( subsidiary of coal india limited) jayant projectnclcil.in/env/compliance/sept 15 to march...

11
ORTHERN COALFIELDS LIMITED ( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant Colliery, Distt. Singrauli (M.P) PIN 486890 Phone/Fax 07805-222228 REGD. POST - -IF: V/16/ b j b Dated :27.05.2016 vt e Director lA, Monitoring Cell, Paryavaran Bhawan, CGO Complex, New Delhi- 110003 Sub: Six Monthly Environmental Compliance Report for the period September 2015 to March 2016. Ref: Clearance No. J-11015/382/2008-IA.II(M) dated lO th Dec.2008, and Corrigendum issued vide letter No.J-11015/382/2008-IA.II (M) dated 15 th April 2009 Dear Sir, With reference to the above, please find enclosed herewith the six monthly Environmental Compliance report in respect of Jayant Project for kind information and needful action. Thanking You. Copy to : 1. Additional Director (S) , Ministry of Environment & Forest, Regional Office, (Western Region), KendriyaParyavaranBhawan, Link Road No.-3, Ravi Shankar Nagar, BHOPAl-462 016 (MP). 2. Joint Director(S) , Ministry of Environment & Forest, Regional Office, (Western Region), KendriyaParyavaranBhawan, Link Road No.-3, Ravi Shankar Nagar, BHOPAl-462 016 (MP). 3. Member Secretary, M.P.Poliution Control Board, ParyawaranParisar,Sector E-5, Arera Colony, Bhopal (MP). 4. Regional Officer, M.P.Poliution Control Board ,Sector-2, NavjivanVihar, PO-Vindhya Nagar, Dist. Singrauli (M.P). 5. The GM (Env), NCl, Singrauli.

Upload: hoangkiet

Post on 25-May-2018

229 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

ORTHERN COALFIELDS LIMITED( Subsidiary of Coal India Limited)

Jayant ProjectP.O. Jayant Colliery,

Distt. Singrauli (M.P) PIN 486890Phone/Fax 07805-222228

REGD. POST

- -IF: V/16/ b j b Dated :27.05.2016

vte Director lA,

Monitoring Cell,Paryavaran Bhawan,CGO Complex,New Delhi- 110003

Sub: Six Monthly Environmental Compliance Report for the period September 2015 toMarch 2016.

Ref: Clearance No. J-11015/382/2008-IA.II(M) dated lOthDec.2008, andCorrigendum issued vide letter No.J-11015/382/2008-IA.II (M) dated 15th April 2009

Dear Sir,

With reference to the above, please find enclosed herewith the six monthly EnvironmentalCompliance report in respect of Jayant Project for kind information and needful action.

Thanking You.

Copy to :

1. Additional Director (S) , Ministry of Environment & Forest, Regional Office, (WesternRegion), KendriyaParyavaranBhawan, Link Road No.-3, Ravi Shankar Nagar, BHOPAl-462016 (MP).

2. Joint Director(S) , Ministry of Environment & Forest, Regional Office, (Western Region),KendriyaParyavaranBhawan, Link Road No.-3, Ravi Shankar Nagar, BHOPAl-462 016 (MP).

3. Member Secretary, M.P.Poliution Control Board, ParyawaranParisar,Sector E-5, AreraColony, Bhopal (MP).

4. Regional Officer, M.P.Poliution Control Board ,Sector-2, NavjivanVihar, PO-Vindhya Nagar,Dist. Singrauli (M.P).

5. The GM (Env), NCl, Singrauli.

Page 2: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

<: of Coal India Limited)

Jayant ProjectP.O. JayantColliery,Singrauli(M.P) PIN486890

Pone/Fax 07805-222228

REGD. POST

18 Dated :27.01~2016=I2f

.~ ,=-:: '-g Cell,~-. a aran Bhawan,

Complex,Delhi- 110003

Sub: Six Monthly Environmental Compliance Report for the period September 2015 toMarch 2016.

Ref: Clearance No. J-l1015/382/2008-IA.II(M) dated lOthDec.2008, andCorrigendum issued vide Letter No.J-l1015/382/2008-IA.II (M) dated 15th April 2009

Dear Sir,

With reference to the above, please find enclosed herewith the six monthly EnvironmentalCompliance report in respect of Jayant Project for kind information and needful action.

Thanking You.

aith~~,-/

General Ma agerJayant Proje$jt.

