EXCEPT AS MODIFIED BY THE PLANS AND SPECIAL PROVISIONS.
CONSTRUCTION, HIGHWAY FOR SPECIFICATIONS STANDARD 2009 THE OF REQUIREMENTS THE WITH COMPLY
PROVIDE QP-2 CERTIFICATION TO THE RESIDENT ENGINEER PRIOR TO START OF WORK.
SSPC QP-2 CERTIFICATION WILL BE REQUIRED FOR THIS PROJECT.
VERIFICATION OF EXISTING CONDITIONS:
DESCRIPTION OF WORK:
WORK SITE OBSTRUCTIONS:
WITH REMOVAL OF OBSTRUCTIONS SHALL BE INCLUDED IN OTHER ITEMS OF WORK.
ASSOCIATED COSTS ALL WORK. BEGINNING TO PRIOR CONTRACTOR THE BY REMOVED BE SHALL PERFORMED
BEING OPERATIONS PAINT WITH INTERFERING DEBRIS, AND VEGETATION INCLUDING OBSTRUCTIONS ALL
SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE, TO THE SATISFACTION OF THE ENGINEER.
NEGLIGENCE CONTRACTOR'S THE TO DUE ROADWAY OR STRUCTURE BRIDGE THE TO DAMAGE ANY ROADWAY.
OR STRUCTURE BRIDGE EXISTING ANY TO DAMAGE PREVENT TO PRECAUTIONS NECESSARY ALL TAKE SHALL AND
PRACTICE CONSTRUCTION GOOD WITH CONSISTENT METHODS ADOPT SHALL CONTRACTOR THE PERFORMED. BE
WILL IT WHICH UNDER CONDITIONS AND WORK THE OF NATURE THE OF THEMSELVES INFORM FULLY SHALL BIDDERS
CLEAN THE DEBRIS SHALL BE INCLUDED IN OTHER ITEMS OF WORK.
TO COSTS ALL SEATS. BRIDGE AND PIERS OF TOPS THE FROM DEBRIS ALL REMOVE SHALL CONTRACTOR THE
WHAT METHOD OF REPAIR SHALL BE USED.
SO, IF AND NECESSARY ARE REPAIRS ANY IF DETERMINE SHALL ENGINEER BRIDGE THE DAMAGE. THE OF EXTENT
THE TO AS ENGINEER BRIDGE THE NOTIFY WILL TURN IN WHO ENGINEER RESIDENT THE NOTIFYING FOR RESPONSIBLE
BE SHALL CONTRACTOR THE CLEANING DURING EXPOSED IS STEEL STRUCTURAL DETERIORATED ANY IF
SPECIFICATIONS:
SSPC QP-2 CERTIFICATION:
CLEANING OF DEBRIS:
EXPOSURE OF DETERIORATED STRUCTURAL STEEL:
LABEL PAINT SYSTEM:
GENERAL NOTES
VERTICAL CLEARANCE SIGNS:
WORK.
OF ITEMS OTHER IN INCLUDED BE TO COST NECESSARY. AS SIGNS, CLEARANCE VERTICAL REINSTALL AND REMOVE
SECTION 512 OF THE STANDARD SPECIFICATIONS.
WITH ACCORDANCE IN BRIDGE OF CORNER SOUTHWEST THE ON GIRDER EXTERIOR THE INSIDE COMPLETION OF
DATE AND NAME CONTRACTOR'S NAME, MANUFACTURER'S TYPES, PAINT THE STENCIL SHALL CONTRACTOR THE
OF THE OKLAHOMA DEPARTMENT OF TRANSPORTATION.
BRANCH REPRODUCTIONS THE FROM OBTAINED BE MAY STRUCTURES, EXISTING THE FOR PLANS CONSTRUCTION
PLANS:ENVIRONMENTAL MITIGATION NOTES
GENERAL NOTES (CONT.)
JOB PIECE NO.
Design
Detail
Check
SHEET NO.
