* oas indirect cost recovery (icr) policy and procedures (ver. 1)
DESCRIPTION
TRANSCRIPT
![Page 1: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/1.jpg)
SAF Transformation and Modernization Project04/10/23 OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1) 1
SECRETARIAT FOR ADMINISTRATION AND FINANCENOV. 2007
Ver.7
SECRETARIAT FOR ADMINISTRATION AND FINANCENOV. 2007
SAF TRANSFORMATION AND MODERNIZATION PROJECT (STAMP)Secretariat for Administration and Finance (SAF)
Presentation to the Committee on Administrative and Budgetary Affairs (CAAP)
November 15, 2007
![Page 2: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/2.jpg)
SAF Transformation and Modernization Project
What is covered in this presentation?
I. Is Modernization Necessary?
II. The Transformation Path
III. Managing the Transformation Successfully
IV. Next Steps
04/10/23 2
![Page 3: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/3.jpg)
SAF Transformation and Modernization Project04/10/23 3
IIs Modernization Necessary?
![Page 4: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/4.jpg)
SAF Transformation and Modernization Project
An Evolving OAS
▪ The General Secretariat translates mandates from Member States into programs and projects, initiatives, services. Well-executed programs and the trust of Member States and the international community are essential elements to sustain and increase support for OAS’ mission.
▪ OAS needs to evolve into an integrating agency and strategic alliance builder that must maintain its competitive advantage as it seeks scarce donor resources to implement programs.
▪ Good internal governance is fundamental to successful program execution and increased member state/international community support.
04/10/23 4
![Page 5: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/5.jpg)
SAF Transformation and Modernization Project
An Evolving OAS / A Static Resource Management Structure
▪ OAS and all other multi-laterals have not kept pace with industry standards and trends.
▪ OAS’ General Standards, Budgetary and Financial Rules, Administrative Memoranda, Procurement and Personnel guidelines adopted decades ago were consistent with the industry standards at the time. International accounting standards were in their infancy.
▪ Changes to the standards since then have been minimal and/or piecemeal with a focus on solving crises or specific issues, not the overall management of resources. The results are often OAS-specific and limit management and partners from being able to benchmark and compare OAS’ results to other institutions.
e.g., Employee/Contractor hiring mechanisms have become unwieldy and unintelligible over time in order to deal with hiring for specific fund programs. One or two mechanisms have grown to eleven.
▪ Business processes are rigid and rules-driven. Each transaction is treated as though it poses the same level of risk. As a result, transaction costs are high.
04/10/23 5
![Page 6: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/6.jpg)
SAF Transformation and Modernization Project
An Evolving OAS / A Static Resource Management Structure
▪ Management and Donor Reporting was mainly financial, focused on inflows and outflows, lacked analysis and a meaningful link between the use of resources and intended outcomes.
▪ Despite a significant investment in a modern enterprise resource management system, Oracle’s E-Business Suite (internally named “OASES”) was being configured to fit an outdated resource management model. The full strategic capability of OASES was underutilized.
▪ External systems were being developed independently by program areas and not as part of an well-defined organizational approach to managing resources. The Organization’s IT resources were not aligned with the core business of the OAS.
04/10/23 6
![Page 7: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/7.jpg)
SAF Transformation and Modernization Project
What Do Our Donors/Strategic Partners Expect?
▪ A meaningful way to measure performance based on common standards. Good quality, credible standards enhance the reliability, consistency and transparency of
resource management information. Standards are more credible when the standard-setting process is independent of any particular body.
▪ Proper accountability Timely, understandable reports that link the use of resources to the accomplishment of
strategic goals and objectives; not just transaction reporting.
▪ Resources to be used effectively and efficiently to accomplish objectives Minimize transaction costs, simplify and streamline rules and business processes, less
bureaucracy.
▪ Quality service and results Modern, responsive and flexible administrative infrastructure focused on delivering value.