~Copy to :

1. Additional Director (S) , Ministry of Environment & Forest, Regional Office, (WesternRegion), KendriyaParyavaranBhawan, Link Road No.-3, Ravi Shankar Nagar, BHOPAL-462016 (MP).

2. Joint Director(S) , Ministry of Environment & Forest, Regional Office, (Western Region),KendriyaParyavaranBhawan, Link Road No.-3, Ravi Shankar Nagar, BHOPAL-462 016 (MP).

3. Member Secretary, M.P.Poliution Control Board, ParyawaranParisar,Sector E-5, AreraColony, Bhopal (MP).

4. Regional Officer, M.P.Poliution Control Board ,Sector-2, NavjivanVihar, PO-Vindhya Nagar,Dist. Singrauli (M.P).

5. The GM (Env), NCL, Singrauli.

Page 3: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

e period of September 2015 to March 2016~- - - S-Ec FOR JAYANT PROJECT

=;--=- -.--;:::-- - -.::~5 - -;;_~ s ry/

:; "2: :~~-.:.,::-=-'G::e-)Mining Industry

.-~ == """'= ::. cect- ~~ [_ -- rs)/OM number

JAYANT PROJECTNo. J-11015/382/2008 IA.II(M) dated io"Dec.2008And Corrigendum issued videNo. J-11015/382/2008-IA.II(M) dated 15th April2009

c. Dist -SingrauliState - Madhya PradeshLatitude -24° 08' 45" N to 24° 11' 2S"Nt.onqitude- 82° 38' 21"E to 82° 40' 4S"E

6

7

9

.!:; -ess for correspondence:dress of concerned Project

Chief Manager (with PIN code &telephone/Telex/Fax no. etc.)

Salient features of Project.Environmental rnanaqernent PlanBreak-up of the Project Area.

Break-up of Project affectedpopulation with enumeration ofthose loosing houses/dwellingunits only, agricultural land only,both dwelling units & agriculturalland landless labourers/artisans.SC/ST Adivasis, Others.Please indicate whether thosefigures are based on any scientific& systematic survey carried out oronly Provisional figures. If asurvey is carried out, give details& year of survey others.Financial details:(a) Project cost as originallyplanned & subsequently revisedestimate and the years of pricereference.(b) AllocationsEnvironmentalplans, with itemwise break -up.

made formanagement

wise and year

General Manager,Northern Coalfields Ltd, Jayant Project,P.O: Jayant Colliery,Distt: Singrauli (M.P.)Pin- 486890Phone no.- 07805-222228Fax No. 07805-222228

Given in Annexure I

Submergence area (Forest & Non Forest): Nil.Others:TenancyGovt. LandForest LandTotal

: 1075 Ha.467 Ha.

: 1162 Ha.: 2704 Ha.

Total Nos. of PAPs = 1545SC= 60,ST=356,Others= 1129

1. Loosing house & land= 668 (plot given to530 nos., rest 138 nos. not claimed for plot.)

2. Loosing only land= 877 (given compensationand other facilities to 877 nos. as per R&Rpolicy.)

Original Cost: Rs. 313.61 Cr. in year 1983Revised Cost:Rs. 375.04 Cr. as on year 1988.

Details given in EMP.

2

Page 4: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

11

12

13

14

s: ~e:::

e status of compensatoryestation.

ROI 431.28% as on 31/03/2016.

Yes.

Rs.956.26Corers as on 31/03/2016.

Rs. 10.43 Cr (As per Environmental statement)

1162.171 Ha. of forest land has been approved.

An amount of Rs. 38.00 Lakhs have been depositedto M.P. Forest deptt. against compensatoryafforestation of 220.278 Ha. At Gopadbanas &Majhauli Tehsil area.

168.290 Ha. area has been completed with allactivities related to felling.

Being done by M.P. Forest Department.

NIL

17-2-197510.12.2008 (for enhance production 12.5 to 15.5MTY)Planned for u to 2019-20 @ rate of 15.5 MTYNot applicable.

Annexure II may please be seen.

(c) The status of clear felling.