REVISIONSREV. NO. DESCRIPTION DATE
Engr.:
Squad:
MULTIPLE BRIDGES MULTIPLE COUNTY
OKLAHOMASTATE OF DEPARTMENT OF TRANSPORTATION
512(B)
0200
1.00
1.00
512(B)
1.00
1.00
UNIT
UNITDESCRIPTION
28782(04)
BRIDGE 'A' - NBI 18305
512(A) 1323 PAINTING EXISTING STRUCTURES (1) (3) LSUM
LSUM COLLECTION AND HANDLING OF WASTE (2) (3)6303
0201 BRIDGE 'B' - NBI 17566
1323512(A)
6303 COLLECTION AND HANDLING OF WASTE (2) (3)
LSUM
LSUM
ITEM QUANTITY
QUANTITYDESCRIPTIONITEM
PAY QUANTITIES
PAY QUANTITIES28782(04)
512(B)
0202
1.00
1.00
512(B)
1.00
1.00
UNIT
UNITDESCRIPTION
28782(04)
BRIDGE 'C' - NBI 17255
512(A) 1323 LSUM
LSUM COLLECTION AND HANDLING OF WASTE (2) (3)6303
0203 BRIDGE 'D' - NBI 17229
1323512(A)
6303 COLLECTION AND HANDLING OF WASTE (2) (3)
PAINTING EXISTING STRUCTURES (1) (3) LSUM
LSUM
ITEM QUANTITY
QUANTITYDESCRIPTIONITEM
PAY QUANTITIES
PAY QUANTITIES28782(04)
PAY ITEM NOTES
THE ON SITE LOCATION FOR TEMPORARY STORAGE OF LEAD WASTE MUST BE APPROVED BY THE ENGINEER.
WASTE.
COMPLY WITH SECTION 512 OF THE STANDARD SPECIFICATIONS FOR HAZARDOUS AND NON-HAZARDOUS
PAINT ON THESE STRUCTURE CONTAIN LEAD. THE CONTRACTOR IS RESPONSIBLE FOR TESTING AND WILL
OTHER THAN PAINTING AS SPECIFIED IN THE STANDARD SPECIFICATIONS.
OF WASTE, SAMPLING AND TESTING OF SOIL, AIR AND WASTE MATERIALS, PERMITS AND RELATED ITEMS
NECESSARY FOR CLEANING, CONTAINMENT, STABILIZATION, INCINERATION, TRANSPORTATION AND DISPOSAL
(2) PAY ITEM "COLLECTION AND HANDLING OF WASTE" SHALL INCLUDE ALL LABOR, MATERIALS AND INCIDENTALS
PRICE BID PER LUMP SUM OF "PAINTING EXISTING STRUCTURES"
ALL COSTS INCLUDING CLEANING, PAINTING, EQUIPMENT, LABOR AND INCIDENTAlS WILL BE INCLUDED IN
FOR STRUCTURAL STEEL" OF THE STANDARD SPECIFICATIONS.
THE PAINT SYSTEM AND APPLICATION THEREOF SHALL BE IN ACCORDANCE WITH SECTION 730 "PAINT
ITEMS AS SPECIFIED IN SECTION 512 OF THE STANDARD SPECIFICATIONS FOR A CATEGORY "E" APPLICATION.
SUPERSTRUCTURE SECTIONS INCLUDING BRACINGS, BEARING DEVICES AND ANY OTHER MISCELLANEOUS
(1) PAY ITEM "PAINTING EXISTING STRUCTURES" SHALL CONSIST OF CLEANING AND PAINTING OF ALL BRIDGE
A CATEGORY "O" APPLICATION.
(4) PAINT METAL HANDRAILS AND HANDRAIL POSTS AS SPECIFIED IN THE STANDARD SPECIFICATIONS FOR
512(B)
0204
1.00
1.00
UNITDESCRIPTION
28782(04)
BRIDGE 'E' - NBI 16612
512(A) 1323 LSUM
LSUM COLLECTION AND HANDLING OF WASTE (2) (3)6303
ITEM QUANTITY
PAY QUANTITIES
1.00
UNIT
0640
641
CONSTRUCTION
1399 MOBILIZATION LSUM
ITEM DESCRIPTION QUANTITY
PAY QUANTITIES28782(04)
MOLLA-ESMAIL
STRUCTURE 'E' WAS CONSTRUCTED UNDER PROJ. NO. I-35-1(15)(16)025
STRUCTURE 'C' AND 'D' WERE CONSTRUCTED UNDER PROJ. NO. F.A.P.-I-35-1(52)039.
STRUCTURE 'B' WAS CONSTRUCTED UNDER PROJ. NO. I-35-2-(105)046.
SBR-208C(022)SB.
NO. PROJ. UNDER REHABILATED AND 8(66) S.A.P. NO. PROJ. UNDER CONSTRUCTED WAS 'A' STRUCTURE
ASK FOR:
OKLAHOMA CITY, OKLAHOMA 73105
200 NE 21ST STREET
OKLAHOMA DEPARTMENT OF TRANSPORTATION
REPRODUCTION BRANCH
01/19TIS
AB01
PAY QUANTITIES
GENERAL NOTES AND
SORRELS
(04)
PAINTING EXISTING STRUCTURES (1) (3)
APPLICATION.
