· utiliza como sistema de recuperación de energía sip y turbinas pelton r. sánchez, j.m....
TRANSCRIPT
2/50
INDEX
A. About Us ................................................................................................................................ 3
B. Field of Activity ...................................................................................................................... 3
C. Published Articles .................................................................................................................. 4
D. References. Key Projects ....................................................................................................... 5
E. References. Project Engineering ......................................................................................... 11
F. References. Consulting ........................................................................................................ 39
G. Contact ................................................................................................................................ 50
3/50
A. About Us
Ecoagua is one of the main engineering and consulting companies in Spain which specialises in
desalination and water reuse.
We have a team of highly qualified professionals and accredited experience regarding the complete
engineering cycle of desalination plants, which enables us to undertake projects of all types and sizes in
relation to the market of desalination and reuse in all its stages: definition, design, bidding, construction,
assembly, implementation, operation, optimization and audit.
In Ecoagua we develop the design, the basic engineering, the supervision of the construction and the
assembly, the implementation of the installations with Reverse Osmosis, Multi-Stage Flash Distillation
(M.S.F), Multiple Effect Distillation (M.E.D.) and Ultrafiltration processes, both on the national and
international markets.
Among our clients there are government departments, private construction companies, banks, energy
companies, etc. Our work philosophy is based on a close collaboration with our clients, handling each
project according to its characteristics, analyzing it from different perspectives and finding the most
effective solutions.
Ecoagua is committed to research as a way of maintaining the high quality of our work. As a result of this
approach Ecoagua has become one of the engineering pioneers in desalination technology in Spain.
Our research works have been published in different specialized magazines and presented at several
congresses of the Spanish Desalination and Reuse Association (Aedyr) and of the International
Desalination Association (IDA).
B. Field of Activity
Ecoagua's main field of activity is the engineering and consulting of water treatment. We specialize in
seawater and brackish water desalination plants for human consumption, industry and irrigation and
reuse plants for water recycling.
Ecoagua specialises in seawater desalination plants and water reuse project engineering: preliminary
studies, preparing technical specifications for biddings, basic and detailed design, procurement
management, manufacturing inspection, construction supervision, commissioning supervision,
evaluation and optimization of operating plants and plant upgrades analysis.
Ecoagua relies on a vast experience in developing different projects in the water sector. As a specialized
engineering enterprise we offer consulting high value-added services: cost and investment feasibility
studies, technical feasibility studies, reports, due diligence, energy audits and management and
technical advisory services.
4/50
C. Published Articles
Our technoscientific research works have been published in a variety of magazines and presented at a
variety of congresses:
Uso de variadores de frecuencia en bombas de alta presión de plantas desaladoras
N. Sánchez, J.M. Sánchez, A. Dapueto. 4ª Congreso Latinoamericano de Desalación y Reúso de Agua.
Santiago de Chile (Chile). October 2014.
Modeling of brine discharges using both a pilot plant and differential equations.
J.I. Díaz, J.M. Sánchez, N. Sánchez, M. Veneros, D. Zarzo. IDA World Congress. Perth (Australia).
September 2011.
Brine Discharge Procedures to Minimize the Environmental Impact and Energy Consumption
R. Sánchez, J.M. Sánchez, N. Sánchez. IDA World Congress. Maspalomas (Gran Canaria). October
2007.
Mathematical Model for Isobaric Energy Recovery Devices
J.M. Sánchez, N. Sánchez, R. Sánchez. IDA World Congress. Maspalomas (Gran Canaria). October
2007.
Técnicas y procesos disponibles en la reutilización
J.M. Sánchez. IV Conferencia sobre Gestión del Agua, AQUA'07. Palma de Mallorca. February 2007.
Tecnologías de desalación: procesos de destilación
J.M. Sánchez. XII Máster Internacional de riego y drenaje, Centro Nacional de Tecnologías de Regadíos.
Madrid. May 2007.
Representación y comparación entre las curvas de operación de un modelo de Planta Desaladora que
utiliza como sistema de recuperación de energía SIP y Turbinas Pelton
R. Sánchez, J.M. Sánchez. VI Congreso Nacional de AEDyR. Palma de Mallorca. November 2006.
Actualización de Plantas Desaladoras en la Isla de Ibiza. Nuevo diseño del Proceso
M. Torres, B. Reus, N. Sánchez. VI Congreso Nacional de AEDyR. Palma de Mallorca. November 2006.
Mejora de la eficiencia energética de las plantas desaladoras: nuevos sistemas de recuperación de
energía
F. Martín, J.M. Sánchez. Ingeniería y territorio, ISSN 1695-9647, Nº. 72, pag. 74-79. 2005.
La desalación de aguas: su estado actual
J.M. Sánchez. SAM: Suport a la gestió ambiental d'activitats en el municipi, ISSN: 1139-4366, Nº. 11,
pag. 99-103. 2004.
