<Process Name>
PROJECT DEVELOPMENT WORKFLOW TASK MANUALVERSION 2.0
RIGHT OF WAY 2-Phase Support EA 9-Phase Capital EA
CONSTRUCT PROJECT3-Phase Support EA4-Phase Capital EA
PS & E1-Phase EA
PA & ED0-Phase EA
100 Project Management
Office of Structures &Other ES offices
START
245Post Right of Way Certification
800 End Project
120 CirculateDraft Env. Doc.
XXX.xx
District EngineeringServices (Lab, RW Eng,
etc.)
015 ProgramProject
230Draft PS&E
255Final PS&E
180Prepare and
Approve ProjectReport and FinalEnv. Document
205Obtain Permits, Agreements, & Route Adoptions
500 ApproveContract
Construction
XXX.xx
225Obtain R/W Interests for Right of Way
Certification
460 Ready to List
(RTL)
PM Activities
150 Developed
PID
Design Activities
030 Notice ofPreparation
CEQA requirement(EIR-ONLY)
035 Notice of IntentFHWA-NEPA requirement
(EIS ONLY)
235Mitigate Environmental Impacts and Clean up Hazardous Waste
195 & 200Right of Way Property Management & Utility Coordination
295Final
ConstructionEstimate &
Report
XXX.xx
200 PA & ED250
FinalStructures
PS&E
EnvironmentalActivities
410 Right ofWay
Certification
000 IdentifyProject Need
175Circulate DED andSelect Preferred
Project Alternative
260Contract
Documents
XXX.xx
190, 210, 215, &240
StructuresPlans, Design
and Draft PS&E
160Perform PreliminaryEngineering Studies
and Prepare DraftProject Report
225 RegularRight of Way
220Right of Way Engineering
265Advertise, OpenBids, Award &
Approve Contract
285 & 290CCO & ResolveContract Claims
380 Project PS&E
Xxx.xx
010 ApprovePID
END OFPROJECT
185Prepare Base
Maps and PlanSheets
300Final R/W
Engineering
165Perform
EnvironmentalStudies
Right of Way Activities
700 FinalReport
XXX.xx
270Construction
XXX.xx
LEGENDLEAD FOR
DELIVERABLES
600 ContractAcceptance
(CCA)
Project Phase and WBS Level 5 Flow Chart
1/13/2005