04/10/23 7
![Page 8: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/8.jpg)
SAF Transformation and Modernization Project
How Are Other International Organizations Adjusting?
▪ All other international organizations, public-sector entities and NGOs are adapting their resource management standards and systems to meet member state and partner expectations and evolving priorities.
▪ The United Nations, World Health Organization, Pan American Health Organization, International Monetary Fund, Inter-American Development Bank, The World Bank, The Commonwealth Secretariat have all undertaken transformation initiatives.
▪ Standardization and simplification and a focus on value is driving change in the way that all resources are managed: human, financial, real property and information.
▪ They are adopting new resource management standards such as International Public Sector Accounting Standards (IPSAS), human resource and procurement standards.
04/10/23 8
![Page 9: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/9.jpg)
SAF Transformation and Modernization Project
Consequences of Maintaining the Status Quo
▪ OAS will be the only major international/multilateral organization trying to implement programs/projects in the 21st century with 20th century administrative mechanisms.
▪ OAS will lose its competitive edge if it cannot demonstrate to partners that it can effectively manage resources in a modern way, demonstrate accountability for those resources, and meaningfully report results.
▪ OAS will not be able to develop meaningful strategic plans and implement results-based management as managers/donors/partners will continue to have only a “moment-in-time” snapshot of Organizational resources.
▪ No benchmarking will be possible with similar institutions to measure the effectiveness and efficiency of the OAS.
▪ OAS will continue to have dual approaches to managing Regular and Specific fund resources.
04/10/23 10
![Page 10: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/10.jpg)
SAF Transformation and Modernization Project04/10/23 11
IIThe Transformation Path
![Page 11: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/11.jpg)
SAF Transformation and Modernization Project
OAS’ RESOURCE MANAGEMENT FRAMEWORK
•Performance Reporting•Cost Management•Investment Management
•Internal Controls•System Security and Integrity•Training/Skill Sets
•Roles and Responsibilities•Code of Ethics•Administrative Support Model
RISK MANAGEMENT
OAS’ GOVERNANCE STRUCTURE
RESOURCE MANAGEMENT STANDARDS AND SYSTEMS
•Accounting/Reporting Standards•Hiring Standards•Procurement Standards
•Policies and Procedures•Business Processes•Enterprise Resource Planning System
C
omm
un
icat
ion
Str
ateg
y
Professional Development
1204/10/23
![Page 12: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/12.jpg)
SAF Transformation and Modernization Project
OAS’ RESOURCE MANAGEMENT FRAMEWORK
RESOURCE MANAGEMENT STANDARDS AND SYSTEMS•Accounting/Reporting Standards•Hiring Standards•Procurement Standards
•Policies and Procedures•Business Processes•Enterprise Resource Planning System
1304/10/23
![Page 13: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/13.jpg)
SAF Transformation and Modernization Project
Resource Management Standards and SystemsThe Transformation Path
Adoption of International Public Sector Accounting Standards
▪ This is not just an accounting issue – it defines the way we manage and report on all resources including fixed assets, human resources, buildings, equipment, etc. Reporting will be integrated and standardized across all funds of all types, allowing greater transparency and better decision-making.
▪ Adoption will align OAS accounting practices with independent and internationally-recognized accounting standards and will improve the consistency and comparability of financial statements, internally and externally. Similar to the approach used by other IO’s/Multilaterals, we will gradually introduce changes to our resource management standards.
04/10/23 14
![Page 14: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/14.jpg)
SAF Transformation and Modernization Project
Resource Management Standards and SystemsThe Transformation Path
Adoption of International Public Sector Accounting Standards
▪ Follows from instructions to General Secretariat via General Assembly Budget Resolution AG/RES.2353 (XXXVII-O/07) and Board of External Auditors recommendations.
▪ Accrual accounting means that the OAS for the first time will recognize past, present and future obligations against Organizational resources. There is nothing new here. These are not new obligations but under OAS-specific accounting rules they remain largely un-quantified; rendering them “invisible” and/or under-reported.