Pasado, presente y futuro de la desalación
J.M. Sánchez. Curso de desalación: la desalación como solución a la escasez de agua, organizado por
el COI, La CEE y La Comunidad de Murcia. October 2004.
Download these and other articles from our website: www.ecoagua.com.
5/50
D. References. Key Projects
PROJECT
La Chimba Expansion Seawater Reverse Osmosis Desalination
Plant, Antofagasta (Chile)
CLIENT AGUAS DE ANTOFAGASTA
CAPACITY 25,920 m3/day (3 units)
SCOPE
Pretreatment trade-off study
Basic Engineering and Asset during construction engineering
Equipment request for quotation (RFQ)
Technical comparison of equipment offers
Technical assistance during both the erection and the start-up
Drawing up the operation manual of the desalination plant
YEAR 2014-2016
PROJECT
Mantoverde Seawater Reverse Osmosis Desalination Plant, Bahia
Flamenco (Chile)
CLIENT ANGLO AMERICAN CHILE. DIVISION MANTOVERDE
CAPACITY 10,368 m3/day
SCOPE
Feasibility study
Drawing up the technical requirements for the bidding process and revision of the
commercial requirements for the bidding process
Technical advice during the Environmental Impact Assessment (EIA)
Technical advice during the contract award process
Technical assistance during both the construction and the start-up
YEAR 2009-2014
6/50
PROJECT Honaine Seawater Reverse Osmosis Desalination Plant (Algeria)
CLIENT The joint venture company of GEIDA (BEFESA, COBRA, SADYT)
CAPACITY 200,000 m3/day (10 units)
SCOPE
First contract:
Complete water process design
Technical consulting during the equipment procurement and the plant construction
Second contract:
Drawing up the operation manual of the desalination plant
Advisory role during pre-commissioning, commissioning and start-up
YEAR 2007-2011
PROJECT
Tejina Valle Guerra Seawater Reverse Osmosis Desalination Plant in
Tenerife, Canary Islands (Spain)
CLIENT CONSEJO INSULAR DE AGUAS DE TENERIFE (TENERIFE GOVERNMENT
ADMINISTRATION)
CAPACITY 10,000 m3/day (4 units)
SCOPE Complete water process design of the plant
YEAR 2007-2008
7/50
PROJECT
South Antofagasta Seawater Reverse Osmosis Desalination Plant
(Chile)
CLIENT AGUAS DE ANTOFAGASTA
SCOPE
Feasibility analysis for the construction of a new desalination plant in Antofagasta
Desalination Plant Basic design for Environmental Impact Statement
CORMIX modeling of brine discharge and design of the discharge
Drawing up the technical requirements for the bidding process
YEAR 2006-2012
PROJECT
Campo de Dalias Seawater Reverse Osmosis Desalination Plant,
Almeria (Spain)
CLIENT The joint venture companies of VEOLIA WATER, VEOLIA AGUA, SANDO, INYPSA,
MONTAJES ELÉCTRICOS CRESCENCIO PÉREZ
CAPACITY 97,200 m3/day (9 units)
SCOPE
First contract
Basic and detailed design for the bidding process
Second contract
Complete water process design
Advisory role during the construction engineering
YEAR 2006-2010
8/50
PROJECT
Sant Joan Despi Brackish Water Reverse Osmosis Desalination
Plant, Barcelona (Spain)
CLIENT AIGÜES DE BARCELONA (AGBAR)
CAPACITY 206,000 m3/day (10 units)
SCOPE
Feasibility analysis for the construction of the desalination plant
Drawing up the technical requirements for the bidding process
Technical advice during the contract award process and the plant construction
process
YEAR 2006-2009
PROJECT Skikda Seawater Reverse Osmosis Desalination Plant (Algeria)
CLIENT The joint venture company of GEIDA (BEFESA, COBRA, SADYT)
CAPACITY 100,000 m3/day (5 units)
SCOPE
First contract
Basic and detailed design for the bidding process
Second contract
Complete water process design
Technical consulting during the equipment procurement and the plant
construction
Third contract
