative & Selling expenses are estimated as fixed expenses
Rs.2,000 per month and variable expenses equal to 5% of his turnover.3. He expects to fix sale price for each product which will be 25% in excess of his
cost of purchase.4. He expects to turnover his stock four times in the year.5. The sales and purchases will be evenly spread throughout the year. 20% of
sales will be on cash and balance on credit and allowed 2 months credit. He also expects one month credit from his suppliers.
6. Cash balance = Fixed and variable expenses for one month.Calculate his average working capital and prepare his income statement for the year.
(10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 24: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/24.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 24
F.M. Test Paper 24
Time: 30 Min. Total marks: 15
Chapter: Working Capital.
Instructions: All Questions are compulsory.
(Q.1) “During economics slowdown Solvency ratios are more important than profitability ratios.” Discuss
(5 Marks)
(Q.2) From the following information of M/s. Deepak Co. Ltd. prepare Balance Sheet with as many details as possible:
1. Current Ratio 2.5 : 12. Liquid Ratio 1.5 : 13. Working capital Rs. 1,20,000/-4. Bank overdraft Rs. 20,000/-5. Reserve and surplus Rs. 80,000/-6. Fixed Assets to proprietors fund 0.75 : 17. There is no long Term Loan and Investment and Fictitious Assets.8. Current Assets include only Stock. Debtors and Cash Balance in the ratio of
11:5:4 respectively(10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 25: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/25.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 25
F.M. Test Paper 25
Time: 30 Min. Total marks: 20
Chapter: Vertical Statement, Ratio Analysis, Working Capital.
Instructions: All Questions are compulsory.
(Q.1) (a) Classify the following accounts and state whether it is- (8 Marks)i. Current Asset
ii. Fixed Assetiii. Current Liabilityiv. Long Term Liabilityv. Shareholders Fund
vi. None of these1. Delivery truck2. Accounts payable3. Bills payable (90 days)4. Delivery expenses5. Equity capital6. Prepaid insurance7. Trade mark8. Short Term Investment9. Income tax payable10. Debenture redeemable after seven years.11. Tsunami relief fund deducted from employees salary12. Depreciation.
(b) Write short notes on: (3 X 4 = 12 Marks)i. Limitations of Ratio Analysis
ii. Working Capital Cycleiii. Trading on Equityiv. Window dressing of financial Statements.
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 26: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/26.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 26
F.M. Test Paper 26
Time: 30 Min. Total marks: 15
Chapter: Ratio Analysis.
Instructions: All Questions are compulsory.
(Q.1) Any three Activity ratios and its Significance (5Marks)
(Q.2) M/s Rajesh & Co. gives you the following information. Prepare trading and Profit & loss account for the year ended 31st March,2004 and balance sheet as on that date in as much detail as possible.Opening Stock Rs.90,000Stock Turnover Ratio 10 timesNet Profit Ratio on Turnover 15%Gross Profit Ratio on Turnover 20%Current Ratio 4 : 1Long Term Loan Rs. 2,00,000Depreciation on Fixed Assets @ 10% Rs. 20,000Closing Stock Rs. 1,02,000Credit period allowed by suppliers One monthAverage Debt collection period Two months
On 31st March,2004 Current Assets consisted of stock, debtors and cash only. There was no bank overdraft. All purchases were made on credit. Cash sales were 1/3rd of Credit sales.
(10 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 27: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/27.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 27
F.M. Test Paper 27Time: 40 Min. Total marks: 20
Chapter: Vertical Statement.Instructions: All Questions are compulsory.
(Q.1) (a) Classify the following accounts and state whether it is- (6 Marks)vii. Current Asset
viii. Fixed Assetix. Current Liabilityx. Long Term Liability
xi. Shareholders Fundxii. None of these
1. Delivery truck, 2. Accounts payable3. Bills payable (90 days), 4. Delivery expenses5. Equity capital, 6. Prepaid insurance7. Trade mark 8. Short Term Investment9. Income tax payable10 Debenture redeemable after seven years.11 Sunami relief fund deducted from employees salary12 Depreciation.