04/10/23 15
![Page 15: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/15.jpg)
SAF Transformation and Modernization Project
OASES Becomes the Definitive Enterprise Resource Management System
▪ OASES is the definitive source of all resource management and performance reporting
▪ Eliminate external applications and build solutions within OASES; Maximize use of existing Oracle functionality
▪ Integrate redefined, optimized business processes into OASES
▪ Implement new modules where needed to reduce risk and enhance resource management capability:
Project Management Public Sector Budgeting Fixed Assets Time and Labor Self-Service Human Resources
▪ Move set of books to an accrual basis
04/10/23 16
Resource Management Standards and Systems
The Transformation Path
![Page 16: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/16.jpg)
SAF Transformation and Modernization Project
Business Process Reengineering (BPR)
▪ The objective is to move away from a rigid, transaction-oriented and “silo” approach to a more flexible, adaptable and horizontally-integrated way of managing resources.
▪ Focus is on easing the administrative burden and reducing manual transaction processing by fully integrating solutions into OAS’ enterprise resource management system (OASES), and
▪ Simplifying and standardizing policies, processes and terms. What is a performance contract? When should it be used? Who is an employee? How should we hire/contract short-term vs. long-term human resources? How should we hire/contract individuals financed with project specific funds? What are appropriate contracting mechanisms?
04/10/23 17
Resource Management Standards and Systems
The Transformation Path
![Page 17: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/17.jpg)
SAF Transformation and Modernization Project
OAS’ RESOURCE MANAGEMENT FRAMEWORK
•Performance Reporting•Cost Management•Investment Management
•Internal Controls•System Security and Integrity•Training/Skill Sets
RISK MANAGEMENT
RESOURCE MANAGEMENT STANDARDS AND SYSTEMS
•Accounting/Reporting Standards•Hiring Standards•Procurement Standards
•Policies and Procedures•Business Processes•Enterprise Resource Planning System
1804/10/23
![Page 18: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/18.jpg)
SAF Transformation and Modernization Project
Develop a Risk Management Framework
▪ Performance Reporting Reports link resource use to results and are relevant, understandable, comparable to
established standards, timely, consistent and reliable Quarterly Resource Management Reports Board of External Auditors Reports Develop a reporting strategy
▪ Cost Management Develop and deploy good costing models and budgets for projects, activities
▪ Investment Management Not just about money; manage the Organization’s investments in all resources: cash,
buildings, people
▪ Internal Controls
Achieve the proper balance between controls and risk; leverage technology and reduce manual controls, raise the level of consciousness to internal controls within resource management team; partner with OIG’s Office in proactive identification and mitigation of risk
▪ System Security and Integrity Enforce risk management policies
04/10/23 19
Risk Management
The Transformation Path
![Page 19: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/19.jpg)
SAF Transformation and Modernization Project
Develop a Risk Management Framework
▪ Training Training programs must be in place to prepare and equip staff with the skills and tools
necessary to both navigate the transformation process and to operate within a modernized OAS
Role-based training programs:
First stage is training and AGA certification in governmental financial management for finance/budget/administrative personnel.
About 60 administrative and financial staff are participating in the Certified
Government Financial Manager Training Program
Oracle business-analyst training for OASES module managers
IPSAS training
Career and succession planning
04/10/23 20
Risk Management
The Transformation Path
![Page 20: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/20.jpg)
SAF Transformation and Modernization Project
OAS’ RESOURCE MANAGEMENT FRAMEWORK
•Performance Reporting•Cost Management•Investment Management
•Internal Controls•System Security and Integrity•Training/Skill Sets
•Roles and Responsibilities•Code of Ethics
•Administrative Support Model
RISK MANAGEMENT
OAS’ GOVERNANCE STRUCTURE
RESOURCE MANAGEMENT STANDARDS AND SYSTEMS
•Accounting/Reporting Standards•Hiring Standards•Procurement Standards
•Policies and Procedures•Business Processes•Enterprise Resource Planning System
C
omm
un
icat
ion
Str
ateg
y
Professional Development
2104/10/23
![Page 21: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/21.jpg)
SAF Transformation and Modernization Project
Strengthen OAS’ Governance Framework
▪ Includes clear definitions of roles and responsibilities and lines of accountability and the development of a corporate code of values and ethics.