(d) Comments on viability andsustainability of compensatoryafforestation programme in thelight of actual field experience sofar:The status of clear felling in non-forest areas (such assubmergence area of reservoir,approach roads) if any with

uantitative information.Status of construction:Date of commencement (Actualand/or planned)Date of completion (Actual and/or

lannedReasons for the delay if theProtect is et to start.Point wise report regardingimplementation of environmentalsafeguards as stipulated inclearance letter mentioned atSI.No.3

15 Status of environmental controlmeasures as specified in EMPs. Airpollution Noise Pollution & WaterPollution.

Environmental control measures are being adoptedas specified in EMPs. Monitoring is being done byCMPDI, RI-VI, Jayant and State Pollution ControlBoard.

3

Page 5: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

Annexure -IFEATURE OF JAYANT PROJECT.

NORTHERN COALFIELDS LTD., District: Singrauli- (M.P.)

-- 15.5 Million tonnes per annum (from 10.12.2008)--

.:; ~::: _":, e mine. Up to year 2019-20 (@ rate of 15.5 MTY)

e roject or Existing Existing Mine expansion.t-' ne expansion,

- and Required:-Forest: 1162 Hectares

I Other: 1542 hectares

6 Work force 2366 as on 31stMarch 2016

7 Total cost of Project. 375.04 Crores

8 Forest clearance. 1162.171 hectares has been already approved.

9 Main recommendation and As per details mentioned in EMP.safeg uards.

4

Page 6: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

Annexure- ".- of conditions imposed by Ministry of Environment & Forests in

a a Opencast Coal Mine Expansion project (expansion in production frome '0. J-11015/ 382/ 2008 -IA.II (M) dated 10th Dec.2008 :-

IV

ConditionsSpecific Conditions

- -- --- e carried out in the forestland for- -:-= c earance has not been obtained.

~...:...--; s+al! be carried out as per statute at a safe= -;:;-~e ~ 0 the BaliiaNaliah. No modification of the-?_c. drainage shall be done in the expansion

soil to be stacked properly with proper slope at eara ed site (s) and shall not be kept active and shall

used for reclamation and development of greenelt.trrr')

No new external OB dumps shall be created. OBstored in two external OB dumps of a max. height of90m, consisting of 3 benches of 30m each, has beenstabilized with plantation and no new OB generated inthe balance life of the mine shall be dumped on theexisting OB dumps and the height of the existingdump shall not be increased from the present 90m.OB generated in the balance life of the mine shall beback filled into the decoaled void only by concurrentbackfilling and by rehandling at the time of mineclosure into the de-coaled void. Slope stability studyshall be undertaken to determine if the backfilled voidheight can be raised to a max. heightof 90-100m withan overall angle not exceeding 28°. Copy of the reporton slope stability shall be furnished to this Ministryand to MOEF RO, Bhopal and only with prior approvalbased on slope stability the dump height on de-coaledvoid shall be raised to 100m. The backfilledarea/dump shall be stabilized with plantation (existingexternal OB dump of a balance area of 630 ha and996 ha of backfilled Internal dump). Geo-textilematerial shall be used to stabilize critical areaSOf1iiedUrTip~-f\'ionftorT;'g and management of reclaimedexisting dump sites and the reclaimed internal dumpshall continue until the vegetation becomes self-sustaining. Compliance status shall be submitted tothe Ministry of Environment & Forests and its RegionalOffice located at Bhopal on a yearly basis.

5

Compliance as on 31.03.2016 I

No mining is being carried out in theforestland for which forestry clearancehas not been obtained. A copy of planshowing forest land mark as "A".(Annexure-III)Mining is being carried out as per I

statute at a safe distance from theBaliiaNallah, as shown in plan as "B". Nomodification of the natural drainage wascarried out in the expansion project. I(Annexure-III) i

Topsoil (soil & sandy soil) is available in Ipatches, which is stored at earmarkedplace and used for reclamation ofdumps. The dump is not kept active.

Month Stacki ng Uti lization(m3) (m3)

SL

l----=l'---+-_0"--c""t:....;'1::....;5'---+----C7-=5:;..:O=-----ITo bef--=2=----t--=Nc...:..-=-OV..:....',-=1c=:5_t----C4c.::1c.::0=------luti I ized

3 Dec'15 620 during II--~~-~~~-r-~~~f---:4':--t-_J::...;a::..;n...:...',=1-=-6_t----C4:...::3:....:O=------lpIanta ti 0n I

5 Feb'16 920 I6 Mar'16 660

~ No new external dump has beencreated. The earlier two nos. ofexternal OB dumps, in westernside with final RL 425m and on Ieastern side with final RL 413mhave been completed as per Imine closure plan.