(b) Write short notes on: (4 Marks)1. Window dressing of financial Statements.
(Q.2) You are given the following information of ‘Dipak Ltd’. Prepare Vertical Financial Statements. Trial Balance as on 31/03/2008
Sr. No Account Head Debit Credit(Rs.) (Rs.)
1)2)3)4)5)6)7)8)9)10)11)12)13)14)15)16)17)18)19)20)
LandsMachinerySalaries and WagesSundry DebtorsBuildingSundry CreditorsGoodwillSales (Gross)Purchases (Gross)Return InwardsReturn OutwardsOpening StockAdministrative ExpensesReservesEquity Share CapitalBank Term LoanCash and Bank balancePrepaid expensesOutstanding expensesBank Overdraft
1,20,00085,00,00016,00,00020,00,00015,00,000
50,000
13,00,0001,00,000
5,70,0009,00,000
40,00010,000
40,00,000
88,00,000
2,00,000
21,00,00010,00,0005,00,000
16,00074,000
Total 1,66,90,000 1,66,90,000
Additional Information:1) Closing Stock on 31/03/2008 was Rs.6,00,000.2) Depreciate Machinery by 10% (10 Marks)
![Page 28: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/28.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 28
Time: 60 Min Total marks: 30
Chapter → FFS and Working Capital
Instructions: All Questions are compulsory.
Q.1 Concept Testing (1 concepts of 5 marks) 10 marks (a) Factors determining estimation of working capital (b) Distinguish between FFS and Balance Sheet
Q.2 A Statement of retained earnings of X Co. Ltd. is given below: 10 marks Rs.3,25,6006,48,480 25,4709,99,550 14,460 95,3704,70,3505,80,810
Balance retained earning, 1st January, 2005Add: Net profit after taxesTax Refund
Less: Loss on sale of Plant and machineryGoodwill written offDividends Paid
Balance of retained earnings, 31st December, 2005 4,19,370 Additional Information:
(a) Plant and machinery having a written- down value of Rs.54,360 was sold in October, 2005.
(b) Depreciation of Rs.68,250 has been deducted while arriving at net profit for the year.
(c) Plant and machinery was purchased during the year at a cost of Rs.1,60,000 but the payment was made in the firm of 8% debentures of Rs.100 each for the same.
(d) Rs.12,800 debentures have been redeemed during 2005. You are required to prepare a statement of sources and applications of funds for the year ended 31st
December, 2005.
Q.3 From the following Operating Cycle of Ambica Ltd. examine the short 10 marks term financing policy of the company and render your comments on the same.
Number of DaysParticulars Year 2003 Year 2004 Industry
Raw Material HoldingWork-in-Process StockFinished Goods InventoryAverage Collection PeriodAverage Payment Period
30 17 25 55 45
28 15 20 45 50
45 20 30 50 40
State assumptions if any, considered.
![Page 29: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/29.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 29
Time: 60 Min Total marks: 30
Chapter → Study of Finance Statement 1 & 2 and Ratio
Instructions: All Questions are compulsory.Q.1 Explain the following 12 Marks (a) Advantage of Vertical Statement (b) Financial stability ratios (c) Limitations of trend analysis.Q.2 You are given the following information of Tango Ltd. Prepare Common Size financial statements. 10 Marks
Trial Balance as on 31/03/2008Sr. No. Account Head Debit (Rs.) Credit (Rs.)
