พญาไท phaya thai ราชปรารภ ratchaprarop มักกะสัน makkasan...
DESCRIPTION
Suvarnabhumi : Entrance Wall Advertisement Rate 360,000THB/Wall/Month LocationSuvarnbhumi Station No. of Media2 Walls Available Size23.00 x 3.00 m./Wall MaterialRemovable Sticker Production Cost135,000THB/WallTRANSCRIPT
พญาไทPHAYA THAI
ราชปรารภRATCHAPRAROP
มกักะสนัMAKKASAN
รามคำาแหงRAMKHAMHAENG
หัวหมากHUA MAK
บ้านทับชา้งBAN THAP CHANG
ลาดกระบงัLAT KRABANG
สวุรรณภมูิSUARNABHUMI
Package 2015
Airport Rail Link (ARL)
Number of Passenger
Number of ARL Passengers Increased by 4% in 2013Monthly: 1.2 ~ 1.46 Millions, Yearly: Over 15 Millions
Month/Year 2013 2014 2015
Jan 1,240,073 1,484,500 1,471,282
Feb 1,116,138 1,351,060 1,398,413
Mar 1,336,638 1,464,002 1,634,716
Apr 1,151,321 1,336,582
May 1,204,359 1,324,393
Jun 1,218,661 1,331,746
Jul 1,314,677 1,446,664
Aug 1,372,916 1,509,528
Sep 1,307,068 1,402,872
Oct 1,373,147 1,441,405
Nov 1,459,955 1,461,207
Dec 1,367,245 1,435,802
Total 15,462,198 16,989,761 4,504,411
Station/Year 2013 2014 2015 *
Phaya Thai 4,060,524 4,240,702 1,134,721
Ratchaprarop 1,099,807 1,140,831 318,535
Makkasan 1,551,790 2,028,312 556,248
Ramkhamheang 1,438,814 1,723,380 458,189
Huamark 1,592,622 1,695,873 422,005
Ban Tab Chang 610,555 744,952 187,923
Latkrabang 2,118,354 2,432,534 632,072
Suvarnabhumi 2,989,732 2,983,177 794,718
Total 15,462,198 16,989,761 4,504,411
Note: 2015 * updated as of end of March 2015
Suvarnabhumi : Entrance Wall
Advertisement Rate
360,000THB/Wall/Month
Location Suvarnbhumi Station
No. of Media 2 Walls Available
Size 23.00 x 3.00 m./Wall
Material Removable Sticker
Production Cost 135,000THB/Wall
Platform : Mirror Wrap City Line
Advertising Rate 250,000THB/Month/Side
Station Suvarnabhumi
No. of Media 2 Sides
Location City Line Platform
Material See-trough Sticker
Production Cost 96,300THB/5 Panel
Train Body Wrap
City Train Express Train
Advertisement Rate
200,000THB/Train/
Month
200,000THB/Train/
Month
No. of Media 5 Trains(1 Train = 3 Bogies)
4 Trains(1 Train = 4 Bogies)
Material Removable Sticker Removable Sticker
Production Cost
630,000THB/Train(a/w cover 3 Bogies)
630,000THB/Train (a/w cover 3 Bogies)690,000THB/Train (a/w cover 4 Bogies)
City Train
Express Train
Whole in Train - City Train
Advertisement Rate 140,000THB/Train/Month
No. of Train 5 Trains
Location Inside City Train
Material Clear & Removable Sticker
Production Cost
240,000THB/Train
Side Door
Overhead
Entrance Door
Connecting Door
Advertisement Rate 240,000THB/Train/Month
No. of Train 4 Trains
Location Inside Express Train
Material Clear & Removable Sticker
Production Cost 132,000THB/Train
Whole in Train - Express Train
Entrance Door
Overhead
Back Seat
Connecting Door
Phaya Thai Beam
Advertisement Rate 250,000THB/Package/Month
No. of Media 4 Panels/Package
Station Phaya Thai
Material Removable Sticker
Production Cost 68,000THB
Ceiling Advertising
Advertisement Rate
PhayathaiLatkrabangRatchaprarop, RamkhamhaengBan Tab Chang
120,000THB/Panel/Month100,000THB/Panel/Month 7 0,000THB/Panel/Month 50,000THB/Panel/Month
No. of Media 1 Station has 5 Panels
Size 4.78 x 7.20m./Panel
Material Removable Sticker
Production Cost 60,000THB/Panel