PAINT THE SECURE TO CONTRACTOR OF RESPONSIBILITY SOLE THE IS IT ENGINEER. THE BY APPROVED
AS USED BE WILL EQUIPMENT NECESSARY OTHER AND TARPS PAINTING. AND CLEANING DURING TRAFFIC
THE TO CAUSED IS DAMAGE NO THAT ENSURE TO TAKEN BE SHALL CARE E). AND B (BRIDGE HANDRAIL AND
E) D, C, B, A, (BRIDGES SUPERSTRUCTURE BRIDGE THE ON STEEL EXISTING THE PAINTING OF CONSISTS PROJECT THE
PAINTING EXISTING STRUCTURES (1) (3) (4)
PAINTING EXISTING STRUCTURES (1) (3) (4)
FOR THE ACCURACY THEREOF. NO COMPENSATION WILL BE ALLOWED FOR ERRORS IN THESE ESTIMATES.
THE AREA SHOWN FOR STRUCTURAL STEEL IS APPROXIMATE, AND THE STATE ASSUMES NO RESPONSIBILITY
STR. 'E' ESTIMATED AREA OF STRUCTURAL STEEL TO BE PAINTED IS APPROXIMATELY 8,500 SQUARE FEET.
STR. 'D' ESTIMATED AREA OF STRUCTURAL STEEL TO BE PAINTED IS APPROXIMATELY 6,500 SQUARE FEET.
STR. 'C' ESTIMATED AREA OF STRUCTURAL STEEL TO BE PAINTED IS APPROXIMATELY 7,500 SQUARE FEET.
STR. 'B' ESTIMATED AREA OF STRUCTURAL STEEL TO BE PAINTED IS APPROXIMATELY 10,000 SQUARE FEET.
(3) STR. 'A' ESTIMATED AREA OF STRUCTURAL STEEL TO BE PAINTED IS APPROXIMATELY 7,000 SQUARE FEET.
PRE-APPROVED BY THE ODOT BIOLOGIST.
BE MUST NETTING THAN OTHER METHODS 1. MARCH TO PRIOR OPENINGS, SMALLER OR 0.25-INCH WITH
NETTING POLYPROPYLENE WEATHER-RESISTANT OF PLACEMENT THE BY STRUCTURE A WITHIN OR ON SITES NEST
SUITABLE FROM BIRDS ADULT OF EXCLUSION THE INCLUDE OPTIONS INJURY. OR DEATH BIRD IN RESULT NOT DO
THAT MEANS BY 1, MARCH TO PRIOR ESTABLISHMENT NEST NEW FROM PROTECTED BE MAY BRIDGE THE OCCUPIED.
NOT ARE NESTS BIRD MIGRATORY WHEN 28, FEBRUARY AND 1, SEPTEMBER BETWEEN CONDUCTED BE SHALL
BRIDGE/STRUCTURES EXISTING THE OF DEMOLITION OR REHABILITATION RETROFIT, REPAIR, PAINTING, THEN
OBSERVED ARE BIRDS IF OBSERVED. IS STRUCTURES EXISTING THE OF USE BIRD ANY IF 405-210-3671 AT BIOLOGIST
ODOT THE CONTACT SHALL ENGINEER RESIDENT THE PROJECT. THIS ON DONE WAS SURVEY NO 31. AUGUST TO 1
MARCH FROM EXTENDS SPECIES BIRD MOST FOR SEASON NESTING THE NESTING. FOR CULVERTS AND BRIDGES USE
COMMONLY BIRDS MANY ACT. TREATY BIRD MIGRATORY FEDERAL THE BY PROTECTED ARE BIRDS MIGRATORY
BRIDGE 'B' (NBI # 17560)Ø
Ø 5/23/2019ADDED NOTE
BRIDGE.
THE ON TRUCKS AND EQUIPMENT PARKING WHEN CONTRACTOR THE BY OBSERED BE MUST LIMITS WEIGHT THESE
BASED ON THE TRUCK CONFIGURATION. SEE WEIGHT LIMIT DEPICTION BELOW:
TONS 42 OR 33, 21, TO LIMITED IS BRIDGE THE OF CAPACITY CARRYING LOAD THE BRIDGE. POSTED LOAD A IS THIS