Drawing up the operation manual of the desalination plant
Advisory role during pre-commissioning, commissioning and start-up
YEAR 2005-2008
9/50
PROJECT Beni Saf Seawater Reverse Osmosis Desalination Plant (Algeria)
CLIENT The joint venture company of GEIDA (BEFESA, COBRA, SADYT)
CAPACITY 200,000 m3/day (10 units)
SCOPE
First contract:
Basic and detailed design for the bidding process
Second contract
Complete water process design
Technical consulting during procurement
YEAR 2005-2007
PROJECT
La Chimba Seawater Reverse Osmosis Desalination Plant
Antofagasta (Chile)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 13,000 m3/day (2 units). Future expansion to 52,000 m3/day (8 units)
SCOPE
Complete water process design
Technical management during the construction
Advisory role during the procurement process
Supervision during assembly, pre-commissioning, commissioning and start-up
YEAR 2001-2003
10/50
PROJECT
Lanzarote IV Seawater Reverse Osmosis Desalination Plant, Canary
Islands (Spain)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 20,000 m3/day (4 units)
SCOPE
Basic and detailed design for the bidding process
Complete water process design
Drawing up the Operation Manual of the desalination plant
Supervision during procurement, construction, pre-commissioning,
commissioning and start up
YEAR 2000
PROJECT
Las Palmas-Telde Multiple Effect Distillation (M.E.D.) Desalination
Plant, Canary Islands (Spain)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A. (Joint venture
company of INIMA, BABCOCK WILCOX ESPAÑOLA, LAIN y UNELCO)
CAPACITY 35,000 m3/day (2 units)
SCOPE
Basic and detailed design supervision
Technical consulting and commercial advise during procurement and construction
Supervision during pre-commissioning, commissioning and start-up
YEAR 2001-2005
11/50
E. References. Project Engineering
PROJECT
Jeddah IV Seawater Reverse Osmosis Desalination Plant, Saudi
Arabia
CLIENT ACCIONA
CAPACITY 404,000 m3/day (20 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2016
PROJECT Barka 4 Seawater Reverse Osmosis Desalination Plant, Oman
CLIENT GS INIMA-ACCIONA-GS E&C-OMAN INVESTMENT CORPORATION
CAPACITY 281,000 m3/day (11+1 units)
SCOPE Basic and detailed design for the bidding process (BOOT)
YEAR 2015
12/50
PROJECT Sohar 3 Seawater Reverse Osmosis Desalination Plant, Oman
CLIENT GS INIMA-ACCIONA-GS E&C-OMAN INVESTMENT CORPORATION
CAPACITY 250,750 m3/day (10+1 units)
SCOPE Basic and detailed design for the bidding process (BOOT)
YEAR 2015
PROJECT Ras Laffan Seawater Reverse Osmosis Desalination Plant, Qatar
CLIENT GS INIMA-TECNICAS REUNIDAS-GS E&C
CAPACITY 159,100 m3/day (7+1 units)
SCOPE Basic and detailed design for the bidding process (BOOT)
YEAR 2014
13/50
PROJECT Qurayyat Seawater Reverse Osmosis Desalination Plant, Oman
CLIENT EPTISA
CAPACITY 200,000 m3/day (8 units)
SCOPE Basic and detailed design for the bidding process (BOOT)
YEAR 2014
PROJECT Tocopilla Seawater Reverse Osmosis Desalination Plant, Chile
CLIENT AGUAS DE ANTOFAGASTA
CAPACITY 17,280 m3/day
SCOPE Study of the brine plume discharged using the software CORMIX
YEAR 2014
0 5 10510
05
25,8gr/L
75%
20gr/L
58%
15 gr/L
43%
10gr/L
29%
7,5gr/L
22%
5 gr/L
14%
2,5 gr/L
7,2%
0,866gr/L
2,5%
0 gr/L
0%
INCREMENTO DE LA SALINIDAD SOBRE LA DEL MEDIO MARINO
14/50
PROJECT Basra Brackish Water Reverse Osmosis Desalination Plant, Iraq
CLIENT WABAG
CAPACITY 199,000 m3/day (14 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2013
PROJECT
La Chimba Seawater Reverse Osmosis Desalination Plant,
Antofagasta (Chile)
CLIENT AGUAS DE ANTOFAGASTA
CAPACITY 73,440 m3/day (11 units)
SCOPE Study of the brine plume discharged using the software CORMIX
