Page 1: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

Investment opportunities in natural gas infrastructure - - legallegal aspe aspeccttss - -

MINISTRY OF MINING AND ENERGY

RUPUBLIC OF SERBIA:

Branislava Lepotić Kovačević, Ph.d

Aleksandra Babić

Belgrade, March 8th 2005

Page 2: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

2

Content

investments in construction of gas pipelines and

underground storages

existing investment models

investment barriers

conclusions

Page 3: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

Development of gas pipelines and underground storages

Page 4: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

4

Development of gas pipelines and underground storages - before The Energy Law is fully enforced -

administrative procedure for construction of energy

facilities is same as procedure for all facilities

responsibility of the Ministry for capital investments

Building permit and Occupancy permit issued by the

Ministry for capital investments

Page 5: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

5

Development of gas pipelines and underground storages - after The Energy Law is fully enforced -

Energy permit for constructions of energy facilities

responsibility of the Ministry of mining and energy

Energy permit is precondition for Building permit

issued in accordance with:

– Energy sector Development Strategy and

– Strategy Implementation Programme

Page 6: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

Activities in natural gas sector

Page 7: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

7

Activities in natural gas sector- provided by the Energy Law -

gas pipeline transportation and operation of gas transportation pipelines

gas distribution and operation of gas distribution pipelines

underground gas storage and operation of underground gas storage

natural gas trade

activities of public interests (except natural gas trade), monitored by the Government and the Energy Agency

Page 8: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

Existing Models

Page 9: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

9

Existing Models

State-owned enterprise (SOE)/daughter company

of SOE

Contract on assignment of right to conduct activity of

public interest (Assignment Contract)

Concession Contract

Page 10: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

SOE/daughter company of SOE

Page 11: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

11

S O E - existing models -

founded by – the Government of the Republic

of Serbia

investment into SOE:

– investment into SOE is not allowed so far

– joint ventures with SOE are possible

– loan agreements and commercial arrangement are

possible

Page 12: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

12

Daughter company of SOE - existing models -

daughter company founded by – Petroleum Industry of

Serbia (SOE)

sources of investments

– Investments in daughter company of SOE

– Joint venture…

Page 13: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

13

SOE and daughter company of SOE - existing models -

Characteristics: legislation is in transition procedure (pending

adjustments)

Petroleum Industry of Serbia (SOE) is approaching

restructuring procedure

Page 14: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

14

Model of daughter company of SOE

additional founder daughter company

bank(credit

contract)

feasibilitystudy

Assignment Contract

contract on international

sale of equipment

additionalfoundingcapital

credit forfoundingcapital

Modality 1:credit for

assets

Modallity 2:credit for

assets

gas pipelineconnection

Page 15: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

15

Model of daughter company of SOE - after The Energy Law is fully enforced -

additional founderdaughtercompany

bank(credit

contract)

feasibilitystudy

AssignmentContract

contracton international

sale on equipment

additionalfounding

capital

creditfor founding

capitalModality 1:

creditfor assets

Modality 2:credit

for assets

Modality 1:energy permit

Modality 2:energy permit

energy licence- Energy Agency

responsibility

gas pipelineconnection

Page 16: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

Assignment Contract

Page 17: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

17

Assignment Contract- existing models -

Preconditions: any form of company can be founded (except SOE)

founder of company - domestic and/or foreign person

company must be fully in compliance with the

legislation (technical conditions for equipment,

environmental protection,...)

Page 18: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

18

Assignment Contract- existing models -

Characteristics: procedure not used so far

avoids tendering procedure

new legislation pending

time period is not legally limited nor defined

there is no legal obligation to transfer energy facility

into state property

Page 19: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

19

Model – Assignment Contract

founder newcompany

bank(credit

contract)

feasibilitystudy

Assignment Contract

contractfor international

sale of equipment

foundingcapital

credit forfoundingcapital

Modality 1:credit

for assets

Modality 2:credit for

assets

gas pipelineconnection

Page 20: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

20

Model – Assignment Contract - after The Energy Law is fully enforced -

foundernew

company

bank(credit

contract)

feasibilitystudy

Assignment Contract

contractfor international

sale of equipment

foundingcapital

Credit forfoundingcapital

Modality 1:credit

for futureequipment

Modality 2:credit for

equipment

Modality 1:energy permit

Modality 2:energy permit

energy licence- Energy Agency

gas pipelineconnection

Page 21: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

Concession Contract

Page 22: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

22

Concession Contract - existing models -

Preconditions: Grantee – domestic or foreign person Grantor – the Government of the Republic of Serbia

Procedure: Serbian Government and Parliament to review the

application

one member of Tendering Commission from Serbian Parliament

The Government of Serbia signs the contract

Page 23: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

23

Concession Contract - existing models -

Types of Concessions: construction, exploitation and maintenance of gas

pipeline reconstruction, modernization, maintenance and

exploitation of gas pipeline construction, exploitation and maintenance of

underground gas storage reconstruction, modernization, maintenance and

exploration of underground gas storage conduction of activities of public interest B.O.T. system...

Page 24: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

24

Concession Contract - existing models -

Characteristics: complex procedure precise procedure tendering procedure is being applied for selection of

grantee grantee have to establish concession company concession contract may be valid for the maximum

period of 30 years transfer of new energy facility into state property is

obligatory after concession expires

Page 25: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

25

Model - Concession Contract

grantee concessioncompany

bank(credit

contract)

tender bid

contractfor international

sale of equipment

foundingcapital

credit forfoundingcapital

Modality 1:credit

for assets

Modality 2:credit for

assets

gas pipelineconnection

Page 26: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

26

Model - Concession Contract- after The Energy Law is fully enforced -

granteeconcessioncompany

bank(credit

contract)

tender bid

contractfor international

sale of equipment

foundingcapital

credit forfoundingcapital

Modality 1:credit

for futureequipment

Modality 2:credit for

equipment

energy licence- Energy Agency

responsibility

gas pipelineconnection

Page 27: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

27

Notes

one additional procedure for development of energy facilities that are required to secure reliable energy supply is envisaged by the Energy Law

development option should be tendered by the Government of Serbia

Page 28: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

Barriers for investments

Page 29: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

29

Barriers for investments

inconsistency between some applicable Laws

high level of administration discretion rights in

decision making process

lack of secondary legislation

certain steps to overcome these problems are envisaged

Page 30: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

Conclusions

Page 31: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

31

Conclusions

Concession Contract - the most precise procedure

Assignment Contract - avoiding tendering procedure, shorter procedure, transfer of energy facility into state property is not envisaged risk of changes in legislation

Investment in daughter company of SOE - the shortest procedure, risk of changes in legislation

Page 32: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

32

Applicable Laws

Energy Law Law on foreign investments Company Law Law on State-owned enterprises and activities of

public interests Concession Law Law on pipeline transportation of liquid and gaseous

hydrocarbons

Page 33: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

33

Resume

investments in construction of gas pipelines and gas underground storage

existing models:– Investments in daughter company of SOE

– Assignment Contract

– Concession Contract

barriers for investments conclusions applicable Laws

Page 34: - legal aspects - Investment opportunities in natural gas infrastructure - legal aspects - MINISTRY OF MINING AND ENERGY RUPUBLIC OF SERBIA: Branislava

34

www.mem.sr.gov.yu

dr Branislava Lepotić Kovačević

[email protected]

Aleksandra Babić

[email protected]