▪ CAAP and Political Bodies▪ Administrative Model▪ Program and Evaluation Committee (PEC)▪ Handbook on Specific Funds▪ Indirect Cost Recovery (ICR)▪ STAMP▪ Staff Committee▪ Building a corporate culture
04/10/23 22
OAS Governance Structure
The Transformation Path
![Page 22: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/22.jpg)
SAF Transformation and Modernization Project04/10/23 23
OAS Governance Structure The Transformation Path
Governing Bodies
Central Administration (SAF)
OAS Country and Project Offices
Program Area Financial and Administrative Staff
Continuous CommunicationContinuous
Communication
Continuous Communication
Shared Administrative
Responsibility
Continuous Communication
![Page 23: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/23.jpg)
SAF Transformation and Modernization Project04/10/23 24
IIIManaging the Transformation Successfully
![Page 24: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/24.jpg)
SAF Transformation and Modernization Project
Managing the Transformation Successfully
▪ Commitment Requires high-level vision and commitment to modernization effort
Secretary General’s Agenda Board of External Auditors Recommendations All of OAS Initiative CAAP Member States, Key Stakeholders/Partners
Requires everyone involved in change effort to have a cohesive vision and strategy. All modernization initiatives should harmonize with the Organization’s strategic direction and the transformation plan.
04/10/23 25
![Page 25: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/25.jpg)
SAF Transformation and Modernization Project
Managing the Transformation Successfully
▪ Communication Strategy Builds a shared vision of the need to modernize OAS’ resource management
structure Communicates modernization plan throughout the Organization Keeps donors and stakeholders informed about plan progress Provides a forum for stakeholders to provide feedback
▪ Cross-Functional Team SAF Transformation and Modernization Project (STAMP) team has been tasked to
lead the change effort.
The STAMP team has representatives from all SAF Departments/Offices, Program Areas, Office of the Inspector General, and the Staff Association
▪ Training Strategy Ensures that those involved in and impacted by the change effort have the
necessary skills and tools to successfully plan and implement changes.
04/10/23 26
![Page 26: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/26.jpg)
SAF Transformation and Modernization Project04/10/23 27
IVNext Steps
![Page 27: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/27.jpg)
SAF Transformation and Modernization Project
Where are We and Where Do We Need to Go?
We have started on the journey towards new standards; e.g.:
1. Dramatically improved quarterly reporting2. Specific Fund Handbook3. Indirect Cost Recovery 4. Project Evaluation Committee5. Results-Based Management6. STAMP Implementation Team has been formed (BPR is underway)7. Oracle being upgraded (Technical Upgrade is the first phase)8. Updated Staff and Procurement Rules9. OAS has joined the UN IPSAS Task Force in order to keep abreast of developments,
share knowledge and develop solutions10. Some professional development (AGA)11. Information Management Plan
04/10/23 28
![Page 28: * OAS Indirect Cost Recovery (ICR) Policy and Procedures (Ver. 1)](https://reader035.vdocuments.mx/reader035/viewer/2022062617/54b8c60e4a7959df298b45a9/html5/thumbnails/28.jpg)
SAF Transformation and Modernization Project
Where are We and Where Do We Need to Go?
CAAP and the Governing Bodies’ role is now pivotal in moving this modernization agenda forward. In the not-too-distant future, we will be coming with an integrated proposal to modify and update the General Standards, particularly in the following areas:
Adoption of IPSAS Staff Rules Information Management Policies Procurement Rules Real Property Strategy