~ These two external OB dumpshavebeen technically andbiologically reclaimed withplantation in total 118.65 Haarea out of total area of 166 Ha. i

~ As of now, all OB is being Ibackfilled in to de-coaled area. I

~ Slope stability study at JayantProject has been conducted byBIT, Mesra and CMPDI, Ranchi.

~ Backfilled void has been raisedup to a maximum height 90-100m.

~ Overall slope angle of thebackfilled dump has been kept at I

less than 28° as specified in the Icondition.

~ Plantation details of area wiseare given separately in point No.XI. I

Page 7: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

V1

VII

VIII

IX

X

a ion ponds of appropriate size_ ed to arrest silt and sediment flows

3 a d mineral dumps. The water sooe utilized for watering the mine area,elt development etc. The drains shalldesilted and maintained properly.

---::- _ e-arns (size gradient and length) and sumps all be designed keeping 50% safety

--- - e and above the peak sudden rainfall anddischarge in the area adjoining the mine

p capacity shall also provided adequateperiod to allow proper setting of silt

Dimension of the retaining wall at the toe of thedumps and OB benches within the mine to check runoff and situation shall be based on the rainfall data.

CHP would be fully enciosed.Crushers at the CHPshall be operated with high efficiency ba~ filters,water sprinkling system shall be provided to ch"&l<'"fugitive emissions from crushing operations,conve or s stem haula e rods transfer oints etc.Drills shall be wet operated only.

Controlled blasting shall be practiced between lPMto 2 PM only with use of delay detonators and onlyduring daytime. The mitigative measures for controlof ground vibrations and to arrest the fly rocks andboulders shall be implemented.

The entire coal of 43000 TPD shall be transported byMGR with Silo loading facility only. There shall be noI mineral transportation by road.

~ Considering the water & siltquantity, Catch drains & Siltationponds have been properly

esigned & constructed which arecovering the present dumps' flowof any loose soil.

~ Collected water is used forsprinkling on haul roads, HEMMwashing, & in CHP for dustsuppression(after treatment atETP)

~ De-Silting of drains is done everyyear. /

~ Garland drains (Total Length= 2.7Km) and sumps are properlydesigned keeping 50% safetymargin over and above the peaksudden rainfall and maximumdischarge in the area adjoiningthe mine site.

~ Mine Sump has adequatecapacity to allow adequateretention period to collected water I!

and allow proper settling of siltmaterial.

~ Total len th of Gabion Wall= 6 Km~ Retaining Wall (Total Length= 11.51

Km) is designed & constructedafter due consideration of rainfall/Idata and angle of repose. .

~ Height of the retaining Wall abovethe ground level ranges from 2mto 3.5m based on the site specificconditions.

JayantCHP is fully enclosed. In CHPCrusher dust extractor and mist spray Isystem for dust suppression is being Iused.

High capacity drills with latest dust Iextraction advanced system are being Iused.15 Nos of drills are in operation at /1

present viz. IDM 70 Make Atlas Coppco,IDM 30, RECP 650 & 750 & OMS drill311mm dia in 0 eration Ora line face.Controlled blasting with use of delaydetonators is already in practice andblasting is done between lPM to 2PM.Charging of holes and total charge perblast is maintained to control groundvibration within permissible limit for whichthe same is monitored fre uentl .The coal is loaded through CHP &Silo tothe Marry Go Round (MGR) system andtransported by rail. Approx 43000 TPD Icoal is transported. There is no coal itrans ortation broad.

6

Page 8: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

- _-=::.: _ - plan shall betal area of not less

cluded reclaimed t-=E-xt:-e-r-n-a-:-I--=O:-::B:-=D-u-m-p----t-------"-'-'~==----j

-3 a) backfilled area f-----------+----------l_=-~~ary along roads and Internal OB Dump 373.22a) green beIt (74 ha), rG-'r"""ee-n-b:-e:-l-t:-in-c-o-:-Io-n-y-a-re-a-+----1-9-. 3-0----1

:::- = 2 2.82 ha) and in coIony r---::---:--: ---__: --:----t-----=:--=- ---1:; -:::: ::: species in consultation Greenbelt on vacant land 74.00

gricultu re Departm ent. r-0-th:-e-r-p:-la-n-t-a-ti-o-n-s----t-----9-4-.7-1----1:;- -- e ~ees shaII be around 2500 I- ---==--:---:- -+- :=:::--:- --~

Total 679.88

Type of land

= - ...c ate area, an area of 996 ha2C illed and reclaimed with

he balance 114 ha of the de-shall be converted into a watere higher benches of which shall

:::e"·ly sloped and stabilized by/afforestation by planting native

species in consultation with localgriculture department Biologicala ion of backfilled areas shall

ence immediately and the balance as ae bound manner. The density of the trees

all be around 2500 plants per ha.

