Page 1: Optimising Building Performance - City of Melbourne...18-28 C,

Presented by

22/05/2012

Optimising Building Performance

Dr Paul Bannister

Page 2: Optimising Building Performance - City of Melbourne...18-28 C,

Where does the energy go?HVAC technologiesLighting technologiesOffice equipmentOther technologiesConclusions

Overview

Page 3: Optimising Building Performance - City of Melbourne...18-28 C,

Where does the Energy Go?

Page 4: Optimising Building Performance - City of Melbourne...18-28 C,

HVAC consists ofChillersCooling towersBoilersCogen/trigenFans and PumpsPackage unitsHVAC control systemAnd some other bits and pieces

HVAC Technologies

Page 5: Optimising Building Performance - City of Melbourne...18-28 C,

Optimum chiller technologies<300kW – scroll300-700kW – magnetic bearing VSD centrif700-1000kW mag bearing VSD centrif, small VSD screw1000-2000kW VSD screw, VSD mag bearing centrif

Savings – up to 50% relative to 10-15 year old technologiesEconomics: long payback, coordinate with routine replacement if possible. Note: R22/R123 (HCFCs) are becoming obsolete

Chiller Hardware

Page 6: Optimising Building Performance - City of Melbourne...18-28 C,

Don’t run when they aren’t neededOutdoor temperature lockout

Operate at higher chilled water temperaturesOperate at lower condenser water temperaturesStage up and down at the right timeEconomics: great

Chiller Operation

Page 7: Optimising Building Performance - City of Melbourne...18-28 C,

Hardware:Replace old tired cooling towersUse induced draft towers not forced draft towersVariable speed fans

OperationSpread load out across multiple towersOptimise temperature set-point in conjunction with chillers

Cooling Towers

Page 8: Optimising Building Performance - City of Melbourne...18-28 C,

Hardware:Replace tired old boilersEliminate steam boilers as far as possibleUpgrade burners to fully modulating burnersUse condensing boilers

OperationTune the burner regularlyTurn off as much as possibleReduce operating temperature when loads permit

Boilers

Page 9: Optimising Building Performance - City of Melbourne...18-28 C,

Hardware:Not a magic bullet, and very expensiveSizing a critical issueCan you actually use the waste heat?

OperationConsider third party operation and managementMaximise run hours during peak electricity cost periods to get returnDon’t create false loads to justify thermal useNot a substitute for efficiency

Cogen/trigen

Page 10: Optimising Building Performance - City of Melbourne...18-28 C,

Hardware:Replace stuffed bearings and sagging V-belts Use VSD control not guide vane

OperationSet up controls to minimise operating speed and pressure to meet loadTurn off when not needed

Fans

Page 11: Optimising Building Performance - City of Melbourne...18-28 C,

Hardware:Replace stuffed bearingsUse VSD control not throttling valves

OperationSet up controls to minimise operating speed and pressure to meet loadTurn off when not needed

Pumps

Page 12: Optimising Building Performance - City of Melbourne...18-28 C,

Hardware:Replace dying unitsInstall condenser water shut-off valves

OperationTurn off when not neededWiden dead bandsRefrigerant chargeFilter cleaning

Water Cooled Package Units

Page 13: Optimising Building Performance - City of Melbourne...18-28 C,

Hardware:Replace with inverter units

OperationTurn off when not neededWiden dead bandsRefrigerant chargeFilter cleaning

Air Cooled Package Units

Page 14: Optimising Building Performance - City of Melbourne...18-28 C,

Hardware:Replace pneumatic systems

OperationSee operational measuresWiden dead bandsCommission!Time-of-use control

HVAC Controls

Page 15: Optimising Building Performance - City of Melbourne...18-28 C,

Outside air controlOptimise economy cycleMinimise unnecessary outside air

Air FiltersClean regularlyUse high energy efficiency filters (Eurovent standard)

Other HVAC Bits and Pieces

Page 16: Optimising Building Performance - City of Melbourne...18-28 C,

Halogen downlightsReplace with LED (with care!)

Metal HalideConsider LED replacements if control possible

FluorescentAim for <9W/m² in office spaceT5 or T8 with electronic ballastGrid spacing and design important

Lighting is a DESIGN issue

Lighting Technologies

Page 17: Optimising Building Performance - City of Melbourne...18-28 C,

Time of use control is paramountManual switches rarely effectiveTime-clocks tend to longer hours than necessaryUse occupancy sensors

Manual on, auto-off Zone size <250m²

DimmingGood theory but often unsuccessfulKeep focussed on the time of use control!

Lighting Control

Page 18: Optimising Building Performance - City of Melbourne...18-28 C,

Time of use control is paramountWorking week is less than a third of the hours in a weekTurn off!!

Use low-power PCs (laptops and some desktops; thin client)Use power management settings

Screen savers do not save energy

Office Equipment - Computers

Page 19: Optimising Building Performance - City of Melbourne...18-28 C,

Time of use control is paramountUse power management settings

Avoid excess equipmentUse central print stations, MFDs

Kitchen equipmentUse 3+star fridges, etcTime-clock boiling water/ chilled water units

Office Equipment - General

Page 20: Optimising Building Performance - City of Melbourne...18-28 C,

Don’t over-conditionASHRAE air-on recommendations:

18-28°C, <60% RH, 5.5°C<dewpoint<15°CMake sure air goes through not around the racks

“Hot aisle/cold aisle” approachEnsure that separate conditioners are not fightingVirtualise/modernise serversRemove old, underutilised servers

Office Equipment – Server Rooms

Page 21: Optimising Building Performance - City of Melbourne...18-28 C,

Upgrade technologyMassive costBenefit can be >40%

Tune operating parameters to match real-occupancyDon’t over condition the lift motor roomUpgrade the lights in the lift carsTurn off some lifts overnight (remarkably difficult)

Other Equipment – Lifts

Page 22: Optimising Building Performance - City of Melbourne...18-28 C,

Convert electric to gas or heat pumpReduce tap flowsTurn off circulation pump out of hours

Other Equipment – Domestic Hot Water

Page 23: Optimising Building Performance - City of Melbourne...18-28 C,

Wide range of possible upgrades for all technologyIn each case measures may be

Hardware – longer paybacksOperational – shorter paybacks

Remember: Most buildings have many operational savings availableImproved efficiency frequently means better service

Conclusions

Page 24: Optimising Building Performance - City of Melbourne...18-28 C,

Presented by

22/05/2012

Questions?