YEAR 2013
15/50
PROJECT
Los Pericues Seawater Reverse Osmosis Desalination Plant, Punta
Arena (Mexico)
CLIENT OHL DESARROLLOS
CAPACITY 9,945 m3/day (3 units)
SCOPE
Preliminary design of the Desalination Plant
Study of the brine plume discharged using the software CORMIX
YEAR 2012
PROJECT Seawater Reverse Osmosis Desalination Plant of a Steel Plant
CLIENT HIDROAMBIENTE
CAPACITY 26,400 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2012
16/50
PROJECT
IDAS-II Melilla Brackish Water Reverse Osmosis Desalination Plant
(Spain)
CLIENT AQUALOGY
CAPACITY 7,000 m3/day (2 units)
SCOPE Basic and detail engineering for the construction of the desalination plant
YEAR 2011-2012
PROJECT Formentera Seawater Reverse Osmosis Desalination Plant, Balearic
Island (Spain)
CLIENT BALEARIC ISLANDS GOVERNMENT
CAPACITY 4,900 m3/day (2 units)
SCOPE Study of the expansion and improvement of the desalination plant
YEAR 2012
17/50
PROJECT
Al Wasia Brackish Reverse Osmosis Desalination Plant (Saudi
Arabia)
CLIENT ACCIONA WATER
CAPACITY 300,000 m3/day (5 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2011
PROJECT Nungua Seawater Reverse Osmosis Desalination Plant (Ghana)
CLIENT ABEIMA
CAPACITY 60,000 m3/day (4 units)
SCOPE Preliminary project for bank financing
YEAR 2011
18/50
PROJECT Castilla-MPX Seawater Reverse Osmosis Desalination Plant (Chile)
CLIENT ENFIL
CAPACITY 65,000 m3/day (4 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2011
PROJECT Taltal Seawater Reverse Osmosis Desalination Plant (Chile)
CLIENT AGUAS DE ANTOFAGASTA
CAPACITY 432 m3/day (1 unit)
SCOPE Design optimization for construction
YEAR 2011
19/50
PROJECT
Feasibility study of the construction of a desalination plant as part of
Meghaier Project Hybrid Solar-Gas, Electricity and Water (Algeria)
CLIENT SOCOIN
CAPACITY 122,000 m3/day (6 units)
SCOPE
Feasibility study of the desalination plant
Preliminary project for the bidding process
Technical specification for the bidding process
YEAR 2010-2011
PROJECT Candelaria Seawater Reverse Osmosis Desalination Plant (Chile)
CLIENT CADAGUA
CAPACITY 30,000 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2010
20/50
PROJECT Lanzarote V Seawater Reverse Osmosis Desalination Plant (Spain)
CLIENT CANARY GOVERNMENT ADMINISTRATION
CAPACITY 24,000 m3/day (4 units)
SCOPE Preliminary project for the bidding process
YEAR 2009
PROJECT
San Pedro del Pinatar Seawater Reverse Osmosis Desalination Plant
(Spain)
CLIENT FACSA
CAPACITY 65,000 m3/day (9 units)
SCOPE Tender project for the operation bidding of the plant
YEAR 2009
21/50
PROJECT Formentera Seawater Reverse Osmosis Desalination Plant (Spain)
CLIENT BALEARIC ISLANDS GOVERNMENT ADMINISTRATION
CAPACITY 4,000 m3/day (3 units)
SCOPE Preliminary project for the bidding process of the Formentera SWRO plant
upgrade
YEAR 2010
PROJECT
Delma Island Seawater Reverse Osmosis Desalination Plant (Abu
Dhabi)
CLIENT CADAGUA
CAPACITY 12,500 m3/day
SCOPE Basic and detailed design for the bidding process
YEAR 2008
22/50
PROJECT
Oropesa Seawater Reverse Osmosis Desalination Plant, Castellon
(Spain)
CLIENT SADYT
CAPACITY 48,750 m3/day (6 units). Future expansion to 65,000 m3/day (8 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2007
PROJECT
Moncofar Seawater Reverse Osmosis Desalination Plant, Castellon
(Spain)
CLIENT SADYT
CAPACITY 30,000 m3/day (3 units). Future expansion to 60,000 m3/day (6 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2007
23/50
PROJECT
Sagunto Seawater Reverse Osmosis Desalination Plant, Valencia
(Spain)
CLIENT CADAGUA
CAPACITY 24,000 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2007
PROJECT
Son Ferrer and Camp de Mar Seawater Reverse Osmosis