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)(11)(12)(13)(14)(15)(16)(17)(18)
Land and BuildingPlant and MachineryFurniture DebtorsCash and Bank balanceCreditorsOutstanding expensesSales (Gross)PurchasesOpening StockAdministrative ExpensesProfit and Loss A/cSelling and Distribution ExpensesShare CapitalSecured Loan Sales ReturnsGoodwillPreliminary Expenses
4,00,000 3,00,000 1,70,000 2,80,000 9,000
12,00,000 2,20,000 8,00,000
4,90,000
20,000 35,000 5,000
4,80,000 9,000 25,00,000
1,60,000
5,00,000 2,80,000
Total 39,29,000 39,29,000 Additional Information:(1) Closing Stock on 31/03/2008 was Rs.1,80,000.
Q.3 The Capital Gearing Ratio is 0.75 and Debt-Equity Ratio is 0.40. 8 Marks Equity capital of the company is Rs.3,00,000. Preference Share Capital is Rs.1,00,000. Find out the other items of the capital structure. Capital Structure: Rs. Equity Share Capital ___??_____ Reserves ___??_____ Preference Share Capital ___??_____ Loans ___??_____
TOTAL ??
![Page 30: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/30.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 30
Financial Management 60 Marks 2 Hours
Section I
1. Explain the following concepts: (3 marks each) 12 marks (a) Net Income Approach (b) Trading on Equity (c) Dividend (d) Entity Concept2. Case Study 9 Marks
Mr G would like to start his new business. He is planning to start a manufacturing plant. He needs total Rs 5 Crores while he has Rs 2 Crores. Explain him, risks and benefits of borrowing the balance the balance amount. Also make a checklist of documents and information that the bank ask from him for loan purpose.
3. Case Study 9 MarksStock Price today Rs 300Expected dividend after a year Rs 75Dividend expected to grow 5% per annumDebt equity proportion Debt 60% & balance equityInterest Rate 15% per annumTax 40%Total Capital Rs 1000 LakhAsset Leverage 2Asset Leverage 2P V Ratio ½Fixed Operation expenses Rs 100
a. Calculate Weighted Average Cost of Capital.b. Calculate Degree of Operating, financial and combine leverage.c. Explain risk and return on investment in this firm.
Section II Answer Any 3 10 Marks each
4. Discuss Profit maximization vs. Wealth Maximization.5. Compare merits & demerits of equity asa source of finance vis-à-vis those of debt
as a source of finance.6. What is financial management? Explain functions of finance manager.7. Equity Rs 500/- and Debt Rs 1,000/- Interest Rate is 10%. Sales Rs 4,500. Variable
cost is 2/3rd of sales. Fixed operating expenses Rs.500/-a. Calculate DoL, DfL and DcLb. Calculate RoI. Is financial leverage favorable?c. Calculate asset leverage. If industry average is 2, is this firm efficient?d. Calculate sales for PBT = 0
8. Expected overall return is 25%. Intrerest rate of debt is 10%. Tax rate 40%.a. As per Net Operating Income approach, what is available return to equity
shareholders if debt equity ratio is 2 : 1b. Shareholders expect the stock to reach price of Rs 50 after a year which is
Rs 40 today. This company is not likely to pay any dividend in near future. What is expected return by shareholders?
c. Observing a and b, would u say it is good investment?d. If debt equity ratio in (a) above is 1 : 1, would your answer change?
![Page 31: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/31.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 31
Financial Management 25 Marks 1 Hour
1) Explain the following concept:(a) Dividend (b) Financial Leverage. 6 Marks
2) Case Study 9MarksYour company has just grown to bigger size and would like to like to appoint a new finance manager. A shortlisted candidate has a meeting with you. Explain him his role and responsibilities in detail. Also tell how your company will reward him, based on his performance, in brief.
3) What is financial management? Explain Profit Maximization vs Wealth Maximization.
OR 10 Marks.
3) Original Capital Structure includes Equity Rs 340/- and Debt Rs 460/- Cost of Debt is 8% and cost of Equity is 24%. Calculate WACC.If this WACC remains constant, but cost of debt is 10%, what is return on equity?In the above (original) capital structure, if expansion plan is funded by 15% preference share of Rs 100, what will be WACC?