Platform Banister
Advertisement Rate 20,000THB/Banister/Month
No. of Media 1 Station has 4 Banisters
Size 4.00 x 1.00m./Banister
Material Removable Sticker
Production Cost Platform Banister 6,000THB/Banister
Suvarnabhumi : Entrance Columns
Advertisement Rate
700,000THB/8 Columns/Month
No. of Media 8 Columns
Location Entrance to Suvarnabhumi Airport
Material Removable Sticker
Production Cost 104,000THB/8 Columns
Suvarnabhumi: Wall Scape
Advertisement Rate 75,000THB/Wall/Month
No. of Media 1 Wall
Size 4.48 x 1.76 m./Wall
Station Suvarnabhumi
Location Passenger Hall
Material Removable Sticker
Production Cost 12,000THB/Wall
Suvarnabhumi Overhead
Advertisement Rate 150,000THB/2 Panels/Month
No. of Media 2 Panels
Station Suvarnabhumi
Location To/from City & Express Line Platform
Material Removable Sticker
Production Cost 16,000THB/2 Panels
LCD Advertising
Advertisement Rate 60,000THB/30 Days
No. of Media 138 Monitors, LCD Size 46 Inches
Length of Spot 30 Second – 4 Times an Hour
Operating Hours 18 Hours a Day
Airing Time/Screen/Day 72 Spots
Airing Time / 30 Days 2,160 Spots
Floor Display
Advertisement Rate 7,000THB/Booth/Day (Phaya Thai)
5,000THB/Booth/Day (Others station)
No. of Media Subject to Client
Size 2.00 x 2.00 m./Booth
Station Phaya Thai Ratchaprarop
Makkasan Ramkhamhaeng
Hua Mak Ban Thap Chang
Lat Krabang
Location Next to Ticket Vending Machine
Material Subject to Layout
Production Cost
Subject to Layout & Material
Remarks : Layout & material must be approved, and must be 30 days before the contract start date.
Street Over Head
A1 A2 B1 B2 C1
C2 D1 D2 E1 E2
No. Location ARL Station
Dindaeng – Watergate Ratchaprarop
Watergate - Dindaeng Ratchaprarop
Asoke – Rama 9 Makkasan
Rama 9 - Asoke Makkasan
Akekamai – Rama 9 N/A
No. Location ARL Station
Rama 9 - Akekamai N/AKlongtan – Ramkhamhaeng RamkhamhaengRamkhamhaeng - Klongtan RamkhamhaengPatthanakarn – Lamsalee Hua MakLamsalee - Patthanakarn Hua Mak
A1A2
B1
B2C1
C2D1
D2E1E2
Street Over Head
No. & Location Advertising Rate(THB/Billboard/Month) Size Production Cost
(THB/Billboard) Material
A1 : Dindaeng - Watergate 400,000 21 x 3 m. 180,000 Vinyl
A2 : Watergare - Dindaeng 400,000 21 x 3 m. 180,000 Vinyl
B1 : Asoke – Rama 9 300,000 18 x 4 m. 300,000 Sticker Wrap
B2 : Rama 9 - Asoke 300,000 18 x 4 m. 300,000 Sticker Wrap
C1 : Akekamai – Rama 9 300,000 18 x 4 m. 240,000 Sticker Wrap
C2 : Rama 9 - Akekamai 300,000 18 x 4 m. 240,000 Sticker Wrap
D1 : Klongtan – Ramkhamhaeng 250,000 18 x 4 m. 240,000 Sticker Wrap
D2 : Ramkhamhaeng - Klongtan 250,000 18 x 4 m. 240,000 Sticker Wrap
E1 : Patthanakarn – Lamsalee 250,000 18 x 4 m. 240,000 Sticker Wrap
E2 : Lamsalee - Patthanakarn 250,000 11 x 4 m. 220,000 Sticker Wrap
Traffic Information
Remarks: Information based on reports from Office of Transport and Traffic Policy and Planning (OTP) Year 2013. This is an estimated number of car per day nearby intersection of Street Overhead.
Station LocationNumber of
Car/Day (7.00 – 19.00 hrs.)
Ratchaprarop Dindaeng – Watergate 64,000
Makkasan Rama 9 – Asoke 79,200
Makkasan/Ramkhamhaeng Rama 9 – Akamai 54,900
Ramkhamhaeng Klongtan – Ramkhamhaeng 41,400
Hua Mak Patthanakarn – Lamsalee 44,200
A
B
CD
E