~ Major part of the de-coaled void is beingbackfilled and reclaimed with plantationafter achieving the planned height ofDump.

~ Balance 114 ha of the de-coaled void shallbe converted into a water reservoir whichwill be gently sloped along the higherbenches and stabilized by plantation/afforestation at the time of closure ofmine.

~ The density of the trees is being keptaround 3500 plants/Ha during plantation Ion OB Dumps and 2500 plants/He on

lain area.company shall obtain approval of

CGWA/CGWB Regional Office for use ofground water. If any, for mining operations,sanction of the competent authority shall beobtained for use of water from the integratedWater Su I Scheme of the G.B. Pant Sa er.

Ground water is presently not used for miningoperations. Sanction of competent authority foruse of water from G.B.PantSagar (Rihand) hasbeen obtained by NCl, the then CentralCoalfields ltd. vide No. 649-CU-II/NTPC/79 dtd.March 12/13.1979.Monitoring of ground water level and quality isbeing carried out in four seasons, by establishinga network of dug wells. Nine borewell (5 deepand 4 shallow ) has been completed for groundwater monitoring. One piezometer has beeninstalled in one of the deep borewell.Ground Water Monitoring report is enclosed forthe period QE March 2016. (Annexure-IV)

Regular monitoring of ground water level andquality shall be carried out by establishing anetwork of existing wells and construction ofnew peizometers. The monitoring for quantityshall be done four times a year in pre-monsoon (May), monsoon (August), postmonsoon (November) and winter (January)seasons and for quality in May. Data thuscollected shall be submitted to the Ministry ofEnvironment & Forests and to the CentralPollution Control Board quarterly within onemonth of monitorin .Check dams, water channels and other waterrecharge structures shall be constructed inconsultation with the local communities.

~ Four Nos of check dams have beenconstructed in Mine Area to arrest minewater so that it does not flow in thenatural course of water of surroundingarea.

~ Check dams have also been constructedat Jaitpur village in consultation with thelocal communities.

XV

~ 12 numbers of Water harvesting facilitieswere constructed at Executive hostel, VIPGuest house, Officers club, dispensary jet Ihostel and sports complex.

I

The company shall put up artificial groundwater recharge measures for augmentation ofground water resource. The projectauthorities shall meet water requirement ofnearby village(s) in case the village wells god due to dewaterin of mine.

XVI

7

Page 9: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

plant to 1

14.00 MLD capacity STP has already been 1

of 4000 constructed and maintained in operation for ~_-=:2= r~o the project shall be treatment of domestic sewage from colonies.~ <= srinq colony. ETP shall also 2Nos (32.00 MLD+ 8.00 MLD capacity) of ETPs ,

s: r workshop and CHP are in operation for treatment of effluent Iensure that the total generated from workshop & CHP and mine!

0,000 m3/d being discharges discharge. The treated water conforms to Ie conforms to prescribed prescribed standards. Most of the treated waterscharge. Water from both STP except rainy season is reused for sprinkling on- =- 5 2 I be recycled and used for haul roads & in CHP for dust suppression.

- ==c:: ties to the extent ossible.--~ = oje • a horities shall carry out a study Condition of Zero Discharge from Jayant Project

oischarge from NCL mines by is maintained efficiently since Dec'14. Reuse of9 various options for using excess treated effluent of STP is being done at Parkincluding artificial recharge and the (Rose Garden), Jayant. Treated effluent of CETP

he same shall be submitted to this is being used in HEMM washing and CHP andwithin six months of issue of this treated effluent of mine ETP in Haul road

- == c: ce letter. s ra in ." es carrying out regular periodic health Regular periodic health check up of all employees I'

ee up of their workers, 10% of the in the form of Periodic Medical Examinationers identified from work force engaged (PME) is carried out. I

active mining operations shall be subject to Periodic healthchecks up were conducted for 919ealth check up for occupational diseases and numbers of employees during the year 2015-16.earing impairment if any, through an Regular health check up is also done by NIOH,

agency such as NIOH, Ahemdabad with a Ahemdabad with a period of two years.period of two years and the results reportedo this Minist and to DGMS.

