Page 1: 101018.URS.SAG.CAC Meeting #1
Page 2: 101018.URS.SAG.CAC Meeting #1

Agenda

• Study Purposey p• Brooklyn Streetcar History• What is Streetcar?• Streetcar Systems in

OperationStudy Area• Study Area

• Goals• Scope of StudyScope of Study• Schedule

2

Page 3: 101018.URS.SAG.CAC Meeting #1

Study Purpose

• Determine the Feasibility of ya Streetcar Linking Red Hook with Surrounding AreasAreas.

3

Page 4: 101018.URS.SAG.CAC Meeting #1

Brooklyn Streetcar History

• First electric streetcar opened in 1893

• During its peak Brooklyn h d 80 li d 3000had 80 lines and 3000 streetcars

• Baseball team gotBaseball team got nicknamed the “Brooklyn Trolley Dodgers”L t t t i 1956• Last streetcar ran in 1956

4

Page 5: 101018.URS.SAG.CAC Meeting #1

What is a Streetcar?

• "Streetcar" refers to local public transportation using electric vehicles h ilthat run on rails.

• Streetcars typically run in shared traffic lanes, but can also run on a segregated right-of-way.

5

Page 6: 101018.URS.SAG.CAC Meeting #1

What is a Streetcar?

S

Overhead Catenary Wire

StreetcarLight Rail Transity

6

Physical Separator Operates in Mixed Traffic

Page 7: 101018.URS.SAG.CAC Meeting #1

Streetcar Vehicle Types

Heritage StreetcarSan Francisco, CA

ReplicaTampa Bay, FL

7

ModernSeattle, WA

Emerging TechnologyNice, France

Page 8: 101018.URS.SAG.CAC Meeting #1

Streetcar Systems in Operation

Example Systems

Philadelphia, PASeattle, WAPortland, OR

8

Page 9: 101018.URS.SAG.CAC Meeting #1

Streetcar System - Portland

• First modern streetcar system in the United Statesin the United States

• Service started in July, 2001

• Original route was a 4.8 mile loop which currently extends to 7.8 miles

• Estimated economic development impact - $3.5 billion

• Unique 12” shallow track construction minimized impact to abutting business owners

9

to abutting business owners

Page 10: 101018.URS.SAG.CAC Meeting #1

Streetcar System - Seattle

• Service started in December, 20072007

• 2.6 mile route

• Area property owners contributed to 50% of the capital costs

• Project approval to completion in 2 years

• GPS trackers allow riders to know when the next streetcar will arrive

10

Page 11: 101018.URS.SAG.CAC Meeting #1

Streetcar System – Girard Avenue

• Started as horse car line in 1859

• Service ended in 1992 and restarted in September, 2005

• 8 5 mile route8.5 mile route

• 25% of track line was rehabilitatedrehabilitated

• 1947 PCC streetcars rebuilt d d f t

11

and used for system

Page 12: 101018.URS.SAG.CAC Meeting #1

Red Hook / Brooklyn Streetcar Study Areay

Red Hook / Focus Area

12

Page 13: 101018.URS.SAG.CAC Meeting #1

Goals

• Identify potential alignments in Red Hook.

Id tif it t d• Identify unit costs, and potential impacts (e.g. construction, utilities, traffic).

• Determine the feasibility of a streetcar in the focus area with connections to the larger study areaarea.

13

Page 14: 101018.URS.SAG.CAC Meeting #1

Scope of Study

• Learn from experience of other streetcar systems

• Project transit demand in Red jHook

• Identify potential streetcar routesIdentify potential streetcar routes

• Estimate costs and identify issues for feasibility of streetcarfor feasibility of streetcar

14

Page 15: 101018.URS.SAG.CAC Meeting #1

Schedule

October November December January February

Existing Conditions & Case Existing Conditions & Case Study Report

Identify Potential Routes

Cost Estimating, Construction Issues

and Alignment Work and Alignment Evaluation

Work Completed

To Date Feasibility Evaluation

Final Report

15

CAC Meeting

CAC Meeting

CAC Meeting

Public Meeting

Page 16: 101018.URS.SAG.CAC Meeting #1

Brooklyn Streetcar Feasibility Study

Questions?

16

Page 17: 101018.URS.SAG.CAC Meeting #1