Genius is the ability to reduce complicated to simple… A. Einstein
F.M. Test Paper 32
![Page 32: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/32.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 32
Time: 1 Hr. Total marks: 30
Chapter: Capital Structure.
Instructions: All Questions are compulsory.
1. Explain the following concept (3 Marks)Net Income Approach
2. Case StudyA small port is to be developed at Dighi, near Alibaug. Investment is Rs. 100/-Crores. Promiters think, they can get Rs.40 Crores by public issue of Equity, which is free source of capital. Rest all way be their own funds & loans. Are they a right track? Give them your opinion.
3. a) What is trading on equity?b) What is WACC?c) Explain Total yield on equity.
4. Stock price today Rs240/- Expected divided Rs60/- Some time which will not grow some time.Capital Structure
Rs. LakhEquity 4008% Pref 10012% Debt 1000Tax@40%a) Calculate WACC at present.b) If expansion plan is undertaken them it will cost Rs.500/- Lack which will be
totally funded through 14% Debt. Dividend will then grow @ 5% p.a. [Stock price & expected dividend unchanged]. Calculate WACC on Expansion.
Genius is the ability to reduce complicated to simple… A. Einstein
F.M. Test Paper 33
![Page 33: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/33.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 33
Time: 1 Hr. Total marks: 30
Chapter: Source of Finance.
Instructions: All Questions are compulsory.
1. Concept Testing (2c x 5 Marks)= 10 Marksa. Objective of cash flow statementb. Short term source a finance
2. State 8 explain long term source of finance. 10 MarksXYZ
3. FFS for y.e. 31.03.09P Rs. (Crores)
→ Issue of share capital 100.00→ Bank Loan (10% Years) 500.00→ Funds from operations 200.00→ Interest on investment 50.00
850.00
Application of Funds Rs. (Crores)→ Increase in working capital 100.00→ Take our MTN Ltd. 600.00→ Prop divd paid 50.00→ Prov for tax paid 100.00
850.00
4. Convert FFS into CFS & comment on cash utilization/management 10 Marks
Genius is the ability to reduce complicated to simple… A. Einstein
F.M. Test Paper 34
![Page 34: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/34.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 34
Time: 1 Hr. Total marks: 20
Chapter: Capital Structure.
Instructions: All Questions are compulsory.
5. Explain the following concept (2c x 3 marks = 6 Marks)a. Wealth maximizationb. Motives for holding cash
6. State 8 explain function of finance manager. (10 marks)
7. A business wants to invests Rs.10 lakh, Suggest Investment avenves. (4 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein
![Page 35: - Weeblybmsproject.weebly.com/uploads/2/4/3/5/2435652/sem5fm_practise... · S’COrE @ BMS-BAF-BBI-CAT-CET 1 ... 15 Full Length practice test with analysis. Actual CAT-CET questions](https://reader031.vdocuments.mx/reader031/viewer/2022011801/5ae22e497f8b9a097a8c9903/html5/thumbnails/35.jpg)
www.scoreeducation.co.in
S’COrE @ BMS-BAF-BBI-CAT-CET 35
F.M. Test Paper 35
Time: 1 Hr. Total marks: 20
Instructions: All Questions are compulsory.8. Concept testing (2c x 3 marks = 6 Marks)
a. Wealth Maximisation.b. Acounting principles.c. Inter Corporate deposit.d. ADR & GDR.
2. Ms Radha has joined XY10 Ltd, as a finance manager. You being finance director explain her function of finance manager, which will help her fulfill job responsibilities.
(9 Marks)
3. Ms Rutika want to setup a project. Project cost Rs.50 crores (35 crores fixed Asset & 15 crores W. Capital). She wants to know from you possible sources of finance to set up the project. Please guide her. (9 Marks)
Genius is the ability to reduce complicated to simple… A. Einstein