For monitoring land use pattern and for post Land use maps based on satellite imagery ismining land use, a time series of land use prepared once in 03 years through CMPDI.maps based on satellite imagery (on a scale Remote sensing map of Singrauli Coalfieldsof 1:5000) of the core zone and buffer zone, prepared by CMPDI for the Year 2014 has beenfrom the start of the project until end of mine uploaded on the website of the company. .life shall be prepared once in 3 years (for anyone particular season which is consistent inthe time series) and the report submitted toMOEFand its Re ional Office at Bho al.

XXI A final mine closure plan along with details of Revised Mine Closure Plan have been submittedCorpus Fund shall be submitted to the to MoEFCC and MPPCB, vide letter NoMinistry of Environment & Forests five years CGM/JNT/ENV/13/29 dated 20.12.2013.before closure of the rotect.

XXII R&R for the remaining 511 PAPs of the total Total Nos. of PAPs = 15451239 PAPs R&R shall be completed within SC= 60, ST=356, Others=11292011 Monitoring of impact of implementation For the remaining 511 PAPs of the total 1239, Iof various activities and measures outlined in R&R has been finalized. As per R&R policyR&R and CSR over the life of the project shall compensation has been given to 877 Nos withbe based on key indices of 'UNDP Human other facilities and Plot has been given to 530Development Report using pre-project status PAPs.of socio-economic and human development Monitoring of impact of implementation is basedas the baseline. on the key indices of UNDP Human Development

Re ort.

8

Page 10: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

General conditions Com Iiance status- mining technology and scope of

e made without prior approval of the:= =~'ironment and Forests.

-=-:::e in the calendar plan including=--=-=~ -, quantum of mineral coal and waste

"" == +ade.- _- a+oient air quality-monitoring stations shall

=-~ Iished in the core zone as well as in the_ =::- zone for monitoring SPM, RSPM, 502 and NOx

eavy metal such as Hg, Pb, Cr, As, etc.--c-' n of the stations shall be decided based on_ eteorological data, topographical features and

_ ' onmentally and ecologically sensitive targets insuftation with the State Pollution Control Board.

Fugitive dust emissions (SPM and RSPM and heavymetal such as Hg, Pb, Cr, As etc.) from all thesources shall be controlled regularly monitored anddata recorded properly. Water spraying

Iarrangement on haul roads, wagon loading, dumptrucks (loading and unloading) points shall be

rovided and ro erl maintained.

VI Adequate measures shall be taken for control ofnoise levels below 85 dBA in the work environment.Workers engaged in blasting and drilling operations,operation of 'HEMM' etc. shall be provided with ear

lu s/rnuffs.

V Data on ambient air quality (SPM, RSPM, S02 andNOx and heavy metal such as Hg, Pb, Cr, As, etc.)Shall be regularly submitted to the Ministryincluding its Regional Office at Bhopal and to theState Pollution Control Board and the CentralPollution Control Board once in six months.

VII Industrial waste water (workshop and waste waterfrom the mine) shall be properly collected, treatedso as to conform to the standards prescribed underGSR 422 (E) dated 19th May 1993 and ai=December 1993 or as amended from time to timebefore discharge. Oil and grease trap shall beinstalled before discharge of workshop effluents.

VIII Vehicular emissions shall be kept under control andregularly monitored. Vehicles used for transportingthe mineral within the mine shall be optimallyloaded.

IX Environmental laboratory shall be established withadequate number and type of pollution monitoringand analysts equipment in consultation with theState Pollution Control Board.

9

No change in the calendar plan includingexcavation, quantum of mineral coal andwaste will be made.

No change in mining technology and scopeof working will be made without priorapproval of the Ministry of Environmentand Forests.

AAQ Monitoring stations established atfollowing places:Core Zone:

1) CETP2) Coal sub station3) CWS GM office4) Rose Garden

Buffer Zone:1) Madhauli Sub Station2) Nigahi STP3) CMPDI Camp, Singrauli4 Sur aKiranBhawan

Fugitive dust emissions from all thesources are being controlled by providing16 Nos. Mobile sprinklers on haul road,automatic Water spraying arrangement atcrusher, wagon loading and CHP andmaintained in operative condition.

