- recommendations status - prr review report: actions - conclusion

5
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, 18.12.2012, CNES TOULOUSE Guillaume Prévôt APC, Paris Status on PRR recommendations and actions

Upload: leif

Post on 24-Feb-2016

46 views

Category:

Documents


0 download

DESCRIPTION

EUSO-BALLOON DESIGN REVIEW, 18.12.2012, CNES TOULOUSE. Status on PRR recommendations and actions. Guillaume Prévôt APC, Paris. - Recommendations status - PRR Review report: actions - Conclusion. Recommendations. 3 recommendations : - Project organization - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: -  Recommendations status -  PRR Review report: actions -  Conclusion

- Recommendations status

- PRR Review report: actions

- Conclusion

E U S O - B A L L O O N D E S I G N R E V I E W, 1 8 . 1 2 . 2 0 1 2 , C N E S T O U L O U S E

Guillaume PrévôtAPC, Paris

Status on PRR recommendations and actions

Page 2: -  Recommendations status -  PRR Review report: actions -  Conclusion

Recommendations

3 recommendations:

- Project organization

- First flight as soon as possible

- Schedule control

Project organization“ Defining the CNES organization, introducing an electrical architect, identifying all the activities relative to the harness, clarify the participations to the AIT, the instrument GSE responsibilities.”

- Action 1.1: The team has provided the updated organization.- Action 1.2: The team has provided the updated development plan to CNES.

CDR – 18.12.2012

Status on PRR actions 2

Page 3: -  Recommendations status -  PRR Review report: actions -  Conclusion

Recommendations

First flight as soon as possible“In consequence, the review panel supports the Euso-Balloon Project in its demand to obtain the first flight as soon as possible considering the project schedule and the opportunities of the CNES Balloon campaigns. A first launch before mid 2014 is recommended.”

Schedule control“In consequence, the review panel supports the Euso-Balloon Project in its demand to obtain the first flight as soon as possible considering the project schedule and the opportunities of the CNES Balloon campaigns. A first launch before mid 2014 is recommended.”

- Action 3.1.1: The 3 laboratories have done a proposition for a new project manager and it has been accepted by CNES.

- Action 3.4.1: The team has provided the updated instrument planning to CNES.

CDR – 18.12.2012

Status on PRR actions 3

Page 4: -  Recommendations status -  PRR Review report: actions -  Conclusion

PRR Review report: actions

41 actions have been taken with answers from the project team expected for the design review.

- Updates of: - The Technical Specifications document (EUSO-TS-INST-206-LAL_V2.0)- The Instrument Definition document (EUSO-DF-INST-204-LAL_V2.0)- The Organization Note (EUSO-ON-INST-201-LAL_V2_6)- The Compliance Matrix (EUSO-PA-INST-203-LAL_V2.0)- The Risk Analysis document (EUSO-RI-INST-404-IRAP V1.1)- The Development Plan (EUSO-DP-INST-207-LAL_V2.0)

- Writing of: - A Thermal Analysis document (EUSO-TA-INST-409-IRAP V1.0)- A Mission Analysis document (CNES)- ICD documentation (EUSO-IC-INST-407-IRAP_V1.0 (electronics) and

EUSO-MI-INST-408-IRAP_V1.0 (mechanics)) - A AIT Plan document (EUSO-AI-INST-251-LAL_V1.0)- A calibration Note (EUSO-CN-INST-003-APC_V1.0)

CDR – 18.12.2012

Status on PRR actions 4

Page 5: -  Recommendations status -  PRR Review report: actions -  Conclusion

PRR Review report: actions

39 actions have been closed by the team.

2 actions are open (about cleanliness strain).

- FB-14 and OLM-14 are open and they will be dealt with on a specific note delivered at the AIT Key Point.

CDR – 18.12.2012

Status on PRR actions 5