Desalination Plants, Mallorca (Spain)
CLIENT AGBAR
CAPACITY 5,500 m3/day and 2,500 m3/day
SCOPE Basic and detailed design for the bidding process
YEAR 2007
24/50
PROJECT
Eivissa Seawater Reverse Osmosis Desalination Plant, Balearic
Islands (Spain)
CLIENT AGENCIA BALEAR DE L’AIGÜA I DE LA QUALITAT AMBIENTAL (BALEARIC
GOVERMMENT)
CAPACITY 12,000 m3/day (2 units)
SCOPE Preliminary project for the bidding process of the Eivissa SWRO plant upgrade
YEAR 2006
PROJECT
Sant Antoni de Portmany Seawater Reverse Osmosis Desalination
Plant, Balearic Islands (Spain)
CLIENT AGENCIA BALEAR DE L’AIGÜA I DE LA QUALITAT AMBIENTAL (BALEARIC
GOVERMMENT)
CAPACITY 17,500 m3/day (4 units)
SCOPE Preliminary project for the bidding process of the Sant Antoni SWRO plant
upgrade
YEAR 2006
25/50
PROJECT
Aguilas Guadalentin Seawater Reverse Osmosis Desalination Plant,
Murcia (Spain)
CLIENT SADYT (the contract for the Aguilas Guadalentin facility was awarded to the joint
venture company of SADYT and CADAGUA)
CAPACITY 120,000 m3/day (8 units). Future expansion to 180,000 m3/day (12 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2006
PROJECT
Bajo Almanzora Seawater Reverse Osmosis Desalination Plant,
Almeria (Spain)
CLIENT SADYT
CAPACITY 60,000 m3/day (6 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2006
26/50
PROJECT
Denia Seawater Reverse Osmosis Desalination Plant, Alicante
(Spain)
CLIENT Joint venture company of VEOLIA WATER, SANDO e INYPSA
CAPACITY 24,000 m3/day (4 units). Future expansion to 42,000 m3/day (7 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2006
PROJECT
Marina Baja Seawater Reverse Osmosis Desalination Plant.
Mutxamel Solution, Alicante (Spain)
CLIENT Joint venture company of VEOLIA WATER, SANDO e INYPSA
CAPACITY 50,000 m3/day (5 units). Future expansion to 80,000 m3/day (8 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2006
27/50
PROJECT Albacete Brackish Water Nanofiltration Plant, Albacete (Spain)
CLIENT Joint venture company of VEOLIA WATER, AQUAGEST, S.A. y JUAN NICOLÁS
GÓMEZ, S.A.
CAPACITY 24,000 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2006
PROJECT
El Mojon Brackish Water Reverse Osmosis Desalination Plant,
Murcia (Spain)
CLIENT SADYT
CAPACITY 18,000 m3/day expansion from 5,400 m3/day (2 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2006
28/50
PROJECT
Adeje-Arona Seawater Reverse Osmosis Desalination Plant,
Tenerife (Spain)
CLIENT SADYT
CAPACITY 20,000 m3/day
SCOPE Study of operation improvements of the plant
YEAR 2006
PROJECT
Carlsbad Seawater Reverse Osmosis Desalination Plant, California
(USA)
CLIENT BEFESA
CAPACITY 189,276 m3/day (11 units). Future expansion to 206,476 m3/day (12 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2005-2006
29/50
PROJECT
Huntington Beach Seawater Reverse Osmosis Desalination Plant,
California (USA)
CLIENT BEFESA
CAPACITY 189,276 m3/day (11 units). Future expansion to 206,476 m3/day (12 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2005-2006
PROJECT
Taunton River Seawater Reverse Osmosis Desalination Plant with
upstream Ultrafiltration, Massachusetts (USA)
CLIENT SANTANDER CENTRAL HISPANO INVESTEMENT BANK
CAPACITY 18,930 m3/day (5 units)
SCOPE Technical and financial due diligence for the feasibility study of the plant
construction
YEAR 2005
30/50
PROJECT
Taunton River Seawater Reverse Osmosis Desalination Plant with
upstream Ultrafiltration, Massachusetts (USA)
CLIENT AQUALIA WATER LLC
CAPACITY 18,930 m3/day (5 units)
SCOPE Improvements in the design, construction and operation of the plant
YEAR 2005
PROJECT
Escombreras Seawater Reverse Osmosis Desalination Plant
(Murcia)
CLIENT SADYT