Monitoring is being done by CMPDI forSPM, RSPM, 502 and (NO)x and report isbeing submitted. Enclosed monitoringreport is for QE March 2016. Heavy metalin air is being tested six monthly byCMPDI. Annexure-VAdequate technical measures have beenadopted. Additionally Ear plugs/ Earmuffsare also being provided to employeeswherever found necessary.

Already two ETPs have been constructedand maintained in operation for treatmentof wastewater from workshop, CHP &mine. Quality of treated water of ETP ismonitored fortnightly by CMPDI andweekly by SPCB/ MOEF recognizedlaboratory and all parametersconform tothe standards prescribed under GSR422(E) dated 19thMay, 1993 and 31st Dec1993.Regular maintenance of vehicles is beingconducted so that vehicular emissions areto be kept under control. Vehicles arebeing used for transporting the optimallyloaded mineral within the mine.Environmental laboratory is already set upat CMPDI (RI-VI) which is a subsidiary ofCIl, having all requisite facilities andmonitoring & analysis of Jayant O.c.P. iscarried out b the same at re ular interval.

Page 11: ( Subsidiary of Coal India Limited) Jayant Projectnclcil.in/env/compliance/Sept 15 to March 16-min.pdf( Subsidiary of Coal India Limited) Jayant Project P.O. Jayant ... Compliance

:- -g in dusty areas shall wear_____ ,_ --=::; c-ory devices and they shall also be

-- acequate training and information on- -:::= - aspects.

ealth surveillance program of thee undertaken periodically to observe

rs due to exposure to dust and to takeeasures, if needed.

- ==~2ra e environmental management cell with__ .s: e qualified personnel shall be set up under the

I of Senior Executive, who will report directlye head of the company.

nds earmarked for environmental protection+easures shall be kept in separate account and shall

be diverted for other purpose. Year-wiseexpenditure shall be reported to the Ministry and its

egional Office at Bhopal.

The Regional Office of this Ministry located at Bhopalshall monitor compliance of the stipulatedconditions. The project authorities shall extend fullco-operation to the office(s) of the Regional office byfurnishing the requisite data/information/monitoringreports.

Dust masks are provided to employees I

working in dusty areas and adequatetraining on safety and health is imparted.Occupational health surveillance programhas already been implemented andPeriodic Medical Examination after every I05 years for all the employees is done atour central hospital/ Project dispensary.Status of PME:-1. Last year (2014-15) PME forEmployees= 687.2. Financial year (2015-16) PME for

Em 10 ees = 919Environmental Management Cell hasalready been established and currentlyheaded by Dy. General Manager (Civil),Jayant who is reporting directly to thehead of Protect.Fund is not earmarked in Environmenthead but the actual expenditure forenvironmental measures is being reportedannually.The total expenditure on environmentdurin the ear 2015-16= Rs. 10.43 CrEnvironmental monitoring report andstatus of EC compliance is beingsubmitted to MPPCB and MOEF sixmonthly. Time to time officials of MPPCBand MoEFCC visiting the project formonitoring the physical status of thecom liances.

A copy of the environmental clearance letter shall bemarked to concerned Panchayat/local NGO, if any,from whom any suggestion/representation has beenreceived while rocessin the ro osal.

Complied.

xv Not Applicable to project.State pollution control board shall display a copy ofthe clearance letter at the Regional Office, DistrictIndustry Centre and Collector's office/Tehsildar'soffice for 30 da s.

XVI The Project authorities shall advertise at least in twolocal news papers widely circulated around theproject, one of which shall be in the vernacularlanguage of the locality concerned within seven days r-:-:----:-l---::-;------::-"-,----:----,----1of the clearance letter informing that the project has Name of Placeof Date ofbeen accorded environmental clearance and a copy News advertisement advertisementof the clearance letter is available with the State r-c-a7'-'e'-'-r--t----:--:------:-~=__-t---=-_:_::-::-::_:_--jPollution Control Board and may also be seen at the Amar Varanasi, UP 5.1.2009website of the ministry of Environment & Forests at Ujjalahttp:// envfo r. nic. in. The compIiance sta tu 5 5haII aIso t-::---:---:-:--:::-i-----::::-:----:-:-=__-t--::--c--:-:_:_---1be up loaded by the project authorities in their DainikB Satna, MP 6.1.2009website so as to bring the same in the public haskardomain.

~(g~11~Sr. Manager (~/EnV)

Jayant10

The EC of Jayant Project was published intwo news paper. The details are asfollows:

--- --- -- "--