CAPACITY 60,000 m3/day (5 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2005
31/50
PROJECT
Rabigh Seawater Reverse Osmosis Desalination Plant (Saudi
Arabia)
CLIENT Joint venture company of GEIDA (BEFESA, COBRA, SADYT)
CAPACITY 18,000 m3/day (4 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2004
PROJECT
Al Wajh Seawater Reverse Osmosis Desalination Plant (Saudi
Arabia)
CLIENT Joint venture company of GEIDA (BEFESA, COBRA, SADYT)
CAPACITY 9,000 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2004
32/50
PROJECT Al Lith Seawater Reverse Osmosis Desalination Plant (Saudi Arabia)
CLIENT Joint venture company of GEIDA (BEFESA, COBRA, SADYT)
CAPACITY 4,500 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2004
PROJECT
Qunfuda Seawater Reverse Osmosis Desalination Plant (Saudi
Arabia)
CLIENT Joint venture company of GEIDA (BEFESA, COBRA, SADYT)
CAPACITY 6,000 m3/day (4 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2004
33/50
PROJECT
Farasan Seawater Reverse Osmosis Desalination Plant (Saudi
Arabia)
CLIENT Joint venture company of GEIDA (BEFESA, COBRA, SADYT)
CAPACITY 3,000 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2004
PROJECT
Canal de Alicante Seawater Reverse Osmosis Desalination Plant
(Spain)
CLIENT AIGÜES DE BARCELONA (AGBAR). Mancomunidad de Canales del Taibilla
(Spanish Government)
CAPACITY 65,000 m3/day (7 units)
SCOPE Preliminary project for the bidding process
YEAR 2004-2005
34/50
PROJECT
Minera Escondida Seawater Reverse Osmosis Desalination Plant,
Antofagasta (Chile)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 45,000 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2003
PROJECT
Balearic Islands Seawater Reverse Osmosis Desalination Plants:
Alcudia, Ciutadella, Sta. Eulalia y Andraxt, (Spain)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 10,000 – 15,000 m3/day
SCOPE Basic and detailed design for the bidding process
YEAR 2003
35/50
PROJECT
Galapagos Islands Seawater Reverse Osmosis Desalination Plants:
Santa Cruz, Isabela y Floreana (Ecuador)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY Variety of capacities
SCOPE Basic and detailed design for the bidding process
YEAR 2002
PROJECT Melilla Seawater Reverse Osmosis Desalination Plant (Spain)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 20,250 m3/day (3 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2002
36/50
PROJECT
Tara and Chidro Seawater Reverse Osmosis Desalination Plants
(Italy)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY Variety of capacities
SCOPE Basic and detailed design for the bidding process
YEAR 2002
PROJECT
Aegean Islands, Floating Seawater Reverse Osmosis Desalination
Plant (Greece)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 30,000 m3/day
SCOPE Basic and detailed design for the bidding process
YEAR 2002
PROJECT
Ayios Theodoros, Larnaca y Limassol Seawater Reverse Osmosis
Desalination Plant (Chipre)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 21,120 m3/day (4 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2000
37/50
PROJECT
Javea Seawater Reverse Osmosis Desalination Plant, Alicante
(Spain)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 26,000 m3/day (4 units). Future expansion to 39,000 m3/day (6 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2000
PROJECT
Tampa Bay Seawater Reverse Osmosis Desalination Plant, Florida
(USA)
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
CAPACITY 94,620 m3/day (6 units). Future expansion to 141,930 m3/day (9 units)
SCOPE Basic and detailed design for the bidding process
YEAR 2000
38/50
PROJECT
Carboneras Seawater Reverse Osmosis Desalination Plant, Almeria
(Spain)
CLIENT
INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A The contract for the
Carboneras facility was awarded to the joint venture company of INIMA and
ENDESA
CAPACITY 120,000 m3/day (12 units). Future expansion to 240,000 m3/day (24 units)
SCOPE
Basic and detailed design for the bidding process of the plant operation
Complete water process design for construction
YEAR 1999
39/50
F. References. Consulting
PROJECT
Distillation desalination plants of Ammonia production plant of
Fertial, Argelia
CLIENT IDOM
CAPACITY Various
SCOPE Report about the status of the existing desalination plants
YEAR 2016
PROJECT El Tajo Water Treatment Plant
CLIENT AGBAR
CAPACITY From 100 L/s to 1500 L/s
SCOPE Revision of operation bidding project
YEAR 2014
PROJECT
Feasibility Study for El Abra Seawater Reverse Osmosis Desalination
Plant, Tocopilla (Chile)
CLIENT TRACTEBEL
CAPACITY 138,240 m3/day (6 units)
SCOPE Feasibility study for the plant construction
YEAR 2014
PROJECT
Feasibility Study for a Seawater Reverse Osmosis Desalination
Plant, Chile
CLIENT AGUAS NUEVAS
CAPACITY 77,760 m3/day (4 units), 110,160 m3/day (5 units), 116,640 m3/day (6 units) and
176,256 m3/day (8 units)
SCOPE Feasibility study and CAPEX and OPEX estimation for a SWRO desalination plant
(four production scenarios)
YEAR 2013
40/50
PROJECT
Utilization of Geothermal Heat by a Seawater Distillation Desalination
Plant of Multi-Effect
CLIENT ABENGOA WATER
CAPACITY 4,500 m3/day (1 unit)
SCOPE Basic design and CAPEX estimation for a distillation desalination plant of Multi-
Effect
YEAR 2013
VAPEUR A LÉ
EVAPORATEUR
CONDENSÂTES A
LÉ CYCLE
EAU DE MER A LÉ
EVAPORATEUR
REJET D'EAU DE
MER
PRODUIT
PURGE DE
SAUMURE
PRÉTRAITEMENT
PHYSIQUE ET
CHIMIQUE DE
L'ALIMENTATION
E V A P O R A T E U R CONDENSATEUR
ALIMENTATION
PROJECT
Touggourt Brackish Water Reverse Osmosis Desalination Plant
(Algeria)
CLIENT ALGERIENNE DES EAUX (ADE). MINISTERE DES RESSOURCES EN EAUX
CAPACITY 34,560 m3/day (3 units)
SCOPE Technical Assistance during the plant construction
YEAR 2012- 2014
PROJECT Desalination Technology Study by Low Temperature Distillation
CLIENT GRUPO IF
SCOPE Feasibility study of a desalination process by Low Temperature Distillation (LTD)
YEAR 2012
41/50
PROJECT
Radomiro Tomic Seawater Reverse Osmosis Desalination Plant
(Chile)
CLIENT CODELCO
CAPACITY 170,000 m3/day (8 units)
SCOPE
Technical Study in order to establish the best strategy of both operation and
maintenance of the Desalination Plant and revision of the EIA ambient
documentation
YEAR 2012
PROJECT Ténès Seawater Reverse Osmosis Desalination Plant (Algeria)
CLIENT BEFESA
CAPACITY 200,000 m3/day (10 units)
SCOPE P&ID’s revision
YEAR 2012
PROJECT Online Desalination Course
CLIENT STRUCTURALIA
SCOPE Online desalination course
YEAR 2011
42/50
PROJECT La Chimba Seawater Reverse Osmosis Desalination Plant (Chile)
CLIENT AGUAS DE ANTOFAGASTA
CAPACITY 52,000 m3/day (8 units)
SCOPE Contingency plan against red tide
YEAR 2011
PROJECT
Feasibility study for the construction of a New Desalination Plant in
Puerto Viejo (Chile)
CLIENT CANARAGUA (AGBAR)
CAPACITY 86,400 m3/day (4 units)
SCOPE Feasibility study for the construction of a New Desalination Plant
YEAR 2009-2010
PROJECT Desalination course
CLIENT AGUAS DE ANTOFAGASTA
SCOPE Desalination course
YEAR 2009
43/50
PROJECT
Feasibility study for the construction of a New Desalination Plant in
Tubarão (Brazil)
CLIENT ARCELORMITTAL
CAPACITY 12,000 m3/day (3 units). Future expansion to 24,000 m3/day (6 units)
SCOPE Feasibility study for the construction
YEAR 2008
PROJECT Desalination course
CLIENT UPM
SCOPE Desalination course
YEAR 2008
PROJECT
Las Palmas III Seawater Reverse Osmosis Desalination Plant,
Canary Islands (Spain)
CLIENT EMALSA
SCOPE Due diligence on the Las Palmas III Seawater Reverse Osmosis Desalination Plant
YEAR 2007
44/50
PROJECT
Sagunto Seawater Reverse Osmosis Desalination Plant, Valencia
(Spain)
CLIENT Joint venture company of LUBASA and PAVASAL
CAPACITY 24,000 m3/day (3 units)
SCOPE Technical advice during the construction of the plant
YEAR 2007
PROJECT
El Mojon Brackish Water Reverse Osmosis Desalination Plant,
Murcia (Spain)
CLIENT Joint venture company of TECNOCONTROL, TECNOLOGÍA CANARIA DEL
AGUA, DAM Y VILLEGAS CONSTRUCCIONES
CAPACITY 18,000 m3/day
SCOPE Technical advice during the construction of the plant
YEAR 2007
45/50
PROJECT
Study of Wastewater Reuse in Vinalopo-Alacanti System, Valencia
(Spain)
CLIENT INTECSA-INARSA
SCOPE Study of the plant operation
YEAR 2007
PROJECT
Maspalomas Seawater Reverse Osmosis Desalination Plant, Gran
Canaria (Spain)
CLIENT EMALSA
CAPACITY 9,000 m3/day
SCOPE Study for a possible upgrade of the plant
YEAR 2007
46/50
PROJECT La Chimba Seawater Reverse Osmosis Desalination Plant (Chile)
CLIENT AGUAS DE ANTOFAGASTA
CAPACITY 52,000 m3/day (8 units)
SCOPE Contingency plan and due diligence
YEAR 2006-2007
PROJECT Study of Multi Stage Flash Distillation
CLIENT INIMA SERVICIOS EUROPEOS DE MEDIO AMBIENTE S.A.
SCOPE Study of MSF distillation
YEAR 2006
PROJECT Desalination Survey
CLIENT AGUAS DE ANTOFAGASTA
SCOPE
First contract
Drawing up the “Desalination Survey” of the “Fourth Rate Process” of the II
Antofagasta Region
Second contract
Update to the report
YEAR 2006-2011
47/50
PROJECT Advice on the desalination business
CLIENT SADYT
SCOPE Advice on the desalination business
YEAR 2006-2007
PROJECT
Environmental research on the residual chlorine of the GLN
seawater discharge in Zaule (Italy)
CLIENT GAS NATURAL
SCOPE Research Study: “Environmental research on the residual chlorine of the GLN
seawater discharge in Zaule (Italy)"
YEAR 2006
PROJECT
Term Certificate of both Construction and Operation of Desalination
Plants
CLIENT AGUAS DE ANTOFAGASTA
SCOPE Term certificate of both construction and operation of desalination plants
YEAR 2006
PROJECT Desalination course
CLIENT SADYT
SCOPE Desalination course of desalination plants design
YEAR 2005
PROJECT
Sagunto Seawater Reverse Osmosis Desalination Plant, Valencia
(Spain)
CLIENT PROINTEC
CAPACITY 24,000 m3/day (3 units)
SCOPE Technical support for the preliminary project for the bidding process
YEAR 2005
48/50
PROJECT
Course in the Infrastructure Master of the College of Civil, Channels
and Ports Engineers (CICCP), Madrid (Spain)
CLIENT CICCP
SCOPE Desalination course
YEAR 2005
PROJECT Desalination course
CLIENT AEDYR
SCOPE Desalination course
YEAR 2005 and 2009
PROJECT
Treatment for reuse of the sewage water of Rincon de Leon Plant,
Alicante (Spain)
CLIENT PROINTEC
CAPACITY 25,700 m3/day (3 units)
SCOPE Technical advice during the new plant construction
YEAR 2004
PROJECT Advice on the Desalination Business
CLIENT BEFESA
SCOPE Market study and advice on the desalination business
YEAR 2004
PROJECT Course in Murcia College of Engineers (Spain)
CLIENT Murcia College of Engineers
SCOPE Desalination course
YEAR 2004
49/50
PROJECT Technical Advice on the Desalination Business
CLIENT K-UVE
SCOPE Technical advice on the desalination business
YEAR 2004
PROJECT Feasibility studies
CLIENT EXPANSIÓN EXTERIOR
SCOPE Technical, economic and financial feasibility study of both Reverse Osmosis
process and Multi-Stage Flash Distillation (M.S.F) in Libya
YEAR 2002
50/50
G. Contact
Avenida de Manoteras, 38, C-314
28050 Madrid (Spain)
Tel.: +34 91 392 35 62
Cell.: +34 647 493 400